Thanks, operator. Hello everyone, and I'm grateful you're giving up some of your time today to review our second-quarter 2023 results with us. After I wrap up my remarks, Dale will take you through the numbers and a few additional details, and then it'll be your turn to ask questions. We were pleased to deliver another strong quarter, one where our operational execution enabled a 15% increase in sales and production volumes versus the prior-year period, which, if you remember, set records on many fronts, including coal pricing. The big change relative to a year ago is hard coking coal prices falling 46%, which pushed our average net realized selling price for premium coal down 48% during Q2. Even with conditions easing in the quarter, we saw improved performance from our logistics partners, including continuing work at the McDuffie terminal. Most importantly, the extensive rebuild of ship loader number one's belt structure that we mentioned last quarter — it was out of service for most of Q2 — has now been completed, and 19% of our volumes went into South America. Because of that project and other terminal improvements, most of our outbound logistics metrics are returning to normal levels, allowing our vessels to load on time and reach customers as scheduled. That said, the overhaul's timing, along with some bad weather, caused a slight reduction in our vessel loadings in Q2. Even so, the export terminal remains a longer-term endeavor, and we remain committed to working with the Alabama State Port Authority to reach a favorable outcome. Turning to demand, second-quarter output from steelmakers globally landed about where we expected. Production was relatively flat across most steel producing regions, although it was below the prior-year comparable. Global steel prices have declined from their April peaks, indicating that weaker demand is emerging in certain segments. The prospect of a broader economic recovery in China has yet to yield meaningful results, as the country has struggled to find ways to lift its property sector and domestic consumption. So even with solid production figures in the quarter, we expect Chinese steel production to be lower in the back half of the year, in line with China's stated goal of cutting output year over year. In Q2, steelmaking coal availability, primarily from Australia, improved markedly, as reflected in a larger flow of seaborne coal. Favorable weather in Australia and better logistics performance in the US both contributed to improved steelmaking coal supply; however, on a year-to-date basis, Australian exports continued to trail the same stretch of last year, mainly due to the weakness in the first quarter. Mongolian exports continue to exceed expectations, with volumes well above last year's levels. Our main pricing index, the PLD FOB Australia, declined $62 per short ton over the quarter. Most of that adjustment took place in April, after which the index moved inside a tight range for the last two months of the quarter. When the quarter closed, the index stood at $211 per short ton — a drop of about 22% from its April peak and something like 40% below the February high. The PLV CFR China Index followed a comparable pattern, correcting sharply early in the quarter as it went from $286 per short ton down to roughly $203 per short ton, then remaining flat there for the remainder of the quarter. According to the World Steel Association's monthly report, global pig iron output increased roughly 1% during the first six months of 2023 compared with the same period a year before. Chinese production drove much of that increase, rising 2.7% over the stretch. India also continued its climb, delivering 6.8% growth for the period. Sales volume in our second quarter hit 1.8 million short tons, which is 15% better than the equivalent quarter last year. The improvement stemmed from stronger performance by our rail transportation provider at the McNulty terminal, enabling us to ship more product; in addition, better-than-expected production also drove sales volume up during the quarter. Second quarter sales broken out by geography look like this: 47% into Europe in South America, 33% into Asia, and 1% into the US. Most of the increase in Asian sales came from spot volume sold into China in the second quarter. Production volume for the second quarter came in above expectations at 1.9 million short tons, compared with 1.7 million short tons in the same quarter last year — an increase of 15%. That is the biggest quarterly production figure since the first quarter of 2021. Both mines operated at high capacity levels during the quarter, with headcount 54% above the comparable quarter a year earlier. We also began seeing production benefits from eligible employees returning after the labor strike, though we expect the full impact of their return to show up over the second half of this year. That should also reduce our production cost per short ton. Since production exceeded sales volume in the second quarter, our coal inventory rose to 760,000 short tons, up from $659,000 at the end of the first quarter. With our logistics partners and the terminal now performing better than they have lately, we expect to draw down inventory over the second half of this year. We were pleased to welcome back the roughly 250 eligible union representative workers who returned in the second quarter, as we negotiate in good faith toward a new labor contract. This addition to the workforce should produce incremental production and sales volumes of approximately 500,000 short tons, mainly in the second half of this year, in line with our recently revised guidance. In Q2, our CapEx and mine development spending totaled $147 million. Capital spending made up $136 million of that total, while $97 million was directed to Blue Creek, a project I'll cover in more detail in a moment. With half the year behind us, we've drawn down about 45% of the midpoint of our full-year CapEx target. Q2 mine development came to $11 million. We expect to complete mine development during Q3. Turning now to Blue Creek, our world-class asset, and where things stand. Momentum on this project remained strong through Q2. Everything continues to track to plan, which I'm glad to share. As you may remember, we began development work at the Blue Creek mine again in May 2022. At that point, the company estimated the project's total capital expenditures at between $650 million and $700 million over the expected five-year development period; that number was assembled in late 2021 through engineering feasibility studies and the best data then available, acknowledging that the company would get a clearer sense of the project's needs as development progressed. South America represented 19% of that.

