Wheaton Precious Metals Corp. (WPM) Earnings Call Transcript & Summary
November 4, 2022
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thanks for being on the line. Welcome to the Wheaton Precious Metals conference call for the third quarter of 2022. <<operator_script>> I want to remind all of you that this call is being recorded today, Friday, November 4, 2022, at 11 a.m. Eastern Time. At this point I'll hand things over to Mr. Patrick Drouin, our Senior Vice President of Investor Relations and Sustainability. Please go ahead, sir.
Patrick Drouin
executiveThank you, operator. Good morning, everyone, and thanks for joining us on today's call. With me this morning are Randy Smallwood, Wheaton Precious Metals' President and Chief Executive Officer; Gary Brown, Senior Vice President and Chief Financial Officer; Haytham Hodaly, Senior Vice President, Corporate Development; and Wes Carson, Vice President, Mining Operations. For anyone who isn't on the webcast right now, the slide deck that goes along with this conference call can be found in PDF format on the Presentations page of the Wheaton Precious Metal website. I want to draw your attention to the fact that certain comments made on this call may include forward-looking statements, and I'd encourage everyone to look at Slide 2 of the presentation, where you'll find important cautionary notes about forward-looking statements. Please note that unless we say otherwise, every figure mentioned on today's call is stated in U.S. dollars. At this point, I'll hand the call over to Randy Smallwood, our President and Chief Executive Officer.
Randy Smallwood
executiveThanks, Patrick, and good morning to all of you. We appreciate you being with us today for a discussion of Wheaton's results for the third quarter of 2022. I'm happy to report that our high-quality portfolio once again produced strong revenue, earnings and cash flow during Q3 2022, as Gary will cover later on. Although inflationary pressures continue to affect every part of the economy, mining in particular, Wheaton has kept cash operating margins above 75% year-to-date, which underscores how resilient the streaming model is when inflation is running high. On top of that, we have shown again our readiness to seek out strategic opportunities, whether outside the company or inside our portfolio, that generate value for shareholders. Along those lines, during the quarter we finished terminating the Keno Hill stream for $141 million and announced a proposed termination of the Yauliyacu stream with Glencore for $150 million. We are extremely pleased with the returns these mines have generated for us over the years. That said, we believe they have reached the end of their useful life in our portfolio, and the timing was right for us to separate from them and redeploy that capital into expanding our portfolio. And we keep seeing a very robust appetite for streaming as a way for the mining industry to raise capital.
Randy Smallwood
executiveWe're actively going after quite a few new opportunities that add value. On top of that, we showed our sustainability leadership once more, and Corporate Knights named us among Canada's best corporate citizens. Also, Sustainalytics again placed us in the worldwide top 50 among more than 15,000 multi-sector companies. Worth noting is that Wheaton is the sole precious metals firm within that global top 50 — we're proud of it, though there's still work ahead. With our solid balance sheet, investment liquidity and varied development portfolio, we're positioned to deliver steady long-term output and robust growth across the coming 10 years and beyond. Now I'd like to hand things to Gary Brown, our Senior Vice President and Chief Financial Officer, for further detail on the results. Gary?
Gary Brown
executiveThanks, Randy, and good morning everyone. In the third quarter of 2022, our precious metals interests turned out 159,900 gold equivalent ounces, or GEOs. That was a 13% drop compared with the third quarter a year earlier, driven mainly by reduced output at Salobo and by the shutdown of the 777 mine. Third-quarter 2022 revenue came to $219 million, down 19% from Q3 2021, as commodity prices fell 12% and sales volumes declined 7%. Breaking that revenue down, gold accounted for 49%, silver 46%, palladium 4% and cobalt 1%. As of September 30, 2022, roughly 138,000 GEOs sat in PBND and cobalt inventory — about 2.5 months of payable production, which is 17,000 GEOs below the average for the preceding 4 quarters. Gross margin in the third quarter of 2022 fell 33% to $102 million, reflecting both the 19% revenue decline and a greater share of sales volumes coming from PMPAs with higher unit costs, chiefly Yauliyacu. G&A expenses and donations totaled $10 million in the third quarter of 2022, essentially flat versus Q3 2021. For 2022, the company anticipates that combined G&A expenses and donations will land at the lower end of the previously announced $47 million to $49 million range.
