Operator

operator
#1

Good morning, everyone. Thanks for holding. Welcome to the Wheaton Precious Metals conference call on our 2023 third quarter results. <<operator_script>> I'd like to remind all of you that this call is being recorded on Friday, November 10, 2023, at 11 a.m. Eastern Standard Time. At this point I'll hand things over to Emma Murray, Vice President of Investor Relations. Please go ahead.

Emma Murray

executive
#2

Thanks, operator. Good morning, everyone, and I appreciate your joining us on today's call. With me this morning are Randy Smallwood, Wheaton Precious Metals' President and Chief Executive Officer; Gary Brown, Senior Vice President and Chief Financial Officer; Haytham Hodaly, Senior Vice President, Corporate Development; and Wes Carson, Vice President, Mining Operations. For anyone who isn't on the webcast right now, you'll find a slide deck that goes with this conference call in PDF form on the presentations page of our website. A portion of what we say today could include forward-looking statements, and I'd encourage all of you to look over Slide 2 of the presentation, where you'll find key cautionary notes about those statements. Please keep in mind that every figure we mention on this call is stated in U.S. dollars unless we say otherwise. With that, I'll hand things over to Randy Smallwood, our President and Chief Executive Officer.

Randy Smallwood

executive
#3

Thank you, Emma, and good morning to all of you. We appreciate your presence today as we go over Wheaton's results for the third quarter of 2023. It is my pleasure to report that our portfolio of long-life, low-cost assets turned in yet another solid quarter, producing strong metal output and robust cash flows, with several of our assets reaching record quarterly production levels. The value of holding a diversified portfolio of high-quality, low-cost assets was demonstrated by Wheaton's capacity to deliver solid operating results even though operations at Penasquito remained suspended throughout the entire third quarter. Strong outperformances from Salobo and Constancia drove quarter-over-quarter production growth, which further underscores the resilience of our diversified asset base and reflects our commitment to continuous growth over the next 5 years. Our strong quarterly performance was highlighted by significant progress at the expansion of our largest asset, Salobo, which is now expected to reach a throughput capacity of 32 million tonnes per annum in the fourth quarter of 2023. Our growth pipeline of development projects was further derisked during the quarter as Artemis received their Fisheries Act authorization for the Blackwater project, which continues to advance on schedule with first gold pour targeted for the second half of 2024. Furthermore, Aris Mining announced that they have received approval of their environmental management plan, which now permits the development of the Marmato Lower Mine.

Randy Smallwood

executive
#4

A handful of these assets are projected to help drive our strong organic growth profile—more than 40% production growth over the next 5 years. This quarter, we were also proud to be named by ESG Investing's corporate ESG awards as the top company for ESG and sustainability in the metals and mining sector. As we look toward the rest of 2023, and with Penasquito back in operation, we are very pleased to reaffirm our previously forecast annual guidance of 660—or between 600,000 and 660,000 gold equivalent ounces—though with a slightly heavier weighting toward gold. With interest rates where they are, streaming remains one of the most appealing sources of capital, and our corporate development team is staying exceptionally busy assessing opportunities. After the quarter ended, we announced the acquisition of a silver stream on Waterton Copper's Mineral Park Mine, which Haytham will give an overview of shortly. This most recent acquisition shows our commitment to strengthening our portfolio through growth that is accretive and sustainable and benefits all stakeholders. With that, I'd like to hand the call over to Wes Carson, our Vice President of Operations, who will share more details on our operating results.

Randy Smallwood

executive
#5

Wes, you're up.

Wesley Carson

executive
#6

Thanks, Randy. Good morning. On the whole, we had a solid quarter, with output exceeding our expectations. As Randy pointed out, that was fueled by robust outperformance at both Salobo and Constancia, partly offset by the temporary suspension at Penasquito. During the third quarter of 2023, Salobo generated 69,000 ounces of attributable gold — a rise of roughly 56% compared with the third quarter of 2022 — thanks to greater throughput, with production from the third concentrator line starting at the end of 2022, along with better gold recoveries. In the third quarter of 2023, Salobo achieved its highest output level since the fourth quarter of 2019, as ramp-up of the Salobo expansion keeps moving forward and overall improvements at both Salobo 1 and 2 continue. The Salobo site as a whole, once the Salobo III expansion is included, should reach a capacity of 32 million tonnes per annum in the fourth quarter of 2023, and full throughput capacity by the end of 2024. In the third quarter of 2023, Constancia generated 700,000 ounces of attributable silver and 19,000 ounces of attributable gold — gains of roughly 24% and 164%, respectively, compared with the third quarter of 2022. Record quarterly gold production, combined with strong solar production stemming from significantly higher grades mined in the high-grade zones of the Pampacancha deposit, better recoveries and greater throughput.

