Torex Resources Inc. (TXR) Earnings Call Transcript & Summary

November 5, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings

Earnings Call Speaker Segments

Shaun Silveira

executive
#1

Thanks, operator, and good morning to all of you. On behalf of everyone at Torex, I'd like to welcome you to our Q3 2026 conference call. Before we get started, I want listeners to know that a presentation that goes along with today's call is available in the Investor section of our website, www.torex.com. If you turn to page 1, I'd also like to point out that some of the statements the management team makes today may include forward-looking information. So please take a look at the detailed cautionary notes on page 1 of today's presentation, along with the ones included in the Q3 2026 MD&A. Joining us on the call today are Andrew Snowden, our President and CEO, and Dan Rollins, our CFO. After the presentation, we'll be open for the question and answer period. This conference call is being webcast and will be available for replay on our website at www.torexgold.com. Last night's press release, together with the accompanying financial statements and MD&A, are posted on our website and have been filed on SEDAR+. Please also note that unless otherwise stated, all amounts mentioned on this call are in U.S. dollars. I'll now hand the call over to Andrew.

Andrew Snowden

executive
#2

All right, thanks Shaun, and good morning everybody. During our previous call, we discussed the anticipated increase in output for the latter half of the year as we transitioned into higher-grade zones at Media Luna. Our third quarter came through on that commitment, which you can see on slide 4. Output rose roughly 37% compared with the prior quarter, reaching 132,000 ounces. All-in sustaining costs also fell 27% versus the previous quarter, landing at just over $1,800 per ounce. That resulted in $150 million in free cash flow for the period, which enabled us to return $95 million to shareholders while lifting our cash balance to $226 million. Dan will take you through those figures shortly. If you look at slide 5, we are still very much on course to hit annual production guidance of 420,000 to 470,000 ounces this year. We anticipate fourth quarter operating results will remain robust, setting us up for a strong close to the year. Over the first 9 months, output came in at roughly 329,000 ounces, which is 74% of the midpoint of our full-year production guidance. Thanks to a robust Q3, all-in sustaining costs year-to-date now stand at $2,025 per ounce, inside our full-year guided range of $2,000 to $2,100. Our focus is on carrying the operating performance that drove that meaningful cost improvement this quarter forward into Q4 and 2027. Capital spending, once you strip out working capital, was $79 million for the quarter. That breaks down as $38 million of sustaining capital, leases included, and $41 million of non-sustaining investments. Most of the non-sustaining money went to Media Luna North development and drilling. Year-to-date capex was a bit more than $200 million, and our full-year guidance is unchanged at $300 million to $320 million. Moving to slide 6, both mines continued to run above their target rates during the quarter. Media Luna averaged about 8,200 tonnes per day, roughly 10% above design, and ELG Underground stayed above 3,000 tonnes per day against its 2,800 tonne target. The biggest gain this quarter came from planned mine sequencing as we moved into higher-grade stopes. Across the Morelos Complex, average mine grade rose to roughly 4.6 grams per tonne gold equivalent, compared with 3.7 in Q2. At the paste plant, adding backup paste and slurry pumps will increase availability moving forward, which supports the backfilling needed to keep flexibility in our mining sequence. Combined with our GeoMet model, that gives us clearer visibility into what upcoming stopes will look like, helping us make better-informed sequencing decisions. Turning to processing on slide 7, throughput remained steady at 10,800 tonnes per day during the quarter. Higher feed grades and improved gold recovery drove the increase in production. On average, process grades came in at roughly 4.6 grams per tonne gold equivalent for the quarter, compared with 3.5 in Q2, and gold recovery climbed by about 2.8 percentage points to 88%. Gold recoveries are still strong, near 95%. We continue to make progress on gold recovery toward the 89% technical report benchmark. As noted last quarter, gold recovery will vary with ore mineralogy. This quarter, we benefited from processing higher-grade material that also delivered better gold recovery. Beyond improvements to the flowsheet, the GeoMet model helps us predict more accurately how different ore types will perform in the plant, including expected recovery and reagent requirements. Our present focus is on