Viavi Solutions Inc. (VIAV) Earnings Call Transcript & Summary

February 1, 2024

NASDAQ US Information Technology Communications Equipment earnings 39 min

Earnings Call Speaker Segments

Ilan Daskal

executive
#1

Thanks, operator. Hi everyone, and good afternoon. This is Viavi Solutions' Second Quarter Fiscal Year 2024 Earnings Call. I'm Ilan Daskal, Viavi Solutions' CFO. With me today is our President and CEO, Oleg Khaykin. I'd like to note that during this call we'll be making forward-looking statements about the company's financial performance; these statements involve risks and uncertainties, and actual results could differ materially from what we currently expect and estimate; please review our latest annual report and SEC filings, particularly the risk factors described in those documents. The forward-looking statements, including the guidance we provide on this call, speak only as of today. Viavi isn't promising to refresh any of these forward-looking remarks. And keep in mind, unless noted otherwise, everything we cover here besides revenue is measured on a non-GAAP basis. You can find a bridge from those non-GAAP figures back to our preliminary GAAP numbers, along with a look at why we find them helpful and where they fall short, inside the earnings release issued today. That release, plus our supplementary earnings slides containing historical financial tables, can be accessed through Viavi's investor site, www.investor.viavisolutions.com. One more housekeeping item: this call is being taped, and a replay should be posted to our site by 4:30 p.m. Pacific Time tonight. With that out of the way, let's walk through how we performed in the second quarter of fiscal year 2024. For the quarter, net revenue came in at $254.5 million. That topped the midpoint of the $240 million to $260 million range we had guided to. Compared with the previous quarter, revenue rose 2.7%, while versus the same period a year earlier it fell 10.5%. Our operating margin in the second fiscal quarter landed at 13.2%, beating the top of the 9.6% to 12.8% guidance range. That figure was 80 basis points better than the prior quarter, but 300 basis points lower than a year ago. EPS reached $0.11, above the $0.06 to $0.10 guidance ceiling, an improvement of $0.02 quarter over quarter and a decline of $0.03 year over year. Now let's turn to how each business segment performed in Q2. For the second quarter of our fiscal year, NSE brought in $179.6 million in revenue, landing above the midpoint of the $169 million to $185 million range we had guided to. Compared with the same quarter a year ago, revenue fell 13.3%, driven mainly by NEMs spending less on CapEx along with softer spending from service providers. NE revenue during the quarter totaled $155.5 million, a decline of 15.2% year over year. SE revenue reached $24.1 million, up 1.3% versus the prior-year period. As for NSE gross margin, it came to 63.4% for the quarter, which is 100 basis points below where it stood a year earlier. On NE, gross margin landed at 62.5%. That's 190 basis points below the prior-year period, driven mostly by product mix along with lower volume. For SE, gross margin came to 68.9% — a 460 basis point improvement over last year's same period, helped by a mix tilted toward higher-margin products. NSE's operating margin was 3.6%. Compared with the previous quarter, that's a 270 basis point gain, though measured against last year it fell 530 basis points. The figure finished above the middle of the 0% to 4% guidance range we had provided. Turning to the second fiscal quarter, OSP revenue came in at $74.9 million. That number landed at the top of the $71 million to $75 million range we had guided to, and it was down 3.2% from the equivalent quarter last year. OSP gross margin stood at 52.1%. That's a decline of 20 basis points year over year, mostly because of softer volume and a product mix that worked against us. OSP operating margin was 36.4%. Compared with the previous quarter, that's 140 basis points lower, while versus the same period last year it gained 90 basis points. This operating margin came in above the upper bound of our 32.5% to 34.5% guidance range. Let's move on now to the balance sheet and cash flow. At the close of Q2, our total cash plus short-term investments came to $571.8 million, which is an increase over the $489.7 million we reported at the end of the same quarter a year ago. Operating activities generated $20.4 million in cash flow during this quarter, whereas the comparable period last year brought in $46.2 million. We did not repurchase any of our stock during Q2, as our plan is to pay off what remains of the March 2024 convertible notes, amounting to $96.4 million. For the quarter, fully diluted shares totaled 223.5 million. This represents a decline from 227.1 million shares in the preceding quarter, and it is measured against the 222 million shares we had guided for Q2. During the quarter, capital expenditures came to $5.8 million. That figure is down $12.3 million compared with the prior-year period, when construction on our new Chandler facility was wrapping up. Turning now to guidance: for fiscal Q3 2024, we're projecting revenue in the range of $245 million to $253 million. We expect an operating margin of 10.4%, give or take 160 basis points, and EPS between $0.05 and $0.09. NSE revenue should be about $176 million, plus or minus $3 million, at an operating margin of 1.5%, plus or minus 150 basis points. For OSP, revenue is anticipated at roughly $73 million, plus or minus $1 million, with an operating margin of 31.8%, plus or minus 200 basis points. For Q3, we're looking at roughly $8 million in tax expense, which reflects the mix across jurisdictions. On the other income and expense line, we anticipate a net expense of about $3 million. Share count ought to come in near 224.7 million. I'll now pass things along to Oleg. Oleg?