Gary Brown
executiveIn Q3 2022, the company showed essentially zero stock-based compensation, since stock option and RSU expenses combined were offset by a reversal of costs previously accrued related to performance share units, or PSUs. That combined expense was down $4 million versus the same quarter a year earlier. In the third quarter of 2022, the company ended its Keno Hill PMPA, receiving $141 million of Hecla Mining common shares in return. That deal produced an income inclusion, net of tax, of $103 million. With the Keno Hill disposition included, net earnings came to $196 million in Q3 2022, up 45% from Q3 2021. After neutralizing the Keno Hill disposition along with several other minor items, adjusted net earnings were $94 million, versus $137 million in Q3 2021, with the decline driven by the lower gross margin. Basic adjusted earnings per share were $0.21, compared with $0.30 per share a year earlier. Operating cash flow in Q3 2022 was $154 million, or $0.34 per share, versus $201 million, or $0.45 per share, in the prior year — a 24% decrease on a per-share basis.
Gary Brown
executiveIn line with the company's dividend policy, the Board has declared a dividend of $0.15 per share, payable to shareholders of record on November 21, 2022. Through the dividend reinvestment plan, the Board has chosen to give shareholders the option to reinvest their dividends into newly issued common shares of the company at a 1% discount to market. In the third quarter of 2022, the company paid out $59 million in dividends, invested $31 million related to the Goose PMPA, $15 million related to the Marathon PMPA, and $1 million related to the Cotabambas early deposit agreement, which underscores that these projects are progressing and driving Wheaton's future organic growth. On an overall basis, net cash inflows came to $46 million in Q3 2022, which left cash and cash equivalents at September 30 at $495 million. The capacity from the undrawn $2 billion revolving credit facility, together with the strong forecasted operating cash flows, puts the company in a very good position to meet its funding commitments and maintain its dividend policy, while also having the flexibility to complete additional accretive precious metal purchase agreements. That wraps up the financial summary. With that, I'll hand the call over to Wes.
Wesley Carson
executiveThanks, Gary, and good morning. Third-quarter output overall landed where we expected, with Constancia and Antamina delivering more, while Salobo and Stillwater fell short of forecasts. At Salobo, attributable gold production for the third quarter was 44,200 ounces, roughly 20% below the third quarter of 2021 on reduced throughput. Even so, third-quarter output was up 30% from the prior quarter. Plant performance came in better than the second quarter of 2022, even with continued emphasis on extra planned and corrective maintenance through the third quarter. Vale anticipates additional maintenance continuing in the fourth quarter, aimed at boosting overall operational performance and reliability at the process plant, which should ultimately lift production for the rest of the year. Vale also said the Salobo III mine expansion was 98% physically complete as of the close of the third quarter. Work in the quarter included full commissioning of the primary crushing circuit, hot commissioning of the conveyor systems, and the start of wet commissioning at the flotation circuit. At the Stillwater mines, third-quarter attributable gold production was 1,800 ounces and attributable palladium was 3,200 ounces, down roughly 38% for gold and 37% for palladium versus the second quarter of 2021.
Wesley Carson
executiveOn June 13, 2022, flooding in the region hit the Stillwater operations, damaging several bridges as well as the access road leading into the Stillwater mine. The East Boulder mine and the Columbus metallurgical facilities were unaffected in terms of access, and throughout the flooding event both of those facilities kept running at full capacity. Mining at Stillwater, which represents 60% of mine production from the Stillwater operations, started up again on July 29, 2022, after safe access to the mine was reestablished. Output at the Stillwater mine should be back at normal levels in the fourth quarter. In the quarter, the Constancia mine turned out 560,000 ounces of attributable silver and 7,200 ounces of attributable gold — a rise of 8% in silver production and a drop of 16% in gold production compared with the third quarter of 2021. The silver increase came from higher throughput in grades from the Constancia pit, while the gold decrease stemmed from lower grade and volume of material mined from the Pampacancha pit. Output from Pampacancha is anticipated to rise in the fourth quarter, bringing higher gold production as the year wraps up. In addition, during the quarter Sabina Gold & Silver announced a formal construction decision for its Goose project.
