Operator
operatorGood afternoon, everyone, and welcome to the Thermax Limited Q2 FY '27 earnings call, brought to you by DAM Capital Advisors Limited. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Mr. Kunal Shah of DAM Capital. Thank you, and the floor is yours, Mr. Kunal.
Kunal Shah
analystGood afternoon, everyone. Welcome to Thermax Limited's 2Q FY '27 earnings call. Joining us from management today are Mr. Ashish Bhandari, MD and CEO, along with Mr. Arunachalam, Group CFO and Executive Vice President. Right now, I'll turn things over to management for their opening remarks, and after that we'll open it up for Q&A. Thank you, and over to you, sir.
Ashish Bhandari
executiveThanks a lot, and a really warm welcome to everybody joining us today—and a very happy <<inaudible>>, and happy Diwali too. On the numbers, I'll keep it very short. We can simply take those up during questions. I expect there will be plenty of questions given what we've released. As far as the numbers go, nothing unusual. I'd love to share a bit about what's happening underneath, which has been visible and keeps giving me enormous optimism and positivity—not only regarding the backlog but also regarding the potential across multiple businesses. And through the questions, I'll go through each sector we have, since there's plenty to discuss in every sector. Rather than delivering a monologue myself, let me work through all the questions. As I did last time, I promise to stay well beyond the hour or so we have together. We can continue until 12:30. That way, through your questions, I can make sure everything I need to talk about gets shared. Thank you. We can go right into questions.
Operator
operator<<operator_script>> Our initial question comes from Atul Tiwari at JPMorgan.
Atul Tiwari
analystSir, my question concerns order bookings and order inflows for this quarter. They're down 8% year-on-year. Even in the first quarter, we were kind of flat year-on-year. So how does the outlook for order inflows look over the next 3, 4 quarters? Can we hope to achieve, say, mid-teens kind of growth in order inflows, given the pipeline on a sustainable basis from here on? Or is more like a single-digit growth more likely?
Ashish Bhandari
executiveNow, on orders — I'd say this quarter wasn't too bad, and I'll explain why that's the case, because you'll recall that a year ago we had those big utility boilers, which were pretty substantial in terms of international orders. This time around we also had something large, though not quite as dramatic as what we saw last year. So even with some of that environment stuff, the orders we picked up demonstrate the overall health we have across the board. And you'll see that pickup begin to show more prominently in Q3 and Q4 as well. The question then becomes: is it single digit, or is it double digit? I think either of those scenarios is possible. I'll hold off, because there's just so much going on in the environment we're in that committing to an absolute number right now — somewhere between those two numbers is where I'd be. Where we end up landing will depend on customers agreeing to absorb some of the pricing, which is very real in the market. Some of the — it's just — I guess that's the biggest driver more than anything.
Ashish Bhandari
executiveThere's a small piece about how the U.S. data center market is moving as well. So there are several moving parts here. We will grow versus last year — that much I'm confident about. And as we know, last year was a big jump for us; crossing that INR 14,000 crore threshold was a major one from a backlog standpoint. And then to keep growing on top of that number — I think that's something we're confident about. Whether it's double digit or not, I can't say, because for double digits you need some big projects to come in, like really big projects. And that I want to see actually done, and then come and announce and share. Yes, the possibility definitely exists.
Atul Tiwari
analystAnd sir, my second question is clearly about margin. I mean, margins have been squeezed. We understand the reasons well. But all those costs on brands, impairment and so on that had to be taken — have they all been taken and finished with? Or are some still pending? And the second part, obviously, is can we hope for, say, a high single-digit margin to be sustained at least?
Ashish Bhandari
executiveThe final piece of the response is a definite yes. Beyond that, I believe that for at least 2 quarters, our performance ought to be even stronger than that. I'll use this moment to outline the 3 areas we're currently addressing. Sure — in no specific order, though we had big — these sizable orders we've discussed, which are mainly the FGD orders and government orders carrying loan duration. And a number of these are projects that are, I mean, the project we're finalizing at this moment is in its 8th year. Yes, that order was originally booked in 2019, and it's now being cleared from our system. So at this stage, what's left is becoming progressively smaller. And in practice, as I've mentioned previously too, by the close of this year, the sole project retaining a meaningful volume of work will be the single project we're carrying out in Assam. It's the very project we took a hit on in Q1. And that project at present, as I noted, has all engineering finished, with everything else wrapped up. What remains is solely the construction portion.
Ashish Bhandari
executiveNothing this quarter raises any worry for me that the hit we absorbed in Q1 was inadequate, or anything along those lines. We also expect to make changes with some of our customers, and that margin won't be recognized by us. We'll hold that within the execution scope for the rest of that project. That therefore means we had HRRL, which was likewise INR 500 per order, picked up by us in Q2, and that is now fully done. All of HRRL concluded in Q1. What remains now is change orders, which we anticipate will come back from the customer, since we have very solid grounds that we hold change orders and a certain claim against the customer that needs to be presented. So anything that does show up will land on the positive side. Regarding the FGD projects, there is one project that is being completed — it actually was completed last quarter, and we took — so across Q2, Q3, Q4, practically all of the FGD work will also be finished this year. Some revenue recognition will occur at the start of next year, but every bit of mechanical completion, all of it, will be done this year.
Ashish Bhandari
executiveSo that's on the large project side — it's simply stuff we're flushing out of the system. Over the past 3 years, nothing we've taken on worries me. Execution on the supercritical one also continues to be good so far. Our margin is holding on the international projects despite some of the price moves and the commodity price increases. We've continued to hold internally. I don't see a concern — last quarter, we had shared a table on how our projects look as well. That project, a similar look would hold. The second area has been FEPL, which is our renewables business. This is a business where we've taken consistent losses that have been high — relatively high. And even in Q2, we took a loss against basically — we have a project in Tamil Nadu, which is significantly high CapEx where after the — and the entire project is up, which means the machines are up, the stringing is up, transmission is up. It's just waiting — I was waiting on government approvals, which during the government change, they just came and stopped approvals of the previous government or whatever may be the case. So some of those delays, which were very difficult to fathom before.
