The Weir Group PLC (WEIR) Earnings Call Transcript & Summary

October 8, 2021

London Stock Exchange GB Industrials Machinery earnings 29 min

Earnings Call Speaker Segments

Operator

operator
#1

Hello, and thanks for joining us today. Welcome to the Third Quarter Trading Update Call for The Weir Group PLC. <<operator_script>> I'd like to let you know that this conference is being recorded today. <<operator_script>> At this point, I'll turn the call over to Jon Stanton, CEO of The Weir Group, who is your speaker today. You may proceed.

Jon Stanton

executive
#2

Thank you, operator, and good morning, everyone. We really appreciate your joining us for this update on such short notice. As you're aware, the group is right now dealing with the fallout from a sophisticated ransomware attack. My team moved quickly, decisively and firmly to shield the business from this attack, and I'm extremely proud of how they responded. I'll share with you as much detail about the incident as I can this morning, while keeping in mind that this is a criminal act and a thorough forensic investigation is under way, carried out in cooperation with intelligent services and the relevant regulators. Because of this update, we've moved up the publication of our third quarter IMS, and we did so as soon as we were able to quantify the possible financial impacts stemming from the consequences of the attack. Although the cyber incident had no effect on order demand, which was very strong in Q3, it has disrupted our operations across the world, and I'll return to describe that impact shortly. Most importantly, none of this diminishes in any way our confidence in our strategy and in our ability to achieve the 3-year growth and margin ambitions we set out earlier this year. Let me begin with a summary of the third quarter, in which the group saw very strong demand across our markets.

Jon Stanton

executive
#3

Mining and infrastructure markets are both thriving. Mining is being supported by commodity prices that stay well above incentive levels—especially for the group's key exposures: copper, iron ore, and gold. Our mining customers are still sharply focused on getting the most production out of their assets and steering clear of downtime, and our strong order trends show that. Mine site access has generally gotten better, though problems continue in certain markets, and travel restrictions are still a drag for us. Operationally, supply chain inflation along with freight and logistics complications haven't eased since our last update, yet we've kept fully offsetting their impact. All in all, group orders for the third quarter rose 31% year-on-year, with original equipment climbing 71% and aftermarket gaining 21%. Let me now add a bit of detail on each division, beginning with Minerals. In that division, original equipment orders came to GBP 129 million, a 71% year-on-year increase, which reflects strong conversion of our pipeline into firm quotes. Those orders mirrored the very active markets for smaller brownfield and integrated solutions, including projects tied to sustainability. We booked solid orders for HPGRs and GEHO pumps—our longer lead time products—while demand was also robust for the mill circuit product range. For some extra detail: the 2 largest orders this quarter were GBP 6 million and GBP 5 million, followed by a long tail of smaller project wins.

Jon Stanton

executive
#4

As you may recall, the first quarter had the Ferrexpo order worth GBP 36 million, while Q2 saw the APAC dewatering order at GBP 33 million. The sequential underlying OE trend is therefore quite favorable, and we anticipate OE orders staying robust over the next several quarters. Aftermarket orders came in at GBP 262 million, a rise of 16% year-on-year, which mirrors strong activity levels everywhere and aligns completely with what we expected sequentially once multi-period orders are stripped out of the Q2 comparison. Revenue in the Minerals Division took something of a hit from the cyber incident, which I'll address in a moment. Moving to ESCO, orders there totaled GBP 137 million, 36% higher than last year and marking a fifth consecutive quarter of sequential improvement from the trough in Q2 2020. ESCO has now surpassed its prior record quarter, Q2 2019, a time when customers were pulling forward a substantial amount of business. For Q3 of this year, we expect mining GET growth rates to speed up as machine utilization kept climbing in line with expectations. Growth rates eased in infrastructure, mirroring the OEM's slowdown in output of new construction machines, yet they stay at high levels. Mining attachments and other capital products, including large mining buckets, likewise experienced robust demand, as we gained from extending ESCO's product range into neighboring markets and regions.