Wesley Carson
executiveSabina anticipates being ready to begin full construction on the project in early 2023, with initial production targeted for 2025. Additionally, in the quarter, Artemis — Artemis Gold announced that site preparation has started at its Blackwater project, covering site clearing, bulk earthworks, and sediment and erosion control. Artemis expects major construction works at the Blackwater plant site to get underway in the first quarter of 2023. Wheaton anticipates output will carry on for the rest of the year, consistent with its guidance of roughly 640,000 to 680,000 gold equivalent ounces. That wraps up the operations overview. With that, I'll hand the call back to Randy.
Randy Smallwood
executiveThanks, Wes. To recap, Wheaton posted a strong quarter marked by a number of notable highlights. We delivered solid revenue, earnings and cash flow for the quarter and declared a quarterly dividend of $0.15. We improved and reinforced our financial flexibility, which puts us in a good position for future accretive growth, and we're very active on that front. And finally, we kept demonstrating our leadership in sustainability, one example being our support for flood relief for the local communities near the Stillwater mine in Montana. So with that, I'd like to open the call for questions. Operator?
Operator
operator<<operator_script>> Our first question is from Trevor Turnbull at Scotiabank.
Trevor Turnbull
analystRandy, a quick question from me about Salobo's third line beginning its ramp-up. How ought we to think about attributable production for Wheaton? As I recall, the technical report pointed to the mines entering a stretch of lower grades. So I was wondering how soon the ramp-up together with that grade profile adds up to incremental growth on your side.
Randy Smallwood
executiveYes. Thank you, Trevor, and it's good to speak with you. Some growth is going to show up, but Salobo is certainly going to deliver lower grades. On top of that, they're still finalizing the mine plan regarding how much material they intend to move — how much goes to the mill versus how much goes to the stockpile. So until that gets finalized, it's hard for us to pin down exactly what growth we'll see. I can assure you it will be a bump up in gold production for us. Ultimately, it comes down to how much they choose to put into stockpiles versus how much they feed through the mill. So there's still some variability in the possible scenarios here, and they simply haven't reached a final decision. The limiting factor — or, I suppose, the driving factor — is their mobile fleet, and that's something where adjustments to scale and size are relatively easy to make. So until they reach a final decision, it's really tough for us to give you a firm answer. What I can assure you is that overall gold production will see some growth, but it likely won't reach the 50% scale that we're seeing when it comes to increased throughput capacity.
Randy Smallwood
executiveOverall production growth will probably land closer to 10% to 20%, and it could even reach as much as 25%.
Trevor Turnbull
analystAll right, that does help. My sole remaining question, then, concerns when certain payments are scheduled. Specifically, the amounts owed to Capstone regarding Santo Domingo, along with the incoming payment for Yauliyacu — I wanted to ask whether those are items that take place next year, or does any portion of that occur before year-end?
Randy Smallwood
executiveWe remain optimistic that the Yauliyacu deal will wrap up before this year is over, though a few final approvals and that sort of thing are still pending. That said, we held some talks just last week, and it appears the transaction is on schedule to be completed prior to year-end. I can tell you as well that Capstone is kept busy at Santo Domingo wrapping up remaining work there. They still have tasks left to complete. As a result, nothing is expected from Santo Domingo — I'd figure — until perhaps some point in the following year, and that may be the earliest we hear anything regarding the Santo Domingo side.
Operator
operatorThe following question is from John Tumazos of John Tumazos Very Independent Research.
John Tumazos
analystCould we just walk through the cash coming in and going out to give a sense of how solid the financial position is? Is it fair to view year-end as roughly $900 million in cash, counting the current cash, the interim earnings, the Glencore payment should it close, and, pro forma, the Hecla shares at whatever point you decide to sell them?
Randy Smallwood
executiveWell, I should point out that those Hecla shares come with a 6-month hold. So they would still be — at year-end, we would still be holding Hecla shares. But Gary, I’m not sure whether you have a feel for that. I mean, I don’t think you’re too far off on that, but...
Gary Brown
executiveYeah, John — assuming the Yauliyacu deal wraps up before year-end, I'd say we'd likely land nearer to the $800 million mark.
Randy Smallwood
executiveThere are some payments that we're making to a few of those development projects, so additional payments could occur on that track prior to the year's end.
John Tumazos
analystFollowing up, I'd like you to break out every one of the property payments owed, even if they won't all come due this quarter or next year. Instead of holding excess cash, you might view it this way: you've essentially prepaid the bulk of your obligations covering the coming 5 years.
