Walt Scheller
executiveThanks, operator. Hi, everybody. We appreciate you spending time with us today to go over what we achieved in the third quarter of 2022. Once I finish my comments, Dale will walk through the results with more granularity, and afterward there will be time for your questions. It's a pleasure to report on yet another highly robust quarter, with outcomes coming in ahead of what had been anticipated even with the market presenting obstacles. Once again we showed that we can use our cost-efficient operating approach to satisfy robust demand from customers for our premium met coals and capitalize on favorable met coal prices to produce those outcomes. The biggest persistent obstacle holding back our performance involves delays in shipments, which is a challenge we've faced before, but it turned especially troublesome in the third quarter because of several different factors. A mix of poor rail service, outages tied to significant equipment maintenance at the Port of Mobile that ran eight weeks late, and heavy vessel congestion pushed coal inventory levels higher, caused missed sales, and drove up demurrage costs. Although the maintenance-related port outages ought to be finished now, we anticipate that port congestion difficulties will persist in the quarters ahead. On top of that, we are still worried about a possible work stoppage stemming from the national railroad contract negotiations. Luckily, we have lately begun to notice progress in cutting down these delays, thanks to more rail crew availability and the new tandem car dump at the Port of Mobile coming online. We also anticipate improvement that is gradual yet slow as our rail carrier keeps refining their cycle times and as the port keeps working through ongoing performance problems and heavy traffic volume. As you're about to hear, if we were able to ship additional volume, we could sell additional volume. With our solid customer base, low-cost operating model, and liquidity position, we kept using our robust production capabilities to grow our inventory, which climbed to 858,000 short tons by the close of the third quarter. Once shipment problems get resolved, we are positioned well to capitalize on sustained demand for our high-quality products. Moving to pricing and met coal demand, we saw less volatility during the third quarter compared with earlier quarters. Even so, as anticipated, we kept noticing a broad softening of steel demand in certain geographies; specifically, the European steel industry kicked off many production shutdowns of electric arc furnaces because of elevated electricity prices, along with output reductions in blast furnace capacity; we keep seeing weaker steel demand, elevated inflation, and economic uncertainty in that region, all of which affects demand from our customers. Europe's prohibition on importing Russian coals went into effect on August 10th, which we anticipate will lead customers to seek met coal supply from other geographies. Furthermore, crossover coals offered some price support since thermal coal demand stayed robust for the bulk of the third quarter. Looking at Asia, Chinese steel output improved slightly across the first 2 months of the quarter, yet it remains weaker than what we saw in the first 9 months of 2021, since the property sector in China is still depressed and strict COVID measures keep holding back economic activity. Our benchmark, the PLV FOB Australia, had been correcting since late May and opened the quarter at $274 per short ton, then bottomed out at $171 per short ton in early August. After hitting that low during the quarter, the index managed to recover part of the lost pricing ground, closing the third quarter at $246 per short ton. The CFR China Index fell more sharply because of weaker demand, finishing the third quarter at $279 per short ton, a drop of $78 per short ton versus its July first level of $357 per short ton. According to a recent report from the World Steel Association, worldwide pig iron production declined 4.4% during the first 9 months of 2022. For that same period, China posted a 2.5% production decline, whereas pig iron output in the rest of the world dropped 8.1%. The reduction in Chinese steel output stems from recent shutdowns tied to stringent COVID restrictions along with weaker demand, particularly in property. Through our ongoing conversations with customers, we continue to hear that steel demand is strong in oil and gas, aerospace, and shipbuilding. Every other sector, automobiles included, has softened and is expected to stay soft given the broadly difficult economic environment. Despite that backdrop, our performance was quite good, with third quarter sales volume