Vikran Engineering Limited (VIKRAN) Earnings Call Transcript & Summary

November 6, 2026

National Stock Exchange of India IN Industrials Construction and Engineering earnings 50 min

Earnings Call Speaker Segments

Rakesh Markhedkar

executive
#1

Thanks so much. Morning to all; speaking for Vikran Engineering Limited, I'd like to welcome each participant warmly to our Q2 and H1 FY '27 earnings conference call. We're grateful for the ongoing trust and backing of our investors, analysts and other stakeholders. Joining us today are Mr. Nakul Markhedkar, our Whole-Time Director; Mr. Vipul Markhedkar, and Mr. Ashish Bahety, our CFO, together with our investor relations advisor from Adfactors PR. I trust you've had a chance to go through our financial results and investors presentation, which are up on the stock exchanges and our company websites; financially speaking, our standalone business delivered healthy growth through the first half of the financial year. For the period, our standalone revenue from operations rose roughly 27% year over year, reaching INR 424.12 crore, up from INR 335.45 crore in H1 FY '26. Profit after tax likewise climbed by about 71%, coming in at INR 25.37 crore. These figures show how far we've come in growing the business. We know operating margin is still something we need to work on, but we're committed to sharpening execution efficiency and achieving sustainable growth going forward. In the course of the period, we secured two major orders from POWERGRID Corporation of India Limited. The first, worth roughly INR 120.69 crore, covers a 400 kV GIS substation package from POWERGRID, spanning the Baroda and Rajkot substation. We additionally secured roughly INR 153.76 crore from POWERGRID tied to the 400 kV AIS substation package SS136T, under TBCB at the Tumkur II pooling substation. That scope covers substation activity plus the civil portion linked to STATCOM installation. It marks our first STATCOM undertaking, and we view it as highly significant for the country. We also hit a key execution milestone by commissioning the 132 kV Miao-Namsai transmission line in Arunachal Pradesh on behalf of POWERGRID Corporation of India Limited. This stands as a very prestigious initiative of the Government of India, and once it wrapped up, we were able to deliver electricity to a deeply remote part of India in Arunachal Pradesh. This work covers roughly 40.6 kilometers of transmission line along with 138 tower foundations. Beyond that, we're really happy to share that we've commissioned one more significant GIS — a 400 kV GIS substation built for POWERGRID at Malerkotla. That one also came in about 2 months ahead of schedule, and it's India's first facility of this type. The substation was commissioned using their process bus system. So Vikran has become the first company to carry out such a project in India for POWERGRID and the process bus system; when it comes to solar EPC, our NOPL project spans 152 locations throughout Maharashtra, with a plant capacity of 969 megawatt AC, equivalent to 1,163 megawatt peak. The EPC contract held by Vikran for this project carries a value of roughly INR 3,517 crore. A short while back, NOPL finalized a long-term facility agreement with IREDA to fund up to INR 2,941.19 crore, against a projected project cost of about INR 4,201 crore. Such steps represent important milestones across our operations. Our focus stays on expanding the project portfolio while maintaining discipline in execution and prudence in financial matters. I'll now hand over to Mr. Nakul Markhedkar, our whole-time director, who will share further insight on project execution and our business priorities. Thank you very much.

