Titagarh Rail Systems Limited (TITAGARH) Earnings Call Transcript & Summary

February 14, 2023

National Stock Exchange of India IN Industrials Machinery earnings 56 min

Earnings Call Speaker Segments

Operator

operator
#1

Ladies and gentlemen, good day, and welcome to the Titagarh Wagons Q3 FY '23 Conference Call hosted by ICICI Securities. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Ms. Aashna. Thank you, and over to you.

Aashna Manaktala

analyst
#2

Thank you, Mike, and a very warm welcome to everyone. On behalf of ICICI Securities, I would like to welcome you all for the investor update call of Titagarh Wagons Limited. We will start the call with opening remarks from the management, post which we will have the Q&A session. I would now like to hand over the call to Mr. Prithish Chowdhary, Director, Marketing and Business Development for his opening remarks. Thank you, and over to you, sir.

Prithish Chowdhary

executive
#3

Good evening, everybody. Firstly, thank you very much for taking time out to be a part of this call. I'm very proud and very honored to share with all of you that this quarter, the company has achieved its highest-ever turnover at INR 766 crores. Further, this year -- this quarter, we have seen a 101% growth in total income as compared to the last -- the quarter of financial year 2022. In terms of EBITDA, the company has reported an EBITDA of INR 83 crores, which is a 75% growth from quarter 3 FY 2022. This year, there are also several drivers this quarter that have been announced and that the company is looking upon very favorably and with a lot of interest. Firstly, the railways has seen its highest-ever budget allocation to the tune of INR 2.4 lakh crores. A lot of this budget will go into the -- into capital expenditures, such as Vande Bharat train sets, as well as train wagons, both of which are areas of interest to the company. Secondly, this quarter, the company has attained major successes through the supply of its first traction motor from the company's state-of-the-art facility in Uttarpara. This was accomplished in the month of November 2022, and this opens the potential to a huge market, which can be tapped into and can also be used for the captive production of metro cars that the company is engaged in. This may also result in a substantial cost benefit for the company. Thirdly, the existing capacity that exists with the company of 700 wagons per month. Against that, we have already achieved a production of approximately 630 to 650 wagons per month. This is almost the entire assessed capacity as per the Indian Railways. We are, however, working towards increasing this capacity further. Fourthly, the company has participated in the very prestigious and well-renowned Vande Bharat tender in November 2022. This tender was for the supply of 200 trains with a maintenance contract of 35 years as well. This contract will be awarded to the 2 lowest bidders in a ratio of 120 trains to 80 trains. And the estimated value -- the total estimated value is to the tune of roughly INR 72,000 crores. The company is 1 out of 5 potential bidders in a consortium with BHEL, making the company the only truly [indiscernible] consortium as both the consortium partners are fully Indian. Further, as I mentioned earlier, with the new budget allocation that the railways has seen, the company also foresees further demand for these Vande Bharat train sets, therefore, indicating larger markets that will be available in the near future, and future opportunities for the company. Lastly, the company has also participated in a tender for forged wheel sets in partnership with Ramkrishna Forgings Limited. And we have submitted a joint bid in response to the Indian Railways request for quotation. This will entail the company setting up a forged wheel manufacturing unit. If the company wins -- if the company is the successful bidder and wins the bid. The purpose of this bid will be to produce forged wheel sets in India for both the Indian market, as well as the potential export market, as well as to reduce the dependence on imported wheel sets from countries like China and other foreign nations. As on date, the company has a standing order book of INR 10,130 crores with a good subsequent visibility. Thank you very much. And I hand it back over to ICICI.

Operator

operator
#4

[Operator Instructions] We have the first question from the line of Kunal Sheth from B&K Securities.

Kunal Sheth

analyst
#5

Congratulations for a great set of numbers. My first question is pertaining to the wagons, the supply to Indian Railways. So you mentioned that we have reached about 650 wagons in terms of production, right? So what is our plan going ahead in terms of where do we aspire to reach over the next 2, 3 months, given the schedule that we have in terms of supply?

Umesh Chowdhary

executive
#6

Yes. Thank you for the question. So as far as the capacity according to which the orders were placed by the Indian Railways was for 8,400 wagons per annum, which effectively means 700 wagons per month. As I had mentioned during the last conference call that our target will be to achieve 700 wagons per month. We have not achieved that target as of now in the last quarter, but we are confident of -- as was mentioned by Mr. Prithish Chowdhary just now that we have already touched 630 to 650 wagons in a month, not in the entire quarter, but in the last month of the quarter. And we are confident of being able to get to the 700 number in the next couple of months or so. And thereafter, we do intend to enhance it further to between 800 and 900 wagons. So to answer your question, as far as the obligation or the contractual commitment to the Indian Railways, we would be in line with that in any case now. In terms of exceeding the commitment so that we have more capacity for either the private sector wagon demand or for getting additional share from the railways in future tenders, that is something which is work in progress, and we will report back to the market as soon as we are able to achieve that.