Ashish Bhandari
executiveAnd as you're aware, we're examining — we've made a commitment to bring in a growth partner for this portion of our business. And the third remaining business is TBSPL, where, as we've mentioned, we're in the process of completing multiple PGTRs. We had 6 PGTRs that were of concern, and three of those are already out. Two of them relate to <<inaudible>>, and those are among the tougher ones, which would go into PGTR; they've been delayed due to monsoons. Our customer wasn't able to bring the feed required to execute these projects, and they will go into PGTR imminently. So I'm being very open in sharing which areas have potential looks for me, and I'm quite openly sharing what the future holds for each of these portions we're working through.
Operator
operatorThe next question comes from Shirom Kapur at Jefferies.
Shirom Kapur
analystI have a quick question about your order bookings. You also noted during your presentation that a few sizable orders had been pushed back. In your interview this morning, you referenced an export order worth INR 100 crore that affected your order flow. Yet looking at domestic order flow, it appears somewhat lower Y-o-Y. So could you say a bit about industrial products and the order flow—how do you expect it to develop going forward? Are there any major orders in the pipeline?
Ashish Bhandari
executiveOkay, let's break this down in tomorrow morning's interview. I was discussing the revenue side. Orders weren't what I meant, and that person brought up orders, though they also brought up margins. So — and I attempted to make it clear, but I don't believe I explained well that I — this wasn't an orders push and INR 100 crore orders per share, or that's not something I would bring up. The revenue side was what I was addressing. Regarding orders, so for industrial products, which is where you'd notice that after quite some time, there was a minor pause in the reduction of orders. It was entirely temporary in October itself and has reversed out, and you'd see industrial products domestically showing a strong jump in Q3 itself. And a substantial portion of it is even in October itself, we've had some of those that moved from SIP from September to October, nearly all of it has come in. So that INR 300 crore gap in orders that you observe in industrial products in Q2, you will see it being made up in Q3 itself. So I don't see any concern on domestic demand.
Ashish Bhandari
executiveFor our Water segment, we've raised pricing substantially on both water and chemicals, since those are the two areas where commodity effects are <<inaudible>> the largest. So there, customers are feeling some impact — delaying decisions a little or not doing their refills on the services side as quickly as they would, which is also just a matter of timing. But eventually, these are all businesses where customers have to make a decision.
Shirom Kapur
analystOkay, continuing with the question about commodity costs from here. So what's your view on the outlook? Could you provide additional detail regarding how commodity costs are affecting the industrial products business, particularly in areas where margins have declined? So could you share more detail on how you expect this to unfold going forward? Is it — has the cause of the decrease been that customers aren't accepting the price increases? Or has inflation come in above what you anticipated, and where are you seeing the greatest impact, and in which commodities? If you could just offer more detail on this whole commodity situation.
Ashish Bhandari
executiveLet me handle the second question first, and after that I’ll address industrial products along with the margins piece specifically. Commodity costs rose in February — right at the moment when things happened. Yes, essentially as soon as the war broke out, practically every commodity moved up in the short term. And for us, first of all, steel has a big effect, both on plates and pipes and even on <<inaudible>> tubes. Every one of those rose — depending on which commodity you’re looking at — by 10% to 15%. Then copper and aluminum. Aluminum has since eased somewhat; copper — and we don’t — copper doesn’t hit us directly, but we purchase a great deal of electrical equipment, so motors and generators and all of that, which you buy as part of our solution set, are bought out for us. There, prices climbed rather significantly. And finally, crude and derivatives accrue. So crude derivatives would be PVC, plastics, and in our chemicals business, Styrene. Styrene is a crude derivative, yet it’s affected not only by crude but also by availability itself, since Styrene comes from plants in the Middle East and plants in China. So Middle East supply has dried up, and in some cases plants have shut down or are at least running at much lower capacity utilization.
Ashish Bhandari
executiveSo crude prices aren't the only thing hitting them — what happens with supply itself hits them too. Then, on our industrial products business, commodity prices played a role in the impact on industrial products, but a larger factor was that we had goods manufactured that we couldn't ship here. So for any plan, and particularly plants where you've got the base cost of the plant itself — if you come in short of the revenue number because the product is sitting in inventory, the margin hit isn't merely a direct margin. As you can imagine, you also get a double impact, in effect, because the factory's cost isn't being covered. And then there's a third act: a lot of your international orders are comparatively more profitable. And as you can imagine, with the rupee depreciating, even when you hedge, those orders become only slightly more profitable from the moment you gave the quote to the moment the customer places the orders, and that's because they're all denominated in dollars. But all three of these — the second portion, which is the inventory sitting on the books and the margin out there, the effect on the base cost and the profitability, the extra profitability since these are international orders.
Ashish Bhandari
executiveEvery one of these is a timing effect. What you’re seeing in Q3 — and Q2 as well — is a substantial impact, and it will begin to actually show up. I’ll add a fourth item here too, and that’s inventory, which sits in Water. Right. So take our data center project for the U.S. as an example, and our Chemicals business to the U.S. — the war in the Middle East doesn’t hit them as much, but the time ships need to reach the U.S. does affect them. So — and until we deliver to the customer in the U.S., we can’t recognize revenue, because we sell to our local entity in the U.S. So all four of these parts are timing impacts, yes, they will — Q2, a good chunk will show up. And as things normalize between Q3 and Q4, and that is assuming things normalize, of course. The part that is — that has been — that is the commodity cost increase, which for industrial products was on the order of roughly between INR 10 crores and INR 15 crores for the quarter. That also will come down in amount. Q2 was the worst.
