TKMS AG & Co KGaA (TKMS) Earnings Call Transcript & Summary
August 12, 2026
Earnings Call Speaker Segments
Jacques Esser
executiveI'd like to extend a really warm welcome to everyone for our quarterly earnings presentation covering the 9-month results of the financial year 2025/2026. Oliver Burkhard, our CEO, and Paul Glaser, our CFO, are here in the room with me, and we're grateful that you're joining us today for this 9-month reporting event. Our CEO, Oliver Burkhard, will begin with an overview of the actual key highlights and the recent developments shaping our market, and after that our CFO, Paul Glaser, will take you through the detailed financial results and share our outlook for the year ahead. Finally, before I hand over, please allow me a few housekeeping remarks. All the documents from today's earnings release and for this conference call are available on our Investor Relations website. We will also be recording the call today, and the replay will be available shortly afterwards on our IR homepage. After the presentation, we will open the floor for questions for analysts and investors. When asking a question, please raise your virtual hand. My colleagues will open your line, and then please also state your name and institution so everyone in the room and on the webcast can follow. Now, I would like to hand over to you, Oliver.
Oliver Burkhard
executiveThanks a lot, Jacques. Welcome, everybody, to this call. Having a smiling CFO really sets the tone for the call, and Paul is smiling in that picture you saw a short while ago, so let me dive right in. I think we're all aware that defense budgets keep growing; it's no longer a matter of demand, it's a matter of how we turn that into stable financial figures. That's what they care about, I believe, and that's where our main focus will be over the coming months and years. Let me add that we believe the Iran conflict has had a profound effect on our industry and will continue to, and it further underscores the strong demand for our products, particularly mine countermeasures, which are, let's say, quite topical these days, and we're getting a lot of questions about that from the region, which wasn't the case previously. I can't put a number on it at this point, it's too early for that, but something is happening that will also affect our businesses. While I won't read out all these bullets, let me say that tkMS is an industrial partner of naval forces, and I think we're very well positioned to equip its customer with state-of-the-art naval warfare equipment, and we're able to execute.
Oliver Burkhard
executiveLater on, you'll notice demand climbing in both budget and timing. We demonstrated that over the last nine months, since we handed over three of our ships and boats before the year wraps up at the end of September. Against that backdrop, let's examine tkMS' results more closely. The numbers are familiar to you: 20.1 order backlog, 110 in EBIT, negative free cash flow, which will flip in the coming months. Paul will go into detail on that. For a company such as ours, this isn't unusual, because when you consider the down payment schedules, a quarter ending or not is irrelevant—what counts is delivering at the right moment, and we have. At times it aligns with quarterly announcements, at others it doesn't. On the whole, what matters is that the year comes out positive, and once more, Paul will update you later. Sales, 8.9—where exactly? 8.9 seems a bit high, doesn't it? 1.89, and EBIT margin, 5.8. Perhaps to touch on a few of those major events from the past three months, of course, for us it was—and we're delighted—that the German Parliament approved tkMS' biggest surface vessel contract to date.
Oliver Burkhard
executiveAfter the F126 program was terminated in June, the German Navy picked tkMS' MEKO A-200 as its anti-submarine warfare frigate solution, and that is exactly what the A-200 is designed for. In July — on July 8th, which falls after our reporting period — the German budget committee gave approval to procure four of them, plus an option, and this will land in that reporting unit perhaps in the first quarter, with an option for another four vessels as well. The formal contract has now been signed, and delivery of the first frigate is targeted as early as 2029, by the end of the year. I am very happy, and honestly, that took a lot of work and really a great deal of effort to convince people, because eight months ago this was not a contract — it was not even an idea. After we lost Australia, I think we made the very best of that and offered this as a solution to bridge, let's say, the big delay on the F126. It was not a debate of neither/nor — we have 126 or A-200. That it is now a 'nor' is new. This is a decision made by the ministry and by the administration, which I can follow, because a lot of money had already been spent and there was no clearance on how to finish those boats.
Oliver Burkhard
executiveA delay of four years — that shouldn’t occur. That’s not the situation we’re in. I think an order book can be trusted provided you deliver on it safely, and that’s exactly what we’re doing. Again, we’ve delivered three units after nine months. Second, you can see the picture below — Andreas Georgen and Gonzalo from Navantia. We signed an updated MoU to capture, let’s say, advancing discussions toward collaboration on submarine projects by the end of the year. We had a first MoU some months ago. Now we’ve laid it, let’s say, one layer deeper. This partnership will combine complementary industrial capabilities to boost capacity, innovation, and long-term competitiveness for customers worldwide, while leaving existing projects and contracts unchanged. This matters. You may have noticed that we’re spinning an idea of a SeaBus or a SubBus or whatever you want to call it, but compared with what Airbus did in the ’70s, I think joining forces here is a brilliant idea to become faster and maybe to spend European taxpayers’ money more efficiently. We can be the consolidation knot for that because we have everything under one roof. That’s why we are pursuing this partnership as well.