Oleg Khaykin

executive
#2

Thanks, Ilan, and welcome to your first earnings call with Viavi. Results for the fiscal second quarter of 2024 landed ahead of what we had anticipated. Revenue finished just above the midpoint of our guidance, supported by stronger demand for 400-gig and 800-gig fiber Mil/Aero and SE products. EPS exceeded the top end of our guided range, thanks to a margin-rich mix of revenue and reduced OpEx. Over the near term, we believe stronger demand in those product areas will help counter ongoing softness in service provider spending. Beginning with NSE. Second fiscal quarter revenue for NSE came in above the midpoint of the range we guided to. While NSE revenue was down compared with the prior year, due to a pullback in 5G and fiber build-outs among major service providers, there were several positive signs. Fiber lab and production kept recovering, helped by healthy 800-gig demand, which offset weaker results in computing and storage. Aerospace and defense products posted strong growth, fueled by solid demand for avionics and PNT, or positioning, navigation and timing products. The new SE products also continued to do well, producing slight growth relative to last year even with lower service provider spending. Going forward, we anticipate continued recovery and expansion in fiber lab and production, aerospace and defense, and SE products, which should balance the persistent near-term softness in service provider spend. Now moving to OSP. OSP fell compared with last year, mainly because of reduced demand for anti-counterfeiting products. That decline was partly made up for by strong 3D sensing demand. All told, OSP results landed at the upper end of our guidance range. For the March quarter, we look for OSP to dip slightly from the December quarter, as stronger demand for anti-counterfeiting products offsets the normal seasonal slowdown in 3D sensing. Looking ahead to calendar ’24, we expect telecom service provider spending to stay soft, with one key exception: North American cable operators. We anticipate cable spend will increase around the middle or second half of calendar year 2024. Even so, our efforts over the past 6 years to diversify beyond service providers into lab and production and aerospace and defense make it easier to manage through this down part of the telecom cycle. Spending in lab and production is recovering more quickly than at service providers, helped by demand for newer technologies like 800-gig and Open RAN. Recently, Viavi received a $21.7 million grant from NTIA to build an advanced test lab that will enable and speed the development of Open RAN technologies and components. This award highlights Viavi’s technology leadership in 5G, upcoming 6G and ORAN. Demand and growth for our aerospace and defense offerings remain robust, fueled by next-gen avionics along with the requirement to safeguard vital infrastructure and assets from jamming, spoofing, and cyber warfare. In closing, I want to thank my Viavi colleagues for navigating this difficult environment, and I’m grateful to our employees, customers, and shareholders for their backing. With that, I’ll hand it back to the operator for Q&A.

Michael Genovese

analyst
#3

That's all I have. To start, I want to ask about the service provider market just so I'm clear — I want to confirm I understood the remarks correctly; it sounds like your view is that the whole of calendar '24 will be soft in that area, while cable improves late in the year. First, is that accurate? And second, have your expectations shifted over the past 3 months? Has the carrier side, the telecom side, been delayed further? Or did that match what you were saying 3 months ago?