Walt Scheller

executive
#2

After that point, taking into account additional details and shifting conditions relative to what we had initially assumed, we have kept working to fine-tune and reduce risk on this project so that Blue Creek's ability to generate value improves. That includes altering the project's scope in ways that ought to bring about reduced operating costs, greater room to maneuver around risks, and access to several transportation channels. These adjustments call for extra capital spending — a strong investment that we feel certain will boost the value a finished Blue Creek can create. Our view is that the project's schedule won't be affected by these adjustments. Let me walk through a few specifics of the revised scope. Originally, our plan was to move coal out of the Blue Creek mine using an overland belt leading to a barge load out facility owned and run by a third party. Now, our plan is to construct a belt compare system feeding a railroad load out to move most of the coal, which we anticipate will bring lower operating costs and get volumes to the port more quickly. On top of that, we will construct and run a barge load out on our own instead of relying on a third-party provider. We expect this change in scope to push total capex at the Blue Creek mine up by about $120 million to $130 million over the rest of the development timeline. Our thinking is that the potential financial upside from this revised scope should leave Warrior with an outbound logistics setup that is naturally resilient and able to compete on cost, giving us more room to handle transportation across multiple channels. On top of that, starting in late 2021, the company has faced cost inflation of 25% to 35% on both opex and capex at its current mining operations. At Blue Creek as well, the company is encountering inflationary pressures, particularly when it comes to labor, construction materials and certain equipment, and these are expected to persist through the rest of the project development period. Because several key material contracts are in the middle of negotiations right now, and given uncertainty about what future inflation rates will be, the company isn't offering an estimate of inflation's impact at this time. That said, as the company negotiates and signs contracts for bigger project components, the company anticipates that additional information will emerge, enabling revised guidance to be provided. Even though inflation has pushed up costs and impacted the project's economics, we expect that a higher long-term price assumption for steelmaking coal, driven by inflation, will counterbalance those pressures. Taking into account the factors we just went over, our updated projection for capital expenditures tied to developing the Blue Creek mine in 2023 comes to roughly $250 million to $300 million, and that figure could still shift. What's mainly behind the higher 2023 capex estimate is the transportation scope change we mentioned earlier. At present, the company anticipates that development spending at Blue Creek will peak during 2023 and 2024, with 2024 expected to land at a level comparable to 2023, though that remains subject to change. At this point, I'd like Dale to walk us through the second quarter results in more detail.

