Vinci SA (DG) Earnings Call Transcript & Summary
February 4, 2022
Earnings Call Speaker Segments
Xavier Huillard
executiveGood morning, everyone. Thank you for taking part in this presentation of our 2021 results. I hope you can all hear me. I also hope that you found on our website the presentation of our results, which you'll be able to read through this morning. We're at the l'Archipel building. This is our new HQ in Nanterre. At my side, there are several of my colleagues from Executive Committee, especially Christian Labeyrie, who's seated next to me, plus the main -- the heads of the main business lines that will be able to answer questions you have later. First of all, a few pictures quickly, as is our custom. The first one is just to illustrate the fact that we opened last December the Strasbourg bypass with Jean Castex, the French Prime Minister, who used the opportunity, firstly, to congratulate the environmental excellence of the project but also to give a strong speech about revamping road mobility, emphasizing the fact that roads are essential for the development of France. He even added that roads were no longer to be viewed as the enemy of the environmental transition and shouldn't be seen as something that opposes rail travel. Both these types of mobility go hand in hand, was his point. On the next slide, we see that we took charge a few days ago in January for a 30-year period of the Manaus airport. We'll also be gradually taking charge of regional airports located near Manaus, six further small airports in Brazil. Manaus is the #3 cargo airport in Brazil. Especially most importantly, its infrastructure is completely crucial for the economic and social development of the Amazon region. Our project is to roll out there our environmental action plan, just as we did in Salvador, which, since our arrival in 2018, has become the most sustainable airport in the whole of Brazil. Next slide. We're showing you that we finalized the financing of the B247 federal road in Germany, a PPP 30-year motorway investment, around EUR 500 million. This is a project which is a good illustration of the development of the PPP model in Germany. I'm sure you know we already said this, we're a leader in this business area with 5 PPPs that we've won already. Next, we have a picture of the project designed by VINCI Energies. It's a floating photovoltaic farm on an old quarry that was rehabilitated by Vinci Construction. I'd add that the solar panels are placed on water, which is a plus. It increases the overall energy yield of the facility because this water naturally cools the 44,000 PV panels that, after the building of this, will make it possible to provide electricity for around 6,400 households. Here, we have an illustration of a major project that we won along with our Italian partner under the gigantic Lyon-Turin railway project. Our portion is 23 kilometers of bitumen tunnels, which is 46 kilometers of tunnels all in all, plus around 70 safety branching tunnels. This should be a 5-year project employing around 1,650 people. Lastly, VINCI Immobilier real estate is developing part of the athletes' village on 6.4 hectares of industrial brownfield. It's complex because, first of all, it's designed for the Olympic Games in 2024. 6,000 beds for the athletes, 33,000 square meters of services and workspace. And afterwards, it'll all be converted just after the Olympics to turn it into a new neighborhood, a blended neighborhood, residential plus offices. And during both stages of the process, careful attention will be placed to environmental performance as well as social performance. Furthermore, this is a beautiful illustration of the concept of urban recycling, a great illustration of the zero net artificialization strategy, no soil ceiling that we talked about already at the beginning of the year. Those points made, I'd like to say VINCI is doing well after 2020, which showed our great ability to adapt, great resilience. Now in 2021, we're booking a strong rebound revenue for the full year, going beyond 2019, up around 3%. Our order intake, very good. The order book, looking very good. A clear turnaround in margins as well. Now an important salient point. Free cash flow up. It's a record level, EUR 5.3 billion. This, of course, is due to an uptick in overall revenues, but it's also thanks to a great deal of work to get cash in from billings. VINCI Airports' cash flow went back in the black in the second half of 2021. This is thanks to major -- for its intense efforts made to cut both OpEx and CapEx. Second item, our works business increasing their operating margins. Operating margin levels are record highs, 6.5% at VINCI Energies, and a gain of 40 basis points, reaching 3.7%, at new Vinci Construction versus 2019. Next item. Motorway traffic has recovered very quickly as soon as restrictions were lifted. Henceforth, since around the second half of 2021, its level has reached a higher level than the pre-COVID level. We also benefited this year -- reaped the benefits of continued rollout of our strategy for the environment and in-depth strategy, where we've got all of our employees on board in all of our geographies, and we'll be talking about this in more detail at our next Annual General Meeting. Lastly, at the very end of the year, 31 December -- of the year, 31 December, we've closed on Cobra IS acquisition, which we'll be building a global leader in engineering services relating to energy and also boost our development in concessions for renewable energy. All geographies -- this is Page 12 of my slide show. All geographies are seeing growth versus 2020. The most active geographies are also growing versus 2019. Especially on the left-hand side of the slide, you can see North America growing very significantly, reaching now almost EUR 4 billion in revenue. We've made major progress in that part of the world over the past few years. Now to delve into greater detail in each business line starting with VINCI Autoroutes. After the first 4 months of the year, they were a little bit more difficult, particularly April, as you'll remember, where there were still some lockdowns. So after that period, light vehicle traffic quickly recovered, reaching levels above traffic levels for 2019, that was in the second half, completing the year at minus 5.3% compared to traffic observed in 2019 during the same period. To talk about heavy goods vehicles, heavy vehicles, this was much better. It continued to be above 2019 levels throughout the year, ending the year at plus 3.1%. Interesting to observe, we feel that there's still a great potential for growth. Two phenomena here. First of all, we observed that foreign traffic, especially at the Spanish border, was below the norm for the whole year. So it should recover this year. Furthermore, bus traffic also continued to feel the strong impact of restrictions, and we do believe it should rebound this year. The crisis has yet again confirmed that roadways are the vital network in our country. 