Kunal Sheth

analyst
#7

Sure. My second question is pertaining to the private wagon market. In your estimate, what would be the size of the private wagon market per annum? And what would be our share in the private wagon market?

Umesh Chowdhary

executive
#8

So historically, we have always maintained a good share in the private wagon market. As it has been mentioned in the presentation also, we have now an order book of almost INR 1,200 crores from private wagon, which is in itself a substantial sizable order book, I would say. It's the highest-ever order book for private wagon market that we have had in the history of the company. In terms of the total market size of the private wagons, it is not a very defined formula of the private wagon. The private wagon market depends upon the availability for wagons from the Indian Railways, the overall capital expenditure cycle from the private investors. But if we take a thumb rule, I would say, about 15% to 20% of the overall wagon addition or I would say anything between 10% to 20% of the overall wagon addition into the Indian fleet would happen from the private sector.

Kunal Sheth

analyst
#9

Sure. And sir, we mentioned about the supply for traction motors from our factory. And also, we have done a JV with R.K. Forgings for the forged wheel. So if you can give us some sense about how large this market potentially could be? And what could be our play in this market in terms of size?

Umesh Chowdhary

executive
#10

So both are completely different from each other. The first one is the part of the transit and propulsion vertical. We have mentioned in the last investor call also, I had mentioned that in the last -- in the succeeding quarter, that is the Q3, we would intend to make the first sale from the propulsion division, which is what my colleague reported that we have been able to do that. It's just a developmental order execution. The prototype has been supplied for the traction motor. The propulsion division has 2 advantages. One is a strategic advantage, which will be useful to reduce our cost of production for the metro coaches and for the trains that we produce. And on the other side, the market advantage, which is an export and domestic market for both propulsion equipment, as well as traction motor. We believe that the market size is quite large. I mean, there are companies who were doing business worth thousands of crores in propulsion and electrical business, which is including the traction converter and traction motor, et cetera. And we have begun in a small manner, but we do intend to become an important and a significant player in this segment. As far as the forged wheel is concerned, this is a tender that we have participated and this is more by way of an information, which has been shared with the market. This is not a project which has already been taken up. This is subject to our winning the tender, the project will be taken up. So we would not be able to estimate the impact of this project on our financials or our initial future financials until unless we have a result of this tender, which is favorable towards us.

Kunal Sheth

analyst
#11

Sure. Got it, sir. And sir, my last question is pertaining to our CapEx. Can you help me with what kind of CapEx do we envisage over the next 3 years?

Umesh Chowdhary

executive
#12

So we had already announced this in the last call also that, including the CapEx that has already been spent in the last 2, 3 years, we expect that for completing the entire projects that we have in hand that is likely to take another 4.5 or 5 years. The total CapEx estimated is about INR 1,000 crore. Having said that, our company has always tried to optimize wherever possible. And the CapEx is spent, not on the basis of a top-down approach, but a bottoms-up approach, which is effectively to achieve the capacity target. For example, to illustrate the wagon capacity of 650 to 700 wagons that we have achieved, we have achieved with very limited amount of CapEx. And if we really look at the replacement cost or a greenfield cost for setting up that kind of a capacity or even the incremental capacity that we have achieved, it would be far higher than the CapEx that we have spent. So the CapEx that we have incurred in the last 3 years is about INR 300-odd crores, including the development of some of the product intellectual properties, et cetera. And we expect that over the next 5 years, 4.5, 5 years, we should -- including the INR 300 crore, we should be spending around INR 1,000 crores.

Kunal Sheth

analyst
#13

Sure. And sir, would it be possible roughly to give a sense of where this CapEx will be split as in what projects and what division?

Umesh Chowdhary

executive
#14

The 3 divisions. We are only operating in the 3 divisions, the passenger transit and propulsion, the freight and SBD, which is shipbuilding, bridges and defense. So we have -- we will not be able to give you the breakup of the numbers, but it is on an overall -- since all 3 divisions are part of the same company, and we do have some capacities and facilities, which are inter-fungible between the divisions. Therefore, I will not be able to give you the breakup of the 3 verticals.

Kunal Sheth

analyst
#15

Sure. And best of luck for the future quarters.

Operator

operator
#16

We have the next question from the line of Sarvesh Gupta from Maximal Capital.

