Vestas Wind Systems A/S (VWS) Earnings Call Transcript & Summary

May 10, 2023

Nasdaq Copenhagen DK Industrials Electrical Equipment earnings 64 min

Earnings Call Speaker Segments

Henrik Andersen

executive
#1

Good morning, and welcome to Vestas' Presentation of first quarter of 2023. First of all, I just want to begin by thanking our customers, partners, suppliers, and also our 28,500 colleagues around the world for working tirelessly throughout this Q1 — of course, a good start of '23, which we will talk more about. So let's therefore go into the highlights and the details of our Q1, and we had a revenue of €2.8 billion, and that is a growth of 14% year-on-year, driven by higher average pricing on deliveries, higher volume, and also a 29% growth in the Service business. Our EBIT margin ended positively at 1%, profitability improvement driven by the sale of the converter business, lower warranty provisions but also the very strong Service business performance in Q1. The order intake of 3.3 gigawatt come from wind turbines orders, and that's up 12% year-on-year with an ASP of €0.89 impacted by mix which we will take you through in one of the coming slides. A solid capital structure, now with more than €1 billion of new financing in Q1, testament to the strong credit both recognition of Vestas but also in the market there was a €500 million sustainability-linked bond issue, plus a €750 million RCF that was signed with a strong group of banks.

Henrik Andersen

executive
#2

At Vestas, we’re pushing the industry ahead by staying disciplined. So even as we mature the industry, Vestas holds a top spot worldwide. We’ll break that down for you on one of the slides later. With that said, let’s move to the business environment. You know this slide well. Over on the left is the one we’ve been navigating for 3 years now, and we keep saying it again. Our number one priority is protecting the health and safety of colleagues everywhere, while also keeping all our operations running without interruption. Those remain our operating priorities in 2023 as well, a year in which we expect conditions to stay, and really continue to be, somewhat challenging all through 2023. We saw Vestas exit Russia in Q1. We’ve also seen that still combined with certain geopolitical uncertainties around the globe, but we are working our way through it. Inflation is clearly growing more pervasive. So when we look at it, it’s hitting our production, it’s hitting some of our execution costs, and it’s also hitting some of what we do in discussions with unions in several of our European markets.

Henrik Andersen

executive
#3

Looking at how the market is designed, permitting remains an obstacle for new installations as well. To us, that's surprising given how strongly more energy solutions are needed, particularly in Europe. We'll discuss that further, but this is likely one of the disappointing factors that persists. Then, if we also observe that conditions for completing projects are still somewhat difficult — we're doing this on every continent — we also notice there are still shortages of certain components. And we likewise see that still causes some stop and go at a number of our factories too. Be assured that we'll devote this year to focusing fully on getting back in black, and thus having Vestas profitable by the end of the year, which remains a key focus for all our colleagues worldwide. Let me now give you a brief snapshot of market share for 2022. It goes without saying that we're pleased to be at the top of that when we consider onshore and offshore installation excluding China. I think another takeaway here is that in a year, from 2022, we see global installation actually fell from 47 gigawatt to 41 gigawatt, which is disappointing for us, in a year when the world probably needed more energy than ever.

Henrik Andersen

executive
#4

So I think this is what we'll be working with here, but rest assured as well, we're going to drive both Vestas and lead by example for the industry when it comes to having that strong commercial discipline. So we won't compromise commercial discipline when it comes to volume, that's for sure. Then when we look at Power Solution in Q1, with commercial discipline intact, this is a necessity first of all for industry wide profitability and improvement, but it's also the foundation for getting Vestas firmly back into profitable territory. Order intake was strong, up 12% year-on-year, driven predominantly by Americas and South Africa. In the quarter we saw 1.3 gigawatt Casa dos Ventos orders in Brazil, the largest onshore order ever for investors. And I'll also say it's a recognition of the customer, the partnership, and also the personal relationship with customers in Brazil. We've also seen a slow permitting process, and regulatory uncertainty also remains a challenge in both onshore and offshore. In offshore now, probably more related to PPA offtake levels, which still pose a challenge for the players; developers, OEMs, and governments have to start moving.

Henrik Andersen

executive
#5

If we look at ASP, it went from €1.15 million per megawatt hour in Q4 down to €0.89 million per megawatt hour megawatts in Q1 2023. Mix effects alone — scope, country and FX — are what drove that. So the underlying ASP and profitability is absolutely not diluted. This ties to the fact that in Q4 last year, we had EPC. There is hardly any EPC in this quarter, and you will also notice that the first repowering has come through in the US, where no towers are actually included, which of course are among the main explanations in exactly that scope, country mix. We will talk more about it I'm sure in the Q&A. Looking at the strong momentum we are having in offshore, we have now passed 10 gigawatt of total preferred supplier agreements. And we are very pleased to see that coming across in a couple of regions as well, and we are looking forward to that, but it also forms the basis of firm discussions with governments and customers in those markets. You will see the normal charts on the right where you can follow the development. And then, as I said, respect the trend of where we will go also with ASP.

Henrik Andersen

executive
#6

Moving on to the Service business — an outstanding Q1, a robust beginning to the year. Naturally, we’re grateful to all our colleagues; sustained heavy customer activity provides the foundation, layered on top of the standard platform and the usual Service business portfolio, though Q1 also brought more transactions and one-offs. Service order backlog rose to €31 billion during the quarter. Inflation indexation keeps safeguarding backlog profitability. And that matters greatly, of course, for preserving margins in the elevated inflation setting across every market we serve. We likewise observed Convento — Vestas’s digital platform serving aftermarket parts and services — gaining traction. Additional markets are being opened, and more of both our customers and global suppliers are joining that platform, which we gladly welcome. Looking to the right, you’ll note the service order backlog stands at €31 billion. We hold 147 gigawatt on the service side, with typical contract length beyond 11 years. Beneath, you’ll find the regional split. Once more, we truly value the robust growth momentum seen in every region. Turning next to Vestas Development for Q1, activity levels are high throughout many of our key energy markets.