9 trips out of 10 are made by road. Our belief is that decarbonizing France and meeting commitments to decarbonize our country broadly, these targets won't be met if -- quickly if we don't quickly decarbonize mobility, generally more precisely decarbonize road transport. That's precisely what we're doing with our low-carbon motorways program. This is what Jean Castex, the Prime Minister, underscored when he inaugurated the Strasbourg bypass on 13 December. VINCI Autoroutes is one of the main project owners in France, and we're very pleased to have reached an agreement and gotten the go-ahead from the State Council last Saturday precisely. It was put in the official journal. It's an addendum, making it possible for us to carry out the western bypass of Montpellier, thereby continuing our missions to -- with an eye to town and country planning. Let's move on to VINCI Airports, Slide 14. VINCI Airports, the first half was depressed. But after the first half, we saw a clear uptick starting from the summertime, ending up with the last quarter that had more than doubled versus the corresponding quarter in 2020. Situation is still quite a mix, varies from geography to geography. In the Americas, they're reaching almost normal levels, going almost -- sometimes beyond traffic booked in 2019 in some countries. Europe is starting to normalize. The United Kingdom will begin improving. Travel restrictions very recently were lifted. You'll remember that U.K. citizens we're only allowed to leave their country for major reasons, and this as a constraint was lifted a few weeks ago with a release of those restrictions. So we're going to see an impact of this now on air traffic in upcoming weeks and months. I already mentioned this. We took charge of the Manaus airport, and we'll be rolling out there the policies that have shown their effectiveness in Salvador in terms of quality of service, productivity, environmental impact and labor impact, social impact. What seems quite clear to us is just as we've observed here regarding our motorways and what we also observe in domestic airport markets when they're in countries such as the U.S. and many Latin American countries that have major domestic airline traffic, people want to travel, people want to fly. And we're going to see the impact of this as soon as any and all restrictions are lifted in the various countries. Now in our engineering business lines, works and services, order intake continues to be very high, almost reaching the level of order intake of 2020. And you'll remember, in 2020, we booked several mega orders, truly exceptional ones such as the HS2 high-speed line in the United Kingdom for VINCI Construction. It was a beautiful, absolutely tremendous year at VINCI Energies. Revenue up -- this is Page 16, Slide 16. Revenue up 10% compared to 2019 and 11% compared to 2020 in spite of delays in supply toward the end of the 2021 period. The supply delays probably delayed some continued job site -- continuation of job sites, and that has carried some of our -- postponed them into 2020. So revenue would have probably grown even more if there hadn't been some of these delays in supply. And you're familiar with these types of delays. VINCI Energies, as I already said, is so magnificent, I'd like to repeat. It's yet again improving its EBIT margin reaching, 6.5% versus 6% in 2019, which is truly remarkable and really demonstrates, of course, the resilience but also the robustness and the potential for growth in their business model, VINCI Energies. Excellent cash flow generation as well, making it possible to improve by EUR 700 million the net debt situation for that activity over an annual period. Lastly, in spite of the pandemic, VINCI Energies continued with its strategy of external growth. During 2020 and 2021, there were no fewer than 50 small- and medium-sized businesses that were acquired, accommodated -- integrated into VINCI Energy, producing additional revenue of around EUR 300 million during 2021. To move on to Slide 17 now, you can see here the new Vinci Construction, after the merger of Eurovia and VINCI Construction, is keeping its promises, it's revenue up 5% versus 2019, reaching EUR 26.3 billion. We're seeing a ramp-up of the major projects won recently. Also a very good deal flow in terms of order intake specifically. And very important, I'd mention kind of orders for small and medium-sized businesses. It's very important because they make up overall resilience, helped obtain overall resilience. There's a good order intake, very good order book but, back to the point, makes it possible for us to be confident in VINCI Construction and look at new projects in a highly selective fashion. Another important point, our EBIT margin is up significantly, 3.7% versus 3.3% in 2019, and it should continue to grow. Lastly, we're seeing excellent cash generation, making it possible to improve by more than EUR 1.1 billion the overall net debt for the annual period. Bottom right of the screen, you can see we've now achieved -- VINCI Construction now has just over half of its revenue outside of France. That had been the case for several years at VINCI Energies. It's now the case at VINCI Construction as well. This is all fully in sync with our strategy which we embarked upon several years ago now. Lastly, to talk about property, real estate development recovered very well after the abrupt shock due to the pandemic. Housing unit reservations, slightly above their level in 2019 specifically for managed residences, which are developing well. VINCI Immobilier is the #1 developer to commit to zero soil ceiling, zero artificialization by 2030, which is 20 years ahead of what's called for in the law called Climate and Resilience. This will make for in-depth, profound transformation of its property development model. The idea will be to prefer using services that have already been built on or sometimes polluted. And also, it will mean recycling -- urban recycling services. And when you have to build on a greenfield, we will make sure we optimize projects so that we limit to the utmost any artificialization of soil during the project. We take into account all 3 components, and that's why we are very much in a position to reach our target of zero net artificialization of soil in property development for the full French scope by 2030. I would like to give the floor now to Christian Labeyrie.
Christian Labeyrie
executiveThank you, Xavier. Good morning, ladies and gentlemen. So I'll go into a little more detail on the figures that Xavier has presented. First of all, revenue, which was up in 2021 on 2020 across all our businesses, because overall, we are up 14%, over EUR 49 billion. And with our VINCI Construction and VINCI Energies, we're even above -- were up 3% on 2019. Over the year, the increase is particularly strong in concessions even in the airports, which -- or whose revenues are very similar to that of 2019. This is not yet the case of VINCI Airport because VINCI Airport is still down, minus 55%, on 2019 due to passenger traffic, which is still quite low. VINCI Energies was up 10% both on 2020 and 2019, and VINCI Construction is up over 13% and has now reached a level above that of the precrisis. At constant scope and FX, revenues are up 13% with scope effects representing EUR 500 million in revenue additional, of which EUR 300 million from VINCI Energies. This reflects about 50 acquisitions, of which 30 completed in 2021 mainly in France and Germany and in the United States. We should also point out the 100% control taken of URBAT Promotion, which is a company in which VINCI Immobilier took a 49% stake a few years ago and which has EUR 150 million in revenue for the full year. Currency impact is low. The depreciation of currencies versus the euro, offset by appreciation in sterling, offset the depreciation of the dollar and some Latin American currencies. Looking now at the breakdown of revenue between France and international business in 2021, moving on to the next slide, we see that this was a similar increase between France and international. But comparing to 2019, we see that France is back to 2019 levels, whereas international business is up, which means that international business in our revenue has increased. It's gone up from 45% in 2019 to 47% in 2021. Of course, this is excluding Cobra. And with Cobra in 2022, over 50% of our revenue will, of course, be generated overseas. Operating income, next slide, up strongly, EUR 4.7 billion. Up EUR 1.9 billion on last year, but we're still below the 2019 level to the tune of approximately EUR 1 billion. VINCI