Good morning, everyone, and welcome to the Vestas Q3 presentation. First off, let me thank every stakeholder joining this call, and especially our colleagues at Vestas as well. This quarter marks Vestas returning to an operational profit for Q3. With that said, let's move to the Q3 highlights. Order intake for Q3 came in at 4.5 GW. Wind turbine orders more than doubled compared with a year earlier, lifted by offshore as well as stronger activity across North America and Europe. As I mentioned, we posted positive earnings from operations. This return to profitability reflects, first, solid execution during the quarter, and second, steady gains in project profitability and in the backlog. Turning to revenue, EUR 4.4 billion, which is 11% growth year-on-year, supported by a higher value of turbine deliveries, flat volumes, and once more double-digit growth in service. The EBIT margin, as noted, was 1.6%. That profitability gain came from a higher gross margin, improved pricing, and again, thanks to all our service colleagues for the strong performance and profitability in the service business. At this point in the year, we are also narrowing the outlook, and we remain on track to deliver a positive EBIT in 2023, and everyone here will appreciate that our notion of being Back in Black will happen.

Henrik Andersen

executive
#2

Now, when we look at the business environment, the first thing to note is that conditions are expected to stay difficult through the remainder of 2023. I'd also like to take this chance to mention that we have 53 days left in the remaining portion of 2023. And I believe this is likely — and should be — the final occasion on which you'll see this chart. It has served us extremely well ever since we brought it in during March, April 2020, at the outset of the COVID outbreak, and it has kept our priorities for operating the business in place the whole way through. Then, in this quarter as well, we still observe that market design and permitting stand as obstacles to new installations, though we have likewise witnessed the positive launch of the EU Wind Power Action Plan, which represents a very significant move in the right direction. Now the ball is in the court of the EU 27 countries to turn it into proper action and real implementation. Without question, the industry must still mature — above all, to secure operational efficiency, quality, and not least, scalability for the benefit of governments as well as our customers across the world. The business environment has gotten better over the course of 2023. We can see that supply chain and disruption, along with inflation, continue to be a worry, but the picture is mixed, depending on where we stand.

Henrik Andersen

executive
#3

Let's move on now to the segment that showed the greatest improvement this quarter and also year to date, which is Power Solutions. For Power Solutions, the short version for Q3 is this: commercial discipline plus strong order intake. Among the highlights here, order intake came in at 4.5 GW, which is more than double last year's figure, powered by offshore growth alongside onshore activity, mainly in the U.S. and especially Germany. We booked the first two orders for our V236 15.0 MW turbine, for the Baltic Power and He Dreiht offshore projects, and I want to thank our customers here for placing their trust in us and in that solution to supply them with electricity. By the close of Q3, Vestas had secured over 10 GW of PSAs for the V236 at the end of that quarter. Turning to the onshore ASP, it rose to EUR 105 per MW in Q3, up from EUR 0.97 in the previous quarter, and overall with a mix that was typical for Q3, so we are very pleased with the pricing and the discipline reflected in the order intake. Then we will also just note that, for business reasons, very much commercial reasons, we will not — or rather we will adjust this disclosure concerning the ASP so that individual offshore projects and their values are not exposed in the future.

Henrik Andersen

executive
#4

Discussing an ASP doesn't really make sense when we're only announcing one or two orders in a quarter, since that would actually reveal pricing to the broader world of individual projects. But that was simply a heading, for entering Q4 and moving forward. Then you're able to see our order intake breakdown on the right. And I'll just note here that we'll cover this further as well, why Asia Pacific, in that case, is backloaded when it comes to order intake. Now, let's also move to our service business. So the service business this quarter, once again, another quarter of very strong performance. Again, thanks to the broader service team and colleagues across more than 80 countries. They kept activity at a high level, and here too, despite inflationary cost pressures, we delivered continued strong operational performance, much appreciated by our customers, along with strong support on delivery of components. The service order backlog keeps growing, now above EUR 32 billion. Inflation indexation stays a vital lever mechanism for preserving profitability, and you'll be able to see the breakdown to the right, so EUR 32.4 billion in service order backlog, 151 GW in active service contracts, and an average contract duration of more than 11 years.

Henrik Andersen

executive
#5

Thanks again, and I'm very pleased. On the development side, there isn't much new this quarter. The quarter has been heavily focused on pipeline quality and, once more, on the discipline of bringing projects to life. In the quarter, Vestas secured 1.2 GW of new pipeline projects, mainly from South Korea. Our focus on pipeline quality resulted in the closing of certain early stage projects and adjustments to project size, along with a successful sale of projects in EMEA, which offsets the pipeline additions made during the quarter. By the end of Q3 2023, Vestas' development project pipeline stood at just around 30 GW, with Australia, the US, and Brazil making the largest contributions. You'll find the breakdown on the right, and once again, the continuation of Vestas development is what matters most. Turning to sustainability, again here, representing the most sustainable energy company in the world, throughout 2023. So by Q3, lifetime CO2 avoided by product and ship capacity had risen 6% from Q3 2022, thanks to higher produced volumes in Q3 versus Q3 last year. Carbon emissions from our own operations, Scope 1 and 2, fell 17% compared with Q3 2022.

Henrik Andersen

executive
#6

As you can all appreciate, we've now reached a point where carbon emissions from Scope 1 and 2 show some volatility, since we're at a low level. That's 20,000 tons of CO2 in a quarter. And as you saw last quarter, even a short or single project construction can move that figure. Turning to safety, the numbers for the quarter were stable versus the same quarter last year, with a Total Recordable Injury Rate of 3.5 per million working hours. It's stable, and it also reflects somewhat that we're still bringing on a fairly high number of new colleagues, particularly in service and construction. So with that, thanks again, and over to Hans for the financials.

Hans Martin Smith

executive
#7

Thanks, Henrik. We'll begin as we always do with the income statement, and you can see gains across a number of the lines shown there. To start with, revenue was up 11% versus a year ago, and that came from the greater value of the turbines we delivered, from volumes holding steady, and from the Service segment continuing to expand. On gross margin, we hit 8.1%, which is four percentage points higher than last year. Once again this quarter, the improvement came from the Power Solutions segment and from increased pricing, though the service business segment also pitched in. Income from JVs and associates tied to our development activities gave us EUR 14 million of EBIT for the quarter. Taken together, that brings us to an EBIT margin before special items of 1.6%. To go back to your question, Henrik, on operational profits, this is a meaningful improvement over -3.2% a year ago, or a rise of 5 percentage points. Moving to the Power Solutions segment, we are getting closer, step by step, to break-even. As you can see, revenue rose 10% year-over-year, lifted by high activity levels in the Americas and the Asia Pacific regions, which were then partly offset by somewhat lower activity in offshore, as well as by currency headwinds of 7%.