Henrik Andersen

executive
#7

Yet this is also a quarter in which we're devoting substantial effort, and it's still about the quality of the overall project pipeline that we hold. So during Q1 2023, Vestas' development project pipeline came to 32 gigawatts, with Australia, the US, and Brazil standing as the nations holding the biggest project pipeline for us. In the quarter, Vestas added 1.1 gigawatts of new pipeline projects. On a net-net basis, there's actually no change versus the end of last year in Q4, which likewise mirrors the fact that in development we stay very disciplined, and if certain projects don't make sense, they will simply fall out as well. So we have those two big figures here — newly secured pipeline and the total net project pipeline — and you can work out your own gross and net inside that. That said, it's simply a natural reflection of remaining very disciplined in this business. Finland produced 50 megawatts of order intake during the quarter, which we appreciate. And that is, of course, the start of the year, so there's more to come. We look forward to sharing that with you over the coming quarters. Turning then to sustainability in Q1 2023, another quarter in which we simply keep moving and working diligently forward.

Henrik Andersen

executive
#8

We remain the top sustainable energy company globally, and we're the second most sustainable company worldwide. We'll continue that effort and keep introducing initiatives from our operations. CO2 avoided over the lifetime by capacity produced and shipped fell 21% versus Q1 ’22. The reason is fewer turbines produced and shipped, a natural reflection of what the chart shows and the full methods on our side. Turning to carbon emissions from our own operations, those dropped 4%, driven by low activity but also — on the other hand, of course, activity in the Service business has been much higher, so there are some underlying movements within that figure. Moving to safety, we're now rolling out a new methodology for discussing total recordable injuries. We believe it's very, very important, when we discuss total recordable injuries, that we also count anyone present at our sites, and thus within and under our leadership, going forward. So we're now releasing 2.1 here, which now includes contractors onsite, and over the coming quarters we'll track that development, along with a bit of how we compile those statistics; we'll return to that, but you'll be able to follow it across the coming quarters as we proceed.

Henrik Andersen

executive
#9

That's also the reason the line looks a bit broken between Q1 ’22 and Q1 ’23 — in that sense, they aren't comparable. We're very pleased, but we still had more than 40 injuries in Q1, and 40 is too many, so of course we'll keep working hard on that discipline. With that, I'd like to hand things over to Hans for the financials.

Hans Martin Smith

executive
#10

Thanks, Henrik. As is our habit, we begin with the income statement, and it's clear that profitability is getting better compared with the weak levels seen in Q1 2022. Revenue rose 14% year-on-year, and the drivers were higher average pricing on deliveries, higher volumes, and growing Service activities. Gross margin went up 5.7 percentage points year-on-year, reaching 6.6%, helped by higher revenues in both segments and by the better margins we observed in the Power Solution segment. I'd ask you to keep in mind the KK transaction, which affects this quarter through a sale of technology amounting to roughly €150 million. That's the line shown here on the right, positioned somewhat above the EBIT line. Taken together, that brings us to an EBIT margin before special items that rose 15 percentage points year-on-year, €40 million, 1.4%, driven by all the reasons already mentioned regarding gross margin, improved fixed cost absorption in the quarter, and also the fact that we don't have the same kinds of offshore adjustments that we had in the first quarter of 2022. Moving on to the segment overviews, we begin with the Power Solution segment, where, as I mentioned earlier, profitability is clearly improving.

Hans Martin Smith

executive
#11

Sales rose 9% compared with a year earlier, reaching slightly more than €2 billion, with strong activity in EMEA and the Americas fueling that gain. The EBIT margin before special items came in at negative 2.7%. Yet that figure is in fact up 18 percentage points from a year ago, thanks—as I said earlier—to the divestment of the converter business, to the absence this quarter of the offshore adjustments we recorded last year, and not least to the activity levels we observed. On balance, I would say underlying profitability is getting better. That said, I also want to note that profitability is still being held back by how we are executing the low margin projects sitting in our backlog, so there is certainly still work ahead of us there. Within the Service segment, we are seeing robust growth alongside a steady EBIT margin. Sales there climbed 29% versus a year ago, going from €623 million to €806 million, lifted by generally higher activity levels, inflation indexation written into the contracts, and greater transactional sales as well. Negative currency effects offset that somewhat. The Service business produced €183 million in EBIT, equal to a 22.7% margin. So there too we are seeing an improvement relative to last year.

Hans Martin Smith

executive
#12

Now on SG&A, I'd say it's reasonable to note that the level looks very much like what we saw a year ago. On a trailing 12 month basis, SG&A as a share of revenue came in at 8.2%, which, as I mentioned, is basically unchanged. So I don't really plan to dwell on this slide for long. Net working capital went up during the quarter. That said, it does mirror the usual seasonality we'd expect to see. The increase comes from a higher inventory level, and also from elevated supplier payments made in the quarter, which are only partially offset by the down and milestone payments received. As I said, I'd characterize the working capital movement as reflecting the seasonal pattern in our business, where we build inventory during the first half in preparation for what you could call a busier second half of the year. That's the pattern we've observed for many years, and it's certainly what we expect to see in 2023 as well. That brings us to cash flow, where operating cash flow before changes in working capital actually rose by €560 million, supported by stronger profitability in the quarter.

