Good morning. I'm the conference operator for Chorus Call. Welcome, and thanks for being with us on Webuild's First Half 2021 Financial Results Conference Call. <<operator_script>> Right now, I'd like to hand the conference over to Mr. Pietro Salini, Chief Executive Officer. Please go ahead, sir.

Pietro Salini

executive
#2

Good morning, and good evening, everyone, and welcome to the conference call we've dedicated to Webuild's first half results. I'm Pietro Salini, the group's Chief Executive, and I'll say a few words regarding how we performed during the first 6 months of the year before handing over to Massimo Ferrari, our General Manager, who will go into further details. Let's begin with some highlights on Slide 3. Over these first 6 months, Webuild delivered markedly positive results despite global uncertainties linked to the pandemic continuing to persist. We sped up our derisking process along 3 main pillars. First, we brought in a record on new orders. We're talking about EUR 9.6 billion. We concentrated on low-risk markets such as the European, U.S. and Australian markets. Tied to new orders, we substantially raised the overall backlog in low-risk areas. Finally, we lowered risk on the financial side. Our net and gross debt came in better than historical trends and beat market expectations. We settled some important claims and enhanced the quality of our assets. After a year of disruption in efficiencies, slowdown and site closures, we can now take a more positive view of the future of the construction sector. For most of the developed countries where we operate, the recovery post pandemic will pass through great investment in infrastructures.

Pietro Salini

executive
#3

Revenue and margins in these markets increased, and that came not just from the Astaldi acquisition but also from reorganizing operations, which lets us take less of a hit from COVID-19. When we look at the 2021 targets in light of how the pandemic currently stands, we can say with confidence that we remain on course to hit them. Naturally, those targets could shift given how unpredictable the COVID-19 pandemic is. As you'll recall, we finished acquiring 66% of Astaldi in November 2020. The integration is now complete. Astaldi going concern merges into Webuild by the first of August, which is tomorrow. On the subject of sustainable development and the innovation behind it, the figures we have demonstrate our commitment. Over 90% of our construction order backlog today stems from projects devoted to meeting sustainable development goals. We also rolled out our ESG plan for '21, '23, with targets linked to cutting greenhouse gas emissions, safety, gender diversity and innovation. Slide 4's graphic will show you clearly how much we achieved during the first 6 months of the year. In January, we issued a tap bond worth EUR 200 million.

Pietro Salini

executive
#4

That marked the final one in the series, lifting the overall sum raised to EUR 750 million, and we deployed it to refinance debt, extending maturity while having only a modest effect on the overall expense of that debt, as Massimo will detail further later on. As I mentioned, with governments across numerous nations—Italy especially—putting money into infrastructure to assist their economies in bouncing back from the pandemic, we were in a strong position to capture several highly significant contracts. Within Italy, we secured deals to upgrade the rail link connecting machine and Catania and Sicily, to build out a portion of the high-speed line linking Naples and Bari, and to carry out work on the high-speed railway joining Verona and Brenner. Beyond Italy, signing the final agreement for the Texas high-speed railway stood out as our greatest achievement. In Australia, our consortium came out as top bidder for the tunneling portion of the Northeast Link project in Melbourne. Back in April, we introduced our ESG plan. On top of that, we appeared among Europe's climate leaders in a ranking released by the Financial Times. So the work we're doing is getting noticed. That same month, shareholders at both Webuild and Astaldi gave the green light to the plan for merging the 2 companies.

Pietro Salini

executive
#5

The outcomes we delivered also prompted the top ratings firm to affirm the rating on our debt and to lift the outlook for the group. Let's turn now to Slide 5, which lays out our new orders in more detail. Orders worth EUR 9.6 billion in the first 6 months represent a record. These are orders we have secured, that are being finalized, and on which we have been named best bidder. The first front is Italy, where the government is investing heavily in infrastructure to prop up the economy. The second front is a set of countries with low-risk profiles in which we are growing: United States, Australia and Europe. Put briefly, more than 95% of the new orders originate in low-risk countries. Italy accounts for orders valued at roughly EUR 5 billion. That is over half of the total value of the orders we have won so far this year. The robust order intake was due in part to the attention paid to the technical side of our offer, which in some cases we developed alongside Italian partners. On projects such as the Naples-Bari high-speed railway, we managed to win contracts to build more than 1 section of the same railway, thanks to the fact that we already have people and machinery on the ground there.