Nakul Markhedkar

executive
#2

Thanks a lot, sir. Good morning to everyone who's joined the call, and Shubh Dhanteras to all of you. I'll go over a few points regarding our execution, where we stand operationally, and our priorities, especially for the transmission and solar EPC business. In power transmission and distribution, the orders we recently won from POWERGRID Corporation of India reinforce our position in high-voltage substation infrastructure. What we concentrate on is solid project planning, procurement, and coordinating site activities so that execution happens on time and meets the contractual requirement, something we've shown repeatedly that we do well. We also hit a very significant milestone, which CMD sir mentioned, with the commissioning of several transmission lines in Arunachal. That project meant working in really difficult terrain, with roughly 40 kilometers of transmission line and 138 tower foundations across hilly ground and dense forest areas of Arunachal; this — yes, sorry, its success — the fact that it was commissioned successfully shows our capability to deliver transmission projects under the hardest geographical conditions. Turning to solar EPC, the NOPL project is a major — is a major undertaking spanning 152 locations throughout Maharashtra, with a planned capacity of 969 megawatt, AC, equivalent to about 1.16 gigawatt peak. Because of its size and how distributed it is, we plan execution across 8 clusters, which lets work move forward at different locations in a phased, coordinated way. It also lets us deploy our resources in a phased manner. Right now, the company can commission close to 10% of the required capacity even before the first disbursement from the lender has begun. So we've commissioned about 18 sites with close to 90 megawatt of capacity so far, and we're at advanced stages for another 100 megawatt, which should be completed over the next month, the next couple of months. Revenue from the solar projects has already begun and should exceed roughly INR 50 crores in revenue during the second half of this fiscal year. At peak capacity, power sales from this facility would go beyond INR 500 crores. On the financial — on the financing side, NOPL has signed a long-term agreement with IREDA to finance INR 2,941 crores against an estimated project cost of INR 4,200 crores. The interest rate on the loan is 9.15%. Disbursement of the sanctioned loan will track the progress of project execution. Since the project is split into eight clusters, work is happening across different clusters and phases, and loan funds will be there to meet execution needs as the project moves into later stages. This phased approach — the availability of financing lines up with the project's execution schedule and funding requirements. We're focused on keeping close coordination among financing, procurement, and on-ground execution so that project progress is planned and efficient — planned in an efficient way. In every vertical we operate in, we keep on-time delivery as a priority, along with upholding quality standards, using resources efficiently, and tracking project milestones closely. We stay mindful of how much working capital large EPC projects demand and of how important it is to keep financial discipline as we scale up operations. As we progress through the second half of FY '27, we will focus on carrying out the projects we already have, building up our operational capabilities, and making sure growth is backed by disciplined project management. With that said, I will now turn things over to our Chief Financial Officer, Mr. Ashish Bahety, who will walk you through how we performed financially in Q2 and H1 FY '27. Thank you.

Ashish Bahety

executive
#3

Thank you, Nakul Ji, and good morning to everyone. We've come together today on the auspicious occasion of Dhanteras. This marks day one of our Diwali celebrations, so Happy Dhanteras to all our investors and stakeholders. I trust you've had a chance to go through our financial results for the second quarter and the first half of the fiscal year. I'll start with our standalone financial performance, then move on to the consolidated numbers, and finish with a short update on cash flows. On standalone financial performance for the quarter, for Q2 FY '27, revenue from operations came in at INR 220 crores against INR 76 crores in the same quarter a year ago, which works out to a growth of approximately 25%. EBITDA for the quarter was INR 20.12 crore versus INR 25.43 crore in Q2 FY '26. EBITDA margin came in at 9.1% against 14.4% in the corresponding period last year. Profit after tax for the quarter is INR 7.87 crores against INR 9.12 crores in Q2 FY '26. PAT margin stands at 3.6% against 5.2% in the same quarter last year. Turning to the first half of the fiscal year, revenue from operations rose to INR 424 crore, against INR 335.45 crore in H1 FY '26, which represents a good growth of 26%. EBITDA for H1 FY '27 was INR 48.13 crore against INR 48.09 in the prior year. EBITDA margin stood at 11.3% against 14.3%. Profit after tax for the first half rose to 24 — INR 25.38 crore against INR 14.78 crore in H1 FY '26, which represents a growth of approximately 72%. PAT margin has improved as well, to 6% against 4.4% in the corresponding period last year. Overall, our standalone performance reflects healthy revenue growth in both the quarters and the first half, while EBITDA remains broadly stable in H1, and EBITDA margin was lower than last year; however, PAT and PAT margin showed improvement during the first half; on consolidated financial performance, our revenue for Q2 FY '27 was INR 211.84 crore against INR 176 crore, again, again giving a growth of about 20%, which reflects non-NOPL projects; consolidated EBITDA for the quarter was about INR 22.26 crore against INR 25.43 crore in the same quarter last year. EBITDA margin stood at 10.5% against 14.4% in Q2 FY '26. Consolidated profit and profit after tax for the quarter was INR 2.75 crore against INR 9.12 crore in the corresponding period last year. PAT margin was low at 1.3% against 5.2% in the last quarter. The main reason behind the reduction in PAT margin and EBITDA margin was higher direct cost, which is attributable to the escalation of these direct costs. Though these costs can be passed through to the client, because there is a price variation clause that lets us pass the escalation on to the client. But under our conservative accounting approach, the company booked that cost right away. The revenue from price variation, though, can only be recognized once the client certifies it. So we expect that certification to come in H2, and that is when this revenue will show up. Quarter to quarter it might be slightly above or below, but for the full financial year we are confident of holding our margins. For H1 FY '27, consolidated revenue from operations was INR 353 crore, against INR 335 crore in H1 '26, a growth of roughly 5%. Consolidated EBITDA for the first half came in at INR 33.53 crore, versus INR 48 crore in H1 '26, with EBITDA margin at 9.5%, compared with 14.3% in the same period last year. Consolidated profit after tax for the first half stood at INR 6.74 crore, against INR 14.78 crore in the first half of FY '26. PAT margin was 1.9%, compared to 4.4%. On cash flow and financial discipline, our standalone statements show net cash generated from operating activity of INR 258 crore during H1 FY '27, versus net cash used in operating activity of INR 166 crore in the first half of last year. That marks a meaningful improvement in operating cash flow generation in the first half. We keep a close watch on receivables, contract assets, project expenditure and collections as part of managing our working capital. For an EPC company, striking the right balance among project execution, working capital needs and cash flow is very important to us. Our emphasis stays on billing and certification on time, along with efficient collection and disciplined control of project-related spending. In closing, the standalone results show healthy revenue growth and better PAT for the first half of FY '27. While EBITDA margin is still something we are focused on, we keep working to strengthen operating efficiencies, improve cash flow management, and make sure our growth is backed by disciplined execution and financial management. Thank you for your time and participation; we are now happy to take any questions you may have.

