Warrior Met Coal, Inc. (HCC) Earnings Call Transcript & Summary

May 3, 2023

New York Stock Exchange US Materials Metals and Mining earnings 37 min

Earnings Call Speaker Segments

Walt Scheller

executive
#1

Thanks, operator. Hi, everybody, and I appreciate you making time to be with us today as we go over what we achieved in Q1 2023. Once I finish my comments, Dale is going to walk through the details of our results, and afterward there will be a chance for you to pose questions. We felt good about turning in yet another very robust quarter, which showed up in our financial numbers along with sales and production volumes that came in above what we had anticipated; we began Q1 feeling optimistic that solid demand from customers, combined with the drawdown of our inventories, would lead to ongoing gains and better performance at the McDuffie Terminal. We have talked before about the problems with how the McDuffie Terminal has been performing and have pursued multiple steps to fix them. During the last several months, we put a number of initiatives in place aimed at raising loading throughput at that terminal, such as assigning people and resources. These first measures mainly target fixing maintenance and equipment reliability problems affecting belt conveyor systems; we are happy with what has been accomplished up to now, yet we recognize that the Terminal's performance is still fragile and will need support and focus from Warrior over the long haul. Another issue we face is that the terminal is going through a major rebuild of the belt structure on its ship loader #1, and that unit will stay out of commission through the close of Q2. We will keep coordinating closely with the Alabama State Port Authority so it can reach its goals. In the meantime, Warrior is going to move modest volumes through other ports so our customers still get deliveries on time while extra costs stay minimal. Our dedication to producing sustainable outcomes at the terminal has not changed. Looking at the market, in Q1 the steel sector put up stronger results than expected, which you could see in a steady climb in steel prices throughout North America, Europe and certain Asian regions. Steelmakers in Europe said they were restarting a number of blast furnaces that had been sitting idle and increased output, helped by a sharp correction in energy prices. China stayed focused on reopening its economy and shoring up its all-important property sector, which produced an encouraging uptick in steel production across the first 2 months. On top of that, China's move to end the ban on coal imports from Australia was made official during the quarter, even though dealings between the 2 countries have been limited so far. On the supply side in Q1, the fragility of the global supply chain was fully evident as heavy rains and a major train derailment hurt Australia's supply performance. Those developments left Australian exports more than 15% below 2022's levels for the first 2 months of the year. Consequently, Australia will probably post its weakest first-quarter exports in more than 5 years. At the same time, Canada and the United States both turned in strong performance over that period, with each posting positive growth; we also want to point out the striking jump in Mongolian exports to China, which have climbed by an astonishing 470% during the first 2 months of this year. With the first quarter almost wrapped up, worldwide supply availability began showing improvement, particularly out of Australia, which brought the market into better balance. A gradual price correction made that clear. Our benchmark, the PLV, FOB Australia, fell more than 23% from a high of $354 per short ton in February down to $273 per short ton as of March 31. By comparison, the PLV CFR China Index saw a smaller drop of roughly 8%, going from a peak of $311 per short ton in early March to $286 per short ton at month's end. A recent World Steel Association report noted that global pig iron production rose 3.1% during the first 3 months of 2023 versus the same stretch a year earlier. That gain was largely powered by a robust start to Chinese output, up 7.6% over the period. India also extended its recent upward trend, growing 5.9% in that time. As expected, output among the major European producers fell more than 8.9% because of the many blast furnace idlings and production cuts put in place during the prior fourth quarter. On top of that, steel production in Turkey took a heavy hit from the devastating earthquake that struck the country's southern region in early February. First quarter sales volume came to 1.9 million short tons, 73% above the equivalent quarter a year ago. That rise stemmed from drawing down coal inventory levels during the quarter thanks to better performance at the McDuffie Terminal, which let us ship more product. Stronger-than-anticipated production also lifted sales volume for the quarter. Looking at first quarter sales by geography, 52% went into Europe, 23% into South America and 21% into Asia. European sales stayed robust amid the blast furnace restarts I mentioned earlier, even with the economic headwinds the region faces. Production volume in the first quarter beat expectations, totaling 1.8 million short tons versus 1.5 million short tons in last year's same quarter, a 14% gain. Both mines ran at higher capacity levels this quarter with a larger head count than in the comparable quarter a year ago. At this point last year, Mine 4 was in the process of restarting and both mines were running at reduced capacity. During the first quarter, we spent $83 million on CapEx and mine development. CapEx spending came to $68 million, including $28 million on the Blue Creek project. Mine development spending reached $15 million in the first quarter. We expect development at Mine 4 to wrap up within the next few months, while work at Blue Creek will carry on throughout the life of the project. In February, the labor union representing some of our hourly employees announced it had ended its strike and offered unconditionally to return to work. We kicked off the return-to-work procedure, which mainly consists of drug testing, plus a return-to-work physical and safety training. That return-to-work procedure is still underway, since processing every eligible employee through the testing and training requires time. Although we anticipate that returning to work will require somewhat more time, we are examining and modifying our work schedules so we can accommodate the eligible employees who are coming back. Roughly 300 is the anticipated count of eligible employees taking part in the return-to-work procedure. Slightly over one-third of those employees are already back at work. We anticipate that all of our present employees will keep working full time at the mines, alongside those who are returning. With those employees coming back, we are currently revising our internal budgets and outlook for the rest of the year, and we expect that effort to wrap up by early June. At that point, we expect to give the investment community an external update on our 2023 guidance targets. Our preliminary assessment suggests that the bulk of any additional production volume will mainly begin to appear in June, and affect the second half of the year. Given that anticipated additional production, we expect to take advantage of chances to sell the extra volume to our current customers or through opportunistic spot sales. In the meantime, we keep negotiating in good faith the new labor contracts, as the eligible employees come back to work. During the first quarter, we kept making considerable progress on developing Blue Creek, and our work is still on schedule. To be specific, the production slope, service shaft and return ventilation shafts are slightly past the halfway point right now. We recently broke ground on building the bathhouse and mine offices, with the initial foundation work now underway. Financially speaking, we put $28 million into developing Blue Creek during the first quarter. We expect to make additional investments on a bigger scale over the rest of this year. Other key time line tasks are in progress across various stages of securing bids, negotiating contracts and revising project specifications. We intend to keep offering updates on our quarterly earnings calls all year long. I will now ask Dale to discuss our first quarter results in more detail.