Hans Martin Smith

executive
#13

That brings us to €248 million in positive cash flow, which is of course a positive thing to see. Movements in working capital then bring us down to the levels visible on the right-hand side here. And on top of that, when we include the CapEx we're observing, we arrive at figures of roughly €1.1 billion. Taken together, this partly mirrors the seasonality present in the business and, as I said, is also in line with last year's level. Investments totaled €107 million. I'd like to point out that the divestment of the converters & controls business contributed an impact of roughly €60 million. Beyond that, we also saw reduced investments, or investments in transportation equipment and transportation tools. Overall, I would say the figure shown here shouldn't be multiplied by four to derive a full-year estimate. It is artificially low, and for that same reason you aren't seeing changes versus what we expect for the full year on this metric. Warranty provisions are still at elevated levels, but we are certainly working very hard on this and doing our utmost to ensure that we, let's say, diligently do whatever we can to achieve improvement in this area.

Hans Martin Smith

executive
#14

On the LPF side in particular, it remains elevated. What's driving that is the ongoing unusually heavy levels of repair and upgrade activity we see across the business. As I noted earlier, warranty provisions are an area we're putting a lot of effort into getting into better shape. For Q1 we're looking at 4% of revenue, and that's actually an improvement versus last year, when we were at 7.8%. So roughly half of last year's figure. As I said, a fairly meaningful improvement on that metric. That brings us to the capital structure overview, where we report net debt to EBITDA of 5.8. The main factor there is the low EBITDA we're seeing on a trailing 12 month basis, which we've discussed previously. The profitability we're observing clearly affects this metric, since there's both a numerator and a denominator. And when the numbers are very, very low, naturally you can see some significant swings in it. One thing worth noting is that in March we issued a €500 million sustainability-linked bond maturing in 2026. In addition, we signed a €750 million revolving credit facility maturing in 2024.

Hans Martin Smith

executive
#15

And then lastly, Moody's assigned us a Baa2 rating, and the outlook on that is stable. And on the subject of outlook, I'd like to give it back to you, Henrik, so you can say a few words about the outlook.

Henrik Andersen

executive
#16

Thanks a lot, Hans, for that overview, and now for our full-year 2023 guidance, which remains unchanged. Revenue falls in the range of €14 billion to €15.5 billion. Within that, Service is anticipated to increase by at least 5%. Turning to the EBIT margin before special items, it lands between minus 2% and 3%. And naturally, you're now seeing the complete impact of the divestment to KK, something we mentioned back in February as well. The Service margin should come in at roughly 22%. Then, as Hans correctly noted, don't simply divide by the four quarters, since total investment is projected at approximately €1 billion, and portions of that, across both manufacturing ramp-up and technology, will of course have an effect. As usual, this outlook rests on current foreign exchange rates. It also, as noted, still comes within the operating environment, which remains one where uncertainties exist, and challenges persist out there. So uncertainty is higher than usual. With that, thank you for listening, and we'll now open the Q&A to all of you.

Operator

operator
#17

Ladies and gentlemen, we're going to start the question-and-answer session now. <<operator_script>> Our first question is from Kristian Tornøe at SEB. Go ahead, please.

Kristian Tornøe

unknown
#18

Yes, thanks, and good morning. My first question concerns cost predictability. Thinking back to what we discussed last year, I remember plenty of discussion about unexpected costs and the difficulties caused by supply chain disruptions. Henrik, early on you mentioned that challenges out there persist, so perhaps you could expand a little on cost predictability. How many unexpected costs are you still seeing?

Henrik Andersen

executive
#19

Thanks. Thank you, Kristian. What we're seeing here, I think, is some easing. Which means the mitigation work on our side is getting smaller, or there's less of it to do. So in that sense, I'd say things are easing. That said, we're pointing out that we still have components — critical ones — that won't loosen up simply because China reopened in Q4 and then the world goes back to operating normally. That isn't what's happening. We've said from the start that this likely takes a few quarters. That's the reason we're standing here essentially telling you that we're carrying out projects sitting in the backlog that will still feel that impact. But it ought to ease as the year goes on, hopefully growing smaller and smaller — and nobody would be happier about that than us, should it come to pass.

Kristian Tornøe

unknown
#20

Okay, that's very clear—thanks. My next question concerns the Service business and transactional sales. Since you haven't altered your growth guidance for Service, I take it you aren't assuming transactional sales will keep going at the present level—is that right?

Henrik Andersen

executive
#21

I think we're really happy with how the Service business has performed. We also see that they're operating in an environment right now where getting assets to run is critical, because the energy and electricity output is so valuable. So there's a push behind transactional sales, and there's a push behind parts and other things. But I'll also say here, Kristian, you're going from the first half of the year into the second half of the year in ’23, and your comparable quarters also hit Q3 and Q4 of last year, when you had respectively high 30% and into the 40% growth in Q3 and Q4. So from a math exercise standpoint, you're suddenly running into very tough quarters to match with that. So I will — we'd rather say here, let's look at a business that grows more than 30% over 24 months, and we're really pleased with it. And therefore we're very happy to see the business doing what it does right now. And as for transactional sales, of course, their indexation is included in that growth number. But I can also promise you, if we can do more, we will do more.

Kristian Tornøe

unknown
#22

Got it. Thanks very much.

Operator

operator
#23

Our following question is from Akash Gupta at J.P. Morgan — Akash, you have the floor.