Ashish Bhandari
executiveThat amount will come down as well. But we'll carry that impact into Q3 and somewhat into Q4. The absolute amount will decline each quarter, assuming conditions don't deteriorate beyond what they've already been. And so far, the indications are that things will normalize going forward. So I think I've answered your question in quite a bit of detail, with specific numbers and specific insights as well, yes?
Operator
operatorOur next question comes from Parikshit Kandpal, who is on the line from HDFC Securities.
Parikshit Kandpal
analystLet me start with the U.S. market. Could you help us get a picture of how the data center pipeline is shaping up on <<inaudible>>? In the past we've talked about this, but <<inaudible>> no new orders have come in. So on both the Cogent side and the RAS side, can you help us understand whether opportunities are piling up?
Ashish Bhandari
executiveWhen it comes to data centers—both in the U.S. and India—our lineup of cooling products keeps building a foothold. During Q2 we booked an order in India, and in Q3 we'll land another sizable cooling order there as well. The encouraging piece, at least, is that this product portfolio is beginning to take hold. On the U.S. side, I've felt let down regarding both orders and revenue. Let me address each of those separately. My disappointment doesn't stem from any lack of product fit or from seeing no opportunity pipeline. As a matter of fact, that pipeline grows more concrete with every passing quarter. The projects—and their size—keep expanding and getting more exciting wherever we're engaged. What has let me down is the timing of all this. Across every project, we watch things slip to the right, and that's entirely because of U.S.-specific factors—namely, data center projects where some piece of the puzzle, driven especially by local environmental clearances and local approvals that come from authorities and get billed, keeps getting pushed back. So things simply continue sliding to the right, which is, naturally, disappointing.
Ashish Bhandari
executiveWhat's available in the market keeps growing larger, however. So I remain quite open-minded, though compared with our last conversation, I'd say nearly every project we were involved in and working on would face a delay of at least 1 to 3 months. That slippage has even appeared in the revenue cycle — for instance, in Q2 we had anticipated the first data center project, the one for the U.S., would ship out entirely in Q2, and it has shifted from Q2 into Q3, with a small part in the medium portion landing in Q4, entirely because of how the customer's project got delayed. NBD wanted it up and running sooner so we could showcase some of our capabilities. Having said that, we are going deeper into the customers' design specification for more and more projects in the U.S. So as those projects complete their funding and move through their ordering cycle where Thermax stands, that portion makes me more and more excited. As for the India portion, while the pie is comparatively smaller, a typical order runs only between INR 40 crores and INR 100 crores.
Ashish Bhandari
executiveThat segment still shows activity in 2Q, and we landed an order in India. In Q3 as well, we've already closed another order, and we're seeing ongoing activity from them.
Parikshit Kandpal
analystRegarding the U.S., you mentioned pricing in India is roughly INR 40 crores to INR 100 crores — what would the order price typically look like there? Is that understanding <<inaudible>> limited to folding products only? But for the U.S., could you help us understand the opportunity in terms of order size, for both the cooler <<inaudible>> opportunity?
Ashish Bhandari
executiveSo the boiler portion, all of that would be in the hundreds of crores, in the U.S.
Parikshit Kandpal
analystAnd what about cooling?
Ashish Bhandari
executiveNo, I mean cooling. Boilers too, plus cooling. There would be fewer boilers, though each one larger in size, while cooling units would be greater in count — and that also runs into hundreds of crores.
Parikshit Kandpal
analystAnd is there any particular sense of what the opportunity or bid pipeline might be in the U.S. that you're currently selecting, so that kind of bid value <<inaudible>>?
Ashish Bhandari
executiveThe figures involved are substantial, and based on what we've accomplished so far — I'd point to the initial order we received, which came in a bit above $20 million. What came back to us was a medium-sized project, small to medium in scale. It wasn't among those medium- to large-sized data centers, and in that scenario you'd be looking at potentially several times what we did on that first one. So — and since — I think the only thing I can really say is that the numbers are large, but whatever I say will just push expectations higher than they already are. We simply have to deliver against those expectations and not — you'd be pleased with the size whenever it arrives. It's not as though there's just one. There isn't only one; there are multiple. From a timing standpoint, I suppose, you're already bringing up Q4. As I've said before, I'd be disappointed if we don't land one, and my expectation was two within the year. I think I'd be — I'd say that, where I stand right now, closing one within the year looks more likely, possibly more than that. But compared with when we last spoke, I'm somewhat more pessimistic on the timing side, and more optimistic regarding the size of the overall opportunity.
Parikshit Kandpal
analystBut <<inaudible>> — you've come through. What I mean is, we feel pretty sure about that cut...
Ashish Bhandari
executiveWe're well beyond confident — we're now moving into design specification work for several of the largest names in the industry.
Operator
operatorOur next question comes from Hardik Chira, who is on the line from Lark.
Hardik Chira
analystSir, I was hoping you might put the margin into figures for us. You went through Q3 and Q4 in plenty of detail. Could you simply give us a number for what margin we should expect in H2?
Ashish Bhandari
executiveMuch stronger than the first half — though that isn't saying a great deal, considering what the first half showed — and our potential scenario for the second half will hinge heavily on how much of the revenue we believe we can generate we actually manage to deliver. Let me stick my neck out here: on the revenue side, the figure we're expecting for the second half is INR 7,000 crores-plus, across Q3 and Q4, which isn't much. Yes, that's our scenario given geopolitics and how particularly low Q1 and Q2 were. So it simply assumes teens growth versus where we stood last year. Could we do even more? I believe we can. But this, in our view, rests on a scenario in which the war runs for another couple of months, et cetera. This is what we consider reasonable. If we hit this revenue, the profitability impact is quite substantial, and product line by product line, we can pull up — industrial products, for example, where we delivered early 6% profitability in Q1 and Q2. That number, you'll see, will jump to the other side of the mean very quickly.
