Operator
operatorGood evening, everyone, and welcome to this earnings call held after the announcement of VA Tech Wabag Limited's Q2 and H1 FY '27 results. Joining us from the management team today are Mr. Rajiv Mittal, Chairman and Managing Director; Mr. Bhupesh Chowdhary Nagineni, Deputy Managing Director; and Mr. Skandaprasad Seetharaman, Group Chief Financial Officer. Please be aware that the company may, during this call, make forward-looking statements about business prospects and profitability, and these may carry risks and uncertainties, so actual results could differ materially from those expressed in such forward-looking statements. This conference call will be archived, and a transcript will be posted on the company's website. The results update presentation has been uploaded to the website and the stock exchanges, and it gives an overview of the core offerings along with an analysis of this period's results. We trust you have had a chance to review it. I will now ask Mr. Rajiv Mittal to walk you through the key business highlights. Thank you, and over to you.
Rajiv Mittal
executiveThank you. Good evening, ladies and gentlemen. It's a very warm welcome to each of you on this earnings call, which follows the announcement of Q2 H1 FY '27 results by VA Tech Wabag Limited. Our investors, analysts and other stakeholders have our thanks for the continued interest, confidence and support they have shown in Wabag. And we genuinely appreciate that you are with us this evening. With me today on the call are Mr. Bhupesh Chowdhary, our DMD, and Mr. Skandaprasad Seetharaman, our Group CFO. I'm glad to report that the first half of FY '27 has stood out as a remarkable stretch in Wabag's growth story, defined by meaningful strategic progress, strong order intake, healthy execution and further gains in our financial performance. During this period we reached 2 separate milestones in the company's history. For the very first time, our order book has gone past INR 20,000 crores, and our net cash position has gone past INR 1,000 crores, with record levels reached on both counts. These milestones mirror the ground we have covered over the years in making our business model stronger, sharpening how we execute and keeping our financial discipline intact. Our growth has come on the back of a mix of international expansion, repeat orders from long-standing customers, technology-led projects and a sustained emphasis on opportunities that are profitable and generate cash.
Rajiv Mittal
executiveIn the present financial year, we've entered Kuwait for the first time, set up a presence in the UAE, won substantial orders from Reliance Industries Limited, and grown our footprint in Europe. Crucially, alongside this strong momentum in orders, we've seen healthy revenue growth, better profitability, and further strengthening of our balance sheet. We think the mix of a robust order book, strong liquidity, and a widening international footprint puts Waba in a favorable position to go after the next phase of growth. Now let me briefly cover a few of the key developments in this period. The biggest highlight on the order win front during this period was landing 2 mega orders from 2 separate clusters. In H1, we signed and began the contract with the Ministry of Electricity Water and Renewable Energy, Kuwait, together with HEISCO, for a 60 MIGD, or roughly 272 million liters per day, seawater River osmosis desalination facility. This project also includes a 5-year operation and maintenance arrangement after the EPC phase is completed. This first project gives us an important foothold in a market where water security carries strategic importance, and it builds on our broader GCC track record. Our entry into Kuwait is validation of the significant progress we've made on one of our strategic objectives to expand internationally.
Rajiv Mittal
executiveIn India, we deepened the relationship we've had with Reliance Industries Limited for a long time, winning a mega order for a desalination plant in Jamnagar with a capacity of roughly 201 million liters per day, which can be expanded to approximately 302 million liters per day, plus a remineralization plant of about 72 million liters per day. Back in September, we had also received a repeat medium order from Reliance Industries Limited for an effluent treatment plant at the Dhirubhai Ambani Green Energy Giga Complex in Jamnagar. These wins reinforce where we stand as a technology partner for a demanding industry water application and reflect the trust that this renowned customer places in us. On O&M, we also signed a contract with Adani, one of the largest Indian conglomerates. We also entered the UAE through the Ajman Wastewater Treatment Project, which further extends our regional presence. Taken together, Kuwait and Ajman broaden our addressable market and show how relevant our desalination, wastewater treatment and resource recovery capabilities are across the Middle East. We also secured a large order for 2 projects from Bangalore Water Supply and Sewerage Board, along with a medium order from Delhi Jal Board. In Europe, meanwhile, we announced a large order for expansion of waterworks in Vienna, Austria. These orders underline how broad our offering is across municipal and industrial and advanced technology-led projects around the globe, thus achieving a good geographic diversification.
Rajiv Mittal
executiveAt the close of H1 FY '27, our order book hit a lifetime high of INR 2,207 crores, helped along by order intake of INR 5,200 crores in the first half — more than 4x annual revenue. This diversified backlog gives us strong visibility on execution, blending medium-term EPC opportunities with long-duration O&M revenues. We stay selective about the projects we chase, keeping our focus on technology differentiation, margin, payment security and execution risk. At this point, I'd like to invite our DMD, Mr. Bhupesh Chowdhary, to give you a project-specific update and business outlook. Thank you very much.