Oliver Burkhard
executiveThen, of course, another standout point is that this is a once-in-a-lifetime kind of story, since never before has there been a chance to sell 12 submarines at one time, yet we were chosen as preferred bidder for the Canadian program. We finished ahead of Hanwha Ocean, which was a tough competitor, and I believe we recognized that they also performed very well, but in the end, I think we prevailed for certain reasons that may have been more favorable to us than to their concept. Now the work begins. As I mentioned earlier, we will aim to reach contract signing for the boats by the end of 2026, but there are some contracts, let's say, within that flow and behind it, that may have time to be done in '27, so there's no rush. On the other hand, we are quite focused on the situation that we will not be that bottleneck, and we have to negotiate in three different countries, with Canada, of course, but anything we change because of the boats will also have an impact on Norway and Germany. I think at the moment we are really well on track. A large team from Canada visited us just last week, and we began the negotiations, and will follow up within the next week already in Ottawa as well.
Oliver Burkhard
executiveSince you keep track of our company and want to know what we have in store and what we are carrying out, once more: execution, execution, execution is what we are pushing for, yet our future stays on our minds. A brief slide here offers you a peek at what happens on the R&D side, with new products, with what we aim to accomplish down the road. Over on the left, you can see our activities, and I consider it a major plus that we hold platforms both above and below the sea level, and we possess every technology in software, in combat management systems, in sensors, in effectors. When you convert that into the new era to build what is called a future naval ecosystem, I believe we are an excellent starting point as a company and are putting a lot of effort there. There is no time right now to go into details on that, but should you have questions, they are more than happy to answer, since becoming, let's say, the tactical systems of systems that originate from a platform concept means hardware will matter less and software will carry more weight going forward, and that is what we are getting ourselves ready for.
Oliver Burkhard
executiveLooking at the order backlog, 20.1. To be honest, since we've signed the contract, it's actually higher — as of today's date it stands at more than 25, though what we're reporting covers the first nine months, and back in June it was 20.1. The relevant orders, as you know, included Norway at the end of January, and at that point also the four vessels for Germany. Heavyweight torpedoes represented a major contract early in the year, plus some updates on SATCOM, let's say. On ongoing campaigns, we still have four, and I continue to count Canada as one of them. We're the preferred bidder, and I'd say we've covered more than half of the distance, definitely — but it's over when it's over, as the saying goes. We should be clear that a full contract doesn't exist yet, but we're working toward it, we won't be the bottleneck, and we're optimistic about getting there. I can only put it in the order backlog once it's booked and signed, and that isn't the case yet. We're in a brilliant position, and again, very happy and, yeah, confident — and that was a very trustful gesture from Canada, and now we have to demonstrate that we have, let's say, earned the trust placed in us.
Oliver Burkhard
executiveLet me clear up any confusion: there are 2, sorry, 4 A-200 units already in the order book as of July and August now, but 4 additional ones are on the way by the end of the year at the latest. My expectation is sooner—perhaps September or October—when the German Bundestag grants its approval. India remains in play. You've been tracking us, so you know India is a recurring subject, and on timing I'd say things are turning somewhat more conservative, though that isn't because I doubt we'll secure it—I believe we will—but there were some setbacks in the Indian budget as well, since the Iran conflict may have caused more disruption to their financial planning than it did to the German defense budget. That much is already established: our project is going ahead, the funding is there, the finance minister has already said so, and we are very near the finish line in concluding negotiations with the Indian government and the shipyard that will serve as general contractor, MDL in Mumbai. Once again, we are doing this jointly with NVL—formerly NVL, now Rheinmetall—within a special purpose company to construct the F127, a vessel entirely unlike anything currently in existence, since the Germans have never had one of this kind, and we are likewise pursuing that campaign to complete it as soon as parliament gives its approval.
Oliver Burkhard
executiveWhat I think stands out for you too is that we've delivered. That's the point we're making — we're convinced we deliver on time. We did exactly that, and over the last nine months we delivered three different submarines. This is phasing out what we call our legacy contracts and placing growing importance on the new contracts. As I said earlier, I think we're no longer in a buyer's market; we're in a seller's market, and terms and conditions are more favorable than they used to be. That also supports our balance sheet and supports profitability, because the new contracts are more profitable than the older ones were. Going forward, you'll see those legacy orders fade out latest by the end of this decade, but as you can see here, we're quite optimistic that we have the right drumbeat at the moment. Again, three in nine months means something is going on at the shipyard, which increases the speed, and we have understood that everybody has budget, but not anymore time. We have to concentrate on time because that's the critical factor. That's more or less my CEO overview. Now I'm more than happy to hand that to a smiling CFO, and Paul is putting you into the latest news on our figures.
Oliver Burkhard
executiveGo ahead, Paul.
Paul Glaser
executiveThank you. Many thanks, Oliver. And a really warm welcome from me as well to our financial update and outlook. I'd like to dive straight into the group results. You can see them here on the page — I won't read every figure out to you, but I think order intake for the first nine months is now very strong at over €3.6 billion. And bear in mind that during these nine months we haven't yet seen the MEKO A-200 that Oliver just mentioned; for Q4 we will definitely see a higher value there, with expectations of over €5 billion for the MEKO A-200s. On sales, we're up 19%, and momentum has really picked up. That comes from converting our order book into sales, which matters a great deal to us — to get execution right, to get delivery speed right, and then also to get profitability right, and I'll also take you through the segments there. Looking at our adjusted EBIT, it's up 13% year-over-year, rising to €110 million, and as a management team and leadership team we're all very proud of that, because it comes despite the spin-off-related G&A cost increases and also despite the higher selling expenses driven by the various campaigns this year.
