Warrior Met Coal, Inc. (HCC) Earnings Call Transcript & Summary

May 5, 2022

New York Stock Exchange US Materials Metals and Mining earnings 44 min

Earnings Call Speaker Segments

Walt Scheller

executive
#1

Thanks, operator. Hi, everybody, and I appreciate you spending part of your day with us to go over what happened in our first quarter of 2022. Once I finish my comments, Dale is going to walk through the results with more granularity, and afterward there will be time for your questions. We felt good about posting our second straight quarter of record quarterly earnings in more than 3 years, driven by robust customer demand. Worldwide met coal supply stayed tight through Q1, even as China kept cutting back its steel output; we are positioned well to keep honoring our commitments to customers despite possible worldwide economic swings down the road. Premium met coal demand held up strongly across the first quarter, thanks to continued steel output and because customers were restocking; we also saw a brief spike in demand from panic buying tied to Russia's invasion of Ukraine. Russian purchasers hunting for substitute coals in a market that was already tight drove prices into territory never seen before. <<inaudible>> was mostly behind the fact that this past quarter became the most volatile pricing stretch in recent memory; even so, the price spike did not last long, since we watched all the major indices surrender a big chunk of the gains the war had created. Our main index, the PLB, FOB Australia, opened the quarter at $357 per metric ton, then rose more than $313 per metric ton to reach a peak of $671 per metric ton on March 14, and ended the quarter at $515 per metric ton; beyond the robust demand, supply shortfalls remain an issue because of a combination of weather-driven problems in Australia and logistical bottlenecks in North America. As I noted earlier, Russia's invasion of Ukraine simply worsened market conditions that were already tight. We had anticipated that Chinese buyers would begin buying imported coal from the U.S. after the Olympic Games. Yet they stayed mostly on the sidelines through the whole quarter. Just a handful of deals involving North American suppliers and Chinese customers got done in the opening days of the quarter. Because steel output was lower for most of the quarter, Chinese steel mills got by using strong domestic coal production plus imported landborne coals from Mongolia, though those were below historical levels too, along with the leftover Australian coals sitting in bonded warehouses. The World Steel Association said recently that worldwide pig iron production fell 8.8% during the first 3 months of 2022. China posted an 11% drop in output for that period, whereas pig iron production in the rest of the world declined 4.3%. China's weaker steel output stems mainly from measures adopted for the Olympics plus recent shutdowns tied to COVID restrictions. Although lower steel production volumes elsewhere reflected ongoing supply chain troubles, steel demand overall is still solid even with volumes below what they were a year earlier. Regarding Warrior, our first-quarter sales volume came to 1.1 million short tons, versus 2 million short tons during the same period a year ago. The decline from last year stemmed mainly from the continuing labor strike, which reduced overall production, along with roughly 100,000 tons that shifted into the second quarter because of shipping delays at the port. Dredging, maintenance, and congestion during the first half of the quarter pushed some shipments back into March. Meanwhile, a mechanical failure of the ship loader during the final weeks of the quarter curtailed our last vessel loadings, which is what moved that volume into the second quarter. Because of these problems, 54% of our sales volume shipped in March, backloading the quarter's sales and driving demurrage costs up to nearly $3 million. Beyond that, though less significant, our rail transportation provider performed poorly in delivering product to the port on time; we estimate these delays cut first-quarter adjusted EBITDA by about $40 million, net income by $32 million, and EPS by $0.63. Geographically, first-quarter sales broke down as 66% Europe, 13% South America, and 21% Asia. We sold nothing into China during the first quarter, since the CFR China index price sat below the Australian FOB price for the whole quarter, apart from 3 days in early January. Spot sales accounted for roughly 15% in the first quarter. First-quarter production volume this year reached 1.5 million short tons, against 2.2 million short tons in last year's comparable quarter. Output during the quarter came from operating both longwalls plus 5 continuous miner units at Mine 7 and 2 continuous miner units on Mine 4's longwall. Our lead days on the longwalls stayed essentially unchanged through the quarter and held up well. The mines performed strongly and efficiently in the first quarter as we raised Mine 4's production to roughly 50% of its 1 million ton nameplate capacity. We ended the quarter running the mines with a mix of salaried and hourly employees, about 50% of the typical workforce, while generating approximately 75% of typical production volume. First-quarter capital spending and mine development totaled $20 million and remains on track for the full year, including work on the 4 North portal, which should wrap up early next year; on that point, given the company's current free cash flow generation and our philosophy of investing in our core business, our Board recently approved buying 2 new sets of longwall shields for the existing mines; that marks another major investment of approximately $100 million to keep our mines well capitalized and running as efficiently as possible. We anticipate making down payments during this year, and that is captured in our annual guidance, with final delivery projected for the third quarter of 2023. Before turning things over to Dale for a more detailed discussion of our first quarter results, I wanted to spend a moment talking about the exciting and important announcements we issued earlier this week. To be specific, we announced the relaunch of development at our Blue Creek reserves, our choice to accelerate returns to stockholders through special cash dividends — with the first dividend amounting to $0.50 per share — and an update regarding our capital allocation approach. Let me begin with our capital allocation approach, because it serves as the overarching framework for understanding how we think about creating short- and long-term stockholder value, and it also explains why our Board chose to unlock the value of Blue Creek and boost stockholder returns through special cash dividends on top of our regular quarterly dividend. First, let's examine where we stand from a cash and operating standpoint. Our cash position today is much stronger than it was 2 years ago, since we have generated significant free cash flow across the last 2 years. Given the current industry outlook pointing to higher met coal pricing in the near term, we will keep generating significant amounts of free cash flow going forward.