Autoroutes posted results very similar to 2019. And VINCI Airports, as Xavier pointed out, is still showing a loss. But the good news is that in the second half, VINCI Airports came back with a positive result, reflecting the drastic cuts that were implemented after the beginning of the pandemic in March 2020. We're very happy with the results of VINCI Energies and VINCI Construction, whose results are up strongly, EUR 1 billion in revenue for both of these businesses, 50 basis points more margin. Most of the business in the geographies have contributed to this very strong overall performance with the strongest synergies in the sector. VINCI Construction, in its new structure with Eurovia, has a margin of 3.7% versus 3.3% in 2019, and it had not reached this level for many years. This increase reflects cuts and previous losses through the reorganization of the business in oil and gas in 2021 and completion of some difficult projects. The first positive impact of the merger between VINCI Construction and Eurovia, this improves profitability on 2019 with a significant increase in VINCI Construction, whose margin stood at 3%, and for VINCI -- approximately 3%, which was the margin that you've become accustomed to. And as for VINCI Immobilier, although the amount is lower, it still shows a strong increase on last year. But unfortunately, we have not yet gone back to 2020, pre-'21 levels due to increases in the cost of land and technical costs. So looking at the income statement, operating income in Construction, where we had a loss previously, we are now back to positive result this year, even though we have not yet gone back to the very high level of 2019, but it's still an improvement. The financial result here is slightly up on previous years, reflecting variation in the other direction. We've reduced the euro and -- the cost of debt in euro with a coupon of close to 0 for VINCI SA and the amortization of a long-standing debt for Cofiroute. And we're continuing to reduce the cost of debt in euro, and we had to pay more for sterling debt in order to refinance London Gatwick. So the financial result, we have a very strong increase in corporate tax, double that of last level -- last year's level. We have a nonrecurring item of EUR 400 million which is the impact on deferred tax liability of the increase on corporate tax in the U.K. starting 2023. It's not a cash impact, but it does have an impact on our results and -- the EUR 200 million in the bottom line. So overall, EUR 2.6 billion is the net result, double that of last year, which was a low level, a low base. We're not quite back to 2019, and we hope to reach that this year. And if we adjust for U.K. tax, that's 2.5 billion in income generated this year. Next slide is the analysis and debt variation with an increase in debt of EUR 1.3 billion or EUR 18 billion to EUR 19.5 billion. But this takes into account the check we wrote for EUR 4.2 to acquire ICS (sic) [ Cobra IS ]. And this -- we have free cash flow of EUR 5.3 billion, which is a historical -- historic level, historic record, versus EUR 4 billion last year and EUR 4.2 billion in 2019. EBITDA, not back to 2019 but quite close to that, EUR 7.9 billion. Working capital requirement, EUR 1.6 billion, a further improvement. Not quite as good as last year but much better than what we usually have, with a strong contribution from VINCI Energies and VINCI Construction. That's the blue or green shaded part of the chart. CapEx, really kept under control, even down, CapEx, from EUR 2.9 billion to EUR 2.5 billion over 3 years, with a carryover of the investment in airports, but part of this is due to a genuine reduction and impact of acquisitions, namely that of Cobra. Dividends and miscellaneous up to the tune of EUR 2 billion. We have the dividend which was paid in 2021 to the tune of EUR 550 million; share buybacks, which picked up again from October and now stand at EUR 200 billion -- EUR 200 million per year, EUR 600 million over 3 months. So those are the flows for 2021. So what you should keep in mind is the free cash flow, which is really exceptional, EUR 5.3 billion. So if we analyze how we built up this free cash flow, well, you can see the profile of cash flow over the past 3 years, which makes it very difficult to make forecasts. I'm usually very cautious, as you know. When I -- you asked for guidance on free cash flow in November 2021, we're at EUR 3.4 billion, which was slightly up that of 2019, whereas we only had EUR 2 billion in free cash flow in 2020. But we were expecting that December, given the fact that we have a lot of cash inflows from VINCI Construction, I said that we would have EUR 1 billion in December, as was the case in 2019 and not 2020, which was special -- yes, which was 2 years. And what happened in 2021 is exceptional because we generated in December like EUR 2 billion in cash flow to achieve the full level of EUR 5.3 billion. But that was, you will understand, very difficult to forecast. The major part of VINCI Construction's cash flow is achieved in the last -- in the closing months of the year, and the same goes for VINCI Energies. So we always prefer to be prudent in our forecasts when we give guidance on the free cash flow. Next chart shows that we have moved above a threshold here, looking back over the past 10 years. We had EUR 2 billion, EUR 2.5 billion of free cash flow per year, and now we've moved to EUR 3 billion to EUR 3.5 billion. And over the past 3 years, we've gone above GBP 4 billion, and now we're over GBP 5 billion. But what I would say is that we should not extrapolate that level for the next year. That would not be reasonable given the impact of what happened in December '20, December 2021. But perhaps EUR 5 billion will be a sort of benchmark if we want to come up with a reliable forecast in -- for the years ahead. VINCI's balance sheet is very strong, it comes as no surprise to you, notwithstanding the acquisition of Cobra accounting for EUR 4.2 billion in our committed capital, which is still below that of 2 years ago. And as you can see, we have a strong increase to EUR 4.7 billion in working capital over the same period. Shareholders' equity is up, and net debt is actually down by EUR 2.4 billion even though we paid out, as I said, EUR 4.2 billion net cash to acquire Cobra. So next slide, nothing new. We still have a high level of liquidity, EUR 18 billion, which is the level of 2020 almost, even though we have the acquisition of Cobra to account for the unused credit lines to the tune of EUR 8.5 billion with EUR 500 million of Cobra. And credit ratings, we haven't seen S&P yet. We will be soon, but I think we'll -- we should be looking quite good. And we hope to keep our long-term rating, stable, at S&P and with Moody's. As I said, we issued a VINCI SA bond with a coupon close to 0. And we also redeemed just over EUR 1 billion of our Cofiroute bond, which has contributed to reducing the cost of debt. In the same -- by the same token, we refinanced, in order to avoid any liquidity concerns, the debt of Gatwick to the tune of EUR 750 million at a higher cost because interest rates in sterling are higher than for euro and we had to pay the price for that in order to refinance. And my last slide. I recall that over the past -- the cost of debt has constantly gone down even though the structure of debt by currency has changed. Five years ago, it was almost entirely euro denominated. And now with Gatwick's American concessions and acquisitions in the dollar region, we now have net debt which is only 59% in euros and 41% non-euro denominated. And this means that looking to the next 2 years, I don't think we're going to be able to significantly go below that. We'll probably have to go slightly up given what has been done by the central banks.