Paul Glaser
executiveThis is a really, really strong and truly fundamental improvement that shows up in our profitability profile. And on the adjusted EBIT margin side, we hit a very solid 5.8% across the first nine months — that's actually better than what we posted in the first half, when we reached 5.1% — and naturally, you'll notice the margin is down slightly year-over-year, by 0.3 percentage points, but please don't let that distract you. Last year we had to handle some accounting work to get our combined financial statements ready for the spin-off. That was particularly the case in Q3 of last year, when we booked several one-off accounting gains in preparation for the spin-off, including some required adjustments to accounting methods and reversals of provisions. All in all, the operational direction and trend clearly point toward healthier and very strong underlying profitability, and we're very much on track there — especially with how our adjusted EBIT margin has developed. Turning now to our segments, it's genuinely good to see — and you know the order intake, I won't spend time on that — but it's very good to see the strong growth in our submarine segment, 17%, with sales slightly above €1 billion, so that's very good.
Paul Glaser
executiveThis is driven by our new programs that are contributing, and it also comes from the service business. We're truly seeing a very strong trend in this area. That's also visible when you compare Q3 of last year with Q3 of this year. And here's what I think matters most to us: profitability follows. Sales on their own are nice, but what counts most is profitability. We have a very, very strong quadrupling, from €11 million to €46 million now, with the relative margin even above 6.4% for Q3. This is clearly down to the efforts the team is putting in — not only are we successfully executing the order book, but we also have very strong and sound cost control, especially in the legacy programs Oliver just mentioned, so that we're getting these old orders out of our order book with a very stable and solid progression when it comes to our execution track record. Overall, I think this is a very strong statement from the submarine segment. As I've always told you, we will need some time, but then, quarter-over-quarter and year-over-year, we are going to convert that over €20 billion order book into a very attractive and profitable margin profile.
Paul Glaser
executiveThat being said, let me zoom in a bit on our surface vessels segment. On order intake, naturally, since we've wrapped up the nine months ending in June, and in the middle of July we signed the contract for the frigates, you aren't seeing that order intake here just yet — but it will show up in Q4. And if you compare year-over-year at that point, you'll notice a really strong upward move in order intake for the surface vessels segment. We're delighted to have that potential and that opportunity to now build the MEKO A-200 product for the German Navy as well. Even leaving that program aside, I believe you can see solid development, though somewhat flat in terms of sales — nine months versus nine months a slight increase, while Q3 against Q3 shows a mild downward trend. That will level out, and I think it will now strengthen quarter-over-quarter, as the years go by, with the A-200 program we've booked. Profitability looks very, very good from where we sit, now at €30 million and 7.4% for the first nine months, and especially Q3, now at a 9.5% relative EBIT margin — very attractive, even though we had some one-off gains in Q1 from currency, as you'll recall.
Paul Glaser
executiveAll in all, I'd call this a really strong showing from the surface vessel team. The way they've executed — including delivering the first unit under our Brazilian program, the Tamandaré — demonstrates we can perform in the A-200 class too, thanks to our modular concept, and that brings very cutting-edge and fast delivery times. There's a lot more to come from the surface vessels segment in the near future. What we've witnessed in surface vessels over the last months has already been happening for a couple of quarters now at Atlas Elektronik. We discussed that on our half-year results call. Order intake overall this year is very, very strong — very robust — at close to €2 billion, chiefly from the heavyweight torpedo contract placed in the first half of the running fiscal year. The conversion, which matters a great deal from my perspective, is genuinely picking up. We have strong conversion of over €600 million in sales, clearly outpacing the previous year. It's very nice to see profitability following in absolute terms, close to €60 million now, and narrowing to a double-digit profitability profile of 9.6, which is even better than last year.
Paul Glaser
executiveOnce more, this isn’t a quarter-to-quarter business. I realize many of you still want that comparison. During last Q3 2024/2025, we saw certain service gains that were stronger, and those have not appeared in this quarter, yet overall the trend for this year looks very, very promising for Atlas, and we expect a solid year-over-year improvement in adjusted EBIT for our Atlas Elektronik segment for the full year. Across all three segments, I think the news is very positive, very strong, and fundamentally driven, and it really highlights what tkMS can do. Breaking that down, and taking the dynamics from our segments into the EBIT bridge, I think it once again shows quite clearly how stable and robust our businesses are performing. You can see the strong improvement from the submarines unit, a very strong improvement from Atlas Elektronik already at a very high level, and then much more is still to come from the surface vessels units as we chunk and progress down the A-200 order. You also see a package of others in group consolidation there, so let me shed some light on that. This development also showed up in previous quarters, and it is basically only a temporary phenomenon for the first financial year after the spin-off, namely the increasing costs we had because we were a listed company rather than just a segment of TKAG.
Paul Glaser
executiveNaturally, there was also a drag from a one-off pension funding exercise — in the mid-single-digit million-euro region — during Q2, which I believe we already communicated to you on the first-half year conference call, and second, the G&A costs I mentioned, which were the main driver there. On the whole, the operational performance across the segments more than offset those structural headwinds we face as a one-off, and they produced that 30% increase in adjusted EBIT, to €110 million. All in all, a very strong and robust performance from a P&L standpoint. Now, shifting from the P&L to a balance sheet view, we keep running our operations and our business model in a very, very efficient manner through a negative net working capital approach — something I think is unique in the industry — and it also gives us the strength and muscles to look into a very solid net financial position, and also to fund the capital expenditures that are needed, particularly to ramp up our Wismar site, which is running very well and progressing as we are planning it, and the hiring of people is progressing as we're planning it as well. So the overall position of tkMS shows a pure strength of our balance sheet here.
