Thanks, operator. Hi, everyone, and thanks for joining us for our first quarter 2026 earnings conference call. We put out our earnings release earlier today, and a copy is available on our site as well as through the wire services. I want to point out that this call will include forward-looking statements under the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Such statements carry risks and uncertainties that could lead actual results to differ materially from what we currently expect. For a detailed discussion of those risks and uncertainties, please see our latest annual report and the other documents we have filed with the SEC. VNET assumes no obligation to update any forward-looking statements, except as applicable laws require. I also want to note that VNET's earnings press release and this conference call include disclosure of audited GAAP and non-GAAP financial matters. The reconciliation of the unaudited non-GAAP measures to the unaudited GAAP measures is included in VNET's earnings press release. A summary presentation, which we will refer to during this call, can be viewed and downloaded from our IR website at ir.vnet.com. Next, I'd like to let you know that we will use text-to-speech technology powered by newlink.ai to deliver this quarter's prepared remarks from Ms. Sharon Liu, our rotating President, and Mr. Peter Zhang, our SVP of Operational Finance. The management team will be with us in person for the Q&A session. Also, this conference is being recorded. A webcast of this call will be available on our site at ir.vnet.com as well. Now let's begin today's presentation. Ms. Liu, please go ahead.

Xiao Liu

executive
#2

Hello, everyone, and welcome—whether you're joining us in the morning or the evening. We appreciate you being on today's call. I'd like to open with a look at the key things we achieved in Q1 of 2026. We kicked off this year posting solid numbers, which came from executing well on both our dual core strategy and our hyperscale 2.0 framework; operationally, our wholesale IDC segment saw healthy expansion, powered by robust customer demand and swift customer relocations as of March 31, 2026. Capacity in service on the wholesale side climbed 18 megawatts, reaching 907 megawatts, which aligns with our intention to weight capacity expansion deliveries toward the latter half of the year. At the same time, because of those swift customer relocations, wholesale capacity utilized by customers expanded 64 megawatts to 687 megawatts, lifting the utilization rate to 75.7%, a quarter-over-quarter gain of 5.6 percentage points. Our retail IDC segment kept advancing steadily, buoyed by rising AI-driven demand. Retail MRR per cabinet edged up sequentially to RMB 9,448, while the retail utilization rate held steady at 64.1% in Q1; financially, total net revenues for the first quarter rose 19.8% year-over-year, hitting RMB 2.69 billion. Wholesale revenues stay the primary engine of growth, arriving at RMB 1.06 billion, which marks a sizable 58.1% year-over-year jump. Adjusted EBITDA for Q1 likewise grew 30.6% year-over-year, coming to RMB 891.5 million, propelled by the robust expansion of our wholesale IDC segment; beyond that, our premium reliable services keep winning customer confidence and capturing market share, as shown by several high-quality orders won, amounting to 519 megawatts year-to-date 2026. I'll walk through the specifics on the following slide. Turning to our new order wins on Slide 5, year-to-date 2026. Order momentum stayed solid, with 3 wholesale orders booked totaling 57 megawatts, fueled by continued growth in AI-driven demand for high-quality data center resources. We booked 2 orders, 110 megawatts and 400 megawatts, from an Internet customer at separate data centers in the Greater Beijing area. In addition, a different data center in the Greater Beijing area landed a 7-megawatt order from a local services customer. What's more, supported by AI-driven demand, we also booked new retail orders amounting to roughly 2 megawatts across multiple retail data centers, from customers in the local services, Internet and IT services sectors; this strong order momentum highlights our improved competitive standing and expanding capacity to take market share. Simultaneously, ongoing policy backing for AI Plus initiatives is strengthening industry tailwinds. Regulators are encouraging the build-out of large-scale, clustered green computing infrastructure, which is speeding up wider adoption of computing power across industries and further enlarging the addressable market. In parallel, with the AI industry advancing rapidly. Demand for AI-related computing power and data center resources is climbing sharply, pushing the industry into a fresh growth phase. Yet the