Xavier Huillard
executiveThank you very much, Christian. Well, thank you. This is -- for all these reasons, we are moving on to 2022 very calm and confidently. Why? Because our businesses, construction, energy and mobility, place us at the very core of the main challenges worldwide. These challenges are to transform our cities and buildings to make them more sustainable, more virtuous from a point of view of the environment and energy usage and also more pleasant to live in, other challenges such as the -- bringing the digital revolution into all of our industries and human activities, decarbonizing mobility, all forms of mobility, stepping up the energy transition by developing green electricity within the energy mix, enabling the development of low-carbon hydrogen, which is a prerequisite for several industries and, in our opinion, is going to develop in the area of heavy traffic, heavy transportation such as trucks. We also have to systematically look at projects from the vantage point of their carbon footprint and preserving biodiversity if we're to further develop the circular economy to reduce our impact on global nonrenewable resources. VINCI is very much involved in all of these challenges and is able to provide solutions to all these challenges, which all of our 250,000 employees are very excited about. And these are also major growth drivers for us in the future. Let's now come back specifically to 2022. There are a couple of slides on '22, one on motorways and one on airports. Now our belief is regarding VINCI Autoroutes, we've seen good trends in recent months. This is visible on the slide here on Vinci Autoroutes. This should be Page 31. Our expectation is annual traffic in '22 that will be above traffic we booked in 2019. At VINCI Airports, you'll remember its positioning is more in the area of tourism and discretionary travel versus business. And it's different from other major airport players. We've got about a split of 80/20. This is why we believe this will help us recover, continue turning around air traffic in 2022. Our central scenario is that in 2022, we should reach around 60%, 6-0 percent, of the 2019 level for the full year. The figure of 60% is very important because 60% would mean we'd produce at VINCI Airports a net income which would be near breakeven. At VINCI Energies, we feel we should continue growing, all the while keeping a high EBITDA margin as booked in 2021. At VINCI Construction, our intention is not necessarily to focus on growth as such but, first and foremost, to continue growing the EBIT margin, becoming ever -- even more selective than we were in previous years. So all in all, taking to account all of this, our belief is in 2022, our net income will be above the net income that we booked in 2019. This is the confidence that makes it possible for the Board of Directors to propose to the next Annual General Meeting on 12th April a dividend of EUR 2.90 per share. I'd remind you, point -- EUR 0.65 cents was already paid as an interim dividend at the end of 2021. The dividend is, of course, taking into account the recovery, the rebound we've talked to you about. It's also taking into account the record level of free cash flow and, first and foremost, shows the great confidence we have in the future. At this juncture, usually I talk to -- a bit about our environmental and social policies. We have some slides on this in your booklets. But I believe in the next few minutes, it probably would be more interesting to use the opportunity to give you greater detail about Cobra IS. Cobra IS is a group of companies active throughout the value chain of energy, i.e., in engineering, construction, maintenance. Furthermore, they're able to develop, finance and operate renewable energy facilities. Cobra IS has about 45% of its revenues in Spain, 9% in the rest of Europe, 34% in the Americas, mainly in Latin America, 12% rest of the world, particularly Asia, Oceania, all of this via flow business, which means small- and medium-sized deals through a network of around 450 business units, which are well rooted in several different management regions. This flow business varies from one year to the next, but it's around 67% of the total revenue of Cobra IS. The remainder is other projects, multi-expertise projects, more integrated ones, larger ones usually, usually bigger than EUR 30 million projects. Like with VINCI Construction, these can be very large projects indeed, several hundred million euros. Some examples, some very high-voltage power lines and power substations in Brazil. These are usually done through PPP contracts. Some of these 500,000 volts, I don't know if that means anything to you, but this is a lot, covering 1,000 kilometers in Amazon forestland. Another example, a power plant, cogeneration, 350 megawatts, in Mexico. These are operations that have already been done, and several of them are currently underway. Critical command and control systems, supervision of road infrastructure and tunnel infrastructure, example, in Australia. Cobra in this segment has developed its own solution. It has already outfitted 2,500 kilometers of roads and 3,000 kilometers of tunnels. Another example, offshore platforms for collecting and transforming electricity from offshore wind farms as [indiscernible] with equipment vendors such as Siemens, ABB and GE. Clearly, potential in this area is quite significant in all geographies and especially in Europe and the United States. At least for the time being -- I suspect this will change, but for the time being, there are few groups able to provide these highly complex services because there's a blend here of metal structures, electromechanical equipment that's often high voltage and much of this being done at sea, which makes things even more complex. I think of 2 projects we have in partnership with Siemens that are underway right now for the North Sea client is TenneT. Now of course, Cobra is involved in renewable energy production fields. They were the first in Spain to be active here as a builder, OPC is our phraseology, or, more broadly, as a developer, constructor builder. Cobra, first of all, began with pilot projects around 25 years ago and now gradually has done renewable energy fields via 50 land wind farms, around 2 gigawatts in all. They've had several thermal solar projects and 36 photovoltaic fields all in all producing 2 gigawatts. These assets are in operation already. Generally speaking, they were sold by Cobra and their parent company during their ready-to-build stage or ready-to-reduce stage, which is why we didn't take over assets in operation. We took over the development platform as well as its project pipeline, which are now very much part of the VINCI Group. Renewable energy market, as you know, is growing strongly. Cobra's portfolio, which is currently being developed, varying degrees of maturity, representing approximately just over 14 gigawatts total potential installed capacity, 25% of which is onshore wind, 75% of which is photovoltaic located -- well, 35% of it located in the Iberian Peninsula, 65% located internationally. Plus, there are some biomass projects as well as some offshore wind projects. I'd suggest that quickly, to wrap up, we talk you through a couple of these projects. We have slides on these toward the end of your booklets. The first slide, Slide #43, this is a project in Brazil. It's a photovoltaic project. It's a pretty big one. The power is 570 megawatts. The project is almost ready to build. It will be in the very near future. Anyway, CapEx in euros will be approximately EUR 350 million. Very interesting to observe that this gives you an idea or magnitude of the CapEx cost of a 1-gigawatt project. You can do the calculation. 