Dale Boyles

executive
#2

Walt, thank you. During 2023's first quarter, on a GAAP basis, net income came to $182 million, which works out to $3.51 per diluted share — that's a 25% gain versus the $146 million, or $2.83 per diluted share, posted in last year's comparable quarter. For that same first quarter, non-GAAP adjusted net income, after excluding nonrecurring business interruption expenses, idle mine expenses and other noncash adjustments, reached $3.57 per diluted share. That stacks up against adjusted net income of $2.97 per diluted share in 2022's first quarter, and these quarter-over-quarter gains came mainly from higher sales volumes, partly offset by lower average net selling prices plus higher inflation. Adjusted EBITDA for the first quarter of 2023 came in at $259 million, versus $244 million a year earlier in the same quarter, a 6% rise. Driving that quarterly improvement was mostly a 73% jump in sales volume, partly offset by lower average net selling prices and inflation's effect on supplies and electricity. Our adjusted EBITDA margin stood at 51% for 2023's first quarter, against 64% in last year's comparable quarter. Revenues totaled $510 million in the first quarter of 2023, versus $379 million in last year's first quarter. The 35% gain was mainly attributable to the 73% rise in sales volume, partly offset by lower average net selling prices. Other revenues came in higher during 2023's first quarter, largely because the prior year had included a $13 million mark-to-market loss on our gas hedges, partly offset by a revenue decrease stemming from lower natural gas prices. The Platts Premium Low Vol FOB Australian index price averaged $131 per short ton less in 2023's first quarter than in last year's same quarter. For the first quarter, that index price averaged $312 per short ton. Demurrage and other charges brought our gross price realization down to an average net selling price of $257 per short ton in the first quarter of 2023, versus $339 per short ton in last year's same quarter. Demurrage and other charges totaled $4 million in this year's first quarter, flat against last year's first quarter. Those charges stemmed from temporary vessel loading delays caused by severe weather and port congestion during this year's first quarter. Cash cost of sales reached $232 million, or 46% of mining revenues, in the first quarter, compared with $134 million, or 35% of mining revenues, in 2022's first quarter. That $98 million increase was mainly due to the 73% rise in sales volume, plus inflation's impact. Inflation was responsible for roughly $2 million of higher cost, or $1 per short ton above the fourth quarter, driven by higher costs for supplies and electricity. In the initial quarter, our cash cost of sales for each short ton, FOB port, came to roughly $119, which was comparable to what we saw during the same period in 2022. During this year's first quarter, met coal prices stood below where they were in the opening quarter of 2022. That led to reduced transportation and royalty costs on a per-ton basis, though these savings got offset by greater cumulative inflation, increased wages tied to a larger workforce that pushed up production, plus somewhat elevated transportation costs from shipping vessels via alternative ports during that quarter. In the first quarter, transportation and royalty costs made up 44% of our per-ton cost, versus 46% during the equivalent quarter a year earlier. Even with these elevated variable costs and inflation, cash margins reached $138 per short ton in the first quarter. SG&A expenses came to approximately $15 million, or 2.8% of total revenues, in the first quarter of 2023, and these were above the prior year's first quarter, mainly because of a rise in noncash stock compensation expenses. During the first quarter of 2023, interest income from our cash investments surpassed interest expense on our outstanding notes and equipment leases, largely because our cash balances were higher. Our noncash tax expense in the first quarter mostly reflects the utilization of our federal net operating losses, or NOLs, partially offset by tax benefits for depletion and a tax benefit for foreign-derived intangible income. We anticipate that we will keep utilizing our federal NOLs and tax credit carryforwards. Based on our long-term forecast for met coal prices, sales volumes, and performance, we think we could become a cash taxpayer in late-2023 or 2024. In the first quarter, we incurred $4 million of incremental nonrecurring business interruption expenses, which were 37% lower than the prior year and were directly tied to the labor strike that was ongoing