Ashish Bhandari
executiveAnd that covers what commodity cost prices and all of that have done to us. On the -- and I'm. I'm not giving out exact figures, not because those estimates aren't available to us. But I'm sharing as many of the internal working numbers with you as I possibly can. And I'm telling you I'm extremely bullish on Q3 and Q4 without putting a specific number on it. Then the -- on industrial projects, that's where you'll see a jump that's even bigger. On industrial projects, one piece is how much we can recover through change orders from our customers, which is then the -- which is then the icing on the cake. And right now we're in a mode, especially as we wrap up these big projects, where we've got substantial claims from our customers to to come back and which all flow relatively straight to the bottom line. And in most cases, they are -- in all cases, the claims are genuine. And in most cases, there's reasonable confidence that we'll get these because we have very strong reason to get back. I can't fully estimate what that number will look like, which is why I'll hold off on giving a number on industrial projects, industrial infra specifically.
Ashish Bhandari
executiveAnd third, let me turn to chemicals, since we haven't discussed that segment yet. Chemicals is arguably experiencing the greatest upheaval in its operating environment, because this is where commodity price effects have been enormous, and a substantial portion of what it does is export. So you're up against Chinese supply and supply from around the world in this market, and India is especially hard hit in this situation. So in Q1 and Q2, we raised our prices dramatically. In Chemicals, the total effect of commodity prices came to INR 22 crores -- INR 20-plus crores, somewhere between INR 20 crores and INR 25 crores in Q1 and Q2, and most of that was offset through price increases. The net impact in Chemicals was only INR 2 crores in the first half. And crude was -- a week ago it stood at INR 116 crores-plus. And as of today, it's INR 90-odd crores. I haven't checked the figure this morning. So you can see how severely and how widely it fluctuates. And so here we are, having raised our prices considerably. We need to make sure that this holds, and that we can keep working through it. October has been very good as well.
Ashish Bhandari
executiveWe've managed to keep our price increases in place, even though a few competitors—including a couple of domestic ones—may not have raised prices as much as we did. Our prices have gone up, and we intend to keep holding a higher price level, and we expect that since these are all real costs and the same supply chain applies to everyone, others will also have to raise prices sooner or later. But so far, October has held up very well too. And I give a lot of credit to our team for managing the Chemicals business in this difficult environment. So we have done—so Chemicals have less clarity into Q4. It could be a very good quarter also if prices come down and the war slows down. If volatility continues, there's some amount of uncertainty. Q3 looks like it will be okay based on a very good October as well. Then that brings us to Green Solutions. In Green Solutions, we have three parts. One is FEPL, where we have taken losses between the first half and—first quarter and second quarter.
Ashish Bhandari
executiveEach quarter, we've posted losses. In Q2, it was a bit more than we should have had. We expect that — and at the start of the year, this wasn't the outlook we anticipated. So compared with that, FEPL is our worst outlook, and we expect that to carry on through Q3 and Q4 too. Our present estimate is that FEPL will record losses in Q3 and Q4 as well. TOESL keeps looking better and better, is doing extremely well, and has a very strong pipeline. It keeps hitting all its numbers and keeps improving. BioCNG, our third business, which brings in revenue out here — we're finishing all the PGTRs. It's still losing money each quarter, a small single digit, but that figure is declining quarter by quarter. So I think there's — Look, one part is completing the PGTR. Once the PGTR is finished, I can come back and say all the BioCNG stuff is completely done. And then, hopefully, you'll have a very good trial in orders coming into this business as the BioCNG business turns with the government price increase, which is now happening.
Ashish Bhandari
executiveThat’s how I see things for the remainder of the year, though I won’t put a very precise figure on it. I’ll simply say I’m extremely bullish, given how we’ve begun the year — though of course I can’t, on a percentage basis, match what we delivered last year, which I’d also describe as not that great. Still, we’ll close a fair amount of the gap, that’s what I’d say.
Operator
operatorNext in the queue, we have Kartik Kohli calling in from Cotistitutional Equities.
Kartik Kohli
analystYou clearly discussed how you expect margins to play out going forward <<inaudible>>. But I'd like to get a better handle on 1Q and 2Q, since on the previous quarter's call you pointed out that close to INR 300 crores of <<inaudible>> had not gone out and were weighing on the numbers. So in direct quantum terms, I just want to understand what happened in 1Q, and how much of it came through in 2Q? And what was the <<inaudible>> it can to sell basically at is bringing on margin in the product segment? That would be my first question.
Ashish Bhandari
executiveThe volume we carried into Q2 from Q1 was pretty significant. Now, what's shifting from Q2 into Q3 is a bit less than that Q1 figure, though still a sizable chunk has rolled over from Q2 to Q3. And the whole thing stems purely from — actually, let me give some context first. During Q1, the supply chain took a larger hit across the board, meaning gas was scarce, vendors lacked the capacity, and our own chain struggled just to produce things, and that pushed the number up somewhat. That's now clearing out of the backlog — take TBWES, for instance: our capacity utilization dropped considerably in Q1 owing to gas unavailability and similar issues. By Q2, that had resolved. Gas shortages are gone. Manpower shortfalls are far less common — in fact, I'd call it 0 shortages of manpower at the factories. Yes, that too is fully back to normal. What remains unnormalized? The carryforward of international projects, particularly the higher-margin international ones — that's the piece which shifted from Q1 into Q2 and keeps exerting pressure from Q2 into Q3.