rising versus the third quarter a year ago. As I mentioned, absent the shipment delays, we could have moved even more volume during the quarter. By a wide margin, the biggest hit to our third quarter results came from the weak performance of our rail transportation provider, which kept our product from reaching the port on time. On top of that, strong demand for seaborne thermal coal meant more thermal coal flowed through the port, which added congestion and affected loading dates and times. We sold 1.5 million short tons in the third quarter, up from 1.1 million short tons in the same quarter a year earlier. Breaking down third quarter sales by geography, 62% went into Europe, 17% into South America, and 21% into Asia. European sales stayed strong even with the economic headwinds the region faces, including softening steel production. Our European customers kept running their coke batteries to generate gas and heat for local communities, and also to bring down their overall energy costs, even as steel production declined. Third quarter production volume this year came to 1.6 million short tons, compared with 1.1 million short tons in the same quarter of last year. During Q3, output came from operating two longwalls plus 5 continuous miner units at Mine 7, along with 3 continuous miner units and the longwall at Mine 4. Our longwall lead times stayed lengthy and consistent. The mines performed nicely and operated quite efficiently in Q3, even with certain skip maintenance downtime that we talked about during the prior earnings call. We wrapped up the quarter operating with a mix of salaried and hourly staff, roughly 50% of the typical headcount, yet generating over 80% of typical output. These figures mark yet another robust quarter for worker productivity versus earlier periods. Throughout the last 12 months, the mines have moved upward in clean tons generated per man-hour worked, thanks to well-funded mining operations, adjusted shift plans, and a more efficient hourly team. This productivity gain has aided in countering part of the inflation we've faced; we're grateful for our employees' considerable work to push output higher while still keeping a safe workplace. In Q3, we invested $56 million in CapEx and mine development. CapEx totaled $41 million, including $12 million allocated to the Blue Creek project. Mine development outlays reached $15 million for the quarter. So far this year, we've put $120 million toward CapEx, with $21 million of that going to the Blue Creek project.
Walt Scheller
executiveFor the entire year, we're looking at somewhere between $75 million and $80 million going toward sustaining capital at the mines we already operate. On top of that, we anticipate somewhere in the range of $110 million to $120 million going to special projects — that covers Blue Creek, the new longwall shields, and the 4 North portal. When we take those full-year target figures together with what we've already spent so far this year, it points to the fourth quarter being our heaviest quarter for CapEx in 2022. Rising inflation and extended lead times are things we keep seeing affect our operations, and we don't know how long that will last. Beyond the higher costs, wait times for supplies and for equipment purchases — whether new or rebuilt — are still running 18 to 24 months. We've partially offset these problems thanks to better productivity at the mines, but even so, we're seeing costs for operating supplies and materials, repairs, and major equipment rebuilds climb by 25%-35%; those higher prices dragged our third quarter results down by $4 per short ton. U.S. inflation came in at 8.2% in September, close to a four-decade peak, and the Federal Reserve kept raising interest rates at a quicker pace as it tries to pull that figure lower. Looking forward, we achieved solid progress during the quarter on building out Blue Creek, which is a transformational opportunity for Warrior. To be more specific, we kept advancing site development and kept building the slope and service shaft. With the early development phases continuing on schedule, both the activity at Blue Creek and the money needed for it are going to grow over the rest of 2022. We're still very enthusiastic about the chance this project gives us to build substantial stockholder value; we keep balancing what we put into Blue Creek against what we hand back to stockholders, so they can gain from our robust free cash flow generation both near term and long term. In the third quarter, we were glad to pay yet another special dividend, $0.80 per share — the second special dividend of 2022. I'll hand things over to Dale now so he can walk through our third quarter results in more detail.