Wesley Carson

executive
#7

Hudbay has said it expects output to keep gaining from better grades during the fourth quarter of 2023. Additionally, during the third quarter of 2023, Penasquito produced nothing because mining was halted there, a stoppage that started on June 7, 2023 amid a labor dispute. On October 13, 2023, Newmont struck a definitive deal to bring the strike to an end and has since started bringing operations back up safely. Newmont anticipates hitting full operating capacity before the fourth quarter wraps up. Because output and sales are separated by a lag, the effect of Penasquito's halted operations will show up in our sales figures during the fourth quarter of 2023, producing a substantial drop versus the prior quarter in the Penasquito sales volumes we report. Wheaton's projected attributable output for 2023 is estimated at roughly 600,000 to 660,000 gold equivalent ounces, the same as our earlier guidance. Across the 5-year span concluding in 2027, the company projects average yearly output of 810,000 gold equivalent ounces, and across the 10-year span concluding in 2032, the company projects average yearly output of 850,000 gold equivalent ounces. That figure encompasses sector-leading organic growth above 40%, with overall output from our existing portfolio climbing past 900,000 gold equivalent ounces before 2027 ends.

Wesley Carson

executive
#8

That wraps up the operations overview. So with that, I'll hand the call over to Gary.

Gary Brown

executive
#9

Thanks, Wes. Per Wes’s remarks, third-quarter output came to 155,000 GEOs — up 6% from the second quarter of 2023 and in line with the same period a year earlier. It’s worth pointing out that, beyond the quarterly gold production record set at Constancia, Zinkgruvan set a new silver production record; that stream has formed part of our portfolio since 2004. Compared with Q3 2022, gold output rose 46%, mainly on stronger results at Salobo and Constancia, partly offset by a 42% drop in silver production, largely because of the labor dispute at Penasquito that has now been resolved and the divestment of the Yauliyacu PIMPA, which took place during 2022. Sales volumes totaled 119,000 GEOs — down 14% from the second quarter of 2023 and down 12% from the same period a year earlier. The year-over-year difference stems mainly from relative shifts in ounces produced but not yet delivered, or PBND, which cut sales volumes by 18,000 GEOs, purely a matter of shipment timing. Robust commodity prices, together with our solid production base, produced revenue of $223 million, a gross margin of $127 million and a total cash margin of $173 million.

Gary Brown

executive
#10

Breaking down that revenue, gold accounted for 65%, silver for 32%, palladium for 2%, and Cobalt for 1%. As of September 30, 2023, roughly 125,000 GEOs sat in PBND and cobalt inventory — about 2.4 months of payable production, a level somewhat above the prior 4 quarters yet inside the 2 to 3 month range we expect. G&A costs came to $9 million in the third quarter, and the company expects full-year G&A of $40 million to $42 million. Interest income earned on cash balances reached $10 million, which is $8 million more than the same quarter a year earlier. Adjusted net earnings were $121 million, and the $28 million gain over the prior year stemmed mainly from better gross margins and greater interest income. Even with inflation proving stubborn, Wheaton kept posting strong cash operating margins in the second quarter, producing operating cash flow above $171 million and a quarterly dividend of $0.15 per share, matching the third quarter of 2022. In the quarter, Wheaton's total upfront cash payments toward Artemis' Blackwater project came to roughly $90 million, together with dividend payments of $67 million.

Gary Brown

executive
#11

So overall, in Q3 2023 net cash inflows came to $5 million, which left us with cash and cash equivalents of $834 million as at September 30th. That substantial cash position, together with our fully undrawn $2 billion revolving credit facility and the strength of the operating cash flows we've forecast, puts the company in an exceptionally strong position to meet its funding commitments, and it gives us the financial flexibility to acquire additional accretive mineral stream interests. That wraps up the financial summary. With that, I'll hand the call over to Haytham.