at the time; these nonrecurring expenses were mainly for incremental safety and security, legal and labor negotiations, and other items. Turning to cash flow. In the first quarter of 2023, we generated $110 million of free cash flow, which came from cash flows generated by operating activities of $193 million, minus cash used for capital expenditures and mine development costs of $83 million. The end result was cash flow conversion of 43% this quarter versus 20% in the first quarter of 2022. Free cash flow in the first quarter of 2023 was 122% higher than last year's first quarter, even though it was negatively impacted by a $69 million increase in net working capital from the fourth quarter of 2022. That increase in net working capital was primarily due to a rise in accounts receivable as a result of higher sales volume and the timing of sales, as well as lower accrued expenses and accounts payable, partially offset by lower inventories. At the close of the first quarter, our total available liquidity hit a record $986 million. That's up $33 million, or 3%, from the fourth quarter. It was made up of cash and cash equivalents of $863 million plus $123 million available under our ABL facility. When it comes to capital allocation, the company is still committed to returning excess cash to stockholders to boost stockholder value, while also driving long-term growth by investing in the development of our world-class Blue Creek reserves. We showed that commitment again in the first quarter by raising our fixed quarterly dividend by 17% and paying a special cash dividend of $0.88 per share. Now let's turn to our outlook and guidance for 2023. We think we're on track to hit the targets laid out in the outlook section of our earnings release. As Walt said earlier, at this point we haven't updated our internal budgets or external guidance to reflect any changes in cost and volumes tied to the union represented employees coming back to work. I'll now hand it back to Walt for his closing remarks.

Walt Scheller

executive
#3

Thank you, Dale. Prior to opening the floor for questions, I want to offer a few closing remarks regarding what lies ahead for us. Looking to the future, we expect demand for our products to remain steady, drawing on what we've heard from our wide-ranging customer group. Though it's still hard to forecast steel output in China, we presently believe a correction will take place over the course of this year, which would mean annual production falls compared with the prior year. With restocking activity tapering off and the anticipated deceleration in the back half of the year starting to take shape, we anticipate that steel prices will give back part or even most of what they recently climbed. On top of that, we anticipate additional downward adjustments in met coal pricing, assuming no other unexpected interruptions arise, largely because of supply chain improvements coming out of Australia along with increased Mongolian shipments entering China. As I mentioned before, we anticipate the process of eligible employees returning to work will carry on until the conclusion of May; we're in the process of updating our internal budgets and projections for the rest of the year and anticipate wrapping that up during the early part of June. Once that happens, we plan to give the investment community an external update regarding our 2023 guidance targets. Based on our preliminary evaluation, most of any added production volume will mainly begin to show up in June and have an effect on the latter half of the year. We anticipate that the increased production volume during the back half of the year will translate into greater sales volumes too. We believe 2023 will mark a major inflection point in the advancement of our world-class Blue Creek mine, which will generate long-term stockholder value. In the later part of this year, we will commence groundbreaking for the bigger infrastructure elements, including the new coal preparation plant, a bathhouse of mine offices and overland belt conveyor and a barge load out. We're eager to witness the progress that will unfold this year, as we anticipate spending roughly $250 million on this project. This organic growth project has us tremendously enthusiastic, since it will reshape Warrior and let us extend our demonstrated history of generating value for our stockholders. Consistent with what we've said in the past, we anticipate the first development tons from continuous mining units during the third quarter of 2024, with a longwall set to begin operation in the second quarter of 2026. With all of that said, we'd now like to take questions. Operator?