Pietro Salini

executive
#6

It's also worth mentioning that the government in that country has worked to shorten how long it takes a project to get going—from contract signature through to the beginning of construction. Turning to other markets: in Australia, we've been named best bidder for the tunneling package on the Northeast Link in Melbourne. That's not just the biggest road project in the state of Victoria—it's also the biggest private-public partnership for an infrastructure project in Australia. We saw solid order intake as well via our Swiss subsidiary, CSC. In the United States, we have the Texas mega rail project, valued at EUR 15.1 billion. That contract stands out not only because of its size but also since it will bring the country its first genuine high-speed rail service. Our book-to-bill came in at 1.7x—7.8x once you include Texas and the contract where we've been named preferred bidder. Slide 6 illustrates just how substantial our backlog is, at EUR 43 billion. Even more significant is the diversification of these projects. Over 70% of our portfolio sits in countries such as the United States, Australia, Europe and, naturally, Italy. Within the total, EUR 35 billion relates to construction projects.

Pietro Salini

executive
#7

So that provides us with visibility across the coming 5 years, grounded in expected 2021 revenues. When we factor in the Texas contract along with tenders where we've been named best bidders, the overall backlog reaches EUR 52 billion — more than double what it was at year-end 2020. This Texas contract's effect on our group is transformational to the point that it would contribute between EUR 700 million and EUR 800 million to our equity value. Italy accounts for the largest share of the backlog. A portion of it will be carried out under the National Infrastructure Plan — known as the Piano Nazionale di Ripresa e Resilienza, the Next-Generation EU. On Slide 7, a geographical breakdown of our revenues is shown. Given the significant investments the Italian government is making, our home market has moved ahead of North America to become our primary market, at 31% of total revenues for the first half of the year. What matters to note here is how much Italy's share of total revenues has been rising in recent years. Back in 2018, it was only 10%. The United States ranks as our second biggest market. Europe, too, is growing in importance at 19% of the total, as we expand mainly in France and Switzerland.

Pietro Salini

executive
#8

We have managed to consistently lower how much we depend on our 10 largest projects, which is part of our diversification strategy. Those projects now account for 40% of revenues. At the close of 2018, they made up almost 50%. The revenue numbers also highlighted how strongly we remain dedicated to our objective of fostering sustainable development. The pie chart shows that sustainable mobility projects, such as high-speed rail, represent 68% of total revenues. Our operating performance has, naturally, been affected by restrictions that the government put in place to halt the spread of COVID-19. Some production inefficiency continues at certain construction sites, chiefly in the Middle East and Australia. We are also carrying out our plan to protect workers from becoming infected. During the second quarter, we launched vaccination campaigns at construction sites. On Slide 8, we would like to remind you of the latest developments concerning the integration of Astaldi and Webuild. As you are aware, in March, we began the process for the partial and proportional demerger of Astaldi in favor of Webuild. Under the plan, Astaldi shareholders will get Webuild ordinary shares totaling 203 for every 1,000 Astaldi shares. The demerger's effectiveness was mainly conditional on the Court of Rome issuing a provision certifying the execution of the Astaldi composition with creditors.

Pietro Salini

executive
#9

As we told the market, that was published over the past few days. The remaining steps can be viewed as completed, and the demerger takes effect on 1 August. Through this demerger, Astaldi's operations in building infrastructure, construction, engineering, design, maintenance and facility management — all within the going concern perimeter — will move over to Webuild. Astaldi itself will retain only the assets and legal relations that go to the separate business, Patrimonio Destinato, for the creditors it established on 24 May 2020. Meanwhile, we keep working on aligning the core process, information technologies, bidding, procurement, operation and so on. Moving to Slide 9. During the first month of 2021, we continued putting money into our commercial activity. In truth, infrastructure investment will serve as the model for economic growth and social development in the post-pandemic world. The enormous amounts governments intend to spend convince us of this. The U.S., Europe, Australia and other developed economies ought to keep generating strong demand for what we offer. Our commercial pipeline holds upwards of EUR 34 billion, including roughly EUR 7 billion of tenders whose outcome we are waiting on.

Pietro Salini

executive
#10

Consistent with our derisking strategy, the bulk of our tenders sits in the United States, Australia, Italy and other European nations. Our confidence in the Italian market will be borne out by Slide 10. The high-speed railway network within PNRR carries a total value of roughly EUR 24 billion, with EUR 15 billion of that financed directly by PNRR. The plan's railway elements are laid out on the map. Those where Webuild already has a role include Fortezza-Verona, Milan-Genoa, Naples-Bari and Palermo-Catania-Messina, worth approximately EUR 10 billion — more than 70% of the project awarded year-to-date. A further EUR 10 billion has yet to be tendered, among them Orte-Falconara, Salerno-Reggio Calabria, Taranto-Battipaglia and Rome-Pescara. Beyond those, the Infrastructure Ministry has added another EUR 10 billion, chiefly to finish the Salerno-Reggio Calabria high-speed rail line. Our group stands ready. The same strategic thinking that produced Progetto Italia has led us to commit resources and expertise to the domestic market, including through the creation of a new entity devoted to the Italian market — to respond swiftly to the need to upgrade counter infrastructures, particularly in sustainable mobility as set out in the National Plan of Recovery and Resilience, and to optimize indirect and overhead costs by centralizing them in a shared service center and deploying back office automation.