Paul Glaser
executiveSure, you might have noticed that, and since we’re about to discuss free cash flow, it was negative for the first nine months, as shown on the next slide. For those who’ve been tracking us over a longer stretch, there’s no reason for concern here or anything like that—it’s simply the typical milestone-payment pattern we see in the EPC industry, where cash milestones and payment milestones drive the timing. Those are now partly folded into our Q4, including a down payment and prepayment related to the A-200 order. On the whole, we expect free cash flow to be positive by the end of the fiscal year, and this is just the usual quarter-by-quarter variability, as Oliver also pointed out. Altogether, this is a very, very cash-generative business—one that can be operated with negative net working capital, which gives a very, very good and strong perspective on return on capital employed, and I think that’s a very, very strong indication of our productiveness and profitability. As you saw me smiling on the first page—you can’t see me smiling now, but I am smiling about our fiscal year guidance.
Paul Glaser
executiveYou've probably already gone through the material and read it by now. For the second time this year, we're raising and updating our guidance for the full year. Sales are now expected to grow 10% to 12%, which is up from the earlier range of 2% to 5%. The upgrade comes because of how we've performed overall so far this year and the strong execution of our order book. Given that, we rather expect the upper end of this new range. On adjusted EBIT, we now target a precise margin of up to 6.5%, versus our previous guidance of more than 6%, and this also reflects continued good progress in the margin mix, driven especially by the submarines units as well as Atlas and also surface vessels units. As for our mid-term guidance, that is fully confirmed, as you can see on the slide here. That said, I'll hand back over to Oliver, who is going to, yeah, summarize the key messages from our call.
Oliver Burkhard
executiveThank you. Thank you, Paul. It's a privilege to give you the final slide and the closing remarks, and after that, ladies and gentlemen, it's over to you. Reflecting on how this year has unfolded through nine months, and also considering what lies ahead, I believe we have plenty of encouraging things to share. The deliveries make us genuinely proud, and once more, take that as given and as proof that we are serious, that we honor our commitments, that we deliver. Second, I'm truly glad that we're back in the game in surface vessels in a manner we wouldn't have anticipated eight months ago, since eight months back it was merely an idea, and it was a lost campaign in Australia, and we turned it into something the German Parliament approved in July — very quick, let's say, on the one hand, but also when it comes to execution. We know what we're doing here, and we still have 40 months remaining to deliver in December 2029 the first of the perhaps eight A-200. On the order backlog, the question, I think, is no longer whether demand exists — demand for our products is out there.
Oliver Burkhard
executiveThe real question is how quickly and how profitably we can turn this outstanding backlog—already at 25—into revenue and cash. Paul mentioned that this is precisely what we're focused on and where we're headed. There are still some opportunities out there on the campaigns side: CPSP, which stands for the Canadian Patrol Submarine Project, is one of them. I believe we can land a deal there once the contract exists, but again, the odds are very good for hitting all our targets. Another four batches—four of the other batch and four of A-200s—plus India, and naturally the F127. That's why we raised our financial guidance, and as you know, we've said from the start, including at our capital markets day, that we're after prudent growth. We understand what we're doing, but we're not aiming, so to speak, to double ourselves every four years—that isn't our goal. The company carries no debt, which is a nice bonus too, and given that, going public last October was the right move.
Oliver Burkhard
executiveTurning to what lies ahead, that also ties into your starting point. I believe we mentioned that over recent years we've done our preparation, and that's exactly why our EBIT margin has tripled when I look back a mere three years. Achieving that feels genuinely good and puts everyone in a positive mood, and I can say that truly across every part of our shipyard and all of our facilities, people understand their work and they enjoy doing it. Let me close with this point: a big order backlog by itself doesn't build shareholder value — execution does, and that's precisely what we're focused on. So, many thanks for listening up to now. At this point I'll hand things back to Jacques, and we look forward to taking your questions.
Jacques Esser
executiveThanks, Oliver. Thanks, Paul. With that, we're ready to take your questions. When you ask a question, please raise your virtual hand. My colleagues will open the line, and as I mentioned, please keep in mind that you also need to unmute yourself, and please give your name and institution so everyone can follow along. The first question comes from Olfa. Please go ahead. Olfa, I think you need to unmute yourself?
Olfa Taamallah
analystHello there. Can you hear me?
Jacques Esser
executiveHello there. Yes, go ahead.
Olfa Taamallah
analystOlfa Taamallah here, calling in from Oddo BHF. Oliver and Paul, congratulations on the strong performance and the guidance upgrade. I might have three questions. First, regarding that upgrade to guidance, could you speak to business development and what's chiefly driving it? Which division is outperforming the original expectation, at least? My second question concerns order intake in Q4. You already mentioned the MEKO 200. Should we anticipate further contracts arriving? Perhaps you could help us a bit with prepayments and flows and free cash flow developments, so as to be more specific than the positive guidance. Last, I realize it's a little early, but if you could share any thoughts or insights regarding fiscal year '27 — should we expect the same trends as in this current fiscal year, with margin improvement at a faster pace? Thank you very much.
Oliver Burkhard
executiveThanks. I believe that was meant for Paul, correct?