Bhupesh Nagineni
executiveGood evening, everyone. I'm delighted to be on my first Wabag conference call with all of the investors and analysts. Execution and operational excellence continue to be our main priorities across our 3 operating clusters. I'll quickly touch on a few selected milestones, with 3 project-specific advances that we've achieved. On the India cluster side, the Chennai Metro 400 MLD Perur desalination plant has been coming along quite nicely. We've completed roughly 90% of the concreting, covering nearly 1 lakh cubic meters. We've also reached 7 million safe man hours on that project, which is a significant figure when it comes to standards. Mechanical equipment erection is moving ahead very well, and I'm confident the project is on its schedule to finish in the coming year. At the Bangalore water supply sewage board, Bommanahalli project, engineering and procurement have reached an advanced stage, and civil works are advancing very steadily as well. For the Delhi Jal Board make-around project, engineering and civil works are likewise progressing very well. And the outfall pipeline supply should begin this month, in line with the schedule requirements. Turning now to the MEA region, Middle East and Africa, the few projects we're executing there have also hit meaningful milestones. At the one Al Haer sewerage treatment plant, execution is moving along well despite the regional challenges.
Bhupesh Nagineni
executiveWe expect commissioning to take place in quarter 4 of FY '27, which is the target. At the Yanbu desalination plant, basic engineering is largely complete, and long lead equipment and procurement have been started before the project itself formally begins. As for the Ras Tanura mechanical project, the mechanical construction work is finished as well. Pre-commissioning activities are in progress, and hydro testing is targeted for the end of this November. In Africa, in Zambia at Lusaka, the Ngwerere and Chongwe sewerage treatment plants are also moving along well. Civil works are underway, and major equipment orders are finalized so that installations can get in place. In Nepal, as part of SAR Southeast Asia, the projects are progressing well too. And there are a couple of projects where we are working on the multilateral front. Procurement is almost 100% complete, civil concreting has been done to about 70%, and we expect liquid stream commissioning by the end of this financial year. On the business outlook, regarding the recent political developments in the Middle East as well as in the U.S., this is also helping us significantly with the movement of various business opportunities. We are also seeing a lot of inquiries coming in, and we are working in Africa on some of those opportunities, and that seems to be an underserved market.
Bhupesh Nagineni
executiveAnd that would serve us much better in the years ahead. Strategically, we're pleased that we've hit or surpassed most of the targets under our strategy plan, which we refer to as Writhi 1.0. As we near the completion of Writhi 1.0 in this financial year, we've also seen — and we've begun work and formulated Writhi 2.0, the strategy plan covering the next 5 years, which is likewise at an advanced stage of work. Besides setting out our strategic priorities and growth road maps for the coming phase of our journey at Wabag, we're aligning our organization and business structure, bolstering our capabilities and capacities, ensuring the needed skills are upgraded so we can execute the strategy, and we look forward to unveiling Writhi 2.0, our 5-year strategy plan, at the upcoming Annual Investor Meet in May 2027. Going forward, demand stemming from water scarcity, decarbonization, industrial water needs and wastewater reuse keeps supporting our priority and opportunity pipeline. We stay focused on technology-led growth, disciplined execution and efficient capital deployment while selectively pursuing opportunities in desalination, reuse and digitalization and resource recovery areas.
Bhupesh Nagineni
executiveSo with that, I'd like to hand things over to our Group CFO, Mr. Skandaprasad, who will walk you through the financial results for both the quarter and the half year. Thanks, everyone. The floor is yours, sir.
Skandaprasad Seetharaman
executiveThank you, Mr. Bhupesh, and good evening to all of you. Wabag had a landmark quarter. The order book went past INR 20,000 crores. H1 order intake exceeded INR 5,000 crores, and net cash surpassed INR 1,000 crores — every one of those at record levels. In Q2, revenue came in above INR 1,000 crores and PAT was over INR 100 crores, which makes these the highest second quarter results we have ever reported. These numbers show healthy execution, better profitability and consistent financial discipline, and once again profit growth has outpaced revenue growth, consistent with our mantra of profitable growth. Starting with the quarter, consolidated revenue from operations rose 20% year-over-year, and PAT climbed 23%. EBITDA stood at INR 145 crores, a margin of roughly 14.5%. For the half year, consolidated revenue from operations reached INR 1,887 crores, an increase of 20.3% year-over-year. EBITDA was up about 21% at INR 261 crores, with a margin of nearly 14%. PAT grew more quickly, rising almost 30% to INR 195 crores, and the PAT margin widened to 10.3% from 9.6% in the same period last year. That shows our ongoing emphasis on profitable growth. On a stand-alone basis, H1 revenue increased 19% to INR 1,587 crores. EBITDA was higher by 20% at INR 227 crores, and PAT rose almost 29% to INR 169 crores.