Hans Martin Smith

executive
#8

The EBIT margin before special items got better by 7 percentage points, landing at the -1.1% that you can see. What drove that gain was improved project pricing, along with stronger execution on the projects. Again, I think it's worth pointing out how important it is to recognize that profitability keeps moving in the right direction. The improvement is gradual, though I should add that it's still being held back by how we're executing the low margin legacy projects sitting in the backlog. On the service side, revenue rose 15% year-on-year, and the drivers were higher contract activity—especially in the EMEA and Americas regions—plus inflation indexation. Transactional sales in fact declined once more, making it the second quarter in a row, and on top of that we had an 8% currency translation headwind during the quarter. Looking at all this, I'd like to stress once more that service remains a stronghold for Vestas, producing close to EUR 200 million of EBIT, which corresponds to a 21% margin for the quarter. That brings us to SG&A cost, where—if you look at the chart—it isn't the most dramatic one when it comes to movements. What we're seeing is that measured against activity levels, SG&A came to 8.2% on a trailing basis.

Hans Martin Smith

executive
#9

That ratio gain comes from a mix of favorable factors — greater revenue plus reduced admin expenses — which higher R&D spending and employee-related costs in the quarter then partly counteract. Regarding net working capital, the pattern we observe isn't unlike what has appeared previously, so it's not necessarily all that unusual versus what we'd typically see before a busy Q4. During Q3, net working capital went up. The level of down and milestone payments from customers declined. Lower supplier payments in the quarter, along with reduced inventories, then partly counterbalanced that. And once more, this is the customary working capital and unwind — or rather, we anticipate the customary working capital unwind arriving in the year's final quarter. So that's roughly the summary on this one. That brings us to cash flow, where on a number of these lines as well, improvements keep showing up. Operating cash flow got substantially better versus last year, reaching minus EUR 31 million in the quarter — roughly EUR 600 million better than last year — driven especially by improved profitability. Turning to free cash flow before financial investments, it too rose significantly, to minus EUR 251 million, even with the elevated investment level we had.

Hans Martin Smith

executive
#10

That leads quite naturally into the next slide, which covers our investments—here you can see they amount to EUR 220 million in total. That's up versus last year, and the main driver is spending on tooling and molds for our 236 platform, whereas intangibles investment stayed fairly flat... I should also flag that, for comparability with last year, the divestment of the Lauchhammer facility ran through the numbers. As a result, last year's figure was unusually low, which is why a direct comparison is perhaps somewhat tricky when you simply look at these numbers. Moving on to provisions and the loss production factor: the LPF is stabilizing, though it remains at elevated levels, chiefly due to extraordinary repairs and upgrades currently underway. Warranty costs came to EUR 260 million in Q3, equivalent to 6% of revenue. That is up one percentage point versus the prior quarter and mirrors cost volatility across existing cases. Warranty provisions used during the first nine months totaled EUR 346 million, down from EUR 486 million in the same period a year earlier.

Hans Martin Smith

executive
#11

On these capital structure slides, you can also observe how financial leverage is coming down as earnings recover. Net debt to EBITDA came in at 3.6 for Q3. That naturally reflects improved profitability measured on a trailing twelve-month basis. In other words, it's arriving as the earnings recovery keeps going. Our investment-grade rating from Moody's stands at Baa2 with a stable outlook. And since we're on the subject of outlook, that brings us to the final part of the presentation, which is yours, Henrik. So over to you.

Henrik Andersen

executive
#12

Thanks, Hans. Moving on to the 2023 outlook now. And here it is. Looking at it today, we've tightened the revenue guidance for the year, and it now represents EUR 14.5 billion to EUR 15.5 billion. The prior outlook was EUR 14 billion to EUR 15.5 billion, as you know. Service is expected to grow around 10%, also up from what it was last quarter. And then the EBIT margin before special items is now indicated at 0%-2% EBIT. The previous outlook was -2% to 3%, so that's narrowed into positive territory. And the service margin is expected to come in at approximately 21%, a small adjustment from the previous 22%. Then total investment for the year lands at around approximately EUR 0.8 billion, slightly lower than the previous approximately EUR 1 billion. And of course, this outlook is based on current foreign exchange rates, so you'll be able to adjust for that. I'd also note here that the takeaway from this and from the presentation is that we are on track. We are very focused and disciplined when it comes to executing and delivering on the plan we've called Back in Black for Vestas. And of course, what we have here is that we can also see the plan is working.

Henrik Andersen

executive
#13

It builds up gradually, and that is likely the nicest outcome of putting out Q3, yet also something that I’m aware a great many of our 1,000 colleagues have waited for with patience and helped bring about. So with that, thanks, and now we’ll move to the Q&A.

Operator

operator
#14

Ladies and gentlemen, we're going to start the Q&A portion now. If you'd like to pose a question, you can press star and then one on your touchtone phone. To keep things moving, kindly stick to two questions per person. Should you want to drop out of the queue, just press star and then two. For those on speaker equipment today, please pick up the handset before you make your selections. Anyone with a question can press star and then one right now. Our first question is from Kristian Tornell at SEB. Please go ahead.

Kristian Tornell

analyst
#15

Yes, thanks. I've got two questions, and of course we'll begin with one about your target of a 10% EBIT margin. In the report, you repeat that you still view a 10% margin as realistic by 2025, and as I'm sure you're fully aware, consensus sits notably lower than that. So could you just talk about the stepping stone involved in getting from the 0%-2% to the 10% margins? Obviously, hence, highlight the gradual improvement, hence the backlog conversion. But, but what other stepping stones do you see, and what challenges do you see to get to the 10%?

Henrik Andersen

executive
#16

Thanks a lot, Christian. Regarding the 10%, I believe it's clear to everyone by now that we've entered the quarters of what others have labeled the inflection point. You'll also notice that a portion of it stems from two sources. Partly it comes from our own pricing, and as you'll see, that pricing—which we describe as stable to positive—is still in place. So pricing discipline plays a very significant role in getting us to that 10%. We're patient and disciplined, working through the backlog, and within that backlog there will still be a number of projects across 2024 tied to the days of 2020 and 2021, and early 2022, when we faced difficulties covering cost and pricing. But as you can see as well, that share shrinks as time goes on. So on the external side, volume and market predictability—which we're delivering—and I think you've observed this broadly, right now the U.S. and Europe are shifting quarter by quarter in our favor, and we expect the same, particularly in Pacific and Asia. Then, of course, internally, the largest driver on the internal side adding to the 10% is that in time we'll also move toward what we'd call a more natural reflection of the warranty provision, which ought to sit around 3%.

Henrik Andersen

executive
#17

And we're working hard to get through that, just by avoiding new cases and then completing the repair and upgrade work. Of course, Kristian, I won't say what accounts for the biggest share of that 10%, but you can certainly observe the shift in run rate and gross margin, and that means you'll have to estimate where the midpoint lands in 2024. So we'll revisit that for 2024.

Kristian Tornell

analyst
#18

Got it — that's clear and well understood. Thanks. My second question is about warranty provisions. You're seeing a somewhat higher level in Q3, but let's assume it relates to the existing cases. So just as an update on those existing cases, how far along are you, and are further negative surprises on the way, or has it simply become more costly, or how should we think about that 6% warranty ratio?