Paul Glaser
executiveI appreciate that, Olfa, and thanks for your questions as well. On the guidance raise we communicated, the main drivers — and you asked about these — really come from the submarines unit, where we're seeing strong momentum in sales growth, and that's what led us to raise our guidance for the current fiscal year; Atlas is also part of it, with the strong demand we've seen for Atlas contributing to that. For surface vessels, we had always expected a flatter development this year, and that indeed proved true. But as I mentioned, that's now going to change with the MEKO A-200. Let me add something here — Oliver said it — this is something we worked hard for and, as you know, it wasn't part of the original planning. The F126 program has now been canceled, which is why we now have a much more positive outlook for the surface vessels unit going forward. As for your questions on Q4 order intake, the main driver we expect will be the four frigates for Germany, plus of course smaller order intakes in the service units and so forth, but the majority of the portion will come from the surface vessels unit.
Paul Glaser
executiveFinally, on the prepayments side of things, as I mentioned before, every contract we have is overpaid — if you consider any single contract on its own, it's always in the money, to use my own term, meaning it's cash-positive. That's a firm condition we insist on before we sign any contract. Of course, given the capital expenditures we carry and the other cash outflows, this can shift somewhat quarter to quarter, but on the whole we still expect the rolling three-year average free cash flow guidance to land in that €400 million range. High prepayments aren't something we require — we only need enough to remain cash-positive, and it's always a matter of how lower prepayments can also help us offset the risk of receiving fewer escalation gains, which lets us then balance out the escalation formulas built into our contracts. Overall, you'll see this play out quarter to quarter, and I realize that makes modeling tough for you, but broadly speaking, from a modeling standpoint, if you begin calculating with positive free cash flows for the individual contracts, you're taking the right approach.
Paul Glaser
executiveYou need to consider this across the cycle rather than quarter to quarter. As for '27, I think calling it now is a bit premature. We remain comfortable with the mid-term guidance we've shared up to this point, and we'll let you know as soon as there's an update.
Oliver Burkhard
executiveThe nice part about 2027 is that it actually kicks off in October at our place—maybe I'm the first one to offer any perspective on 2027, right?
Jacques Esser
executiveThanks. Our next question is from Sriram. Go right ahead.
Sriram Krishnan
analystIs this coming through at my end now?
Jacques Esser
executiveCorrect.
Oliver Burkhard
executiveYes.
Sriram Krishnan
analystGreat, thank you. I have a number of questions—I'll probably limit myself to three this round, and if the chance comes up, I might come back. My first question, and it's likely a two-part one, concerns the submarines. Relative to what you shared with us at the capital markets day last year, do you see the move from the legacy contract to the new construction contract occurring somewhat faster than your own initial plans? On a related point, the 700 bps improved margin you told the market about at the gross margin level between the legacy and the new orders—are you noticing any betterment there? Because the execution looks to be going quite well on the submarine construction side. Those are the two parts of my submarine question. The second one, and this is somewhat of a longer-term question, so to speak, is about the autonomous market. I know you mentioned it only briefly in your presentation, but I'm just curious how you view this market. You already have some offerings at the product level. How do you see the future? Do you need to consider M&A as a possible route to add more capability to serve this future market?
Sriram Krishnan
analystNumber three is really straightforward, and it's just for clarification, if I can. Regarding that provision release that showed up in the surface vessels division — I realize it's a modest figure, roughly €4 million to €5 million in this quarter, but I'm simply trying to get at what drove it. Would you say it's a standard warranty release, or is it something different that's somewhat more encouraging for the surface vessels division? Thank you.
Oliver Burkhard
executiveThank you, Sriram. I'll begin, and perhaps Paul can chime in. When it comes to submarines, I believe your observation is quite a friendly one, though not surprising to us. We aimed to become faster, and we did. Why is that the case? Because of the ramp-up at Wismar, you may notice there's also an acceleration, since we won't have just one shipyard — in the future we'll have two. It is indeed shifting away from the legacy contracts, and you're familiar with this branch, and you know that contracts previously were somewhat different to negotiate than they are today. Nowadays, I'd say we're more inclined to get our terms and conditions down on paper with a signature beneath them, as was the case in the past. You should expect that phasing out the legacy and moving into the new contracts — and I think this has begun, though not fully — has started with the first contract from Germany and Norway; just recall, it was two and four, and then the Germans added another four while the Norwegians added another two. That second, let's say, round of contracts is different — definitely a bit different — from what we had before.
Oliver Burkhard
executiveActually, the beginning was in 2028 — sorry, 2021 — when we built those six submarines, the 212CD. Canada is joining that effort now. My guess is they'll adopt much of what has already been agreed with Germany and Norway and essentially copy and paste it, more or less, since we know those terms and conditions will also be fairly favorable. On the legacy side, there are still a few remaining when it comes to Turkey. That one is trickier, but I think we've also demonstrated that despite all the complications we've had over recent years — almost a decade — we've picked up speed there too, though it isn't solely in our hands, because a Turkish shipyard is the one constructing them. You should expect to see and will see additional improvement regarding how long it takes to build a submarine, run the testing phase, and commission it for a new customer. You raised the autonomous market point. What's our future view on that? Honestly, we have no interest in building hardware, because that isn't what we're aiming for. Paul and I have discussed this. If you go to a trade fair, or somewhere like Euronaval or wherever, in the past there were five, four offering this, and now it's 30, 40 offering some carriers that you can put any stuff on.