1 gigawatt of photovoltaic costs approximately EUR 620 million. This project was foreseen. Electricity selling will take place 50-50 through merchant called -- PPAs, 50% sold through the market. Market prices, as you know, the spot market for green energy market prices, are quite high, well above what you could get after negotiating a PPA. This project, just like in the following projects, IRR -- project IRR, we would call high single digit, sometimes even better than that. The second project I wanted to mention to you, this one's in Ecuador, it's an onshore wind project, a concession covering 25 years, ready to build in the very near future, in all likelihood in the next few weeks or months. Ready to build means you've got all the permits and authorizations, the right to connect, authorizations to build the connection lines and to, in this instance, install the wind turbines, plus the environmental permits. Only once you're in that situation and you've got the actual ability to put together the funding in line with expected [indiscernible] [Audio Gap] onshore wind. CapEx, around EUR 175 million. Now if you do calculation, you can see CapEx per gigawatt in onshore wind in that country is above EUR 1 billion. So well above photovoltaic that I mentioned earlier. Nevertheless, the producible, i.e., ability to produce power, is greater in wind due to greater regularity of electricity production from wind production. Wind blows even at night when there is no light for your photovoltaic panels. So the third project is located in Spain. This is photovoltaic project. Power, 114.4 megawatts. We hope it'll be ready to build midway through 2022. CapEx, EUR 72 million. You can also calculate the amount of EUR 630 million per megawatt in this area of photovoltaic. A last point, the Morecambe project in the Irish Sea, this is offshore wind project won in the first half of 2020. It's an exceptional site. Firstly, it's near the coast. Next, the geotechnical conditions are good. A lot of development time is required. Offshore wind, one of the features here is that it takes years between the time you begin your development and you can actually begin generating power usually. In this type of project like in the Irish Sea, we're hoping to reach ready to build by 2026, which means 4 years down the road because we have to fine-tune our geotechnical knowledge, do environmental studies on flora and fauna in this area of the sea. Then we have to do all of those detailed engineering studies, including the power outflow line that you use to connect to the land power grid. Then one very last slide. This is on the Kincardine project in the North Sea. It's not a concession. We didn't take over the concession portion. Instead, it is ACS. We just took over the construction portion, which is now completed, wrapped up around September of 2021. This is an experimental pilot operation, a floating offshore wind farm, a special feature here. It won't be the case for very long. Things are changing. But for the time being, this is the facility using the most powerful turbines in the area of offshore -- of floating offshore wind farms. Floating offshore wind is the new frontier. This way, you can make the facilities more distant from people who live on the coast. They don't see them from the coast. This reduces the constraints. You can use larger surface areas of the sea since you're far away from the coast. Don't do the calculation of CapEx per gigawatt here because the price is huge. But it's, again, due to the fact that this was an experimental operation. I emphasize that. It was done in very good conditions by Cobra in terms of the EPC, the actual build. It was delivered and it's now producing -- generating power. Therefore, the authorities that had entrusted the operation to us have also entrusted us with another floating offshore wind project also in the Sea of Scotland. This will be 100 megawatts of capacity. Those are our points. Now of course, we'd be happy to answer any questions that you might have. Thank you.
Operator
operator[Operator Instructions] First question from CIC Mr. [ Mogoloff ] (sic) [ Moulenq ]
Jean-Christophe Lefèvre-Moulenq
analystCan you hear me?
Xavier Huillard
executiveYes, Welcome, Jean-Christophe, we can hear you loud and clear.
Jean-Christophe Lefèvre-Moulenq
analystTwo questions. On the improvement of VINCI Construction's results, we saw the margin up 70 basis points with Eurovia and Construction. Can we consider that Eurovia has significantly improved its EBITDA margin to the tune of 4.5%, 5%? Or would you rather not answer the question, bearing in mind that the United States has picked up nicely? Second question, on the VINCI Energies-Cobra scope. VINCI Energies -- well, which of the 4 divisions improved its performance in order to be able to post 6.5%? And on Cobra, could we have an idea for this year/next year of the current CapEx and for the CapEx of the companies held which manage the 15 gigawatts?
Xavier Huillard
executiveWell, I'll take the questions as they were asked. And if I forget any of them, then please jog my memory. We won't go into detail on who improves -- contributes the most to improving the VINCI Construction margin. And Pierre Anjolras decided outside of France to set up a structure which includes all the businesses -- for example, construction or ex construction business of Eurovia in the U.K. -- under his authority. So it has to be considered as a whole. But what I can say is that, yes, you're quite right, Eurovia performed well in 2021 across almost all of its geographies. But this should not be considered to mean that the other divisions did not perform well. All of our VINCI Construction divisions posted good results, including VINCI Construction France. And that is indeed one of the -- part of the good news. On the rest of your questions -- now you asked a question about VINCI Energies, and I'll come to that in just a minute. Arnaud Grison will answer the question. And you have a question, I believe, on the CapEx of Cobra. Cobra, for the main part of its business, is very similar to what we call the service business of VINCI Construction, VINCI Energies, and does not generate a significant CapEx. We need trucks, drills and equipment items which do not represent a major investment. So most of Cobra's CapEx mainly reflects our ability to launch the CapEx in renewable projects, and this will depend on the rate at which they will be launched. And this is why I put some figures of CapEx in the photovoltaic projects in Spain, PV in Latin America and onshore wind farm onshore in Latin America, et cetera. I gave you some idea of the CapEx that is required, depending on the kind of project -- product we're dealing with and depending on the geography. Everything will, therefore, depend on the rate at which these geographies were able to implement, in other words, to move to the actual construction. I can't say much more than that. Arnaud?
Arnaud Grison
executiveWell, like VINCI Construction, all of our divisions have picked up. None stands out. It's a collective improvement in performance with a decentralized model, and each component contributes to the performance.
Operator
operatorYes, JPMorgan has a question.
Elodie Rall
analystFirst of all, first observation on contribution of contracting, generally. Apparently, inflation in raw materials or labor hasn't had a significant impact on contracting margins. That had been, to some degree, the fear we'd had. Could you confirm that's the case, though? Another point, regarding 2022 margins in construction. You are to make major progress compared to '19, this is clear, 3.7%. You'd have in mind to reach 4.5% or 5% for construction business. Question, is this conceivable with the time line in 2022/2023? Another point, energy. No doubt about it, with the integration of Cobra, you produced guidance in revenue. I suspect you're tidying things up somewhat your order book. But you're very confident when it comes to margins. Margins would be in line with the best in the class. So positive surprises in 2021, 6.5%. Does this mean that the division, including Cobra, might go beyond 6.5% in 2022? If I might ask one last question. On the dividend policy, where do you stand? Payout is well above the 50%, which was customary. Results were lower 64% in '21. Airport businesses won't be back to normal in 2022. So we -- can we continue to have a payout that would be in the higher end of the range versus the past?