Lucas Pipes

analyst
#4

Nice work on a great opening to the year. My first thing is about where headcount stands right now and how you see it going. Could you say when you think you'll have all positions filled? And in a sense, once the strike wrapped up in February, are you carrying extra workers? Or is that what you're expecting?

Walt Scheller

executive
#5

Thanks for asking; and once we've got the employees back — they've made the choice to return — we'll still be roughly 200 people short, or 150 to 200 short, compared with before the strike. So we'll keep hiring hard all year and likely into next year as we start looking at Blue Creek too. That's the approach, and one thing we're examining is precisely how many people — since we're in the middle of it, and as I mentioned, a number of them are already back, and by the end of May or early June, we expect to have the folks back who are going to make it.

Lucas Pipes

analyst
#6

That's really useful. Now regarding the gap of 150 to 200 workers, what's the plan to close it? Does that come from people leaving or folks retiring? I'd like to hear anything about what shifted during the interim.

Walt Scheller

executive
#7

Lucas, my sense is that once our striking miners — whenever they — we got everyone back on the job, some of those individuals, for personal reasons of their own, chose not to come back, be it that they found work at different sites, or they simply retired, or for some other reason, they personally felt ready to move forward.

Lucas Pipes

analyst
#8

That's quite useful. Now, let me switch gears very fast. Dale, you mentioned exhausting the federal NOLs either at some point later in this year or at the start of 2024, and I was curious whether, if you reach that point, it might affect how you return capital — could it make more sense then to do a larger share buyback, for instance? I'd like to hear what you think about that.

Dale Boyles

executive
#9

Thanks, Lucas — good question. Yes, like we've previously stated, after we finish using the NOLs, my guess is we'd likely move to a fixed quarterly dividend that's more balanced alongside variable quarterly dividends, plus stock buybacks down the road; and as we've said, we're dedicated to giving back excess cash even while Blue Creek is being developed, should extra cash be there. So after the NOLs are behind us, my sense is we'd have a stronger capital return plan, with all those various choices included.

Lucas Pipes

analyst
#10

That's quite useful. Now let me fit in something about the market. Looking at Platts met coal pricing from last night, FOB Australia, PLV, at 229; CFR China delivered coal price at 243. And roughly figuring a $30 freight rate from Mobil to China, that would land at a net back price of 213 if selling into China. So I was wondering, is that market available to you? And what would your approach be to the China opportunity right now?

Walt Scheller

executive
#11

Well, I'd say your figures are pretty much right on with where things stand; and what we'll be examining as we consider the rest of the year and any spot opportunities we have, we'll seek out whatever represents the best opportunity; and should that mean moving those tons into China at a somewhat lower rate than we could — than what we're doing from a contractual standpoint, then that's something we'll have to weigh. But all of those things are under review at this moment <<inaudible>>.

Nathan Martin

analyst
#12

Nice job on the quarter. Walt, you mentioned that output exceeded what we'd anticipated during that period. And from what I can tell, for example, it appears Mine 4's production rose by more than 30% versus the prior quarter — was that purely due to greater efficiency, or was it about having the capacity to assign additional miners? And then perhaps you could say where most of the union employees who've come back are currently being deployed? I'd appreciate hearing your perspective on that.

Walt Scheller

executive
#13

Well, the efficiency came down to just running the longwall as much as possible and bringing additional CM units back into the lineup. Regarding where the workers who are returning are headed, when those people departed they'd been designated to a specific mine, and they went back to it. And what we've observed is, if you look at us as essentially, for the most part, 3 portals, 3 major portals. It's roughly evenly divided among those 3 as folks come back to work. So Mine 4 ends up with approximately 1/3 of the personnel and Mine 7 receives approximately 2/3, more or less.

Nathan Martin

analyst
#14

All right, that's useful. And along those same lines — I realize you're not yet updating the June guidance for production shipments. But if we think about a possible bump because some union employees are coming back, is there any CM lead work that has to happen before you could potentially ramp toward higher nameplate capacity output?

Walt Scheller

executive
#15

No, not really. Since the strike began, we've essentially operated 5 days each week, and what really presents an opportunity is bringing on more shifts. How much coal they can extract each day is our main constraint, and they've performed very well. So the chance we have is locating — you need to locate extra hours in which mining can occur. That's truly the crux of it. And all of that is being incorporated into the budget at this moment.

