Warrior Met Coal, Inc. (HCC) Earnings Call Transcript & Summary

August 1, 2024

New York Stock Exchange US Materials Metals and Mining earnings 35 min

Earnings Call Speaker Segments

D'Andre Wright

executive
#1

Good afternoon, everyone, and thanks for joining the Warrior Q2 2024 Earnings Conference Call. Before we get started, I need to remind you that some of what we say today involves statements about our anticipated future business and financial performance. Under the Private Securities Litigation Reform Act, these could be viewed as forward-looking statements. By their very nature, forward-looking statements deal with matters that carry varying degrees of uncertainty; those uncertainties, which get described in greater detail in the annual and quarterly reports the company files with the SEC, could wind up causing our actual future results to differ materially from what our forward-looking statements anticipate. We don't commit to updating our forward-looking statements, whether because of new information, future events, or anything else, unless the law requires it; for additional details about forward-looking statements, please see the company's press releases and SEC filings; we'll also cover certain non-GAAP financial measures, and those are defined and reconciled to comparable GAAP financial measures in our 2024 Q2 press release, which was furnished to the SEC on Form 8-K and is also posted on our website. On top of that, we filed our 10-Q for the Q2 ended 30 June 2024 with the SEC this afternoon. You can find more information about the company on our website at www.warriormetcoal.com, and that site also has the Q2 supplemental slide deck posted this afternoon. Joining me on the call today are Mr. Walt Scheller, Chief Executive Officer, and Mr. Dale Boyles, Chief Financial Officer. Once our formal remarks are done, we'll be glad to take any questions. With that, I'll hand the call over to Walt. Walt.