Pietro Salini

executive
#11

So in that sense, the head office functions as a hub of expertise, able to support activities across the globe. Now I'll hand things over to Massimo, who will walk you through the specifics of our first half 2021 financial results.

Massimo Ferrari

executive
#12

Thank you, Pietro, and good morning, everyone. Before I walk you through the numbers, I want to remind you that, as usual, the figures we're presenting are adjusted ones, and they take into account the effects of work under management — that is, the JVs belonging to Lane Construction, our U.S. subsidiary. On top of that, the first-half 2020 figures leave out the P&L impact of the settlement agreement reached with Condotte d'Acqua regarding the ownership transfer at COCIV, the consortium in charge of what's known as the Terzo Valico dei Giovi, the Milan-Genoa high-speed rail line. And lastly, our first-half 2020 numbers do not include Astaldi, which Webuild acquired in November of this year. Let's begin on Slide 12. Revenues came in at EUR 3.1 billion, compared with EUR 2.2 billion in the same period a year earlier. That 42% increase reflects both the Astaldi acquisition and a pickup in activity on our construction side. As Pietro told you, despite a strong recovery relative to the same period last year, our business is still being affected by certain government restrictions put in place to fight the spread of COVID-19. Those restrictions are still with us and could impact our business. As things stand now, we are on track to achieve our targets.

Massimo Ferrari

executive
#13

EBITDA rose to EUR 198 million. EBIT came in at roughly EUR 99 million. That figure leaves out EUR 38 million of amortization and depreciation stemming from the PPA process tied to the Astaldi acquisition. Margins for both EBITDA and EBIT gained over 1 basis point, though they remain weighed down by below-optimal efficiency at certain sites because of COVID-19 restrictions, which carried an impact of around 10%, 15% on EBITDA; by approximately EUR 15 million of front-loaded restructuring costs linked to integrating Astaldi, aimed at creating future synergies that begin already in '22; and by a marginal near-term squeeze from raw material cost inflation. On that last point, I'd remind everyone that the majority of our international contracts carry clauses letting us pass on to clients any price increases. In Italy, the government is preparing a new decree that would strengthen protections for general contractors facing sharp increases in raw material prices. That decree would probably apply retroactively, so as to capture costs builders took on during the first half of the year. Turning to Slide 13, we show the P&L beneath the EBIT line. Net financial costs stood at EUR 54 million, versus EUR 49 million a year earlier. That includes EUR 5.6 million in bond charges, mainly connected to the temporary overlap between the 2021 and 2025 notes.

Massimo Ferrari

executive
#14

During June, we repaid the 2021 notes. As a result, that cost won’t be counted twice in our full-year figures. We also need to factor in that we are consolidating Astaldi’s financial expenses — primarily bank debt charges, financial costs on guarantees, and the devaluation of certain financial assets — which adds roughly EUR 20 million in cost. Taxes came to EUR 54 million, versus EUR 27 million. The tax burden was shaped by the favorable resolution of a claim in Ethiopia. That claim recognized for Webuild approximately EUR 400 million in extra cost, settling all disputes on the matter known to date. In any event, under current legislation these taxes could potentially be deductible in the coming year for taxes payable in Italy. Meanwhile, adjusted net income — which excludes certain one-off items discussed earlier in the call, such as the front-loaded restructuring cost tied to the Astaldi integration, the amortization from the PPA process, and the tax effect on claim settlement — was positive at EUR 41 million, and better than the same period last year by about EUR 90 million. On the next slide, we have reported cash flow for the first half of 2021, and you will see the positive results recorded in terms of net and gross debt.

Massimo Ferrari

executive
#15

We surpassed every market expectation and, let me add, our own expectations as well. So a big thank you to everyone who delivered this remarkable result for the first half of the year. Operating free cash flow stands at roughly EUR 70 million. Clearly, the biggest drivers are the stronger EBITDA and the cash coming in from working capital. We did a great job handling the seasonality of working capital, which in recent years weighed on the opening portion of the year to the tune of about EUR 350 million, based on our estimates. The record level of new orders booked in the first half lets us collect over EUR 500 million in advance payments on new contracts and project backlog. Yet at the same time, we had to return roughly EUR 280 million to clients and partners. So on a net basis, the advance payment effect on working capital came to an improvement of about EUR 220 million. Not every advance payment has been received yet. We are still awaiting approximately EUR 1.5 billion in advance payments, including somewhere between EUR 400 million and EUR 500 million of contractor advance payment that we expect to collect in the second part of '21 tied to contracts awarded in 2021.