Skandaprasad Seetharaman
executiveTo put it briefly, our core business keeps delivering growth along with better operating profitability. The revenue mix stayed consistent with our strategic targets, with international markets making up 54% of H1 revenue and India 46%. On the business side, EPC represented 82% while O&M was 18%. O&M brings a high-margin, asset-light recurring revenue stream on top of our EPC execution pipeline, and we continue to focus on growing this business for the future. Moving to the balance sheet. Net cash, excluding HAM, hit an all-time high of more than INR 1,100 crores, compared with INR 950 crores at the close of FY '26. With HAM included, net cash came to INR 1,036 crores -- so on either basis net cash went past INR 1,000 crores. This marks the 15th quarter in a row of positive net cash and the seventh straight year in which we have posted a positive net cash position. Consolidated operating cash flow for H1 was INR 225 crores, more than 1.1x our PAT for that same period. Net working capital also got better, at 101 days versus 104 days as of March 2026. Returns kept getting stronger, backed by our asset-light model and efficient execution. Return on equity rose to 16.3% in H1 compared with 15.7% in March '26, and return on capital employed climbed from 19.5% in March '26 to 20.5% in H1 FY '27.
Skandaprasad Seetharaman
executiveThat shows stronger profitability along with a lasting focus on capital efficiency and ongoing gains there. At the half-year mark, the order book stood at a record high of INR 20,207 crores, helped by H1 order intake exceeding INR 5,200 crores. What we're concentrated on is turning that visibility into profitable revenue and solid cash generation. We restate our medium-term goals: revenue CAGR of 15% to 20%, EBITDA within the 13% to 15% band, ROCE around 20%, ROE above 15%, O&M moving toward 20% of revenue, and a net cash position that stays positive. Results across recent years, including H1, demonstrate solid headway on our Writhi 1.0 targets, and on most key parameters we have met or exceeded them. ROCE of 20.5% and ROE of 16.3% sit above their thresholds, while an EBITDA margin of 13.8% falls comfortably inside the range, and our net cash positive position remains so. O&M is climbing steadily toward the 20% goal, backed by an all-time-high O&M order backlog of INR 6,500 crores. Disciplined execution, healthy margins, efficient working capital management and robust cash generation stay our priorities. Before wrapping up, we want to thank our bankers, investors, customers, vendors, subcontractors, partners and our fellow Wabag guys for their trust and continued support.
Skandaprasad Seetharaman
executiveHaving said that, we’re ready to take questions from the floor. I’ll hand things over to the moderator.
Operator
operator<<operator_script>> Our initial question comes from Mohit Kumar, who is on the line from ICICI Securities.
Mohit Kumar
analystLet me start with my first question: could you discuss what's happening in the Middle East, particularly regarding execution, the headwinds you're encountering, and the pressure on margins? And what steps are you taking to mitigate that?
Rajiv Mittal
executiveThanks for that question — it's very relevant given what's going on in the Middle East. You described it accurately as a headwind: specifically, commodity pricing and the disruption in that region are putting pressure on supply chain management. Fortunately for us, as our results show, this hasn't caused a major hit to our execution timeline or our margin. Fortunately, we've been at a stage of a project where the bulk of the work has moved to site. On Al Haer, we're in the final phase of mechanical completion. Ras Tanura is finished and awaiting pre-commissioning; the other projects haven't started at site yet, and deliveries are still at the engineering drawing stage, while the O&M projects are progressing nicely. But beyond the pressure from commodity prices, what we're dealing with is a very large delay in shipments. We've raised this with the client, and they've acknowledged the problem and instructed us to proceed by taking a longer route, even though that may take more time. Eventually it will get to site — for some of the critical components, we may even use airfreight. So at present it hasn't affected us, but we're watching it closely: as our new projects begin, we'll need a strategy — if things haven't improved by then, within the next 3 to 6 months, we'll have to devise a strategy for getting the equipment delivered to site.
Rajiv Mittal
executiveFortunately for us, once we get to the site, our project locations haven’t been impacted. At those project sites, work continues as usual. The only issue is that we need to get our material delivered to the site. I hope that answers your question.
