Ladies and gentlemen, good day, and welcome to Q3 and 9 Months FY '25 Earnings Conference Call for Vascon Engineers Limited, hosted by Stellar IR Advisors. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Akhilesh Gandhi from Stellar IR Advisors. Thank you, and over to you, sir. Mr. Akhilesh, your line has been unmuted, please go ahead.

Akhilesh Gandhi

attendee
#2

Hello. Am I audible now?

Operator

operator
#3

Yes, sir.

Akhilesh Gandhi

attendee
#4

Good morning, everyone. I, Akhilesh Gandhi, on behalf of Stellar Investor Relations, welcome you all to Vascon Engineers' Quarter 3 and 9 Months FY '25 Earnings Conference Call. We shall be sharing the key operating and financial highlights for the third quarter and 9 months ended on December 31, 2024. We have with us today the senior management team of Vascon Engineers Limited, Dr. Santosh Sundararajan, he's the group CEO; and Mr. Somnath Biswas, he's the Chief Financial Officer. Before we begin, I would like to state that this call may contain some of the forward-looking statements, which are completely based upon the company's beliefs, opinions and expectation as of today. The statements made in today's call are not a guarantee of future performance and also involve unforeseen risks and uncertainties. The company also undertakes no obligation to update any forward-looking statement to reflect developments that occur after the statement is made. Documents relating to company's financial performance, including the investor presentation, have already been uploaded on the stock exchange and the company's website. I now invite Dr. Santosh Sundararajan to state his opening remarks on the company's performance for the third quarter and 9 months, then we will open the floor to Q&A session. Thank you, and over to you, sir.

Santosh Sundararajan

executive
#5

Good morning, everyone. I welcome you all to the earnings conference call of Vascon Engineers for the third quarter and 9 months ended December 31, 2024. It has been an exciting period for Vascon Engineers as we have made meaningful strides in our key focus areas of execution, financial discipline and growth. The performance in Q3 FY '25 showcased our resilience and adaptability in evolving macroeconomic environment with our efforts towards improving operational efficiencies playing a significant role in driving top line growth. We reported strong revenue growth of 48% year-on-year in Q3 and 37% for 9 months FY '25, driven by robust execution in our Engineering, Procurement and Construction business. The EPC revenue grew by 48% year-on-year to INR 274 crores in Q3 FY '25 and by 37% year-on-year to INR 664 crores in 9 months FY '25. The outlook for the EPC segment remains highly promising, supported by a robust order backlog of INR 3,179 crores, nearly 4x the FY 2024 EPC revenues. Of this, INR 2,715 crores pertains to external EPC projects while INR 464 crores is from internal projects with approximately 78% of the orders coming from government projects. This ensures stable cash flows and facilitates efficient execution timelines. Execution is expected to gather further momentum in the coming quarters, leveraging the healthy order book and sustained operational efficiencies. Now on Real Estate segment. Firstly, let me reiterate that the Ind AS accounting treatment in Real Estate can result in timing differences between the recognition of expenses and revenue. And therefore, in the light of lower revenue recognized in Q3 and 9 months of FY '25, profitability has also declined as compared to previous year for the similar period. However, in terms of our outlook on the segment, it remains favorable. We are excited to announce that our first redevelopment project, Om Sainath, located in Santacruz, Mumbai, received RERA approval in the second week of January and construction is now underway. We are gearing up to officially launch the project [indiscernible] significant milestones in our journey. Additionally, the Powai residential and commercial project is on track for launch in April 2025 while other projects are slated for FY 2026. These launches are expected to contribute significantly to revenue in the coming quarters, and we remain optimistic about our business prospects in the year ahead. In 9 months FY '25, we achieved new sales bookings totaling 47,658 square feet, generating a sales value of INR 30 crores and a total collection of INR 39 crores. We remain optimistic about the [indiscernible] supported by strong pipeline of upcoming projects. Another key business update is on our subsidiary, GMP Technical Solutions [indiscernible]

Operator

operator
#6

Sir, sorry to interrupt, your voice is not very clear, sir.