Oleg Khaykin

executive
#4

Well, let me put it this way — honestly, I can't predict how the second half will play out for service providers; we do know demand will be a bit stronger in the June quarter; that's always the case. Past that, my sense is — obviously, things aren't deteriorating, they're improving slightly. Still, I'd rather frame it as flat to modestly improving as the general pattern, since I believe conditions remain quite weak. The key thing is we are observing — it's showing up, yet it isn't as pronounced as I'd hoped. The stronger piece right now is cable. Actually, our expectation was that cable would begin spending and contribute during the first half of the calendar year. However, as you're likely aware, delays occurred because of technology readiness issues in rolling out the DAA architecture among certain vendors. Because of that, the ramp has slipped by 1 or 2 quarters; so we're confident it's on the way. We're already receiving some orders. But the surge we anticipated in the March quarter was deferred. That's the reason we're guiding March quarter flat to slightly down. Without that slowdown, it would have been slightly up. I'd say — to phrase it plainly, I feel far more positive about the conditions we're working in than I did even a quarter or 2 quarters back. I simply don't want to get ahead of our skis regarding a service provider rebound, because once I see it, I'll believe it. I'd add — so I think they still face plenty of balance sheet problems that must be resolved before they genuinely begin spending at a significant level. So treat this as an abundance of caution. Do I feel better about the current situation? Yes. Am I seeing large sums flowing in? No. One more thing — something interesting we noticed is solid traction for our service enablement products tied to the new architecture, AI ops, which help lower OpEx and enable things such as capital avoidance. So in that area, traction is quite good. As for instrumentation, especially around fiber deployment, I'd say there's a pause that could last at least 6 months. Perhaps as we move into the second half of the year, conditions will improve. Yet right now, I'd say — according to what my crystal ball is showing me, nothing dramatic appears to be shifting.

Michael Genovese

analyst
#5

Let's take the next one. That 800G fiber lab in production is quite intriguing. My guess is you've had maybe two or three quarters now with some revenue you can actually measure from it. So my assumption is that number is growing — anything you can share on that front? And I don't know if you'll answer this, but it would really help to know what portion of NE that accounts for today, or what it might account for down the road.

Oleg Khaykin

executive
#6

Sure. Regarding our lab and production business — when it comes to NE, let me think. Looking at it, we've got network enablement, plus the SE. Network enablement sits at roughly 87%. When I look at lab plus production — and wireless is part of this too — that piece is around 40%. Within that, fiber lab along with compute, meaning high-performance computing, accounts for about half, so call it 20%. Then, as storage billing slowed down, we noticed both computing and storage came in softer. That entire segment really hit its low point near the June quarter. What has actually powered the rebound in this business is demand from fiber production and fiber lab. The 400 and 800-gig products are behind that. So at this point, I'd say it has recovered. To start, that area is bouncing back and still expanding. My sense is that the very same companies producing modules for telecom—and more lately, modules for AI data centers—are the ones purchasing this equipment. I've been attempting to figure out, for a given volume of millions of ports, what amount of machinery gets bought. Honestly, we likely don't yet have a real grasp of how that CapEx spending ties back to port counts, since this is all still quite new. That said, the identical machinery employed on the coherent telecom module production line is likewise being used to manufacture data center modules for AI use cases.

Michael Genovese

analyst
#7

Yeah, it seems like moving forward, figuring out that connection is going to be interesting; so I'm eager to hear an update about it. One more question from me. I apologize for using up so much time; but I want to ask Ilan something, specifically, could you just assist me in grasping the — since the revenues for the quarter were quite strong. The earnings were solid. The revenue guidance was solid. I'm still failing to see why the EPS guidance is reduced; so might you clarify that for me?

Ilan Daskal

executive
#8

Certainly. I appreciate the question; so as you're aware, our third fiscal quarter, from a seasonality standpoint, tends to be somewhat slower compared to the second quarter. So if you look at it sequentially, then additionally when you're at the start of the calendar year, there are some added costs tied to employee related matters and that sort of pushes things in terms of the OpEx. But once more, like Oleg said before, the usual seasonality, if you consider it, is sort of — it's sort of accumulating quite well if you think about the remaining part of the year, such as the fourth quarter.

Oleg Khaykin

executive
#9

Right. A significant amount of statutory cost accrual gets recorded during the opening quarter of the calendar year. And regarding OSP, you can see the margin is lower, which stems from 3D sensing's cyclical pattern. During the latter half of the fiscal year, utilization drops considerably, meaning under-absorption increases in that regard. That being said, anti-counterfeiting is recovering, which has compensated for part of it, though not the whole amount. Also, during the prior quarter, 3D sensing performed quite well.