applying that better ore understanding to manage variability, make recovery more consistent, and keep reagent consumption under control. Moving now to slide 8, where there is a bit of a project update, at Media Luna North, first ore is still on schedule for late this year. After the ventilation adit and haulage breakthroughs we discussed last quarter, progress was made on ventilation, paste distribution, and electrical infrastructure. The work that remains involves finishing those systems, receiving and installing the rest of the equipment, and carrying on with mine development. Initial production equipment has come in, and hiring and training of the workforce is also in progress. Once the mine is ramping up, Media Luna North is going to serve as a third mining front, and that helps with ore supply as well as giving us more flexibility in sequencing. Looking at 2027, we expect an average of about 1,000 tonnes per day, and then further ramp-up toward the 2,300 tonne per day design capacity in the years after that. Then at Los Reyes, drilling and field investigations are supporting the pre-feasibility study, which we're targeting to deliver in late 2027. Right now we've got 6 active drill rigs and close to 100 people on site, and during Q3 we completed close to 6,000 meters of drilling. The near-term focus is the resource model, the geotech work, and the information we need for engineering in 2027. That effort is going to help us as well when we look at ways to make the Los Reyes project more economic and to put together solid permit applications. Likewise, beginning mining at Media Luna North is going to give us a third mining front, which increases operational flexibility and helps with the phased ramp-up in overall mine rates. And as a result of that, Morelos is going to shift away from being mine-constrained, which is what we dealt with during 2025 and 2026, and become plant-constrained, which is a much more comfortable position for me personally. Since we saw this coming, it gave us an opportunity to look at two options right now for raising throughput at our plant. Slide 9 sets out those two opportunities, and the first one is focused on debottlenecking the infrastructure we already have. We just wrapped up studies that back increasing the plant's capacity to roughly 12,000 tonnes per day, at a very low capital intensity of around $5 million at the plant. We expect to begin carrying out this debottlenecking in Q1 2027, and the benefits should show up by the end of that year. The second opportunity is a bigger plant expansion, which means adding flotation capacity and supporting equipment to lift total capacity to 14,500 tonnes per day, matching the installed capacity of the existing grinding circuit. The current capital estimate for that expansion is about $100 million. Ahead of unlocking the debottlenecking upside and advancing more resource drilling at the San Miguel Corridor, we're aiming to make a call on that in Q1 2028. With that schedule, we feel confident about having a sustainable ore supply prior to putting capital into the expansion. Those 2 projects together could add 35% in processing capacity — about 50,000 extra ounces per year from debottlenecking, plus roughly another 100,000 ounces annually from the bigger expansion. Naturally, those figures hinge on the throughput, grade recovery, and feed availability we actually achieve. This opportunity ties straight into the exploration effort we have underway, which slide 10 lays out. What we've seen from San Miguel so far keeps reinforcing the idea that a mineralized corridor of at least 4 km could run westward from Media Luna toward Media Luna West. One thing that's especially exciting is the way our geological understanding of the area keeps developing, including the chance that the San Miguel Fault is a feeder source for the bigger Media Luna system. Given how large the corridor is and the results we've gotten up to now, we think San Miguel holds multimillion-ounce gold equivalent potential. The indicative gold equivalent grades we've received so far do average above the Media Luna reserve grade. Because the corridor sits near infrastructure that’s already underground, we might reach mineralization by developing additional drifts—possibly giving us higher-grade mill feed and making use of what’s already been invested at Morelos. Drilling planned through 2027 will assist us in determining how large and continuous the mineralization is, and it will guide the bigger decision on expanding the plant. What we intend is to aim for announcing a maiden resource for that San Miguel Corridor in Q1 2028. At ELG Underground and the Media Luna Cluster, our programs also keep focusing on replacing reserves and growing resources, and we expect to provide a year-end update in March 2027. With that, Dan, I’ll hand things over to you for the financial results.

