Good morning, everyone, and a warm welcome to the Q2 presentation from Vestas. On behalf of executive management here and for myself, first I'd like to extend a huge thank you to our colleagues around the world. I think their commitment, their dedication, and also how we have been able to absolutely focus on business continuity is nothing less than exceptional in a quarter like the second quarter of 2020. With that, I'd just like to take you directly to our key highlights. In Q2 2020, we had strong performance in, again, challenging environments, and we have gone through this without having received any state aid in any of our countries. Revenue was EUR 3.5 billion. It's up 67% compared to the Q2 in 2019. Our order intake continued at a very high level at stable pricing, so we took 4.1 GW of order intake in the second quarter. It also leads to an all-time high backlog of in excess of EUR 35 billion. In terms of the EBIT margin, we had an underlying EBIT margin of 5.9%. That was impacted by an extraordinary warranty provision of EUR 175 million, meaning that the reported EBIT margin for the quarter is 1%.

Henrik Andersen

executive
#2

Our service business delivered another outstanding quarter. In servicing, we achieved 6% organic growth in Q2, organic growth measured against Q2 2019, along with an EBIT margin of 28.5%. Later today, we'll share some additional specifics regarding our sustainability efforts. Our CO2 targets received scientific approval and were verified in line with the Paris Agreement, and we'll return to this with further specifics during the presentation. To start, I'd like to offer a quick overview of how we actually navigated Q2 amid the COVID-19 crisis. As you know, we accomplished this without receiving any state aid, while also doing it with a primary emphasis on keeping everybody safe at work and at home as well. That approach also means that when we set out to do this, business continuity served as the prime driver for us at the point when COVID-19 broke out in February in China. Once more here, a big thank you goes to our customers and also to our partners when it comes to suppliers and partners around the world, and also, once again, to the colleagues. I think it's also fair to say we're in Copenhagen, it's Europe. In our societies, we probably take a somewhat more relaxed attitude toward COVID-19, but we also must recognize that the epicenters right now remain the Americas, India, and South Africa.

Henrik Andersen

executive
#3

So because of that, we truly need to stay completely focused on following the protocols while continuing to push forward. On the whole, suppliers have caught up, handled things very well, and we're quite happy with the backing and dedication shown in catching up through the second quarter of this year. I believe, when it comes down to it, we can discuss how effectively we're handling both manufacturing and the supply chain feeding into the factories, particularly in certain epicenters across the globe. Nothing demonstrates that better, I think, than the fact that during the first half of 2020, we produced and delivered 9.6 GW, an increase of 60% over the same period in 2019. Naturally, that also underpins our ability to come out and reaffirm our guidance for the year. Moving to second quarter order intake: as mentioned, 4.1 GW. Our order intake was somewhat lower in the comparable quarter of 2019, when, as you'll appreciate, the U.S. played a very dominant role in Q2 2019. During Q2 2020, we saw large orders in the U.S., China, Vietnam, and the Netherlands, which were among the main contributors. Turning to ASP, it was very stable and stayed stable right through Q2.

Henrik Andersen

executive
#4

Naturally, as always, that caveat applies—geography, turbine, and scope all play a part in shaping the ASP of 0.78. That produces a record-high order backlog. It stands above EUR 35 billion. That marks an 11% gain versus the same period a year ago. In the turbine business we went past EUR 16 billion, and as you can see, services now sit at close to EUR 19 billion, and you'd also have picked up from the announcement that we crossed 100 GW in service. If I add a bit more detail on Power Solutions, we had, as I mentioned, a strong emphasis on locking in business continuity, and I'm very glad to report that this truly paid off during the quarter. Order intake is broad-based right across EMEA. It hasn't been affected by the Green Deal so far, though naturally we're mindful that many countries are now discussing green recovery programs, partly with an eye not just to next year but probably more toward the coming decade of the green renewable transition. On a positive note, we've also begun to build a pipeline for 2021 deliveries in the U.S.

Henrik Andersen

executive
#5

In the second quarter, we’ve seen order intake for the U.S. exceed 1 GW. As we’ve said, at least over the past couple of quarters, given the PTC changes, it matters that we and our customers can get those calculations and the order intake right. Another positive in the quarter is Asia Pacific. You’ll see progress on order intake, up 281% versus what was probably a somewhat low figure last year, but overall we’re very pleased. Turning to the service business, as mentioned, 100 GW is a major milestone, so congratulations also to the service business, because you’ve delivered not just on order intake but also with more than 10,000 colleagues working under very difficult conditions. A highlight this quarter was our first AOM 5000 service contract in the U.S. for the new EnVentus turbine. We’ve signed a number of multi-brand contracts across Asia Pacific, particularly for the Senvion turbines, at least some of them with longer duration. Overall, roughly 70% of our order intake carries a tenure of more than 20 years, which means our service backlog now stands above nine years, giving us a very solid foundation for the future growth of the service business.

Henrik Andersen

executive
#6

At the bottom here, we show—and it's quite impressive—the comparison with where we stood in Q2 2019, and you can see gigawatt increases across both Americas, EMEA, and APAC, and we're very pleased with the overall development there. Turning to offshore, again, a normal quarter, and as you'd expect, we've seen the firm order signed on the 1.1 GW Seagreen project in Scotland. That included a 15-year service agreement as well. We have completed the Northwester 2 installation. We're well under way installing the Borssele project too. It is already now partly producing electricity, which is of course very positive. We have completed the third and final floating turbine at the WindFloat Atlantic project, which sits off Portugal's coast. Of course, that again demonstrates our commitment to keep innovating in foundations toward floating offshore. Elsewhere at the bottom, you can see what other projects we have in progress. I don't think there's any major news on that. I also want to mention here that we are the first wind turbine manufacturer with a validated strategy in line with the 1.5% global warming scenario according to the Paris Agreement.

Henrik Andersen

executive
#7

Science Based Targets experts validated that during the quarter — and it relates particularly to our Scope 1 and 2 emissions, which as you know means carbon neutrality by 2030. I'd also say that an important point here is the extensive discussion about how we then take action on it. As you'll have seen, since the announcement on 1st of January, we've now replaced over 100 electric service vehicles, and by the time we approach year-end we'll have both service cars and benefit cars, roughly 300 cars altogether. That genuinely makes a difference, and it's also an effort to show and put real commitment behind this. If you're interested, please turn to page 15 of the quarterly announcement, where you can read more about our other initiatives as well as the progress — which here we can only emphasise and describe in positive terms. With that, I'll hand over to Marika.