Walter Scheller

executive
#2

Thank you, D'Andre. Hi, everybody, and I appreciate you spending part of your day with us to go over what we achieved in Q2 2024. Once I finish my comments, Dale will walk through the results with more granularity, and after that, the floor will be yours for questions. The second quarter brought us exceptionally robust outcomes, powered by the ongoing wins we're seeing from squeezing the most value out of our top-tier assets along with how well we operate. Our operational execution was outstanding, and it produced double-digit gains in sales volumes as well as production volumes even though demand around the world was soft, and that translated into powerful financial results on Adjusted EBITDA and free cash flow. Cash generated from operations came to $147 million, and those funds covered $122 million in CapEx and mine development across the Q2, which left us with free cash flow of $25 million. Beyond that, Blue Creek keeps moving forward impressively, and we hit a number of important milestones as we push ahead with building out this world-class asset; this outstanding execution and the Blue Creek buildout keep creating value for our stockholders, no matter what the market is doing. Looking at the market side, the Q2 unfolded mostly the way we anticipated, with demand softer and supply stronger from every region, which pushed the steelmaking coal price environment lower; we had hoped demand would start showing signs of recovery near the end of the quarter, but that never happened. On top of that, the spot volume availability coming out of Australia in May and June caught us off guard. Buyers saw these attractive supply conditions and chose to be patient with their purchasing strategy. Among the other forces behind softer demand were Chinese steel exports sitting at multi-year highs and global steel prices falling through most of the Q2, which mirrored weaker steel demand everywhere. Consequently, steelmaking coal prices carried on the steep drop that began in March; two attempted price spikes emerged during the Q2, but neither lasted because the market fundamentals didn't back them up. Our rail partner's performance during the Q2 once again left us very pleased, since we managed the temporary loss of the barging system caused by the Demopolis Lock failure with zero impact on our customers and only minimal impact on our costs. That lock got fixed and reopened near the end of May, which let us get back to moving product on the river. Sadly, that reopening didn't last long, because the river system had to shut down once more in late June when the Holt Lock failed, which had nothing to do with the Demopolis Lock. At this moment, we haven't received an official repair plan from the local Corps of Engineers. Even so, we're planning on the assumption that the repairs will take about as long as the Demopolis Lock repairs did, roughly 4 to 5 months. We believe we can handle the present Holt Lock failure without any interruption for our customers, exactly the way we did during the earlier lock failure. The sharp price drop we saw in March carried over into the start of Q2, with every index hitting recent bottom levels near the start of April. For our main index, PLV FOB Australia, Q2 closed at $212 per short ton — a figure $95 beneath the Q1 peak of $307 per short ton. In the same way, PLV CFR China fell by $76 over that stretch, finishing Q2 at $224 per short ton. Second-tier indices showed comparable decreases and also sat below the PLV index, landing in the 86%-90% range on average across Q2. High-vol prices closed Q2 at $192 per short ton, with a Q2 average of $197 per short ton. Consolidated gross price realization for Q2 came in at 90%, driven by product mix, geography, and freight rates. Per the World Steel Association's monthly report, worldwide pig iron output was down roughly 2.6% across the first six months of 2024 versus the same period a year earlier. China, the largest producing region globally, saw pig iron output drop 3.6% in that period, while the remainder of the world posted a smaller 0.3% decrease for the year's H1. India continues to stand out, growing at 2.7%, and should keep expanding as new blast furnace capacity starts up later in the year. A number of other regions likewise posted positive growth during the period, including certain European countries and Brazil. Even so, those increases were mostly canceled out by reduced output in Japan and South Korea. I'll now move on to our Q2 results. Q2 sales volume reached 2.1 million short tons, up 18% from the equivalent quarter a year ago. That overall gain came mainly from both mines running at greater capacity this year than last, steady contractual demand out of our traditional markets, and robust Asian spot demand. Q2 sales by geography split out this way: 39% to Europe, 38% to Asia, and 23% to South America. Most Q2 sales into Asia went to buyers in Japan, China, and India. As we've said before, demand from Asian steel producers has risen over the past year, pushing sales higher in that geography, while sales into our traditional European and South American markets have come in lower, largely because spot markets are weak. Spot volume accounted for 30% in Q2 2024, sold mainly into Asian markets. That figure was below the 37% recorded in Q1 of this year. Across the full year, we anticipate spot volume will make up roughly 25%-30% of total sales volume. Q2 production volume was 2.2 million short tons versus 1.9 million short tons in the same quarter of 2023 — a 13% rise, and the largest quarterly production output in three years. In the second quarter of this year, both mines ran at greater capacity than they did during the same period a year earlier. Our coal inventory rose a bit, reaching 895,000 short tons, up from 892,000 short tons when the first quarter closed. We invested $122 million in CapEx and mine development across the Q2. Of that, CapEx accounted for $111 million, including $84 million directed to the Blue Creek project. Spending on mine development for Blue Creek came to $11 million in the Q2 2024. With work starting in the Q3 on the first long wall panel at Blue Creek, our mine development costs are set to keep rising through the H2 of the year, and that will remain the case until the long wall begins producing, something we anticipate happening in 2026. Now I'd like to walk you through a progress report on our Blue Creek growth project, covering how our development work advanced remarkably in the Q2 as well as what lies ahead. All the major components for seam access are now finished, and we did this on schedule — these consist of the production slope, service shaft, ventilation shaft, and fan. The following major milestone involves finishing installation of the service cage along with the slope belt. Thanks to how much we've accomplished so far, we can now start development of the initial long wall panel, with the first continuous miner unit anticipated during the Q3.

Walter Scheller

executive
#3

On the surface infrastructure side, the bathhouse, warehouse, and critical electrical substations are all complete, and we pushed the preparation plant build along considerably. As for moving coal, we made good headway on both the run-of-mine belt structures and the clean coal belt structures. Rail and barge loadouts continued advancing steadily throughout the quarter as well. All of these elements remain on timetable; on top of that, we're focused on adding about 100 workers at Blue Creek before the year ends, and we expect to reach that goal. We're thrilled that long wall panel development will begin right when we originally expected, and we remain on track to produce approximately 200,000 short tons of High-Vol A steelmaking coal in the H2 of 2024. The development tons we generate from the H2 of this year through the H1 of 2025 ought to be sold in the H2 of 2025, once the preparation plant comes online. Switching to finances, Warrior invested $84 million in Blue Creek development during the Q2 of 2024, which brings year-to-date spending to $153 million. The company expects to invest about $325-$375 million over the course of 2024 to continue developing the Blue Creek reserves, and that number encompasses the $153 million already outlaid; across the entire project through the close of the Q2, our cumulative investment totals $519 million. We remain dedicated to strict capital discipline so the project concludes within our reset baseline cost estimate and according to the original schedule, including the long wall startup in the Q2 2026. Blue Creek is among the final undeveloped premium high-quality High-Vol A coal reserves remaining in the U.S., and we anticipate it will fetch premium pricing. Warrior expects incremental annualized output of 4.8 million short tons of premium High-Vol A steelmaking coal once the long wall begins operation, which the company believes will reinforce and elevate its already robust standing on the global cost curve and generate incremental profit and cash flows. I'll now pass it to Dale so he can detail our Q2 results further.