Prathamesh Sawant

analyst
#4

Wish you a very Happy Diwali, Vikran team, sir. Sir, my first question concerns the clarification you gave about the EBITDA margin. You mentioned that certain price variation clauses would help you. So does that relate to our NOPL project, or does it relate to the EPC portion of the non-NOPL book?

Nakul Markhedkar

executive
#5

That applies to the non-NOPL project, mainly the projects we have in MP and Maharashtra. So roughly INR 13 crores to INR 16 crores of price variation revenue has not been recognized yet.

Prathamesh Sawant

analyst
#6

All right, all right. So that's going to immediately contribute to EBITDA over the next few quarters?

Nakul Markhedkar

executive
#7

Right. Right, right, right.

Prathamesh Sawant

analyst
#8

All right. Good to hear that. Then, sir, on the second point: out of that INR 6,200 crore order book we hold, about 30% comes from T&D. That's mostly substation EPC, correct? And substation work usually carries a double-digit margin — 15, 14 to 15% — when we look at other substation EPC players, they tend to post EBITDA margins of 15% to 16%. So should we expect similar margins for us on these projects?

Nakul Markhedkar

executive
#9

Yes, yes. So our current guidance is that we'll keep EBITDA margins similar, around 15-odd percent, give or take 1% here and there. What we've also noticed recently is that, because of this West Asia crisis, a few items that don't — that generally aren't covered by price variation have gone up significantly owing to the rise in crude oil prices; so I'm hoping that by the time we procure those items, the pricing — the oil levels should come down to a somewhat manageable price. But yes, so the rest, the rest of the impact is more or less covered.

Prathamesh Sawant

analyst
#10

All right, all right. And then last, regarding the commissioning of that NOPL part — we're saying that, you know, 10% of the project has been executed and commissioned. So in the quarters ahead, should we expect roughly INR 50 crores split by 4 — so about INR 12.5 crores in monthly annual or quarterly revenue from power generation sales? Will that be…

Nakul Markhedkar

executive
#11

From these projects? Yes.

Prathamesh Sawant

analyst
#12

All right, so for this quarter, we're going to <<inaudible>>.

Rakesh Markhedkar

executive
#13

Yeah. That's right, that's right.

Prathamesh Sawant

analyst
#14

Looking forward, we can see a run rate of INR 12 crore and rising from that generation over the coming quarters.

Ashish Bahety

executive
#15

Right, right. So for H2 as a whole, we expect somewhere around INR 40 crore to INR 50 crore in revenue from power sales.

Prathamesh Sawant

analyst
#16

All right, INR 40 crore to INR 50 crore, but that will depend on the number — since we've already commissioned 10%, I think we ought to be on track to commission 35% to 40% of the NOPL projects by year end. So the proper revenue recognition really should be well above INR 50 crores, correct?