Marika Fredriksson

executive
#8

Thanks, Henrik. So on the income statement, you clearly heard Henrik and the strong level of activity we had here in Q2 of 2020 despite the COVID-19 situation. As a result — and with the organization doing a very good job — revenue is up 67% compared with Q2 of last year. Gross margin is lower, and so is EBIT, mainly because of the higher warranty provision taken here in Q2. I'll come back to that. We also saw a negative COVID-19 impact here in the quarter. As I said, you can see that EBIT is also down versus last year. Keep in mind that the underlying EBIT margin before special items is in line with last year and is actually coming up to 5.9% here in the quarter. Altogether, a very good activity level, and also good leverage on SG&A, as I'll show you later. SG&A cost continues to be well under control. Compared with last year, we're now on a 12-month rolling basis, down to 5.7 percentage points versus 7.2 percentage points in Q2 of last year. Depreciation and amortization, excluding the impairments you've seen, increased year-over-year, mainly because of the new products we've introduced, and as we've already highlighted.

Marika Fredriksson

executive
#9

Moving to the service business, that also kept up strong results, as Henrik mentioned. Service revenue rose 6% versus Q2 2019, with an EBIT margin of 28.5 percentage points in the quarter. Clearly a very solid, strong showing in service, particularly given that we're operating in a COVID-19 environment. At MHI Vestas, we're looking at a negative profit of EUR 12 million. Our share of that comes to EUR 6 million. That was expected, since we had anticipated a low activity level in 2020 for the offshore business. What you're mainly seeing there is really the aftermarket work being done. On the change in net working capital, as I've said before, we keep using the balance sheet so that inventory sits higher than it did previously. That's a factor in Q2 as well. Contract assets and liabilities are climbing too. Because activity is high, payables are also reaching a different level. I'll return to what that means for cash flow in the quarter. On the cash flow statement, cash flow from operating activities came in at a solid EUR 296 million.

Marika Fredriksson

executive
#10

Clearly, it’s higher than the prior year. You can observe the substantial effect of the shift in net working capital, which allows us to handle the elevated overall activity level expected for the second quarter. Free cash flow before financial investments is roughly on par with a year earlier, even with that large working capital movement. We land at a negative EUR 78 million versus EUR 75 million in the prior year. Total investments are lower than last year. That does not imply we are slowing investment in the business to support both the high activity level and new technology. As you recall, we also discontinued one product line, or platform, during the previous quarter, and that clearly affects net investments in Q2 as well. Warranty provision and the low production factor. As you can see, we are recording an extraordinary provision of EUR 175 million in this quarter, and that also brings us to 3%, or to be precise, 3.1% for the quarter. Altogether we have EUR 283 million, which is a far, far higher level than a year ago. As you have seen previously, that naturally affects gross profit as well as EBITDA.

Marika Fredriksson

executive
#11

Because of that unusually high level of repairs and upgrades, the LPF went up, which puts us above 2% here in Q2. On the capital structure and net debt to EBITDA, we're comfortably under the threshold. It should come as no surprise that Vestas keeps a very sharp focus on this, and we remain in a solid position. Our liquidity is still very strong, with roughly EUR 2 billion of cash on hand right now. With that, I'll hand the word over to you.

Henrik Andersen

executive
#12

Thanks, Marika. So that brings us to talking about and, as we mentioned here, putting back in place our guidance for this year. Before we get into the numbers, I just want to point out here that it goes without saying that, since we're in August, with roughly 142 days remaining in the year, the key thing to note here is that the underlying assumptions right now carry more uncertainty than usual, because we're still in the thick of it, and we've discussed the COVID-19 epicenters around the globe. That said, since we also have better visibility on the year now, we're guiding for revenue that matches what we originally stated at the start of the year, EUR 14 billion to EUR 15 billion. Our EBIT margin before special items is 5%-7%. Please do note, though, that this includes the extraordinary warranty provision of EUR 175 million. As Marika correctly walked through here, on the total investment side, thanks to the initiatives we took early in the year, we now say it will be below EUR 700 million. With that, we'll wrap up the presentation here and hand the word back to the operator for Q&A.

Operator

operator
#13

Thanks. Should you wish to pose a question, kindly press zero one on your phone's keypad. We'd appreciate it if you kept to 2 questions per turn. Kristian Johansen of Danske Bank has our first question. Please proceed.

Kristian Johansen

analyst
#14

Yeah, thanks. First off, I want to ask about U.S. deliveries, which were obviously really strong in Q2. Could you go into a little more detail on how we should be thinking about the U.S. delivery schedule going forward, particularly regarding how customers have responded to the option the IRS has provided, which lets them sort of shift volumes out of 2020 and into 2021 and still get the 100% PTC level?

Henrik Andersen

executive
#15

Thank you, Kristian. I believe that is a highly pertinent question. As we have mentioned here, much of our attention is likewise directed at the U.S. and at when that will happen. We are very happy with the headway being made, though plenty remains to be completed. We are monitoring that closely, down to individual days and weeks. It is also reasonable to note that our conversations with customers generally indicate that nobody would push things into 2021 if there is any way to prevent it. The reality here is that the dedication to a partnership is that it pays off. It generates profit from the moment it is commissioned and delivered, so people prefer to hold to the earliest possible delivery. As you can likewise observe in our guidance, we are also back to getting the majority of that finished, as far as we can, within that standard schedule we follow.

Kristian Johansen

analyst
#16

All right, just to piggyback on that, what about the conversations regarding those projects carrying 80% PTC that you're able to push into 2022? Are those talks facing any hold-up, or are they moving forward on schedule too?

Henrik Andersen

executive
#17

There's a great deal of that discussion happening, I'd say. I think we've been transparent. During the last quarter, I believe that was the case. The quarter before that, likewise. What we need to recognize is that near the end of the year, we secured the extension. After that, a 2020 and 2021 possibility came up later in the year. I'd say at this moment many of those conversations are taking place. As you can understand, whether it's 100% or 80%, it remains profitable for customers to proceed. So the question becomes the timetable — how do we get into the schedule? What do both the projects, along with permitting and, naturally, the capacity we have, actually let people do. Kristian, you'll understand that both 100% and 80% PTC projects are profitable for the customer.