Akash Gupta

analyst
#24

Yes, hello and good morning, everyone. I've got two questions too. First, regarding competition—specifically the Asian rivals that have come up over the past few quarters. Could you share how you view the landscape now compared with, say, 12 months ago? And is there anything that must be done to tackle some of those concerns, especially on the cost side, given the gap in cost between you and your Asian competitors? Second, I was hoping for an update on the offshore wind situation. I believe your customers, the launch customers at BW, have already reached final investment decision on the project. So I'm wondering whether you could tell us when we should expect a firm order from EnBW for that 900 megawatts German offshore wind project? Thank you.

Henrik Andersen

executive
#25

Akash, thanks very much — I'll take that one. And honestly, I don't think we need to frame it as Asian; it's probably fairer to say Chinese competitors in that context. The world keeps evolving as it evolves, and we do see China in our market. We haven't booked Chinese orders for roughly two years now. We delivered a substantial amount of that by the end of the last feed-in tariff environment in China, which is also the reason I'm noting here that our plans contain no planning, no expectations, and for that matter no reliance on turnover in China. I'd say China is a different game. Naturally, we work with customers all over the world. And in certain markets it looks to us — even though we also have a footprint worldwide — that some competitors are operating at artificially lower cost levels. And we can welcome that, because it means there has to be an underlying company investment, or an underlying country investment, into securing those infrastructure orders, and that's something we hold back from. We run this company on behalf of the shareholders. So we don't take part in subsidizing a solution build-out of that kind. On offshore, yes, as you rightly put it, at some point individual customer discussions and PSAs will translate into firm order intake.

Henrik Andersen

executive
#26

That comes entirely from the final conversation between us and each customer. So I'll need to ask you to bear with us: we'll make it known once it's a firm order, and at that point you'll see it within the overall mix. Still, you're right that offshore is more transparent in that respect for all of us.

Akash Gupta

analyst
#27

Appreciate it.

Operator

operator
#28

Our following question is from Ben Heelan at Bank of America. You have the floor.

Ben Heelan

analyst
#29

Morning, thanks. I wanted to raise a question about margin. Q1 performance came in fairly strong. You've discussed costs across the year, and that makes the low end of your margin range seem comparatively unlikely. I'm just curious whether you could offer a bit of an update on where you expect to finish.

Henrik Andersen

executive
#30

We anticipate staying inside our guidance. No — what I'm saying is, look, we've gotten off to a solid start this year. As we go through this year, folks, you need to grant us this: we're working through what is probably the most varied price backlog Vestas has ever carried. So it's going to be a bumpy ride across the four quarters, and it only takes two or three of those projects shifting from one quarter to another. Then one quarter might look better, or another quarter might look a bit worse. For us, it comes down to execution this year, because that leaves us with a year out in the backlog where we'll still carry a red number around turbine solutions during that year. And that's the corner we must turn within ’23. We're doing that. We believe we've gotten off to a solid start this year, but when I look at Hans sitting beside me here, we're also a little scarred by what we came through in ’22. So we execute this year, and then we'll bring you the update once we reach the next quarter.

Henrik Andersen

executive
#31

At this point, there's no need for us to change the guidance. There are still a lot of variables in how this year plays out.

Ben Heelan

analyst
#32

Right. And turning to pricing — you mentioned that underlying pricing has been pretty steady. Could you expand a bit on the conversations you're having with customers? Now that costs have mostly normalized, looking ahead, are customers pushing back on price? Or do they still recognize that you need to earn a margin on mediums, and how should we think about that?

Henrik Andersen

executive
#33

Put it this way — I believe the discussion is a healthy one. Some customers are essentially telling us, well — no one actually calls up and says, incidentally, we're happy to spend a little extra on this solution. So when we take this step, tension is involved. Beyond that, certain projects are now paused or under negotiation, either because of a hold-up or because a PPA fails to line up with the project itself. So that, I'd say, is what's being set off at the moment. As we've stated throughout, the quarter was solid for us at 3.3 gigawatts. A number of those orders were talked about for far longer than usual, since customers faced so many moving parts across the last four quarters before they could secure financing and close things out. I'd say the encouraging offset here is that in most markets, energy and electricity prices remain at a level where the turbine's cost isn't misaligned with the fundamental worth of what it produces. That matters, because naturally, were that not true, we'd be facing a very different set of circumstances.

Henrik Andersen

executive
#34

And we saw big shifts this quarter in financing and in the financing market as well, but we were also able here to find the right solution with customers for that. So we're actually pretty pleased with how we executed during the quarter, and also with the mix of countries and other. So it's discipline on the commercial side, nothing else.

Ben Heelan

analyst
#35

All right, that's great — thanks.

Operator

operator
#36

Our following question is from Supriya Subramanian at UBS. Please proceed.

Supriya Subramanian

analyst
#37

Yes, hello, and good morning. Thank you for taking my questions. I have two questions from my side. So I suppose, returning to the permitting problems and, naturally, the environment, those remain difficult on that front. But are you noticing any shift in attitude? We've observed a few countries achieving some headway there, such as Germany, and Spain too. And do you think perhaps the recommendations from the EU Net-Zero Industrial Act could have any effect on how the countries behave? I'll begin with that, and then I'll ask my next question afterward.

Henrik Andersen

executive
#38

I think we need to draw a clear distinction between guidance and recommendation, and then the projects that have actually been decided, along with those that are signed and have received permits. And with a couple of the countries you mentioned, I still find it embarrassing that a larger share of auction rounds goes unsubscribed. And as long as that remains the situation, Supriya, then we can probably conclude that, right now, you're not doing your job as a politician to make it happen. The truth, the fact of life, is that in '22 in the EU you had a goal of 30 gigawatts and you got 15 gigawatts basically done and executed. That's half good. No, it isn't. It's really bad in a year when Europe is still short of energy supply. So I am — and that's what I'm — we keep saying it as an industry, we keep saying it, and as a company, as an executive, you keep saying it, but it seems like we are running in a different cycle. We put infrastructure up for thirty years, and somebody else is focusing on potentially the storyline for 12 or 36 months in a political environment. We need to come together and fix this, otherwise, we won't get the assets to work.