Ashish Bhandari
executiveOn top of that, we had two sizable orders — one for chemical supplies and another for our cooling equipment — where the goods are already on the water, and all of those shipments carry a fair amount of margin that is sitting there. I'd rather not give specific figures, because that would mean discussing the profitability of individual orders and so on. Across all of these together, the amount is quite substantial — we're talking north of INR 30 crores.
Kartik Kohli
analystNo problem — I realize you'd rather not give figures. I was only hoping to get a feel for the size of it, since you mentioned roughly INR 300 crores on last quarter's call. The reason that matters is that you're telling us all of it has carried on and that you expect, or believe you can reach, INR 7,000 crores. So I just wanted some sense of how much of that you can lock in as you shift from 1H to 2H.
Ashish Bhandari
executiveOkay, so the shift from Q2 to what's currently in motion comes to a bit more than INR 200 crores, that's how I'd put it. At the start of the quarter, we set a target of roughly INR 3,100 crores, based on what we believed was realistically achievable given strong customer demand and so on. In the end, we only just got past INR 2,800 crores. That's the impact we're seeing. Yes, the second half was already much stronger, driven by backlog and deliverability, along with them. And then you had business. Yes, overall, if you look at what can actually be delivered in the second half, that figure is well above INR 7,000 crores. The number I'm giving you reflects what we consider practically achievable, accounting for some supply chain challenges and everything else we're facing.
Kartik Kohli
analystUnderstood, sir. I have one quick follow-up question. <<inaudible>> It relates more to the <<inaudible>> work already completed and the <<inaudible>> pipeline we are building, and I wanted to <<inaudible>> So I just want to understand how many BioCNG orders are pending right now under the PGTR exercise. And what kind of pipeline are you seeing that has been built on the CBD side following the <<inaudible>> — is there a pickup you are observing on the ground when it comes to inquiries and larger players or greater capacity to <<inaudible>>.
Ashish Bhandari
executiveInquiries have picked up nicely. The inquiry pipeline that has risen is broad-based. It comes from plenty of the smaller players who are considering 5, 10 tonne plants. And then there are some of the larger players too. I'd say these aren't the largest business houses. They're big players, though not the biggest. And we're looking at those 15, 20 tonne plants, where we have quite a few discussions that are imminent. For Q3 itself, I'd say we don't expect any orders. We do expect ordering to appear in Q4.
Kartik Kohli
analystAnd sir, regarding how many orders sit in your backlog that are right now supporting the performance for guarantee <<inaudible>>
Ashish Bhandari
executiveWe have roughly 4 — if my memory serves, 4 or 5, if my memory serves, in this case, and of those, two, the <<inaudible>> 100% <<inaudible>> ones, are, from where we sit, the somewhat harder ones. As for the rest, we're more than confident about satisfying what the customer requires.
Operator
operatorOur next question comes from Mahesh Patil with ICIC Securities.
Mahesh Patil
analystSir, just to clarify one thing — you said the revenue that slipped between Q2 and Q3 came to roughly INR 300 crores, is that right?
Ashish Bhandari
executiveBetween INR 200 crores and INR 300 crores — that's right.
Mahesh Patil
analystAll right. And sir, regarding orders, you said that as of now 2 orders have been moved into Q2 — roughly what would that amount to?
Ashish Bhandari
executiveNo, no, no. On orders, I didn't make any specific remark. What I said was that in industrial products, it appeared roughly INR 300 crores fewer orders came in compared with last year. A gap of that size, I think you'll see us closing very quickly in Q3. That's what I said.
Mahesh Patil
analystI believe during the presentation we noted that some significant orders had been deferred, so I'm just verifying that on our end.
Ashish Bhandari
executiveAre large orders being pushed back to Q3?
Mahesh Patil
analystYes. During the presentation, you mentioned order bookings in the Industrial Products segment — <<inaudible>> — with major orders primarily deferred to Q3.
Ashish Bhandari
executiveRight, that figure I mentioned — around INR 300 crores — I said we'd pick it up pretty quickly in Q3, and that's exactly what I said. It was simply a shift from Q2 to Q3.
Mahesh Patil
analystUnderstood. And sir, this morning I believe you brought up the idea of building inventory for its full size. So if you could share a little on that, and how we’re handling our supply chain given the volatility you mentioned? Yes. And sir, finally, regarding the two nonrecurring items we had, right? <<inaudible>> of the reprojected you senior <<inaudible>>.
Ashish Bhandari
executiveI believe there's some background noise. I heard impairment in the RE business. And what was the other one?
Mahesh Patil
analystThe incentive, the incentive that we have booked at.
Ashish Bhandari
executiveAll right. The incentive we have — we’ve had that incentive regularly over the last few years. If anything, and this has been included in Thermax’s numbers. Whatever the figure is year-on-year, we’ve been sharing it quite actively. Rajendran, what was the number this year — was it between INR 15 crores and INR 20 crores this quarter?
Rajendran Arunachalam
executiveRoughly INR 20 crores. That's the PSI incentive.
Ashish Bhandari
executiveThat figure was for the quarter on the supply chain? And then — sorry, what was the other question you have on the nonrecovering — I covered that on the RE business, and I've shared previously on the message as well what our outlook is for the RE business for the year as a whole.
Mahesh Patil
analystAnd sir, about what you said concerning building up inventory to handle those export orders?