Dale Boyles

executive
#3

Appreciate that, Walt. Moving to Q2 2023, we posted GAAP net income of $82 million, which works out to $1.58 per diluted share. That marks a sizable drop from the record-setting $297 million, or $5.74 per diluted share, booked in the same period a year earlier. On a non-GAAP basis, adjusted net income for the quarter, once you strip out the non-recurring business interruption expenses, came to $1.63 per diluted share. That's against an all-time record high for adjusted net income of $5.87 per diluted share in Q2 2022. The quarter-over-quarter declines largely reflected the steelmaking coal market softening from the record highs seen in the second quarter of 2022. Adjusted EBITDA came in at $130 million for Q2 2023, versus an all-time record $431 million a year earlier. Driving the quarterly drop were a 48% decline in average net realized selling prices for our steelmaking coal along with a softening coal market, higher employee-related costs stemming from a larger head count, and the cumulative effect of inflation on supplies and electricity. Partly offsetting those factors was a 15% rise in sales volume. Our adjusted EBITDA margin stood at 34% in Q2 2023, down from 69% in the prior-year quarter. Total revenues reached $380 million in the second quarter of 2023, compared with $625 million a year earlier. That 39% decrease stemmed mainly from the 48% lower average net realized selling prices on our steelmaking coals, partly offset by the 15% increase in sales volume. Other revenues came in higher in Q2 2023, largely because the prior year contained a $15 million mark-to-market loss on our gas hedges; on top of that, gas revenues were lower in this year's second quarter thanks to a 70% decline in natural gas prices. The Platts Premium Low Vol FOB Australian Index price averaged $184 per short ton less in Q2 2023 than in the comparable quarter of last year. For the second quarter, that index price averaged $220 per short ton. Demurrage and other charges pulled our gross price realization down to an average net selling price of $209 per short ton in Q2 2023, versus $404 per short ton in last year's same quarter. Demurrage and other charges ran $9 million lower than in last year's second quarter, with demurrage accounting for the biggest decline at $6 million; the elevated demurrage and other charges in Q2 of last year resulted from temporary delays in vessel loadings caused by severe weather and port congestion. Cash cost of sales totaled $229 million, or 62% of mining revenues, in the second quarter, compared with $190 million, or 30% of mining revenues, in the second quarter of 2022. Looking at the $39 million rise in cash cost of sales, $29 million came from a 15% bump in sales volumes, while $10 million stemmed from increased production costs — mainly more headcount, along with 15% greater production volumes and inflation's effect. Our headcount rose 54% in this second quarter versus a year ago, driven by a push to hire workers amid the labor strike and partly tied to employees who came back from that strike in this year's second quarter. Production costs encompass wages, onboarding and training tied to those returning workers over the quarter, and we ought to see cost per ton improve later this year as incremental volumes arrive. Higher costs for supplies and electricity accounted for roughly $3 million of the increase, or $1.50 per short ton. Cash cost of sales per short ton, FOB port, came to about $129 in the second quarter, versus $123 in 2022's second quarter. Although premium steelmaking coal prices fell 46% in this year's second quarter from a year earlier, our average net realized selling prices dropped 48%. That produced lower transportation and royalty costs per ton, which higher wages and employee benefits on a 54% larger headcount offset, fueling greater production volumes and related production costs like supplies, repairs and maintenance. Transportation and royalty costs made up 41% of our cash cost per ton in the second quarter, against 54% in last year's same quarter. Even with elevated production costs and inflation, cash margins reached $80 per short ton in the second quarter. SG&A expenses totaled roughly $13 million, or 3.5% of total revenues, in 2023's second quarter, a bit above last year's second quarter, chiefly from a rise in employee-related expenses. Interest income from our cash investments far surpassed interest expense on our outstanding notes and equipment leases during 2023's second quarter, largely because of our sizable cash balances and solid investment returns. Our second quarter income tax expense shows an income tax benefit for depletion expense and foreign-derived intangible income. In the second quarter, we took on incremental non-recurring business interruption expenses of $4 million, which came in 44% lower than a year ago. That decline stems mainly from the labor strike ending. These non-recurring expenses covered mostly incremental safety and security, legal and labor negotiations and other items; we anticipate ongoing legal expenses tied to continuing labor negotiations. Now to cash flow. In 2023's second quarter, free cash flow was negative $22 million, largely because of greater Blue Creek CapEx spending. That came from cash flows generated by operating activities of $125 million, minus cash used for capital expenditures and mine development costs of $147 million. During Q2 2023, free cash flow took a hit because net working capital rose by $7 million compared with Q1 2023. That jump in net working capital stemmed mainly from larger inventories tied to increased production, along with reduced accrued expenses. Even with the greater capital expenditures tied to the Blue Creek project so far, we produced $87 million in free cash flow, and $46 million of that went back to stockholders through a special dividend paid earlier in the year, on top of our normal quarterly dividends. At the close of Q2, total available liquidity stood at $951 million, which is $35 million lower, or a 4% drop, than the record-setting Q1, and it was made up of $827 million in cash and cash equivalents plus $123 million available through our ABL facility. As Walt mentioned before, the change in scope for the new Blue Creek mine's multichannel transportation is anticipated to deliver flexibility and optionality while reducing the risk of relying on one method to move our coal along the river; beyond that, we expect gains from lower overall transportation costs by avoiding a third party to construct and run the barge load out while getting the coal to port more quickly. The added capital of $120 million to $130 million for all the scope changes had no material effect on the original project economics for NPV and IRR at the illustrative $150 net coal price. So far we have invested roughly $173 million in the project, and we hold enough liquidity to fund the anticipated $250 million to $300 million in spending for 2023. Although the scope changes call for extra capital expenditures, we think our robust cash flow generation, current available liquidity, and the capacity to finance part of the overall expenditures via equipment leases let us stay opportunistic as we assess any further funding options for Blue Creek, aiming to keep an efficient, low cost of capital. Lastly, let's discuss our 2023 outlook and guidance. We think we remain on course to hit the revised targets laid out in the outlook portion of our earnings release. Now I'll hand things back to Walt for his closing remarks.