Kristian Johansen

analyst
#18

Got it, thanks. My second question concerns this warranty provision. Over the last couple of quarters, you also raised the warranty provision, in a way reflecting new technology. How far did those earlier increases capture the particular problem that you're calling out here as an extraordinary provision? So does the overall expense of fixing these blades in fact exceed EUR 175 million?

Henrik Andersen

executive
#19

You can understand that a provision of this kind doesn’t arrive all at once, and neither does the underlying cause. Over the past couple of quarters, we’ve been digging into it. There’s a rigorous process surrounding this. Naturally, some of what we’ve been doing during earlier quarters has also involved examining this matter. From our perspective, that had some impact on prior quarters, but what we’re stating now is that, with the root cause identified along with the specific repair and upgrade, we can say that neither current nor future blades will carry that requirement going forward. As a result, we’re able to make the final one-off provision for the blade issue at this point.

Kristian Johansen

analyst
#20

All right, that makes sense. So could you put a number on what this particular problem has cost us in total?

Henrik Andersen

executive
#21

That's something you'd appreciate, but we don't share it in that sense. It's a discussion that's ongoing between us as well as with our customers and the asset owners globally. In that situation, we handle it the way we ordinarily would with any of our warranty or CIM cases. We don't provide that breakdown.

Kristian Johansen

analyst
#22

Okay, that's fair. That's everything from my side. Thanks a lot.

Operator

operator
#23

Claus Almer from Nordea has our next question. Please proceed.

Claus Almer

analyst
#24

Thanks. Yeah, I’ve got a few questions too. First one is also about those extra provisions you took in Q2. Will there be an effect on the service division next year as well — for example, since some of those turbines aren’t meeting their up-and-running guarantee? That’s my first question.

Henrik Andersen

executive
#25

No, Claus, that isn't something we're expecting.

Claus Almer

analyst
#26

All right. So if we look at the lost production factor and set aside those blade problems, do the remaining contracts come down to 2%? What's the underlying level like?

Marika Fredriksson

executive
#27

I think it's reasonable — and you're basically answering it yourself — that we're at a normal level, around 2%, if you set aside the extraordinary provision we're taking this quarter.

Claus Almer

analyst
#28

Alright, my next question is about the EBIT margin, or the gross margin. When you look at the power division and strip out those one-offs, the gross margin, I believe, remains under 10% for that division. Are there any other meaningful additional costs baked into that figure, and what would be required to raise it into double digits, at minimum?

Marika Fredriksson

executive
#29

I'd say when you look at gross margin, clearly the largest effect in the quarter is the warranty provision that you're seeing here. And keep in mind, versus last year, we already carry a higher warranty provision — 3.1% — as a point of comparison. That obviously factors into the explanation. We also have extraordinary costs, or COVID-related costs, hitting us in the quarter, and therefore affecting gross profit. Operating the business in the environment we're facing right now is certainly not free of charge in any way. We're seeing additional costs, especially in transportation and logistics, and for turbine operations.

Claus Almer

analyst
#30

Is it mostly that second factor that's pushing gross margin under 10%, even once you strip out the provisions?

Marika Fredriksson

executive
#31

Yes, I'd say so — in short, every one of those factors is affecting gross profit at Power Solutions.

Claus Almer

analyst
#32

All right, thanks a lot.

Marika Fredriksson

executive
#33

Appreciate it.

Operator

operator
#34

We'll take our next question from Dan Togo at Carnegie. Dan, please go ahead.

Dan Togo

analyst
#35

Yes, thank you. Perhaps this question dovetails a bit with what you just said, Marika, since I'd like slightly more than 1% on this warranty provision. Regarding that remaining portion of roughly one percentage point, could you give some wording on what underlies it? My expectation is that it relates to what you just mentioned, Marika. Please say a few words about the guidance. Thanks.

Marika Fredriksson

executive
#36

Clearly, the 5%-7% guidance we’re giving stems from that elevated warranty provision, plus the COVID situation we’re still dealing with overall. Of course, if I look back at last year, there’s another effect as well — we have no extraordinary income from development projects, which, as you saw, made a big difference last year. The two main factors are really that unusual warranty provision and the COVID-19 situation. That’s the reason we’ve lowered the EBIT guidance for the full year.

Dan Togo

analyst
#37

Okay, one more thing about that EUR 175 million warranty provision. Going forward, is that the amount you'll use up? Will it in any way, say, hold back or hurt how your business would have grown otherwise? Do you have to put a lot of resources into this? Thanks.

Marika Fredriksson

executive
#38

Well, I believe Henrik mentioned that earlier too. The way we arrive at the warranty provision is definitely not arbitrary. There's a process we've been following throughout. We also conducted a detailed investigation when it came to arriving at that EUR 175 million figure. Naturally, we know precisely what we're discussing and what it pertains to. What I think matters greatly is that neither the current blades nor the forecasted blades going forward are affected. That's a substantial quantity of blades, and that's why the amount is as high as EUR 175 million. That much is evident. And since we're guiding for the same activity level as in our original guidance, we're referring to EUR 14 billion to EUR 15 billion. We clearly believe we can handle both together, and that, I think, is the key point to emphasize.

Dan Togo

analyst
#39

One thing to point out here is that this extends across at least maybe 18, 24 months. That's a fairly lengthy stretch, and it carries on into 2021 too.

Marika Fredriksson

executive
#40

No, I'd say that's more your assumption. We aren't the ones forecasting next year. What we're discussing right now, obviously, is the full year for 2020, and warranty-related activities are part of that guidance.

Henrik Andersen

executive
#41

Dan, I think that's a reasonable way to put it — if you're asking what your approach should be and how it gets used, then yes, of course, it will carry on through the quarters ahead and into next year, no doubt.

Dan Togo

analyst
#42

Alright, thank you very much.

Marika Fredriksson

executive
#43

Appreciate it.

Operator

operator
#44

Gael de-Bray from Deutsche Bank has the next question. Go ahead, Gael — are you there?