Nakul Markhedkar

executive
#17

So, Prathamesh Ji, here, look, INR 500 crores — 10% of that is roughly INR 50 crores; that's the annual amount expected from the 10% we've already commissioned. So in the first half, from what we have commissioned, we expect 200 megawatt. In the second half, we should deliver about 25 crores plus, and there will be a few other projects we're commissioning at around 100 megawatt to 150 megawatt in this quarter, which ought to bring in revenue in Q4. So that's where the INR 50 crores guidance for the second half comes from.

Analyst

analyst
#18

I have a question about this — I have a question about this NOPL project. When is this NOPL project expected to be 100% complete, and when will revenue generation begin fully across the whole year?

Nakul Markhedkar

executive
#19

Our expectation is that completion will occur by the end of Q1, or there could be a slight spillover into Q2 of FY '28. But yes, so peak, peak generation will begin from Q2.

Analyst

analyst
#20

All right, and when we look at revenue of INR 500 crore plus after Q2 for a year along with 85% EBITDA, what percentage of PAT would we be able to generate from that?

Nakul Markhedkar

executive
#21

Right. So in this case, okay, if I take out depreciation and those other items, those come later in the accounting. So roughly how much would that be?

Analyst

analyst
#22

INR 100 crores <<inaudible>>.

Nakul Markhedkar

executive
#23

No, that figure is free cash flow; so you can expect INR 100 crores of free cash flow from this project each year. The precise PBT, PAT, and margins—I will pass those along to you by the close of this call.

Analyst

analyst
#24

All right, all right, that's fine. So we can state that, yes, go ahead.

Nakul Markhedkar

executive
#25

Regarding EBITDA, it will come in at roughly 80% — sorry, 85%, 88%; therefore the sole item that ought to be subtracted, taken out of this, is interest cost. So it ought to be significant. Yes. So, wherever — obtain the precise figures, yes, go ahead.

Analyst

analyst
#26

Got it. So is it fair to say that between Q2 FY '28 and Q1 FY '29, a complete year, generation will be at 100% and the standalone financials won't carry any expenses?

Nakul Markhedkar

executive
#27

Correct — those expenses show up in the consolidated figures rather than the standalone.

Analyst

analyst
#28

Right, that will be included in the consolidated figures. And since what's going on at the standalone level is that we're performing well, but this NOPL is causing our consolidated results to drop.

Nakul Markhedkar

executive
#29

No, that with — I apologize, just to clarify, a PAT including depreciation should be roughly INR 70-odd crores, INR 70 crores — INR 75 crores, approximately 12%. So that's just to address the earlier question.

Analyst

analyst
#30

My question relates to revenue — revenue is going up, yet PAT is coming down, sir. Which particular operational improvements are going to drive that margin recovery, in that recovery, across the next 2 quarters?

Nakul Markhedkar

executive
#31

Yes, there are a couple of reasons behind it. As Bahety Ji mentioned earlier, there is a bit of price variation, and revenue recognition that did not take place this quarter, which we expect in the quarters that follow. That is one; and secondly, one of the most important factors was the — or deferment of execution in NOPL. So because we have not received any disbursement, we decided not to raise our exposure in this project; so we only focus on completing, you know, projects where significant work had already been done. Therefore we are not spreading ourselves too thin. Now that we expect the disbursement to happen in — before next week, where all our formalities have already taken place, so now we will start pushing, and, thereby our revenue is going to increase significantly, and we will take care of all the overheads that, you know, have caused a little bit of decline in the EBITDA margins this quarter.

Analyst

analyst
#32

Sir, my next question is this: with Vikran Engineering’s cash position already tight, how will it pay the interest on its IREDA loan, sir?

Nakul Markhedkar

executive
#33

Sorry, what was that? Could you please repeat it—hello, or am I audible? Can you, or could you please repeat the question.

Analyst

analyst
#34

Sir, my question is this: how is Vikran going to pay the interest on its loan when its cash position is already tight?

Ashish Bahety

executive
#35

The way —

Analyst

analyst
#36

All right, I'll take this <<inaudible>> out.

Ashish Bahety

executive
#37

So regarding the IREDA loan, there's a fixed period involved for that. Second, the cash flow coming from solar generation will be enough to cover the interest and, later on, the loan as well. There will also be additional positive cash flow remaining after all of this, once we reach peak power generation, which is expected after one year.