Dale Boyles
executiveThank you, Walt. Looking at Q3 of 2022, our GAAP net income came in at $98 million, which works out to $1.90 for each diluted share. In the comparable period a year earlier, that figure stood at $38 million, or $0.74 for each diluted share. When we strip out the non-recurring business interruption expenses along with idle mine expenses, non-GAAP adjusted net income for the quarter reached $2.10 for each diluted share, versus $0.97 for each diluted share on the same adjusted basis a year ago. Adjusted EBITDA for Q3 of this year totaled $172 million, up from $105 million during the equivalent quarter of last year. Driving that quarter-over-quarter gain were two main factors: average net selling prices climbed 32%, and sales volumes rose 42%, though these were partly counterbalanced by greater variable transportation and royalty costs, as well as inflationary pressure on labor, materials, supplies, and major equipment rebuilds. Our adjusted EBITDA margin for the quarter came to 44%, whereas it was 52% in the same period a year prior. Total revenues reached $390 million in Q3, compared with $202 million in the year-ago quarter; that 93% jump stemmed largely from the 32% rise in average net selling prices and the 42% higher sales volume. On top of that, other revenues got a boost this quarter from natural gas prices that were up $6, or 145%, relative to the prior year's third quarter. Other revenues in last year's third quarter were also dragged down by a $6 million loss on natural gas hedges that existed back then. The Platts Premium Low-Vol FOB Australia index price averaged $13 per short ton less this quarter than in the same quarter a year earlier. For Q3, that index price averaged $227 per short ton. Demurrage and other charges brought our gross price realization down to an average net selling price of $248 per short ton this quarter, versus $189 per short ton in the year-ago quarter. Those demurrage and other charges ran roughly $13 million above last year's level in Q3, driven mainly by stronger pricing and the shipment delays Walt mentioned a few minutes back. Cash cost of sales came to $202 million, representing 54% of mining revenues for the quarter, compared with $91 million, or 46% of mining revenues, in the same quarter last year. That $111 million increase was chiefly attributable to $73 million in higher variable costs tied to price sensitive wages, transportation, and royalty costs, including inflation's impact, elevated maintenance costs, and other spending, plus a $38 million effect from the 42% higher sales volume. Inflation was responsible for $7 million of the added cost and $4 per short ton, arising from pricier belt structure, roof bolts, cable, magnetite, rock dust, and other materials, along with labor and parts and repairs and major equipment rebuilds. Even with elevated variable costs and inflation, third-quarter cash margins reached $113 per short ton, up from $103 per short ton during the same period a year earlier, which shows how much leverage we get from stronger met coal prices, fueling both profitability and free cash flow. Cash cost of sales per short ton FOB port came in at roughly $135 in the third quarter, versus $86 in last year's comparable quarter. Of the $49 per ton increase, transportation and royalty costs made up $31. The other $18 of the increase came from a rise in production costs tied to inflation of $4 per short ton, Mine 7 skip repairs of $4 per ton, Mine 4 production costs that had previously been treated as idle costs of $4 per ton, and higher other spending of $4 per short ton. Because we kept ramping up Mine 4 production through the quarter, more costs were classified as production costs rather than idle costs, which is how they were classified in the prior-year comparable quarter. Variable transportation and royalty costs represented 47% of the $135 cash cost of sales per short ton in this year's third quarter, against just 39% in the same quarter a year ago, mostly because of stronger met coal pricing and sales volume. Keep in mind that our transportation rates get reset at the start of every quarter, based on average met coal prices from the quarter before. So we anticipate transportation cost in the fourth quarter will come in below the third quarter. SG&A expenses totaled roughly $11 million, or 2.7% of total revenues, in this year's third quarter, and they exceeded the prior-year same quarter because of higher employee-related expenses, mainly greater stock compensation expense and greater professional fees. In the third quarter, we incurred $7 million of incremental non-recurring business interruption expenses tied directly to the ongoing labor strike; these non-recurring expenses were mostly for incremental safety and security, legal and labor negotiations, and other expenses. Idle mine expenses came to $5 million in the third quarter, representing costs incurred while both mines operated at reduced capacities, such as electricity, insurance, maintenance, labor, and taxes. Those expenses fell quarter-over-quarter, mainly because Mine 4 partially restarted this year, unlike the prior-year comparable quarter when it sat fully idle. Turning to cash flow, in this year's third quarter we generated $191 million of free cash flow, which came from cash flows provided by operating activities of $247 million. Cash used for capital expenditures and mine development costs was $56 million; that produced free cash flow conversion of 112% this quarter, versus 50% in last year's third quarter. Free cash flow in this year's third quarter got a positive boost from a $95 million reduction in net working capital from this year's second quarter. The main reason net working capital went down was a reduction in accounts receivable, which stemmed from weaker met coal prices and the schedule of sales, and that was partly counterbalanced by larger inventories caused by robust output and the shipping holdups we mentioned earlier. At the close of the third quarter, our total available liquidity hit a record $869 million, which marks a gain of $101 million, or 13%, compared with the second quarter of 2022, and it was made up of $746 million in cash and cash equivalents plus $123 million accessible through our ABL facility. As things stand, we are in a solid position to keep advancing and financing our Blue Creek project despite whatever difficult macroeconomic headwinds may arise soon. Let's move on now to our outlook and guidance for 2022. With this year almost finished and a clear view of overall volumes, we have revised our guidance. Although shipping delays have improved bit by bit, we expect those problems to keep affecting us through the rest of this year. That said, we think we can still achieve our production and sales volumes, as laid out in the outlook section of our earnings release. I'll hand things back to Walt now for his closing remarks.