Walt Scheller

executive
#4

Appreciate that, Dale. Prior to opening things up for Q&A, there are a few closing remarks I want to share. When we look toward the back portion of 2023, what we anticipate hasn't shifted from what we said last quarter; we think steel output will stay exposed to the danger of shrinking industrial production, and we think China — the biggest producer globally — will hold back its output during the back half in order to hit a goal of reduced production compared with a year earlier. At the same time, coal supply ought to stay fairly steady across that stretch. Given this, we see our markets as mostly in balance, capable of soaking up shifts in demand or supply without triggering major price fluctuations. We anticipate that spot activity across our natural markets will stay weak, which pushes us to steer a greater share of our spot tonnage toward CFR-based opportunities in Southeast Asia. Where Warrior is concerned, we see 2023 as a major inflection point for the buildout of our world-class Blue Creek mine, something we anticipate will generate considerable long-term value for stockholders. Across the remainder of this year, we anticipate kicking off groundbreaking work on the bigger infrastructure pieces, including the new coal preparation plant, roughly the mine offices, the overland belt, plus the rail and barge load outs. This organic growth project has us tremendously enthusiastic, and we expect it to transform Warrior while letting us extend our demonstrated history of delivering stockholder value. As noted previously, we anticipate the initial development tons from continuous miner units at Blue Creek during the third quarter of 2024, with the longwall set to come online in the second quarter of 2026. With all that said, we'd now like to take questions. Operator?

Lucas Pipes

analyst
#5

Thanks a lot, operator. Afternoon, everybody. Walt and Dale, I want to start with the scope change regarding Blue Creek. Doing a rough calculation, it seemed to produce an approximately $7 per ton decrease in cost at the port, because of savings on transportation. Would that be the correct interpretation? Also, any thoughts on the economics? Thanks a lot.

Dale Boyles

executive
#6

Well, I don't know how you arrived at your $7. But yes, as I mentioned during my prepared remarks, our initial plan was for a third party to build the barge load out and to own and run it too. Therefore, the expense tied to that essentially canceled out all the additional CapEx, more or less making it neutral for the project's overall economics.