Jon Stanton

executive
#5

We saw strong sequential revenue growth too, as the H1 order book converted. Now to the balance sheet. Net debt as of the 30th of September came in a bit above the figure reported at the 30th of June 2021, which was consistent with what we expected and mirrors typical seasonal trends. To sum up, Q3 performance has left me quite pleased. Order intake was extremely strong. Given a broad pipeline of opportunities, I anticipate that carrying into Q4, and at this point that's highly encouraging for the year-end order book and, in turn, how we expect to perform in 2022. Now let me address the cyber attack. It began when our IT security monitoring systems picked up suspicious activity on our network during the third week of September. Intrusions of this kind occur occasionally. As we normally do, we promptly brought in our external partners to give a fuller assessment of the risk and the response needed. It soon became evident that this was a deliberate ransomware attack, both large in scale and sophisticated, demanding a very rapid and forceful response to safeguard our data, systems and networks. That meant requesting that all employees using a Windows computer shut their devices down, taking most core applications offline — our ERP and engineering systems among them — and cutting every data link between our applications as well as from those applications out to the internet.

Jon Stanton

executive
#6

We think that fast yet drastic step was essential to keeping the incidents contained. Right now, we have found no indication that any data was exfiltrated or encrypted. Obviously, this wide-ranging reaction has affected our business. Our employees had to adjust rapidly, and the manner in which they did that has been outstanding. Voluntarily shutting down its digital systems and going lights-out is not a simple thing for an engineering and manufacturing company, but our teams began solving problems right away and came up with workarounds that reduced any effect on our customers — manual dispatch and invoicing of finished goods and a return to paper drawings, for instance. Since those first steps contained the threats, our focus has been on bringing systems back, giving priority to the applications that matter most to the business, like our ERP and engineering software. And although we are not yet at full capability across those systems, our progress is excellent. Other back-office applications are coming back on a priority basis, and we have a clear plan to have most of them online again in the coming weeks. But we wanted to make sure that, as we restore systems, we do it safely, securely and in a manner that makes our IT infrastructure even more resilient.

Jon Stanton

executive
#7

Because of that disruption, roughly GBP 50 million in revenue we had planned for September moved into the fourth quarter, since we couldn't dispatch from a number of sites, and we took overhead under-recoveries in manufacturing and engineering. Although most of the September revenue we missed should be billed in Q4, the knock-on effect on our core business processes will push some Q4 revenue into 2022, especially in minerals, given the complexity of its engineering and supply chain functions. We're also likely to see additional overhead under-recovery through October. And by year-end, we will have incurred incident management costs stemming directly from the cyber attack of about GBP 5 million. Consequently, the group now anticipates full year PBTA in the range of GBP 230 million to GBP 245 million. And though there is some uncertainty about the precise impact, we view the low end of that range as a worst-case scenario, and we expect the profit impact to be broadly split between GBP 10 million to GBP 20 million from delayed revenues and GBP 10 million to GBP 15 million of overhead under-recoveries, together with the GBP 5 million of direct costs.

Jon Stanton

executive
#8

To wrap up, I'd like to go over what I see as the main points coming out of Q3. Our strategic focus is clear. We're winning in the markets where we operate, and the business has once again shown how resilient it is. Our markets are very active, and that gives us a platform for strong growth over the coming few years — beginning with 2022, which now looks really encouraging. Over the medium term, the cyber event does nothing to shake our confidence in the potential of where to execute strongly against its strategic aims and to deliver on the performance goals we set out earlier this year: growing faster than our markets, expanding margins by 150 basis points, strengthening the balance sheet through more predictable cash conversion and, of course, delivering on our sustainability commitments. So thanks for listening. John and I would now be glad to take whatever questions you have. Over to you, operator, please.

Operator

operator
#9

<<operator_script>> Our first question is from Arsalan Obaidullah at Deutsche Bank.