Walt Scheller
executiveThank you, Dale. Prior to starting the Q and A, I want to offer a few closing remarks regarding what we anticipate for the fourth quarter and for the entirety of 2022. As stated previously, our inventories reached another high point as the third quarter concluded, driven by robust output alongside ongoing shipment holdups; it has been encouraging to observe steady easing of those shipping delays during recent weeks, and we anticipate that trend will persist through the fourth quarter. Naturally, much depends on the national railroad contract talks and on there being no strike or other interruptions that might arise. Owing to better rail transportation and port performance in the fourth quarter, we anticipate making steady headway in reducing our inventory levels. Going forward, we are unable to pinpoint probable drivers that would bolster the weak steel demand throughout Europe, the United States, and a number of other developed nations. As a result, we anticipate that output reductions will stay a probable reality for the immediate future. Furthermore, we expect that fears of recession, persistent inflationary strain, and the lasting consequences of the Russia-Ukraine War will keep burdening our customer markets. We do perceive a chance that Chinese steel production could improve in the fourth quarter, owing to coordinated initiatives aimed at stimulating the property sector. If that comes to pass, we think the biggest beneficiaries will be imports of Mongolian and Russian coals; we likewise think met coal pricing may stay supported by robust thermal demand along with the fragile met coal supply chain, as was shown recently through production problems and weather-related issues in the major producing regions. We are glad that, notwithstanding all these challenges, our customers have locked in their volumes for the rest of this year. With robust liquidity and substantial inventory, we stay concentrated on what is within our control, concluding the year with ongoing solid financial performance and advancing our standing as a distinctive and durable pure-play met coal supplier for every economic climate. Having said that, we would now like to take questions. Operator?
Lucas Pipes
analystThanks a lot, operator. Afternoon, everybody, and nice work this quarter. To start, I'd like to ask about where things stand with inventory, and I was hoping you might go into a bit more detail regarding what's needed to bring those stockpiles back to a typical level. If my memory serves, the figure was roughly 400,000 tons; feel free to correct me if that number should be revised. So once more, what would it take to bring those inventories down to reduced levels? I've got a handful of additional questions regarding pricing as well. Thanks.
Walt Scheller
executiveLucas, when it comes to rail transport, shipments were likely running at roughly half of what we'd regard as typical. We had increased our volumes moving via barge. Over the last several weeks, what we've observed is rail getting much better than that kind of level. Another factor behind the inventory buildup was that at the port, one of the two car dumps — specifically, the most efficient one, which dumps a pair of cars simultaneously — had been completely shut down for several months, and that resulted in reduced capacities, reduced throughput capacities at the port; that unit is now operating very well. Cycle times look fantastic, and rail is once again moving better. My expectation is that while this won't vanish overnight, I believe there will be a steady improvement on that front as capacity gets better, and that we'll get our inventory levels aligned, probably, hopefully, by the end of the year. Once more, all of that hinges on what occurs with that rail situation, and possible rail contract negotiation.