Henrik Andersen

executive
#19

We haven't seen any negative surprises when it comes to the existing cases. We've discussed these over the past several quarters. So we continue to work through them carefully. No new cases have emerged, but I think it's also fair — as Hans mentioned regarding the service business — that when you observe an indexation uplift and similar items, those naturally feed into your warranty provisions too, because part of it, whether through components or upgrade costs, simply because we pay our colleagues to carry it out, of course, rises as well. As a result, they stay elevated in the quarter. And once more, just remember that 1% equates to roughly EUR 40 million of deviation in a quarter, out of a total warranty provision of close to EUR 1.7 billion. So that is reflected there. So warranty follows the same process as over the last decade, and we adhere to that process strictly.

Kristian Tornell

analyst
#20

Got it. That’s all I had. Thanks.

Operator

operator
#21

Ben Heelan from Bank of America has our next question. Go right ahead.

Ben Heelan

analyst
#22

Morning, guys, and thanks for the question. My first one is about offshore and what you're seeing in that market. We've just come through a stretch of news flow that was quite volatile. A lot of it was negative. So could you say a bit about what you're observing? Of course, you booked 2 solid orders in Q3. Has the reset happened yet? How are you viewing underlying activity in offshore right now? That's the first one. Then second, on the U.S., order momentum there has genuinely been picking up on a book-to-bill basis over the last 12 months. Do you expect U.S. onshore to keep showing solid momentum? What's your thinking there? Thank you.

Henrik Andersen

executive
#23

Thanks, Ben. Regarding offshore, I'll likely emphasize a point or two here. Don't let a couple of negative items throw you off. When you undertake a worldwide transformation in a significant field such as the energy transition, come on, some bumps along the way are inevitable. And I think at a moment when the world repositions itself across differing macroeconomic levels and interest rates, and energy pricing too, some adjustment has to happen. So probably a few countries, a couple of states, the East Coast, the US, are likely weighing a bit of a reset around how we collaborate in the triangle linking government, our developer customer, and naturally, the OEM. Together we can make this work. Offshore represents a highly appealing energy source, yet it isn't free of charge, and it was never meant to be free of charge. But probably at an interest rate of zero, some countries nearly assumed that plan. And I think, Ben, I know you're based in the U.K., and U.K. CFD Round Four served as an illustration of that too, where you probably didn't want to modify it, since a legal framework surrounds an auction. But the encouragement for the government to take action to build out in CFD Round Six is obvious.

Henrik Andersen

executive
#24

And just a thought on the U.K.: in the auction, the onshore price take came in higher than the offshore price take, and that isn't how the world looks when it comes to construction and the cost of building energy sources. I think here — come on — it will probably take a few quarters. Four quarters ago we flagged that offshore could face challenges ahead, but this quarter we've just announced two of the first firm order intakes in offshore. It works well in Poland, it works well in Germany. There's more to come. So therefore I'm also saying I think it comes down to — as we've always said — onshore too, country by country, market by market, and that's also how offshore will build out. So actually optimistic, but I know it's very hard to stay optimistic at a time when we haven't had a lot of positive news, but I'm encouraging everyone to stay on the track of the transition. Secondly, on the U.S., we passed last year's total U.S. order intake in Q3. Momentum is picking up. It's a pleasure to see, it's a pleasure to talk with customers. It's a pleasure to see how projects are coming in, and, and I, I don't dare guess what run rate we are seeing.

Henrik Andersen

executive
#25

It's clear to me at this point that the developments we said two quarters back might occur are indeed occurring now, and as I mentioned, for our part we're glad to begin making plans for additional shifts in the U.S. at some point regarding manufacturing. So we have that in place. It's something we're actively working on, and I can certainly assure you that our customers have confidence in the solutions we're giving them on the onshore side.

Ben Heelan

analyst
#26

Got it, Henrik — that's very clear. Thanks.

Operator

operator
#27

Up next, we have a question from Claus Almer at Nordea. Claus, the floor is yours.

Claus Almer

analyst
#28

Thanks. Yeah, I’ve got a few questions too, and I’ll go through them one at a time. First one’s on the onshore pipeline outside the U.S. — maybe you could give some color on what you’re actually seeing there? That’s the first one.

Henrik Andersen

executive
#29

Sure, what I'd say here is that it's encouraging to the extent that a number of our core investor markets are genuinely showing strength. So we're seeing Europe pick up in individual countries. In Germany, if you look at the breakdown of our orders as well, put together this quarter, it's clear that Germany has suddenly started accelerating, quarter by quarter. Germany is amending its legislation so it can accommodate more renewables and more wind solutions, and that reflects a need and a demand for more electricity in a country like Germany. Spain is a good example for us. They got their auction wrong. Now they're issuing permits for new capacity that's coming online. France adjusted to the auction levels. So, Claus, across the core market of Europe, we're welcoming development, and the speed is increasing. That's the best way of portraying it. I think in LATAM, it always arrives in a somewhat more bulky way. So LATAM comes in and out. We've seen Canada suddenly exploring how it can actually contribute and how it can do this. So Canada's wind market looks like a reemergence of something that was almost closed down 6 to 8 years ago.

Henrik Andersen

executive
#30

And finally, regarding Asia Pacific—whenever we discuss the Pacific region, we always recognize that Australia plays a dominant role there. And in Australia, thanks to the very solid and strong relationship we maintain with AEMO, the grid operator in Australia, applications and approvals often come through at the end of the year, which means order intake will be back-end loaded. And that is probably one of the only pieces of guidance you will ever get from me about a future Q4. So with that, yes, I will be spending time in the US and in Australia over the coming quarter, simply to meet customers and to try to be part of that in Q4 as well.

Claus Almer

analyst
#31

All right, so I want to make sure I've got this right — and I completely get that you're not offering guidance for individual quarters, certainly not for Q4, so let me ask about 2024 instead. Is it reasonable to expect order intake excluding the U.S. to grow this year?

Henrik Andersen

executive
#32

On next year? Claus, we should have that conversation at a later point. We are diligently doing what we can, and in a market where customers, once they receive a permitting on onshore, want the solution put in place, we are doing everything we can. As you have seen quarter-on-quarter, that could lead to order intake that is stable to increasing, but also with a positive ASP, and that is the name of the game.

Claus Almer

analyst
#33

That’s clear. For my second question, I want to focus on provisions. The gap between the amount you’re putting aside each quarter and the amount you’re actually using appears to be getting larger—or at least those two figures are moving apart. Could you give some detail on why you aren’t drawing down more provisions relative to what you’re adding to them?

Hans Martin Smith

executive
#34

Sure, Claus — that's a good question. I don't believe you've ever really been in a position to draw, let's say, a direct one-to-one link between any two given quarters. What we're doing, I'd say, is continuously refining the plans we have for executing the repairs. So you can't really jump to the conclusion that provisions and consumption ought to match one for one. A great deal of work goes into determining the ideal moment for a repair to be done — when it's most optimal. Planning it and then carrying it out also takes time, while on the provision side, you sit down and produce that estimate of what you believe the cost of doing it will be. So I'd frame it as a portfolio of issues, so to speak, that will need some time before they're essentially repaired. That's also what we point to on the slide you had there regarding the LPF, where we note that it reflects, say, the repairs currently being performed. But as I said, it isn't all that straightforward to simply claim there ought to be a one-to-one link.