Lucas Pipes

analyst
#7

Understood. All right, so the $7 was simply backing — using the midpoint between $120 million and $130 million, presuming a rate of return comparable to Blue Creek, and then there was — once more, I ran this quite fast, approximately $7. All right. Perhaps changing subjects. You accumulated inventory in the second quarter. McDuffie, you mentioned, has achieved certain progress; could you provide a status update regarding where the terminal stands right now, when the terminal began improving in the second quarter, and how quickly destocking will proceed on the inventory side for the second half of the year? Thank you very much.

Walt Scheller

executive
#8

Well, the most significant development was the work on the number two or number one loader. And that was — the moment that work was finished, it immediately boosted their performance rates, more than doubling their vessel loading capacity; so getting that back online was truly the key, and on the — on several of the other tasks, much of the belt availability plus simply enhancements in the port's overall operation have generated enormous additional gains. And what we observe is loading rates comparable to those we witnessed at our peak production level. So they have returned to where we believe they ought to be. We believe additional improvement remains to be achieved. We're pushing — we are currently pushing toward the enhancements required to bring Blue Creek online at full production; so even if those rates might be acceptable at present, we're pushing toward ever-better performance to let Blue Creek run properly or sell the coal.

Lucas Pipes

analyst
#9

That's useful. Thanks; and then one more from me before I get back in line. In the press release, you mentioned that you'll look to fine-tune your capital structure in order to boost returns for stockholders. Could you talk about what fine-tuning you might have in mind — is it lowering leverage, is it boosting capital returns — I was just curious whether you could say more about what you meant by fine-tuning your capital structure? Thank you.

Walt Scheller

executive
#10

Yeah. Thanks, Lucas. I mean, that's truly a mix of everything you just brought up, examining possible debt paydown since we gained over the last 1.5 years from those really high prices. We're in a strong spot to not only fund Blue Creek, but also pay capital returns while development goes on, plus pay down debt; so we're just, sort of, reviewing what works at the moment and making sure we're in a strong spot to spike Blue Creek, the spending there. So we're attempting to achieve a bit of all of those items and simply being really positioned for what's ahead.

Lucas Pipes

analyst
#11

Okay. Dale, Walt, I genuinely appreciate the details, and good luck. I'll rejoin the queue.

Walt Scheller

executive
#12

Thanks.

Dale Boyles

executive
#13

Thank you.

Nathan Martin

analyst
#14

Appreciate it, operator. Hello, everyone, and thanks for answering my questions.

Walt Scheller

executive
#15

Of course.

Nathan Martin

analyst
#16

Perhaps a fast one to kick things off regarding the new transportation efforts at Blue Creek — to which railroad load out are you fellas going to construct your conveyor system?

Walt Scheller

executive
#17

We are going to build a rail load out, somewhat west of the mine. Honestly, none of that has been disclosed publicly by us, nor have we made any of that information available yet. Much of it remains in negotiation. So the terms of these agreements simply are not finalized. It is a bit early. We have sufficient knowledge that the extra expense is going to require, yet this represents a genuinely strong chance to reduce risk on this project and to possess multiple transportation modes instead of placing 5 million tons on the rework, we now have the capability to do both.

Nathan Martin

analyst
#18

Yes, I get it, that makes sense. I was just wondering if it would be CSX, because I know they now serve your mines, so was there flexibility in terms of where you folks intend to construct that new load out?

Walt Scheller

executive
#19

The Blue Creek mine along with our current facilities.

Nathan Martin

analyst
#20

All right. Excellent. So perhaps taking a quick look at the quarter, the realized price for each ton came in somewhat beneath what was expected, and likewise below your typical utilization rate compared with the quarterly benchmark. Could you share any insight on that? Did mix play a role, were various indices involved, was it a matter of timing around the merger? Whatever extra perspective you can offer would be useful.