Nakul Markhedkar

executive
#38

Building on what Bahety Ji said, these solar projects are structured so that the whole cash flow, revenue, and cost get modeled properly, and multiple scenarios are run through the numbers. Even the worst-case scenario is sufficient to cover all the loan repayments, interest and principal included. That is in fact how the lenders themselves evaluate the project, and that is how the loan gets sanctioned. So servicing the interest on the loan is not a challenge at all for the project. This is largely a self-sufficient project. Instead, it hands INR 130 crores of free cash flow to the investor, which is Vikran Engineering.

Analyst

analyst
#39

All right, so can the company keep operating cash flow positive over the next several quarters without depending on any big collections from older receivables?

Rakesh Markhedkar

executive
#40

Yes, Bahety?

Ashish Bahety

executive
#41

Yes, so looking ahead as well, now that the NOPL project has begun generating positive cash flows for us, we also anticipate solid operational cash flow from these projects going forward. As you're aware, with solar projects the cycle is shorter than in the power and water business. So in that respect, we expect the receivable cycle to come down further from this point, and that should assist us in bringing our working capital cycle days down.

Analyst

analyst
#42

Let's keep our fingers crossed that Vikran does a lot better in the quarters ahead.

Analyst

analyst
#43

My first question, then, is this: what key activities are scheduled for the NOPL project during the coming six months, and is anything running late or posing difficulties when it comes to procuring the equipment?

Nakul Markhedkar

executive
#44

On that front, we aren't seeing any hold-up in equipment procurement, since the orders have already been placed. We have already reserved all the capacity this project needs, and our planning was done well ahead of time. The one difficulty we're looking at involves the last 10 to 15% of the land — the 10% of the land that we hold which hasn't been identified as yet; even so, we're confident we can sort it out by the time we reach that land. Up to now, the biggest obstacle we faced was disbursement, and with that now resolved, we are optimistic that we should be able to move the project forward.

Ashish Bahety

executive
#45

A plan spanning 6 months.

Nakul Markhedkar

executive
#46

That 6-month plan is quite clear. In fact, our intention is to carry out roughly, what exactly?

Rakesh Markhedkar

executive
#47

Five hundred megawatts and up…

Nakul Markhedkar

executive
#48

14? Right, so they intend to push roughly 500 megawatts with this during this financial year.

Analyst

analyst
#49

All right, sir. So for my next question: now that part of the NOPL operation has begun, has it started producing cash flow? And at what point will it start meaningfully contributing to our financial performance?

Nakul Markhedkar

executive
#50

Well, this year already we saw — pardon me, this first half, or actually the quarter just gone, we saw roughly INR 4 crore to INR 5 crores, INR 4.66 crores of revenue and free cash coming in from the project; and the peak, naturally, will come meaningfully starting from Q2 onward, next year.

Analyst

analyst
#51

All right, sir. And beyond NOPL, is there any plan by the company to develop and operate further renewable energy projects?

Nakul Markhedkar

executive
#52

Yes. So on that, ma'am, we have the — I don't know whether you've been following the company, but we intend to establish an international base in UAE as well. The, the entire rationale behind this is so that we can, we can establish long-term relationships with big investors who will co-invest together with Vikran to develop, large projects in which, at the end of the day, Vikran wants to hold a minority stake in the project and make sure EPC comes to us; we've already identified a few projects internationally which would bring, sizable, revenue as well as margins for the company; and, yes, hopefully we should be in a position to give you good news by the next earning call.

Mahesh Kaushik

analyst
#53

Yes, so my question is this: you've all brought in roughly INR 424 crores of revenue during the first half. To hit the full-year guidance of about INR 2,300 crores, you'd need to deliver INR 1,875 crores in H2 by itself. Are you on track for that?

Nakul Markhedkar

executive
#54

Mahesh Ji, if you could, take a look back at our earlier conversation too — in that one as well we had said that by the close of Q2 we were in fact aiming at roughly INR 500-odd crores of revenue, and the only reason we slipped was NOPL. If you look, in Q2 our target was INR 200 crores to come from non-NOPL projects and INR 100 crores from the NOPL project; and the shortfall we saw was only on the NOPL side. We are, we are fairly confident that we ought to be able to push and bring in revenues from NOPL too. Just to repeat, we are planning to do about INR 900-odd crores, in, we are hoping to do somewhere around INR 850 crore-INR 900 crores in Q3 and, the rest in Q4; now, with the IREDA disbursement just around the corner, we will push our operations to make sure revenues are met; it is without doubt a challenging, task, but we should be, we should be able to do it.