Gael de-Bray

analyst
#45

Oh, hi there. My apologies—I had myself muted. Sorry about that. Good morning, everyone. Are you able to hear me at this point?

Marika Fredriksson

executive
#46

That’s something we’re able to do.

Henrik Andersen

executive
#47

Yes, we can.

Gael de-Bray

analyst
#48

Hello? All right. That's excellent. Many thanks. Please allow me two questions. First, regarding what we call COVID-related expenses: might you be able to attach a figure to those? It would be wonderful if you could quantify the elevated costs, which may potentially fade away gradually as time goes on. My second question concerns the offshore strategy. Could you provide some form of update on that? Are you pleased with how the joint venture is currently performing? Do you remain at ease with the present situation, with the status quo, with MHI? Thanks so much.

Marika Fredriksson

executive
#49

Alright, on your question about how COVID-19 affected us this quarter. Since the start of the year — or really when we reported Q1 — we've said we are very rigorous about the way we measure the direct COVID-19 impact. What we've arrived at for this quarter, Q2 of this year, is a EUR 20 million hit from COVID. Naturally, there will be some effect from delays on the revenue side, and of course that carries through to EBIT as well. The direct cost impact of COVID-19 comes to EUR 20 million in the quarter.

Henrik Andersen

executive
#50

Sure, I’ll just say a few words about where we stand offshore. It’s something we get asked about, we do discuss it, and we’re really happy with how offshore is progressing. The joint venture arrangement has us very pleased, and in a quarter such as this one, when we have orders as well as being fully engaged in installing additional projects, I think it’s fair to give a big thank-you to the people in our joint venture, who put in hard work during this quarter. Our stance on that hasn’t changed. As you know from our strategy, onshore, offshore, and service make up the three essential strategic legs of what we do.

Gael de-Bray

analyst
#51

All right, thank you so much.

Marika Fredriksson

executive
#52

Thanks.

Operator

operator
#53

We’ll take our next question from Akash Gupta at JPMorgan. You have the floor.

Akash Gupta

analyst
#54

Yeah. Hi, good morning, Henrik. Good morning, Marika. To start, I'd like to ask a follow-up about that warranty provision. Could you give more detail on when those turbines were first sold, and which turbine models are covered by these provisions? On the blade issue, was it a design problem, or was it a serial production defect that you discovered after the blade had been installed?

Henrik Andersen

executive
#55

Let me put it this way: first, as you'll appreciate, this is a commercial conversation we're having with the customer, and it also concerns a specific set of confined spaces in and around the blades here. It has to do with what we refer to as high intensity lightning as well, and so that's the matter we're working through diligently. It involves a limited number of blade models, and because of that, we're handling it, in practice, on a customer-site basis and turbine by turbine in that sense.

Akash Gupta

analyst
#56

Thanks. I have a follow-up about the EnVentus turbine. When you look at the large orders in Q2, the EnVentus share was, I'd say, fairly low. I believe it has been quite some time since you launched this turbine. What I'd like to ask is: by when do you expect most of those large orders you announced to come from EnVentus? Could that happen this year — say, perhaps by Q4 — judging by your pipeline, or do you think it's more likely in 2021?

Henrik Andersen

executive
#57

So again, I'd call this a normal, typical ramp-up. The prototypes are up and running there. It has moved into serial production now, over the course of the year — particularly in the second half. That's going according to plan. So, as you can see, there are a number of ongoing discussions, and you've also seen that we've booked some orders. More will follow. At this point, I'd say it's a gradual ramp-up, in terms of the EnVentus order backlog as well. Honestly, at this stage, Akash, we're quite pleased with how it's going.

Akash Gupta

analyst
#58

Thanks. Maybe a quick one for Marika. Should we expect any effect on next year's margin from some project delays? I'm not sure how that lands in your P&L, but let's say you have a project where revenues and costs are recognized at completion, and if that project has some cost overruns, then how would that hit the P&L? Would it hit this year or next year?

Marika Fredriksson

executive
#59

So what you might potentially see this year is a bit of slippage from Q4 into Q1 of next year. I think we've also given the guidance of EUR 14 billion-15 billion. Obviously, we hold a positive view on the rest of the year. As Henrik mentioned earlier, nobody has a silver bullet for the COVID-19 situation, so there's nothing we can guarantee. Up to now we've done a very good job accommodating our global presence.

Akash Gupta

analyst
#60

Thanks.

Marika Fredriksson

executive
#61

Appreciate it.

Operator

operator
#62

The following question comes from Supriya Subramanian at UBS. You have the floor.

Supriya Subramanian

analyst
#63

Yes. Hello, and good morning. Thanks for having me ask these questions. The first one, once again, concerns the sort of effect that the present COVID-19 circumstances are having. I understand that you're unable to put a specific figure on the cost or on how costs will be affected during this quarter. What's your view of that, and I realize matters remain fairly uncertain, but in light of the current situation, how would you expect that to develop over the rest of this year? Perhaps also tied to this, has the company undertaken any particular restructuring steps that are meant to secure some near-term savings, and if it has, could that potentially be reversed, or are there longer-term savings initiatives that would offset it?

Marika Fredriksson

executive
#64

I hope I've grasped what you were asking, Supriya. When it comes to the direct effect of COVID-19 on our costs in this quarter, the figure is EUR 20 million, and you should set that against EUR 10 million in Q1. Naturally, we have worked out — and this is reflected in the guidance we've now provided — that we have planned for a COVID-19 situation persisting for the whole year. Clearly nobody, as I mentioned before, holds the silver bullet regarding how things will turn out. Since we're providing guidance of EUR 14 billion to EUR 15 billion for the full year here, we obviously feel confident that we will manage well given the circumstances we find ourselves in. What we've said from the start is really that when it comes to COVID-19, we shouldn't treat that as an excuse and mix it in too heavily. Obviously you're seeing effects on suppliers, on transportation, on logistics more broadly. What we're working out is really the direct cost related to COVID-19, not the effect on our capacity to supply our customers. I believe that's the best we can offer in our view of the COVID-19 situation. I don't think anybody has a silver bullet. I think under the circumstances we are managing well and handling and dealing with the situation.