Sarvesh Gupta

analyst
#17

So firstly, on the...

Operator

operator
#18

Mr. Gupta, your audio is not very clear. If you could go off the speaker phone once?

Sarvesh Gupta

analyst
#19

Yes. Is it better now?

Operator

operator
#20

Yes.

Sarvesh Gupta

analyst
#21

Yes. So first question is on the gross margin profile. So, I guess, this quarter, your gross profit, as well as the other competitors' gross profit has come down on a quarter-to-quarter basis. So are there some material price pressures that we are seeing to fulfill this current contract of the Indian Railways? Or because this is slightly counterintuitive because raw material prices have generally been on a downward trend? Or is it because of some contract-specific sort of the requirement that your margins are a little bit lower on this contract? So that's my first question.

Umesh Chowdhary

executive
#22

So the -- as far as our contracts are concerned, sir, most of our contracts are with the price variation clause, which effectively are -- which means that the increase or decrease in raw material prices are passed on either which ways. So when there is a decrease in commodity pricing, the benefit of that is passed on to the customer. And when there is an increase in commodity or raw material prices, we are reimbursed for that increase or decrease. Having said that, on a quarter-to-quarter basis, I have always maintained that our EBITDA margin that we can expect is between 8% and 10%. And in the current quarter also, we have done 10.7% of margin, including -- or EBITDA margin, including the other income. If we exclude the other income, still we are at about 9.6% -- 9.48%. So we are pretty much in line with our target. I will not be able to speak about competition, but I can speak for ourselves that as far as we are concerned, we are pretty much on target. As regard the comparative EBITDA margins of previous quarters, I've also mentioned that quarterly comparison of EBITDA margin in our sector is -- will not give a very, very reflective picture because we execute many contracts. Some have a higher margin, some have a lower margin. And when we speak about our targeted margin levels, we talk about a blended margin of different contracts. So as far as the expected margin guidelines are concerned, we maintain that we would be able to keep a sustainable EBITDA margin of between 8% and 10% and there is no pressure on the margins for the reasons I explained just now.

Sarvesh Gupta

analyst
#23

So generally, in a manufacturing setup when you are aiming for almost now from a low -- very low capacity utilization, you're going for a very high utilization of almost 100%. There is an element of fixed cost, employee costs, corporate overheads involved. So shouldn't you sort of expect your EBITDA margins to grow and grow beyond the traditional band of 8% to 10%? Or when you take up such a large order, you sort of sacrifice your gross margin in a way that it comes back to your normalized margins? Because otherwise, because you have fixed costs and also ideally it should increase, right? It should not be in the same range as it was when your utilization was far lower than this?

Umesh Chowdhary

executive
#24

It's a very good academic discussion, but I don't think that I'll be able to answer that. I would be only saying that when we do our -- there is always a trade-off in a tender of trying to get volumes versus trying to get margins and balancing the 2. So in the whole picture, we are able to position ourselves that we have been consistently the market leaders. And in order to be the market leader, sometimes one has to take a strategic pricing policy.

Sarvesh Gupta

analyst
#25

Understood. Now, in terms of your CapEx plan of INR 1,000 crores over the next 4, 5 years, even at the current profitability, this would mean almost 4 years of EBITDA or more than that. So how are you planning to fund it because this would again be slightly heavy on the balance sheet, even a INR 250 crore per year sort of a CapEx, given the current scale is sort of not -- it will lead to no generation of the cash as such? So how do you look at cash generation? And how do you look at this CapEx of INR 1,000-odd crores?

Umesh Chowdhary

executive
#26

I mentioned that this is CapEx over a 8-year period. So it's about, on an average, INR 150 crores, and this is an approximate number, which will be based on projects that we are able to undertake. Many of them are project CapEx, so the cost can be charged to the project itself. So, of course, the company has maintained a very prudent policy. We have reduced our debt significantly to become a net 0 debt company, long-term debt company. And I can only say that the company maintains a very prudent and conservative policy in terms of overcommitting or leveraging itself.

Operator

operator
#27

[Operator Instructions] We have the next question from the line of Parvez Qazi from Nuvama Group.

Parvez Qazi

analyst
#28

Congrats for a great set of numbers. Sir, a couple of questions from my side. It would be great if you could update us about the status of the Pune Metro order and also the CRRC order?

Umesh Chowdhary

executive
#29

Sure. As far as the -- am I audible?

Parvez Qazi

analyst
#30

Yes, sir.