Hans Martin Smith

executive
#35

And I think what's actually positive about that is that when we're able to plan things in an optimal way, that usually results in better kinds of solutions too. As you probably know as well, I think we've talked about this before — if you're pushed into doing something at very short notice, that generally isn't the sort of solution you'd necessarily want to pursue. So in a sense, you could say this reflects the diligent effort we put into optimizing the one-to-work that we perform.

Claus Almer

analyst
#36

Alright. Thanks a lot for clearing that up. That's everything on my end.

Operator

operator
#37

The following question is from Sean McLoughlin at HSBC. Go right ahead.

Sean McLoughlin

analyst
#38

Thanks very much, and good morning. I have a couple of questions. First, on free cash flow — obviously that was another negative quarter. Could you maybe just walk through the moving parts in Q4? In other words, is there any reason we shouldn't count on the usual Q4 pattern of strong, positive free cash flow in the quarter, and in particular, how should we think about those still very high inventory levels as we head into Q4 and as we finish the year? And on that same point, I see you're cutting CapEx by EUR 200 million. That looks like a sensible defensive step. So what are the implications of that — does it actually point to somewhat slower growth on the delivery side? Is there anything that delayed CapEx might hold back if we think about 2024 and 2025? Thank you.

Hans Martin Smith

executive
#39

Okay, regarding cash flow — you're essentially highlighting several of the correct points here. Our expectation is that Q4 will show a profile that is, well, we'll find out how it turns out by December 31, naturally. But once more, at this moment, it isn't necessarily something we anticipate being all that different from what past periods have shown. That said, I'd add that we've made this point previously and I'll repeat it: we don't anticipate being in positive territory. For the year, we do expect free cash flow to be negative. So let's be clear on that once more. Looking at where we stand year to date in terms of consumption, or rather non-consumption, of cash flow, I mean... In any case, I think you follow what I'm saying — it will stay negative, though naturally Q4 should carry a different characteristic from what earlier quarters displayed. Turning to CapEx, I wouldn't really attribute it to, say, unfavorable expectations around things. And as I've discussed fairly thoroughly, there are some market developments we're observing.

Hans Martin Smith

executive
#40

I'd say it's really more that certain things are simply taking longer than we expected on some of this CapEx. As you know, even with your own building projects, sometimes it just takes a bit more time to get things done, and that's basically what we're seeing reflected now in the adjustment we're making from EUR 1 billion down to EUR 800 million. But it isn't a reflection of us seeing, let's say, an adverse market effect on anything like that.

Sean McLoughlin

analyst
#41

And could I just ask a quick follow-up to confirm that the cut to CapEx won't actually get in the way of your execution?

Hans Martin Smith

executive
#42

No, because if that had been the situation, maybe we'd have made different choices to accelerate something. So I don't view it that way.

Sean McLoughlin

analyst
#43

Thanks.

Operator

operator
#44

Ajay Patel from Goldman Sachs has our next question. You have the floor.

Ajay Patel

analyst
#45

Morning, and thanks a lot for the presentation. I've got two questions. The first is about the service business and the guidance, right? So that 10% revenue growth.

Operator

operator
#46

Ajay Patel from Goldman Sachs. Your line is open. Good morning, and thanks a lot for the presentation. I've got two questions. The first concerns the service business and the guidance, correct? So, the 10% revenue growth. Your performance across the first nine months has been quite phenomenal. The implied figure for Q4 under that guidance looks rather negative. I just want to grasp what the underlying dynamics are behind that guidance, or is some conservatism involved here, so I can properly gauge what is what? And then my second question is, I think you've noted several times that 2025 contains no legacy projects, and that 2024 is the final year for legacy projects in the backlog. That's potentially a source of uncertainty for investors. Is there anything you can offer on that?

Ajay Patel

analyst
#47

So, you know, I realize I don't want to give forward-looking guidance. I'm really kind of thinking, well, that's something you can see in your backlog. Could you maybe even give us a comparison with this year? So, would you expect the drag on performance from legacy projects to be half the level of, say, 2023, or anything like that which could give us an order of magnitude? Not necessarily the exact number, but just to help us frame the issue better.

Henrik Andersen

executive
#48

Thank you, Ajay. To begin with the service side, we're sharing the information we have regarding service revenue. You also understand that this is a business where a top line of ±30 million EUR produces a percentage deviation on the growth figure. We're also aware that the Q4 comparison between 2022 and 2023 — Q4 2022 included repowering. As a result, with the current comparison, there's a likelihood that you'll end up with a somewhat lower number in Q4 this year versus last year, and that is what the guidance implies. So there's nothing else in that beyond what we know as a comparison. On the backlog, as I mentioned, once again, we don't do that. You can track it on an ASP basis, and what you are — and I think Christian actually referred to this at the start, we also understand that most of you have a consensus for 25 that deviates from the 10%, and that, of course, means you are either looking at a different backlog or different progress than we potentially are. We are working toward the 10%, and as I said at the outset, the backlog will improve.

Henrik Andersen

executive
#49

You can see it really is getting better. First, in terms of pricing and the backlog, but also, as we mentioned here, the mitigations and the deviations that occurred in project execution during Q3 are the fewest we've had this year, out of the three quarters. So the more we move into a world where the supply chain has things arriving on time and departing on time for the site, the better we do at executing our projects. And regarding your question on how we view the development and what proportion — no, only people who work with investors are aware of that number.

Hans Martin Smith

executive
#50

As a quick aside regarding Ajay’s comment about how the backlog is developing: naturally, many of the difficulties and the ups and downs we saw through the summer of last year— So, if you engage with this, if you take a seat and examine, say, our order intake, I believe we are fairly transparent about what we disclose. And naturally, that gives you some level of visibility into when orders get booked, what volumes are being booked, at what moment, and usually we would also mention what the delivery dates for those would be. So if you spend a little time working with that, I think it would provide you with, let’s say, at least some indications about where things are heading. But that is at least one thing I would recommend you could examine. I mean, we can also discuss that over the coming days. I think we will likely meet as well, and then we can continue with that kind of analysis.

Operator

operator
#51

Great, I’m looking forward to it. Thanks a lot. Henry Tarr from Berenberg has our next question. Go right ahead.

Henry Tarr

analyst
#52

Hey, everyone, and thanks for taking my questions. I've got two. The first is just about offshore pricing and ASPs during the quarter, which, if I sort of back out from the figures you provided, aren't much higher than the onshore ASP for that same quarter. I'm wondering, for this particular PSA, when did you sort of lock in the price there? And are you pleased with that level of pricing offshore? I know every project differs. Then the second question is just about the competitive landscape, and I guess there are two sort of factors there. One is, we've potentially seen one of your big European clients maybe pulling back from onshore, and I wonder whether you're beginning to see the impact of that. But then on the other side, perhaps we're seeing a bit more activity from some of the Chinese players, particularly in Europe. So any comment on that would be great. Thank you.