Dan Rollins

executive
#3

Thanks, Andrew. Beginning with slide twelve, the solid operational execution translated into strong financial outcomes, with adjusted EBITDA rising to $344 million, up from $204 million in Q2, and free cash flow climbing to $150 million versus $94 million across that same span. All-in sustaining costs landed at $1,803 per ounce, which is a 27% gain compared with Q2. Consequently, all-in sustaining margins rose to 58%, up from 46%. The quarter-over-quarter gain stemmed from higher grades mined and processed, along with better gold recovery. Cyanide usage was somewhat below the previous quarter and stayed above budgeted amounts in order to support enhanced gold recoveries in the leach circuit. We anticipate cyanide consumption holding at present levels through next year. Keeping cyanide usage in check continues to be a top priority for our site team. Looking toward 2027, we anticipate continued pricing pressure on consumables, reflecting how the Ukraine conflict has affected energy and ammonia prices, which flows directly into input costs for producing key consumables including cyanide, SMBS, and explosives. Beyond that, we expect sustaining CapEx to rise next year with the startup of Media Luna, plus additional leases covering new equipment that supports displacing an underground mining contractor at ELG Underground and new gear for the Media Luna North ramp-up; on top of that, we will speed up other sustaining projects to back the higher throughput rates tied to the debottlenecking project Andrew mentioned earlier. Accordingly, we expect all-in sustaining costs in '27 to be broadly in line with the level guided for 2026. As shown on slide thirteen, after returning $95 million to shareholders, our cash balance grew by $57 million, reaching $226 million. Cash flow from operations, before non-cash working capital changes, totaled $298 million, including $54 million in income taxes paid; for Q4, tax payments should fall between $55 million and $60 million. Taking non-cash working capital changes into account, cash flow from operations was $231 million. After CapEx, free cash flow came to $150 million, lifting the year-to-date figure to $402 million; we expect operating cash flow and free cash flow to be lighter in Q4 as we complete our first direct concentrate sales to a smelter. Until now, our shipments have gone mainly to traders. Although we expect revenue recognition in Q4, when the concentrate is loaded onto the vessel at the port of Manzanillo, payment on that sale is not expected until Q1 2027. Therefore, Q4 cash flow from operations should be affected by an accounts receivable build of roughly $120 million. In Q1 2027, cash flow from operations will gain from an accounts receivable inflow of a similar size, subject to final price adjustments. As in prior quarters, we will manage price risk through quotational period hedges, or QP hedges. Moving to slide 14, we finished September with $226 million in cash, which is above our minimum cash target of $200 million. Total available liquidity comes to $563 million, including $337 million accessible under our credit facility. As we discussed earlier regarding the timing of cash flows tied to our first direct concentrate sale to a smelter, our cash balance is expected to dip temporarily in Q4 and then be strengthened in Q1 '27 once the cash proceeds come in. Wrapping up my remarks on slide 15, through September we have returned $271 million of capital, which is 77% of our $350 million target for 2026. Year-to-date returns consist of $239 million in share repurchases and $32 million in dividends. We have bought back roughly 4.9 million shares at an average price of just over CAD 67 per share, equal to about 5% of our shares outstanding at the beginning of the year. The buyback has stayed active since the quarter closed, and we remain well on track to hit our stated target by year-end. We will keep balancing return of capital against our other capital allocation priorities, including organic growth opportunities at Morelos, Media Luna, developing Los Reyes, boosting our investment in value-enhancing exploration and drilling across the entire portfolio, and maintaining a strong and flexible balance sheet. With that, Andrew, I'll turn the call back to you.

Andrew Snowden

executive
#4

Thank you, Dan. As we wrap up, I’d like to offer a handful of remarks about the catalysts ahead that you’ll find outlined on slide 17. In Q3 we saw exactly what Morelos is capable of, as better grades and higher recoveries fed through to improved margins and stronger cash generation. What matters most to us right now is keeping that performance going through the end of the year and building further on it in 2027; over the near term, the next operational milestone is first ore at Media Luna North. With a third mining front added, our ore supply and sequencing flexibility will both improve, which supports Morelos in moving from being constrained by mining to being constrained by the plant, and opens the chance to unlock extra processing capacity. We’re also making progress on our planned listing on the New York Stock Exchange, which would widen investor access, subject of course to exchange approval and the applicable listing conditions. Then, in early 2027, we anticipate starting plant debottlenecking work and issuing our updates on year-end reserves and resources. Ongoing drilling at San Miguel will help us define the longer-term opportunity around our existing infrastructure, while Los Reyes moves ahead toward its pre-feasibility study; with a stronger balance sheet and a number of ways to grow from the asset base we already have, we’re well placed to fund disciplined investment while still delivering meaningful returns to shareholders. Consistency at Morelos, together with progress on these opportunities, will be central to realizing that value. My thanks go to our teams for their continued commitment and to all of you joining us today on the line. We’ll now open the line for questions.

Cosmos Chiu

analyst
#5

Hi, Andrew. Perhaps we could start by looking at production so far. Like you said, Andrew, you had the benefit of better grades during Q3 — 3.5 grams per tonne, that's just for the gold in Q3. Could you speak to whether those higher grades can be sustained into, say, Q4 or perhaps into next year, and what was it that helped produce those better grades?

Andrew Snowden

executive
#6

Thanks for asking, Cos, and good morning; for Q4, my expectation is that higher-grade stopes will keep working in our favor. We'll be somewhat range-bound relative to what Q3 showed you. I think you should expect grade to come in around there in Q4, so I expect Q4 will remain a strong one for us. As we look toward 2027, I think what you should expect is that we won't see the extremes, I suppose, that showed up here in 2026, when the lower-grade quarters were Q1 and Q2 and the higher-grade quarters were Q3 and Q4. You should expect far more stability in grade and far more stability in our production profile as we look out through 2027. So really, what I'd look at is the midpoint between our first half of the year grades and our second half of the year grades as being the normal; so on a gold equivalent basis, that's roughly 4 grams a tonne gold equivalent. And what that will result in is average quarterly production of somewhere in the 110,000 to 115,000 ounce range, and that's all based on current plant throughput levels. Of course, as we execute on the debottlenecking program I talked about earlier, that gives us an opportunity to step up that quarterly range. But that 110,000 to 115,000 ounce quarter is a good benchmark to use looking forward into 2027.