Randy Smallwood
executiveYes. I mean, there is some expansion happening. Clearly, we have that expansion payment at Salobo coming. Since it involves a 90-day completion test, they will make every effort to finish it before next year ends. However, they still have work to do on that front. I should note that previous commissionings have generally needed roughly 18 months to achieve the full production profile. So my guess is that it probably won't be recorded until early 2024. Beyond that, there are quite a few projects spread across the board. I'm not sure whether you have the list.
Gary Brown
executiveYes. John, honestly, this is likely something better handled offline. As you’re aware, we have quite a few projects that are still in the development stage. Our contingency note lays out the payment timetable quite thoroughly for each individual project. At a broad level, we anticipate roughly $80 million in payments being made before this year ends tied to those development-stage projects, and the top end of the range for the Salobo III expansion is $646 million. We expect a further $1.3 billion to be paid across ’23 and ’24, with what remains to be paid coming after that point.
Randy Smallwood
executiveThe largest pieces will be Sabina, as Goose advances, Blackwater as Artemis progresses, Curipamba continuing to move ahead, Dentists, and then Marathon ought to kick off at some point next year as well. So those make up the bulk of the biggest items, plus the Salobo expansion payment on top of that.
Gary Brown
executiveYes. But one thing worth stressing, John, is that even under our most aggressive development plan, we don’t expect that we’ll actually need to draw on our revolver at all in order to make any of these payments. All of them are covered by the cash we had on hand at the end of September — just under $500 million — along with our projected future cash flows from operations.
Randy Smallwood
executiveThere's ample room to take on additional deals.
John Tumazos
analystIt's genuinely a strong position that nobody is forcing you into a transaction to deploy $1 billion, since you already have solid projects secured. Let me squeeze in one more question. On their call yesterday, and during their site visit a couple of weeks back, Hudbay discussed reopening the Rosemont stream arrangements with you. Copper prices are likely above where they stood when that initial agreement was struck with Augusta nearly 10 years ago. Grades have risen as well, and resource tonnage has increased. CapEx is clearly larger too. Still, the project seems to have improved. It isn't clear to me why those terms would be revisited. Does it concern you that firms might look for a way to tear up contracts and renegotiate?
Randy Smallwood
executiveLook, they’re not able to tear up the agreement, and our relationship with Hudbay is solid and strong. So the reason for the renegotiation, I think, comes down to the fact that their current go-forward plan with Copper World actually envisions a production rate of roughly two-thirds of what the original plan had. So since we were funding a mine that was meant to run at a higher throughput rate, we’re going to need to have some conversations with them about how that plays out. Under the original plan, we were set to receive nearly 60,000 gold equivalent ounces per year from Rosemont. That gold and silver is still there, but it’s the revised development plan—the one that brings Copper World into the picture—that changes things. And in the early years of production, it would have us seeing only about 40,000 ounces of gold equivalent production. So the renegotiation stems from the shift in the mining plan itself, where we have to sit down and examine how that plan—I mean, there’s no question we’ve benefited enormously from the successful exploration of Copper World. And this project has grown. It’s going to be a major American copper producer.
Randy Smallwood
executiveThat brings a lot of solid advantages. It frustrates us, the work Hudbay has needed to do in attempting to secure permits at the federal level. And it makes me sad that they must follow the course they are on, heading down the Copper World route, particularly in a nation so committed to boosting its domestic output of critical minerals such as copper. So my hope is that they can ultimately achieve some success on the other front and return to the optimal plan for that site, which is the original Rosemont plan with Copper World being brought in alongside it. Yet considering the difficulties Hudbay has faced, and every prior owner has faced, when it comes to permitting that project as it moves ahead, Copper World appears to be the way forward. And with that shift in the mining plan, we will need to sit down and figure out how we can collaborate with them to ensure. Hudbay is a highly valued partner of ours, a very fruitful partnership at Constancia, 777, and in the end, Rosemont as we move ahead. And I anticipate working with Peter and his team to reach a successful resolution.
Randy Smallwood
executiveSo the contract isn’t being torn up at all. What this does is simply reflect the adjustments in the mining itself — specifically, the mining plan.
Operator
operatorThe following question is from Charlie Rothbarth at Berenberg.