Mohit Kumar
analystYes, that's quite clear. For my second question, could you discuss the Middle East pipeline? Obviously, a substantial number of orders over the last 24 months originated from that region. So what I'm asking is whether that pipeline is converting into orders. Is it something highly uncertain at present? And should we expect that to keep producing a fairly, let's say, lower conversion rate for the next — for H2 and going forward until the war ends. Is that a reasonable assumption?
Rajiv Mittal
executiveTo some degree, it's reasonable to expect some delay, since governments are also waiting on the investment strategy — what they'll have, what they'll allocate to which basket. Right now, infrastructure projects are getting their funding for whatever work has begun and is under execution. Starting new projects is moving somewhat slowly. But we've seen — as you'd have seen — that in Kuwait, we just signed last quarter a large project worth almost about $400 million with our consortium partner or a joint venture partner. So that has progressed. You've seen in UAE that we've signed, and execution has begun, for the Ajman project. So things are happening. Yes, Saudi has been somewhat slow and somewhat cautious, but again we understand that some of the projects where we were preferred bidder have also started moving. So we expect that within the next quarter or so, that too should be moving ahead. So yes, it has slowed down somewhat, but it has not stopped.
Operator
operator<<operator_script>> Our following question comes from Vaibhav Shah, who is on the line from JM Financial.
Vaibhav Shah
analystFirst, sir, regarding the bid pipeline, how does it look in both the international and domestic markets?
Rajiv Mittal
executiveIt's fair to say we've been extremely busy. As always, we have a large number of inquiries, and these are big ticket orders that we're working on. For some of them we're working on the bids, and some are under evaluation. But it's very heartening to see the Europe cluster, which had very subdued activities in the past. In the last couple of quarters, we have seen some activities in the European cluster, and we have also got 2 contracts in European cluster. So overall, we are at a peak in terms of the bidding activities. So we are very bullish about the future.
Vaibhav Shah
analystSure. Sir, could you put a number on the pipeline for the next 12 to 18 months — what does it look like in both the domestic and international markets? I mean, especially domestically, there were some announcements in Tamil Nadu as well for some water, sewage, and desal projects. So how do we stand over there as well?
Rajiv Mittal
executiveLook, this is our home market. When it comes to anything on home soil, we can see our chances. And yes, you're right that something has been announced — a very large desalination plant, similar in size to what we're executing in Perur, a 400 MLD on the North Chennai has been announced. They also announced one more river cleaning program. So yes, I think Tamil Nadu has always been at the forefront of alternate water sources, and I think that will continue. But other than Tamil Nadu, if you look at even Bangalore, Delhi and other states in MP, Rajasthan, there are enough inquiries there. There are also enough inquiries on the industrial side. You have seen we have got Reliance, we have got BPCL on the refineries, Petrochem. So there is bullishness all around. Middle East — it's very, very — we are very busy. We are submitting some large ticket inquiries, which we have got. We are working on it. Some of them we have submitted it. So we are very hopeful the next 12 to 18 months is going to be a bumper order intake for us. We are just trying to establish that we reach a preferred bidder status.
Rajiv Mittal
executiveThat's what our team is focused on, and I'm confident that within the next 1 or 2 quarters, we'll build a substantial order pipeline, where we'll be the preferred bidder.
Operator
operator<<operator_script>> Our following question comes from Sailesh Raja at 360 ONE Capital Market.
Sailesh Raja
analystCongratulations on the impressive results you delivered during a difficult period. My question concerns that outstanding order book for the municipal and industrial segment, which stands at INR 13,500 crores. Could you tell me how it splits between EP and EPC for the first half, and also for last year, what those figures were?
Rajiv Mittal
executiveSailesh, looking at the order intake we secured in the first half, take just the two big ones — Kuwait and Reliance. In Kuwait, naturally, we also have a 5-year O&M following the EPC phase, but Kuwait and Reliance both sit in our sweet spot, where everything except the civil falls to us — either the customer handles the civil or our partner does. So our emphasis on winning EP projects stays in place, and those 2 alone make that plain, since they'll represent almost 80% of the first quarter order intake. That mix, as we've said on many occasions, shifts over time. On average, though, we'd want to see no less than somewhere between 20%, 30% of our orders coming from EP. That's the reason we lean more toward international and industrial orders, which make room for the EP mix rather than the EPC mix. For the first half, though, the 2 orders we booked are already visible to you, and both fall in this industry.
Sailesh Raja
analystSir, as you noted, thankfully we succeeded in getting that equipment delivered to the project location in Saudi Arabia. So how is civil work coming along at the Al Haer project? And given the present circumstances, what's our plan for handling the civil construction and execution?
Bhupesh Nagineni
executiveAt the Al Haer civil treatment plant, the civil works have largely been finished. In fact, yes. So most of what we've achieved on the civil side is actually above 80% to 85%. So we've already begun the mechanical erection as well as the equipment erection work. So that has also been taken care of.