Xavier Huillard
executiveThank you to you, Elodie. I'll go through those in opposite order. Dividend. We're not taking a commitment as to future years. You're right when you say payout. We had decided to not focus too much on that during the whole pandemic period. It's also the case for the 2021 dividend. But I can't say how things will happen in the future. All I can say is that probably, next year's dividend will be up compared to the current dividend. But that's pretty obvious and in line with our guidance in terms of increased net income. Regarding Cobra, I don't know why I talk about a drop in revenue. But to some degree, you're right. There are two points here. Firstly, we didn't take over all of the scope that previously was called ACS IS. There were several carve-out on our complicated operations, and it wouldn't make any sense to go into those in detail. But the interesting thing is to look at the track record and the future trajectory but not to focus on the past volumes because it's not exactly the same scope. Second point. Cobra, considering the geographies where they're located and considering the size of their businesses, which tends to be somewhat greater than VINCI Energies, more similar to what you see in VINCI Construction. So clearly, their revenue depends on the pace of the large-size projects, especially the major projects, particularly the projects that we were in charge of, i.e., concessions where we can or not postpone and defer start-up of EPC depending on purchasing conditions for some of the equipment. For instance, when you do a PV field, there's a big investment you've got to make when you move into the ready-to-build phase, i.e., you've got to buy the solar panels. Panel prices, there are times when they're very low-ish, and there are other times when they're really high. So some of the cleverness is to take options to buy PV panels at the right time so you don't worsen the IRR of the entire deal. And this, of course, has a knock-on effect on revenue flows. This is the case for major projects. It's not always smooth running the entire time. But in the case of Cobra, their major projects are also impacted by the fact that some major renewable energy projects can be postponed or sometimes speeded up for external reasons such as the price of certain types of equipment. Now regarding margins, just look at the past track record. We're confident, yes, including starting in -- as of 2021, should we be reaching margins that are at the top of the class in their industry? That's what we've said, and you can deduct as you would like. We're talking about top of the class, which also includes VINCI Energies but not only VINCE Energies. Now margins in construction. I made a mistake once several years ago. I am forecasting something. So I won't make that same mistake again. We've just said there'll continue to be positive period. We won't go further than that. We're not talking about 10% or anything that'd be unrealistic, but we're talking about ending up at margin levels that we've already reached in the past between 4% and 5%. Regarding price impacts, inflation, Pierre Anjolras might want to say something about this.
Pierre Anjolras
executiveI agree, raw materials' prices are fluctuating quite a bit right now. We have to realize -- remember that if you look at VINCI Construction's activity, most of it, about 80%, is infrastructure work. So public work, mainly public orders, government orders. These are contracts that are indexed with revision clauses, sometimes cost-plus fees. So sometimes that's a perfect revision. 20% of our business is construction buildings, about half of which is also government contracts and another half basically is private contracts. Here, these are lump sums. We're agile, and we apply the same techniques, as Xavier Huillard already explained to us. When you're talking about procurement, we secure the main purchases early on as soon as we get the order so that we're not hit by any future fluctuations, which is why all in all, we'd be very agile of course and very responsive. But all in all, we manage to contain inflation in our raw materials. The residual risk, which I briefly touched upon, doesn't have as much to do with prices inflation but rather availability. Maybe Arnaud could build on this just very briefly, which is something that did disrupt, I think, slightly toward the end of the year.
Arnaud Grison
executiveYes, our revenue includes cost advancement. So this delay in supplying job sites and delays revenue recognition. We saw this through the end of the year. There was a delay in growth and revenue due earlier to some supply delays where it took longer to get some supplies and also some major electromechanical equipment that was delayed.
Operator
operatorNext question, from Nabil Ahmed from Barclays.
Nabil Ahmed
analystThree questions, if I may. First, Cobra. You're saying revenues of EUR 5.5 billion this year. I think you communicated on revenue around EUR 5.8 billion earlier.
Xavier Huillard
executiveWe can no longer hear Nabil. [Technical Difficulty] So while we wait -- we don't have any further questions on the French line, so I'll hand over to Jess for questions in English.
Operator
operatorThank you. So the first question comes from the line of Luis Prieto from Kepler.
Luis Prieto
analystI had a couple of questions very briefly. The first one, regarding working capital management last year. If you could give us a bit of light on what the drivers were behind the pretty strong performance, that'd be particularly useful. And the second question is regarding Cobra IS. In terms of operational renewables capacity already in 2022, can you give us any sort of guidance how many megawatts could be actually producing energy by the end of the year? And connected to this, is there any particular year over the next 8, 9 years of full development of that pipeline that you acquired in which we should see a large percentage of the capacity coming or being commissioned? Or is it going to be very linear?
Xavier Huillard
executiveChristian will understand the question. I didn't quite understand.
Christian Labeyrie
executiveWell, I understood the question, but I don't know we have an answer to the question. As I tried to explain, when you talk about VINCI's capital at least, it's EUR 1.6 billion in variation. It was EUR 2.3 billion last year. So over 2 years, that's a lot. It's almost EUR 4 billion. But that's versus EUR 50 billion in revenue or EUR 40 billion in VINCI Energies and Construction. It's not an awful lot. So it's very difficult to draw any explanation or conclusions on the figures because a large part of these amounts are settled at the end of the year, actually booked to the accounts. Last year, we felt that our clients, whether private or public sector, really made an effort to support the economy, in particular in France but not only in France but in many countries where we have a presence in Europe. And this is what happened again this year. So I don't think we can expect this to happen every year. So this improvement mainly concerns VINCE Construction and VINCE Energies. Now the question is that it's mainly focused on the end of the year. What conclusion can we draw for that? Well, I don't think there's much that we can conclude from that. We'd like to have more visibility at the beginning of the year in terms of what will happen at the end of the year, for example, but we're not sure. In fact, we don't know. And what we hope is that we remain at an average level at around EUR 1 billion. But it may only be EUR 600 million, it may be EUR 1.6 billion versus EUR 40 billion in revenues. If we added Cobra to that, it will make the analysis and forecast even more difficult. But there's nothing -- there are no sort of material items, no significant down payments. There are down payments, but then we have them every year. But the fact is that the business was handled more -- it was generated more through smaller transactions for VINCI Construction. But we -- if we have a big project, as we did in 2020, then we have down payments on which we were not banking initially. That's all I can say. And I'm sorry, it's not very precise, but I can't commit to very much if only to say that people are doing their very best on the ground, the business unit heads, financial controllers. Everybody's working hard. And the cash culture is very much a part of our culture, as it is with Cobra, and this is what we saw when we did an update with them recently.