effective supply of high-quality data centers stays comparatively constrained, held back by utility and power quotas limitations in core regions. So with that as the setting, IDC companies that have built up experience over many years, hold ample resources in reserve, and have projects deployed across key regions are the ones most likely to fully seize the structural openings created by growing AI demand. As an AIDC trailblazer, VNET stands to gain from these structural changes. Our large-scale, high-performance data center clusters, together with a strong pipeline of resources across core regions, give us a notable edge. On top of that, our demonstrated strength in fast delivery and in operations and maintenance sets a competitive bar that gets harder and harder to match at scale, and we have supportive policies plus an industry-wide structural transformation working in our favor. We're confident we can keep capturing new market opportunities as they emerge and lock in our leadership role; now let's go through our business updates, beginning with wholesale on Slide 7. Wholesale kept expanding, with capacity in service up 18 megawatts from the prior quarter to 907 megawatts. Utilized capacity rose 64 megawatts sequentially to 687 megawatts, which pushed the utilization rate to 75.7%, compared with 70.1% in the previous quarter, largely because customers moved quickly at NOR campus 02A and NHB campus 03. Our mature capacity utilization rate also hit 93.8%, a fairly elevated level. We have a well-defined path for growth in our wholesale data center capacity. Let's turn to Slide 8. Our total wholesale resource capacity kept climbing, hitting 2.48 gigawatts as of March 31, 2026. To break that down, capacity under construction climbed to 516 megawatts, with a precommitment rate of 85.8% year-to-date 2026. Capacity held for short-term future development and for long-term future development rose to 697 megawatts and 359 megawatts, respectively. Notably, most of the capacity set aside for future development comes from resources we've locked in at our Ulanqab IDC campus, which shows we can secure critical resources and scale capacity quickly in strategic regions. The resources we've secured give us a meaningful competitive edge, especially with supply tightening in the IDC industry, and they strengthen our confidence in long-term growth potential fueled by AI-related demand. Now to our retail IDC business on Slide 9. Our retail business made steady progress in the first quarter. Retail capacity in service rose to 5,170 cabinets from 49,863 cabinets in the prior quarter, utilization rates stayed steady at 64.1% as of the end of March, and MRR per retail cabinet edged up to RMB 9,448 this quarter. Now for our delivery plan on Slide 10. We delivered 18 megawatts in the first quarter of 2026, and consistent with our delivery plan, which puts most of the year's deliveries in the second half, we currently have 8 data centers under construction, with 7 in the Greater Beijing area and 1 in the Yangtze River Delta. Our goal is to bring 56 megawatts online within the coming 12 months, roughly 250 megawatts across Q2 and Q3 of 2026, plus approximately 266 megawatts in Q4 2026 and Q1 2027, with most of that going to our data centers at the Ulanqab IDC campus to serve robust wholesale customer demand. To wrap up, Q1 results showed we're executing well strategically and operationally. Going forward, we'll stay committed to pushing our dual core strategy and hyperscale 2.0 framework forward, expanding our scalable green data center clusters, and improving our comprehensive AIDC solutions to satisfy rising AI-driven demand. Alongside that long-term approach, we've bolstered our shareholder base by bringing in new strategic investors — affiliates of CATL have signed a share purchase agreement to buy up to about 38.1% of our shares from subsidiaries of Shandong Hi-Speed Holdings Group, with the deal expected to close in Q4 of this year. We'd also like to offer our heartfelt thanks to Shandong Hi-Speed Holdings Group for believing in our vision, for many years of partnership, and for supporting our growth journey alongside CATL's entry. We're confident this new relationship will create significant strategic synergies and open doors to productive collaboration in technological innovation, supply chain, and next-generation AI data center development, boosting our long-term competitiveness and growth momentum. All in all, we're optimistic about seizing the growth opportunities in front of us and generating sustainable long-term value for every shareholder. At this point, I'll hand the call to Peter, our SVP of Operational Finance, who will go deeper into our operating and financial performance. Thanks to all of you.