Lucas Pipes
analystThat's really helpful, and the detail you gave is something I genuinely appreciate. I want to go further into the pricing topic. First off, the met coal markets on the seaborne side have proven remarkably resilient. Could you once again say a bit more about what's behind that, especially since the summer lows, if I remember correctly, were around $190? That's a strong recovery, so it would be good to hear what you see as the primary drivers. There seem to be some arbitrage opportunities in the market. From what I understand, China CFR is at about $330, and a report said a Blue Creek cargo sold into China at that number. Of course, netbacks are higher and freight costs factor in there. If you have a view on how big an opportunity the Chinese market could be, I'd be glad to hear it. I'd really appreciate your thoughts on the pricing dynamics. Thank you very much. On the low end, I think we'd need to ship roughly 1.6%.
Walt Scheller
executiveI believe what will truly take place is that if demand from China gets better. My belief is that the main beneficiary will be Mongolia, which will do better, and coal from Russia is now moving. A great deal of that coal is heading into China. My sense is that most of it is going to head in that direction. Some chance might exist, but once more, if you examine even that chance, my view is that the sensible source for that coal would be Australia; that is the obvious market, or perhaps even the U.S. West Coast. Yet from where we sit, even that modest amount of growth or improvement would be beneficial. My view is that the forces behind pricing have been, first and foremost, thermal. In my view, thermal, the reality that thermal pricing went through the roof, provides a natural floor for where met coals are able to go, since most of, not all, but many met coals are able to be shifted over as crossover coals into the thermal market. My view is that there is, as you know, simply overall supply limitations across the coal industry. My view is that you have had the latest problems over in Australia involving storms and other matters that are simply holding supply very tight. My view is that those are the factors that are the main forces behind what is propping up the price.
Lucas Pipes
analystThat's quite useful, and I really value the detail. I might circle back with a follow-up there, but I also want to pose another question regarding your cash position of $746 million. How much cash is required to operate the business? Assuming coal prices, knock on wood, remain elevated, plus you've got obligations tied to your capital structure, including some debt, and then there's the funding of Blue Creek as well. What level of cash would you like to hold on the balance sheet? And then, clearly, investors are watching for capital returns. Just trying to figure out a number to work backward from there. Thanks so much for sharing your view on this.
Dale Boyles
executiveYes, Lucas, thanks for asking. This is Dale speaking. That specific cash balance figure isn't something we're aiming for. As we proceed from this point, we're examining capital allocation in the context of what's happening in the market. Although pricing has remained elevated, demand has been softening, which we mentioned during our prepared remarks. At present, we're in the process of assembling our budget for the coming year. Considering Blue Creek, capital spending could exceed $400 million-$450 million, covering just capital and mine development. We want to finalize that and assess our position, but we definitely want to retain sufficient cash on the balance sheet to safeguard ourselves, satisfy all our other obligations, and also fund Blue Creek. Being at this elevated level, we're only at the beginning of Blue Creek spending, roughly $20 million. Clearly, we've observed inflation in the business, so there could be some inflation there and some prices as we look toward next year. Those are factors we're attempting to factor in right now, along with the budget and what's occurring in the market. Going forward, as I mentioned, we don't aim for a specific number, beyond ensuring we have enough to cover all those needs. If we believe there's surplus cash, we'll keep returning it to shareholders, as we've already done a few times this year via extra special dividends; we're not stopping those. If pricing stays high, we'll review that periodically and, you know, perhaps declare some additional special dividends.
Lucas Pipes
analystThanks, that's really useful. My guess is that's sitting in one-month and three-month T-bills, so I'd probably begin modeling a 4% rate on those funds. I appreciate the detail, and good luck.
Dale Boyles
executiveAll right. Thank you.
Lucas Pipes
analystThank you.