Charlie Rothbarth
analystWell done once more on the results. Randy, I just want to double-check something — I believe you mentioned this on the previous earnings call too, but I think it slipped past me. Are you expecting Vale to pull that trigger in Q4 of next year? Did I hear that correctly? Maybe I got it wrong.
Randy Smallwood
executiveMy sense is that's the soonest they could pull the trigger. There's a completion test — it runs 90 days. So given that satisfying it requires a whole quarter, they're going to do everything they can to wrap it up in Q4 of next year. That said, the 2 prior lines they've commissioned took no less than 18 months before reaching full production levels. So it's going to be a <<inaudible>> go forward. I hope that came through. There's plenty of feedback on the line here.
Charlie Rothbarth
analystYes, I did catch that. If the feedback is coming from me, I apologize. I'll mute myself the next time you're telling me about my mistakes. On the subject of inventory — the type of inventory you've built up — just taking a quick look here. You've built it up in terms of gold sold versus gold produced across the last couple of quarters. It appears that since the beginning of Q1 '21, comparing production with sales, you had an inventory build of roughly 108-kilo ounces of GEOs. Do you expect any of that to unwind in Q4? Or is this the kind of thing you plan to sort of hold back for now?
Randy Smallwood
executiveThere's a pattern we've noticed in Q4 — that is, during the fourth quarter each year — where businesses delay pushing sales out in an effort to make their year-end numbers look better. So my expectation would be — and this is typical of what prior years have shown, though it doesn't happen annually, just in most instances — we do witness a compressed quarter in which companies accelerate sales ahead in order to secure that output, that is, the additional sales for the year-end results.
Charlie Rothbarth
analystAll right. And last, with the 777 mine now successfully shut down, as part of the arrangement referenced in Note 11 of your financial statements, you have — when do you anticipate getting any refund on the stream, if there is one at all, if that question makes any sense? Sorry, I feel like I have...
Randy Smallwood
executiveYes. I understand your point. There's a minimum amount that must be delivered, and that hasn't been reached so far. That means a payment is owed. My recollection is that it's roughly 20 or 30 years away. That said, Hudbay remains a highly valued partner for us. They're looking into whether tailings could be reprocessed at that site, which would both assist with reclamation and allow recovery of additional metals. So it's possible we'll see some extra production from 777 at some point soon if that route pans out. And again, with those sorts of refunds, it's important to remember that this sits within a wider relationship involving the company as a whole. So it always factors in. So we do — it's written into the contract, but my hope is that we never actually have to request it.
Patrick Drouin
executiveThere are a few questions that came in through the webcast, and I'll pass them along. Both of them have to do with share buybacks. The first one asks how much appetite we have for share buybacks. And the second one is whether the new liberal government here in Canada — with its policy of taxing your buyback at 2% going forward — will limit any future share buybacks by Wheaton Precious Metals?
Gary Brown
executiveOkay, Patrick, I'll take that one — this is Gary. We genuinely see three routes for giving excess cash back to shareholders. The first is the quarterly dividend; the second would be share repurchases; and the third would be special distributions. And I can tell you plainly that we'd far prefer to embrace that first route and step up the payout ratio — right now it sits at, or is targeted to reach, 30% of our operating cash flow — rather than embrace either of the remaining two. So since the odds are quite low that we'd embrace share repurchases, I believe that also covers the second question.
Patrick Drouin
executiveThat brings us to the end of the questions submitted through the webcast.
Randy Smallwood
executiveAll right, and thanks to each of you for joining us today. To wrap up, we feel Wheaton is strongly placed to keep generating value for every one of our stakeholders, and there are several reasons for that. First, our costs are low and predictable, and when that is combined with rising leverage in commodity prices, it produces margins that rank among the highest anywhere in precious metals. Second, we give shareholders exposure to a diversified set of long-life, low-cost assets, along with the robust organic growth built into that portfolio. Third, we return value to shareholders via our distinctive dividend policy that is linked to cash flow. And finally, we lead among precious metal streamers on sustainability, and we back our partners as well as the communities where we live and work. I very much look forward to talking with all of you again before long. In the meantime, please stay healthy and stay safe. Thank you.
Operator
operatorThat brings today's conference call to a close. We appreciate everyone for joining in. You may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Wheaton Precious Metals Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Wheaton Precious Metals Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Wheaton Precious Metals Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.