Supriya Subramanian

analyst
#65

Okay, understood. My follow-up question concerns the offshore segment, specifically how MHI Vestas is positioned competitively against its rivals. As we're aware, GE offers a 12 MW machine, and Siemens has, naturally, just introduced its 15 MW and 16 MW turbines. At present, MHI Vestas only has the 10. Do you feel some technological gap exists? Put simply, might an injection of investment be required to advance the relevant technologies so the joint venture can now compete effectively in the marketplace?

Henrik Andersen

executive
#66

Thanks for asking that. I believe the point is fairly clear, and we've addressed it several times already. Should we ever conclude there is something fresh worth saying about the product roadmap, that will be handled through the proper channels rather than as some unusual item in the quarterly investor setting. We monitor it quite carefully. We likewise keep a close watch on the conversation with our close partners, and as you can imagine, when it comes to both project life cycle and product life cycle, offshore has a longer life cycle and we are completely aware of that. Within the joint venture we are very aligned with our partner, MHI, and naturally we will be assessing that for the quarters and years ahead as well.

Supriya Subramanian

analyst
#67

Okay, sounds good. Thanks a lot.

Marika Fredriksson

executive
#68

Thanks.

Operator

operator
#69

Martin Wilkie of Citi has our next question. Go ahead, please.

Martin Wilkie

analyst
#70

Thanks, and good morning. My first question concerns service. It was another very strong quarter, yet I notice the 25% margin outlook has been maintained. Since we had a lower margin in Q4 last year, is that kind of seasonality what you would anticipate? In effect, should we expect this to be the new profitability pattern — the first three quarters quite strong, with Q4 showing a somewhat weaker margin? Or, given the strong margin in the first half, is your 25% effectively a floor? That is the first question. The second one is just about cash flow. Obviously there is an inventory build, perhaps as we would expect. Clearly it looks like we are setting up a very strong second half. Will most of that inventory build be unwound during the second half, or are you already building inventory for expectations of a strong 2021? Thank you.

Henrik Andersen

executive
#71

Alright, Martin. Regarding the service side, I believe it’s reasonable to say there will be variables and deviations within the quarter. You really can’t use a 2019 pattern to claim there’s an uneven spread of quarterly profitability and so on. We’ll take that quarter-by-quarter, and so when we say it’s approx. 25%, I always emphasize both the organic growth and the EBIT here. Let’s just recognize that every percent on that business is EUR 20 million in round terms, which easily deviates in a business with more than 10,000 employees. Give us a little bit of wiggle room around when we say approx 25% in the EBIT. It’s good to see that they’re progressing through the year, especially as you’d appreciate — come on, these guys, colleagues out there, they’re having a really tough time getting all of this done under very challenging conditions considering you have to be in the field every day. We really appreciate that. Give us the wiggle room around the approx 25%.

Marika Fredriksson

executive
#72

On the cash flow side, and clearly with your assumption there, we are planning for the elevated activity level we expect in the second half, given that the EUR 14 billion-EUR 15 billion we are guiding for is entirely right. Yes, our order intake is very strong, and we also carry a very large order backlog that must be delivered. All I can say — and I won't guide on next year — is that, obviously, should activity be high in Q1 of next year, yes, we'll most likely need to begin building in the later portion of this year. As for what we anticipate now, looking at total inventory on hand at present, we clearly expect a substantial share of it to be used up in the second half.

Martin Wilkie

analyst
#73

Alright, I appreciate that — that's quite useful.

Marika Fredriksson

executive
#74

Appreciate it.

Operator

operator
#75

Rajesh Singla from Societe Generale has our next question. Kindly proceed.

Rajesh Singla

analyst
#76

Yeah. Hello, and thanks for taking my question. I have two questions. The first would be whether you could comment a bit on your Asia Pacific strategy, given that order intake in the Asia Pacific region has been quite strong this quarter compared to your peers. If you could just comment on where you see things and what kind of strategic moves you are making in that particular region to gain more market share. The second question is on the warranty provisions. How confident are we that we would not be seeing these kinds of warranty provisions going forward in the future on our latest turbines?

Henrik Andersen

executive
#77

Alright, first off, thanks for the questions. Regarding the Asia Pacific strategy, I'd say nothing has changed. When we talk about it each quarter, it's fair to note that some quarters—like when we looked at last year—we also mentioned we probably weren't especially impressed with the order intakes where we failed to secure orders. So this quarter, it's genuinely good to see things spread across countries such as Vietnam. Japan too. Some China. Some Australia as well. A few of those are long-established markets where we hold an established position, and it's really pleasing to see we're still reinforcing that existing position. In a few markets—Vietnam and China in particular, I'd say—it's great to see the teams pursuing the strategy of becoming a material player in those markets. We understand what the solutions require, so it's nice that, especially in Japan and Vietnam, we can see local customers are attracted and want to do more projects. Here, as we've mentioned and discussed in prior quarters, we're also applying the same process and the same discipline regarding profitability thresholds and targets.

Henrik Andersen

executive
#78

In reality, that amounts to nothing and is only a positive for the quarter. As for your question about how we don't see this, I'd frame my answer differently. We've spent several decades as a technology and quality leader in our industry, and we have no absolute aspiration to change that vision. So we're also simply stating it upfront here. There's an issue we need to address. We will address it, and after that we'll run our normal robust process when we examine it. That's how to comment on this, and this is more about us taking responsibility and making the repair and upgrades in an area where we can now say current and future blades will not be affected by any of this.

Rajesh Singla

analyst
#79

Alright. Let me ask one more follow-up regarding the onshore wind market. Since onshore wind power has been the most competitive renewable energy source, it's extremely competitive against other energy sources. How do we expect R&D cost to trend over the next few years? Will we see some reduction in R&D cost, given that we are already very competitive versus fossil fuel and other energy sources? What further scope exists for R&D in onshore energy? Can we go to, say, 7 MW, 8 MW, or 9 MW turbines in the market?

Marika Fredriksson

executive
#80

Naturally, we can't say anything about how things will develop down the road. I believe it's reasonable to state that staying the technology leader remains a continuous priority for us, and clearly, that is going to demand investments in the future as well. I'd add that it's equally reasonable to say we're now seeing — given that we've introduced quite a number of new products — that R&D will dip slightly in the foreseeable future. The focus remains in place, and we will certainly not put at risk the technology position we hold.