Henrik Andersen

executive
#53

Thank you, Henry. And as usual, offshore is a separate process and a separate method of doing things. There's a PSA that lays out a set of conditions, and then you operate between that PSA and the shortlisting until the firm order intake gives you assurance that the product is bankable and can also be delivered. I believe that covers both timing and other conditions as well. So we're pleased with the offshore orders we've secured. It's a confirmation of that. And for both customers, it's a pleasure to see that we'll be placing the V236 in what I'd call the nearshore, at Vestas' home in Denmark, so in Poland and Germany. That is also why, when you look at that mix, you can't compare it, because the scope will differ, and the scope will also be agreed between customer and Vestas in a completely different manner, between onshore and offshore. So that's why the comparison, frankly speaking, doesn't make that much sense. On the competitive landscape, we have no intention other than to strengthen our onshore presence and to keep using that. And if someone needs a solution at short notice, you can also see that we have a certain size of our inventory, and then we'll use it to complete the orders on the onshore.

Henrik Andersen

executive
#54

Onshore is an area we favor. Onshore has been our focus for quite a while. We're only now moving into offshore in that way. Within the competitive landscape, I think another piece of it is — and we just finished a sizable project in Scotland. That one was offshore, done with a customer of SSE, and I think there we also see the advantages of sitting inside the European landscape and of being able to both handle commissioning and coordinate with the grid. So there are several ways in which the solution also ties to local energy supply. Look, competitors will come and go on some of these orders. We simply have to ensure we can offer our customers the strongest 30-year agreement and the highest energy production output as well. Then I'm quite confident we'll endure a long way in that competition. And I think this quarter demonstrates that well across both onshore and offshore.

Henry Tarr

analyst
#55

Alright, thank you, Henrik. Goodbye.

Operator

operator
#56

Martin Wilkie from Citi is up next with a question. Go right ahead.

Martin Wilkie

analyst
#57

Alright, thanks. Good morning. Martin here from Citi. My first question concerns the U.S. market. I believe you said you'll be spending some time in the U.S. shortly, and I'd be curious to hear how you view that market. We've heard somewhat differing remarks from a few of your competitors and suppliers. General Electric, I think, sounded fairly upbeat regarding the prospects of Inflation Reduction Act-linked orders either already happening or coming very soon. TPI perhaps took a somewhat more cautious line on when it expected to see the benefit from it, maybe as far off as 2025. So yeah, clearly, we're still waiting on tax guidance, that sort of thing, but yeah, I'm just curious to hear what your thinking is regarding the U.S. market. Thank you.

Henrik Andersen

executive
#58

Thanks, Martin. I believe the U.S. market is taking shape right now, in real time. Order intake is coming in, and ramp-up is underway too. And honestly, it makes sense that supply chain timing varies, because when I look at TPI — a very dear partner of ours across many, many, many years — it's also clear that whenever we have factories and investors ready, we naturally try to fill those first. So there will be a timing gap in how fast it lands. And 2024 in the U.S. will always be somewhat of a ramp-up year. We've discussed this before. 2024 won't be the full run order for the U.S. onshore market, since we've always needed to have the approvals in place. And I don't sense any pressure right now to rush orders out during 2024, because you have a PTC that now carries a 10-year framework. So, Martin, that's the usual timing stress around it. So ramp-up is happening, we're seeing order intake, and we're seeing large projects now materializing through that.

Henrik Andersen

executive
#59

And I'm fairly confident you'll value that too, given that you're in the financing business, since many projects are coming your way seeking funding as part of this. So the outlook for 2024 is positive as well, and it will be better than 2023. And naturally, it serves as a solid stepping stone for underscoring the greater activity in the supply chain and manufacturing footprint.

Martin Wilkie

analyst
#60

Thanks, that's really useful. One more question, and it's actually on a different topic. Earlier you said — and it's on the slide as well — that you're considering a change to your ASP disclosure so you don't have to reveal individual offshore projects, which makes sense to me. Does that mean no ASPs at all will be provided starting next year? Or is it more that you'd give just a blended figure rather than splitting offshore and onshore? Clearly this metric matters a lot to analysts and investors for seeing how the order book is developing in value terms. So I'm just curious what that comment means. Thank you.

Henrik Andersen

executive
#61

We'll try our hardest to provide disclosure that leaves out any chance to sit down and price an offshore project individually. That wouldn't make sense — not for you, not for our individual customers, and for that matter, not for sharing with competitors. So that's simply how we have to approach it: it comes down to what we see in the total backlog and how we share the onshore piece. We will come back to you with a proper message on that, Martin. But I'm sure you can understand—

Martin Wilkie

analyst
#62

Thanks a lot — that’s great.

Henrik Andersen

executive
#63

So when an offshore market is ramping up, we just saw here that something isn't right when we discuss ASP. So we said it for Q3, but going forward, it makes no sense to talk about an average of potentially one project order.

Martin Wilkie

analyst
#64

Yeah. No, no, I see that. Thanks a lot.

Operator

operator
#65

The following question is from Supriya Subramanian at UBS. You have the floor.

Supriya Subramanian

analyst
#66

Yes, good morning, and thanks for taking my question. I just wanted to follow up regarding margin trends as we head into 2024 and, you know, the trajectory toward that 10% margin in 2025. Of course, I understand you're not able to provide any specific figures. But if I consider your guidance for fiscal 2023 and what's implied for Q4 — roughly 2.7% margins at the midpoint — would that serve as a reasonable benchmark for margins in 2024 and, you know, possibly improving sequentially quarter by quarter as those low-quality orders fall away?

Hans Martin Smith

executive
#67

Yeah, I suppose that calculation you're doing there is the one that jumps out at you,

Supriya Subramanian

analyst
#68

Mm-hmm.

Hans Martin Smith

executive
#69

... because we do have a range outcome for both the top line and EBIT. So I get why you'd frame it that way. Naturally, ours is a business that swings quite a bit, and that's another reason we're looking at a range. So what will the outcome be for 2024? We'll return to that when we issue the 2024 guidance, which I already indicated. But right now, what matters to emphasize, I think, is that we see the recovery unfolding favorably. We are on track — that's the phrase you used at the end there, Henrik. So that naturally gives us, let's say, a starting point, sitting here on our side, for examining how 2024 will shape up. Still, the calculation you're doing there — I get that it's a natural one to make given the guidance we've provided. But let's see where 2024 lands once we reach the moment when we begin guiding for it.

Supriya Subramanian

analyst
#70

Okay, okay, that's reasonable. So my follow-up is about pricing. I just wanted to verify the rough share of orders that are... The share of costs that are indexed in the orders you're securing — meaning what portion has price indexation built in? And, if so, does it also function in reverse? When your costs decline, does that mean you pass that saving along to your customers?

Hans Martin Smith

executive
#71

Right. So the indexation levels themselves we haven’t made public. That’s a commercial — how should I put it — secret, something we go back and forth on, sometimes quite intensely, with customers: what levels would you be willing to go to? What I’d say is, it isn’t as if suddenly, overnight — if you think about it from a timing standpoint, in terms of where the indexation sits, and then which orders — that it all shifted at a single moment and then we were fully covered. And I don’t think we’re at the end of the indexation journey either. But it’s fair to say that this is a tool that has been increasingly put to use since, say, the middle of last year. That’s when it really took off, in terms of us pushing for it. Early on, I wouldn’t necessarily say we were outright successful in achieving it, but increasingly we’re seeing with our customers that there’s an acceptance that this is something — in situations where you have longer-dated, say, schedules — that it’s at least up for discussion, and where you’d rather sit down and discuss exactly what the structures around it should be.