Peter Zhang

executive
#3

Hello everyone, and good morning and good evening. Before we dive into a detailed conversation about how we performed financially, I want to flag that unless we say otherwise, every financial figure shared today relates to Q1 2026 and is expressed in renminbi. Also, unless noted differently, each growth rate I discuss is calculated year over year. Please go to Slide 12. During Q1, high-quality development remained our focus. Total net revenues climbed 19.8%, reaching RMB 2.69 billion, with our wholesale business's swift expansion serving as the primary catalyst. Adjusted cash gross profit advanced 25.1% to RMB 1.21 billion, and adjusted EBITDA likewise rose 30.6% from a year earlier, hitting RMB 891.5 million. Now let's examine our top line in greater depth. On Slide 13, you'll see that this quarter brought a fresh milestone: for the very first time, wholesale revenues exceeded retail revenues. Wholesale revenues — our main engine for revenue growth — jumped 58.1% to RMB 1.06 billion in Q1, chiefly because of activity at NOR campus 01 and NOR campus 028. Retail revenues for Q1 were up 5.4%, reaching RMB 1.02 billion. Revenues from our non-IDC business rose 0.3% to RMB 606.6 million in Q1. Throughout Q1, we kept margins solid, helped by continuing programs aimed at boosting efficiency. Slide 14 shows our adjusted cash gross margin climbing to 45%, up from 43.1% during last year's comparable period. Adjusted EBITDA margin increased to 33.1%, versus 30.4% a year earlier. Now to liquidity, on Slide 15: our liquidity stayed strong and healthy. Net operating cash inflow came to RMB 173.7 million in Q1, once you exclude the effect of RMB 119.1 million of income tax tied to capital transactions along with other one-off items. For this quarter, net operating cash inflow would have been RMB 292.8 million. Our cash position is still solid, with total cash and cash equivalents, restricted cash, and short-term investments amounting to RMB 8.8 billion as of March 31, 2026. Moving next to our debt structure on Slide 16: our cautious method of managing debt continued. As of March 31, 2026, net debt divided by adjusted last quarter annualized EBITDA stood at 3.8%, and total debt divided by adjusted last quarter annualized EBITDA stood at 6.1% — both at healthy levels. Our adjusted trailing 12 months EBITDA to interest coverage ratio came in at 5.8%. When managing debt and strategy, we put priority on planning long-term debt maturity so repayment security is assured. At present, short and medium-term debt maturing between 2026 and 2028 accounts for 45.8% of the company's total debt. Now regarding CapEx spending, on Slide 17: CapEx totaled RMB 1.91 billion in Q1, with most of it directed toward expanding our wholesale IDC business. Our projection for capital expenditures across the whole of 2026 remains unchanged, staying between RMB 10 billion and RMB 12 billion, primarily aimed at backing our scheduled 450 to 500 megawatts of deliveries during 2026. Our monetization program for assets keeps moving forward, and we achieved significant headway in Q1. As discussed during our prior call, back in March 2026, a pair of our private rate projects got listed successfully on the Shanghai Stock Exchange, carrying a total offering size of roughly RMB 6.36 billion alongside an EV to EBITDA multiple near 13x to 14x, accomplished by setting up a scalable and efficient capital recycling framework; these rate listings provide us an edge within this inherently capital-intensive sector, enabling us to plough funds back into developing new projects. We anticipate generating at minimum RMB 2 billion in aggregate cash proceeds from our REIT-related efforts during this fiscal year, considerably reinforcing our liquidity standing and establishing a fresh benchmark for sustainable growth within digital infrastructure. Turning now to our 2026 full-year guidance, found on Slide 18. Given anticipated robust demand from our wholesale IDC clientele plus continuous operational efficiency improvements across 2026, we project total net revenues landing between RMB 11.5 billion and RMB 11.8 billion, marking a year-over-year rise of 15.6% to 18.6%, while adjusted EBITDA should fall between RMB 3.55 billion and RMB 3.75 billion, equating to a year-over-year gain of 19.2% to 25.9%. This outlook is identical to the figures we previously provided. Prior to wrapping up, let me give a quick update regarding our ESG initiatives. Sustainability stays central to our business strategy, underpinning our operational excellence and long-term growth. During April, we released our sixth ESG report, showcasing our ESG progress and achievements throughout 2025. Our average annual power usage efficiency rose to 1.24 in 2025 versus 1.27 in 2024. Renewable energy consumption made up 36% of total resources utilized by VNET in 2025, up from 18% in 2024. Such achievements also earned ongoing recognition from top ESG rating agencies. We appeared in the global addition of the S&P Global Sustainability Yearbook for 2 straight years, 2025 and 2026, and additionally got chosen for the China Addition for 4 consecutive years, where we were once again acknowledged among the top 1% in IT services industry. Moving ahead, we shall deepen our dedication to sustainability, bolstering our investments in intelligent infrastructure and green data center operations to generate long-term sustainable value. In summary, we posted robust first quarter results, mirroring sustained strong execution and strategic direction. Looking forward, we will remain focused on reinforcing our core capabilities, seizing opportunities emerging from accelerating AI adoption and digital transformation, delivering sustainable, high-quality growth and generating long-term value for all stakeholders. That wraps up our prepared remarks for today; we are now ready to take questions.