Tim Savageaux

analyst
#10

Oleg, could you go over what your lead times look like for fiber test equipment sold to service providers?

Oleg Khaykin

executive
#11

In most cases, once an order comes in, we can complete it in about 2 months. So it tends to fall inside a single quarter, roughly speaking. There are some exceptions, though — certain items move very fast, like fiber scopes and similar products. For other offerings, say when a customer is purchasing an entire bench setup that includes MEMS, switches, and related components, if we already have those units on hand, we can typically fulfill the order within 2 to 3 months.

Tim Savageaux

analyst
#12

Where do you think your service provider customers' stock levels stand when it comes to your product?

Oleg Khaykin

executive
#13

There aren't any. Basically, everything moves on a just-in-time basis.

Tim Savageaux

analyst
#14

The thing is, the reason I raised that question comes down to this: during the first stretch of the reports we've gotten, from a few of your larger competitors — Corning, Nokia — and from some of the larger service providers too, there have been a few initial signals pointing to project-driven bumps in '24 plans. So I'm simply attempting to square what has been a fairly steady drumbeat on this front with the message coming from your side. And my sense is there may be — usually, you're the one setting the pace on these matters. But I can't say for sure; could it be that you're behind at this stage given the lead times? That's what I'm wondering.

Oleg Khaykin

executive
#15

No. That's not how I see it. I think…

Tim Savageaux

analyst
#16

Are you noticing similar patterns?

Oleg Khaykin

executive
#17

I wouldn't say we're behind. After they make the call — so at the point they inform those folks that a project is happening, that heads-up might reach them ahead of reaching us. Since the moment they're set to begin construction, they simply submit a request, and inside 2 months, the gear arrives. That's quite fast.

Alex Henderson

analyst
#18

Alex, could you provide a bit more detail regarding how large 3D sensing was during the quarter, and what you expect for 3D sensing in the March quarter?

Oleg Khaykin

executive
#19

Well, Alex, generally speaking, with 3D sensing, half of the yearly demand arrives during the September and December quarter — sorry, 2/3 arrives during the September and December quarter, while 1/3 arrives during the March and June quarter. So I would say we're at roughly $20 million to $25 million for the quarter.

Alex Henderson

analyst
#20

So for the next quarter, are you anticipating something like $10 million or thereabouts?

Oleg Khaykin

executive
#21

You mean the current quarter?

Alex Henderson

analyst
#22

As far as the quarter ending in March goes.

Oleg Khaykin

executive
#23

Possibly slightly above $10 million, I'd say, though let me check. Just a moment. Right, it comes to — roughly — $10 million, give or take $1.5 million.

Alex Henderson

analyst
#24

Could you also bring us up to speed regarding the Phoenix facility? At this point it's running at full capacity, and every one of the cost-reduction advantages tied to how the counterfeiting operation works is being realized — is that right?

Oleg Khaykin

executive
#25

That's right. So the situation we're observing right now — that's the point when, you know, inventories across the board are getting exhausted. As a result, you begin to notice plenty of spot orders that weren't forecasted showing up, along the lines of rush this out the door as fast as possible. So these kinds of occurrences are appearing more and more frequently. The orders aren't large; even so, it signals to us that stock in the channel is beginning to run down. Consequently, for the March quarter, we anticipate demand that's somewhat stronger than what we believed roughly 3 months back. That, in turn, is actually assisting us in counterbalancing part of the quarter-over-quarter drop in 3D sensing.

Ilan Daskal

executive
#26

Broadly speaking, it's up and running at this point. And there's still room on that front for us to grow further. So when you look at utilization being maxed out, we aren't at that point yet as far as what we're able to make available.

Alex Henderson

analyst
#27

We're up and running completely — though not at our maximum output. Yes, absolutely.

Oleg Khaykin

executive
#28

Alex, I should set the record straight on something. The figure for 3D sensing this quarter will actually land nearer $16 million — that's one-six — I had year-end in mind when I said that.

Alex Henderson

analyst
#29

Let's return to the 800-gig split, just so we're all clear. The port-to-equipment ratio is pretty low, correct? I'm saying we're discussing a double-digit port-per — that kind of ratio. My assumption is this mostly goes to the production side. It isn't headed into field deployment; and you're discussing how many products can pass through a test and measurement process during any given period, but that's a sampling process. Therefore, the ratio is extremely high compared with the total number of ports that pass through that equipment, correct?