Hans Martin Smith

executive
#72

Still, I wouldn't stand here and say that what we're doing at present is completely flawless, though it certainly beats what we were doing if you look back to a year and a half ago. And I'd add, as a final point, that that's... Yeah, apologies, I blanked on it there, Henrik.

Henrik Andersen

executive
#73

Let me just mention this point here — it's unstable, moving toward positive ASP, and that's the very thing we're emphasizing. There remains a certain worry regarding underlying inflation, but as I mentioned, within that pricing, we're pricing toward the EBIT of 10%. That's the scope and the magnitude. And if you're essentially asking when pricing will begin to decline and so on, I'd say this is the wrong quarter for that question, since it's still a quarter in which, even while executing the backlog, we still carry a small negative on turbine deliveries. So there's still some distance to go on restoring the EBIT as we look into 2024 and 2025, and that's what we're pricing for.

Supriya Subramanian

analyst
#74

Okay, sure.

Hans Martin Smith

executive
#75

And at this point, I—

Supriya Subramanian

analyst
#76

Um, my—

Hans Martin Smith

executive
#77

And at this point, I remember what—

Supriya Subramanian

analyst
#78

I apologize.

Hans Martin Smith

executive
#79

That was my second point here. And of course, to your point, Henrik, also, that also means that if you have indexation in a contract, and all of a sudden you start to see deflation on certain component groups, it of course works like that also in the way that it's set up. So there's of course an element of de-risking when you introduce this. And as mentioned, that would then also have the opposite effect. I think it's important, and that's also what we have been saying in many calls, that you need to be happy about, say, the margin, the project you're taking-

Supriya Subramanian

analyst
#80

Yeah.

Hans Martin Smith

executive
#81

... if you go ahead and put these tools to work.

Supriya Subramanian

analyst
#82

Alright. Alright, thanks. Thanks so much.

Operator

operator
#83

We’ll take the next question from William Mackie at Kepler Cheuvreux. William, the line is yours.

William Mackie

analyst
#84

Good morning, and thanks for making time for this. I just have one question about the tightening in financial conditions — how would you characterize what that tightening is doing, and also how the shifting pricing on offtake agreements is affecting, broadly speaking, the bankability of the projects your customers are trying to execute, and then how that in turn is influencing the pace at which you're able to turn the tender pipeline into booked orders?

Henrik Andersen

executive
#85

I appreciate that, William. Honestly, I don't believe how that process works has really shifted. Neither in this quarter nor when it comes to tightening the finances — we're seeing that globally, there's solid discussion around it. That said, I also believe the financing industry has recognized that the PPA market's rapid growth is in fact giving that industry more clarity and transparency regarding how bankable the projects are. So when I look at it, I think we have a market here that's growing and maturing at the same time, meaning the offtake is maturing too. Where we do see an offtake standstill is likely in cases where you've got a conditional auction from a government, but the private PPA market keeps working better and better. So that's a positive. And I also see a certain understanding among the financing industry: if you have some very experienced customers, they also accept that there is an offtake that isn't 100% on the offtake. So I think, actually, that works well when it comes to the tightening. On interest, yes, I think that goes up. The price of money rises. But on the terms around the world, we still see customers managing that quite well, in that sense.

Henrik Andersen

executive
#86

So in the U.S., we've been watching that move forward. What we've observed is that customers are moving it along within the usual timelines. Naturally, there will always be cases where you ask, "Is that held up because the grid or the permitting slipped, or something like that?" Well, that's just the nature of working in this industry. No change up to now.

William Mackie

analyst
#87

Thanks. May I ask a follow-up about the price-cost equation? More specifically, could you give us some color on how you expect costs to develop over the next 12 months or so? We can see that some of the classic items, steels and resins, are perhaps falling, along with transport costs, but how would you see labor, logistics, specialist logistics, or some of the main core Tier One supplier complex component prices developing as we head into next year?

Henrik Andersen

executive
#88

I think it's very, very wide, because as you'll also appreciate, there are just both the raw materials and components. There are certain components that have a reduction in price. There are certain raw materials that have a reduction in price. On the other hand, there is also an underlying inflationary pressure, which is what we highlight as a bit of a concern. You sit in and around the U.K., where you very much know if you're sourcing something from there, it is affected of that nature, and that is also partly the same if you look towards the U.S. and a few other places. So therefore, I will say it's an uneven picture. But more importantly for us, as Hans rightly said, often the cost and price runs in parallel. But what, of course, for us means a lot is also the mitigations we are doing due to extraordinary things. And those costs, the mitigation costs, and potentially in many projects, the double costing we have had, those are diminishing quarter on quarter. So I think you need to look at cost-price ratio one, but you also need to look at the cost, the price and the cost, extra mitigation cost, as second, because in some cases, the mitigation costs have been bigger than the cost variations we have had.

Henrik Andersen

executive
#89

Considerably larger.

William Mackie

analyst
#90

Thanks. Good to see things going your way.

Operator

operator
#91

The following question is from Casper Blom at Danske Bank. You have the floor.

Casper Blom

analyst
#92

Thank you very much. So, obviously most of the questions have already been asked, but I just want to follow up on your guidance. First, regarding the service margin guidance, where you go from 22% to 21%, could you perhaps elaborate a bit more on what's causing that shift? And second, where do you see a natural level for the service margin once these offshore businesses also reach what I'd call a more normalized level of activity? And then, on the revised CapEx guidance, it sounded like it's kind of a postponement of costs, so should we just expect those costs to land in 2024 instead? Maybe you could give us a little guidance on what would be a reasonable level of CapEx to expect in 2024 and 2025. Thank you.

Hans Martin Smith

executive
#93

Okay, so regarding the service guidance, what we're observing is that certain inflationary pressures are affecting us. And naturally, that produces the effect you can see in the 21% update we're making. Last year there were no bonuses, and that's also part of what we're seeing as we move into the 21%. So that plays a role as well. I'd say there are quite a lot of people in service. It's an operation that's very heavy on head count. So I think that's at least 2 points worth mentioning that factor in. And what I think is important to emphasize here is that we don't view this as something that will weigh on or carry over into 2024. Just to make that clear, Casper. So I think that probably brings us to the other side of that question regarding, say, the natural level for this business. I think we've said previously that we aspire to take service up to 25% in margin levels. That aspiration remains. There's not necessarily any change to it based on what we're looking at here. So as mentioned before, we'll see what the guidance will be for 2024, but at least the update we've done here isn't something we see weighing in when we reach the new year in terms of where this is heading.