Arsalan Obaidullah

analyst
#10

Just 2 quick questions. First, regarding the cyber attack. Just to understand — clearly, with respect to this occurring again, and also the preventive steps to make sure it doesn't repeat itself, what actions are being taken to sort of ensure this is a one-off? Is there sort of a system upgrade, and sort of things that would indicate how it happened? I mean, to be honest, I'm not sort of familiar with these matters — these incidents occur fairly regularly. And often they simply don't penetrate the system. Nothing with sort of infrastructure, and also, defensive management will mitigate them. And then the second question is just to clarify on the orders for the year. I think sort of previously, you suggested sort of in terms of original equipment in minerals, sort of you only spoke about if you strip out sort of 2 large orders, you're looking at sort of typically a flat H1 to H2 sort of order level. Is that what you're saying? Would you actually say now the base orders are probably a bit higher? And similarly, on the ESCO side of things for orders, I sort of had an idea for a similar growth in second half versus the first half as an organic growth.

Arsalan Obaidullah

analyst
#11

I guess what I'm really asking is whether that's still roughly the level you're aiming for and steering toward?

Jon Stanton

executive
#12

Yeah, as far as the network incident goes, we've brought in world-class advisers like Microsoft to help us handle it. They're saying we're doing everything the right way. Our approach from the start was to defend and contain the problem, then rebuild very, very carefully and cautiously so we know all our systems are clean and ready to move forward. So to the best of our knowledge, it's been fully contained. No data has been lost or encrypted. And like I said, our advisers tell us we're handling the rebuilding process exactly right. So obviously we're being very cautious, but I'm very happy that we're in a good place. The business has responded really well, especially the IS&T team — the way they've managed this incident has been extraordinary. So we feel good that as we come back online, we're doing all the right things. When it comes to orders for the full year, I think, yes, for Minerals, we clearly feel very good about the pipeline of opportunities in front of us. Early on, it can be lumpy. So there's a strong pipeline of small opportunities, which is consistent with what we saw in the third quarter, but some larger opportunities could come through as well.

Jon Stanton

executive
#13

I'd anticipate the fourth quarter being roughly in line with the third quarter, assuming no bigger projects land that would give us an extra lift. So the pipeline, I'd say, is extremely strong. And it's going — this is a run rate business, so you really need to focus on the trends you've observed in Q1, Q2, and Q3. It could ease a little in the fourth quarter as Christmas shopping comes in and so forth. But the real driver is the activity we're seeing in the field. And as we've seen across the past few quarters, mining machine utilization has risen steadily — from the roughly 80% utilization we had during last year's COVID peak, we're now approaching max utilization. So that's really showing up in the orders. From here, ESCO is about what more we can do to speed up growth, which means broadening the product line and broadening the geographies where we operate. We saw the benefit of that in the third quarter, and we expect to keep being able to do so as we move toward the end of the year.

Operator

operator
#14

And your following question is from Andrew Douglas at Jefferies.

Andrew Douglas

analyst
#15

I have three quick questions, if I may. First, could we discuss any possible effect on 2022? I understand that hopefully every one of your systems will be operational again by year-end. And from what I gather, guidance assumes essentially no impact next year. May I just confirm the GBP 5 million of costs you are bearing? Will that annualize into GBP 15 million or GBP 20 million next year? Or is it a short-term one-off? That is my first one. My second concerns getting things back online. I understand the ERP system, along with your engineering and manufacturing, has to be brought up so that you can operate as a proper business. Why is the noncore taking longer? Are those on separate systems? Do they require different approaches? I am just wondering that how to maintenance?. And my third question is about ESCO. At the half-year you guided to a lower margin despite the top-line growth, owing to the cost structure. Does that remain the case? Is a lower margin still expected in the second half?

Jon Stanton

executive
#16

Okay. Well, on the ESCO margin question, I’ll direct that to John. Regarding 2022, our new building blocks — well, first of all, with the order terms we saw in Q2 and Q3, we feel really good about how the order book is developing as we head into the start of next year. And again, we expect strong orders throughout Q4. So we’ll enter next year with a very solid order book, and to the extent that any shipments are deferred, any revenues are pushed into 2022, then clearly that’s an added benefit for next year. The GBP 5 million is a one-off. So that’s the specific cost of handling this event — the money we’ve had to spend on our advisers, consultants, and the cost of containment and restoration is GBP 5 million, not the total cost we expect to see through the end of the fourth quarter. And then next year, that should drop away.