Nathan Martin

analyst
#16

Understood. That makes sense. So perhaps moving on to the budget that you brought up a moment ago. When we consider Blue Creek CapEx, I believe, Walt, you said during the previous call that you folks were continuing to finalize several of the major large contracts and would be able to give us a fresher update at a later point in the year. Could you perhaps discuss the sort of headway you have made on that front? Any thoughts regarding labor remaining sticky, lead times that everyone is watching stretch out, and the chance of some strain on CapEx, and then maybe when we might anticipate receiving any updates? Thanks for that.

Dale Boyles

executive
#17

Thank you, Nathan. Dale here. I'll take that question. We remain at an early stage, as we noted during our prepared remarks, still focused mainly on the slopes, more than halfway down, and we will be starting work on some of the bigger items later in the year. So after we secure those contracts, we will have a clearer picture of whether there are any cost changes, but that will likely arrive late in the year, before we have that knowledge. Like we said, over the past 15 months, we have been observing inflation in labor. We have noticed it in supplies, materials, and are even starting to notice it in rate increases and electricity costs; so we would anticipate some form of inflation, but this is a 5-year project, so a portion of that will normalize or level out across that period, and then we might have some scope changes as we get into all those details of the contracts with each of those major components, so it is still too early to say.

Nathan Martin

analyst
#18

Alright, I value those comments, Dale; and perhaps just one final item. What I'd call a robust cost result, I'd say, during the period, folks, in spite of a few of those things you just referenced, lower versus the prior quarter, you've had a rise in achieved pricing. A portion of that is merely the single-quarter delay on the rail side. My guess is that likely becomes a challenge in Q2. I simply, want to confirm I'm considering that properly when building a model.

Walt Scheller

executive
#19

That's right. Correct. Rail rates are going to climb in Q2 because of the greater average met coal price during Q1.

Luther Lu

analyst
#20

Walt, during your prepared comments you brought up a significant repair taking place right now at McDuffie Terminal. Is the second quarter shipment going to be affected by that?

Walt Scheller

executive
#21

No, that impact already happened. We are likely 6 weeks or more into it at this point. Essentially the rails — the rail and belt system the ship loader travels on — required a substantial amount of structural work; so for the last couple of months we have been managing that, but the gains in load rates at the #2 ship loader have been really impressive and have enabled us to perform, have enabled the port to perform in a way that let us cut inventory by a couple of hundred thousand tons. So that has left us very satisfied. Still, it is critical that they get that Ship 1 loader back up and running as well, so that more than one vessel can be loaded at a time.

Luther Lu

analyst
#22

All right. And at the moment, one of the Alabama mines isn't putting out a lot, yet your competitors are working to install long walls and boost output during 2024. As things stand, could the terminal take on an additional 2 million tons of annualized production?

Walt Scheller

executive
#23

That is exactly the reason we need that #1 ship loader operating again, Luther.

Luther Lu

analyst
#24

Got it, that makes sense. And can you share a bit more detail on what the demurrage expense actually came to on a per-ton basis during the first quarter?

Dale Boyles

executive
#25

Sure — altogether, that figure sits at $4 million. So that works out to roughly 2 dollars, actually slightly under 2 dollars.

Lucas Pipes

analyst
#26

This is really a question about the broader market. You've got solid visibility into Europe, South America, and Asia as well. I was hoping maybe you could go a bit deeper on what you said during the prepared remarks — that you'd anticipate pricing continuing to cool off. What are you observing across those various end markets? I'd really value your perspective.

Walt Scheller

executive
#27

Sure — demand remains robust in every one of those regions. What I'd say, though, is that it's on the supply side where things are shifting: like I mentioned, Mongolia is ramping up its shipments, or its trucking, into China very sharply; and it appears Australia is finally getting its transportation problems and its production problems sorted out. So my sense is there will be more supply on the market; and for many quarters now we've been saying that a moment would arrive when pricing would cool off. Even in this year's budget, I believe our figure was roughly $200. So the direction the market is taking as supply constraints appear to be loosening doesn't catch us off guard at all. And that's — where it's going right now really doesn't surprise us; and even at 2/3, we're anticipating somewhat more downward pressure.

Walt Scheller

executive
#28

That wraps up today's afternoon session. Thanks once more for being with us, and we're grateful for your interest in Warrior Met Coal.

Operator

operator
#29

Appreciate it. That brings today's call to a close. Thanks to everyone for joining in. You're welcome to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Warrior Met Coal, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Warrior Met Coal, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Warrior Met Coal, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.