Rajesh Singla

analyst
#81

Sure. Thank you.

Marika Fredriksson

executive
#82

I appreciate that.

Operator

operator
#83

We move now to Sean McLoughlin with HSBC for the following question. Go right ahead.

Sean McLoughlin

analyst
#84

Morning, and thank you for the chance to ask. First, regarding service: I'd like to know whether the second quarter saw a favorable mix effect, perhaps because limits on site access pushed more work toward remote service, and how that mix could develop through the second half. Second, on cash flow, how far under the EUR 700 million CapEx number do you expect to land in 2020? Again, what portion stems from the optimized product portfolio, and what portion is really reduced CapEx from a broad precautionary step? And what is your present stance on buybacks in 2020? Thanks.

Henrik Andersen

executive
#85

Morning, by the way. That came across as a couple of questions too many, but no problem. I'd simply respond: no, nothing has changed, and the structure of the service business remains the same. None of that is visible to us, Sean. That's the one, I believe. After that, Marika will cover CapEx, I think. On the buyback, our position has always been that, given where we stand in the year, we'll always keep it under consideration, but we're also saying this year, with the uncertainty still there and the caveat attached to our guidance, it's fair to say we will revisit that once we're further into the second half of the year.

Marika Fredriksson

executive
#86

If we circle back, I believe you’ve conflated a couple of things there. When you look at CapEx and the figure below EUR 700 million that we’ve given as guidance, clearly there’s an effect from the fact that we stopped development on one of the products, and that happened during this quarter. That clearly has an impact. As for whether we’re taking other steps to make sure we stay reasonable on CapEx and don’t put cash flow at risk, I’d frame it differently, Sean. Plainly, we’re doing whatever is needed to keep operations running and to meet what customers require. As you can see, our order intake is very high, and we have a new product that has to be delivered, and plainly we will deliver it. The one thing I can tell you is that we are always careful with cash. That will remain the case. Again, we will not put our position at risk in any way. The only point we’ve made up to now, without getting too precise, is that we are under EUR 700 million for the whole of 2020.

Sean McLoughlin

analyst
#87

Could that be something, just in terms of that portfolio optimization, that we're able to extrapolate into future years?

Marika Fredriksson

executive
#88

Here's what we've observed. At this point, our overall CapEx sits at an elevated level, driven by the launch of new products and by capacity investments. You've seen that before, especially with molds. Looking ahead, what we've indicated is that a normalized CapEx figure would land near EUR 500 million absent all of these new products launching. It will additionally hinge on the general activity level observed in the market and on customer demand. That's where things stand. I'd characterize a normal scenario as falling anywhere from EUR 500 million to EUR 700 million in terms of CapEx.

Sean McLoughlin

analyst
#89

Thanks.

Marika Fredriksson

executive
#90

Thanks.

Operator

operator
#91

The following question comes to us from Casper Blom at ABG. You have the floor.

Casper Blom

analyst
#92

Much appreciated. To start, congratulations on restoring the revenue guidance—that really is impressive. I have two questions. First, during the previous year, trade tariffs were affecting your supply chain, and now COVID-19 is piling on additional difficulties. With that in mind, are you thinking about any significant adjustments to the supply chain or the way sourcing is handled, or are you fairly comfortable with the current setup? Second, regarding the order intake ASP of 0.78, that essentially gives us 3 consecutive years in which the ASP has remained near 0.75. Since technological advances keep happening, would you say this indicates the industry is increasingly able to retain those improvements for itself instead of passing them along to customers? Thank you.

Henrik Andersen

executive
#93

No, thank you, Casper — and the thanks you’re offering should also go out to a far broader group of people across Vestas. On the supply chain, I have to admit it’s hard to sit here and imagine that any radical changes are needed coming out of a quarter in which we, along with everyone working together — including externally with Vestas — managed to complete another manufacturing effort and ship more than 4 GW. Altogether, we’re close to 10 GW for the first half of the year. What matters far more here, I think, is the closeness and how people have managed to execute on it. Clearly, if we look across the landscape, being a global manufacturer is not the easiest place to be. A global, mature industry cannot exist without a global footprint. A lot has been done really well here, in my view. So we will always search, and we will always optimize. You’ve seen a number of our initiatives, and some of those initiatives are also visible in our guidance. Naturally, the phasing in of certain of those initiatives will benefit us more in the second half of the year than was the case in the first half.

Henrik Andersen

executive
#94

I believe we're putting everything we can into all the initiatives we have, so that over time we move toward that 10% mark — something we've stated and we still hold to. On your point about ASP, we do like stability there. We also completely recognize that it moves quarter-on-quarter. Let me say this: I won't comment on the industry, because I think when you try to draw a conclusion on the industry's behalf, that shows you're quite far from correct when it comes to examining the differences in profitability across the industry. We do what we can both to deliver value to our customers and, at the same time, to earn a decent level of profitability — and it looks like we're succeeding at that.

Casper Blom

analyst
#95

If I could just add one quick follow-up there, Henrik, would it still be more or less a reasonable assumption that, thanks to technological progress, the levelized cost of energy would decline over time, and so in theory the price per megawatt would decline as well? When it isn't declining, that gives you a chance to capture a bigger share of that improvement and channel it into your profitability instead.

Henrik Andersen

executive
#96

I'm not going to push back on that, Casper, since that's really the core principle at play. You'll also recognize the number of changes that have happened worldwide over the last three years, and more are coming in the years ahead, when you'll need to find more efficient solutions to handle the fact that a few markets are actually exiting things like feed-in tariffs and other schemes. My view is it needs to be a mix of both. As we both know, ASP is an excellent metric, but you'll also agree there's a fair amount of variation in it, whether by location, geography, or scope. We say this with a smile here. We're positively past it. We like the stability, and if we were to raise it, we'd do so as well, because it all supports our path to reaching the 10% EBIT.

Casper Blom

analyst
#97

Much appreciated. Thank you very much, Henrik.

Operator

operator
#98

Frans Høyer from Handelsbanken has our next question. Go right ahead.

Frans Høyer

analyst
#99

Morning, and thanks a lot. I've got a question about the warranty cost, which came in at 3.1% in the second half — what did that figure stand at in the same period a year earlier? And could you give some color on how things are going and the momentum with the DSV Panalpina collaboration? My guess is you're at the point now where real traction is starting to show, so what scale of benefits do you expect from it in the second half, please?