Dale Boyles

executive
#4

Thank you, Walt. Even though steelmaking coal demand around the world softened during the second quarter, we keep posting solid operational and financial results by making the most of our top-tier assets and our considerable operational expertise. Our robust financial results let us put money into our company's future and create added value for our stockholders. Over a 5-year span, we are directing close to $1 billion toward our company's future, using cash produced by our current operations, and we are doing this without incurring any extra financial leverage. As a matter of fact, since Blue Creek began development, we have reduced the company's debt and distributed extra special dividends to our stockholders. That speaks volumes about how high the quality of our current assets is, about our people, and about our commitment to creating value for our stockholders. The chance that Blue Creek presents, when paired with our operational efficiency and our solid current assets, means a very bright future lies ahead for Warrior; now let's turn to the particular financial results for the Q2. In the Q2 of 2024, on a GAAP basis, the company posted net income of $71 million, or $1.35 per diluted share, versus net income of $82 million, or $1.58 per diluted share, during the same quarter of 2023. Non-GAAP adjusted net income for the Q2, once non-recurring business interruption expenses are excluded, came to $1.35 per diluted share. That compares with adjusted net income of $1.64 per diluted share during the same quarter of 2023. The quarter-over-quarter declines were chiefly the result of an 11% lower average net selling price along with weaker results from our gas business, partly offset by sales volumes that were 18% higher. We posted adjusted EBITDA of $116 million in the Q2 of 2024, versus $130 million during the same quarter a year earlier. Our adjusted EBITDA margin came in at 29% in the Q2 of 2024, versus 34% during the same quarter a year earlier. Our adjusted EBITDA margin per ton stood at $55 for the Q2 of this year. As I said earlier, the quarter-over-quarter declines were chiefly the result of an 11% lower average net selling price along with weaker results from our gas business, which were partly offset by sales volumes that were 18% higher. Total revenues came to $397 million in the Q2, versus $380 million in the Q2 of 2023. This $17 million overall rise was chiefly attributable to the 18% increase in sales volume, offset by the 11% decrease in average net selling prices, plus higher demurrage and other charges. Demurrage and other charges came in $4 million higher versus 2023's Q2. Demurrage and other charges brought the average net selling price to $186 per short ton in the Q2 of 2024, versus $209 per short ton during the same quarter a year earlier. Other revenues, chiefly from our gas businesses, were lower in the Q2 of 2024 versus the same quarter a year earlier, mainly because natural gas volumes fell 10% between the periods. During the second quarter of 2024, our cash cost of sales came to $260 million, which represented 67% of mining revenues. In the same period of 2023, that figure stood at $229 million, or 62% of mining revenues. Within the $31 million rise in cash cost of sales, $41 million of the increase came mainly from an 18% bump in sales volumes along with greater employee wages and incentives tied to a larger headcount. Partially offsetting that was a $10 million reduction in cash cost of sales, which we attribute to reduced variable transportation costs and royalties stemming from weaker steelmaking coal prices. Per short ton, FOB port, cash cost of sales landed at roughly $124 during this year's Q2, versus $129 in the second quarter of 2023. Cash cost of production accounted for 61% of our total cash cost per short ton, up against 59% a year earlier. Measured per ton, production costs held steady in Q2 relative to the prior-year quarter; that mirrors the larger headcount and the related employee wages and incentives, which were counterbalanced by greater production volumes. All together, transportation and royalty costs made up 39% of our cash cost of sales per short ton in this year's Q2, reflecting weaker average net selling prices, compared with 41% during last year's same quarter. Transportation costs ran about $3 per short ton, reduced because of weaker average net selling prices and how those prices affected variable transportation costs. That figure was net of a $1 per short ton impact from a higher rail mix caused by the Demopolis lock failure. In a similar vein, royalty costs came in about $2 per short ton lower thanks to weaker average net selling prices. Because of these shifts in our cash cost, cash margin per short ton reached $62 in Q2, versus $80 during the comparable quarter a year ago. SG&A expenses totaled roughly $15 million, or 3.9% of total revenues, in the second quarter of 2024, a bit above the 3.5% recorded in 2023's Q2, largely because employee-related compensation expenses grew. Interest income on our cash investments declined in this year's Q2, mainly as a result of lower average cash balances. Our interest expense fell mainly because of the early retirement of debt in August of 2023 as well as the capitalization of interest toward construction of Blue Creek. Our low effective tax rate keeps reflecting an income tax benefit for depletion expense in foreign-derived intangible income. Switching to cash flow: in the second quarter of 2024, free cash flow totaled $25 million, which came from cash flows generated by operating activities of $147 million minus cash used for capital expenditures and mine development of $122 million. Free cash flow exceeded the second quarter of 2023 by $48 million, chiefly because of stronger operating cash flows and reduced Blue Creek CapEx spending. During the second quarter of 2024, free cash flow got a boost from a $29 million reduction in net working capital compared with the close of the first quarter, largely driven by decreased accounts receivable related to sales timing, along with softer steelmaking coal prices. At the close of Q2 2024, our total available liquidity stood at $816 million, made up of $709 million in cash and cash equivalents plus $107 million accessible through our ABL facility. Moving on, let's discuss our outlook and guidance for the entire 2024 year. Following yet another robust quarter in terms of operations and finances, even with sluggish demand across worldwide markets, we have restated our full-year outlook and guidance as detailed in our earnings release. We made a non-material tweak to interest expense, bringing down the anticipated amount for the full year. At this point, I'll hand things back to Walt so he can give his closing remarks.