Massimo Ferrari

executive
#16

The rest of the funding comes from the Italian government's Relaunch Decree — that 30% target we've already discussed. During this month, we also lowered the overall figure for outstanding claims for additional consideration by roughly EUR 330 million. Both the claim tied to the GERD dam and the one connected to Perth's Airport Link have now been collected. They had sat in our balance sheet for a long time. Taking all of that together, net debt comes to EUR 540 million — a drop of EUR 560 million compared with the prior year, which works out to a reduction of more than half. The adverse impact relative to December 2020 stems largely from the cash outflow on the Panama litigation. On gross debt, we brought it down by over EUR 590 million, so roughly EUR 600 million. On top of that, we hold EUR 300 million of revolving credit facilities that are still undrawn. Those could be drawn upon if an extraordinary shock occurs, as happened last year with the COVID-19 outbreak. Turning to Slide 15, we can see when our corporate debt matures. In June, we finished repaying the 2021 note, which was EUR 237 million. At this point, no long-term debt maturity falls due until the second half of 2022. In January, we placed a tap bond of EUR 200 million, which was folded into the 2025 bond issued one month before, in December 2020.

Massimo Ferrari

executive
#17

The proceeds went toward refinancing a portion of bank debt. That January issuance additionally contributed to bringing down the average cost across the whole 2025 bond. For medium- to long-term corporate debt, the average cost sits at roughly 3.5%, and duration now stands considerably higher than it did previously. It comes in at about 3.5 years. Back at the close of June last year, duration was approximately 3 years. I would note that we were able to take advantage of favorable conditions in the debt market beginning in September, partly so as to get ahead of the maturity coming due in 2022. At this point I'll hand things back over to Pietro for a few closing remarks.

Pietro Salini

executive
#18

Thank you, Massimo. Turning to Slide 17, I'd like to walk you through our strategy. As we discussed earlier on this call, we're consolidating our position in Italy, which is our home market. We're accelerating the pace on projects that were already part of our backlog, like the Verona-Padua high-speed railway. On that project, we signed the agreement with the client 5 months ahead of schedule to begin work on the second lot of the Verona-Bivio Vicenza section. That lot is valued at EUR 1.6 billion. The outlook for Italy's infrastructure sector is positive. We're benefiting from a wave of investment that the government is putting in place. As we've noted on previous occasions, there's also a new line of business we're looking to develop. That is road maintenance. Through our subsidiary Cossi and the integrated business of Astaldi, we're awaiting the outcome of approximately EUR 800 million of tenders in this segment. Discussions are also under way about introducing a model in which Webuild could serve as general contractor across the entire maintenance chain, from monitoring to intervention engineering and execution. As for strengthening the value chain — in other words, building up our in-house expertise — we could consider a small tactical acquisition in areas like foundation works.

Pietro Salini

executive
#19

Slide one's initial item concerns our initiative to achieve EUR 120 million in savings by 2023. Implementation of the cost efficiency program that started in 2020 is ongoing. As things stand today, we have finished the first tranche of measures — the crash program that was launched during the pandemic in 2020. Additional measures involve cutting and reorganizing head office and external branch costs, along with cutting and reorganizing indirect costs at our construction sites and consorts in Italy, with the aim of improving margins on our projects. Finally, synergies are being generated from our acquisition of Astaldi. We are well on the way to boosting cash generation, helped by several factors. As was discussed earlier, an increasing share of our projects originate in low-risk markets, which offer better payment, certainty and visibility. Greater operational efficiencies are being achieved through our cost savings program. Payment terms on our Italian projects are getting better, and substantial opportunities remain on our balance sheet to collect outstanding receivables and monetize our assets. Moving to Slide 18. We have the target we set in March. As everyone is aware, in certain parts of the world the virus has grown exponentially.

Pietro Salini

executive
#20

When it comes to certain regions, such as Brazil, our operations there are minimal. In others, the Middle East for instance, we do maintain a presence, and what we do there could be affected. Assuming a steady euro-to-U.S. dollar exchange rate, we expect revenue of between EUR 6.5 billion and EUR 7 billion for 2021. Our present backlog accounts for over 90% of combined '21 and '23 revenues, leaving out the Texas rail contract. A margin recovery in the second half, producing an EBITDA margin of roughly 8% for the whole year, along with net debt improving by between EUR 500 million and EUR 300 million. Because of the uncertainty that remains from the unpredictable character of the COVID-19 pandemic in the nations where the group does business, these targets could still change. Slide 20 (sic) Slide 19 shows how our sustainability strategy, practice and performance have earned recognition from the leading ESG rating agencies. International agencies including Morgan Stanley Capital International ESG, Vigeo and CDP Climate continue to rank us among the top performers in construction. Over the recent months, we have been given 3 significant sustainability awards: the Europe Climate Leaders 2021, the Italian Sustainability Leaders 2021 and the Royal Society for the Prevention of Accidents Gold Award 2021 for building the New Genoa bridge.