Supriya Subramanian

analyst
#39

All right, I hear you. Perhaps a question about PPA levels, since energy prices have already declined. They dropped fairly significantly during the fourth quarter and have continued falling into 2023 as well. Do you view that as a difficulty when it comes to setting up and securing new agreements with customers, considering there may be ambiguity around the long-term PPA level? And yes, I simply wanted to hear your perspective on this, particularly given today's interest rate environment — how does that affect clients' IRRs? Are you noticing any reluctance from customers on that side?

Henrik Andersen

executive
#40

On energy pricing and markets, I'd say things are actually functioning well. Take private PPAs — volumes are at an all-time high. Private companies are pairing up with developers and OEMs such as Vestas to get projects built, and that makes the economics work for each of the three sides of that triangle. What worries me a lot is public PPAs set at artificial levels. You've got governments worldwide holding electricity prices stubbornly at where they stood two or three years ago, assuming the industry can still construct those projects three years later, even though interest rates have climbed from zero to six. Meanwhile, building turbines or infrastructure has likely become 30% to 40% more expensive. With PPA levels like that, no build out happens. That's roughly where my concern sits today — governments aren't acting the way market participants do. Market participants are the ones delivering the electricity build out and the infrastructure build out on those market terms. So I'd put a small question mark there, a bit of concern that government PPAs are the ones currently in trouble, whereas private PPAs are performing brilliantly across every market.

Henrik Andersen

executive
#41

And that's something you're able to see reflected in the orders we booked during Q1.

Supriya Subramanian

analyst
#42

Understood. Thanks. I’ll hold the rest of my questions and rejoin the queue later. Thanks. Thanks very much.

Operator

operator
#43

Our next question is from Claus Almer at Nordea — Claus, you have the floor.

Claus Almer

analyst
#44

Thanks. Yeah, I’ve got a few questions too, and I’ll go through them one at a time. Warranty information is declining compared with last year. Should we take that as a strong sign those issues are being resolved? In other words, should we expect that as we go through this year, maybe you’ll be back to 2%? That’s my first question.

Hans Martin Smith

executive
#45

Thanks for that, Claus. I think on the warranty side, as you rightly point out, there is a decline from the higher levels in Q4, and at least also what we have for the full year last year where we had 6.3%. We're seeing 4% being a good number for Q1. We'll obviously have to see how the year plays out. It is fair to say, also coming back to what you said beforehand and also about the guidance range, there's still a lot left of the year, a lot has to unfold. And I think it would be foolish to sit here and say that we think all of the problems have been solved after a couple of months — being a couple of months into the year. But for now, at least we see that the 4% that we have provided in Q1 is a level that makes sense in Q1. That's how we'll think about it for now.

Claus Almer

analyst
#46

So it's more — the provision you made in Q1 is more for what you're seeing today, and there aren't any extra bills to pay from what was installed a few years back or one year back?

Hans Martin Smith

executive
#47

Naturally, the warranty provisions mirror activity levels which indicate, on one hand, that we anticipate seeing coverage ahead. But naturally, should problems arise with turbines sold previously, that gets taken into account in the levels we are examining. So really it is a mix of those elements you are considering when you consider the warranty provision. So it mirrors what we believe would be required at the moment when that provision was made, so to speak.

Claus Almer

analyst
#48

Alright, so my second question is about cost inflation. I realize we've already touched on this subject during the call. But looking at the world as it stands today, do you still feel the need to raise turbine prices, or are you comfortable with where underlying turbine prices sit — or is it actually that you're beginning to see cost inflation? That's my second question.

Henrik Andersen

executive
#49

Maybe it’s a bit delicate to ask you this, Claus, but do you think your salary will rise or fall? Because honestly, with inflation turning sticky, folks — across the globe at this moment, inflation is getting stickier and stickier. So I believe we need to accept that as things stand right now, and that’s also why our encouragement is to consider PPAs and similar arrangements with indexations, since there’s nowhere to hide. Electricity and all the elements feeding into inflation are turning sticky. So I have to say at this point, turbine prices are not declining. The components and raw materials — after what was probably a somewhat lower level around year end — we’re beginning to see some of that return as increases. And naturally, as you know, the underlying China situation is fully open now following Q4. So Claus, inflation is not coming down at present.

Claus Almer

analyst
#50

Absolutely. Alright, that's nice to hear. And perhaps it's nice to hear, but at least that's where things stand.

Henrik Andersen

executive
#51

Yeah, that's the reality the two of us are up against, no question about it.

Claus Almer

analyst
#52

That's exactly right. Thank you very much.

Operator

operator
#53

Henry Tarr of Berenberg has the next question. Go right ahead.

Henry Tarr

analyst
#54

Hello, and thank you for taking my questions. So, two, one is about the ASP. I understand you mentioned the scope and the geographic content, plus some repairing that goes into the numbers. Any further detail you could provide on that would be great. And then the — second question concerns the Service business: is there a ceiling on the inflation adjustment, or the indexation, for some of those contracts? Or do they simply track CPI? Thank you.