Santosh Sundararajan

executive
#7

As you might be aware, we have successfully completed the divestment of GMP in the previous quarter. We have received a net sale proceeds of INR 110 crores, further strengthening our financial position and enabling us to focus on core business growth. Coming to the financial performance of the company in the 9 months FY '25, let me start with the consolidated Q3 FY '25 numbers. The company reported a total income of INR 298 crores...

Operator

operator
#8

Sorry to interrupt sir, your voice is not very clear. Can I mute and go ahead? [Technical Difficulty] Ladies and gentlemen, thank you for patiently holding. The management is back on call. Sir, please go ahead.

Santosh Sundararajan

executive
#9

Good morning, everyone. I hope I'm audible this time. I welcome you all to the earnings conference call of Vascon for the third quarter and 9 months ended in December 31, 2024. It has been an exciting and productive period for Vascon as we have made meaningful strides in our key focus areas of execution, financial discipline and growth. The performance in Q3 FY '25 showcased our resilience and adaptability in an evolving macroeconomic environment with our efforts towards improving operational efficiencies playing a significant role in driving top line growth. We reported a strong revenue growth of 48% year-on-year in Q3 and 37% in the 9-month period, driven by a robust project execution in our Engineering, Procurement and Construction business. The EPC revenue grew by 48% year-on-year to INR 274 crores in Q3 FY '25 and by 37% year-on-year to INR 664 crores in 9 months FY '25. The outlook for the EPC segment remains highly promising, supported by a robust order backlog of INR 3,179 crores, nearly 4x the FY 2024 EPC revenue. Of this, INR 2,715 crores pertains to external EPC projects while [ INR 464 crores ] is from internal projects with approximately 78% of the orders coming from government projects. This ensures stable cash flows and facilitate efficient execution timelines. Execution is expected to gather further momentum in the coming quarters, leveraging the healthy order book and sustained operational efficiencies. Now on the Real Estate segment. Firstly, let me reiterate that the Ind AS accounting treatment in Real Estate can result in timing differences between the recognition of expenses and revenue. And therefore, in the light of lower revenue recognized in Q3 and 9 months of FY '25, the profitability has also declined as compared to previous year's corresponding period and quarter. However, in terms of our outlook in the segment, it remains favorable. We are excited to announce that our first redevelopment project, Om Sainath, located in Santacruz, Mumbai, received its RERA approval in the second week of Jan and construction is underway. We are gearing up to officially launch the project in February, making significant milestones in our journey. Additionally, the Powai residential and commercial project is on track for launch in April 2025 while other projects are slated for FY 2026. These launches are expected to contribute significantly to revenue in the coming quarters, and we remain optimistic about our business prospects in the year ahead. In 9 months FY '25, we achieved new sales bookings totaling 47,658 square feet, generating a sales value of INR 30 crores and a total collection of INR 39 crores. We remain optimistic about the trajectory of our Real Estate segment, supported by a strong pipeline of upcoming projects. Another key business update is on our subsidiary, GMP Technical Solutions. As you might be aware, we have successfully completed the divestment of our subsidiary in the previous quarter. We have received the net sales proceeds of INR 110 crores, further strengthening our financial position and enabling us to focus on core business growth. Coming to the financial performance of the company, let me start with the consolidated Q3 FY '25 numbers. The company reported a total income of INR 298 crores as against INR 208 crores in the corresponding quarter last year with a growth of 44% year-on-year. In Q3 FY '25, the EBITDA stood at INR 24 crores as against INR 22 crores in the corresponding quarter last year. The EBITDA margin is at 8%. EBITDA margin has declined on account of lower contribution from Real Estate business while margins from EPC business remained stable at about 10% to 11%. Profit before exceptional items and tax stood at INR 17 crores versus INR 16 crores in the corresponding quarter last year. Net profit stood at INR 76 crores in Q3 FY '25, including profit on sale of GMP, as against INR 16 crores in Q3 FY '24. Now moving on to 9 months FY '25 numbers. The company reported a total income of INR 698 crores as against INR 536 crores for the last year, which is a growth of 30% year-on-year. For 9 months FY '25, the EBITDA stood at INR 58 crores as against INR 61 crores in the corresponding period last year and the EBITDA margin is at 8%. Net profit stood at INR 93 crores in 9 months FY '25, including profit on sales of GMP, as against INR 47 crores in the previous year. Overall, we achieved a net debt reduction to INR 124 crores as of June 2024 to INR 110 crores as of September 2024 and further to INR 104 crores as of December 2024, reflecting our commitment to strengthen the balance sheet. This consistent decline highlights our focus on prudential financial management and improving liquidity. In conclusion, our various initiatives are driving the company's growth, effectively backed by healthy order book in the EPC segment and upcoming projects in the Real Estate segment and a strong balance sheet that reinforces our financial and market position. We are confident about the road ahead and remain committed to leveraging our innovative solutions and dedicated team to deliver value and excellence for our stakeholders. With that, we open the floor for questions and answers.