Ashish Bhandari
executiveThat’s purely a matter of timing—it isn’t a worry whatsoever. It isn’t even a cash problem. In every one of these cases the customer covers the cost; in a couple of instances it sits on the books, and those customers are likewise willing to pay storage charges and so forth. So the inventory question is really about extracting the profitability from these items. These aren’t truly—and as you can see, our working capital figures aren’t poor by any means. Your working capital figures are actually fairly strong and keep holding up well. We see no cash concern. We see no collections concern. And even with the material sitting in inventory, we see no concern that customers won’t pay—in all of those cases, customers have already paid sizable portions of what remains outstanding.
Operator
operatorThe following question comes from the line of <<inaudible>> with Nirmal Bang Institutional Equities.
Analyst
analystSir, on the industrial product margin — as you mentioned, we've been running at 6% for the last two quarters. And how — has it already — we've already implemented some price increases. So right now we hold a backlog of roughly INR 5,000 crores, which works out to hardly about 3 quarters of backlog, you could say, going by last year's second-half performance. So how much of that is price-protected against the commodity price, and what price increase have you taken? And can we reach an 8% to 9% margin for the full year, or above 7% margin for the full year? That's my first question.
Ashish Bhandari
executiveIs that just for industrial products?
Analyst
analystYes, sir.
Ashish Bhandari
executiveIt’s going to land at the high end without much trouble — considerably above that.
Analyst
analystAlright. Alright. And sir — alright, and sir, you brought out the Thermax <<inaudible>> boiler <<inaudible>> during this year. So what kind of potential does that hold? I noticed some other rivals are present in that specific MMC competitor space. What potential does that product carry? And how do you view matters regarding this product and <<inaudible>>?
Ashish Bhandari
executiveAlright, let me address the first part of your question. On that first part, I actually offered commentary that was even more bullish than 7% overall for the year for Industrial Products, yes. And you can observe that with Industrial Products, whenever revenue rises, profitability climbs as well. That has been part of the character of Industrial Products, since capacity utilization at the plants increases quite substantially. Beyond that effect, which you see annually — with Industrial Products, between Q4 and Q1, the profitability you have in Q4 has typically been the largest quarter, so you can trace that line. And in addition to that usual effect, here you will see a larger effect from the margin change taking place, because some of your most profitable orders in the first half have shifted out of the first half into the second half — those being the international shipments I mentioned. So for the year overall, I am far more bullish than merely 7% as a total number for the year. We ought to be doing far, far more than 7% and certainly aiming to add close to that profitability for the year.
Ashish Bhandari
executiveAt minimum, that's the case. What we're seeing in terms of the gap is some effect—actually more than some effect—coming from commodity prices. Still, a substantial shift in industrial products generally is something I'd say is already happening, judging by what we observe. Turning to my second point, I'll walk you through new products as a whole. Across new products in general, Thermax has performed very strongly. As a matter of fact, the whole cooling portfolio you'd look at represents just one portion of that. All of our work on India cooling states amounts to an entirely new set of cooling offerings that we've brought out under the System portfolio. It isn't limited to delivering extremely high efficiency—what we refer to as hybrid CMCs. We also offer heat pumps, where certain technology we've introduced is competitive—judged on technology standards—with the world's finest, in terms of what we're capable of achieving; we can handle heat pumps up to 120 and are now aiming for 140 degrees. We also have adiabatic cooling towers included, so from a technology standpoint we're in quite good shape. Then there are Electric Boilers, which are a product range we've launched.
Ashish Bhandari
executiveWe’re now India’s #1 electric boiler provider by a wide margin. And once again, electric boilers are getting good traction. In the announcements, you’ll notice that during this last quarter we booked a gas purification order tied to green hydrogen. So that isn’t a case where we’re supplying electrolyzers—those electrolyzers come from another party. This is one of India’s most high-profile green hydrogen projects, and we’re providing the gas upgradation systems there. So within Industrial Products, we have a steady flow of new products coming to market, and they’re performing reasonably well, which is also part of why, in Industrial Products, we’re committing to growth versus last year. And overall, staying on that solid double-digit growth path is something I can state confidently. Now, turning specifically to the iboiler. The iboiler is unique—not only for India but globally. And the level of science and the number of patents behind it is something we’re extremely excited about. Put as simply as possible, if I need to explain it to you: imagine a car—a car moving through multiple different scenarios fairly quickly, meaning it goes up a hill, then something in the environment shifts, braking changes, and many, many things occur in the environment.
Ashish Bhandari
executiveRight now, every boiler is operated by hand, so a person must review an entire set of parameters and then determine which adjustments to make regarding how much fuel goes in, how much air is supplied, and how dampers, valves and similar components are positioned. Much of that ends up being a human judgment call. What we've now brought to market is an automatic boiler that learns on its own — it foresees an upcoming process change or a shift in input conditions and tunes itself very rapidly. And in practically every trial we've carried out, we've observed that relative to how customers ran things on their own, the intelligent boiler delivers a significant efficiency gain they're able to achieve. So turning to the market potential here: the broader picture, the overall scope, is what constitutes a large share of our heating boilers. We therefore estimate the addressable market size in the first batch of cities where we've launched at roughly a few hundred crores, since our total heating business stands at about — without quoting precise figures — between INR 1,500 crore and INR 2,000 crores, a substantial portion of which.
Ashish Bhandari
executiveThis capability has been introduced in one of our largest product lines. And it's premium — essentially the most expensive offering available on the market, since nothing comparable exists anywhere, not from income companies and not from anyone internationally either. So only customers prepared to pay a very high premium for this capability will get it. And in return, the efficiency they gain will give them very quick payback. We'll come back and share what the uptick is. But overall, as a family, what new products is doing for industrial products — that portion is something we're doing quite well.
Analyst
analystAlright. Alright. Sir, one final question, if I may, on <<inaudible>> — right now we're seeing some government putting together a team of community boiler. What's your take on that, and how do you expect it will affect our business down the road — positively or negatively?