Walt Scheller

executive
#2

Additionally, we've shown that we can function as a business with minimal costs and little debt, backed by ample liquidity, so we stay adaptable amid industry downturns and swings within the metallurgical coal sector. Thanks to this strategy, we've kept running our operations effectively across the last several years even when facing major obstacles; that commitment won't waver no matter what happens with broader pricing or how much cash we hold. Next, as things stand now, we've accumulated enough liquidity that lets us deploy our capital, whether by investing wisely into our operations or by giving money back to shareholders. To wrap up, even though we stick to the very same capital allocation guidelines we've followed for ages, the funds we have on hand plus the free cash flow we produce provide us greater adaptability and reach. Dale will share additional details regarding how we allocate capital shortly. For now, though, I want to share that each person at Warrior feels tremendous enthusiasm regarding what Blue Creek could do to remake this business. We're eager for the chance to extend a solid history of delivering shareholder value through this endeavor. Crucially, right now is the perfect moment to bring this initiative back to life; we think appetite for premium high vol A coals is set to keep rising because of how distinctively they blend. Meanwhile, total availability of premium coals is going to stay tight from shrinking output and an absence of fresh ventures, and that underpins solid pricing basics going forward. The Tier 1 high vol A grade from Blue Creek, combined with a shortage of Tier 1 ventures across the United States, points to substantial appetite for what we'll offer. One more appealing aspect of this new operation is that we anticipate costs of production landing within the first quartile on the worldwide seaborne cost curve; we think merging these elements will yield among the strongest met coal margins anywhere in the U.S. After full build-out, Blue Creek should broaden what we offer to customers worldwide by supplying 3 premium part coking coals that ought to command the top premium met coal prices across seaborne markets. The fresh single longwall operation at Blue Creek should yield on average 4.8 million short tons each year of premium high vol A met coal. Following our build-out of Blue Creek, we anticipate that this new operation might lift our yearly output of nameplate capacity to close to 13 million short tons annually, which works out to a yearly production growth rate of 60%. We hold roughly 70 million short tons of reserves alongside 49 million short tons of resources at Blue Creek, adding up to 119 million short tons. According to the present timeline, we anticipate initial development tons from continuous miner units arriving during the third quarter of 2024, while the longwall should begin operations in the second quarter of 2026. You can locate all these specifics and far more within a slide presentation available in the IR portion of our site. As I noted earlier, Blue Creek stands as a transformative prospect for Warrior. There's nothing we're more thrilled about than getting this project underway, and we can't wait to witness what our investment yields once development wraps up. At this point, Dale is going to walk everyone through our results for the first quarter in more depth, share a few extra metrics regarding how we're allocating capital, and give further details about the way we're handling the financing for Blue Creek.