Walt Scheller

executive
#21

My sense is that our spot volumes ran higher than what we'd typically call usual, and CFR sales relative to FOB sales were likely somewhat elevated. Taken together, those factors pushed realization down a bit.

Nathan Martin

analyst
#22

All right, that's excellent. Thank you, Walt. And following up on that, I found your market observations in the prepared remarks quite useful. It would be helpful to hear how you view the recent upticks in net prices — in particular, the Chinese CFR China price rose by roughly $30 or even more during the last month, and you mentioned some spot sales into China, so that marketplace appears to have become somewhat more appealing. Still, I'd love to hear your perspective on how you're weighing your export mix going forward. Thanks.

Walt Scheller

executive
#23

Regarding our export mix, I'd say we've made a shift and are still somewhat shifted away from the traditional pattern, when we sent somewhere in the mid-50s to Europe, and I believe that figure will come down somewhat, while Asia keeps accounting for a larger share. That's partly because we've just transitioned to a new mining area at mine number 4, where quality differs somewhat, meaning the customer mix will shift somewhat as well. So at present, we anticipate directing somewhat more volume toward Southeast Asia.

Nathan Martin

analyst
#24

All right. Walt, can you go into a bit more detail about that shift in the quality mix?

Walt Scheller

executive
#25

As we've discussed previously, we've relocated from what you'd call the Southwestern or Southeastern section of the coal mine up to the Northwestern section, where the Vol rises somewhat and it's nearer to a high Vol A than before; so, we knew where the quality was headed, and we've been coordinating with customers about it. So, it's only moved somewhat. It's closer to how coal quality was — demand for coal quality was in this same area back around 2014, I think, when we were mining in an area like the one we've just moved to.

Nathan Martin

analyst
#26

Understood. That's quite useful. Perhaps one last item, then. We'd love to hear how you see shipment timing shaping up across the latter six months — 3Q and 4Q — and whether you anticipate either period coming in stronger than the other? You mentioned likely working down some inventory. Should we think of that as fairly even? Also, I believe you have a few long moves — if I recall, 2 in Q3 and 1 in Q4?

Walt Scheller

executive
#27

My expectation is that it will be even. The one thing to flag is weather; hurricane season is arriving, and it doesn't take much for a day here or a week there to see the port having some difficulty because of bad conditions, which can swing a quarter quite easily, particularly when it lands near the quarter's close. Still, at this point I'd anticipate fairly steady results.

Nathan Martin

analyst
#28

Excellent. That's really useful, everyone. Thanks for making room for us, and I hope things go well for you through the back half of the year.

Walt Scheller

executive
#29

Thanks.

Dale Boyles

executive
#30

Thank you, Nathan.

Alex Hacking

analyst
#31

Good afternoon, and I appreciate you making time for us. Regarding Blue Creek, you mention the capital expenditures and the cost pressures we've observed since the project was first defined. I mean, should we expect that initial budget — I believe it was 650 to 700 — could end up 20% to 30% greater, something like an additional $150 million, or am I completely misunderstanding that? Thanks.

Dale Boyles

executive
#32

Well, that matched what we had initially anticipated, and that reflects the inflation we've encountered throughout all parts of our business; and this new project isn't exempt from that. At this point we can't predict where we'll ultimately land; but as of today, based on how we're evaluating it, that's where our cost pressures stand.

Alex Hacking

analyst
#33

Understood. I simply wanted to confirm that my read was accurate. Then, regarding those development tons set to begin emerging in the next year, I’m not certain whether you’ve put a number on that for 2024 and 2025, and here’s a very simple question: how are those development tons accounted for, assuming the quantity to be sold is material? Thank you.

Dale Boyles

executive
#34

The tons will begin to come out — we ought to start generating those tons halfway through next year. Keep in mind, though, that a preparation plant must be constructed, and we need a method to move those tons to market. We are working on that, attempting to determine whether we would be better off simply stockpiling it, cleaning it, and taking it to market right away, which would carry a higher cost since transportation would be considerably different once the transportation modes are finished. So we are still figuring out the best approach for handling that coal, and that is going to require some time.