Andrew Douglas

analyst
#17

All right, so after the total, there's no significant rise in your cybersecurity costs along the central line, right?

Jon Stanton

executive
#18

No, no. Let me back up a bit. What we've been doing — we're roughly 2 years into a 3-year program of major upgrades across our networks and infrastructure. And honestly, without the improvements and investments we made over the last 2 years, we'd be in a far worse spot than we are right now. So we're clearly reaping the benefits of that investment. And at this point we're essentially pulling the final year of the program forward into the fourth quarter of this year. So by year-end, everything will be fully installed. The upgrade program is basically complete at this stage, and we can go forward with confidence. As for how the systems are coming back online, as I mentioned in my remarks, the connections among all our applications and systems were severed to stop ransomware from spreading through the network. So bringing them back has to happen on a prioritized basis. And if you consider our new ERP system, such as SAP, where we stand right now is that we've restored core functionality. But the SAP system carries a multitude of integrations with things such as time recording, payroll, purchasing systems, customer EDI.

Jon Stanton

executive
#19

So we restore the core system, and then gradually we layer those applications back on and rebuild the integrations. And again, on a prioritized basis. So by the end of this month, the core platforms will be fully operational, and then we'll bring on the less important ones, as things currently stand, over the balance of the year. But by the end of this month, the core platforms will be fully operational. And that will let us operate broadly as normal. John, the ESCO margin point.

John Heasley

executive
#20

Yeah. On ESCO margins, you're completely right. Nothing has changed versus what we told you at the half-year about how margins feed through, for the reasons we went through then. So we began reducing margins in H2 compared with H1. Naturally, the one-off costs we're discussing here tied to the cyber incident are partly going to sit inside ESCO, and that will obviously affect the margin on a one-off basis. But the key thing, I'd say, is that on an underlying basis there is no change at all to our medium-term margin targets for the group and for both divisions, apart from these one-off costs this year.

Operator

operator
#21

Moving on to the next question, which is from Mark Davies Jones at Stifel.

Mark Jones

analyst
#22

It's clear you faced some quite particular difficulties in the last few weeks. Still, I'd like you to expand a bit on the broader issues, since we keep hearing from various folks that problems with supply chain logistics are not just failing to ease—in certain respects they're becoming harder as we move through the latter part of this year, and there appears to be a widespread belief that this will persist even longer, into 2022. So do you expect that to remain a headwind next year, both regarding your capacity to deliver on schedule and regarding any extra expense? Or do you feel sure that you can pass along all of it and manage those headwinds?

Jon Stanton

executive
#23

Mark, yeah, look, I think we've handled those challenges really well so far. So when I think about inflation, we moved quickly to pass price increases along to our customers. That contributed to the strong margin performance in the first half of the year. Obviously, inflation has kept rising in — for some of our inputs, but we've kept responding to it through mitigation, through passing pricing toward customers where appropriate, adding surcharges for freight. So I think we've stayed ahead of the curve, and I feel very good about our ability to mitigate that. Clearly, the general point about supply chain constraints and shortages and logistics is a headache, has been, but I think we've put a huge amount of time into managing that, project managing supply chain, expediting from a project point of view. And again, I think the team has done an amazing job when it comes to mitigating that. So I — like you, I think it's not — I agree, it's not getting any better. And it feels to us like we could be in a sort of situation through Q1. Hopefully, Q2 next year would be my best guess of where things start to alleviate.

Jon Stanton

executive
#24

Still, we've completely offset the impact of those difficulties, and I anticipate that we'll keep being able to do so going forward.

Mark Jones

analyst
#25

Great. And a quick follow-up. With all the macro nervousness out there right now, have you noticed any shift in how customers are behaving, especially in China? Any indication that margin customers are hesitating on projects? Or is it still full steam ahead?