Dale Boyles

executive
#3

Thank you, Walt. Before I get into the specifics of the quarter, I'd like to talk about our approach to capital allocation as we proceed with Blue Creek. With liquidity where it is right now, this seems like the right moment to share more about our thinking. In the May 3 press release, we set out the policy we currently follow on capital allocation, which centers on being able to fund operations no matter how much the met coal market swings, putting money into highly accretive growth opportunities like Blue Creek, and using our free cash flow to give cash back to stockholders via special cash dividends or stock repurchases. To be more precise, there are specific key metrics we're aiming to hit as we make these capital allocation choices, including through building out Blue Creek. Those are: one, keeping minimum total liquidity at a higher level of $250 million, which includes a minimum cash balance of $150 million; two, remaining 1.5x to 2x levered. And three, weighing the value of our NOLs against stock repurchases, which might put those NOLs at risk; we firmly believe our capital allocation policy and our key metric guidelines represent the right approach. They strike a balance between capital investments aimed at medium to long-term growth and near-term returns for our stockholders. Now let's turn to Blue Creek. In deciding to proceed with the project, we measured Blue Creek's potential against our investment criteria. With Blue Creek being one of the few large-scale Tier 1 assets in the country, we anticipate the project will produce an attractive internal rate of return on our investment of roughly 30%. As we consider the best way to account for the $650 million to $700 million investment, we'll be opportunistic in assessing funding alternatives beyond our free cash flow. Should financially prudent chances arise to access external financial resources, we will pursue them. We're glad that our solid base of operations has allowed us to take this flexible approach. That said, we expect to generate sufficient free cash flow across the 5-year construction period to cover the project fully in cash, pay special dividends or repurchase stock and retire debt early by as much as 2 years. At that point, we expect the company would carry no debt while producing approximately 13 million short tons per year. When weighing the timing of Blue Creek's development and the investment it requires, several internal and external factors shape our decision to move forward with the project now, even with the inflation we are currently experiencing. First, we refinanced our debt in the fourth quarter last year and extended the maturity until late 2028, well past the start of the Blue Creek longwall in 2026. Second, our cash and liquidity has grown considerably since we first announced our intention with Blue Creek in early 2020, including an additional $241 million of cash and an additional $247 million of total liquidity on our balance sheet. Third, the combination of robust market conditions right now and elevated pricing ought to let us produce substantial free cash flow during this year, which further lowers the funding risk attached to the project. Fourth, pulling the project schedule forward by 15 months means production starts earlier as well, boosting profitability and free cash flows across the next 5 years, 2 years ahead of when our senior notes mature. Fifth, should the need arise, financing choices remain open to us so we can keep our capital structure efficient and low-cost. And last, beyond all of those items, we anticipate generating sizable free cash flows throughout the 5-year construction period, which will supply added liquidity to fund the advancement of Blue Creek while also making additional cash returns to stockholders. Taken together, these items and the value Blue Creek can bring our stockholders leave us confident the project will succeed. Having said that, I'll move on to the first quarter results. During the first quarter of 2022, the company posted its second straight quarter of record quarterly results, with net income on a GAAP basis of $146 million, or $2.83 per diluted share, versus a net loss of $21 million, or $0.42 per diluted share, in the same quarter a year ago. Non-GAAP adjusted net income for the first quarter, once you exclude the non-recurring business interruption expenses, idle mine expenses and other income, came to $2.97 per diluted share, against adjusted net income of $0.08 per diluted share in the same quarter a year ago. Adjusted EBITDA reached $244 million in this year's first quarter, yet another all-time quarterly record, compared with $47 million in the same quarter a year ago. Driving that quarterly gain was mainly a 220% rise in average net selling prices, partly offset by a 42% drop in sales volume. Our adjusted EBITDA margin came in at 64% during the first quarter this year, versus 22% in the same quarter a year ago. As we see it, the financial effect of those shipping delays Walt mentioned earlier cut first quarter sales volume by 100,000 short tons, adjusted EBITDA by roughly $40 million, net income by $32 million and EPS by $0.63 per share. Those delays hit harder because of today's high pricing environment. Total revenues came to $379 million in the first quarter, compared with $214 million in the same quarter a year ago. That 77% rise stemmed mainly from the 220% increase in average net selling prices, partly offset by 42% lower sales volumes in the first quarter versus the same period a year ago. Additionally, other revenues got a positive boost in the first quarter this year from an 87% increase in our natural gas prices, offset by a non-cash mark-to-market loss of approximately $13 million on our gas hedges. That mark-to-market hedge loss traces back to hedges placed before the war in Ukraine, which recently set off a run-up in natural gas prices. On the gas side, we're seeing solid performance — it just isn't reaching the level it could because of the hedges. For the Platts Premium low vol FOB Australian Index, the price came in at an average of $361 per metric ton higher, which works out to a 284% increase in this year's first quarter versus the same period a year ago. For that first quarter, the index averaged $488 per metric ton. Once demurrage and other charges are factored in, our gross price realization dropped, leaving us with an average net selling price of $339 per short ton in this year's first quarter, versus $106 per short ton in last year's comparable quarter. This year's first quarter saw demurrage charges run roughly $3 million above last year's level, largely because of the port delay problems Walt covered earlier in his remarks. Cash cost of sales came to $134 million, or 35% of mining revenues, in the first quarter, compared with $154 million, or 74% of mining revenues, in the same quarter a year earlier. The drop in total dollars was mostly driven by a $65 million hit from a 42% decline in sales volume, partly offset by $45 million in higher variable costs tied to price-sensitive wages, transportation and royalty costs.