Alex Hacking

analyst
#35

All right. So what's the present expectation, roughly, regarding when the prep plant will come online?

Dale Boyles

executive
#36

As for the prep plant's timeline, my understanding is the middle of 25 — the mid-20s. My guess is Q2 or Q3 of 25, and our belief is that the plant will land at some point during 25.

Alex Hacking

analyst
#37

All right. Thanks. Very helpful.

Walt Scheller

executive
#38

Thank you.

Lucas Pipes

analyst
#39

Thanks a lot, operator. I appreciate you letting me ask a few more questions. This is about Blue Creek again. So I want to confirm that I've got the remark regarding 25% and 35% inflation right. Does that stand apart from, or come on top of, the extra scope and the transportation spending that you described? Is that accurate?

Walt Scheller

executive
#40

Yes, that's right.

Lucas Pipes

analyst
#41

That's quite useful. So basically — we start from the initial figure. Our range of 25% to 35% can be applied, and after that we tack on the transportation expense roughly for a ballpark number?

Walt Scheller

executive
#42

Right, and the scope changes go on top of that as well, yes.

Lucas Pipes

analyst
#43

Thanks for that. Now I'd like to dig deeper into the capital structure optimization. Dale, you said there's a possibility of bringing leverage down. Is refinancing the debt something you're considering, or would it perhaps be preferable to lower cash balances — simply retiring a portion of the debt using cash already sitting on the balance sheet? I'm just attempting to understand a bit more clearly what your thinking is regarding that optimization.

Dale Boyles

executive
#44

Sure, that's definitely one possibility. But here's the thing — we've built up a substantial amount of cash, as we discussed with inflation and what's ahead for Blue Creek, and we're working to balance all of that, plus we returned some extra capital this year. So we absolutely don't want to land ourselves in a poor situation with what remains of Blue Creek. We're only 15 months, 16 months into that project; yet even so, we're examining each element of the capital structure. We're examining debt, and how we can position ourselves more favorably. So should we retire some now, or retire it afterward. So it's a bit of everything. So we aren't tilting too strongly toward either approach, though that might shift. We'd prefer to preserve flexibility and carry out whichever works best for the company.

Lucas Pipes

analyst
#45

That clears things up. Beyond that, should we factor in call premiums and prepayment penalties, that sort of thing?

Dale Boyles

executive
#46

Yeah, those definitely come into play. So all of that has to be weighed, and given our position on total cash and total liquidity, putting close to $0.5 billion into capital during this year is a fairly major worry; that's something you've got to take into account too.

Lucas Pipes

analyst
#47

That's really useful. Now, on the balance sheet, one more question. Could you remind everyone what the goals are while Blue Creek gets developed, in terms of minimum liquidity and minimum cash?

Dale Boyles

executive
#48

Those haven't been altered, no. Once the project got underway, I believe we established $250 million as the minimum liquidity level. The bulk of that is going to be cash, and that's the point where we'd say — and we've stayed far above it, which has been quite lucky given how much cash we've built up thanks to high prices, particularly during last year and a quarter that set records like that.

Lucas Pipes

analyst
#49

Thanks a lot, Dale, for providing all of that extra information. Once more, wishing you the best of luck. Walt and Dale.

Walt Scheller

executive
#50

Thanks.

Dale Boyles

executive
#51

Thanks.

Walt Scheller

executive
#52

That brings today's afternoon call to an end. Thanks once more for being with us, and we're grateful for your interest in Warrior.

Operator

operator
#53

Thanks. Just like we said, that wraps up the conference. We appreciate everyone joining us for today's presentation, and at this point you're free to hang up your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Warrior Met Coal, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Warrior Met Coal, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Warrior Met Coal, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.