Pietro Salini

executive
#21

The Financial Times placed us among businesses at the leading edge of the push against climate change, naming us Europe climate leaders for 2021. Between 2014 and 2019, we managed to cut the intensity of our direct greenhouse gas emissions measured against revenues by 9% year-on-year. Thanks for listening — I'll now open things up for your questions.

Operator

operator
#22

<<operator_script>> Our first question comes from Matteo Bonizzoni at Kepler.

Matteo Bonizzoni

analyst
#23

I've got a few questions. The first concerns the guidance you confirmed for both the P&L and net debt. Looking at how the first half went, on the P&L side the margin guidance in particular could be, let's say, somewhat aggressive — or in any case, having posted a 6.3% EBITDA margin in the first half, reaching 8% for the full year is, I mean, no small feat. So could you elaborate on that? On the net financial position, by contrast, could you elaborate a bit on the working capital trend you expect in the second half? Because the first half was completely different from the usual seasonality, which you've already commented on. So starting from net debt of slightly more than EUR 500 million, it seems you could potentially even exceed your tax guidance and deliver better. I'd just like some color on that. The second question...

Pietro Salini

executive
#24

No. Let me just handle this one. Perhaps hold the second question until a bit later, once we've wrapped this up, okay, Matteo?

Matteo Bonizzoni

analyst
#25

Yeah, yeah.

Pietro Salini

executive
#26

So for us, the second half will mark the beginning of several contracts, first in Italy and then overseas. It's going to generate substantial revenue — let's say 30% more than what the first half is expected to bring in. That's because of the <<inaudible>> acceleration we're applying across the board. So revenues will rise in the second half. And naturally, we won't repeat the upfront expense we incurred for the Astaldi reorganization, nor the other extraordinary and nonrecurring costs you can see in the first half. So my view is you can't just double the first-half figures to get the second half, given what happened in the first. Naturally, all of this, as I mentioned, depends on there being no further pandemic effects, since that's something beyond our control. Even so, as I said, some effects are scattered everywhere. So the pandemic conditions we dealt with in the first half did affect our revenues.

Pietro Salini

executive
#27

We also expect to see an impact—and to keep seeing one—during the second half. Naturally, that doesn't factor in any further surge in the pandemic that some people might be anticipating, though at present we don't foresee one. So that's the first point. The second point to keep in mind concerns cash. Regarding the advance payment, under Italian law on advance payments it's possible to receive as much as 30% on new contracts, particularly the one tied to the Next Generation EU plan. Not all of those elements are built into our guidance estimates. We adopted a highly cautious assumption on that front. So those are the first 2 responses to your questions. Kindly proceed with your second question.

Massimo Ferrari

executive
#28

Apologies, Matteo — I want to expand on that first point. As you point out, our usual practice, taking a cautious stance, has been to assume new order production begins 12 months afterward. Given the various PNRR programs globally, clients are speeding things up considerably, so we have strong confidence that we'll begin well ahead of the timeline our earlier assumption used. So, your second question?

Matteo Bonizzoni

analyst
#29

Yeah, real quick. Financial charges for the first half, associates included, came in at minus EUR 72 million. I just wanted to get — could you give us some indication for the full year? And then, if I may, on the raw material side. So you said, if I understood correctly, that the problem is in Italy, right? Because outside the country, you have in several cases...

Massimo Ferrari

executive
#30

Mostly in Italy.

Matteo Bonizzoni

analyst
#31

So where do things stand right now? Because it looks like the government is now talking about EUR 100 million to cover the entire sector, and that's clearly a small amount when you compare it with the number of jobs and the scale of the margins of the — I mean, what's your take on that? One last very quick question. Did I get it right that you — can you evaluate — think about, let's say, an acquisition in special foundation? And if so, I'm wondering, is it Trevi?

Massimo Ferrari

executive
#32

Acquisition isn't the only route—we've included acquisition, but a strategic partnership with them is also possible. We're likewise looking at a potential acquisition in a highly important continent where we operate, though involving a smaller amount of money on our side. So returning to raw materials: you're correct that the first initiatives from the government are insufficient—not just for us, but chiefly for the hundreds of companies serving as suppliers or subcontractors. Therefore a very different legislative approach is needed—one that could be retroactive and could take into account, of course, as in other markets, only the raw materials included in the project we're working on. So we think it's feasible, because the government's interest is to deliver on schedule, as promised to the European Commission, the infrastructure that appears on the list.

Matteo Bonizzoni

analyst
#33

All right. Regarding the financial charges for the full year?

Massimo Ferrari

executive
#34

All right. I want to bring in the colleagues I can see on the video, since I recall that we included Alessandro or Amarilda. Within the range of 110, 120 in total financial charges.

Operator

operator
#35

<<operator_script>> Our following question comes from Alessandro Tortora at Mediobanca.