Tom Tang

analyst
#4

Once more, well done on an impressive quarter and on securing that order for more than 500 megawatts. My question concerns how the deliveries under this new order will be scheduled. What timeline or cadence should we expect for getting this 500-megawatt order out the door? Beyond that, on a quarterly basis, where does the effect land, or when will our revenue and EBITDA start showing a meaningful contribution from this new order? And one more thing — since we're booking such a large volume of orders, might there be an increase to the full year CapEx guidance we currently have? <<foreign_lang>>

Xiao Liu

executive
#5

<<interpreted>> Thanks for that question, Tom. Sharon here. When it comes to the 500 megawatts of new orders, our plan is to hand them over across the coming 2 to 3 years, running effectively from 2026 through 2028. The initial batch will go out in the first second half of 2026. That depends on how quickly our clients, our customers, are progressing. As a result, this should produce a favorable effect on EBITDA across our next 3 years, and we will not be revising our CapEx guidance for the full year of 2026, since the guidance we provided rests on our yearly delivery target of 550 to 500 megawatts. So our annual CapEx guidance will remain unchanged.

Edison Lee

analyst
#6

There are two things I'd like to ask. First, since CATL is now a strategic investor in VNET, could you tell us how investors ought to view the synergies from here on out? Also, I believe Shandong Hi-Speed had been constructing green power plants in new line top supply for your data center campus. Is that still moving forward, and will anything about it change? That's the first one. Second, could you talk about where pricing stands, given that you now have one pipe projects, and what pricing trend are you actually observing in the market? And do you expect pricing in 2027 to hold steady, or could it even rise? <<foreign_lang>>