Oleg Khaykin

executive
#30

Well, it varies, correct? When you begin production, you tend to run many more tests. So you get a lower number of ports per, let's say, $1 million of equipment. When you move along with the experience curve, you begin — and once you feel comfortable, you begin de-contenting the test, so you spend less time on a tester. So yes, the equipment mostly goes onto the production lines. You have all these factories in China and other places that are building these modules; so when they begin, they generally use more intensive testing. And afterward, as they grow more comfortable, they begin reducing and performing more of a sample testing or less extensive testing per module. So that's why it's continuously moving targets. In one case, we've kind of did one project, and we have gauged — and it came out about $0.40 per module of CapEx — per module of capacity; so if you're doing a port, you need about $0.40 investment per port on the capacity line. So you build a, let's say, 1.5 million units a week line, so you probably — I think it works out to about $0.40, so about $300,000 for that capacity that you got to invest. But it's only one data point and other people do it differently, so they spend more. So it's still very early to tell.

Alex Henderson

analyst
#31

Yes. So we have already witnessed a pretty big ramp-up in output for both NVLink and InfiniBand products heading into the AI clusters. And 2, based on what I can see, you really haven't gotten any real contribution from that so far. So should we think that as we enter the second and third phase of production ramping, the sampling rates actually rise? And so, instead of the sampling percentage, we ought to be treating the growth rate in AI as the main driver of the overall demand curve?

Oleg Khaykin

executive
#32

Well, I wouldn't put it that way, because keep in mind when — the very first step they took was to redeploy the same lines that had been building the telecom coherent business that fell off quite a bit. They moved those assets over to the AI data centers. And when you consider it too, if you're only doing alignment on something like, let's say, InfiniBand, you're placing a photonic integrated circuit, aligning it with the processor, which is really more about semiconductor packaging. When you're actually constructing the actual module with lasers and everything else, that's the point where you tend to use more of our optical test equipment.

Alex Henderson

analyst
#33

Let me return to the telecom topic briefly. Clearly, there's a huge surplus of telecom gear sitting around that still needs to be worked through. Has any of that stockpiling occurred in the areas you serve? Or did that simply not take place since those kinds of products weren't as restricted?

Oleg Khaykin

executive
#34

We don't have any inventory sitting in the channel. Basically, orders pretty much stopped, I'd say, in the December quarter of calendar 2022. If anything, much of the equipment out in the field is growing outdated. We're aware there's considerable wear and tear, and a replacement cycle is going to be needed. In fact, we're already witnessing indications of customers asking, hey, I'm going to need to swap things out — what would the terms look like, what would the lead times be. So from that angle, people are going to sweat the assets. They'll swap the assets. They'll cannibalize. And eventually they'll be forced into a wholesale replacement; so when I mention roughly flattish 2024 or something like the — I simply believe — I simply don't believe — I'm certain they need to do it. I'm just not sure they can manage a massive replacement. But there is — there could be a solid possibility that during the second half, we'll observe more and more of these situations emerging. However, I lack that kind of visibility past 6 months.

Meta Marshall

analyst
#35

Oleg, you said you felt somewhat more upbeat regarding cable spending earlier in the year. I just want to understand, is that DOCSIS 4.0? Is it simply that their networks are running hotter, based on a few of the remarks you just made to Alex? What exactly is driving that investment? And on the other side, since you seem to believe wireless might take a bit more time, what do you think ought to be the initial indicators for wireless, or I mean ?

Oleg Khaykin

executive
#36

So if I look at — so cable first, right. I think the — we know it's going to be happening. It actually was — we were expecting some orders to begin appearing in the March quarter and then pick up into June. Based on what we've heard, and I won't name any names, but some of the core technology development by leading infrastructure providers has been delayed. So I think that is being pushed out by 1 to 2 quarters in terms of getting the software ready and everything needs to be working; so I think that's where we are with cable; but I do see actually cable happening this year. On the — so what was your second part of your question?

Meta Marshall

analyst
#37

Regarding the wireless segment.