Ashish Bhandari
executiveSo in two ways that works well for us, because one of the biggest companies in the community boilers space — a supplier of community boilers — actually uses only Thermax boilers. So the boiler is supplied by Thermax, and they handle the entire business as well as the servicing and all of that. In fact, that company is India's largest provider. Thermax is also able to deliver these solutions under TOESL, but only when it is 100% green. So there are certain opportunities in community boilers that we are examining. And not just community boilers — community water and district cooling too. In many of those areas, Thermax would have a role to play. With community boilers, our role would be the biggest.
Analyst
analystOkay. Okay. And sir, regarding the industrial intra project, there was INR 20 crores...
Ashish Bhandari
executiveIf I could return to you on that afterward, like I mentioned ...
Operator
operatorOur next question comes from Amit Anwani at PL Capital. The first one is about FEPL. You mentioned that maybe this effect is going to carry on. In H2 at FEPL, how large might that impact be? And more broadly, I recall that as a long-term strategy we were aiming to go from 900 megawatts to 1,000 megawatts over the coming few years. So I just wanted to get a sense of whether the impact would also continue next year. And what is the position as of today when it comes to net <<inaudible>> investment?
Ashish Bhandari
executiveSure. So for the business itself, regarding the magnitude of the hit we absorbed during the first half, we anticipate a comparable effect—perhaps even somewhat greater—is likely in the second half of the year too. That covers the first part of your question. As for the business itself, as I said during the previous quarter, we are seeking to bring in an outside growth partner into the business. And we expect that entire process to be completed by Q1 of next year. At this moment, as we speak, the IMs have been distributed. Detailed due diligence on the assets and all of that is set to commence shortly. Following that detailed due diligence, we will receive nonbinding offers. And before this financial year is out, we expect to have at least one binding offer that we would want to move toward concluding. That is the timeline. So as to what lies ahead for that business next year and beyond, I would prefer to hold off a little, since there is an entire process we are currently going through.
Ashish Bhandari
executiveSo peering too far into the future might not be the right call.
Amit Anwani
analystAll right. So what's the megawatt figure at present, and how much have you invested in that business?
Ashish Bhandari
executiveI think that, as part of the IM, we're beginning to share a fair amount of detail. I'd hold off, because we have an entire process currently underway. So I'd wait before sharing, since as part of the IM we are sharing a good deal of detail. I'll let some of that process move forward, and then I can return and share, Okay?
Amit Anwani
analystNext, sir, regarding CBG, what was that question again — about impact — and are we receiving additional orders? Also, what does the CBG order book stand at right now?
Ashish Bhandari
executiveSo, at the moment — nothing on that front right now — our order book stands at roughly INR 138 crores, which is INR 130-something crores. Rajendran, could you give the precise figure for the backlog we're carrying in CPG that we're wrapping up execution on — mostly PGTR along with customer retentions and all of that?
Rajendran Arunachalam
executiveINR 130 crores.
Ashish Bhandari
executiveRight, so that's the figure that's still outstanding. Over the last 3 years we haven't booked one new order — really since the start of 2024, so 2.5 years. Correct, not a single new order has come in. Everything we've had has simply been change orders and so forth on the existing plants we're currently working through. And as for Q3, I don't believe we'll be booking anything following the CBG. After the <<inaudible>> scheme, interest has risen considerably. There are plenty of discussions taking place. My view is that in Q4 we will book orders, but Q3 will have nothing.
Operator
operatorOur next question comes from Amit Mahawar at UBS.
Amit Mahawar
analystI'd like to get a clearer picture and spend a bit of time on the second segment, Industrial Infra. On Babcock, we have quite a lot of capacity available. Could you shed some light on the second half of this year and on next year — what types of clients are you going after in India and outside India, specifically in this segment? And with that in mind, and given current practices, how many orders can Thermax realistically aim for, and when it comes to some bid-to-win ratio? Or over the next 2 years, what kind of scale could this segment reach, because looking at the entire scheme of things across all segments — this is by far the most important potential segment, and it isn't managing to realize that potential in the current environment, where energy equipments are having a great time. So some color here would help.
Ashish Bhandari
executiveThere are a lot of moving parts here, so I'll share what I believe I can discuss comfortably. It's not the case that TBWES isn't realizing its potential. You can see that TBWES's profitability and its numbers have been improving year after year, and even in our current figures, if you compare last year with now, the largest increase in our backlog has come from TBWES. Over this past year, we've added over INR 2,000 crores of new TBWES backlog. And as we stand today, we see almost every scenario in which this plant will be — given the demand we have, the plant is essentially already sold out. We're currently debottlenecking the plant and also spending close to INR 100 crores to expand capacity there. And we're actively working with sub-vendors in various parts of the country to manage capacity — to enhance capacity in places where we think there's a bottleneck but someone else can handle it too. We'll move that work outside our plant and use third parties to manage it. So there's a massive effort underway to increase capacity for TBWES.
Ashish Bhandari
executiveWhen it comes to realizing its potential, TBWES is performing fairly well given the current demand environment, because our position is very clear. We have no desire to take on full EPC projects involving site construction, civil work, all of that, and then factor in the complete boiler plus the BOP — particularly since supercritical is a specific topic of discussion — our stance is unambiguous. Our focus should be solely on the boiler, with nothing beyond that scope. So, operating under that framework, TBWES — and even the profitability of its backlog — everything keeps improving. I don't see — what I would push back on in your comment is the suggestion that the business isn't reaching its potential. In its space for boilers, this business leads across multiple segments. Let me go through those segments again. Thermal in India, a range of other applications in India, including waste to energy, cement, waste recovery, AFDC, CSBC — that whole application set — HRSGs and restate recovery for refinery and petrochemical plants, for Middle East Africa power, for U.S. data centers, this kind of broad variety of capabilities. Nobody else in India possesses it, and very few internationally have it as well.