Xiao Liu

executive
#7

<<interpreted>> Thanks for asking. Our quarterly report already disclosed that a CATL affiliate will be joining as our strategic shareholder, and the deal with Shandong Hi-Speed Holdings Groups has now closed successfully. In fact, we identify synergies in a number of areas, including our AIDC energy storage. We find synergy within the supply chain, particularly the kind we observed in technology and resources. To spell it out, we intend to draw on CATL's broad supply chain resources, their energy storage and dispatch capabilities, reinforced by their priority high-voltage DC technology via the investments they themselves have made. This will let us substantially improve our data centers' power stability along with dynamic frequency regulation. In my view, this integration matters greatly for meeting the demanding operational requirements of hyperscale AIDC clusters, and it directly hones our competitive edge over the long run. There's also the synergy we identified in commercial and operational sites. As you know, VNET, if we hand over the remainder of the REIT wholesale — say, the wholesale AIDC targets for this year — our total wholesale capacity in service will reach 1.5 gigawatts. That gives CATL concrete use cases that can feed back into their own businesses. Through our collaboration as well, we'll gather plenty of critical operational data, which will further drive mutual ecosystem value. As for our earlier work with the Shandong Hi-Speed Holdings Group on green energy integration, we've kept up fairly solid communication and collaboration with Shandong Hi-Speed Holdings Group when it comes to green energy development, and we're grateful for their support on that front. Looking ahead, VNET will keep pursuing the development of green and low-carbon data centers. We'll actively evaluate or explore corporation opportunities and grow our corporation in that direction. Beyond that, green energy and digital infrastructure development require coordination among multiple parties. VNET will stay committed to the principles of a prudent, market-oriented approach, and we want to assess collaboration opportunities according to its economics. Ultimately, what we're aiming for is to align our resources in a way that serves our customers' needs best, so the objective is boosting our energy efficiency while strengthening how competitive we are in the green energy sector. That ties into the question regarding the new strategic investor, and also our partnership with Shandong Hi-Speed Holdings when it comes to green development. Now, turning back to what was asked about pricing. In our earnings report, we've already said that we locked in sizable orders set for delivery over the coming 2 to 3 years, and based on what we've been seeing, demand from our customers has been quite robust when it comes to premium, quality AIDC resources. That's been evident through Q1 and continuing right into Q2. I'd say — at this point, these customers are all entering into long-term contracts with us in order to lock down these quality resources, and right now we anticipate pricing will remain stable. Should supply and demand dynamics strengthen down the road, we could potentially see prices move higher as well.

Timothy Zhao

analyst
#8

Nice work on those strong numbers. What I want to ask about is the capacity reserves you're holding for wholesale. I saw that during Q1, the business brought on an additional 300 megawatts for wholesale data centers. I'm curious whether you've set any goals for your reserve capacity across this year, and maybe over the medium term as well? Also, when it comes to that 1.3 gigawatts you have, meaning the expansion pipeline plus what's under construction, could you tell us how much of it has already gotten power quota approval from the government?

Xiao Liu

executive
#9

Thanks for asking, Tim. Over the medium to long haul, our strategy is to push harder on securing additional resources. As we've said before, per the company's plan, we intend to bring in a gigawatt's worth of resources, mainly across Mongolia down to River Delta, plus the key nodes sitting along the West — East Data, West compute route; and we'll reveal what resources we've picked up when we report the following quarters. When I talk about those resources, they're made up of land together with the power quotas. You're probably aware that the government applies window guidance. At this point, we've observed that the entire flow is already being put to the test. That's because here at VNET, 4 of our projects have won government approval, while the rest are still under review right now. So we feel quite confident about securing additional resources when it comes to land and our power quotes; and the company, as I mentioned, is actively looking into and acquiring potentially more resources across those few regions I listed.

Ming Ramey

analyst
#10

I truly appreciate it, and congratulations on those impressive results. I've got some questions regarding our business abroad. When it comes to the <<inaudible>> strategic investment, could you offer any perspective on the way this partnership could influence your approach to expanding overseas? <<foreign_lang>>

Xiao Liu

executive
#11

<<interpreted>> Thanks, Nina, for asking. When it comes to our deployment abroad, we keep quite a tight relationship with our main or key clients or customers. And they've been inquiring about our acquisition or planning of resources in the — in overseas markets. The company is actively getting ready and searching for possible resources abroad; more specifically, we mean resources in Southeast Asia and other regions too. Should there be any additional updates, we'll share them with you promptly moving forward. And also concerning CATL as the new strategic investor, since they operate globally, and they possess mature capabilities in the supply chain and green energy as well. I think these will serve as a pretty solid complementary — this will complement our strengths. Also when it comes to the business, we intend to carry out across these nations

Huiqun Li

analyst
#12

One thing I'd like to ask about is the ways we raise money. Given the CapEx outlook we've provided for the whole year, what's our view on cash generated from operations, and on the funding avenue available to cover that CapEx? Also, could the management team walk us through the risk project we may face going forward — what exactly is our plan there?