Operator

operator
#10

[Operator Instructions] The first question is from the line of Madhur Rathi from Counter Cyclical Investments.

Madhur Rathi

analyst
#11

Sir, I wanted to understand...

Operator

operator
#12

Sorry to interrupt, Mr. Madhur. I would request you to please use your handset.

Madhur Rathi

analyst
#13

Am I audible right now?

Operator

operator
#14

Sir, your voice is very less.

Madhur Rathi

analyst
#15

Hello?

Operator

operator
#16

Yes, sir, much better, yes.

Madhur Rathi

analyst
#17

Sir, I wanted to understand, sir, majority of the finance cost that we have will be pertaining to the EPC division. Is that right?

Santosh Sundararajan

executive
#18

No, not really. I mean, we have a CC limit, which is dedicated to the EPC business. That is the drawdown is typically in the range of INR 60 crores to INR 70 crores on an average and the rate of interest on that is about 10%. So that about INR 6 crores, INR 7 crores is directly to the EPC business annually. And also, we would have short-term borrowing sometimes or interest that we might be paying on advances taken from our clients on the EPC side. But not more than INR 10 crores, INR 12 crores a year could be financial costs attributable to EPC business. The rest would be towards the Real Estate business.

Madhur Rathi

analyst
#19

Okay. Sir, so like 60%, 70% would go to the EPC, right? Sir, so my question was if I look at our PBT basis, we have done around 8%. And we have guided that we'll try to move to 8.5% to 9% by FY '25 end. Sir, I'm just trying to understand, when can we expect them? Because in 9 months, there hasn't been much improvement in the 8% to 9%. So if you could just help me understand, when can we reach this number?

Somnath Biswas

executive
#20

So to answer your question, if you look at that opening statement given by Mr. Santosh that until 9 months, there is no significant revenue and bottom line came from the Real Estate segment. What you are talking about, the 8%, is a blended EBITDA. So we are expecting some revenue. But from the very beginning, we kept on talking that this financial year, we are not expecting any significant contribution coming from the Real Estate. So Real Estate, obviously having a higher EBITDA, so once that will keep on coming, the EBITDA margin will definitely likely to go up. But until we hope that some more revenue is expected in the Q4 in the Real Estate, so it is likely to touch 8.5% to 9% by the end of the year.

Madhur Rathi

analyst
#21

Okay. Sir, my understanding was when I look at our segmental reporting that you have shown in our investor presentation, we've done around INR 72 crores in the EPC on the EBIT level and INR 15 crores was the finance cost. So I was expecting that INR 10 crore would straight away -- INR 10 crore to INR 12 crore would be from EPC segment and that's why 8% kind of margin. But all right, we can get that. Sir, my next question was there hasn't been any major other inflow post Q2 FY '25, where you said that post the elections, we will get aggressive in getting order booking. So on that front, because we have given a INR 1,000 crores to INR 1,500 crores order booking guidance, so on that front?