Ashish Bhandari
executiveThe real constraint we're up against at the moment is really on the — somewhat on the capacity side, and as I mentioned, we're debottlenecking that. Where I can't make a commitment is on something like supercritical, for instance, when it comes to the outlook. Do we believe — do I believe we'll book at least one order? I'd say the probability is very high. My expectation is that this year we will book at least one additional supercritical order. Could it be more than one? There's a high probability, and it could be multiple as well. So from a numbers standpoint, the gap between super confident and high probability is simply very wide. And some of those decisions then shape what else you decide to do in the market or not — that's very clear. And we're also clear that we don't want to overload our plan with just one thing. We have a wide variety of application sets and capabilities. We want to be able to do a good amount of business internationally as well with customers that have worked with us — the penetration that we're having with oil and gas customers in the Middle East, we don't want to lose that. So we're very clear: we don't want to fill up our plan just with supercritical or anything.
Ashish Bhandari
executiveWe’re going to engage with customers in a structured way. That’s all I’m able to share at this point.
Amit Mahawar
analystThanks, Ashish — that's useful. Quick follow-up: looking at FY '28, and you touched on segment 1 — for FY '28, judging by where things stand now, you've got a solid order book in segment 2 at the moment, up 25% plus, and I'm not sure whether that's mostly TBWES as well. What could next year's performance look like in the best case for the second segment, in terms of scale and profitability — whatever you're able to share?
Ashish Bhandari
executiveI won't answer that one, sorry. The best-case scenarios, of course, are just two range. Let me take a — at least let me share the question that I feel comfortable answering, which is this: it's abundantly clear, through Thermax's leadership and starting with me, that what we've done in Industrial Infra simply isn't done. It just drives a lot of operational hard burn internally. It drives a lot of concerns for our external stakeholders. And that's just not something that is like. My only submission again is that the areas where — that said, are Industrial Projects, because when you have a big delivery — and you will have yo-yo impact. The nature of this business is such that you will have yo-yo impact. But the impact can't be minus 1% and then plus 13%. Those ranges are just absolutely not right. There will be yo-yos, but in a much narrower range. And that first means getting this — the bad orders out of the system. And there, I can say again and again, for the last 3-plus years, there is nothing we have taken in our backlog that worries us that while we have done again something that we committed we won't do.
Ashish Bhandari
executiveThat piece—as I mentioned before, I've also laid out what I consider a sensible scenario for this business over the long term, which is if I take an Industrial Intra business of INR 6,000 crores, where INR 3,000 crores comes from the TBWES product side, INR 1,500 crores from Services, and INR 1,500 crores from EPC. What does the profitability mix of that business look like? To me, that is—and to me, that appears to be a sensible scenario for next year. That appears to be a sensible scenario. There is an upside scenario. And naturally, as we have demonstrated, we have been foolish enough at times. There could certainly be a worst case there.
Operator
operatorRabindra Nath Nayak from Nirmal bag, Institutional Equities, has the next question.
Rabindra Nath Nayak
analystSir, my question was about that incentive income tied to the Industrial Infra project that was booked in the last <<inaudible>>.
Ashish Bhandari
executiveYeah, that ties into the TBWES business, which falls under Industrial Infra.
Analyst
analystAlright. Alright. And sir, FEPL carries an impairment of INR 15 crores — the key question is whether any further impairment is anticipated. And second, regarding the interest income we calculated as allocated to KPIs, we have roughly INR 55 crores. Should we expect that to fall within a range of INR 120 crore of allocation for FEPL in the current year, for the full year?
Ashish Bhandari
executiveApologies, I didn’t catch the question regarding Rajendran — could you help clarify it? Specifically, about the interest rate allocation and what the impact to FEPL would be for the entire year?
Rajendran Arunachalam
executiveHonestly, I didn't quite catch that question either. <<inaudible>> if you wouldn't mind going over it once more, please.
Analyst
analystYes, sir. You're working out the interest cost at FEPL, and right now you're deducting that and presenting it separately, because you see INR 8 crores of interest cost sitting in the below-the-segment item, correct? So I'm simply taking that out and computing the interest cost — if I run it for 2 quarters, it comes to INR 55 crores, if I'm not mistaken. So would it be INR 120 crores or INR 150 crores this year? That's what I'm asking. Fundamentally, it comes down to our project plan and the funding plan of FEPL. We can...
Rajendran Arunachalam
executiveWhen it comes to the operating projects we have, it would be reasonable to expect that this interest cost is the one most likely to recur. We also need to factor in that an interest rate marginal hike recently took place in the market, and that will begin to show up going forward. There are also a few projects that will come online during the balance part of the financial year. And once those projects get started, the interest cost for them will be charged to the profit and loss statement, unlike now when some of them are being accounted to the capital cost.
Analyst
analystSo for the entire year, we could land somewhere between INR 120 crores and INR 130 crores — is that the full-year figure you mean?
Rajendran Arunachalam
executiveYes, that's what I said.
Operator
operatorSince no one else has questions from the participants, at this point I'd like to return the conference to management so they can offer closing remarks.
Ashish Bhandari
executiveThanks a lot. I suppose nobody asked about a few of the other segments we discussed — Chemicals only indirectly, I guess, and I gave my view there. Beyond that, we also went over the outlook for Industrial Products and Industrial Infra. And that's fine — I don't believe there's anything further for me to add right now.
Operator
operatorMuch appreciated, sir. This brings the conference to a close on behalf of DAM Capital Advisors Limited. Thanks to everyone for being with us today; you're welcome to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Thermax Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Thermax Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Thermax Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.