Nathan Martin
analystThanks. Good afternoon, Walt and Dale. Congratulations on the quarter, and I appreciate you taking my questions. Perhaps I'll begin with the updated guidance for full-year shipments, just to narrow it down a bit. What do you gentlemen believe would push you toward the low end, or perhaps the high end? If I've calculated correctly, at the upper end you would need to ship more than 2 million tons during Q4. Clearly, you've built up those inventories you just mentioned. With luck, that can be reduced. First, is my figure accurate? And do you consider that feasible even with the logistics challenges that have troubled you and everybody else throughout this year?
Dale Boyles
executiveLike Walt mentioned. This is Dale speaking. I appreciate it, Nathan. As Walt mentioned, it truly hinges on shipment delays, on how much rail transportation gets better, and on whether any interruption occurs. An actual rail strike seems unlikely to me, yet disruptions surrounding those negotiations can never be predicted; everything depends on that and on how much volume we can move. Naturally, we hold sufficient inventory to reach that figure. That figure sits toward the upper end. At the lower end, I believe we would need to ship roughly 1.6, which is quite near what we achieved in each of the past 2 quarters. It can be done. It genuinely hinges on factors beyond our control.
Nathan Martin
analystUnderstood. I appreciate the additional detail, Dale. I'm just wondering—how would you describe the effect during the quarter from those logistics hold-ups in terms of shipments?
Walt Scheller
executiveLikely a handful of ships. At minimum two or three vessels, I'd say. 200,000 tons.
Nathan Martin
analystUnderstood. Thanks, Walt. There are probably numerous shifting components, as you're aware, along with expenses, as you're aware, throughout the quarter. Dale, you did a nice job sort of presenting everything. I mean, I believe inflation represented yet another $4 per ton adverse factor once more this quarter. You know, I'm just wondering, I mean, do you folks anticipate sort of, you know, that magnitude of pressure to continue through Q4 and perhaps even beyond? Or are you noticing any indications of that easing? Really just attempting to, you know, get a sense of which expenses, you know, could be lingering sort of as we move forward into 2023 and perhaps where you anticipate that cost per ton figure going.
Dale Boyles
executiveYeah. I believe inflation will keep affecting us. Like we mentioned during our prepared remarks, it isn't just the expense, but the lead times too. Things are being extended to 18months-24 months, certain items pushed out even beyond that. You know, at present we're progressing at roughly a $4 per ton effect each quarter. I wouldn't anticipate that shifting much. Regarding heading into next year, everything hinges on what occurs with the Fed's actions. You know, at the moment we aren't hearing about any decreases or reductions; we're examining, you know, as we keep sort of navigating around these extended lead times, we're attempting to purchase certain items ahead of time and place them into inventory. I don't foresee it easing at any point soon. We might be far into next year before some easing of this inflation becomes apparent; it's going to require time for the Fed's action to sort of move through the entire global economy, I believe.
Nathan Martin
analystDale, can you refresh my memory on how much of your cost structure is variable? Let's suppose net price decelerates somewhat in 2023 relative to the high levels we saw in 2022. I'm wondering how that might play in, or perhaps bring down your cost per ton in the coming year.
Dale Boyles
executiveOur approach isn't really to separate costs into fixed and variable buckets. The way we see it, transportation along with royalties represent the largest variable pieces. As of this quarter's end, those two made up 47% of cash cost per ton, whereas a year earlier they accounted for just 39%. On a dollar basis, production cost tends to stay fairly level across most quarters when you look at the long term. Certain quarters are going to come in above others, and that really hinges on how much maintenance work and similar items get completed. Transportation and royalties definitely play a role. When you turn your attention to Q4, like I mentioned before, our transportation rates are going to come in below where they were in Q3, and that's tied to met coal pricing. Depending on where prices land, you might see a bit of an uptick. Royalties could also tick up a bit, again depending on the final price. for Q4. Our cost per ton might drop by 10%-12% during Q4.