Mahesh Kaushik

analyst
#55

All right. And turning cash positive was another milestone that got announced. So will this company be cash positive by the end of the financial year?

Nakul Markhedkar

executive
#56

We're cash positive already, and we'll stay cash positive for the whole year.

Mahesh Kaushik

analyst
#57

Right. And on the margins, are you going to be able to hold those 14% plus margins across the entire year?

Nakul Markhedkar

executive
#58

Yes.

Mahesh Kaushik

analyst
#59

Even with all the possibility of cost inflation that could exist?

Nakul Markhedkar

executive
#60

Only a very small portion of our business, then, isn't covered by price variation. So that small portion's impact is, is, you know, it can be plus or minus, but the bulk of what we purchase or the bulk of what we sell is pass-through. So, yes, it's covered by price variation and, it truly doesn't affect our bottom lines.

Mahesh Kaushik

analyst
#61

Alright, on the topic of debtor days, during the previous quarter we talked about roughly 296 debtor days being the high point and that it would decline. So I trust we're still headed in that direction?

Ashish Bahety

executive
#62

Yeah, so as you can see at present, the total debtor days have already declined relative to last year. Roughly INR 200 plus crores has been cut from debtors; and beyond that, once NOPL is disbursed, the overall working capital cycle can be expected to get better further from this point.

Mahesh Kaushik

analyst
#63

By the time we reach year-end, do you have any guidance on the amount debtor days will be reduced?

Ashish Bahety

executive
#64

Yes, so for the current year, with the NOPL project along with the solar project, the cycle is small. Compared with last year, we can therefore expect a reduction of at least roughly 40 days to 50 days in our debtor days. And it will get stronger still on the basis of the new projects we are taking on; we are aiming more at this kind of project, where the cash flow sits in our control and we can secure better terms as far as database are concerned.

Mahesh Kaushik

analyst
#65

In Q2, did any money come in from the Jal Jeevan project?

Ashish Bahety

executive
#66

Yes, we got a substantial amount. Somewhere around INR 40-odd crores came in. INR 45 crores was received during Q2, and that will keep going in the years ahead.

Mahesh Kaushik

analyst
#67

In H1? H1? INR 45 crore, H1?

Ashish Bahety

executive
#68

The whole of H1 comes to INR 45. Yes. So yes. That is going to keep going, and we have observed — so we remain in contact with every government authority connected to Jal Jeevan Mission, and they are confident that the flow of funds will keep going and in fact get better. So at this point they have also begun pushing for more to be done in water.

Analyst

analyst
#69

Yeah, I just had 2 to 3 clarification questions regarding the standalone numbers. Within the INR 220 crores of revenue on a standalone basis, how much of it is contributed by NOPL here?

Ashish Bahety

executive
#70

Just this quarter? No, for this quarter, roughly around INR 7 crore was recognized from NOPL. The remainder came mainly from the other projects that aren't NOPL.

Analyst

analyst
#71

Got it. And on the cost side, how much of that comes from NOPL? As you mentioned, you had higher cost but the absorption wasn't there. So what was —

Ashish Bahety

executive
#72

So that was mostly because of non-NOPL projects that carry the escalation clause, and there the price variation has to be, has to wait until the client has, is approving those particular, claims we made for price escalations.

Analyst

analyst
#73

No, no, that piece made sense to me. What I'm really after is a sense of how much of that cost comes through because of the NOPL in the standalone…

Nakul Markhedkar

executive
#74

Right, so to be honest, that number isn't something I have on hand right now, readily available. But if you're able to, give the team your email ID, and I should be able to share all of that interaction with you. Mostly, though, it's the overheads that haven't, you know, brought in any revenue. So it could be somewhere around a few crores, INR 10 crore to INR 15 crores, or possibly lower. I'm not sure; I'd rather not quote numbers without confirmation. So we'll get that done.

Ashish Bahety

executive
#75

For the first half as a whole, you can look at our investor presentation, where we clearly lay out the reconciliation between standalone and consolidated figures and show what the NOPL impact is across the entire H1.