Umesh Chowdhary

executive
#31

Okay. So as far as the Pune Metro is concerned, we have already executed, delivered up to 15 trains and -- out of 34, and we are well within -- well on track to deliver the complete number of trains within the first half of the next financial year. As far as the Bangalore CRRC project is concerned, the facility setting up of the stainless steel line is already underway. We have already ordered all the major equipments, and we intend to start production in the second quarter or maximum the third quarter of this year -- of the coming financial year. So either in the second quarter or the third quarter of the coming financial year, we will start delivering the coaches.

Parvez Qazi

analyst
#32

And a couple of questions for Anil ji. Sir, what is our current gross debt and net debt for the Indian entity?

Anil Agarwal

executive
#33

Parvez, Anil this side. So the net debt for the Indian entity is basically the working capital debt. So the net debt is at INR 150 crores as of December. And --. Just 1 second, Parvez, I'll just give you the gross number.

Umesh Chowdhary

executive
#34

Maybe we can move on with the questions. He'll just come back with the answer.

Parvez Qazi

analyst
#35

Sure. And what is the current order book in Firema and how do we see that performance going ahead?

Umesh Chowdhary

executive
#36

As far as Firema is concerned, as we've already said that the numbers are not consolidated in the parent balance sheet, in the Titagarh Wagons balance sheet. But having said that, Titagarh Wagons owns 49% shares with Firema. And the order book in Titagarh Firema is close to EUR 500 million and the performance is starting to improve now. The new contract for the Lazio is also under production. We expect that the production of the -- the targeted production of Titagarh Firema will be achieved in the first quarter of the coming financial year. That is from April onwards we should be seeing the targeted level of production in Titagarh Firema also.

Parvez Qazi

analyst
#37

Sure. And lastly, would it be possible to get a breakup of the order book segment-wise among the freight, passenger and the shipbuilding, bridges and defense?

Umesh Chowdhary

executive
#38

It has already been given in the Page 4 of the presentation.

Anil Agarwal

executive
#39

Parvez, it's in Page 4.

Parvez Qazi

analyst
#40

Unfortunately, we don't have access to the presentation.

Umesh Chowdhary

executive
#41

Okay. So I just think we'll upload it, but we'll send it across. I can share the numbers with you. It is INR 8,600 crore for freight business, INR 1,176 crore for passenger rolling stock and INR 341 crores for SBD.

Operator

operator
#42

We have the next question from the line of Sanjay Awatramani from [ Hamara Capital ].

Unknown Analyst

analyst
#43

Sir, almost all my questions have been answered. But...

Umesh Chowdhary

executive
#44

I can't hear you, Sanjay.

Operator

operator
#45

Sanjay, if you could go off the speaker phone, we are unable to hear you very well.

Unknown Analyst

analyst
#46

Hello. Are you able to hear me now?

Operator

operator
#47

Yes, much better.

Umesh Chowdhary

executive
#48

Yes, it's better. Sorry, we weren't able to hear you before.

Unknown Analyst

analyst
#49

So this order book, which you mentioned of INR 10,000 crores, what is the time line to the execution for executing this order book INR 10,130 crores?

Umesh Chowdhary

executive
#50

So different orders have different schedules of execution. But on an average basis, I would say this has to be executed in the next 2.5 to 3 years at the most.

Unknown Analyst

analyst
#51

Okay. 2.5 to 3 years?

Umesh Chowdhary

executive
#52

That's right.

Unknown Analyst

analyst
#53

And if I may request that if you could provide me the breakup? I think I lost my line when you were giving the breakup of this order book.

Umesh Chowdhary

executive
#54

So we shared in the investor presentation also, but I repeat it for you. It's INR 8,600 crores for the freight wagon rolling stock, INR 1,176 crore for passenger rolling stock and INR 340 crores for the shipbuilding, bridges and defense.

Operator

operator
#55

We have the next question from the line of Akshay Kothari from Envision Capital.

Akshay Kothari

analyst
#56

Sir, when is the Vande Bharat award expected to be out? Any details on that front?

Umesh Chowdhary

executive
#57

Unfortunately not, it's a tendering process. So, I mean, the tender was submitted on the end of November, 30th of November, I believe. And normally, such large tenders take time for evaluation, technical evaluation and so on and so forth. But I would just like to add that this is a tender for 200 Vande Bharat as was mentioned by my colleague Prithish and the overall requirement that has been including the current budget announcement is for 1,000 Vande Bharat trains. So I believe that the opportunity for this segment is quite substantial. And our company is very uniquely positioned for several reasons. Number one, we are the only Indian company and in fact, the only company in India, which has facilities for both aluminum and stainless steel coaches. Once we have implemented the line in the next couple of quarters for the Bangalore Metro CRRC project, we would have the stainless steel facility also. So while we are very keenly awaiting the results of the current tender, I would also like to mention that there are adequate opportunities that we foresee coming up in this passenger train segment, whether it is in terms of trains, which is like MRVC or Vande Bharat or metros like Bangalore and Chennai, et cetera.