Oleg Khaykin

executive
#38

Wireless, indeed. As for wireless, well, everyone is aware — you've observed what Ericsson, Nokia, Samsung are doing, along with all the rollouts involving T-Mobile, Verizon and AT&T. So things have decelerated there. The place where we're noticing a reduction is in what you might call field equipment, plus many of the folks — the sales tied to deployment. What we still observe is CapEx going toward product development; therefore, we haven't witnessed any major drop in R&D CapEx for 5G. And at this point, certain pieces of 6G are beginning to appear. It's simply that — broadly speaking, I'd characterize wireless infrastructure as somewhat less aggressive, shall we say, across Europe and North America. Having said that, India is performing quite strongly; though obviously — I'd certainly prefer improved margins in India. Still, I believe plainly, demand is — at present, India stands among the rare bright spots when it comes to infrastructure deployment.

Ruben Roy

analyst
#39

Oleg, I had a few quick follow-up questions. I believe you've already touched on some of this while answering the earlier questions. When it comes to service providers, though, it sounded like you were describing ongoing discussions, correct? Last quarter, as I recall, you mentioned seeing no decommits at all. My guess is that situation hasn't changed. That said — a number of service providers are still working out their budgets for this year. Does that give you a bit of — I wouldn't say optimism, but perhaps some visibility, enough to believe you can still reach what ought to be a typical seasonal pattern, with June rising and then September dipping somewhat as it normally does? Is that what's behind it? Or is there anything more you can share about those discussions?

Oleg Khaykin

executive
#40

So this year, I suppose — I don't want to get too far ahead of myself. Actually, though, September could end up stronger than usual this year, since cable work may be shifting into September as it slips, right? That said, broadly speaking, what we observe among service providers is a really solid churn-related business. Equipment fails, replacements are needed, that sort of thing. What typically adds — let me put it this way, roughly another 20%, which is quite meaningful, is any time they undertake build-outs or network upgrades; and at present, what I'm not witnessing — at least for now, on the churn side, orders arrive and get shipped without any issue; so the routine business is holding up well. Customers are keeping their networks maintained; they're simply keeping operations going. What I have yet to see is anyone making large step-function moves, whether expanding capacity, upgrading networks, or extending them. Some of these projects are somewhat more — I mean, we're aware they're in the planning stages, I know such plans exist. I simply can't say when they'll choose to pull the ripcord and get started. And just — considering the broader telecom sector environment, I believe they'd rather — each quarter they hold off, they accumulate more cash and pay down more debt. So I think one — if I were viewing this purely through a competitive lens, once cable operators begin upgrading their networks, I suspect certain service providers will feel a need to return to extending their own networks. So I think — I just — I don't want to sound like a kill joy, but I simply don't detect a cash-burning hole in service providers' pockets that would force them to start digging and laying new fiber or kick off deployment aggressively. One segment where we're actually seeing pretty solid traction — though the scale is far tinier, roughly ten times smaller — is those Tier 2 and Tier 3 fiber operators, mostly backed by private equity, who are stringing fiber because they expect data centers to arrive in the region, or because service providers are pushing 5G networks out there, or because they at last require fiber to stretch their network out to certain rural communities. So that's a single component that continues. Yet the volume involved is about ten times less than what a company such as AT&T, Verizon, British Telecom or Deutsche Telekom would lay out over the course of a year.

Ruben Roy

analyst
#41

Then, as a fast follow-up for Ilan: perhaps I overlooked this during the balance sheet portion. At this point, are you where you ought to be regarding leverage? Also, do you anticipate returning to the markets for repurchases soon? That may have slipped past me.

Ilan Daskal

executive
#42

Yeah. So for the coming quarter or 2, our focus will likely be more on, clearly, retiring the convert. Meanwhile, the broader buyback remains a component of how we allocate capital, correct? What I mean is we aren't moving away from the strategy as a whole. Yet when it comes to buybacks over the next 1 to 2 quarters, we'll take a more restrained approach.

Oleg Khaykin

executive
#43

We've simply made the choice to put aside some funds, which lets us pay off the entire convert. In a sense, that amounts to a synthetic share buyback, since you're preventing future dilution.

Ilan Daskal

executive
#44

That's all we have. Appreciate it, operator. That wraps up the earnings call for today. And thanks to all of you for being on the call today.

Operator

operator
#45

This concludes today's conference call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Viavi Solutions Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Viavi Solutions Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Viavi Solutions Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.