Xavier Huillard
executiveRegarding Cobra, your question provides us with an opportunity to dwell on a point arising from Jean-Christophe's comments earlier. And I didn't correct once more an error on the part of Jean-Christophe, which is that the platform for development is with us 100%. We don't share it. The agreements with the seller, [ ICS ], simply mean that when a project, because we have a project, say, for 1.5 giga, reduce -- comes to maturity to the ready-to-produce stage for the production of power, then we have to propose to the joint venture to buy it at market prices. But in all the preliminary phase of development and construction, we are 100% in control. And that's very important because these development projects are very complex, and it's important to have overall control. And to respond to your earlier question, what we've said is that given the pipeline of projects and the maturity of the deals that we have in the pipeline, we should be able to generate 1 gigawatt per year to start off with. But as the market is literally exploding in a positive sense, it's in very, very rapid growth, we hope that we will, within the next few years, be able to cruise at the level of approximately 1.5 gigawatts a year, which is pretty good because having 1 gigawatt in offshore wind farms can be done -- achieved fairly quickly. The drawback is that it takes an awful lot of time to come through. As you've seen in the North Sea of Scotland, 26 gigawatts were attributed a few days to some companies, mainly oil and gas companies. And these 25 gigawatts will only come onstream in actual fact in 2030. So in offshore wind farms, you can very quickly produce a large amount of gigawatts, but it takes a long time to develop. But on photovoltaic plants, on the PVs, which are, by definition, land projects, a 1-gigawatt project is very rare. Usually, we're talking about projects of 50, 100 gigawatts, a little bit along the lines of what I was talking about earlier. Producing 1 gigawatt in the PV means that you add a lot of projects. So to be clear, 1 gigawatt per year seems reasonable given the pipeline that we took over when we made the acquisition.
Operator
operatorThe next question comes from the line of Gregor Kuglitsch from UBS.
Gregor Kuglitsch
analystI found your comments on the sort of various projects in the renewables side interesting, and I think you gave one particular example on IRRs. So on Brazil, I think you were talking high single digit. I wonder if you could sort of give us a range perhaps for the other projects. And maybe a point of clarification, if these are sort of unlevered IRRs basically, and I guess they are, and to what extent you would basically use nonrecourse debt to kind of juice those returns up. I guess if they go into the JV with ACS, there would be some debt attached to them. So that's sort of the first question. Second question is, can you give us a little bit more detail on the bypass in Montpellier, bypass that I think you've reached an agreement on? Sort of -- I think it's an ASF, but if you just give us how it works in terms of how do you get remunerated for that. Or is it just essentially a new bid to the concession? And the third question is just coming back to -- and sorry, if you're kind of -- I'm kind of asking the same question again. When you're saying best-in-class margin for Cobra, are you taking VINCI Energies as sort of the reference point? Or do you think you should have a higher margin given the EPC risk that you're taking on part of the business?
Xavier Huillard
executiveThank you. I'll go through those in order. Now I didn't say then 10%. It's a high single digit. There's a slight difference. Next, let me say that we're talking about project IRRs. It's difficult to turn this into equity IRRs because leverage very much depends on technology you're using and also depends on how you intend to sell your power. For instance, if you're talking about the Ecuador deal with a predetermined sale price to local electricity distributors, well, then you got all the terms of the equation and you can have a substantial leverage because your proceeds, your revenues are pretty much secure. On the other hand, as is the case generally in Spain now, if you're talking about merchant, in other words, you're expected to sell your power in the overall marketplace. In our phraseology, you've got what we call traffic risk. So capital requirements here are greater and, therefore, leverage is lower. That's why my rationale was only in terms of project IRR when I mentioned earlier. Third question, I didn't write down, sorry. I didn't -- I've forgotten it. Can you remind me?
Christian Labeyrie
executiveWell, now I want to comment something. This is Christian. There are 2 portions of leverage. There's a project portion, in Brazil, for instance. Christophe will correct if I'm mistaken, Usually, we're talking about BNDES financing. So it's a nonrecourse financing indeed. We use it in VINCI Airports as well. So it's that project leverage, which, of course, also depends on availability of nonrecourse financing in your -- in the country where you're working. Plus there's leverage. We didn't talk about, it's premature, that we could conceivably also position in the company that in the future require the project. So the project equity with ACS. But that's another subject, a separate one that we'll talk about in due course.
Xavier Huillard
executiveWe have to begin by having some projects that become part of the company before talking about this subject. But you're right to bring that up. What was the third question? I can't remember it. Was it Montpellier?
Gregor Kuglitsch
analystYes.
Christian Labeyrie
executiveWas it the one at the end?
Xavier Huillard
executiveYes, it was Montpellier.
Christian Labeyrie
executiveWhat was it about?
Xavier Huillard
executiveOh, okay. Yes. We're not going to give Cobra margins. No further specifics about that. Top of the class. You know the standards in the profession. We've got an example in-house. There are several other examples as well. We're cautious. Margin, we're not going to go to specifics.
Gregor Kuglitsch
analystLet's talk about the Montpellier bypass though, Montpellier bypass, the investment, EUR 330 million compensated by a rate hike by some 1% over a 4-year period. Starting price -- starting in 2023, starting in 2023.
Xavier Huillard
executiveIt's called back-to-back. No public funding, neither from the government, central government, nor from local government. There's no toll barrier on the small section, but it's financed by a slight extra coefficient from the remaining ASF network.
Operator
operatorThe next question comes from the line of Tobias Woerner from Stifel.
Tobias Woerner
analystI hope you can hear me. The first question is, again about Cobra, so apologies. You referred to best-in-class. We've looked at a number of sort of peers, but maybe you can spell them out that we can also cross-reference them to our own in terms of the margin potential. We've kind -- but also a second question is given the order book for Cobra in terms of book-to-bill, is this sort of a normal run rate? Or is this particularly strong at this point in time?