Walter Scheller

executive
#5

Appreciate that, Dale. Ahead of starting the Q&A portion, a few closing remarks from me. As the back half of this year unfolds, we anticipate demand picking up, though solid indications are still lacking, so caution remains our stance; wherever feasible we'll stay patient and pursue chances to get the most out of price realizations, even if that means running inventory at above-average levels for a while. Within our established markets of Europe and South America, no significant demand gains are anticipated, yet in select geographies such as India and Southeast Asia, we do expect improvement. Turning to China, we foresee reductions in steelmaking coal output taking effect during the year's H2, since recent stimulus measures have not succeeded in lifting demand. Our view is that steelmaking coal supply will tighten somewhat in the year's H2, driven by a mix of disruptions — including the mine fires, maintenance at thermal mines, and long wall moves in Australia. Operationally, and in terms of inventory position, we're set up well to take advantage of rising market demand in the year's H2. Although we're ready to handle many different market scenarios, we're also tremendously enthusiastic and sharply focused on the disciplined advancement of our world-class Blue Creek reserves. First development tons from continuous miner units remain on schedule for Q3 of 2024, and the long wall is slated to commence in Q2 of 2026; with that said, we'd now like to take your questions. Operator?

Lucas Pipes

analyst
#6

Thanks a lot, Operator. Good afternoon, all. Walt, Dale, congratulations on what's been achieved at Blue Creek. I'd like to hear about the main milestones for this project from now through the close of the year. Also, I'm curious about who gets the privilege of extracting the initial ton of coal using the continuous miner unit in Q3. Many thanks, Walt, for sharing your thoughts.