Alessandro Tortora

analyst
#36

I’ve got 3 questions, if I may. The first concerns the early portion of your remarks in the presentation about Ethiopia. If I understood correctly, you probably referred to, let’s say, a claim that you resolved. So if you could help us grasp the impact, because in a way you likely freed up a receivable or a credit you had on that project. My second question is about the Texas Central contract. Clearly, we’re now one step further along and before financial closing. So I’d like to understand whether you can share some thoughts with us on the project’s economics, or at least a qualitative indication on margin, and also — very simply — your, how can I put it, buck that you put into this contract, because I read an article where you also gave some indication on some NPV for the project considering the long duration. And the third question is on the integration cost of Astaldi. If you can give us, let’s say, some kind of guidance for the integration cost for this year, and also for the next 2 years.

Pietro Salini

executive
#37

Okay, I'll begin, and then for the final questions I'll hand things over to Massimo. Regarding the Texas Center, we haven't included it in our portfolio, since we're waiting on its financial closure. Naturally, this project is going to deliver a backlog of extremely high quality — it will add a backlog of extremely high quality in that particular country, and it will bring us significant revenue along with cash and liquidity from the contract across a considerable span of years. So it's truly transformational. That's the reason we hold off on putting these items in, let's say, for scaramantic reasons, until the financial closure takes effect. We anticipate that the financial closure will take effect fairly soon. And naturally, the favorable outcome of the Biden boost to the economy and infrastructure is heading in the right direction for the U.S. to launch a serious program aimed at improving infrastructure, and particularly where sustainability of mobility is concerned, that infrastructure is especially interesting. That's the first point on Texas. What was the question again, sorry?

Alessandro Tortora

analyst
#38

What about the Ethiopia claim?

Pietro Salini

executive
#39

Right, so about that Ethiopia claim — we reached a settlement on it, and that recognized EUR 400 million for us, which fell within what we had requested, you could say it was part of our ask. Naturally, we had to pay taxes on it in Ethiopia, since they don't levy on a cost-to-cost basis; instead they charge based on invoicing, and that differs from the approach we use, as you're aware, for revenue accounting on a cost-to-cost basis. So, let's put it this way: that amount has already been paid, given that it's been fully invoiced to the client. And under Italian law, we're able to offset those amounts for tax purposes only when we post a net profit at, let's say, a meaningful ratio between external and internal. I won't get into the specifics there. So, in short, on amounts paid in foreign countries, you can make use of them once the ratio of net profit generated in Italy exceeds the one we currently have. That means we can recover that amount down the road, with that lift in the profit we generate in Italy. That's what is...

Massimo Ferrari

executive
#40

And if I remember correctly, we cashed in a certain amount during 2021, a certain amount...

Pietro Salini

executive
#41

We will cash in 2022. Yes.

Massimo Ferrari

executive
#42

Let me also mention that we won’t be revealing the specific figures, but we’ve done our own estimate regarding Texas: if we’re in a position—alongside the other partner and the sponsor—to complete the financing, then the cash generation that would come into Webuild would fall within a range of many hundreds of millions of euro, in the high range of many hundreds of millions of euro. Naturally, we’ve only just begun working with them. We’ll be working through August as well, gladly. We’re the only ones who’ll take a bit of vacation in Texas. That’s where we’ll be working. So we’re hopeful that by the end of 2021 we can share some updates—not about a closing, but about the processes, the financial institutions involved, the role of the federal government, and so forth.

Alessandro Tortora

analyst
#43

All right. Next, the final question concerns integration cost. After that, I have a follow-up about a different subject.

Massimo Ferrari

executive
#44

Was the question about how much we expect to save in total from the integration, right?

Alessandro Tortora

analyst
#45

No, it comes down to what it costs to get there. Like you said, in the first half we identified some — how should I put it — one-off expenses tied to the Astaldi integration. So just so I’ve got it clear, what’s your take on the, let’s say, cost of the plan, okay?

Massimo Ferrari

executive
#46

So we’re looking for that to be at or above the same level for a few million in 2021, and then 2023 is when these initiatives will be fully deployed.

Alessandro Tortora

analyst
#47

All right, all right. And the final item concerned the maintenance business. Could you help us get a sense of how the, shall we say, competitive landscape looks? Because I'm not sure whether there are some, let's say, non-Italian players that might potentially be interested in offering these services, or whether it's just, let's say, a sort of competitive position within the company as in Italy, and you are the main counterpart when it comes to providing this maintenance service across Italy.