Marika Fredriksson

executive
#100

All right. To address your first question about warranties: measured against Q2 of last year, the underlying figure came in at 2.5%, versus the 3.1% we anticipate for the full year — and that's also what we're seeing here in Q2 — and on top of that, you've got the EUR 175 million.

Frans Høyer

analyst
#101

Yes. During the latter portion of 2019?

Marika Fredriksson

executive
#102

We're looking for that same 3.1% for the whole of this year.

Frans Høyer

analyst
#103

Was that the same situation we saw during the latter half of last year? All right.

Marika Fredriksson

executive
#104

Right. To be precise, 2.5% in the second quarter of last year. The second half of last year.

Frans Høyer

analyst
#105

Yeah.

Henrik Andersen

executive
#106

Regarding your question about.

Frans Høyer

analyst
#107

Yeah.

Henrik Andersen

executive
#108

Alright, my apologies.

Marika Fredriksson

executive
#109

Nope.

Henrik Andersen

executive
#110

All right, sure. Regarding DSV, like we’ve said from the start, the DSV partnership is being phased in, and we’ll handle it project by project. You’ll also understand that in many instances where projects were already scheduled — particularly on the outgoing side, meaning from factory to site — those projects are being taken over there and phased in. Fully operational by the time we reach the fourth quarter of this year. Neither DSV nor us have quoted any figures regarding the benefit from this. We’re working extremely diligently, on both inbound and outbound, to capture as much as possible from the partnership. Happy with the progress, and once we get to the fourth quarter and therefore also the full year, I think it will be easier for us to say a little more about how far we’ve come.

Frans Høyer

analyst
#111

I appreciate it.

Operator

operator
#112

We’ll take our next question from Katie Self at Morgan Stanley. Katie, the floor is yours.

Katie Self

analyst
#113

Hello, and good morning. Thank you. I have a question for you. I believe a few points have already been addressed, so this is really just a quick one about the service business. Could you talk about whether there is any difference in margin between service contracts on Vestas turbines and the ones you've won on the multi-brand side? What I'm really trying to get at is what the key competitive factor is with multi-brand. Do you have to compete more on price against your peers, or is it much the same as with the Vestas brand? Thanks.

Marika Fredriksson

executive
#114

Katie, I believe what we mentioned before is essentially that profitability is mainly determined by how broad the project's scope is. Looking at the Vestas brand, the scope we cover is quite extensive. Most of it consists of AOM 5000. Clearly, profitability there is higher, since you're taking on more obligations within those agreements. With multi-brand, generally speaking, the volume is larger, yet the scope is narrower and complexity is reduced, so profitability ends up lower on those deals. That really stems from the complexity and the substantial volume you expect under multi-brand contracts. Even within those, you get a mixture. Not all of them are low-scope contracts — you'd also find a higher-scope contract in there. That one would be handled much the same way as the Vestas brand.

Katie Self

analyst
#115

Understood. Appreciate it.

Marika Fredriksson

executive
#116

Thanks.

Operator

operator
#117

One quick reminder: if you'd like to pose a question, hit 0-1 on your phone keypad at this point. We now take our following question from Mark Freshney of Credit Suisse. Go right ahead.

Mark Freshney

analyst
#118

Good morning. If I could pose one question, please, linking the prior guidance with the guidance we have now. Since revenues are unchanged, it looks as though EBIT is now expected to come in roughly EUR 290 million below what the old guidance implied. Of that, EUR 175 million relates to warranty provisions, as we know. We also know EUR 30 million cumulatively relates to COVID costs from the past. So what does the remaining EUR 100 million relate to? Is it an expectation of COVID costs in H2, or is something else happening there? Second, Henrik, my question for you is this: in your conversations with customers, the Green Deal is approaching, yet there isn't really much granularity around it. Capital remains very cheap, but consenting has been held up by COVID and other issues. What are you hearing when you sit down with your customers about their plans? Are they frustrated at being unable to move forward with new projects, or do they have more opportunity than they can manage?

Marika Fredriksson

executive
#119

Alright, Mark. Let me begin with the total EBIT outlook for the whole year and how it differs from what we guided back in February. Clearly, that EUR 175 million sits inside the 5%-7%, and you also have the COVID impact in there. Those two represent the largest pieces when it comes to the gap versus the 7%-9% we set out in February.

Henrik Andersen

executive
#120

All right. So regarding the Green Deal — I think, broadly speaking, the Green Deal is, as we often say, Europe. And I think you'd appreciate me noting that in a quarter like this one, we've booked 4.1 GW of orders spanning 18 countries. The reality is that in earlier quarters, it's fair to say everybody was fully dedicated, fully on board, striving to do more projects. But I think what's underneath that — and this is probably even more significant, Mark — is the trend itself. Apart from perhaps some initiatives in Mexico, I don't think we've really seen this elsewhere. Other than that, the entire world has, in reality, put forward either structures or ideas aimed at further accelerating the green recovery as part of emerging from the COVID-19 situation. And here, it's now much more the case that for any customer, as you rightly point out, access to capital isn't limited — notwithstanding COVID-19 and what you might call the financial and economic recession-like conditions. At least in this case, access to that capital exists, and the capital on hand from customers, utilities, and global asset managers, infrastructure funds, has probably never been larger than it is today. What we generally see right now is a different kind of conversation.

Henrik Andersen

executive
#121

It's more of an acceleration, and naturally, we're also prepared to capitalize further on these structures. For example, you've observed a new country such as Vietnam all at once broadening their policies and so on. Plenty of nations will emerge as new countries—favorable markets where Vestas can compete going forward too. The glass is more than half full.

Operator

operator
#122

Alright. Moving on, our next question comes from Ben Heelan at Bank of America. Go right ahead.

Ben Heelan

analyst
#123

Hi there. Good morning, and thanks for the question. I think as people looked ahead to these results, many expected COVID-19 to affect revenue this year, with some revenue slipping from 2020 into 2021. Clearly, the guidance you provided today suggests that the pandemic won't actually affect your capacity to install and recognize revenue this year at all. Do you have any initial remarks or early insight on how we should think about volumes and revenues going into 2021? My second question concerns repowering demand. Could you share a bit of detail on where things stand regarding repowering demand across the different regions? Thank you.