Oliver Burkhard
executiveI think this isn't what we're aiming for, and it doesn't follow the sentence I brought you earlier, saying we're shifting more from hardware to software, because I want to get our, let's say, intelligence on those carriers. Who's carrying it, it doesn't matter. An example for that is the BlueWhale project, which is together with us, IAI, and ELTA—not Elbit, cautious—and us. We are bringing the sonar on this carrier, they are delivering the carrier. This is what we see in the future because this market is far behind when it comes to air or to the land, because the physics are a bit more complicated in the water. One of our big advantages is we know a lot about physics underwater, and we do know how torpedoes work, we do know how sonars work, and we don't have to learn how to, let's say, manufacture carriers, 10 to 8 meters, just circling around and following a given procedure. If there are any M&A opportunities, we will have a deeper look on that. At the moment, I don't see so much, or let me say it in my words, I don't see anything worth paying so much money for it.
Oliver Burkhard
executiveSo what I'd say is this: let's focus on what's within our control, and let's put more intelligence into the water, because I think — and you can see it at Atlas — there are better margins, and there's also, let's say, room to grow, but it won't take the place of — and I keep saying this over and over — the big platforms, whether that's a big ship or a big submarine, since their mission profile is entirely different, and that profile is also required against the threats we face these days. It'll be complementary; those systems will add to them, but they won't take their place. So I think we're focusing on the platforms and focusing on how to bring intelligence into the water, whoever the carrier is — to put it simply, right? The third one, I've already forgotten it, but my CFO still has it in his head.
Paul Glaser
executiveI haven't. Yes, regarding what you asked about the surface vessels unit and that provision release, the way those warranty provisions work is as follows. Typically, you always include a warranty budget when calculating a contract, and once that warranty period ends with no claims or almost none — which usually signals a very solid, proven, high-quality product — you're then able to release those warranties. That's the classic approach we take. After a couple of months, we can then release those warranties. It's an operational sign, if you want to call it that, of how effectively and how well our products are actually performing.
Oliver Burkhard
executiveThat's good.
Jacques Esser
executiveCharles has the next question.
Charles Armitage
analystGood morning, and thanks. I'm having some trouble with your sales guidance for the year. To me it looks like things are going pretty well, so — your remarks about submarines ramping up on a new program, surface ships where you have an accounting catch-up in Q4, and Atlas doing very nicely — yet even when I take the 12%, that implies Q4 is down 7%. Is it milestones, what's happening, I'm struggling to get my numbers low enough. Help me out here.
Paul Glaser
executiveWhat we typically observe, Charles, is that it always hinges on cost-to-cost accounting—specifically, which cost milestones we hit in a given quarter. That's why you can't just apply a linear or mathematical method. It all depends on the cost progress that we and our suppliers are making, and which of those costs qualify for recognition as progress costs or prepayment costs, right? That's the distinguishing factor you need to factor in. And regarding the MEKO A-200, even though it's ramping up far faster than, say, Polarstern, where we had considerably more engineering work to complete, some time will pass before the conversion occurs. We will see that big order intake booking, but not much sales progress stemming from that order during the final three months of this fiscal year. Okay.
Jacques Esser
executiveApologies, Charles — was there something else you wanted to ask? All right, good. Our following question is from Adrien, so please go ahead.
Adrien Rabier
analystMorning, thanks. I have a quick follow-up plus a longer-term question, if that's alright, please. First, can you bring us up to date on when you expect the F127 order? You brought up parliament approval — I'm just wondering whether your expectation is that it lands in early 2027. Would that be fair? Then a question about margins, please. Clearly you've made really strong progress toward your medium-term targets, so I'm wondering what the target is over the longer term — say, the 2030 environment, once all the legacy orders have phased out. Do you think you'd be at 10% for both submarines and surface vessels, or even higher than this?
Oliver Burkhard
executiveThat doesn't mean agreeing — it just means understanding, Adrien, right? Let me begin with the expectation that was given, let's say, regarding the blessing and the way forward on F127. All of us, let's say, have noticed what happened, and it was quite disruptive, wasn't it, when the minister simply stopped F126, and there's still, let's say, plenty of rumor in the branch, and at one point there were many marine projects, which, let's say, demonstrated that there's a big need, but also a big need for money. That was also, let's say, feeding into the debate about F127, just to be clear on that. F127 is a ship the German Navy never had, but it has promised it to NATO to have it sooner or later, and it cannot be replaced by an A-200, and replacing it with an F126 wouldn't be possible either, because it's a BMD frigate, meaning ballistic missile defense frigate, has a displacement of more than 10,000 tons, and this means they don't have such a ship. At the moment, I think we have to educate the parliament a bit as we did with the A-200, which was not unsuccessful, and I'm confident that we maybe can reach that we will have a decision by the first half of 2027.
Oliver Burkhard
executiveProbably not at the start of the year, since plenty remains to be done—a lot, shall we say, headed off in various directions. From what I know, and I've heard nothing different from our peers, we have a special purpose company alongside NVL—known as NVL, now Rheinmetall—through which we're attempting to construct this vessel jointly. The IP belongs to us, we handle the design, we understand the ship's capabilities, and others will assist us in building it. There was—and let me just pick up on that point—an offer last week concerning a GMS 140 from Rheinmetall, merely a design study, which is fine. We too produce design studies; we don't publish them daily. Why would we? Since we possess a common, proven design. Right now, particularly the administration is extremely careful about what you promise and how you can deliver. That's the reason we secured the A-200. Had we pursued the F127 jointly with Rheinmetall, we would have needed to clarify what these ships look like, which capabilities they should carry, what the cost is, how it will be completed, and then when it will be finished.