Akshay Kothari

analyst
#58

Okay. That's great, sir. And sir, what is the current situation of rail wheel sets, if you can throw some light on it?

Umesh Chowdhary

executive
#59

So railway wheel sets you said, right?

Akshay Kothari

analyst
#60

Yes. Availability of rail wheel sets I guess.

Umesh Chowdhary

executive
#61

Railway wheel set are yet to announce by the railway because the capacity is -- the wagon production has gone up and the wheel set capacity also has gone up, but not on the same lines. But having said that, I have always maintained that there can be pressures from time to time. But on an overall basis, the railways have done a brilliant job in planning the availability of wheel sets. And as you can see, the railways are also doing future planning. I mean it's in fact an interesting point that you raised because if you kind of look at the planning of the railways and the tenders that they have floated, whoever wins the tender whether it is our consortium or anybody else, the fact is the railways is going to give a guaranteed offtake for 20 years for 80,000 wheels per annum, which kind of sets the tone of what they're planning for the rolling stock market. So the railways have been doing their homework extremely well, exceptionally well I would say and have been planning the wheel sets also and have continued to do that for the future requirement.

Akshay Kothari

analyst
#62

Okay. That's right. Sir, now that we have deconsolidated the Italian subsidiary -- Italian associate I would rather say so I'm assuming that there won't be any qualifications as much as in FY '22 audit reports. And just to know because it was not very much clear. What was that material element which led to this qualification and to continue, currently what is the debt in the Italian subsidiary? I understand it is already deconsolidated, but still I think the Barrackpore land is still pledged so that hence the question.

Umesh Chowdhary

executive
#63

Yes. So that's right, I mean it is deconsolidated and we've already disclosed all the facts in our results. So I think all the details are available in the results. In terms of there is -- I didn't understand about your point on qualification. I don't think there are...

Prithish Chowdhary

executive
#64

There's no qualification on the stand-alone financials.

Akshay Kothari

analyst
#65

But there was a qualification on the consolidated part, right.

Prithish Chowdhary

executive
#66

Yes. There is only a consolidation on the consolidated financials and that too also it is relating to the consolidation of the Firema results prepared on a management basis, which is we have clarified that in the results. So the stand-alone [indiscernible].

Akshay Kothari

analyst
#67

Sir, what is the current debt at Firema?

Anil Agarwal

executive
#68

So the current debt -- the net debt at Firema is at INR 333 crores and the gross debt is at around INR 640 crores or INR 650-odd crores.

Akshay Kothari

analyst
#69

Okay. And one more in the other expense in FY '22, there were some irrecoverable claims of around INR 23 crores. So what was that actually?

Prithish Chowdhary

executive
#70

In which? You're talking about which quarter?

Akshay Kothari

analyst
#71

I'm talking about the annual report, FY '22. So are these on the private side or...?

Umesh Chowdhary

executive
#72

No, I don't think so. I mean what we can do is if you agree because we did discuss about the quarter and then you can...

Akshay Kothari

analyst
#73

I actually tried to reach out a lot of times through even the IR associate partners, but I think we could not fix up a meeting so that's why I have to ask. Anyway, we can take it offline then.

Anil Agarwal

executive
#74

We'll make sure my colleague, Saurav Singhania, will ensure that he reaches out to you.

Operator

operator
#75

We have the next question from the line of [ Rajesh Bhandari ], individual investor.

Unknown Attendee

attendee
#76

And the results given are excellent. And will we be able to keep the increase in the turnover in the same way that we have been doing?

Umesh Chowdhary

executive
#77

And yes, it is our endeavor to continue to do that. We have a good runway ahead of us. We have good visibility. We have been able to ramp up. If you really look at the company in 5 years; 4.5, 5 years ago we were at an annual revenue of INR 300 crores, now we are at an annual revenue of INR 766 crores. So from INR 75 crores to INR 766 crores on a quarterly basis let us say. So obviously there has been a journey that has been traveled and we are very confident and we are very committed to continue with this journey.

Unknown Attendee

attendee
#78

So '23-'24 we can expect turnover would be more than INR 3,500 crores.

Umesh Chowdhary

executive
#79

I would not be able to give you any forward-looking numbers, but I can only say that the runway ahead of us is clear. We have a good visibility. We have an order book of INR 10,100 crores. So definitely our company and the entire team is committed towards achieving execution of these and additional orders that we are able to procure during this year.

Unknown Attendee

attendee
#80

[Foreign Language] Do we have the capacity to execute such orders in time?