Pietro Salini

executive
#48

Naturally, Webuild's size and its function within Italy are extremely significant at this point—for the nation as a whole, I believe, as I said in that interview I gave this morning. We're serving the country by increasing, so to speak, the production capability on those projects, and that capability is enormous. You'll recall that in Italy, over the last 2 years, investment levels have fallen considerably. That also means industrial capacity has shrunk. So the key point is that Webuild is returning to its position as the backbone of this new infrastructure-based plan for the past, a plan built on infrastructure. As a result, we don't regard competition as a problem, since we believe there's enough work for the entire, let's say, industry in Italy. An economic boost is coming through the way this economic model is organized, and as you'll remember, we disclosed those figures. More than 7,000 companies now work with us in Italy, and 15,000 companies—mostly Italian ones—work with us around the world. So I believe this system, this Italian industrial system, stands to gain a great deal from this investment plan.

Pietro Salini

executive
#49

Naturally, Webuild is well positioned to serve as a strong organizer and partner — particularly as general contractor, which is the role anticipated under the new decree that Governor Draghi has issued and <<inaudible>>, as it's termed in Italian, and that term refers precisely to this approach of organizing and mobilizing the whole industry. So I view this as a favorable development. We'll encounter this situation across the globe, because naturally we shouldn't overlook that this effort to relaunch the economy isn't confined to Italy — it's a global matter. As a result, demand in the construction sector will be strong. We will have — we'll see substantial investment taking place worldwide on a large scale, since launching bigger projects is simpler than launching thousands of our smaller ones. So that is precisely the market we're seeking. That is precisely the market we desire. And we're capable — we have the capacity to organize and to put the entire filiera, as it's called in Italy, to work.

Massimo Ferrari

executive
#50

That's another reason we aim to be glocal, as we've mentioned, in the primary continent where infrastructure is booming.

Pietro Salini

executive
#51

Alessandro, if there's nothing else, then as you know, we're always available. Any further questions?

Operator

operator
#52

Enrico Coco from Intermonte has the next question.

Enrico Coco

analyst
#53

I've just got one question, and it's about cost inflation when it comes to raw materials. What I'd like to know is whether you could give us a bit more color on the impact — the isolated impact, if you like — of the rise in raw material prices, and whether that was partly offset by, say, the release of provisions on certain contracts.

Pietro Salini

executive
#54

So this is quite recent — the law got approved within the last 2 weeks. And it specifically accounts for the sharp rise in certain materials, steel and cement among them, driven by the extraordinary worldwide demand situation for those materials. So it's a particular law that addresses only one specific situation. What Italy needs — and what the ministry is currently examining — is a more specific price revision formula, one closer to what's used around the world. Rather than basing an actualization of prices on the cost for family and for workers, which is the <<inaudible>>, and that's a different thing. So this will bring the sector closer to what's applied in Europe and worldwide. In Italy, as you know, this matter of price revision has historically been very sensitive, because in some cases there was excess in how this revision of prices was used. But now, of course, they're returning to simply the rationale of price that we apply worldwide. So that's it. Of course, this will greatly benefit the sector as a whole. It will make things easier.

Pietro Salini

executive
#55

It's quite straightforward to see that nobody can get at EUR 100 what — for the — if the price — the present price for that same material sits at EUR 250. So making the attempt is simply a squandering of effort, since ultimately either the industry falls apart or you end up without the infrastructure. That makes it highly important given the fact that we must finish the Next Generation EU portion — paid for with those funds — in under 6 years. So we need to be extremely pragmatic and realistic. And I believe this sentiment is now properly grasped within this government.

Operator

operator
#56

Carlo Del Grosso from Swiss Re has the next question.

Carlo Del Grosso

analyst
#57

I've got 2 questions. The first one's likely for Mr. Ferrari, and it concerns inflation. I'd just like to get a sense of whether Webuild has a hedging strategy on top of the contractual clauses covering inflationary events, so as to soften the rise in raw material prices?

Massimo Ferrari

executive
#58

No, that isn't something we have simply on its own — as Pietro explained, a natural and contractual hedge exists in every one of the countries, and we anticipate the same type of production in Italy as well.

Carlo Del Grosso

analyst
#59

Okay, so the second question concerns the P&L. Even though revenues and EBITDA have clearly improved quite strongly, the bottom line is still showing a negative figure. What I want to ask about is the end of 2021. Do you think this operational efficiency program — you said it's worth roughly EUR 120 million by 2023 — will already be enough to keep the fiscal year-end 2021 results from showing a negative figure?

Pietro Salini

executive
#60

This initiative is only getting underway. As everyone knows, it's a 3-year program. You're aware that the going concern for Astaldi has just come through to us. We'll have it in hand tomorrow. So I'd say the program is up and running at this point. Some of the savings tied to our own organization have already been captured. And naturally, we're also at work on the Astaldi organization, which comes to us tomorrow. But this is obviously the beginning of a process. The full effect, then, will show up in 2023. I'd remind you that the savings total EUR 120 million, which will of course provide a boost to profitability. A portion of those savings can be captured as early as 2021, though certainly not the full scale of them.