Cosmos Chiu

analyst
#7

Yes, that sounds good, Andrew, and lower volatility is definitely preferable. Perhaps I could ask about recovery — recovery also went up in Q3 to above 88%. Is that simply because of the higher grades being fed in, or does it tie back to what Dan mentioned, namely greater use of reagents and more cyanide consumption to assist recovery, or is the increased cyanide usage driven by the different ore mix coming through, maybe with a bit more copper. And on that point, with Media Luna North coming in, how does that shift the dynamics once more? So recovery — is it from higher grades? If not, is it from greater cyanide consumption? And how does Media Luna North coming in change things again? Yes.

Andrew Snowden

executive
#8

Yes, and that's a good question, Cos. To begin, I'd point out that gold recovery and the gold grade contained across Media Luna aren't necessarily correlated; we can be working through stopes with higher grade and higher recovery; we can be working through stopes that are higher grade and lower recovery, and similarly across the different dimensions. So they aren't necessarily linked. And during Q3, and we'll see the same in Q4, we were accessing higher-grade stopes and some higher-recovery stopes. So we had the benefit of both during Q3. I expect we'll have the benefit of both during Q4 here. But the changes Dan mentioned, which are more on the operational optimization side, are what we've been aiming to do now that we have a good GeoMet model in place. Now we have much more visibility on what lies ahead of us across the Media Luna mine and at what point we'll be working through some of these lower-recovery stopes. Our focus is on what we can do to maximize recoveries through those lower-recovery stopes. And I think what you saw during, particularly Q2 of this year, was that the solution wasn't optimal because it involved really pumping a lot of cyanide into the plant to recover as much gold as possible. Of course, that is the solution; it simply adds extra cost to our production profile. And what we're aiming to do is find that balance of what the right cyanide level is, coupled with other optimization opportunities through the plant. And so we have been tinkering a little through the flowsheet during 2026 to look for opportunities to manage cyanide as optimally as we can while maximizing recoveries; and so we saw improvements in that during Q3. And so we have seen a bit of a step-down in cyanide, and I think there are opportunities to step down cyanide even further. For the time being, though, I'd say the levels you observed in Q3 are likely a decent placeholder for assuming that, at minimum over the coming 12 months, this is a reasonable level to assume as we keep seeking flowsheet optimization opportunities to keep driving costs down.

Cosmos Chiu

analyst
#9

Great. And then perhaps a final question, peering ahead now. It's great to see that you've got that 1 slide ready, Andrew, regarding debottlenecking and possible additional expansion down the road; when it comes to that possible expansion down the road, it appears to hinge on locating a few additional ounces, particularly around the San Miguel area. Could you quantify for us right now, for instance, how many additional ounces you'd need to locate to justify that possible $100 million investment? And then I also noticed other targets here at Escala and El Nero. Those appear to be shallower, more oxidized epithermal systems. Is that open-pittable? Is the focus on finding more open-pit material or underground material, or does it genuinely not matter?

Andrew Snowden

executive
#10

There are a few questions there, so maybe I'll take the last one first and then come back to the earlier one. As for what we're after at Morelos, we aren't pursuing open-pit or underground material as a strategy; we're just trying to find mineralized material so that we can extend our mine life and add incrementally either to production or to mine life. So if we come across mineralized zones through open-pit areas, that's great. If we find it through underground areas, that's great too. So we aren't targeting either one over the other. We feel good that no matter which route we end up taking, we can navigate Mexico's permitting system and secure the permits and environmental approvals we need. You're correct that a few of those outside deposits—Escala especially—are something we're pretty enthusiastic about at the moment. It would probably be an open-pit deposit. We're aiming to have results from the drilling at Escala come out, most likely in Q1 of next year. So at that point we can share more about that potential. Let me also circle back to your earlier question regarding the larger plant expansion and what we hope to identify inside the San Miguel Corridor. To start, the balancing act is making sure we keep our focus on Morelos as our cornerstone asset with a long life—one we can mine and produce from for many years ahead. So for me, it matters that when we reach the point of deciding on that expansion, and we know there's potential to drive this expansion upward—we've done a lot of work examining what that opportunity could look like—it's important to weigh that annual production rate against being confident we can sustain a long mine life. At the moment, our mine life stands at approximately 10 years, more or less, and I appreciate being in a position to sustain a 10-year mine life. Consequently, I can't identify a precise quantity of material today that would support that figure; that's work we'll be carrying out during 2027. During my presentation and commentary, I mentioned that the San Miguel Corridor could potentially host a multimillion-ounce deposit. Given how near it sits to the infrastructure already in place at Media Luna, and given its proximity to the existing material handling system at Media Luna, we believe—at least based on where things stand right now—that we can integrate it into the mine life quite rapidly. We're going to carry out that drilling all the way through 2027. I imagine we'll find out how much we can grow our resource base from the drilling program we've got set for next year. After that, once we reach Q1 2028, we'll make the call on whether to proceed with it then or instead take it up at some later point. Either way, that choice gets made in Q1 2028.