Oliver Burkhard
executiveI believe we need to make something clear here, but I'm an optimistic guy, and I see that in the first half of 2027 this could be possible, since there is no other design out there. That's why I brought up the GMS 140 — it displaces only 6,000 tons, and it has only ASW, meaning anti-submarine warfare capabilities, which are on the A-200; there is nothing there that could help, let's say, to replace the F127, because it's a common design, it's our design, and a common approach to building it. I remain optimistic on that, even though there was a kind of disruption, but again, if you are four years behind and don't have a plan for how to get out of that, I would not recommend bringing tkMS into such a situation. It doesn't look like that, so our order book is stable and cannot be canceled overnight because a project is running as badly as this one was. I also invited all of those who are, let's say, victims of the F126 — as long as they deliver on time and they create no complications and no further, let's say, difficulties — they are invited to help us build the second batch if we get it in September, but that's not a must.
Oliver Burkhard
executiveWe’ll invite them provided they satisfy the expectations for timing and difficulty. Perhaps a second item?
Paul Glaser
executiveYes, regarding that — I realize everyone is trying in some way to extract a long-term guidance or margin profile from us. Let me just say the following: you can see where our businesses stand right now. Overall, I'd say things are moving forward very, very favorably across the sectors. We've consistently stated, when it comes to our Atlas Elektronik unit, how we intend to view it in terms of competition — if you set it against Saab or Thales in electronics and sensors — and where we want to see it positioned. You've also heard where we can see things during our discussions about the submarine unit. Of course, at this point I think the surface vessels division is shifting its profile; it looks considerably more positive than was the case before the A-200, but I believe it's too early to call at this stage and commit to that direction. Once we've completed our sound assessment of the overall situation and dynamics — certain matters will play a crucial role, such as Canada, the contract award date, what volume we'd be talking about, and so on — there will then be a point in time when we update our guidance as well as our timeframe.
Adrien Rabier
analystThat is very clear. Thank you so much.
Jacques Esser
executiveOkay. Sven is up next with a question. Go right ahead.
Sven Sauer
analystYes, hi there. Sven Sauer here from Kepler Cheuvreux. Thanks for taking my questions. I have two remaining. The first concerns a quote from Reuters attributed to you, Oliver, from this morning. I was wondering whether you could give us some color on it, and whether it is correct.
Oliver Burkhard
executiveI can't say whether the translation came out right, though.
Sven Sauer
analystYou apparently said you expect to win the Indian contract, but that competitors will attempt to wreck that — that's the translation from the German.
Oliver Burkhard
executiveOh. Someone messed something up, I
Sven Sauer
analystI'll share this with you at this moment,
Oliver Burkhard
executiveAll right? Yes.
Sven Sauer
analystMoving to Belgium for the second question. There was some news that Belgium is, yeah, also unhappy about replacing their M-class frigates, and there was also some, yeah, news that tkMS might offer their, yeah, anti-submarine warfare frigate for that program. I was wondering if you could share your thoughts on this as well.
Oliver Burkhard
executiveI’ll do that. Sven, let me be clear about this. This morning, when we were discussing the Canadian campaign, I said—and we genuinely recognized—that Hanwha ran a really strong campaign, and I’m fairly sure they can build boats too, but maybe you can call me biased: we built the better ones, and we won this competition. We are now the preferred bidder. I said nobody should be too—let’s say—too calm and relaxed that this competition is already over, because the Koreans are still in it and their sole objective right now is to wreck our campaign so they can get back into the game. This has nothing to do with India. In India, there’s a situation where we aren’t the preferred bidder—we’re the last one, because everyone else was eliminated. The Canadians handled it quite cleverly: they said, well, tkMS is the preferred bidder, and I’m pretty sure we’ll get along with them, but if not—in case not, which is a very low percentage—then we could return to the Koreans and ask them again to bring us into the submarine contract. I don’t expect any interference, let’s say, with India, but I’m still aware and cautious and—let’s say—prudent, whatever you want to call it, that we aren’t finished with Canada yet.
Oliver Burkhard
executiveWe've achieved, let's say, over 50%, certainly, since we hold preferred bidder status, but at this point we need to finalize a contract concerning the submarines, which we anticipate by year-end. Once that contract exists, we'll then discuss what's called in-service support, which is going to run for the following 40 years. We'll discuss where they locate their harbors and how we assist them in constructing them for submarines. We'll discuss the ITB, or offset, whatever you prefer to call it, where we, let's say, take each MoU — and we completed 40 of them throughout that campaign — and bring it to life, bring them into our supply chain, and help us, both from a Canadian standpoint very worthwhile, but also from our standpoint to perhaps accelerate production time. It's somewhat muddled, let's say, I'm not sure what Reuters reported, we're working here, as with you right now, later on I'll have time to review it, but it wasn't that I anticipate any destructive, let's say, activities, notwithstanding that the Frenchies remain there and are talking about how they'll all divide it up, but then again, India is a separate matter since India is the construction side, and the general contractor is an Indian shipyard.