Sailesh Raja
analystRight, right. And then in the Middle East, the water authorities have been fairly quiet about tendering new projects, for macro reasons, and the region's water sector is also moving more and more toward the PPP model. So how do you view the competitive landscape overall? With PPP projects, they usually call for stronger financial capabilities and the capacity to bear risk. Could Wabag's solid balance sheet and net cash position give it a competitive edge over European and international EPC players?
Bhupesh Nagineni
executiveWe definitely have a very crucial and significant part to play in this. We're monitoring the PPP model, and not necessarily—we aren't taking part. We're also holding discussions and engaging with the developers. So the developers who are essentially putting money into the water assets—whether it's ACWA, whether it's BESIX, or whether it's the sovereign, the company that's taking on those kinds of PPP projects—we're essentially going along with them in the role of an EPC player. So we have built-in strength when it comes to competitiveness, plus our local presence, even compared with competing against any of the European or any of the—I mean, an operator from outside the country in that same segment.
Sailesh Raja
analystSir, one final question about the Indo Solar project — could you give us the current status and how execution is progressing?
Rajiv Mittal
executiveWith the Indo Solar project, you know, when Andhra had a change in government, there was some land reallocation at the site. Because of that, Indo Solar ended up losing part of that land to another organization. As things stand now, they've managed to obtain 90% of what they require for setting up the facilities as well as for future growth. So I believe that out of 1,000 acres, 900 acres are already secured, and the remaining 100 acres should come through fairly quickly. So you'd expect that within a quarter from now, they ought to secure that remaining 100, and at that point they'll launch the mega project. But meanwhile, the smaller one, the 1 gigawatt, is nearly ready and they will commit to it. That in turn will create some confidence that they're capable of building the plant and commissioning it. After that, they'll move ahead with the multi-giga project, which is why they wanted this land. So I think it's very imminent — perhaps in the next few months, we should see them securing the remaining land.
Operator
operatorOur next question comes from Mudit Bhandari, who's on the line from IIFL Capital.
Mudit Bhandari
analystNice quarter — really strong. On gross margin, the level looks unusually elevated compared with the prior several quarters. Broadly, once civil commissioning wraps up on most of our projects, they move into the procurement phase. So was there any one-time effect in 2Q? And how should we think about gross margins going forward?
Rajiv Mittal
executiveLook, Mudit, margins always come down to 2 things. First is the mix of projects we have, and second is how well we execute. You've watched us steadily push gross margins and EBITDAs higher across the last 5, 6 years, and we've kept them within a 13% to 15% band. So viewed that way, I'd call this consistent. Beyond that, it depends on project mix and the pace of the project. So nothing here is one-off. What we're seeing is structural improvement. That said, don't judge us quarter by quarter — always judge us on an annual basis, and that's exactly why we've provided multi-annual guidance of 13% to 15%, a band inside which we've stayed very steady and consistent.
Mudit Bhandari
analystUnderstood. And when we mention 13% to 15%, that figure reflects the commodity price inflation we'll be absorbing.
Rajiv Mittal
executiveRight. And we do have contracts where this clearly flows through to the customer via the formula, and that's part of what's included here as well.
Mudit Bhandari
analystUnderstood, sir. And second, our order book is quite solid at nearly INR 20,000 crores. So when it comes to visibility on execution, how should we think about it over a different time frame, or in terms of execution quality — as you mentioned with Indo Solar, there were some land acquisition issues. So is there anything specific you'd be watching for regarding execution risk, or how should we view that?
Rajiv Mittal
executiveAs an organization, we have a demonstrated track record. We have gone through various challenges, whether it was COVID, whether it's geopolitical situations, in Russia, Ukraine, whether it is now the Gulf situation, we have demonstrated that we have a very robust model because we have distributed our risk over various geographies. So one geography will not pull the company down. That has been our strategy. And also our contracts are in various currencies also. So that is a very conscious effort to distribute our risk. So these things will happen. We cannot say it's happening now and it will not happen in future. We are prepared to handle this in future also. That's the reason we always say that we work on projects which are cash accretive and which has a full payment security. I repeat full payment security. We don't take projects which does not give us a payment security. What do we mean by that? We take contracts with a sovereign guarantee, like Saudi, it comes from the Ministry of Finance or Ministry of Water. So it's directly ministry in India. If you go to Namibia, again, it's a sovereign guarantee by the government of India. We go to multilaterals like World Bank, JICA, ADB, KFW, all these projects, if you see on our order book, these are the quality of projects.