Haytham Hodaly

executive
#12

Thanks, Gary, and good morning to all. As Randy noted, the corporate development team is still extremely occupied with assessing opportunities, and we're pleased to have just announced a precious metal streaming agreement concerning Waterton Copper's Mineral Park Mine in Arizona. Mineral Park Mine is a polymetallic operation that is presently being built, with output anticipated to hit full capacity during 2026. Forecast attributable production averages more than 690,000 ounces of silver annually across the initial 5 years of production, and more than 740,000 ounces of silver annually over the life of mine. In return, Wheaton is to pay Waterton and Copper $115 million across 4 payments while construction proceeds. We're delighted to bring Mineral Park into our portfolio and to be partnering with Water and Copper, which is putting over $600 million into Mineral Park and expects that to yield decades of operational excellence at the mine. With that, I'll hand it back to Randy.

Randy Smallwood

executive
#13

Thanks, Haytham. To sum up, several key highlights stood out for Wheaton in the third quarter. We posted solid revenue, earnings and cash flow for the 3 months and declared a quarterly dividend of 15%. We kept our annual guidance, previously announced, at 600,000 to 660,000 gold equivalent ounces, helped by significant production growth quarter over quarter. Our development project pipeline became further de-risked, which supports our impressive organic growth profile of over 40% across the next 5 years, and we keep growing our asset base, welcoming the Mineral Park Mine into our portfolio. Our balance sheet is still among the strongest in the industry, giving us ample capacity to add accretive, high-quality streams into our portfolio. And finally, we continue to show leadership and sustainability through sector-leading ESG ratings and external recognition. So with that, operator, I would like to open up the call for questions.

Operator

operator
#14

<<operator_script>> Our initial question is from Cosmos Chiu at CIBC. Cosmos has dropped off for a moment. While we wait, we'll take the next question from Richard Hatch at Berenberg.

Richard Hatch

analyst
#15

Nice work on another really impressive batch of results. I have just a handful of questions. Gary, I know the PBND is tough to predict. Still, could you give us a bit of help on whether you think some of that gold will be released in Q4? That is my first one.

Gary Brown

executive
#16

Right. Most of that increase was driven by Salobo this quarter, since the third line is ramping up there. So we'd expect it to decline in Q4. That said, the 2.4 months of average production currently sitting in PBND isn't unusual for us. If you look at the quarter, PBND built up by 23,000 gold equivalent ounces, versus a 5,000 ounce build in Q3 of 2022. That gap translates into roughly 18,000 fewer ounces sold year-over-year, which again just comes down to shipment timing.

Richard Hatch

analyst
#17

Alright, got it. The second item concerns Salobo specifically. You recently reduced the base metals guidance for them. A technical report on Salobo exists, and I suppose several of us have more or less treated it as a rough guide for what that asset might deliver. Could you offer us some sense or indication of your thinking going into '24 on that particular point, simply because it matters so much to the wider picture?

Randy Smallwood

executive
#18

Okay, Richard — this is Randy. I’ll jump in on that, and then Wes can add any closing remarks. They’ve done really well when it comes to bringing that Line 3 expansion up to speed. And as we mentioned during the opening statements, this year they will hit their 32 million tonne per annum average, and they’re working their way through that. Wes was recently down at the site — we just had that — and he came away very impressed by everything we saw regarding what’s happening there. So we absolutely expect them to keep up that ramp-up across the course of 2024, and we expect that by year-end they will be meeting the second phase of the expansion payment, which is 35 million tonnes per annum. The current system’s design capacity — line-in 1 and 2 and now line 3 — is 36 million tonnes per annum right now. So by the end of next year, I would expect them to be running at a rate quite close to that. So, Wes, I don’t know whether you can add anything to that.

Wesley Carson

executive
#19

Yes, I would simply say that as a team — and I include myself in that — we were down at site 2 weeks ago, observing what was happening with the ramp-up there and really building confidence in how quickly things were ramping up. And I will say that we have witnessed steady improvement there over the last 18 months. As you know, we faced some challenges there last year with maintenance and simply getting things kind of going, and there has been a significant improvement over the last 18 months, and that has really continued kind of through this quarter for sure as well. And I think we will see that continue through next year. And as Randy said, in hitting that kind of 35 million tonne by the next year, I think, is a very viable goal for them to get to. So it has been very impressive to see just the focus the team has had down there and really on working this through and making the improvements they needed to both get Salobo 1 and 2 kind of back in line and also that ramp up and really on top 3 has been, I would say, world class and how quickly they have managed to get that going.

Richard Hatch

analyst
#20

Alright, got it. Sorry — just a couple more. The first one is about Analyst, which just came down in Portugal. I assume the guidance there is simply zero until Q2 '25, correct?

Wesley Carson

executive
#21

Right, that's exactly what we're focused on at the moment. They've now completed the full transition to copper ore mining at that site, though they're considering a return to zinc in Q2 '25.