Cosmos Chiu

analyst
#11

Thank you, Andrew. I really am looking forward to it. I appreciate your taking the time to answer all of my questions. That's everything from me. Thanks.

Lauren McConnell

analyst
#12

I just wanted to ask a little about the debottlenecking. You're clearly aiming to increase that plant capacity by roughly 10% to 15% in H2 of next year. What are the main bottlenecks you're addressing, what are the key execution risks, and how should we think about that ramp-up? Is it a gradual ramp starting mid-2027, or is it more of a step-up in throughput that arrives nearer the end of next year?

Andrew Snowden

executive
#13

Good morning, Lauren. Thanks for the question. On the debottlenecking, we worked through our engineering studies over roughly the last 6 months, and what that really showed us was a few things. First, the bottleneck we have today in our processing plant, and the one that must be relieved to realize the potential of what we've already built at Morelos, sits within our detox circuits, specifically the cyanide destruction circuit in our operation. That bottleneck will be relieved through 2 different avenues. One is refining our operating parameters; part of the constraint comes from some of the operational constraints in place within that detox circuit, so it's about making some operating changes there. Second, some minor equipment updates will be needed, and I believe we estimated in the material approximately $5 million in capital costs. You can think of that as swapping out some pipes and swapping out some pumps within the detox circuit. Together, that's what delivers the debottlenecking, and that's what delivers the 12,000 tonnes per day; on timing, we're actually in the final stages right now of putting together our plan for how we'll deliver that over the course of 2027. At this point, I think a reasonable estimate is that the debottleneck would be complete by the end of 2027. So we may see some benefit right at the end of the year, but we'll have the full-year benefit over the course of 2028. I think that's how you should be thinking about it at this stage.

Lauren McConnell

analyst
#14

All right, thanks. That's quite useful. Then a fast question about Media Luna North. Clearly it's still on schedule for first ore later in the year. As I understand it, you're aiming at average output of roughly 1,000 tonnes per day in 2027, and then, of course, the eventual design capacity, I think, is nearer 2,300 tonnes per day. What would you say are the main constraints that govern that ramp-up, and how ought we to think about that ramp-up over the course of 2027? Yes.

Andrew Snowden

executive
#15

So really, the investment we have to make at that mine in order to reach those design levels step by step over the next 2 years is mostly in underground development. So we'll be looking to, I'd say, develop that mine out fairly aggressively across 2027. We're reaching 1 stope at the end of the year. As I understand it, the first blast is scheduled for December. That stope will run through, I think, mine out that first stope during December; and then as we go into 2027, we'll sort of ramp up over the course of the year. I believe the current plan is to finish the year at close to 1,400 tonnes per day, so the average across the full year will be roughly 1,000, meaning it builds up gradually during the year and really just hinges on opening up that mine and putting money into underground development. Apart from that, the project should be mostly finished at the end of this year. Some portions of the capital investment, especially the paste UDS system and certain electrical work, may be finished in Q1. But other than that, it's really only underground development for the rest of the year to support ramping up to those mining rates.

Lauren McConnell

analyst
#16

All right, that's genuinely useful, thanks. And finally, regarding that bigger choice about expanding Morelos, if we take it as given that a favorable investment decision happens in early 2028, and I realize you're likely still sorting through some of these details, what would construction and commissioning take in terms of time, and when could we realistically expect that extra production to start?

Andrew Snowden

executive
#17

So my estimate at this moment, Lauren, is that procuring the parts, installing them, and finishing that expansion project would take somewhere between 1 year and 18 months. Thus, if you begin in Q1 2028, you can expect that perhaps by the first half, mid-2029, it will reach that level.

Lauren McConnell

analyst
#18

Okay, great. That's everything from my side. I'll hand it over so others can pose their questions. Thanks.