Dale Boyles

executive
#4

Beyond that, our expenses came in higher because of inflationary pressure on belt structure, roof bolts, cable, magnetite, rock dust, and other materials and equipment. Even with those elevated variable costs and inflation, cash margins reached $220 per short ton during the first quarter, versus just $27 per short ton in the prior-year period, which shows how much leverage we get from stronger met coal prices, fueling both profitability and free cash flow. Cash cost of sales per short ton, FOB port, came to roughly $119 in the first quarter, against $79 a year earlier in the same quarter. Transportation and royalty costs made up $32 of that increase, along with a rise in production costs from inflation of about $3 per short ton. For price-sensitive items like wages, transportation, and royalties that move with met coal pricing, cash costs were substantially higher in this year's first quarter than in last year's comparable quarter. As you'll recall, transportation costs lag by 1 quarter, and index prices averaged $361 higher in the first quarter than in the same quarter a year ago. Because prices were so much stronger period-over-period, variable transportation and royalty costs now make up much bigger portions of the cost per ton than the usual roughly 1/3 percentage. In this year's first quarter, variable transportation and royalty costs represented 46% of the $119 cost per ton, versus just 29% in last year's same quarter, mainly because met coal pricing was higher. Assuming coal prices remain at or close to these record highs, we anticipate transportation and royalty costs will account for a larger share of our total cash cost over the next several quarters. SG&A expenses totaled roughly $14 million, or 3.7% of total revenues, in this year's first quarter, up from the same quarter last year, largely because of greater stock compensation expense tied to equity grants for retirement eligible employees and a stock price that was 60% higher. In the first quarter, we took on incremental non-recurring business interruption expenses of $7 million tied directly to the ongoing labor strike. Those non-recurring costs were mostly for added safety and security, legal and labor negotiations, and other items. Idle mine expenses came to $3 million in the first quarter and reflect costs incurred while operations at both mines ran at reduced capacities, including electricity, insurance, maintenance, labor, and taxes, and they are largely fixed in nature. Now on to cash flow. In this year's first quarter, we produced $50 million of free cash flow, which came from cash flows provided by operating activities of $70 million, minus cash used for capital expenditures and mine development costs of $20 million. That gave us free cash flow conversion of 20% this quarter, compared with 50% in last year's first quarter. Free cash flow in this year's first quarter took a hit from a $159 million increase in net working capital from the fourth quarter of 2021. Net working capital rose mainly because accounts receivable climbed alongside higher met coal pricing, and because shipping delays we mentioned earlier pushed inventories up while sales volumes came in lower. Available liquidity totaled $557 million when the first quarter closed — that's $78 million, or 16%, above the fourth quarter of 2021 — made up of cash and cash equivalents of $434 million plus $123 million accessible through our ABL facility, after subtracting roughly $9 million of outstanding letters of credit. Let's move on now to how we see 2022 shaping up. Our sense is that we're positioned well to satisfy the customer commitments we expect for 2022. Given how things stand operationally, and absent a fresh labor contract, we think we can hit the production and sales volumes we've laid out, including in the outlook portion of the earnings release. Those figures reflect bringing Mine 4 back up at roughly 50% of capacity while Mine 7 runs below its typical production rates. With that, I'll hand things back to Walt so he can wrap up.