Nakul Markhedkar

executive
#76

Overhead. Yeah, yeah, I noticed that. <<foreign_lang>> anyway, the detailed figures can be shared afterward <<inaudible>>

Analyst

analyst
#77

All right, so moving on, the next question concerns this price variation certificate that we're expecting from the clients. Can we expect those to be received in Q3, or will that slip into Q4?

Nakul Markhedkar

executive
#78

Look, a portion of it will arrive, but the bulk will land in H2. So this is, you know, a cost we have to bear. Interest cost will continue to accrue on it. But yes, so it depends on the progress of work at site. So yes, some will arrive in Q3, and most will arrive in Q4.

Analyst

analyst
#79

Got it, got it. So the finance cost went up due to the pricier raw material we bought during the quarter. Is that what's behind the funding of it?

Ashish Bahety

executive
#80

No — the finance cost is mainly driven by certain NCDs we've issued. That's the effect, since we need to move the whole NOPL project forward, and that's where we're putting in some funds. So as you can see, there's a solid inflow of funds from the investing activity we're carrying out for the NOPL project, and that's how we've managed to reach close to roughly 100 megawatt of site that is nearly finished or fully commissioned. So you could say INR 400 crore — INR 450 crore of assets already sit in this company, and about another 100 megawatt is at an advanced stage.

Analyst

analyst
#81

So moving ahead, should we anticipate a comparable run rate when it comes to interest cost, or is there likely to be a bit of moderation in that figure?

Ashish Bahety

executive
#82

Some interest cost is going to persist at the Vikran level, because the funds we have put into NOPL are going to stay there, and I mean, that is going to carry some interest at Vikran level. That said, we do expect solid cash flow from our subsidiary, and through that we will be in a position to pay back these loans as quickly as we can and bring the interest cost down.

Analyst

analyst
#83

And the final question is really just for clarification. When you mention that the disbursement wasn't coming from NOPL, that makes sense, given how long it takes to secure the funding from the…

Ashish Bahety

executive
#84

Financial project.

Analyst

analyst
#85

Yes, but during that time the work kept moving forward. It's simply that the revenue recognition and the costs weren't booked in the standalone. That's the way we ought to read it.

Ashish Bahety

executive
#86

So the work was continuing. Where EPC work goes, Vikran is carrying out work and commissioning on NOPL projects. And that revenue is being recognized here. So in H1, as you can see, roughly INR 70 crore, and up to now approximately INR 700 crore plus that we've recognized for the EPC work of NOPL.

Analyst

analyst
#87

All right, so when you mentioned there was a bit of a delay in disbursement, and because of that the revenue recognition for the map wasn't happening — what exactly do you mean by that? Like, what, how…

Nakul Markhedkar

executive
#88

So the point is we couldn't push. Yes, so essentially what we're saying is we wanted to do far more, but because of the hold-up in the EBITDA disbursement, we didn't push for panels. To put it very simply, 60% of the cost is solar panels, right? And so we don't send a panel to site for the project to get commissioned; but at the same time, we made sure that the groundwork needed for commissioning or toward completion is going on, right? So the remaining 30% we've invested, we are pushing, and, you know, things should happen. But the 60%-65% panels we didn't send, and therefore revenue recognition didn't happen. I hope that clarified it.

Karan Kubedia

analyst
#89

What I'd like to know is how much interest expense we should expect over the next few quarters. Could you provide some guidance on that? Specifically, what figure in crores should we anticipate for interest cost each quarter?

Nakul Markhedkar

executive
#90

All right, on the interest cost, the borrowing cost, I can share a rough ROI number. We're expecting somewhere around 11%, 11.5%. <<foreign_lang>> Honestly, I… okay…

Rakesh Markhedkar

executive
#91

Interest expense for the quarter.

Nakul Markhedkar

executive
#92

You can work out the quarterly interest cost that way. Yeah, a rough figure for interest cost <<foreign_lang>> — could you pull that up?

Ashish Bahety

executive
#93

Yes, so we can expect a quarterly interest cost of roughly INR 18 cr to INR 20 cr, so for the full year our overall interest cost, which last year was about INR 65 crores, will stay around INR 70 crore to INR 75 crores for the whole of Current FY '27. And if you're asking about NOPL, whatever loan gets disbursed on that basis at 9.15%, the interest cost will be recognized and then capitalized again, because that is work in progress.

Karan Kubedia

analyst
#94

All right, though I'd like to get the full interest cost for each quarter, taken together.