Nathan Martin
analystThat's really useful, Dale — thank you. If I could squeeze in one more, it would help to hear a bit more detail about how things stand with labor. Walt, I realize you touched on this a couple of times already. Is the hiring side still going reasonably well for you folks? I understand the labor market is still incredibly tight — and not only in our sector, but across the board. Given how you're seeing labor and logistics right now, along with what you've said about the market, do you have any high-level views on what production and shipments might look like in the coming year? Thanks.
Walt Scheller
executiveHiring is going well for us. The problem is that across the U.S., and particularly in mining, there aren't many experienced workers sitting unemployed. That means we have to hire people without experience, and training them takes time — getting them to the point where they can run equipment safely. So yes, we're succeeding on the hiring side, but the training that's required makes it take longer than we'd prefer. As for next year, the budgeting process is still underway, so we're in the middle of that. What we expect is to keep building on where we stand right now. We certainly anticipate further improvement.
Nathan Martin
analystThat’s wonderful, Walt. I’m grateful for the time, everyone, and I wish you the best of luck in Q4.
Walt Scheller
executiveThanks.
Nathan Martin
analystThanks.
Lucas Pipes
analystI really appreciate you letting me ask a second question. I'd like to ask about the slowdown in demand that you've brought up a few times today — does that lead you to move sales toward, say, whichever of your nontraditional markets, whether thermal, or, for instance, additional sales into China, or similar things. I'd welcome hearing how much of a commercial adjustment is happening from Warrior. Thank you.
Walt Scheller
executiveWhat's interesting is that if you examine Q3 and our Q4 projections, the share of our product going into Europe has stayed quite robust — actually, it may even be slightly higher. So through year-end, our European customers keep wanting the tonnage they've committed to and keep taking it, and I'm not aware of anything shifting next year. So even though we're seeing a slowdown, my sense is that the majority of these customers run their own coke plants. Those coke plants will keep running. They'll purchase less merchant coke, yet operations will continue. So as for our European demand, it wouldn't shock me to see it stay fairly steady; meanwhile, you see us swing back and forth in Asia and South America; we can reach 24 to 25% in South America, then the following quarter, sit at that same level heading into Asia. I'd expect those figures to persist. We do and will examine whether there are chances to move a cargo of coal. Should we have surplus coal that could go out as a thermal at a better price, we'll weigh that. At this point, we're quite happy with the position of our order book.
Lucas Pipes
analystHow many tons do we have locked in for 2023? And China CFR, I believe, sits at roughly $3.30.
Walt Scheller
executiveThat figure isn't available to me. What I can say is that, as a rule, the tons we have under contract have been accounting for roughly 80%, while spot tons have made up around 20%. I don't expect that to shift, though I don't have the specific figure at hand.
Lucas Pipes
analystThat's helpful. Really appreciate the additional color, and again, best of luck.
Walt Scheller
executiveThanks.
Alex Hacking
analystHey, Walt and Dale. Mind if I ask a few things? First off, the realized price came in pretty robust versus our model. Is that simply a matter of when your particular shipments landed? Second, with the operating footprint you have today, ought we to figure that mine output for next year lands at roughly the same levels as this year, or might it come in higher? Thanks.
Walt Scheller
executiveOkay, I'll take the realized prices first. The bulk of it is a lag impact. As you'll recall, the majority of our contracts use vessel price on what you could call a 40-day average lag. It's the index price averaged 40 days before the vessel gets loaded. Much of that stemmed from stronger prices earlier on; that's more or less the true explanation for that realized pricing. On production, we're in the middle of budget work right now, like I mentioned before. If we land in the range we've discussed for this year — roughly 6 million tons up to 6.3 — we might see something within that band, hinging on labor, on whether we can bring in extra workers and get them trained. Given the labor shortages, predicting that is tough, and it's tough to say when we might push those levels back up to normal somewhere further out.
Alex Hacking
analystThank you very much.
Walt Scheller
executiveThank you.