Rajiv Mittal
executiveAlso, for certain projects, we even require a letter of credit. So viewed from that angle, we don't perceive any payment risk or any significant payment delay. A delay of a few weeks or a month is possible, but that's fine. That's normal in our business. It's provided for. The same applies to commodity pricing. As Skand mentioned, for most of the Indian contracts, we use the escalation formula. Internationally, we hedge right away, and within a few months of receiving our order, we also place some of the major orders so that the future commodity price is fixed and locked. So that has worked for us in the past. I'm sure it should work for us in the future as well.
Operator
operatorOur following question comes from Shubham Borade at ICICI Securities.
Shubham Borade
analystCongrats on the strong set of numbers. I just wanted an update on the Bangladesh project that we secured back in March '23. So how much progress has been made there, in that part?
Rajiv Mittal
executiveRegarding Bangladesh, a disruption occurred roughly 12 months ago. Yet, as I mentioned, since this is a full security arrangement and the World Bank is funding this project — right? — and when the World Bank funds it, our payment security gives us no cause for concern. Yes, owing to the unrest along with the change in government and change in bureaucrats, some delay has arisen, though that won't impact our margin, apart from perhaps a 6-month delay on the project. That is something we'll probably have to absorb. So I'd say progress is coming along well. Engineering is essentially finished. Ordering stands at 90% complete as well, roughly 30%, 40% of the material has been dispatched, and civil works sit at approximately 30%, 40% too. So the project is advancing. It might go somewhat faster, yet it's advancing steadily, and our payments are arriving on time.
Operator
operatorOur next question comes from Vinit M with Ashika IE.
Analyst
analystThank you — those are solid results. I'd like to follow up with a question about the order book. Specifically, I want to check which states or regions within India are seeing strong momentum right now in wastewater projects — for instance desalination or the industrial projects we're pursuing? And secondly, you've consistently mentioned on the past few calls that Sunrise industries are gaining traction. So I'd like to understand the opportunities in the Sunrise sector — things like semiconductor, solar manufacturing and data center, green hydrogen — have you seen any pickup in the order pipeline from this segment over the last quarter or so? Or is active bidding underway that you expect going forward in this segment?
Rajiv Mittal
executiveYes. So India is expanding. I mean, economically, plus the growth of the state is creating fresh opportunities as well. Among that, we're also seeing a lot of inquiries come in from Gujarat, Maharashtra, and also Andhra Pradesh and Tamil Nadu — from desalination to sewerage treatment plants, from the municipality and industrial zones as part of it. And that's where it's growing and opening up a lot of opportunities for us, both in terms of desal, reuse, and sewerage as well. And also on the industry front, I mean, we're also focusing on the industrial side, wastewater treatment plants. That sector is also opening up in Gujarat predominantly and also in — particularly in the central part of India, some of the large projects are opening up in the power sector and the steel sector also. And the other part of the question that you asked regarding the high-tech industries, high-tech factories, primarily the semiconductor data center. So we're also identifying which is in terms of the utility of what kind of reuse water that goes for the chilling or the ultrapure water. So for that also, we've already started interacting with the potential clients, be it the Google or Adani or in terms of Reliance, a lot of things are happening in that sector, but actually physically, it needs to take a shape.
Rajiv Mittal
executiveAnd we’re also looking at the economics behind this, so we can offer them a one-stop solution, which would let them take advantage of our technology — technology that is mainly focused on reuse as well as the ultra-pure water segments, and we’re well positioned in that sector.
Analyst
analystSo, given what you're describing, could you provide some guidance on order intake — for this year and, say, next year? How do you see orders perhaps over a stretch of — how much order intake will there be across what you're seeing, with some slowdown in the Middle East? I just want to get the overall picture: are other geographies trying to offset whatever risk exists in the Middle East, or will we see a slowdown in order intake relative to last year, or maybe now?
Rajiv Mittal
executiveAs we've mentioned, and Bhupesh has now also underscored, this is an appealing sector for us. Everything you're referring to — new energy, be it semiconductors, PV solar, or data centers — holds our interest. On order intake, I'd like to clarify that this isn't a top-line segment, all right? These order sizes will never be a single order of INR 5,000 crores or INR 1,000 crores. They're going to be considerably smaller. But the key point is that they're modular by nature. Each organization will install a certain number of units as it expands. So if you've secured the first one, there's a strong likelihood that the other orders coming in a year or 2 or 3 will be repeat orders for you. Plus, as a technology company holding more than 125 patents and trademarks, we'd like to explore this sector, since it calls for high tech. And as a company — as your company — Wabag operates in high tech. We want to play a part in this, delivering to clients our finest technologies for this sector, which is a sunrise sector and is growing.