Richard Hatch

analyst
#22

Alright, cool. And for the final question — if I just take a look at the growth profile, you've spent the past few years pretty relentlessly just building nice streams that kind of pay off over the medium term. As I see it, it looks like you'll be producing well beyond 900,000 ounces of gold equivalent, assuming all of these come online across the next few years. Is that consistent with how you're thinking? I appreciate the guidance of $850 million on a 10-year average, but there are a few years where perhaps labor has been underperforming somewhat. Still, is that plus 900 something you remain comfortable with, because it just feels like this stock has a lot of growth that the market isn't appreciating?

Randy Smallwood

executive
#23

Yes. I mean, I dislike admitting it, but averaging can be rather deceptive at times, since the average naturally factors in this year sitting down in the 600s. So for us to reach an average of that sort, we'll be producing above 900,000 ounces of gold equivalent by 2027. And I'll tell you, given the efforts Haytham is making and what the entire team is doing on the corporate development side — though Haytham's group is taking the lead — I'm confident we'll even complete a few additional acquisitions that contribute toward that figure over the coming couple of years. So my confidence is enormous. One point worth emphasizing, I think, is that most of this growth actually originates from assets already running within our portfolio — genuinely organic growth, not greenfield development work. So having that quantity of growth stemming from assets currently in production simply gives all of us a greater degree of confidence about reaching it. And so, Richard, we're now at the stage of elevating Wheaton to a level no streaming or royalty company has ever achieved when it comes to precious metals production, and these are quite thrilling times.

Operator

operator
#24

We'll now take a question from Cosmos Chiu, who is with CIBC.

Cosmos Chiu

analyst
#25

Let's give this another go, please.

Operator

operator
#26

It looks like Cosmos Chiu has dropped off once more. While we wait, we'll take the next question from Tanya Jakusconek, who is on the line from Scotiabank.

Tanya Jakusconek

analyst
#27

Alright, I’ve got a couple of questions if I may. Let me begin with the guidance for this year. I just want to confirm our model is right. You’re keeping guidance unchanged. Looking at that guidance, we’re only a little under the bottom of your 600,000 GEOs. So could you give me some direction on where you expect to land on the gold side—you mentioned more gold exposure. Should I assume you’d be at the top of that 350 range?

Randy Smallwood

executive
#28

Okay, so on the gold side we are absolutely going to beat expectations. As we've observed, Constancia has been performing extremely well — the Pampacancha zone is setting records, with gold output from that asset at a really significant record level. But what I think is worth calling out is just how strongly Salobo is doing. As we said, they're very near to meeting the first phase of that expansion payment, and that requires running at 32 million tonnes per annum for 90 days — which, of course, they're already operating at those rates, because hitting that average across a 90-day window would require them to be above it at some point for a substantial share of those 90 days. So we're genuinely impressed by what we've seen on the Vale-based metal side when it comes to taking Salobo and restoring it to the level where it operated for most of its life. During the first 7 years of our streaming agreements on Salobo, it consistently outperformed, and we believe it is well along the path to outperforming once more. So there's no question the gold will land at the top end of that guidance, at the expense of silver, clearly, from Penasquito — and it may even end up going somewhat above it.

Randy Smallwood

executive
#29

Our guidance is something we feel quite good about. So it may come across that Tanya, we're somewhat more optimistic than you are.

Tanya Jakusconek

analyst
#30

I'll go with the cautious view. Just regarding Penasquito, to be certain, do you anticipate any contribution during Q4? We have nothing at all in Q4. And that, once more, is from a ramp-up and then who knows what gets shipped out. So we've assumed nothing, but have you assumed something for Q4?

Randy Smallwood

executive
#31

When it comes to sales, that's unlikely. We don't anticipate anything happening there. So production will clearly be ramping up, of course. We'll have something come through on that front. But where Penasquito's sales are concerned, our approach has been zero.

Tanya Jakusconek

analyst
#32

All right, Randy — at least we agree on that point. Thanks for the added detail there. For my second question, if I may, on 3. So I might direct this to Haytham, if that works, specifically regarding Mineral Park and that deal — when you were evaluating it, what IRR, and feel free to assume any silver price you like, what internal rate of return did this asset produce for you that you considered sufficiently strong to proceed? Its track record has been somewhat uneven.