Somnath Biswas

executive
#22

Out of INR 1,000 crores, what we have targeted, almost we are back more than 50%, more than close to INR 500 crores already we are back this year. And almost 2, 3 orders already are in the pipeline, which the tender has been submitted and we are expecting -- we are quite hopeful, putting our fingers crossed, that we'll get some more good result in the coming days.

Santosh Sundararajan

executive
#23

Yes, we have 2 more months. We are still very hopeful that the other INR 500 crores, we will be able to easily book in the 2 months. Worst case, we might stretch to April, but we are on track to book more than INR 1,000 crores. We are now targeting INR 1,000 crores of fresh orders in the next 3, 4 months itself.

Madhur Rathi

analyst
#24

Okay. So the INR 1,500 crores, again maybe 1 or 2 months here and there, but we will get to that INR 1,500 crores number for FY '25?

Somnath Biswas

executive
#25

Yes.

Madhur Rathi

analyst
#26

Okay, got it. Sir, just a final few questions from my side. So Real Estate sales have been very low for like the 9 months FY '25 than what we have expected. Sir, so why is that? And the second question was on Real Estate was, sir, the Mumbai property CapEx that was going to be incurred with QIP, but I think the QIP has lapsed. So how would we finance Mumbai redevelopment as well as the Powai project?

Somnath Biswas

executive
#27

See, you are right as it was already keep on talking, the Real Estate revenue getting recognized only based upon the competition. So this year, we are not expecting any substantial completion because whatever the project are in the pipeline, that is all the way forward. So if you talk about the Tower of Ascend in Kharadi and Coimbatore, one tower we are expecting, so that's why we are hopeful that the blended EBITDA will go up in the Q4. But rest will keep on coming from the next year onwards. So next year onwards, it will be INR 100 crore-plus kind of Real Estate. And going forward, it will be more than that, quite a bit significant will keep on coming from FY '26 onwards. In terms of the funding of this project, yes, you are right that initially that Mumbai project that was Santacruz redevelopment and Powai project, we are looking for the funds to be raised through QIP. But since at this market conditions, we are not interested to go with the QIP. So that's why the fund, we -- the net sales proceeds received from GMP has been majorly utilized to mitigate that amount. And whatever the shortfall, we are trying to raise interim funds through some term loan or something like that, which will be mitigated at an appropriate time, when it will be very conducive to raise funds through equity mode. But as of now, to keep the continue of the project, we'll raise some kind of short-term borrowing, we'll do in between. But currently, it is majorly mitigated from the sales proceeds from the GMP.

Operator

operator
#28

The next question is from the line of Himanshu Upadhyay from BugleRock PMS.

Himanshu Upadhyay

analyst
#29

If we look at the debt position as on 31 December, it seems cash accretion has not happened on the -- and it remains flattish, INR 110 crore to INR 104 crores net debt. So the substantial amount of money, whatever we received, have we invested for the approvals in Real State? Would that be the case?

Somnath Biswas

executive
#30

No, that is not the case because if you talk about the cash and FD, which is majorly the FD is attributable to your bank guarantee's margin money. So it is not -- it is a mandatory parking of the fund to get the bank guarantee.

Himanshu Upadhyay

analyst
#31

No, I agree to that. But I am saying there has not been substantial accretion. So total cash and bank balance was INR 122 crores at the end of September. It has increased to INR 125 crores. So whatever cash you...

Santosh Sundararajan

executive
#32

In line with the sale of GMP and the receipt of those funds?

Himanshu Upadhyay

analyst
#33

Can you repeat?

Somnath Biswas

executive
#34

No, we are not perfect. We are not envisaging that our cash margin will be -- the cash will keep on increasing. That is not the case.

Santosh Sundararajan

executive
#35

So what is the question you posted?

Somnath Biswas

executive
#36

Yes, September, it was INR 122 crores, now it is INR 125 crores. What exactly you...

Santosh Sundararajan

executive
#37

INR 104 crores, yes.

Himanshu Upadhyay

analyst
#38

No. So what I am saying is the cash, what we came for GMP, around INR 100 crores.