Ashish Bahety

executive
#95

Right, so as far as Vikran is concerned, the interest cost is going to be, just like we talked about, roughly INR 18 crores to INR 20 crores crore each quarter.

Nakul Markhedkar

executive
#96

Sorry, could you tell me the name once more?

N. Bolidiya

analyst
#97

It's N. Bolidiya.

Nakul Markhedkar

executive
#98

All right.

N. Bolidiya

analyst
#99

Could you go over the guidance again, this time on a consolidated basis?

Nakul Markhedkar

executive
#100

Consolidated numbers. To be honest, I'm not certain. Let me give you — all right, I can provide consolidated ones as well. On a consolidated basis, revenue ought to land at roughly INR 750 crores — pardon me, INR 950 crores to INR 1,000 crores; that's for the full year, though on a standalone basis we should overall exceed INR 2,300 crores, and power sale revenue will come in on top of that. So that's it.

N. Bolidiya

analyst
#101

All right. Should the war continue, would you still anticipate a similar margin if it does?

Nakul Markhedkar

executive
#102

Yeah, I don't — as I said, as I mentioned before, only a really tiny, you know, share of what we buy falls outside, you know, the pass-through arrangement we have in place with clients. So yeah, I really don't expect much of a problem. That said, suppose, if there were ever a major, trouble with, say, steel — imagine steel rising perhaps 30%-40%; in that case there's a chance that, you know, outsized, costs could be incurred. Still, I don't expect that to happen anytime soon.

N. Bolidiya

analyst
#103

Alright, so within this order book, what share is tied to price variation clauses? I'd…

Ashish Bahety

executive
#104

Every one of these projects connected to power, and largely those in water, carries that price escalation clause; but aside from solar, where the contract is fixed price, the majority of the remaining projects do include price escalation.

Analyst

analyst
#105

Sir, I've only got one question regarding the capital work in progress. I notice there's roughly INR 740-odd crore sitting in capital work in progress. At what point do you expect that to be capitalized?

Nakul Markhedkar

executive
#106

In H2, we should have it capitalized during H2 itself. So that's — and here's what happens, you see: work continues to get certified, and then a bit of work keeps getting added into the uncertified WIP. So that's — it's not — it won't stay as it is, correct? It'll keep converting, new sales will keep coming, and WIP items will keep getting added. But…

Analyst

analyst
#107

Understood; but this one is going to be capitalized within the next H, correct?

Nakul Markhedkar

executive
#108

Yes. Yes, H2.

Ashish Bahety

executive
#109

Right, so this mostly concerns the NOPL projects we’re handling for them. That sits within NCWIP. As those projects continue to be commissioned, we’ll keep moving them over to fixed assets.

Analyst

analyst
#110

Yes, sir, could you give us an update on the data center plan going forward?

Nakul Markhedkar

executive
#111

Honestly, with data centers, we've looked into a few opportunities, but at hand <<foreign_lang>>, truthfully, we've tried to slow down unless an opportunity arrives at our door that is extremely profitable and very, very urgently needed — those targets and those are the opportunities we are pushing for right now. So anything where the developer is fine with a time delay but wants to save cost, we are currently ignoring those opportunities, or we are politely declining them.

Analyst

analyst
#112

All right. So what's the FY '28 guidance on a consolidated basis? And we're talking about roughly INR 2,000 crore plus. Could we look at something like INR 2,400 to INR 2,500 crores consolidated?

Nakul Markhedkar

executive
#113

Consol, yeah, absolutely, why not?

Analyst

analyst
#114

Are you asking about FY '28?

Nakul Markhedkar

executive
#115

That's right, FY '28 — you can definitely count on that.

Rakesh Markhedkar

executive
#116

All right, thanks to each of you for your question and for making time to be with us today. We value the ongoing interest you show in Vikran Engineering Limited. As we go forward, our focus will stay on disciplined execution, on making our project capability stronger, and on keeping our finances disciplined. We stay dedicated to growing the business sustainably and to producing long-term value for every one of our stakeholders. With that, I want to thank all of you again for being on the call. Wishing each of you a very happy Deepavali and a prosperous new year to you, and to you. Many thanks.

Operator

operator
#117

Much appreciated, sir. Everyone, that brings this conference to a close on behalf of Vikran Engineering Limited. We're grateful you joined us, and you can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vikran Engineering Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Vikran Engineering Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Vikran Engineering Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.