Henrik Andersen

executive
#124

Alright. On the guidance, as we just mentioned briefly, I think that we, our customers, and anyone working alongside us all share the same goal of getting things completed as fast as possible. Realistically, when we examine it, we aren't sitting down right now planning for something to carry over from 2020 or 2021. We aim to execute as much as we can during 2020 in line with the plans. Sometimes new items come up, and perhaps even projects that can be moved forward, offsetting maybe 1 or 2 delays elsewhere. Broadly speaking, I think it really reflects gratitude toward the team and toward the customers for understanding the circumstances under which we are operating, that we are able to maintain a guidance of between EUR 14 billion and EUR 15 billion for the full year. As I mentioned, we are here. We have solid visibility into it, except, naturally, for the challenges that will also clearly arise from time to time during the second half of the year because of COVID-19. I must admit, I actually forgot your second question.

Ben Heelan

analyst
#125

Repowering.

Henrik Andersen

executive
#126

On repowering—I'd say that globally, this trend is gaining momentum. In the Americas, particularly North America, we're observing repowering activity. Europe is another region where we see it, since the technological advances made over the past 10 years make doing so clearly very appealing. We'll begin to witness repowering elsewhere as well. Right now, for example, there's discussion in places such as China and other nations, where attention and emphasis on repowering will start to emerge. As for real volumes, the U.S. and Europe are chiefly where it's happening.

Ben Heelan

analyst
#127

That's great. Thanks a lot.

Operator

operator
#128

Moving on, our following question comes from Lars Heindorff at SEB. Go right ahead.

Lars Heindorff

analyst
#129

Yes. Good morning. Thanks for taking my question. My first one concerns supply chain cost. We haven't discussed those much this year. I believe last year you said it came to roughly EUR 150 million. So the question is: at this point, with tariffs and the trade situation, which seems to be a new normal, have you adjusted and altered your supply chain to fit what may be a new normal? Might we see supply chain costs perhaps decline as we head into next year, given a somewhat more stable situation? I do understand, of course, that COVID-19 remains a source of some concern and uncertainty in that area. That's the first one.

Henrik Andersen

executive
#130

Like I mentioned, let me comment on that — I believe we've consistently said we would do this. On the positive side, there really haven't been any changes, though that equally means nothing has shifted in a favorable direction. What that tells us is that we're basically adapting and stating, "These are the circumstances under which we're operating." You'll notice as well that in the guidance we've given for the second half of the year, we are leaning into that second half and how we execute on it, and that's where we're capitalizing on the supply chain. Realistically, with respect to that, it's probably fair to assume it carries into — and you'll have to assume so, since nothing has changed — it carries into 2021. As you'd also understand here, looking at both our facing and the execution of it, we're continually working to enhance the synergies as well as the efficiencies inside that supply chain.

Lars Heindorff

analyst
#131

Thank you. The second question concerns the warranty provisions once again, specifically those tied to the EnVentus platform. Aside from the EUR 175 million, you've shown a steady climb in warranty provisions across many quarters now, and your explanation has been that the launch of the new EnVentus platform contributes to this. At what point should we expect the warranty provision for that new platform to begin coming down — that is, when will you reach a stage where you have enough certainty and visibility to feel it is safe enough, if you will, to reduce those provisions?

Henrik Andersen

executive
#132

I think, Lars, I'd probably call that safe enough here, and I think we're conflating a couple of things. There's no added warranty provision as such for an EnVentus platform or anything like that. What we've been saying is that we work carefully, and whenever we bring in new things, we'll always make prudent provision for them. As Marika also said early on, if we set aside the issue we've had here around the warranty set-aside related to the blades, then we'll get back to normal provisioning levels as well, as you've seen. That does vary. Over time, you've seen a warranty provision ranging between 1.5% and 3%, and that's what we're saying now — it will stay within that, but also come back to more normal levels inside that range.

Lars Heindorff

analyst
#133

Alright, thanks so much.

Operator

operator
#134

The following question comes from Jakob audio distorion with <<inaudible>>. You have the floor.

Analyst

analyst
#135

Hello there. I’ve got a few things I’d like to ask. To start with, a few of the competitors you face in Western markets have mentioned that COVID-19 has caused orders to be deferred to later dates. Has that been something you’ve seen at all?

Henrik Andersen

executive
#136

To start with, Jakob, I’d just note that this is the final set of questions we’re taking — not your final question, but you are the last person. As I mentioned here, Jakob, regarding order intake: we released 4.1 GW. Had we been able to take more, we would have taken more. Nothing has been pushed into other periods. Customers generally signed up to what it was here. As we said when we did the Q1, we will keep pushing on, so that’s also the message for everyone here. We’re in Q3 now, and we continue to push on, both in terms of order intake and also delivery. We don’t hold back.

Analyst

analyst
#137

Alright, final question for me. When you consider the current global situation and electricity auctions, do you see any significant disruptions or delays that might lead to a few quarters of softness in order intake?

Henrik Andersen

executive
#138

I think you have to accept at this point that auctions can slip by a quarter, and that will naturally happen. Some nations move theirs one quarter later. Broadly speaking, though, it feels as though we're operating in business-as-usual conditions. A couple of countries will have shifted by a quarter, and we'll accept that. As I mentioned, taking the longer view, I think we'll eventually reach a talking point where the lead time to get projects up might turn out shorter, perhaps less than the usual 18, 24 months. Not exactly that, though. I think, as we discussed near the start, when it comes to the PPA and similar matters, certain local markets can face some strain in securing PPAs at present, yet that's no different from other dimensions of this world if you're compelled to seek hedging on something while macroeconomics are under stress or difficult.

Analyst

analyst
#139

Alright, thank you very much for your responses.

Henrik Andersen

executive
#140

All right, that brings us to the end. Thank you very much for listening, then. I realize we'll be seeing a good many of you, in a manner of speaking, through the virtual room in the days ahead. I'm looking forward to it, and I appreciate your time on the investor presentation.

Marika Fredriksson

executive
#141

I appreciate that.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vestas Wind Systems A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Vestas Wind Systems A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Vestas Wind Systems A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.