Walt Scheller

executive
#5

Thank you, Dale. Prior to starting the Q&A portion, I want to offer a few closing remarks regarding what we anticipate for the second quarter and the entire 2022 year. As Dale mentioned previously in his comments, our cash cost for each short ton during the first quarter of 2022 came in much higher because of the variable pieces of our cost structure—things like wages, transportation and royalties—along with inflation's effects. We anticipate that this pattern of elevated transportation and royalty expenses will persist through upcoming quarters, until pricing returns to normal historical levels. One more element that could hurt our cash cost is rising inflation's impact, which we pointed out earlier. March U.S. inflation reached its quickest rate in 4 decades, driven by pandemic-related supply and demand mismatches, together with stimulus programs designed to bolster the economy, which drove the consumer price index to an 8.5% annual rate—a 40-year high. As we said during the previous quarter, we anticipate increases ranging from 10% to 25% in steel prices, freight rates, labor and other materials and supplies during this year. As Dale mentioned previously, we absorbed roughly $3 per short ton in additional inflation during this year's first quarter. These inflationary rises impact, among other items, what we pay for belt structures, roof bolts, cable, magnetite, rock dust and machinery and equipment purchases. Renewed strength has emerged in the met coal indices during the opening weeks of this quarter, since added sanctions and how right bands of Russian coals are making it hard for some customers to keep buying from suppliers of Russian coal; we do anticipate that certain geographies, including India and China, will keep purchasing Russian coals for now; however, the recent index increase is likely to be undone because the danger of a global economic downturn stays elevated thanks to inflationary pressures and high energy costs. Furthermore, we anticipate Australian supply will be more robust starting in the year's second half. Consequently, we believe that weaker demand combined with better supply will deliver pricing relief to purchasing managers. Even so, we continue to anticipate that pricing will stay above cost curve economics because of trade disruptions stemming from the war in Ukraine. With that said, we'd like to begin taking questions. Operator?

David Gagliano

analyst
#6

I've got a handful. I'll do my best to be brief; so — to start with, looking at things in the short term, regarding when that inventory drawdown happens, clearly, the full-year sales guidance hasn't moved, and if you use the midpoint, that works out to roughly 1.6 million tons of sales volumes per quarter on average, I believe, across the coming few quarters, which is a fairly big step up. Should we reasonably figure that gets distributed fairly evenly across those next few quarters? Or what's the right way to look at that part?

Walt Scheller

executive
#7

Appreciate that, David; it's Walt here. My expectation would be that it leans more toward the back half. I believe in the second quarter, we'll keep seeing some problems at the port, where work is underway on one of the car dumps. So my expectation is the second quarter won't be quite as strong as what we'll get in the third and fourth quarters; therefore I think it tilts somewhat more toward the back half.

David Gagliano

analyst
#8

All right. All right. That's reasonable. So now, if we shift focus to the part about returns to shareholders and how that gets balanced against financing Blue Creek — is the approach to accumulate sufficient cash in the near term so Blue Creek can basically be paid for upfront, and after that begin giving cash back to shareholders? Or is the intention to finance Blue Creek in a way that lines up more with the CapEx timeline shown in the slide deck from a few days ago, and then give cash back sooner, if that's clear.

Dale Boyles

executive
#9

Yeah. David, it's Dale here. No, what I'd say is that we would keep providing shareholder returns as the project moves along. We believe that's something we can do. Clearly, we're accumulating additional cash, since prices have remained elevated for a longer stretch than, I think, anyone expected. But as we go into next year, if you look at the presentation, 2/3 of the capital gets spent in '23 and '24; so we're going to build up somewhat more cash. But considering where the markets stand and the cash we're producing, we think we could carry out one or multiple special dividends within the next year or 2.