Walter Scheller

executive
#7

Alright, thank you. The major milestones are going to involve bringing that initial continuous miner unit online, and that’s going to take place quite soon. That’s going to take place in Q3. After that, the next important milestone is going to be getting that second continuous miner unit operational prior to the close of the year, once we’ve moved enough material out of the way using the first continuous miner unit. We’ve also discussed finishing the slope, and the slope belt is currently being put in place; the service cage will be operational quite soon in Q3. So the truly critical moments are going to be getting those first two continuous miner units up and running. And I have zero doubt that our mine manager at that site will demand that he be the person to take the first cut with the continuous miner.

Lucas Pipes

analyst
#8

That makes sense. Thanks, Walt, for that context. Regarding your full-year outlook, looking at the midpoint, it suggests roughly 3.5 million tons of output during H2, compared with H1 at 4.2 million tons. So that's a fairly significant step down. And I'm curious, is there something you're seeing? I realize we're talking about the midpoint here, but is there anything on the operations side that would justify that kind of decrease, or does it reflect some level of caution, whether operationally or given where the market stands? Thanks so much for your thoughts.

Walter Scheller

executive
#9

Well, we generally aim to set expectations low and then exceed them, but honestly, there are 3 long wall moves coming up. And although we have shields in place and those ought to be zero-day moves, you still need to decelerate as you approach the end of the panel so the meshing can be finished and that face can be bolted up prior to moving on to begin the new long wall phase. So that applies to all 3 of those long wall moves; and on top of that, we always figure that during the holidays, with absenteeism plus simply wanting to give folks a bit of extra time off, we anticipate a drop in our production levels.

Lucas Pipes

analyst
#10

Thanks. And also the expense outlook tied to that cautious approach. You saw a solid sequential gain on that front.

Dale Boyles

executive
#11

Yes. Lucas, Dale here. So, if you take a look at what we've done so far this year, we're sitting exactly where we told you we'd land within our range. Therefore, when you compare current pricing to the assumptions behind our guidance, everything lines up pretty closely. So it really does appear to be playing out just the way we described, and we're feeling positive about our position.

Lucas Pipes

analyst
#12

Okay, that extra detail is helpful. And to everyone on the team, I hope things go well. Thanks.

Dale Boyles

executive
#13

All right. Thank you, Lucas.

Nathan Martin

analyst
#14

Good afternoon, everyone. Let's begin with pricing. Walt, as you mentioned, the capture rate reached roughly 90% during this quarter, and that's an improvement over what I recall being 84% back in Q1. So my assumption is that the sequential drop in net prices provided some support there. Yet do you all remain confident that Warrior can reach that 85%-90% target Dale brought up earlier, the Australian benchmark for the entire year? Or given the greater High-Vol A output we're observing from Mine 4 — which I believe is operating at close to record levels, at least through the first half — plus that spread between High-Vol A and the benchmark staying wider than it has historically, should we figure it lands somewhat beneath that range? It would be helpful to hear what you think.

Walter Scheller

executive
#15

Well, in fact, the spread has narrowed somewhat again, and that's quite encouraging. And your initial point regarding falling prices driving those relativities upward is quite — that's quite right. My expectation is that should prices keep dropping, regrettably, you would likely keep watching that percentage climb or remain elevated. That said, I am confident, and I hope prices will rise again, and I would prefer to see the spread along with our percentage come down somewhat since coal prices would be increasing. Even so, we remain fairly confident about that 85%-90% range.

Nathan Martin

analyst
#16

Got it. That mindset from Walt makes total sense to me. Maybe I can tie it to how shipments will flow through the rest of the year. I believe you guys said there are still 3 long wall moves left — if I'm remembering right, 2 in Q3 and 1 in Q4. Walt, you brought up a modest quarter-over-quarter inventory build. When do you think some of that inventory might get worked down — in Q3 or Q4? Any particular thoughts or drivers for shipments across the quarters in the back half of the year?