Henrik Andersen

executive
#55

Thanks, Andrew — let me start with ASP. I don't believe the gap between €1.15 and €0.89 is going to produce a fresh breakdown of that. Because when you look at the quarters right now, it begins — and we've been saying this the whole time — things get a bit lumpier as some of the bigger players, now also onshore, turn into large orders. That means you can then begin saying, hey, this customer paid this amount and that customer paid that amount. It works well for us, since with that breakdown there's a breakthrough on some of the repowering in the US, something we've been discussing for a really long stretch. And on top of that you have barely any EPC this quarter, so those two together serve as the sole explanation. Then there are a couple of country mix effects, which you'll also recognize when you look at the order list, where typically there is scope and lower pricing. So it lines up well with what we're after in that quarter. It simply showed up when you took the order backlog there, so to speak — it came out low on the ASP, but on profitability we're pleased with where we are.

Hans Martin Smith

executive
#56

Turning to the Service question. What I think is fair to say is that we obviously try to structure the contracts so they track whichever Index would be meaningful in the area where we undertake the service activities. Of course, we can structure them in different ways. And if a customer insists on a specific structure, of course, we can talk about that, but then there probably will also be a pricing discussion to be had as to what it costs, if you want specific solutions on your contract. But generally speaking, when it comes to, say, the ceiling discussion, I would say that is something we typically would not want to see in our service contracts.

Henry Tarr

analyst
#57

All right. All right, sounds good. Thanks so much.

Operator

operator
#58

Martin Wilkie from Citi has the next question. Go right ahead.

Martin Wilkie

analyst
#59

Thank you. Good morning — Martin here from Citi. I have a couple of questions on the US, please. First, just to get a sense of what you may be hearing regarding the Inflation Reduction Act and when customers might begin placing orders. One of your peers has said that could occur in the second half, though clearly there is still some tax guidance and all that sort of thing that has to be worked out. But in your conversations with customers, is this something imminent? Or how should we think about the sentiment around it? And then a related question: if I look at your US deliveries, in Q1 that's roughly 300 megawatts. The US, as we would expect, has a fairly low level of volume and sort of what's flowing through the P&L. How are you managing cost in the US this year? If we're going to see a big ramp up over the next couple of years, would there be an excessively negative impact because of low fixed cost coverage, and then sort of a reversal in for next year or so? Or is it more flexible? Just to understand your cost base in the US.

Martin Wilkie

analyst
#60

Thank you.

Henrik Andersen

executive
#61

Sure, a few thoughts on that, Martin, regarding the US and the IRA. Like we've consistently said, it must be somewhat frustrating for the commercial teams too when they're talking with customers, since there's probably never been more activity. Yet, as you're aware as well, nothing is settled until a firm order comes in. There's a great deal of planning, a great deal of discussion, a great deal of projects that are also flowing through that pipeline toward figuring out when permitting can be secured and when tax equity can be reached. There remain some uncertainties regarding both the guidelines and how it functions. So I believe we urge both the Treasury and others to work diligently on that and deliver it. We're seeing customers being a bit bolder about making decisions and placing orders. But I think the big volume and the floodgate is yet to arrive on that front, because we'll see some of it coming through. And we'll see a different structure too when you look ahead, since certain projects will be bigger, as they'll begin tying into the well-known hydrogen as well. So P2X will be a factor in the US as we look at the years ahead.

Henrik Andersen

executive
#62

So because of that, projects are now being planned so they can expand beyond what's usual—200 megawatt, 300 megawatt, 400 megawatt. But at this point it's going to be getting close to several gigawatts quickly. So that's one thing I'd note. Martin, I don't have a clear picture on timing. My sense is that most of the time we're running about a quarter ahead. But I can also tell you that each quarter we are certainly getting nearer to it. So that's the good part. So the discussion is moving along well. On US deliveries, like we've consistently said, we have faith in the US. We've been present in the US for several decades. We wouldn't make changes to our sort of factory footprint there, but we're running hardly any shifts, as we talked about earlier. So in that sense, you could say the marginal cost for an asset coming out of the factory is higher, and that also means our operational levels in the US sit at a point down the line where we can begin doing more as deliveries increase and we can bring more shifts back into the factory. So with that said, that's simply the nature of it, and we very much look forward to that. But we can also say here that it's good that we've managed to take care—we've had some shifts idled, but we haven't idled the factories there entirely.

Henrik Andersen

executive
#63

They're in place and set to go, and we're handling both the repowering. And now we'll also be doing a bit of the early technology ramp-up on turbines.

Martin Wilkie

analyst
#64

Thanks a lot — that’s great.

Operator

operator
#65

Dan Togo Jensen from Carnegie Investment Bank has the next question — go right ahead.

Dan Togo Jensen

analyst
#66

Yes, thank you. To start, I have a question about Q1 and perhaps Q2 as well. You said last year that some orders would slip from ’22 into ’23, and those are probably going to carry a negative margin. Could you give us a sense, or some indication, of what effect those orders had in Q1? My understanding is that we are talking about as much as one gigawatt of capacity here. So what was the impact in Q1? And should we also expect some effect in Q2? That is my first question. Then the second question relates a bit to what Henrik mentioned at the beginning — that you are working toward regaining profitability by the end of the year. I take it we are talking mainly about the Solution business. And it sounded very finely balanced — does that mean you foresee that profitability in the Solution business will basically not be achieved until Q4? Or how should we think about that progression from where you are now to the end of the year? And basically, as well, what will determine what profitability will be in Q4? Is it lower warranty provisions, or is it simply that ASP, or the projects with higher prices, are feeding through?

Dan Togo Jensen

analyst
#67

That wraps it up, thank you.