Jon Stanton

executive
#26

From my perspective, Mark, it's full steam ahead. Iron ore prices have obviously dipped somewhat. In my view, China has responded since we weren't willing to tolerate where prices had reached, and a correction is needed. That correction is underway, but I don't believe it alters the fundamental demand outlook for the commodities we're exposed to. I'm still bullish on the level of CapEx coming down the pipeline from our customers. And we definitely see no shift in their intent to push through some of the projects that must happen to keep demand and supply balanced. So no change.

Operator

operator
#27

Moving on, our following question is from Vlad Sergievskii with Bank of America.

Vladimir Sergievskii

analyst
#28

Could you speak to how big the revenue hit is? I mean, GBP 50 million works out to about 9 days of revenue. You mentioned the attack occurred in the latter half of September. So does that imply the business brought in comparatively little revenue during the final 2 weeks of September? Or should we think about it differently? Second, on cash flows. It appears these attacks had only a minimal effect on cash flows in Q3. Do you expect that cash flow impact to show up in Q4 instead? And finally, on leverage. Given these weaker earnings, is there a risk that net debt-to-EBITDA at year-end will rise back above the targeted leverage for you guys? And if so, would that affect how you think about the data?

Jon Stanton

executive
#29

Vlad, I believe there are 3 questions there for the CFO. Actually, John, would you be alright taking those?

John Heasley

executive
#30

Okay, sure. Vlad, on the size of the effect — yes, you're correct, GBP 50 million is roughly 2 weeks of revenue. So obviously there isn't an ideal way to phase revenues evenly, but that gives the general magnitude. And as we mentioned when we discussed this, we expect it to be recovered in Q4. But as we approach the end of the year, then clearly, with the system disruption, the GBP 10 million to GBP 20 million profit impact from potential revenue slippage into 2022 — that is roughly equivalent, that's between 1 and 2 weeks. That just gives you a sense of the kind of revenue scale, at least, that we're discussing. It isn't significant in the context of the quarter ahead. On cash flow, net debt was slightly higher at the close of Q3, consistent with our expectations. And as we move toward year-end, then clearly, to the degree the profit impact we've flagged materializes, that will clearly carry through and affect leverage to some extent. But following on to your third question about leverage, our target of 0.5 to 1.5x net debt to EBITDA — we stood at 1.6 at the end of June.

John Heasley

executive
#31

Obviously, our goal was to finish the year under 1.5. With the extra cost we're taking on and the possible revenue slippage there, that might have an impact of roughly 0.1 or 0.2 on leverage, and we were still heading toward that mid-1s level by year-end. Given how complex the systems are, it's clearly hard for us to be tremendously precise about that right now, but that's roughly the order. And given how strong our liquidity is and our comfort with the balance sheet and underlying cash generation right now, while it's clearly a Board decision as we reach the end of the year, I wouldn't expect that to have any negative impact on the dividend.

Operator

operator
#32

And our last question is from William Ashman at JPMorgan.

William Ashman

analyst
#33

Honestly, every question I had has been addressed. So I really appreciate you giving us the time.

Jon Stanton

executive
#34

All right, thanks, William. Okay, we'll bring it to a close there, if that's fine with everyone. There are matters I need to see to, as you'd expect. Still, I really appreciate everyone joining on such short notice. It's been a deeply irritating set of circumstances, though it's merely a temporary setback — one the business has handled extremely well and will keep handling. Our outlook doesn't shift at all: we remain positive and confident about what lies ahead for the business. And as I mentioned, with an eye on 2022, the order book is building up very, very nicely indeed. So we feel good about what's achievable next year. Thanks once more. And of course, if any follow-up questions come up, please reach out to Stephen. Thank you, everyone.

Operator

operator
#35

That brings us to the end of today’s conference. We appreciate everyone joining in. You’re welcome to disconnect now, and speakers, please remain on the line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete The Weir Group PLC transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to The Weir Group PLC earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in The Weir Group PLC or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.