Santosh Sundararajan

executive
#39

Yes, that has not been...

Himanshu Upadhyay

analyst
#40

Approval land and everything.

Santosh Sundararajan

executive
#41

No, so that INR 100 crores was in the bank during this period, I agree, as a lean mark. In our presentation, deliberately, we have not included the INR 100 crores as a cash balance. You will see it in the books. Our net debt will be seen as INR 4 crores in our official P&L balance sheet. But we have not -- in the presentation, we have deliberately kept that aside because those funds have a specific utilization, which will happen over the next 1, 2 months and already happened in a significant way as of today in terms of what we said in terms of -- we've given the allocations of those funds earlier as well. We did not want to show that in the presentation because then the net debt looks like INR 4 crores, which is not a real picture. It's a very short-term picture.

Himanshu Upadhyay

analyst
#42

Okay.

Santosh Sundararajan

executive
#43

So this INR 104 crores is without considering the INR 100 crores cash balance from GMP.

Himanshu Upadhyay

analyst
#44

Okay. And on Real Estate, any developments further, any timelines for the launches from both the Bombay projects?

Somnath Biswas

executive
#45

Already, we received the RERA from Om Sainath project, so the groundwork is very much on, [indiscernible] completed, the execution has been started. But we are coming back after a long time in the Bombay, so we want to have an appropriate launch, so we are planning. We'll likely do anytime in the February, depending on the right dates and everything. The rest are in progress. Powai is also -- we are expecting by another 2, 3 months because of what the EC -- the EC meeting has been scheduled. Some of it has got delayed, which is beyond our control. So once the EC has been done, we'll go for the RERA. And the forecast is also expected by another 6 to 9 months in the maximum horizon we are looking at. So plus/minus 1, 2 months, we are very much on the track of this project. But one project is definitely getting already officially -- we started booking, but official launch is likely to happen pretty soon. But since we got the RERA, everything is done and dusted.

Himanshu Upadhyay

analyst
#46

And any business development plans there or progress, what you are seeing in the market? Can you throw some light on both Pune and Bombay in the third market?

Somnath Biswas

executive
#47

You are talking about the Real Estate or EPC?

Himanshu Upadhyay

analyst
#48

Yes, Real Estate.

Somnath Biswas

executive
#49

See, Real Estate, already a couple of projects are in the pipeline. If you look at our presentation, already we are talking three projects in Bombay and two in Pune. So that is very much in the pipeline. So we have -- our major focus is to get this thing mature ASAP. But at the same time, we're in a different level of discussion with a couple of JVs, both in Pune as well as in Coimbatore also because since we are significantly present over there and there is a good amount of attraction that's from that end as well. So we are exploring some JVs in Coimbatore also. So it is very much on the track. Mumbai, as of now, these three, we are primarily focusing. And once this is getting launched and cash flow keeps on coming, there are a couple of proposals out there, but we'll -- we are exploring and evaluating, depending upon the cash flow situation, on all these things.

Operator

operator
#50

[Operator Instructions] The next question is from the line of Rushabh from Finnovate Finance.

Rushabh Dugad

analyst
#51

So my question is on the lines of the order book. So we have an order book of around INR 3,200 crores. So just wanted to know the estimated completion timeline for these projects.

Santosh Sundararajan

executive
#52

3 years. Yes, 3 years, typically, you can consider it as on an average 3 years of execution timeline.

Rushabh Dugad

analyst
#53

Okay. So what will be the payment structure for these projects?

Santosh Sundararajan

executive
#54

Payments are on a monthly work done bill rates.

Rushabh Dugad

analyst
#55

Understood. So my second question is on the line of the RERA approval received on the Sainath project. Can you just provide an expected completion timeline and the estimated revenue for these projects?

Santosh Sundararajan

executive
#56

So see, now we're mixing Real Estate and EPC. Sainath is a Real Estate project for us. And for that, our -- Vascon's share of top line -- one second, expected share of Vascon's top line is around INR 270 crores, considering today's sale rate. We have about 70,000 square feet attributable to us. So that will be the top line. The execution timeline, as I said, the structure will get done in 2.5 to 3 years. So yes, we can consider the next 2 to 3 years max as the execution timeline for the project, mostly 2 years.