Henrik Andersen

executive
#68

Dan, let me take a shot at that. Your question about orders, I think, has to be broken into a couple of pieces. On firm order intake, the way we run the business, there aren't any deviations or dragged-out elements or anything of that kind. When orders have slipped or something similar, you do get a spillover effect running from Q4 into Q1. Still, we don't disclose what volume that involves. Projects will always move — from one quarter into another, they get delayed. As you're also aware, if you look at the ASP trend, pricing has ramped up, which means our backlog contains enormous differences, and as a result enormous differences in per-project profitability as well. So the further out in time you go, the better it becomes. That's simply the average of what you've observed across the last eight to 10 quarters, and so profitability will rise step by step. That's also the reason why, when you look at the Q1 figure, yes, there's a negative EBIT within Power Solutions on the turbines. Naturally, that will gradually ease out as we move through the quarters ahead.

Henrik Andersen

executive
#69

So I won't do that — we're not going to sit here and give you a specific guide on exactly when the turbine business flips from red to black. But obviously we're working toward that 10% in ’25. So that's where you'll certainly see an improving trend between where we stand today and ’25. That I can promise, because it's the pricing we're putting in place.

Dan Togo Jensen

analyst
#70

Alright. And then maybe just a quick question on that. Will we still be seeing those troubled orders, or will this slippage have any effect in Q2, or are most of those orders finished and done with in Q1?

Henrik Andersen

executive
#71

It's not something you can call finished and dusted, since, like I mentioned, slippage moves from one quarter into the next. As you can see, we've actually come out with a solid start to the year. So a portion of that work carried over from last year got done. But we also delivered on what the Q1 plan called for. So on that front we feel fairly good. Still, three quarters remain, and we'll watch how it unfolds. There are, you know, one or two of your projects that have since slipped for a while, and naturally we're working diligently and hard to move those into the later quarters of this year. Yeah, so fingers crossed on that. But like I said, Dan, bear with us and have patience across the quarters, and be careful not to do it. We have full year guidance, which is the average of the four quarters, and that is what we are really, really focused on. And as you can probably hear from the tone of voice, for us at this moment and on behalf of the 28,500 colleagues around, we are fully, fully focused on getting that to an overall black number.

Dan Togo Jensen

analyst
#72

Got it, thanks.

Operator

operator
#73

Our following question is from William Mackey at Kepler Cheuvreux — William, the floor is yours.

William Mackey

unknown
#74

Good morning, and thanks for making the time — I have a couple of questions. First one, on Service: would you be open to sharing what share of Service revenues you'd characterize as transactional rather than normal? In other words, looking back historically, what portion of revenues is transactional as opposed to normal Service revenues, since as we move through the year, I imagine it will matter to think about that normalizing, and perhaps also to get a sense of how much inflation is affecting revenue as you execute or implement your indexation clauses. That was my first question, on Services. Then, if I could follow up on Power Solutions: thinking about the project backlog, you've now been quite successful for almost six quarters at raising prices and effectively pursuing inflation. And you point out that margins will improve as you work through the low margin projects. But at what stage should we consider that you've got there, or when do you plan for the majority — and maybe 90% — of the business you book in Power Solutions to be at levels that fully offset the inflationary effects?

Hans Martin Smith

executive
#75

Okay, I'll begin with the first question—or actually the first two questions regarding Service. Traditionally, we haven't really been providing the figures you're mentioning. I'd say both have fairly significant impacts. And naturally, the mechanisms for inflation indexation are running higher than they usually have. So that should give you at least some sense of where we stand. We'll consider your suggestion. But as of now, at least, disclosing this hasn't traditionally been our practice. Regarding the backlog in Power Systems, let me see if I can attempt to address that. I think we've definitely been observing that pricing is—well, "chasing" may not be the best word for what we've been doing. Obviously, we've been attempting to raise prices and work with them so they mirror what we believe constitutes adequate profitability. And as we've stated many times previously, I think we've performed rather well when it comes to increasing prices, and also in bringing greater discipline around terms and conditions into the contracts we're dealing with. If I'm understanding your question correctly—and I'm not certain I am, so please correct me on this—then.

Hans Martin Smith

executive
#76

Still, this isn't a fixed pattern — we'll keep observing it, and what we're doing plays out gradually across time, though it will be quite uneven since it rises and falls. Take a quarter such as this one: it's modest relative to what you'll probably witness during the year's second half. All sorts of effects feed into this once you examine what shows up through the P&L, since that fluctuates considerably. That said, on the whole, we keep working on this and keep exploring what can be done to, for example, raise prices and improve the margins further.

William Mackey

unknown
#77

Thanks a lot. If I could just ask one quick follow-up on the supply chain. How would you describe what's happened with the supply chain—logistics, plate steel, and especially electronics—over the last 3 to 4 months?

Henrik Andersen

executive
#78

I don't see any way around it. What I mean is, this isn't a run-of-the-mill situation. Ultimately it depends on which country the source is in and which company it comes from, but as I said when I brought this up here, a huge, huge, huge thank you goes out to the partners and suppliers who are working so diligently on this. And William, that really boils down to clearing what I'd describe as a substantial backlog — though at the same time we still recognize how critical it is to get it to site on time. So let's not gloss over that: timing matters, a bottleneck does exist, and on top of that there's still an inflation problem surrounding this. So it's easing, but it isn't finished.

William Mackey

unknown
#79

Great, thank you very much.

Operator

operator
#80

Sean McLoughlin of HSBC has the next question. Go right ahead.

Sean McLoughlin

analyst
#81

Thanks for taking my questions, and good morning. Just thinking about how your earnings progress through the year, do you still expect earnings to be backend loaded? And in that context, as you look through projects for delivery in Q2, should we expect no real improvement in the underlying project margin in Q2 as you work through that low priced, low margin backlog? That’s first question. Secondly, just looking at the high inventory levels, they're up again year-on-year. You've got your high cash outflow in Q1, you've got €1 billion of CapEx. I mean, is — your consensus is looking at positive free cash flow in 2023? I mean, is that looking ambitious?