Rajiv Mittal
executiveBhupesh likewise brought up data centers. One pattern existed that everyone was pursuing an air-cooled, air-conditioning setup. Well, given how dependable our technology is plus the economics around water, we could transform those into water cooled, which in terms of capital cost and operating cost is certainly far superior provided you've got a dependable and reasonably priced water supply. That's exactly what Wabag delivers. So I'd say, considering the types of data centers and the energy reliability in India—India will become a hub for data centers. We're already witnessing considerable PV solar activity. Semiconductor will ramp up. And then perhaps within a couple of years, hydrogen will ramp up once the scale of hydrogen production rises, costs will decline. So these are the new sectors we're concentrating on, and we've got a dedicated team and a vertical focused on them, since they're relatively smaller ticket size orders. So we must have a specialized team that concentrates on them and also executes these orders, because the decision period for these orders is quite short, generally 12 to 15 months.
Rajiv Mittal
executiveSo those orders are going to need to be turned around in roughly 12 months. That's the input we'd give you on your question.
Operator
operatorOur next question comes from Vaibhav Shah, who is on the line from JM Financial.
Vaibhav Shah
analystJust a couple of data points. Employee expense came in on the higher side at INR 99 crores in 2Q. So was there any one-off in the quarter, or is this a recurring number in the coming quarters?
Rajiv Mittal
executiveTurning to the other expense line...
Vaibhav Shah
analystStaff costs.
Rajiv Mittal
executiveOn employee expenses, there's no one-off item. This is in line since we're giving the increments this quarter. So with performance as well as the wage code change impact, you'd now see that fully reflected, whether it's PF, whether it's gratuity, all of those. That's the change you're seeing. We have no other one-offs. And with performance, you'll also have performance pay that will be better year-over-year. So there are no other one-offs in that number.
Vaibhav Shah
analystSo that should decrease over the next few quarters?
Rajiv Mittal
executiveIt's going to level out. And naturally, just the wage code change on its own is going to stay in place.
Vaibhav Shah
analystAll right. And on the other expense line too, it came in at the higher end, at INR 60 crores. So is there anything on that front?
Rajiv Mittal
executiveNo, those are just ordinary provisions we typically need to set aside under our policy, viewed on a consolidated basis. This will even out across the year, and after that there aren't any normality items in there.
Vaibhav Shah
analystAnd second, how much of the total order backlog would come from the Middle East and Chennai?
Rajiv Mittal
executiveChennai alone would very likely exceed 10%—well above 10%—since we have Kodungaiyur and Chennai Ring Main. Those two projects on their own, plus the Perur balance, mean that within EPC it would easily reach 15%, nearly 20% of EPC. And in the international mix, the Middle East would account for roughly 60% to 70%.
Vaibhav Shah
analystLooking at the whole book, it's a 55-45 mix. So if Chennai accounts for 15%, 20%, then what makes up the other 35%, 40%, 35%?
Rajiv Mittal
executiveYou've got, for instance, Reliance in India, you've got BPCL, you've got Bangalore, you've got Delhi Jal board, you've got Maharashtra, you've got O&M — all of this.
Vaibhav Shah
analystAnd what about overseas markets apart from the Middle East — same question there?
Rajiv Mittal
executiveYeah, the bulk of it is going to come from the Middle East. The remainder is going to come from Europe, Africa, and the SEA and SAARC.
Operator
operatorOur following question comes from Mudit Bhandari at IIFL Capital.
Mudit Bhandari
analystThere's just one thing I want to ask. If we look at the order book for the most recent quarter, 1Q FY '27, and we count the order inflows we received while leaving out execution, the resulting implied order book comes out somewhat different. So is there any change in the scope of the current order book?
Rajiv Mittal
executiveLook, typically, when our order book mix is large, a backlog restatement results from Forex movements. That’s why we don’t count it as order intake. It only shifts within the order backlog. So order intake reflects what we have truly secured. That’s the sole distinction you’ll notice. Still, I’d be happy to have our IR team walk you through it if you require any additional details on that.
Operator
operatorOur next question is from Manish Maheshwari at Equity. Since there's no response, we'll go on to the following question. The next question comes from Visweswar Rao Kasturi, an individual investor. With no response there, we'll proceed to the next speaker. Our following question is from Rajagopal Raghunathan, an individual investor.
Rajagopal Raghunathan
unknownI'm a retail investor in your company, and I'd like to hear about the succession plan you have in mind for it. Also, I want to know whether all the knowledge that exists within the company has a central repository — something other people could access if someone departs and leaves — or, in a nutshell, is it institutionalized?