Operator

operator
#57

The next question is from the line of [ Rahul Jain ] from [ RJ Investments ].

Unknown Analyst

analyst
#58

Hello, sir. Am I audible?

Operator

operator
#59

Yes, sir.

Unknown Analyst

analyst
#60

Sir, are you still maintaining the INR 1,500 crores order book guidance for FY '25, given that only 1 quarter remains and there were no new order bookings in the Q3?

Santosh Sundararajan

executive
#61

Yes. See, we have two orders we have not received the paper yet. We haven't announced officially, but we are -- current order booking for the year, starting from April, is around INR 500 crores. We still have INR 1,000 crores shortfall on that INR 1,500 crore target. But as I mentioned, we are now aggressively in line to achieve that target. If not by March end, maybe by April end, we should definitely be achieving the INR 1,000 crore target. We have targeted works. We are filling tenders and a couple of tenders, we've already filled. We hope to back them, I mean. So we're still bullish, may not be March end, but maybe April end, but this INR 1,500 crores will be booked.

Unknown Analyst

analyst
#62

Okay. And sir, what is the outlook for...

Santosh Sundararajan

executive
#63

INR 1,500 crores is already booked.

Unknown Analyst

analyst
#64

Okay. And sir, what is the outlook for new EPC orders? And how is the bidding pipeline shaping up over the next few quarters?

Santosh Sundararajan

executive
#65

Yes, it looks good. Now the Maharashtra elections are over and things are settled, we are now bullish on orders coming out in Maharashtra also. And with stability for the next 5 years, happy to be engaging as much as possible in Maharashtra. It's easier for us to control projects here. So we're focusing there as well. Having said that, other places, we are also looking out for a couple of projects in Tamil Nadu, we are bullish on a couple in UP and Bihar area also. So things are looking positive for the next year. So once we touch this INR 1,500 crores target, then we will take next year's target because again, another INR 1,200 crores to INR 1,500 crores so that for the next 3, 4 years, our 20% EPC growth story can remain intact.

Operator

operator
#66

The next question is from the line of [ Jigar Shah ] from [ Elevate Research ].

Unknown Analyst

analyst
#67

Sir, I have just one question. With the recent divestment of GMP Technical Solutions and an expected net cash flow of around INR 100 crores, so how do you plan to allocate these funds between the Real Estate and EPC division?

Somnath Biswas

executive
#68

It is not expected. It is already received. And as we conducted some time back, that majority of the fund is going to be utilized for the Real Estate project in Mumbai, which is initially planned to be mitigated from the QIP. But since we are not coming up with QIP right now, so the GMP sale process majorly utilized to pump in the required capital for three Mumbai projects.

Santosh Sundararajan

executive
#69

And partly, INR 14 crores, INR 15 crores towards EPC as well to [indiscernible].

Operator

operator
#70

[Operator Instructions] The next follow-up question is from the line of Madhur Rathi from Counter Cyclical Investments.

Madhur Rathi

analyst
#71

Sir, I wanted to understand, what is the status of our Baner project? And it was expected that the GMP proceeds were going to be used for this. So status of that, how do you plan to fund it? And what will be the total CapEx required from our end on this project?

Somnath Biswas

executive
#72

See, this is initially planned, that GMP sale proceed was supposed to be utilized for the Baner Pashan project and at that point of time, when we are aggressively going with the QIP. But since the QIP plan has already been dropped, so GMP sale proceed is majorly utilized for the Mumbai project, which already we conveyed to you all also. But now Baner Pashan [indiscernible] also, we are in the process of the approval cycle. So that's why we talked about that whatever the rest of the fund is required to keep the schedule of the launch and project is intact, so we'll need to raise some kind of short-term capital intermediately. And when the market will be positive and favorable, then we'll try to raise some more capital through equity mode and extinguish the short-term debt.