Xavier Huillard
executiveI'm not going to specify the Cobra margins. Everything has been set. So just take a look at how we expressed this in our press release. Now what you're calling the Cobra order book, I assume this is mainly the pipeline of renewable energy projects. I think it's important to begin this adventure with renewables energy, with a good pipeline, I outlined it for you, over 14 gigawatts, varying degrees of maturity for the price -- projects. And then we have to take into account the fact that developing renewable energy is just at the beginning stages worldwide to such a degree that my personal feeling is that at least for several years, there won't be green electricity available to everyone. Needs in green electricity are going to continue growing faster than our ability -- everybody's ability to actually provide production capacity for generating green electricity. Why? Because there are lots of drivers for demand for green electricity. First of all, portion of green electricity in the energy mix is growing. That's very much good news for all of our business lines that are involved in electricity within energy. Secondly, all the players, whether you're talking about industry, corporates, are trying to decarbonate their scope. And one of the ways of reducing carbon is to use green energy. It's the very essence of PPAs. Lots of people in the industry are big energy consumers. And because they want to reduce carbon content, they try to secure purchases, often long time purchasing agreements, 10, 12 years PPA, purchasing agreements, so that they can be sure that they'll have access to green electricity, enabling them to show a reduction in their carbon footprint hopefully in compliance with the Paris agreements. Furthermore, you've got the development of electricity mobility, mainly light vehicles powered by electricity, and there are lots of ambitions in this area. By 2030, conceivably, there may be -- I don't remember the figure, but a significant portion of the light vehicles in our geographies would be electric. And of course, these will have to be recharged. If you recharge them with fossil-produced electricity, that's pointless. The whole point is to recharge them with green electricity, which means even more green electricity to be sold that's not being sold today. Another last aspect, green hydrogen, developing green hydrogen. We very much believe in this. You saw that we put together with the initiators Air Liquide, TOTAL, and ourselves, the biggest global fund to invest in green hydrogen. The strike for us should be above EUR 10 billion in the end. The idea will be to invest in production equipment and distribution equipment of green hydrogen. This is a sign that shows the confidence we have in the fact that green hydrogen very certainly is going to develop in a big way firstly because industry that uses hydrogen need, for the same reasons we mentioned 5 years ago, need to reduce the carbon footprint coming into -- they're currently using gray hydrogen. They want to transform into green hydrogen. There's going to be a lot of demand for green hydrogen in the industry. In addition to that, we're convinced that green hydrogen is going to be used for what we call heavy mobility, which means, first of all, trucks and trains in the more distant future, but this will happen before the middle of the century; also airplanes, at least initially, when we're talking about regional transport. To produce green hydrogen, you need green electricity. Otherwise, it doesn't work. You can't use an electrolysis equipment with the fuel cell if your initial hydrogen is highly carbon-based hydrogen, which is currently often the case. So all in all, this will mean there'll be a big demand for green electricity. We believe it'll be hard to meet that demand through the supply, at least for a given period, a given period meaning several years, even many years to come. Therefore, the pipeline we need to develop in all likelihood should be growing in future years in the various forms of technology -- for all those areas of technology.
Operator
operatorThe next question comes from the line of José Arroyas from Santander.
José Arroyas
analystI have three questions about the toll schedule for the French auto routes for the year and where -- I mean, I saw the announcement the company made earlier this week announcing a tariff freeze for a short-haul travel, and I wanted to ask you a few questions. First of all, what is the proportion of traffic that will benefit from this measure? Is 5% or 10% a reasonable estimate? Second, why this announcement or this decision was taken in 2022 and not in 2021, for instance, when traffic was under pressure due to the pandemic? And lastly, could the foregone tariff increase for this year be recouped in the next several years? And if there could be positive price elasticity for this type of traffic.
Xavier Huillard
executivePierre Coppey will answer.
Pierre Coppey
executiveWell, on the VINCI Autoroutes network, we have several thousand trips which are origin destination. We have 5 contracts and 5 tariff toll laws. What we have done is that we have applied the toll -- the pricing laws in a differentiated manner. And the result is that there was no impact on the yield of the tariff laws. And we are in a contractual framework whereby each year, we use a theoretical traffic model which is multiplied by the toll law in order to ensure that this does not take us beyond the limits of the toll law when you have the increases. So the impact on revenue of VINCI Autoroutes of this particular measure, differentiated application of tolls, is, therefore, 0. Next, the impact on traffic in terms of elasticity, I think, is probably quite low. It's not significant. It's not significant. It's not a 0 toll, it's simply a stabilization of the price.
Xavier Huillard
executiveAnd as for your first comment on why we didn't do that earlier, well, you didn't suggest it. So you should have come up with a suggestion earlier. And you will recollect that 2 years ago when we had the yellow vest movement in France, we set up another system, which worked quite well, whereby we proposed toll reductions to frequent drivers as it were, which consisted in cutting tolls up to 30% for those of our customers who were using motorways for their home-to-work trips on a regular basis, say, for the whole week. So we innovated a little bit this year with this additional system. It worked well, and it was well received in the press as well. We don't have any more questions, neither in French nor English. Does that answer your question?
José Arroyas
analystYes, very much.
Unknown Executive
executiveWe don't have any more questions neither in French nor English. We were unable to restore the connection with the French speaker who lost the connection. He's unable to restore the connection. So I suggest that we stop there.
Xavier Huillard
executiveWell, thank you all. Yes, the analyst who was -- who lost the connection, I think he's in Dubai. No? He has come back? Okay. Well, okay, so I got that wrong. Well, I think he should change his -- I recommend that he change his Internet supplier. No, I simply wanted to thank you for being here taking part. The fact that we can't see you in person is really becoming very, very difficult, and I do sincerely hope that our next results presentation will be held in person. I'm confident that it will be. My job is to be an optimist. I'm paid for that. But I think we are in the process of emerging from this pandemic, depending on the countries, of course, and I hope to have the very great pleasure of seeing you all in person and to share a drink with you at the next presentation. And between now and then, have a very good day. And of course, stay in good health. Thank you all very much. [Statements in English on this transcript were spoken by an interpreter present on the live call.]
This call discussed
For developers and AI pipelines
Programmatic access to Vinci SA earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.