Operator

operator
#61

Roland Vetter from PraXis Partners has the next question.

Roland Vetter

analyst
#62

Apologies for returning to the subject of material prices. We came across an article citing that in Italy, under the law they intend to enact, the initial 8% increase must still be absorbed by the contractors, and that the overall amount is capped at EUR 100 million for the country. Is that accurate? Or what does the law actually specify?

Massimo Ferrari

executive
#63

So far, what you said is right. It isn't a low yet, since only one of the 2 chambers has approved it. But from what we know and understand, the government is taking a different approach — one closer to what other countries have in place. So we expect that same approach to come very quickly.

Roland Vetter

analyst
#64

All right. And overseas, say, in cases where you’re dealing with large lump-sum projects, is there a fully automatic mechanism that passes through every material price? Or what are the mechanics of those contracts? Because usually, with a lump-sum arrangement, passing through material prices isn’t so straightforward, I’d imagine. So how do these contracts actually work?

Pietro Salini

executive
#65

Apologies, Roland — I'm not sure I followed your question, so I think there may be some confusion here. Contracts in Italy already include a formula. What we're aiming to do is strengthen that formula so it cancels out all of the effects. A formula already exists — it covers less of what happens abroad, but there is still one within Italian contracts. So our problem is the piece that addresses the full scope of this extraordinary cost; it has partly been approved by one part of the Parliament. It should be approved by the next one before the holidays. So we expect it to be in place right away. The second item is a complete revision of the contract so that revision price is better covered. But that's really just, let's say, a technicality for the segment. It isn't something that alters the numbers in the balance sheet.

Roland Vetter

analyst
#66

No, that's clear. And beyond Italy — say, when you signed lump-sum contracts in other countries — do those contracts give you full indexation to material prices? Or is there some risk of some...

Pietro Salini

executive
#67

When we work internationally, we use a complete formula built on the FIDIC Contracts, and as a rule it accounts for all items contained in the agreement. Naturally, it is tailored to each individual contract, since it operates as a parametric formula and takes in the various materials listed in that specific contract, plant depreciation, or anything else of that kind. At times it additionally addresses the exchange rate — neutralizing movements in the exchange rate. So it is something extra that goes beyond merely material prices.

Roland Vetter

analyst
#68

Alright. No, that's good news. That's quite clear. And one final question, if that's alright. You saw a really nice improvement in net debt. That's very encouraging. Could you tell us what portion of that improvement is coming from advances of prepayments? Because it's a very large order intake, which is excellent. So I would expect that...

Pietro Salini

executive
#69

Just as Massimo mentioned earlier, EUR 120 million...

Massimo Ferrari

executive
#70

It came to EUR 120 million, after accounting for the advance payment we cashed in and the ones we returned to the client.

Pietro Salini

executive
#71

This is a normal thing, Ronald, keep that in mind. The exceptional piece is what happens when you gather that 30%. Should you fail to collect the 30%, then it's just ordinary business. So with a standard advance payment, that's the usual practice when you book new orders and afterward pay that contract back over the execution period. That is entirely normal. What's exceptional about this new law aimed at offsetting the pandemic's impact and the economic slowdown was the legislation that raised the advance payment to 30%. And this law...

Roland Vetter

analyst
#72

Is that a EUR 120 million impact?

Pietro Salini

executive
#73

We still need to gather most of the amounts that are planned. So as of now, the only thing reflected in our accounts is the impact of ordinary business. The ordinary portion is expected to come in gradually, since it's slow, but as I mentioned earlier, we've included just a portion of it. It isn't fully factored in—not into the guidance, not into our budget figures.

Roland Vetter

analyst
#74

All right. So EUR 120 million is the ordinary part, and the extraordinary part is still ahead?

Pietro Salini

executive
#75

Yes. <<inaudible>> regarding the cash position and the net financial position, if the government releases those funds in accounting terms — for example, for the Next Generation EU accounts — because a large portion of those contracts that we obtained this year, when we refer to the EUR 9.6 billion, would be financed this way; a large portion of that amount sits within Next Generation EU or PNRR financing. That means the EU, rather than the Italian government, will finance those contracts. So this means those funds can actually be released without creating a burden on Italy's accounting, aside from the debt.

Operator

operator
#76

<<operator_script>> Sirs, at this point we have no further questions queued up.

Pietro Salini

executive
#77

Ladies and gentlemen, happy holidays to each of you. Happy August. Of course, we're available for any questions at our...

Massimo Ferrari

executive
#78

We’re always here for you.

Pietro Salini

executive
#79

Thanks a lot.

Massimo Ferrari

executive
#80

I appreciate it a lot. Goodbye.

Pietro Salini

executive
#81

Take care. Enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Webuild S.p.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Webuild S.p.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Webuild S.p.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.