Peter Zhang

executive
#13

Thanks for raising that. The CapEx forecast we've given for the entire 2026 year rests on delivering 450 to 500-megawatt annually as our target. Our funding avenues are quite varied, spanning both the project level and the more conventional channels. Every one of these exists to serve one identical aim: backing the delivery target we've set for the full year. As a matter of fact, when it comes to ABS, or asset-backed securities, 2 were issued successfully by us during the first quarter, and our work in that area is ongoing.

Ethan Zhang

analyst
#14

Alright, I have two things to ask. First, I want to build on what was said about the land reserve strategy. Can the management team share additional detail regarding the reserve we currently hold in the Mongolia region, and also tell us how you view demand in the other user data areas tied to the computing compute hub cities? Then my second thing: might management offer some perspective on a possible listing in your Hong Kong market?

Xiao Liu

executive
#15

Ethan, thanks for raising that. On the land reserve strategy question — as I mentioned before, over the medium to long term, VNET intends to obtain 1 gigawatt, gigawatt in value, of campuses across Mongolia, the Yangtze River Delta, and the Easter Data West compute hubs. Put concretely, that 1 gigawatt in campus value would convert to approximately 1,000 acres of land, since pricing for that land is very inexpensive. Expressed as an actual percentage, the CapEx needed to buy land would represent just low single digits out of our total full year CapEx. That's why the company will move proactively to buy land so we're ready with reserve capacity. And building on the financing channels part of the question — being a listed company, we have multiple financing channels, from the listed company angle and at the asset level too. The company is actively working to raise funds in order to back our CapEx and also to repay our debt. Turning now to the possible listing on the Hong Kong Stock Exchange: we have been actively examining how feasible a potential Hong Kong listing would be, as part of what we're doing to optimize our capital structure and to better support the company's long-term strategic development, while also expanding our international investor base. As soon as there's a more defined plan or any definitive progress, we will communicate with the public market in a timely manner.

Sara Wang

analyst
#16

Thanks for letting me ask something. And once more, nice work on the strong results. I really just have one question — I've seen that our resource commitment and precommitment rate is already pretty elevated. And beyond that, there's an additional 1 gigawatt of resources being held for future development. Regarding that 1 gigawatt, what's the anticipated average lead time between placing the order and receiving delivery? And also, how should we approach the unit CapEx — for instance, CapEx per megawatt? And how should we view the direction it's heading?

Xiao Liu

executive
#17

Thanks, Sara, for asking that. To clarify the company's strategy: we intend to acquire resources worth gigawatt level across the 3 key regions, as I mentioned earlier, and we'll simply update everyone as things progress. Turning back to the unit CapEx for 1 unit, for 1 megawatt of unit, where we delivered, that unit CapEx comes to roughly RMB 20,000, and that's per kilowatt. We achieved that because of our supply chain capabilities plus our large-scale batch procurement. And we're pretty confident in — and also — so that covers the unit CapEx per kilowatt; now shifting to the precommitment rate. We're quite confident about keeping a fairly high precommitment rate. We've now disclosed our data as of Q1 2027. As for the 500-megawatt order we secured, delivery will happen in batches, so we'll keep the market updated on the orders we've locked in as well as how quickly they're delivered. And overall, we want to say we're fairly confident about maintaining or securing a high precommitment rate for our capacities that are to be delivered.

Operator

operator
#18

We're not taking any more questions right now. Everyone, that wraps up today's conference. We appreciate you joining in. At this point, feel free to hang up.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete VNET Group, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to VNET Group, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in VNET Group, Inc. or any ticker on your watchlist.