Andrew Snowden

executive
#19

Great. Thank you, Lauren.

Jeremy Hoy

analyst
#20

Hey Andrew, Dan, Shaun. I just want to ask a quick follow-up about the bigger Morelos expansion. If you're looking at 14,500 tonnes per day, does that basically max out the infrastructure you had deliberately built oversized with the Media Luna expansion, like the conveyor in the tunnel?

Andrew Snowden

executive
#21

Jeremy, I think the more important thing to focus on there, at least as I see it, is that it maxes out the plant's expansion. Really, that 14,500 tonne per day capacity comes from the grinding circuit that's currently installed. So by expanding and adding more flotation cells, we'll bring the back end of the plant up to match what's installed in the grinding circuit. The question is essentially about the origin of that 14,500 figure. The limiting factor isn't how much we might invest in material handling; what caps it is the grinding circuit's installed capacity at the plant, and that is the binding constraint. Once you reach 14,500 tonnes per day, you may also be asking yourself where the feed would originate. At present, Media Luna is mining 8,000 tonnes per day, and ELG Underground is mining 3,000 tonnes per day, giving us 11,000 tonnes per day combined from those two sources. Within roughly the next twelve months, Media Luna North is going to increase output until it reaches the planned capacity of 2,300 tonnes per day, which means that combined we will have more than 13,000 tonnes per day of material we can supply to the mill. That clearly is enough to fully support the debottlenecked case. It would not, however, be enough to immediately fill the mill at that rate using underground material at the current grade. Under the base case, we would cover any shortfall or differential using open-pit stockpile that we hold. As things stand, we currently have 6 million tonnes in stockpile grading approximately 1.3 to 1.4 grams per tonne on average, so that is what the base case would be. Naturally, the aim is to avoid relying on that lower-grade open-pit material and instead fill the mill with underground material. So, as we demonstrate what the San Miguel Corridor can do, one of the investments we'll be evaluating is what would be required to move additional material from the Media Luna orebody—from that Media Luna Cluster—through the material handling system. That work has already begun. I believe some form of investment would likely be needed to support filling that larger mill entirely with underground material. We figure it's around $50 million at this point. That money would go toward enlarging the underground material handling system and swapping out the motor on the conveyor we already have, so we can run it faster and push more material through. Some further work on that still needs to be done during the coming year, but that's our current way of looking at it, and I'd like to add that, Jeremy.

Dan Rollins

executive
#22

On top of that, we’d need to create what amounts to a new mining front. Remember that when we built Media Luna North, the CapEx came to just over $100 million. One possibility would be to speed up Media Luna West, and since that sits farther out, it could call for extra fleet, so perhaps another $100 million to $150 million to bring that mine into development. But we won’t know until the drilling at the San Miguel Corridor is done, and right now we don’t understand how we would develop it. It might turn out to need less capital if we simply begin drifting across from the southern end of Media Luna, though we really want that drilling completed so we fully grasp what the San Miguel Corridor offers. Just as important is grasping the grade potential there, since that could genuinely underpin still more production and upside.

Jeremy Hoy

analyst
#23

All right, that's quite useful. And yeah, San Miguel is precisely what I was getting at there. If there was extra ore heading to the plant by way of the tunnel, did that get folded into that $100 million figure, and so on; so I appreciate that it's still under evaluation and San Miguel, you know, is working to figure it out; so I look forward to more detail on that. My other question concerns the reserve and resource update coming early next year, which as you said won't include San Miguel. Should we expect the gold price assumptions for reserves and resources to go up? And I'm just wondering whether we could see an overall grade decline in reserves and resources that might partly offset the gain from the debottlenecking work that will raise throughput.

Dan Rollins

executive
#24

Yes, Jeremy, at the moment it's a, we'll go through that as we do the work and move into that year-end process. But as things stand right now, I think I can speak for Andrew, we're not really keen on lowering our cutoff grade at present, given some of the cost pressures we've been facing. You know, if you lower your cutoff grade, unless you're able to stockpile that material and run the higher-grade material through, that would be an option. But at the moment I think we'd aim to keep the cutoff grade where it is. If that means applying a higher gold price to justify that cutoff, we'll consider that. When we actually did a lot of work on cutoff grade analysis, Media Luna itself and Media Luna North are fairly insensitive to metal prices, so you don't really gain many more ounces by using a higher metal price. You could potentially get more from ELG Underground; it is definitely more sensitive. And one thing we'll examine there is their ability to, with the drilling we're going to do this year and next year, can we look at perhaps some cutoff grade deltas there to see whether we can extend the mine life while keeping very strong margin out of that mine, which remains a very, very solid mine for the operation. So at the moment, not really looking to add more pressure to the cost profile, want to get that stable. Once we see the work at San Miguel Corridor, we can then assess how we want to be the optimal stewards of that orebody and that enlarged orebody. So don't expect any material changes, I think, at this year-end. Maybe we'll have a chance to look at that when we put out the 2028 reserve and resource update.