Hans Martin Smith

executive
#94

So regarding CapEx, yes, you could argue that if it gets delayed, it will simply land on us next year. To be a bit self-reflective, I think it's probably also worth noting the situation we saw last year as well, when we weren't able to spend the CapEx we had originally guided. So we'll see how 2024 goes. If this turns out to be a perpetual effect, there will eventually be a saving. But let's see. At least it isn't a reflection that we're cutting CapEx because we're seeing less demand. That's not the case. I think we're simply seeing that spending the CapEx we would expect to spend takes time. Fundamentally, from a cash flow perspective, you can argue it's a positive. At least as long as we don't see it hampering the performance we're planning to carry out. So we'll also see what our planning ends up being for next year as we move through our budget process over the coming months. But for now, at least, it's not something I would read too much into at this stage.

Casper Blom

analyst
#95

Alright, if I could just ask a quick follow-up there, Hans, regarding the CapEx. My assumption is that a fairly significant portion of the CapEx you're currently spending has to be going toward ramping up offshore and getting ready for the first V236 deliveries in 2025. So with that in mind, should we be expecting structurally higher CapEx across 2024 and 2025?

Henrik Andersen

executive
#96

Casper Blom, no, that isn't something you should do, but it will fluctuate around that level, based on what you've observed. The underlying spend on it, of course, shifts, as you correctly point out, moving from developing technology and prototyping into manufacturing now. And then perhaps it has risen a couple of times by now. Hey, if it doesn't work out or demand forecast isn't the same, with clarity in the U.K. on offshore, as we clearly said on the day, earlier this year, then there's no reason to begin digging in the ground in the U.K. for a new factory. So, you'll also notice that our CapEx guidance, of course, mirrors what we're doing and how we're working with our projects, for establishing that capacity. So, you know we have it in Europe, and you know we're also doing and planning in Poland. That is underway, and that's included in the CapEx budget and the adjustments we're making.

Operator

operator
#97

That's useful. Thanks to you both. Deepa Venkateswaran from Bernstein has our next question. Please go ahead.

Deepa Venkateswaran

analyst
#98

Thanks. I’ll ask just one thing, and it concerns offshore wind. Since you have a couple of—well, a large project on the U.S. East Coast from New York, and it’s going to be renegotiated, it isn’t clear whether a higher price will be secured or not. Does that alter anything regarding your planned ramp for 2025, or are those European orders or anything else enough? And then I believe you were also intending to invest in a factory in New Jersey, presumably in light of the situation with cancellations there—not your project, but other projects. I’m just wondering whether you’ll be postponing any of the U.S. spend or, you know, how significant is the U.S. East Coast for your near-term planning?

Henrik Andersen

executive
#99

We do have certain PSAs along the U.S. East Coast, and we’re giving those the same level of attention as well. That said, the projects on the East Coast that have been canceled so far carry no Vestas turbines, which means they have no impact on our planning for manufacturing or anything else. It’s also evident — and I believe we made this quite clear regarding Europe and the U.K. from an early stage — that absent a resolution among the off taker, the state, and the developer, we will not construct factories when there’s no demand for the capacity. That message is unambiguous. A further point is that we stand alongside our customers and partners on these projects, and none of us has any intention of installing the solution and then dealing with an impairment afterward. That’s precisely why it’s termed a PSA — a Preferred Supplier Agreement — and given those terms, it has no effect on our 2025, since none of our U.S. projects were meant to become operational in 2025.

Deepa Venkateswaran

analyst
#100

All right, thanks a lot.

Operator

operator
#101

Akash Gupta from JP Morgan has our next question. Go right ahead.

Akash Gupta

analyst
#102

Yes. Hi, good morning, everyone. Thanks for your time. I have two as well. The first one concerns the financial stability of your supply chain. We can see one of your listed blade manufacturer in the U.S., but most of your supply chain is not visible to outside world. So maybe if you can talk about how do you see the financial health of your supply chain, and are there any risks that we need to be aware as the industry needs to scale up in the next few years? And the second question I have is on V236. Have you received a full type certificate? And if you have not, by when do you expect to receive a full type certificate? Thank you.

Hans Martin Smith

executive
#103

Okay, so first, on the supply chain and financial stability — naturally, there is at least some level of visibility into certain suppliers of ours. In an industry such as ours, where across the board we've been dealing with some of the things we've experienced over the past few years, there are, of course, continuing conversations and matters tied to this. What matters for us to observe is that a recovery is taking place on our side. We maintain good, close dialogue with our suppliers. I believe we also have some solid, strong suppliers on our end. But naturally, like any other business operating in a volatile world, we are, of course, watching and monitoring what happens within the supply chain. If we take, let's say, a very high-level view and consider where the industry stands today versus where it stood 10 years ago, I would add that we now have, let's say, considerably larger, considerably more stable and professional players in this space. So I think the industry is also moving toward a better place regarding this particular topic. So yeah, a couple of weeks ago we held the suppliers day, where we met with some of our suppliers and engaged in various kinds of discussions.

Hans Martin Smith

executive
#104

And I believe, for the most part at least, folks recognize there is substantial opportunity within this industry. They also provide supplies to other sectors, and they are quite eager to do more rather than less in the wind sector. So naturally, that also reflects where people perceive things are headed at present. I'm not sure whether you ought to take the one regarding the type certificate as well. I suppose we do not currently hold a type certificate. Naturally, we intend to obtain one, and I have nothing further to add on that subject since it's at this stage.

Akash Gupta

analyst
#105

Thanks.

Operator

operator
#106

Daniel Haugland of ABG Sundal Collier has our next question. Go right ahead.

Daniel Vårdal Haugland

analyst
#107

Hi, guys. So, you already touched on this a bit with the service margin coming down, but I was thinking, could you maybe give a little bit more, a little bit more detail on that? Because you say that in 2024, you don't necessarily think that we should take a read on the 21% margin for service in 2023, but it has continued to come down throughout the year. So maybe you could explain a bit what's happening there, and yeah, how we should think about that. Thank you... Yeah, so as mentioned, we are seeing, again, compared to last year, there's a bonus that is impacting the numbers. There's an effect also, we have time and material business. I can't recall if we said that before, but that's also something that we're seeing having an effect here. And then as mentioned, there's also general inflationary cost pressures that are hitting the business. Again, or not again, but at least let me say that it's a business where if you look at the revenues in a quarter, it's small, in certain cases, single-digit million EUR amounts we're talking about here. So, it doesn't take, say, a lot of million Euros to sit and then start to interpret quite a lot on what's going on.

Hans Martin Smith

executive
#108

Still, at least within the high levels, bonus, time and materials, and inflationary cost pressures — those are the effects we're dealing with at present, and they're what's pushing us toward the full-year margin we're now looking at. And once more, let me stress that although this is weighing on the margin here, and naturally, as you're pointing out as well, it's something showing up in Q3 and notably in Q4 too, we don't expect that to carry into next year in the way it's going to be operating.

Daniel Vårdal Haugland

analyst
#109

Alright, thanks.

Operator

operator
#110

Klaus Kehl from Nykredit has our next question. Go right ahead.