Madhur Rathi

analyst
#73

Okay. And sir, what would be the investment from our end on this project?

Somnath Biswas

executive
#74

It will not be significant as well because Pune is non that capital-intensive as compared to Mumbai. But still, it will be in the range of INR 40 crores kind of investment is required because that project size is almost 1 million square feet.

Madhur Rathi

analyst
#75

Yes. Sir, I mean, just I couldn't get numbers?

Santosh Sundararajan

executive
#76

INR 30 crores to INR 40 crores.

Madhur Rathi

analyst
#77

Okay, sir. So we'll invest INR 30 crores to INR 40 crores and we will get INR 400 crore of expected sales value from that? Is it right?

Santosh Sundararajan

executive
#78

Yes.

Madhur Rathi

analyst
#79

Okay. Got it. And sir, so majorly, I think this will be a commercial project. So it seems that most of the real estate companies are moving towards a cash flow kind of a model, where the cash flow from the commercial kind of real estate sustain their debt books as well as their interest payments. And so do we plan to do some kind of that for this project? Or do we plan to sell it out totally whenever is launched? And what will be the launch timeline for this?

Santosh Sundararajan

executive
#80

Up until now, Vascon has not really [indiscernible] commercial assets. Our model has not been to sort of get regular rental revenues for the company. I'm aware some of our peers are doing that as a model. But we've always felt that if we can encash our amounts and rotate into the next project, we're probably adding more value than sitting on 8%, 9% rent. So as of now, we -- at the Board level, we do not have any big plans or intentions to hold commercial assets, except to the extent that we need as collateral for our EPC business. But having said that, the Baner project will take 2, 3 years to finish. At that point of time, whatever is the best strategy the market offers, I think we'll take a call.

Madhur Rathi

analyst
#81

And sir, when do we start to -- start with construction? What will be the -- in the next 6 months, can we see the construction started?

Santosh Sundararajan

executive
#82

Not in 6 months, we are not expecting to groundbreak before calendar year 2026.

Madhur Rathi

analyst
#83

Okay. So another 1 year would be minimum before the start.

Santosh Sundararajan

executive
#84

At least minimum 9 months is [indiscernible]. So that's why I talked about the calendar year, 2025 calendar [indiscernible]

Madhur Rathi

analyst
#85

Okay, got it. Sir, then a final question, sir. Sir, when I look at the Real Estate segment, sir, although we are launching new projects that are very attractive based on the margins that double the margin of our [indiscernible] margin on the EPC segment. But sir, when I look at our investor presentation, we have some of our projects from 2018 as well as -- that has not been sold. So what gives us confidence that we can sell a new project going forward, when like real estate boom -- cycle has moved and still we are not able to sell our 2018 projects? That is the worry that we have.

Somnath Biswas

executive
#86

2018, if you talk about 2018 onwards, the Real Estate, whatever it is, segmental report, it is always a better number. So then expect that affordable segment at affordable housing in Kharadi [indiscernible]. Affordable doesn't give that kind of margin what normally other project gives. So any other project, if you talk about the Forest County, if you talk about the Tower of Ascend, most of these are having a significant EBITDA margin. But currently, whatever the top line is coming, it is coming from the Kharadi only. So Kharadi is not going to improve the EBITDA or ratio significantly. But the rest of the project is definitely we have at least of close to 18% kind of EBITDA minimum, that real estate.

Madhur Rathi

analyst
#87

Okay, got it. Sir, just a final suggestion, sir, when we see insider and director selling their stakeholding in the open market in a downturn, sir, it's very -- it gives a negative impression to the investor community that the company -- is there something wrong with the company because even at such levels, the company -- the directors are selling. So if you just like make sure it gets either reflected in their salaries or something else. So that was a suggestion from us.

Santosh Sundararajan

executive
#88

I couldn't get, what is being told?

Madhur Rathi

analyst
#89

Sir, the directors' share, [indiscernible] director shareholding that is sold in the open market, so it is regarding that. So that is a very negative impression to the investor community regarding the...