Jeremy Hoy

analyst
#25

All right, that's great. Really useful. Thanks, folks. I'll get back in line.

Dan Rollins

executive
#26

Thank you, Jeremy.

Don DeMarco

analyst
#27

Hello, Andrew. Before, during this call, you said that for 2027 you expect roughly 110,000 to 115,000 ounces each quarter. That's a solid range to use. Do you figure it will hold steady across the year quarter by quarter, or should we expect some front-end or back-end weighting in the profile?

Andrew Snowden

executive
#28

Yes, good morning, Don, and that's a good question. Look, the way to think about next year in general is that it will be fairly stable. Naturally, each quarter will carry a bit of variability. We are a mining company, after all, but stability will be far greater than what you saw during 2026.

Don DeMarco

analyst
#29

Alright, and we observed that the underground mining rates at Media Luna came in at an average above 8,200 tonnes per day during Q3, compared with the original steady-state goal of 7,500 tonnes per day. So how sustainable are those mining rates above design? And should we be considering a higher normalized mining rate to factor into the 2027 target?

Andrew Snowden

executive
#30

Yeah, look, Don, I think it would be a fair assumption to expect the mine to hold at 8,000 tonnes per day. I think we've demonstrated we can reach that level; we're really pushing the mine hard at the moment. I think there's an opportunity to ease that back somewhat over the course of next year, but assuming 8,000 tonnes per day would, I think, be a good estimate for Media Luna.

Don DeMarco

analyst
#31

All right. Turning to plant throughput and debottlenecking: the plant is already running above its design rate of 10,600 tonnes per day, so what drove that higher throughput in Q3, and should we expect it to keep going? You're nearly at the bottom end of the range for that debottlenecking target.

Andrew Snowden

executive
#32

Yeah, we had a very strong quarter at the plant, obviously — we ran at 10,800. The main reason for that, Don, is that our maintenance schedule varies from month to month; each month we have a planned maintenance shutdown during which we carry out maintenance work on the plant. That can run anywhere from about 24 hours at the short end to sometimes 100 hours at the long end; so we do see some variability month to month and quarter to quarter, depending on how many of the longer shutdowns occur versus how many shorter ones occur; and so over a full year, I still believe that with the way the plant is designed today, that 10,600 to 10,800 tonnes per day is how we'll be able to bring it down to the 10,000 we would currently operate at, and under the unconstrained debottlenecked plant we're discussing — and this would be after the maintenance work as well — we'll be able to hit that 12,000 tonnes per day; so that gap still exists, but across the year you'll see the benefits of it going forward.

Don DeMarco

analyst
#33

All right. And then last thing, could you give us an update on where M&A sits among your priorities and how interested you are, since I'm seeing a growing list of brownfield opportunities — the expansion and other potential items past that, including exploration. Does that in any way dampen possible M&A activity?

Andrew Snowden

executive
#34

Well, the wonderful part, Don, is that, as you point out, we have a terrific organic growth pipeline here. There's a lot of resource potential inside the Morelos property, and we'll be drilling it very aggressively over the course of 2027 so we can maximize what gets brought into the resource base in 2028. We have the plant expansion opportunities we discussed at Morelos. We have the Los Reyes build we've discussed, with the PFS coming out near the end of 2027 as we head toward construction during the 2029 and 2030 period and first production in 2031. And we have our exploration pipeline, which I believe can also help generate value. So I think the wonderful thing about that robust organic pipeline is that it gives us flexibility when we think about M&A. I do believe there remains value in diversifying our production profile and adding another operating asset to deliver that risk mitigation, so we'll keep looking for something operational or near operational that provides that diversification. But having that robust organic pipeline lets us stay disciplined. And I think what you've seen from us, Don, over the past several years is that we have been very disciplined in how we've looked at M&A. We examine opportunities as they come up. We form our view of value. And if the price exceeds that view of value, then we're glad to walk away and wait for the next opportunity. So we'll keep doing that, keep being disciplined. And this robust organic pipeline gives us the flexibility to do so.

Don DeMarco

analyst
#35

All right, excellent. That's really useful. Congratulations once more on the strong quarter, and best of luck for the remainder of the year.