Klaus Kehl

analyst
#111

Yes, hi there. Klaus Kehl here, calling from Nykredit. I've got a question about this EU Wind Power Plan. My question is this: if we step back and look at the really big picture, I suppose the politicians are saying all the correct things. But talking alone doesn't make anything better if that's all they do. Serious action is what's needed from them. So, are you seeing any concrete steps actually being taken and put into practice across Europe at the moment? Or, yeah, and could that change things in 2024, or are they simply — or do they just keep talking, for whatever reason? That's what I wanted to ask.

Henrik Andersen

executive
#112

It's a tricky one to answer, Klaus, but let me try like this. In my view, most of the EU 27 nations are transforming quickly. Of course, we're transforming too — for example, permitting and other local rules in a country that was decentralized and handed down to municipalities and so on more than probably a decade or 2 decades back. So local legislation is changing, though naturally the framework and the directive come from the EU. If I may add, since I know you're Danish, I'd say the only country that still halts more than it expands is probably Denmark itself, but I assume Danish voters will settle that course in the future. Honestly, the EU 27, with the possible exception of Denmark, is doing quite well.

Klaus Kehl

analyst
#113

All right. On that note, can you discuss what shifts you're observing in Germany? Since I'd say, yeah, that's a pretty significant market, and they're sort of lagging behind.

Henrik Andersen

executive
#114

They're taking the right steps, and the pace is something none of us had seen before in Germany. That likely ties back to the point you raised: when there's genuine need and demand for electricity, you have a real underlying driver, which is exactly what we're seeing happen there. So we welcome all of it in Germany, and naturally we also welcome the fact that our technology is there and that we have a long track record of delivering our solutions in that market. All in all, positive for Vestas.

Klaus Kehl

analyst
#115

All right, that's excellent. Thanks so much.

Operator

operator
#116

The following question is from Sebastian Growe at BNP Paribas. You have the floor.

Sebastian Growe

analyst
#117

Alright, I have two questions of my own. Thanks, and good morning, everyone. My first is a follow-up regarding the warranty provision question, and I’ll tie it to the offshore profitability that could materialize over time. You referenced the expected return to a 3% warranty quote after sales, and I’d be interested in more detail from you on the split between onshore and offshore, moving toward the nine-month level of 5%. And related to that, how much of the 200 basis points reduction you foresee here comes from a higher top line over time versus lower absolute spend? That’s my first question. My second question goes back to the onshore outlook, particularly for the U.S. Henrik, you said that you are beginning planning for additional manufacturing in the U.S. Obviously, we’ve seen a very, very broad range in volume between roughly 2 GW of deliveries last year, as opposed to a peak of more than six in 2020. So if you could just walk us through the direction of travel over the next years and what you’re seeing, and again, referring to your earlier comment, that would be much appreciated.

Sebastian Growe

analyst
#118

Thanks.

Hans Martin Smith

executive
#119

Okay, so first off, regarding the warranty topics: you really can’t assume that warranty provision levels are, let’s say, something that in and of itself creates a gearing effect, which is what you seem to be hinting at. What the warranty provisions reflect is the cost we believe will be required, for example, to meet those warranty commitments we’ve already made. So if you look at a business that’s growing, you’d also expect that simply because volume is increasing, your warranty level in absolute terms is going to rise. But you can’t automatically conclude that the percentage will therefore come back down, the way you see with fixed costs, for instance, since warranty provisions ultimately depend on how much is being installed. There may be some element of being smarter about certain things when you have a lot of volume and, say, a large network to carry that out. But at least I wouldn’t say you can make that gearing assumption when it comes to how the warranty provision process works. Then, on the offshore/onshore split, for a range of reasons, that isn’t something we have disclosed. And it isn’t something we plan to do either.

Hans Martin Smith

executive
#120

So from where I sit, I suppose those are the remarks I'd offer regarding the first portion of what you asked.

Sebastian Growe

analyst
#121

If I could just jump in briefly with a follow-up. Clearly, the context for this question ties to the warranty case. What we've observed is that the industry's experience has been almost entirely onshore, and now you're obviously making a revolutionary move with the V236, or the earlier turbine model. So at least intuitively, it isn't easy to follow that no issues should arise going forward, and that was the context, particularly for asking then about the offshore portion as it relates to the warranty.

Henrik Andersen

executive
#122

Right, and of course that's where we understand you're essentially trying to separate the onshore and offshore pieces. The big shift there, of course, is that repair and upgrade work happens in an environment different from land. Because many of the components are also items you're testing. But of course, certain things carry a different dimension. So, we appreciate that. We're not new to environments different from land, because many of the components are also items you're testing. But of course, certain things carry a different dimension. So, we appreciate that, we're not new to the onshore versus offshore split. But again, they're also pointing out, just for the sake of it, we have, just on the service side, 151 GW in total, and 142 GW is onshore. So we're fully aware that we're setting out on a different journey, offshore included as well, but don't see that as a change to the long-term warranty provision.

Sebastian Growe

analyst
#123

Okay, so let's turn to the U.S. next.

Henrik Andersen

executive
#124

Yeah. And if I’m tempted to put it plainly, the trajectory is upward. That’s simple to claim since we began at a low level. You know, we operated a single shift and cut back the days of work at the factory. So there’s a leverage effect here for Vestas too. Because, naturally, factories can deliver far more once they begin running shifts and reach full capacity. So that’s the first step, and then for our next step in the U.S., I think we’ll discuss it further when we get a few quarters down the road. Regarding your 2 to 6 GW, it may be relevant, though it’s also not relevant when you compare that different rules apply now versus in the past, where there is a clear upside to having a manufacturing base inside the U.S.

Sebastian Growe

analyst
#125

Got it. But just considering what you actually made here in the U.S., would it be fair to say most of the historical six came from the U.S.? And then how fast could you return to those old established levels, or the peaks from before?

Henrik Andersen

executive
#126

That's a really good question, though I'll hold off on giving an answer to it. The U.S., in my view, is a competitive market. We're building it out, and I think that particular one stays within the bilateral conversations we have with our customers regarding capacity planning and order intake.

Sebastian Growe

analyst
#127

That's reasonable. Thanks.

Henrik Andersen

executive
#128

With that, could we take the final question from the Q&A?

Operator

operator
#129

Alright. Today’s final question comes from Nabil Najeeb at Deutsche Bank. Go ahead, please.

Nabil Najeeb

analyst
#130

Hello there, and thanks for fitting me in. I was wondering whether you could offer any detail regarding the timing for when you anticipate booking that conditional order in the U.S. My understanding is that it was an onshore order you announced in August, valued at roughly 1 gigawatt.

Henrik Andersen

executive
#131

Nabil, that’s the reason it remains conditional. Once it becomes unconditional, we’ll provide an update and return with that. But I can assure you that all eyes are focused on that one and on how to move it forward. So the customer and we are working to turn it into a firm order intake.

Nabil Najeeb

analyst
#132

That's reasonable. Thanks.

Henrik Andersen

executive
#133

That's all from me—thank you very much. I appreciate your backing and the time you've given today, and I'll be seeing a good number of you in the next few days. Once more, thank you, and talk to you before long.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vestas Wind Systems A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Vestas Wind Systems A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Vestas Wind Systems A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.