David Gagliano

analyst
#10

All right. To dig a bit deeper into what you just said — I've got the CapEx schedule for Blue Creek, and that's really useful. So would it be fair to think you'd want the money sitting on the balance sheet ahead of that CapEx — meaning roughly $500 million of CapEx related to Blue Creek — before any cash goes back to shareholders? Or is that the wrong way to look at it?

Walt Scheller

executive
#11

No. What we've said is, the minimum — since none of us can forecast what the markets are going to do, or whether demand gets destroyed by everything happening in the markets right now. So we haven't established a target for when we'd begin giving cash back to shareholders, nor a target cash balance beyond a floor. As I mentioned in my remarks, across that 5-year stretch, met coal prices will bring highs and lows. And during construction, while the price is happening, we want at least $150 million of cash on hand at all times. But expect it to run above that, so the project can be funded; we don't want to spend every dollar on returns and then be caught without the cash to fund that year if the market turns against you. So with the ability to build up some cash here and do both, we believe we'll hit both goals.

Lucas Pipes

analyst
#12

The first thing I'd like to discuss is the NOLs. With prices as strong as they are right now and all the taxable income being produced, can you remind us what's left in those balances? Over this year, how is that balance going to be impacted?

Dale Boyles

executive
#13

Lucas, I appreciate the questions — this is Dale. Sure. As we entered the year, federal NOLs stood at just about $800 million, and state NOLs were at nearly $1 billion. So yes, we started this year with quite a lot of those still on hand; and since we're bringing in significant cash and strong profitability, a substantial portion of those NOLs will get used up during this year. How quickly we consume them just hinges on how long prices remain at these elevated levels; so regardless, usage this year is going to be significant. But — where we end up at the close of this coming year is fairly difficult to forecast, though that keeps delivering additional cash for shareholder returns and for funding Blue Creek.

Lucas Pipes

analyst
#14

Yes. That's quite useful. Now, regarding the conversation about returning capital, your buybacks have traditionally played a smaller role in what you talk about. Assuming the second quarter turns out even stronger than the first, with volumes and so on, would that shift? And when we look at the close of this year, they're also nearly used up. Would your repurchases climb higher on the priority list?

Walt Scheller

executive
#15

Yes. I doubt it would happen that soon, in the second quarter or third quarter. From that angle, I'd anticipate stock repurchases likely coming next year. It truly hinges on how quickly we exhaust them this year; but at the pace we're going now, clearly, you're going to burn through them quite fast. Still, we don't anticipate prices remaining at this level for the rest of this year. We believe a correction period is coming, and it's going to be fairly sharp, since we've already witnessed pretty major swings even over the last couple of months — in fact, overnight, large swings, $70, $80. So it can adjust real quickly. So we'll make that decision later on, but I don't think it's as early as the second or third quarter and maybe <<inaudible>> quarter.

Lucas Pipes

analyst
#16

Looking at how Warriors has produced over time, you had stretches where output got close to 8 million tons, or perhaps even exceeded that 8 million ton number on an annualized basis. With today's guidance at the midpoint, what are the main positive and negative factors? If I set 6 million tons against roughly 8 million tons from earlier periods, how do you bridge that gap? Is labor the issue? Is it a matter of where you sit in the mine plan? I'd value that viewpoint, plus perhaps some insight into when we might get back near that 8 million ton mark, that near-term level?

Walt Scheller

executive
#17

The cause is entirely, or nearly entirely, labor. As things stand, we're nearing the point of operating Mine 7 at full capacity. Over at Mine 4, we're genuinely operating at roughly half capacity; restoring it to full capacity lifts you by over an additional 1 million tons, and beyond that there's simply some arithmetic still unaccounted for that accounts for the remaining 1 million tons. We keep watching our workforce expand each month. Consequently, we anticipate that our production will keep climbing as the year progresses and/or the present labor circumstance gets resolved. That's what we expect — continued growth via one of those 2 approaches.