Andrew Snowden

executive
#36

Great. Thank you, Don.

Simon Wildsmith

analyst
#37

I have just a single question, and I apologize if it's already been covered. I was dealing with some technical problems. I simply wanted to get a bit of clarity on the AISC improvement. Clearly it was supported by volume, but we also saw some mining unit costs come down. I know you've been addressing the cyanide consumption issue, but I'm curious specifically about the processing cost. It ticked up a little quarter-over-quarter, and maybe this is better handled offline since it's getting too detailed, but I'm just wondering what trajectory we're on there. Thanks.

Dan Rollins

executive
#38

Yeah, on the trajectory, like we mentioned in our documentation, we're still targeting that $2,000 to $2,100 AISC range. Right now I'd say we're probably leaning toward the lower end of it. The improvement from one quarter to the next really mirrors the big step-up in process and mine grades we had during the quarter, plus the better gold recovery; that's likely where most of the gain came from. We also got a boost from ongoing improvement in the TC/RC terms that traders are offering, which kept helping there; so that was a pleasant tailwind as well. Cyanide consumption was slightly better, though overall, consumable costs stayed fairly steady compared with the prior quarter. That covers everything, I think. For the full year, we should end up in a comparable range inside the guidance — closer to that $2,000 per ounce mark. What really matters is how the peso moves; it has swung wildly, starting the year weaker, then getting extremely strong, and recently it has softened. This week, though, it has started to firm up again. So we will try to mitigate that. Looking ahead to next year, as we said, one of the main pressures is what you are going to see. What we're beginning to observe industry-wide is strain on energy and ammonia pricing as fresh contracts for the 2027 timeframe begin to take shape. A lot of manufacturers and suppliers will likely attempt to pass along some of their expenses and counterbalance those cost squeezes when new agreements come through, so my expectation is that you'll see heightened strain on energy as well as cyanide and ammonia-linked components going into next year; that's among the reasons we anticipate our costs next year will line up very closely with the guidance we've given for this year.

Simon Wildsmith

analyst
#39

Alright, that's a big help. Thank you, and yes, I'm sorry about that; it had already been addressed. Thanks, Steve, and once more, well done on a solid quarter.

Dan Rollins

executive
#40

Excellent. Thank you, Simon.

Eric Winmill

analyst
#41

Oh, hi there. Good morning to Andrew, Dan, and Shaun. I believe many of my questions have already been addressed, but perhaps just one regarding Los Reyes. Are there any further updates you could provide about what's taking place, the project itself, the timing, and what comes next?

Andrew Snowden

executive
#42

Yes, good morning, Eric, and thank you for bringing up Los Reyes. At times it gets overlooked given the strong performance we're seeing here at Morelos. So I'd say at Los Reyes everything is proceeding according to plan. I'm not sure whether you heard the commentary during the call, but right now we have 6 rigs working there, focused both on resource drilling and on geotech drilling, all in support of the PFS. We currently have close to 100 people on site, which combines our own employees, roughly 35 employees, along with contractors, all supporting that project. So the work remains very much on track for the PFS to come out by the end of next year. The aim through the PFS is really to complete every one of the trade-off studies we have planned; and so there's plenty of work to do, but the objective is to finish all those PFS studies; so really we are moving into the feasibility study stage in a very planned manner, where the feasibility study can concentrate just on final engineering rather than completing any trade-off studies. But in short, I would say everything is tracking very well there at this point.

Eric Winmill

analyst
#43

All right, thank you very much for that. It certainly seems there are encouraging developments regarding the security situation in Sinaloa as well, and hopefully we won't see any significant headlines or headline risk there.

Andrew Snowden

executive
#44

That's correct, Eric. And as you're aware, I believe, we didn't have people on site until May of this year owing to certain security difficulties in the state. Within our area of interest, conditions have stayed calm ever since we discussed this, I think, on our Q2 call. So throughout Q3, all has been very calm, with no challenges whatsoever when it comes to delivering on our plans and priorities.

Eric Winmill

analyst
#45

Alright, that's great. No, I genuinely appreciate it; and yes, definitely plenty of excellent things happening there. I'm looking forward to the catalysts here, and the debottlenecking at Morelos looks really exciting. Many thanks. Appreciate it.

Andrew Snowden

executive
#46

Perfect, yes; so thank you, everyone, for the questions. There were lots of good questions today, so I appreciate that. And thank you for your continued interest in Torex. And we're focused, of course, on delivering a strong finish to the year and advancing the opportunities ahead of us in 2027; so we look forward to continuing these discussions and to update you on our program. Have a great day, everyone. The conference is now concluded.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torex Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torex Resources Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research