Henrik Andersen

executive
#82

Hi Sean. What I'd say is that we're in a year of this kind, where the goal is to hit our guidance and return to positive figures, and we won't be providing any hints about individual quarters. I've just given you the largest caveat there is about picking one quarter and extrapolating from it, because the backlog we're working through quarter by quarter varies too much when it comes to pricing and costing on certain of those projects. With an average negative EBIT in Power Solution still in Q1, that's something to keep watching, but we won't offer guidance for your Q2. Once we set out the tone for the whole year, we'll give the underlying picture, and that's what to hold onto. On inventory, we're entirely committed to beginning to offload it, but once again, you need patience in equal measure to ours as we execute the backlog. Because we're only just emerging — it's 90 days since the world began reopening somewhat more than before. So a portion of our inventory sits at an elevated level for that same reason: protecting our customers and the execution of our projects.

Henrik Andersen

executive
#83

And I think here, if you assume an EBIT zero scenario, around zero, spending a billion in CapEx is able to do a positive cash flow, I will say that will be a bit tricky for us. We are doing all the optimizations we can do but we can't print the money if we don't have it. So we will release the inventory if we can but as I said here, we are fully focused on it but positive cash flow, look, for me — it looks like a stretch and Hans is smiling here next to me. So I know where I'm — I know I'm on the right direction here.

Hans Martin Smith

executive
#84

Oh, it's fantastic. And like when you sit and talk to the details of how to generate a cash flow, but I can only agree that given what the numbers, I expect it to look like on the dimensions that you mentioned there. I think, I mean, it's — I would say, how do I put it, Sean, optimistic to think that that would be possible. No, we don't see that, I mean, as a technical possibility, because as mentioned, that's not what the numbers would say.

Henrik Andersen

executive
#85

But we’re working on it — and I give you our word: we’re going to make that better as well, a bit each year, though we’re able to switch it on. If we can go ahead now — the last question is, Casper — so could we take the final questions at this point, operator?

Operator

operator
#86

Hello.

Henrik Andersen

executive
#87

Yeah, hello. I just asked whether the operator could put us through for the final question.

Operator

operator
#88

Apologies. Yes, Mr. Casper Blom, your line is now open, from Danske Bank.

Casper Blom

analyst
#89

Oh, thank you very much. And I appreciate you fitting me in there. A question about, I guess, bottlenecks. Whenever I talk with various players in the industry, one thing that quite a few people bring up is the capacity to draw in sufficient numbers of the right qualified employees, and I know hopefully you're planning quite a ramp up, first of all in the US and then hopefully also in, in Europe, if politicians ever get their Act together. Do you view skilled workers as something that might constrain your growth, or is it something that you can manage? That's the first question, please.

Henrik Andersen

executive
#90

Honestly, I'd frame it as a positive: we put substantial investment in. And no matter which region we operate in, we make a big effort to take care of the Vestas family of colleagues, through good times and tough ones alike. I believe a fair amount of that loyalty comes back to us when we ramp back up. So broadly speaking, we do well — we likely enjoy a solid reputation when it comes to ramping up and down. That likewise means we can get past certain shortages, perhaps more effectively or with less difficulty than others. But as you correctly point out, Casper, there's no way around it: inflation exists, and there's wage inflation globally, which naturally we must be part of when we ramp up. This ties back as well to the point Martin made about the US. We didn't release all of our good colleagues, yet you can also observe that headcount in the US fell from well above 6000 to roughly 3000 as it stands now. So there are colleagues who can return in the factories. We've had a long tradition of doing exactly that through good and bad times in places such as Colorado, and we'll do it once more.

Casper Blom

analyst
#91

All right, fingers crossed on that one. My second question concerns how the industry behaves more broadly. For some time, I believe you've been making the case that the technology arms race needs to slow down — that is, the constant launching of new versions. And it seems that lately a number of your bigger rivals have been saying similar things. GE certainly likes to talk about its workhorses, at minimum. So do you see that taking shape at the moment? When it comes to deploying new technology and extending how long products stay commercially viable, are companies behaving more rationally? And second, are you finding as well that some of these large competitors have become pickier about which markets they take part in?

Henrik Andersen

executive
#92

I think maybe it's not really my place to say too much about specific items there. We're quite firm about the cycle we operate in. We put our technology to the test. We have a lot of confidence in how that performs, and it also gives customers some reassurance that they're able to join that same technology cycle and journey that we're on. And I'm proud — we're proud of the technology colleagues we have, who also do open development alongside our customers to get there. I don't believe an industry can turn around misbehavior from a decade ago within a quarter. So I still think, Casper, that probably we as an industry have something to prove here. We know there can be plenty of talk, but in the end it comes down to what is actually happening. And if there has been a say-and-do gap in this industry for many, many years — I hope executives now stand by it and say this is closing, and therefore we are seeing it happen. We'll keep speaking to it and we'll keep at it, and we'll also stay disciplined — that's our promise to the industry.

Casper Blom

analyst
#93

Much appreciated, Henrik.

Henrik Andersen

executive
#94

All right. So with that, I truly want to thank you for your interest. I know we're going to be seeing a lot of you over the next few days. So once again, thank you for your attention, and for those we don't see, we really appreciate your support as well as the interest. So we'll see you later in the year — thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vestas Wind Systems A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Vestas Wind Systems A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Vestas Wind Systems A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.