Rajiv Mittal
executiveThat's a really good question, and a highly pertinent one. For businesses such as ours — a knowledge-based company — I'd say it's an excellent question. Look, succession planning is something we've consistently discussed. And I think it's a priority not just for our HR function but for top management as well. Certain steps have already been implemented. We're developing some individuals. We're bringing in some lateral hires. So it's a mix of talent grown internally along with lateral talent that we're onboarding, to ensure a backup is in place for succession planning. But these kinds of efforts are a continuous, ongoing process. This will keep happening, though management and HR are fully focused on making sure we address it. On your second question about the knowledge repository: we already have knowledge management software into which all of this gets entered, and we're making it increasingly user-friendly. So it isn't merely about entering knowledge into the software — it's also about ensuring it's easily accessible to users with the least effort. That's where we're currently investing a lot of time, and we're also bringing in many new agencies given this AI support.
Rajiv Mittal
executiveWe're looking at a range of AI platforms that could assist us both in feeding knowledge into this system and in pulling it back out whenever we need it. So over the coming years you're going to see attention concentrated on these two areas.
Rajagopal Raghunathan
unknownAnd what about the promoter's relatives? Have any of them joined the business, or do they still want to come in?
Rajiv Mittal
executiveNo, no. Rohan Mittal, my son, has been involved in the business for 9 years now. He's overseeing the Middle East, the GCC and Africa region. And he's performing well. The seniors are grooming him. I'm sure he will definitely grow to take up some position in the company in the coming years.
Operator
operator<<operator_script>> Our following question comes from Manish Maheshwari, Equity at Work Family Office.
Manish Maheshwari
analystSir, for this fiscal year, would it be reasonable to assume and project that we will finish the year with pretax operating cash flow of at least roughly INR 500 crores, or INR 600 crores, on a consolidated basis?
Rajiv Mittal
executiveSince you're asking this on Dhanteras day, how could we possibly refuse? We'll do our utmost.
Manish Maheshwari
analystWith the cash flow momentum we're seeing, at least INR 500 crores is something we're aiming for, right?
Rajiv Mittal
executiveWhy wouldn't we, when we receive so many good wishes and prayers from you? With that support, the company will succeed.
Operator
operatorPawan Kaushik, an individual investor, has our next question on the line.
Pawan Kaushik
unknownI hopped on a little late, so maybe you've already gone over this — I'm not certain. But is there any difficulty in the current geopolitical situation — are we running into any problems carrying out the orders in the Middle East?
Bhupesh Nagineni
executiveYes. Mr. Mittal provided an update on this a while back, and there was a question about it. To restate the point: yes, in the Middle East previously — I'd say roughly a year ago, or 1.5 years ago — there were some disruptions, and step by step, I'd say the difficulties have been easing. We faced problems with sea freight — specifically, the shipping side of the supply chain for goods headed there. But afterward, we got past that by shipping even via air freight for some of the equipment that could be moved. And later, we identified alternative routes and began supplying those materials. So most of the equipment has now reached the site as well, which the project needs. And hopefully, I think over the coming months, we'll be able to fully get past that too, since things are settling down now. I'm confident we're being well taken care of when it comes to keeping that under control.
Pawan Kaushik
unknownAll right, sir, that's good — it's getting better. So, if you'll permit me, just one more item.
Bhupesh Nagineni
executiveYes, go ahead.
Pawan Kaushik
unknownYes. At present, our operations are in the B2B space. So do you have any plans, perhaps around water supply or something along those lines, given that we already possess ultra clean water facilities and all?
Bhupesh Nagineni
executiveThat's a fair question. Look, we've carried out some assessments around how we should position ourselves both as a service provider and as a technology company. We believe there's a significant opportunity in what we already excel at, first and foremost. Moving into the retail side as a water supply business is a possibility — that could be a space that takes us to the B2C level. So we're comfortable handling the B2B side, the larger industrial level, and then the municipal segment around the world. So we would certainly want to explore what we're capable of. And right now, we're very, very well placed in terms of what we're actually delivering to the industry.
Operator
operator<<operator_script>> Seeing that no participants have any more questions, I'll now pass the conference to Mr. Rajiv Mittal for his closing remarks.
Rajiv Mittal
executiveThanks, everyone. Before you go, I want to wish you a very happy Diwali and a prosperous one too — for you and your family, with a great year ahead — and happy Dhanteras as well. Thank you for being on the call today. If anything still needs clarifying, feel free to reach out to our investor adviser agency, AdFactor, or to us directly. Thank you so much. Enjoy the long weekend.
Operator
operatorThanks. Ladies and gentlemen, that brings this conference to a close. We appreciate your participation, and at this point you’re welcome to disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete VA Tech Wabag Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to VA Tech Wabag Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in VA Tech Wabag Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.