Walter Scheller

executive
#17

Well, the main thing to keep in mind here, as we've mentioned, is that we'll mine 200,000 tons from Blue Creek, and that will add to inventory. So even if we hold inventory flat at four and seven, we'd still end up with 200,000 more tons. As for drawing that inventory down, like I said, patience is going to be our approach. We won't rush into the market simply to dump tons. There's no need for us to do that. So we'll stay patient. Should we spot opportunities in the market that, in our view, warrant moving additional coal, we'll act on them. But we aren't — we don't feel any pressure to do that. Nate, I'll add to Dale. Let me build on that. Thinking back to last year, if you recall, in Q3 we pushed a great deal of volume out to get our products introduced into Asia. After that we pulled back in Q4, and we shipped only about 1.5 million last year; so whenever we can, we try to capitalize on market conditions. If we believe prices in the latter half of the year will rise, then our approach will be a bit more patient. So Q3 might come in a little lower and Q4 a little higher. It really comes down to what market customer demand looks like, so that we maximize price.

Nathan Martin

analyst
#18

Understood. Appreciate it, Dale. Thank you, Walt. Perhaps one final item regarding Blue Creek. This is something investors ask me about quite regularly. Scanning the slide deck, clearly a number of those figures have gotten somewhat outdated by now, though my focus is specifically on cash costs and what might be possible with the Blue Creek product. I realize you've indicated it ought to ultimately contribute to bringing down Warrior's total cash cost, the average cash cost. Your deck continues to show roughly $70 or thereabouts; but could we perhaps hear your thinking on what that figure might become once you refresh those economics, particularly considering the inflationary pressures we've already baked into the CapEx budget?

Dale Boyles

executive
#19

Thank you. No, that's a fair question, Nate. Listen, we do anticipate refreshing all of those project economics. Like we mentioned, last year's scope change truly had no impact because we enjoyed the transportation cost improvement and all of that; so no net effect on the economics overall. My own view is they'll actually improve, given a higher net coal price and that assumption. So at some point next year, we'll put that information back out. But that was $70 all in previously. We've discussed inflation and supplies and all of that running 30%-35%. So adding that, you begin arriving where we suspect it will likely land. Of course, I can't say whether that's the precise figure, but it gives a rather solid sense of where we're probably going at present.

Nathan Martin

analyst
#20

Excellent. I appreciate the update, Dale. I'll stop right there, everyone. Thanks for your time. And good luck during the second half.

Walter Scheller

executive
#21

Thanks.

Katja Jancic

analyst
#22

Hi there, and thanks for taking my question. In those prepared remarks, Walt, I believe you said spot exposure for 2024 would land somewhere in the 25% to 30% range. Is that slightly above what people had been anticipating? My understanding was that the original figure was closer to 25%.

Walter Scheller

executive
#23

My recollection is that 25%-30% was the number we gave from the start. The problem, though, is that we haven't seen any real pickup in spot activity across Europe or South America; as a result, we simply have to keep directing the coal toward Asia, and much of that is taking place on the spot market.

Katja Jancic

analyst
#24

Does that fall within the near term? Since, as you pointed out, spot activity is currently somewhat weaker, meaning spot volume or spot exposure might be reduced in, say, Q3?

Walter Scheller

executive
#25

Yes, that's possible. Once more, Q1 stood at 37%, then it dropped to 30% in Q2, and we continue to project 25%-30%. Therefore, a decline is necessary. For our range to be achieved, it must come in under 30% during the third quarter or Q4, pulling our figure lower to where we expect it will land.

Katja Jancic

analyst
#26

And if I could squeeze in one more question. Over a longer horizon, when Blue Creek begins its ramp-up, would that exposure shift?

Walter Scheller

executive
#27

My view is that during Blue Creek's initial 2 years, that exposure actually grows, since you're introducing an additional 4.8 million short tons into the marketplace, working to get that coal established, and locating buyers for it. For that stretch of the coming few years, I'd expect the spot share to rise.

Katja Jancic

analyst
#28

Okay. Perfect. Thank you.

Walter Scheller

executive
#29

Thank you.

Walter Scheller

executive
#30

That wraps up today's afternoon session. Thanks once more for being with us. We value the interest you've shown in Warrior.

Operator

operator
#31

That brings us to the end of this call. We appreciate your joining us for today's presentation. You're welcome to log off at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Warrior Met Coal, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Warrior Met Coal, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Warrior Met Coal, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.