Mark Zand
analystYes, thank you so much. Could you walk through how much is left to spend on Blue Creek in order to get it operational? And what kind of cadence should we expect? I recall you said $400-$450, and my understanding was that this applied to next year. Please feel free to correct me or provide more detail.
Dale Boyles
executiveYes. We are at an early stage. Should you be unfamiliar with that project's schedule, I'd recommend taking a look at a presentation regarding Blue Creek on our website. That project is a five-year build costing $700 million. As I mentioned, just $21 million has been spent by us so far this year. Next year is going to be a $200+ million year. Once our budget is finalized, we'll have a clearer picture at the conclusion of our fourth quarter. Year three should fall within a comparable range. The upcoming two years represent our highest spending period. Out of that $450, next year could see $200-$250 just for Blue Creek. We also have the remaining amounts for the shields on which we placed deposits this year. That comes to roughly $60 million. After that, we need to complete the 4 North portal. Taking all of that into account, we land somewhere in the range of $400 million to $450 million next year.
Mark Zand
analystHow many years can Mine 4 and Mine 7 keep operating?
Walt Scheller
executiveIf you consider the reserves, and then factor in any resources as well, Mine 7 comes in at roughly slightly over 20 years, I think. Mine 4 would be approximately 30 years.
Mark Zand
analystOkay, so, I guess I'm just curious — could you walk me through why Blue Creek makes sense, since your nameplate capacity sits at, what, 8 million tons across Mine 7 and Mine 4, and clearly you've got plenty of mine life ahead.
Walt Scheller
executiveRight, our goal is to expand this company. Bringing Blue Creek in would expand it by 60%.
Mark Zand
analystAll right.
Walt Scheller
executiveWhenever we evaluate a possible acquisition target, Blue Creek has to serve as the yardstick. If you go through the details we've laid out in the deck posted on our site, you'll find that this project delivers an internal rate of return of at least 30%. The product is top-tier and will command a premium price. Against that benchmark, the other mines we could conceivably pursue simply can't measure up to Blue Creek. Our priority at present is completing construction of Blue Creek.
Mark Zand
analystAll right, thanks. To revisit something Lucas brought up — it appears your inventory tonnage sits at roughly 1 million tons, maybe higher. Is that right?
Walt Scheller
executiveNo. 858,000.
Mark Zand
analystAlright, and then just a last question from me. Which railroad has been the source of these issues?
Walt Scheller
executiveOur main rail carrier is CSX.
Mark Zand
analystOkay, so that rules out someone local, I guess. Great — thanks very much, everybody.
Walt Scheller
executiveSure thing. And just to note, we're looking at somewhere around 6 million tons, up to 6.3%.
Patrick Fitzgerald
analystYeah. Hi. Could you walk us through what you're required to do about retiring the bonds prior to distributing any further special dividends, in case there are limits?
Dale Boyles
executiveWell, the bond definitely contains quite a few limits covering various kinds of payments; at present we have enough room to make restricted payments or dividends. It's a three-year no call on those bonds; during the initial three years we're unable to call them; when people make offers in the open market, we're able to seize certain chances to buy back some of those bonds. At a discount we bought back a handful of bonds and seized that discount, which generated some savings recorded on the books for later on. Regarding the limits surrounding the bonds, there are many fine-grained particulars. Right now, the main one is that three-year no call.
Patrick Fitzgerald
analystAll right. At this point, do you have any idea what the RP basket stands at?
Dale Boyles
executiveYes, absolutely. That's something we monitor constantly, and it isn't among the specifics we typically delve into when talking.
Patrick Fitzgerald
analystOkay, thank you.
Walt Scheller
executiveThat brings this afternoon's call to a close. Thanks once more for being with us today, and we're grateful for your interest in Warrior Met Coal.
Operator
operatorThanks. That brings today's call to a close. Appreciate everyone for joining in. You're free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Warrior Met Coal, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Warrior Met Coal, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Warrior Met Coal, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.