David Gagliano

analyst
#18

Okay. What I want to ask actually ties into something you mentioned just a short while back; as you noted, volatility has been enormous, even overnight. Pinpointing figures is always difficult, isn't it? I recall that in the prior quarter, there was a shift away from discussing realized pricing against benchmarks at a discount, that sort of thing, because of how delivery timing affects that spread. So I thought perhaps we might frame it somewhat differently. Since today is May 5, what would be a sensible estimate for lag timing, broadly speaking, on average, when comparing index pricing with Warrior's realized pricing — how far back should the lag go for the present quarter, say?

Walt Scheller

executive
#19

Generally speaking, the way we establish pricing depends on the contract, but it can extend to roughly a month. So to determine our pricing, we take the average of prices over the preceding 30 days.

David Gagliano

analyst
#20

All right. And taking into account everything happening globally right now, would that still be a sensible thing to assume?

Walt Scheller

executive
#21

Yes, it is. The sole factor that can change is that spot pricing gets determined based on whatever that particular day's rate happens to be, or whenever it's established. Still, I'd like to echo something Dale mentioned, since it's quite possible for us to see a sizable pricing shift while our rail costs continue to mirror the pricing from the quarter before. That means if a notable price change occurred within 1 quarter, the rail adjustment won't necessarily catch up right away. As a result, you might observe elevated rail rates or elevated transportation rates lasting for a quarter past that revised price.

David Gagliano

analyst
#22

All right, that's useful. And regarding — with all the situation in Europe, as I understand it Warriors sends a substantial amount of volume straight to sale mills in Europe. Could you share a bit about what we're hearing from the European customer base when it comes to their willingness to accept full delivery, plus any thoughts on how sensitive they are to price and demand?

Walt Scheller

executive
#23

Honestly, demand from our European customers looks very strong. In fact, when people were rushing around trying to determine how they'd substitute for the coal that had been supplied from Russia, we're seeing stronger demand in Europe from a number of those customers. And my sense is that everyone still intends to take their full commitments and full deliveries, and we have not observed any shift in that.

Dale Boyles

executive
#24

Right. We've even received a few inquiries regarding pairing our coal alongside thermal coal. So, with what's been happening in Ukraine, there's been quite a bit of interest coming our way these past 2 months.

Nathan Martin

analyst
#25

Nice work on the quarter. I suspect by now most of what I had has already been covered, though perhaps I'll return to costs. Clearly, cash cost guidance is up somewhat here. Dale, I believe in your prepared remarks you noted that variable cost was about 46% in the first quarter, if I'm remembering right, and maybe Walter said that too. But you also said that should prices remain high, we'd likely see an elevated level similar to that compared with the typical — I think it's 30% — perhaps 33% of costs tied to variable items. So I suppose my question is, given this new increase in cash cost guidance, what sort of net price are you assuming? Previously, I think you said you were assuming a fairly steep decline as the year goes on. How has your thinking shifted there?

Dale Boyles

executive
#26

Well, I think what we did was try to assess and ask, well, how much would it fall and how far, and since prices averaged $488 a metric ton in the first quarter, they'd have to drop quite a bit across the next 3 quarters just to average even $400. So we sort of built our metrics around the upper 3s or near that $400 figure because, as Walt said, we're going to have a quarter with a steep drop, and then another quarter will pass before our transportation costs come down. That's why we have to account for that 1 quarter lag.

Nathan Martin

analyst
#27

Alright, Dale. So from what I'm hearing, you're basically figuring somewhere in the upper $300 to $400 range as, say, a full-year average, and that's baked into those new 115 and 125 numbers for the short-term guidance?

Dale Boyles

executive
#28

Correct, since each quarter following the first quarter would need to come in at an average of around $270, or something in that neighborhood. That means you'd need a fairly substantial falloff over the remainder of the year.

Nathan Martin

analyst
#29

Understood. That's clear to me. Honestly, that was everything I had, everyone. Thanks for your time. Wishing you the best of luck.

Walt Scheller

executive
#30

Thanks; that brings today's conference to a close. I appreciate everyone joining. You're free to disconnect now.

Operator

operator
#31

Appreciate that, sir. That brings today's call to a close, and we're grateful to everyone for joining us. At this point you're free to hang up, and we hope you have a great evening.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Warrior Met Coal, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Warrior Met Coal, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Warrior Met Coal, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.