Umesh Chowdhary

executive
#81

Definitely, sir. I mean the Indian industry is very capable, very competent. The problem that used to remain was lack of visibility and the government now is taking up long-term plans of [Foreign Language]. So Indian industry, I'm not talking about ourselves alone, but the Indian industry as a whole is fully geared up to...

Unknown Attendee

attendee
#82

[Foreign Language] So is a God send opportunity for any railway-related company so we'll be able to [Foreign Language] the place also and the infrastructure [Foreign Language] we are geared up.

Umesh Chowdhary

executive
#83

Absolutely. That's exactly what I would say, sir, we are fully geared up.

Unknown Attendee

attendee
#84

Okay. [Foreign Language] But by the way talking on Vande Bharat, [Foreign Language]

Umesh Chowdhary

executive
#85

That is because this is a start-up business for us. We have just started up this thing. Our capacity for the -- I think this is a very interesting question that you have asked, sir. [Foreign Language] at least 70%, 75% the margins will improve.

Unknown Attendee

attendee
#86

[Foreign Language]

Umesh Chowdhary

executive
#87

That's right. Right now it is 20 coaches per month and with the addition of the stainless steel line and all of that, our target is to enhance this capacity to 40 coaches per month.

Unknown Attendee

attendee
#88

40 coaches because [Foreign Language] that margin is much better if I see on that small value 15%. [Foreign Language]

Umesh Chowdhary

executive
#89

Again it is a question, as I mentioned in a question asked by a previous gentleman, [Foreign Language] that is a right equilibrium that has to be struck between volume and profitability.

Unknown Attendee

attendee
#90

Right. [Foreign Language]

Umesh Chowdhary

executive
#91

In some of the business there [Foreign Language].

Unknown Attendee

attendee
#92

Okay. [Foreign Language] NCLT status, that chapter is closed now?

Umesh Chowdhary

executive
#93

Yes, that chapter is closed.

Unknown Attendee

attendee
#94

[Foreign Language]

Umesh Chowdhary

executive
#95

[Foreign Language]

Unknown Attendee

attendee
#96

[Foreign Language]

Umesh Chowdhary

executive
#97

As we have explained in our notes to the account, the total investment in the books of Titagarh Wagons -- investment value in the books of Titagarh Wagons in the Italian associate stands at INR 3.70 crores.

Unknown Attendee

attendee
#98

INR 103 crores?

Umesh Chowdhary

executive
#99

No, INR 3.70 crores. [Foreign Language]

Unknown Attendee

attendee
#100

[Foreign Language]

Umesh Chowdhary

executive
#101

INR 3.70 crores is the downside potential.

Unknown Attendee

attendee
#102

[Foreign Language]

Umesh Chowdhary

executive
#103

I have disclosed the numbers. [Foreign Language]

Unknown Attendee

attendee
#104

[Foreign Language]

Operator

operator
#105

We have the next question from the line of Panjul Agrawal from Green Portfolio Private Limited.

Panjul Agrawal

analyst
#106

Sir, first thing that I want to know is what is the current bidding pipeline?

Umesh Chowdhary

executive
#107

I'm sorry, I could not hear your question properly, ma'am. Could you repeat?

Panjul Agrawal

analyst
#108

Sir, my question is what is our current bidding pipeline?

Umesh Chowdhary

executive
#109

We have a very large bidding pipeline. We will not be able to disclose exact number of tenders for competitive reasons. But the number of tenders for all the divisions that we continue to bid are quite substantial.

Panjul Agrawal

analyst
#110

Okay. Sir, actually 1 thing I was really concerned about was that the share of losses of joint ventures and associates have increased sharply to INR 7.36 crores in this quarter. So sir, actually it seems like Italian operations are still leading. So would you like to comment on that?

Umesh Chowdhary

executive
#111

As far as the Italian operations are leading is concerned, as I explained in the previous caller, the company is now an associate and the accounting that is done for the company is on equity method basis. I would say that the Italian operations have also started picking up very well. The losses have started coming down. We are very hopeful that the company will stop or will turn EBITDA positive in the coming quarter. In the Q4 of the current financial year and going forward, it will be able to turnaround. Having said that, as far as the stand-alone Titagarh Wagons is concerned, our risks have been kind of capped, downside has been capped.

Panjul Agrawal

analyst
#112

Yes, I do understand that. Sir, like is there any expenditure due to which the losses are incurring in the Italian subsidiary or the revenue? Are you not able to generate revenues on that? Also the legacy contracts are over I guess, right?