Santosh Sundararajan

executive
#90

So I mean, I don't know which specific this you're talking about. I am the only director on the Board to sell in the open market. And if you take my holding in the company, it has only increased. You understand I am also the CEO and I have access to ESOPs year-on-year that the company awards and the ESOPs, including their tax liabilities, have to be purchased by me and paid for. And so whenever a round of ESOP is available, I am supposed to sell a little bit of my old holding, but I end up buying more than what I sell. So overall, if you track my holdings, my holding in the company has only increased. And other than me, the other directors either do not have holdings or are not selling. So directors' holdings are not dropping in the company for sure.

Operator

operator
#91

[Operator Instructions] The next question is from the line of [ Karnik Shah ] from [ AK Services ].

Unknown Analyst

analyst
#92

Yes, I'm audible?

Operator

operator
#93

Yes.

Unknown Analyst

analyst
#94

Yes. I just wanted to ask that with the 6, 7 projects currently underway, when are they expected to be launched or completed, what kind of capital requirement are we looking for over here?

Somnath Biswas

executive
#95

So already, we've given that as a capital requirement, still we need for three Bombay projects, more or less, we have settled with the capital, some INR 20 crores, INR 30 crores may be required, which is the shortfall from the QIP vis-a-vis the GMP sale proceeds that we raise's. And apart from that, the Baner Pashan also, we talked about INR 30 crore, INR 40 crore capital to be required. So all in all, we require INR 70 crores to INR 80 crores kind of capital to be raised in coming days, depending upon the timeline of the projects. And completion horizon is depending upon the -- once again, it varies project-to-project, both the redevelopment project since there is [indiscernible] the horizon is 24-month kind of thing, but other projects will be 30 to 36 months kind of project. And I mean, 100% may be something more, a little bit more because it is almost 1 million square feet project.

Unknown Analyst

analyst
#96

All right. Okay. And looking ahead, what type of Real Estate projects are you planning to undertake? Like will it be affordable category or luxury as well?

Somnath Biswas

executive
#97

Not affordable, the residential for mid and little bit upper mid segment or commercial.

Unknown Analyst

analyst
#98

Okay. And like is there a potential boom in the growth outlook in these segments? Or do you think the other -- like luxury projects also have some more scope?

Somnath Biswas

executive
#99

All the above, eventually. Now it is mostly end user gain. So there is significant attraction is happening and sales are happening that -- so at least we are confident, even the market report also suggests that this growth will be continued for at least next 4 to 5 years or even bigger growth is there.

Unknown Analyst

analyst
#100

Okay. And the last question that I have is how do you see the competitive landscape evolving in both in EPC and the Real Estate segments? Like are there any regulatory issues or market risks that could impact the growth or towards the project completion?

Santosh Sundararajan

executive
#101

No, nothing new, nothing is there.

Unknown Analyst

analyst
#102

Okay. So there are no risks or that regulatory -- there are no regulatory issues that can impact growth?

Santosh Sundararajan

executive
#103

No, no regulatory issues. I mean, nothing new that has cropped up. But of course, there are many regulatory issues to do with Real Estate, launching your project and the timelines that it takes. I would never say there are no risks. We are not getting easy for our second Real Estate project yet, then we have to go for RERA, so all of that. But nothing new, these are all known constraints and known risks. And so yes, nothing to worry about.

Operator

operator
#104

[Operator Instructions] As there are no further questions from the participants, I would now like to hand the conference over to Mr. Somnath Biswas for closing comments.

Somnath Biswas

executive
#105

Once again, we thank all the investors for staying with us and hope we resolved your queries and all these things. If any further queries are there, you can be in touch with either Stellar or Mr. Pankaj Jain, who is handling the Investor Relations team from us. And thank you, wish you all the best for the coming future. Hope the market will keep on improving now.

Operator

operator
#106

Thank you. On behalf of Vascon Engineers Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.

For developers and AI pipelines

Programmatic access to Vascon Engineers Limited earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.