Oliver Burkhard
executiveWhat we're handing over right now is just the material packages, and that doesn't tie up our capacity here, so I don't anticipate any sort of interruption there. Canada is also — it's somewhat alarming, not alarming, more of a wake-up call, though they aren't asleep — it's just telling our politicians that you've contributed very, very well in that campaign, the Norwegian government and the German government, and to keep up, let's say, the good work until the signature happens, because only at that point is the contract truly ready to enter our order book. Today there's an opportunity, and it's highly likely that we land it, but it isn't in the order book yet, and the work ahead of us now is genuinely a tough ride through the end of the year, though I'm confident we'll make it. We won't be the bottleneck, let's say. Belgium — yes, indeed, a few questions were, let's say, raised with us about whether we might jump into their program. It's, as you mentioned, an ASW frigate, ideally exactly the A-200. I circled back and said, well, if they do know what they want to have, then maybe we can talk.
Oliver Burkhard
executiveTheir goal is to move into delivery of the Germans’ A-200. That’s not a matter I can negotiate with them—it has to be worked out between the German government and the Belgian government, and I think that’s the level we’re at. Yes, but I can confirm they showed interest in how the A-200 is performing, what capabilities it carries on board, and whether that might also be enough for them. We’re talking about two only; Belgium is a bit smaller, and a lower-cost coastline is not that long, but I can confirm there was official outreach to us, yes. Great. Thanks.
Jacques Esser
executiveAll right, we're running a little past our time. That said, Sriram has a follow-up question. Sriram, go ahead once more.
Sriram Krishnan
analystThanks a lot for giving me a second chance to ask. I have just a few quick follow-ups, if that's alright. First, on the MEKO 200: for the initial batch of orders, the media had speculated roughly €4 billion, but the starting figure is expected to be €6.3 billion. I'd like to understand what's behind that big jump in cost. How much of it comes from inflation protection, and how much from capability improvement? That's my first question. Second, could you bring us up to date on how things are progressing at Wismar? When precisely do you expect the first production there to begin? What difficulties are you running into right now with that ramp-up, particularly on the labor side, since I'm thinking over the medium term — do you see any upside risk to your labor cost at Wismar? Thank you.
Oliver Burkhard
executiveAlright. Thank you, Sriram. Yes, MEKO 200 carries a higher price tag, as was indicated very early on. Why is that the case? It comes down to the capabilities they want aboard the vessel. If you're after something special, just compare the base model of a VW Golf with the better, shall we say, version of it — then you have to pay the price. That is precisely what drove this up, but I believe it still sits more than €500 million below their old F126 approach, even though it has almost 80% of the capabilities that F126 had. I think it's still, let's say, worth putting this money in this direction rather than another one. The capabilities — and capabilities are always driven by the customer. Whatever the customer wants to have, we show him how we can engineer it on the boat or on the ship, and then they have to decide whether they want to pay for it or can afford it or not. Wismar is going really well, as Paul also already mentioned. I think we have completed production of the pressure hull production line, which means one of the key, let's say, aggregates needed to build submarines is already installed — €100 million later, but anyhow, we made it on time, within budget.
Oliver Burkhard
executiveRight now it's in the testing phase, and production will begin in September for the first submarines from a customer who I don't need to name here, or shouldn't name, but they remain very friendly and are already in our order book, and we'll kick off production of the Polarstern, which also starts in September. We're no longer in a ramp-up — we're trying, let's say, to reach a new normal at this point, and that carries all the, let's say, challenges that come along with such a new shipyard, but I think we're managing it quite well. On the labor market side, the CHRO is sitting in front of me, not too far away, and we're very glad that plenty of people apply for jobs there, and for each vacant position right now, we have 30 applicants, a 1 to 30 ratio is quite comfortable, but that also comes down to good employer branding and to, let's say, groundwork in advance where we were able to persuade people to work at that shipyard, since working at a shipyard in the past always meant, well, muddling through from contract to contract — you were safe for three years, and then in the last year you were wondering how things would carry on.
Oliver Burkhard
executiveWe’re able to provide truly long-term employment with us, since both sides are pleased with that arrangement, and this delivers a great deal of, shall we say, planning certainty for people, even when they need to come to Wismar. Right now we’re receiving many applications from the automotive sector — mid-management people who are looking for, let’s say, fresh opportunities. In my view, working in this branch isn’t as bad as it perhaps used to be. Many people have come to understand that the security narrative has shifted and that it’s quite a source of pride to do this work and to contribute to your home country’s security, so I think we won’t run into any shortages the way maybe others have in smaller branches or in small and medium-sized branches; ours is performing very well at the moment, and we’re quite confident that it will continue that way.
Jacques Esser
executiveAlright, Sriram — is that sufficient as an answer?
Sriram Krishnan
analystYou're welcome. Thank you very much. I really appreciate that.
Jacques Esser
executiveAlright, that brings us to the close for today. Thanks to everyone for your interest and for joining us on today's conference call. Naturally, should any questions remain, the whole Investor Relations team is on hand, and we hope to keep in contact with you. So, I'd like to wrap up the call now. Thank you, and goodbye.
Oliver Burkhard
executiveThank you, and goodbye.
Paul Glaser
executiveTake care.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete TKMS AG & Co KGaA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to TKMS AG & Co KGaA earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TKMS AG & Co KGaA or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.