Umesh Chowdhary

executive
#113

Almost over. That's exactly why the losses have started to come down, but there are some which were pending which are getting over. These are all contracts which are very old so they kind of have -- there is always the tail end of the storm as they say which continues. But now more or less, they are all over. Actually that has been done in the company; a couple of sites have been merged into the parent site, number of people have been reduced, fixed costs have been reduced, the management restructuring has been done. So a lot of action has been taken in order to bring back that company into health and we believe based on all the actions and the current status and the European market which is also picking up, that the company should be able to stand on its feet and start delivering positive results in not so distant future.

Panjul Agrawal

analyst
#114

Okay. And sir, what is the operational status of Falta Shipyard?

Umesh Chowdhary

executive
#115

Falta Shipyard we have only acquired the facility and I had mentioned this in my several interactions that this is an infrastructure that we are keeping it prepared. Our focus and our allocation of resources would first continue towards the first 2 verticals and then only we would take up the third engine to our growth. So the first 2 engines of our growth should be fully fired, which is freight rolling stock and the passenger rolling stock and after that, we will take up the third one which is the SBD on full traction. Till that time, we will continue to strengthen ourselves in that segment, but not allocate too much of resources while keeping ourselves ready.

Operator

operator
#116

[Operator Instructions] We have the next question from the line of [ Ankur Kumar ] from Alpha Capital.

Unknown Analyst

analyst
#117

Sir, most of my questions have been answered. Just question on the passenger volume segment. You said there is around INR 1,100 crores type of order book so can you comment on execution timeline for this business?

Umesh Chowdhary

executive
#118

Sure, sir. As I mentioned that most of these orders are between 2.5 to 3 years and the same is the situation for the passenger rolling stock. All the orders that we have in hand should be executed in the next I would say 30 months at the most.

Unknown Analyst

analyst
#119

But sir, in terms of when I look at quarterly segmental business, we are doing INR 150 crore type revenue per quarter. Is that correct? And it will take 2 years to complete this INR 1,100 crore?

Umesh Chowdhary

executive
#120

Right now what we are doing yes is about the amount that is mentioned there, but as I mentioned that this is in the ramp-up phase. We are now producing just about 1, 1.5 trains per month. We will ramp it up to 15 to 20 cars in the next couple of years, within that.

Unknown Analyst

analyst
#121

Sure, sir. And on Vande Bharat, it is a INR 72,000 crore opportunity and even if we can win the smaller one, then also it's quite substantial.

Umesh Chowdhary

executive
#122

It is the opportunity and of course it's a tender business so we do not know whether we'll be the successful bidders or not. So we have just disclosed that what we have participated in and we have also explained that this is the 200 train tender. There are announcements to add on several more trains. So whether this or the other, we believe that there is a very large opportunity in the Vande Bharat segment that exists for a company like ours.

Unknown Analyst

analyst
#123

And sir, I heard the number of INR 72,000 crores?

Umesh Chowdhary

executive
#124

It would be around that much. I mean this is just an approximate. It could be anything 10% plus/minus or 15% plus/minus.

Operator

operator
#125

We have the next question the line of [ Kunal N ]and from Alpha Invesco.

Unknown Analyst

analyst
#126

Yes. Am I audible?

Operator

operator
#127

Yes, we can hear you.

Unknown Analyst

analyst
#128

So I just wanted to ask can you just give me the update on the propulsion systems business? I mean we were with partnership with ABB and all and you said that you do get the orders, but it's not completely operational on regular basis. So can you just give update on what is happening in propulsion system? That's all.

Umesh Chowdhary

executive
#129

Sure. I just mentioned that we made our first dispatches for the propulsion system, which is for the traction motor in the last quarter. This is a very, I would say, key business to our overall plans and strategy. It is not yet fully operational because we are in the developmental stage. But we believe that in the coming financial year we should be in execution stage and there are prototype approval testing period. So the real commercial advantage of this vertical for the propulsion will start coming in from FY '24-'25.

Operator

operator
#130

We have the next question from the line of Anand Venugopal from BMSPL Capital.

Anand Venugopal

analyst
#131

I joined the call late so forgive me if this is already answered. So I just want to know when do we kind of expect more rolling stock orders from the government? To achieve the target set in the National Rail Plan, how much more does the government need to order? So these are the 2 questions which I have.

Umesh Chowdhary

executive
#132

So as far as the tenders are concerned, the tenders are mostly on an annual basis. Last year the tenders were floated where we got 24,000 wagons. We expect that new tenders should also get floated sometime in the coming financial year so I would say in the time horizon of April to October because railways has placed an order for the next 2, 2.5 years and now the orders which will be placed will be on top of that so either for higher offtake or for furthering up to 2030 the National Rail Plan. The orders that they have placed will get executed by FY '25. So the railways are planning to kind of work backwards to ensure that the target of 2030 is met by way of additional rolling stock that is planned for the entire period of time. We believe, however, that based on our estimates and based on whatever we need that the railway in order to achieve that should be adding around 30,000 freight wagons per year at the minimum.

Operator

operator
#133

We have the next question from the line of [ Bhavya Sonawala ] from [ Samasa Capital ].

Unknown Analyst

analyst
#134

Just again on the traction motors, we had I think supplied a few of the prototypes. Just wanted to know has there been any response? And basically just trying to understand do you see this forming a decent part of our contributing to the revenue? Any thoughts on that?

Umesh Chowdhary

executive
#135

Yes. So we supplied the prototype and we will hear about the -- I mean this is a process that has to be gone through, it doesn't get done so quickly. It takes time. But having said that, I mentioned a little while ago this is both commercially and strategically a very important part of our strategy.

Operator

operator
#136

We have the next question from the line of [ Alicia M ] from [ Invigin Capital ].

Unknown Analyst

analyst
#137

Sir, I understand that the current railway order of 24,000 wagons in 3 years, we were supposed to look at 700 wagons a month number to be able to supply it in the 33 months. It's almost been 8, 9 months and this just the feedback number, we did about 650 last month. Is there a delay or do we still believe that we will be able to achieve it in the timeline that was awarded of 33 months?

Umesh Chowdhary

executive
#138

Ma'am. I can only say that we are running ahead of schedule at this point of time.

Unknown Analyst

analyst
#139

And is that because the incremental capacity will also first -- because like you mentioned earlier in the call, we are expecting to increase the capacity to 800, 900 wagons and that will help us cover up this run rate?

Umesh Chowdhary

executive
#140

No, we are already running ahead of schedule. As we speak today, we are already running ahead of the contractual schedule.

Unknown Analyst

analyst
#141

Okay. Sure. And just in terms you were mentioning to the previous participant that the next round will come, say, in the next financial year, say, in the next quarter. Will the delivery or execution of that also be expected to start immediately or will this order first have to be executed before that can come up in the pipeline?

Umesh Chowdhary

executive
#142

That is for us -- I mean this has to be seen, but normally we expect that the deliveries will be in continuation with the current contractual deliveries. But we will have to wait and watch what the tender says because we will not be able to kind of pre guess the tender conditions. But logically, we believe that it should be in continuation with the current delivery schedules.

Unknown Analyst

analyst
#143

And the [ schedule ] that we have outlined currently looks enough or we probably have to revisit it once the new tender is out?

Umesh Chowdhary

executive
#144

We are already working on increasing our capacity. I mentioned this in the beginning of the call and so did my colleague, Prithish Chowdhary, that we are almost at our previously assessed capacity and now our target is to further enhance that capacity. We should be able to do that in the coming financial year.

Operator

operator
#145

We have the next question from the line of [ Ram Chakraborty ], an Investor.

Unknown Attendee

analyst
#146

And I congratulate you for the excellent set of numbers. Most of my questions have been answered. But if I may ask 1 thing. With your experience, logically can you kindly guess that this Vande Bharat tender if we get it, means some time in FY '24 the tender is going to come out, something like that? Can you just please guess if it comes out? Am I audible now, better?

Umesh Chowdhary

executive
#147

There's static which is coming from your connection. Thank you for your wishes and your compliments, means a lot to us. And as far as the upcoming tenders are concerned, it would be very difficult if not impossible for me to make any guesses. What we can really speak about is the overall announcements that have been made by the railways and the fact that the railways announcement to implementation time has been on a remarkable trajectory or the track record of the railway has been very, very positive in the current government. So we expect that the execution of the announcement should happen quite fast.

Operator

operator
#148

Sir, the participant is no longer in queue. I would now like to hand it over to the management for closing comments.

Umesh Chowdhary

executive
#149

So thank you for a very interesting set of questions and thank you for your time, everybody, to join in on the call. It's been always a great pleasure and very informative interacting, some of the questions which lead us to lot of thought processes. We do hope to continue this run, I would say, to continue to grow the operations. And as I mentioned several times, we have a good runway ahead of us and we have been able to build up the team and the facilities to grow the operation. And we look forward to continue to having your support and your participation like we have had in the past. Thank you.

Operator

operator
#150

Thank you. On behalf of ICICI Securities, that concludes this conference. Thank you for joining us and you may now disconnect your lines. Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Titagarh Rail Systems Limited transcript — plus 252,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Titagarh Rail Systems Limited earnings transcripts and 252,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.