Haytham Hodaly

executive
#33

Okay, so when you look at it using the current life of the mine, the current reserve ratio of 12 years, which is permitted as things stand according to the report — bear in mind that we believe it will actually end up being far, far greater than that. What our analysis indicates is that returns on this come in at a low double-digit level.

Tanya Jakusconek

analyst
#34

All right, then — and what would the cost be?

Haytham Hodaly

executive
#35

Yes — the spot price as of when the announcement was made.

Tanya Jakusconek

analyst
#36

All right, thank you for that. I’d simply like to establish a baseline and...

Randy Smallwood

executive
#37

There's something worth remembering here, Tanya: yes, as you said, its track record has been somewhat uneven. Yet thanks to the money Waterton Copper has reinvested — specifically for greater capacity at the milling end — things look different. One difficulty this deposit faced is that, over time, as mining went deeper, the rock simply grew harder and harder. The milling configuration already in place was simply not adequate for running it. And the capital we have watched Waterton commit, in our view, genuinely positions it for prosperity over the long term. On this asset, that front-end mill capacity is a real game changer. And as you're aware, the orebody itself is already familiar to us, but the past difficulties, I believe, truly stemmed from outdated infrastructure — an outdated mill configuration that simply could not handle the shifts occurring in the orebody. With these new investments, I can report that our team — our metallurgical group — went down and had to take a look, and we are quite impressed by what is emerging from that asset. So it has us excited.

Haytham Hodaly

executive
#38

Right. To start with, that mill had a design capacity of 35,000 short tons per day. What they're attempting to push through is 50,000 short tons per day, and it's an extremely, extremely tough material. So with the reinvestment — up to $600 million in total once everything is finished — this will comfortably reach 50,000 tonnes per day. And at this point the company carries no debt and intends to move this project forward very, very aggressively. So this one has us very excited.

Operator

operator
#39

Cosmos Chiu from CIBC has our next question.

Cosmos Chiu

analyst
#40

Perhaps we could begin with Salobo. You've already touched on the expansion somewhat. But could you perhaps explain what that means for Wheaton Precious Metals and the production profile? Will the figure for Wheaton Precious Metals keep climbing? Is it going to rise in a straight line into 2024 as they hit full capacity? Then again, Q3 came in slightly below Q2. So from your perspective, how should we model it?

Randy Smallwood

executive
#41

Honestly, pushing past what we've already laid out is difficult. What I mean is, we expect it to rise to an average of 35 million tonnes per annum next year, which would meet the Phase 2 expansion test. As for what currently stands on site, capacity sits at 36 million tonnes per annum. And once more, I return to the point that everybody ought to remember Salobo's history — it has certainly endured a couple of hard years, but we signed that first contract back in 2013, and then came 7, 8 years of outperformance, meaning output above design capacity. So given the team on the ground, the spirited, motivated group we're seeing at the site right now pushing this forward, and the management team at Vale base metals — we've witnessed a genuine shift in their approach, and there's a very, very strong wish to outperform. So it would not surprise me in the least if, ultimately, 2 years from now, we saw them going beyond over 36 million tonnes per annum. Talk of a Phase 4 expansion, and whether it's possible, has been around for a long time. They continue to explore that idea. That is, naturally, multiyears away. But what we do have is Vale-based metals gaining more of a standalone presence, concentrating on its flagship.

Randy Smallwood

executive
#42

And naturally, that operation serves as our flagship. So the advantages are going to come to us. Both we and our shareholders will gain the rewards from that concentrated effort. That's why we feel genuinely enthusiastic about the position Salobo occupies at this moment.

Gary Brown

executive
#43

Apologies, Cosmos. Let me just address what you said regarding Q3 coming in below Q2. I believe you mean sales there. Production at this point is considerably greater. And the drop in sales stemmed from a buildup exceeding 20,000 ounces of PBND in Q3 2023. Had that not occurred, sales would have been considerably greater too.

Cosmos Chiu

analyst
#44

Sure, absolutely. I was simply attempting to ask about — I suppose you produced 69,000 ounces, Gary, as you noted during Q3, and will that keep rising? You achieved 43% in Q1, 54% in Q2, and 69,000 ounces in Q3. Should we expect that to carry on climbing, at minimum on the basis of your guidance, as the expansion moves forward? So my aim was to connect that $35 million per annum expansion to what we might anticipate for WPM.

Randy Smallwood

executive
#45

Yes. It goes without saying that as throughput rises and they fine-tune, we are seeing not only the enhanced throughput but also better recoveries than we have seen in a very long time. And so those 2 combined are just lining up to be, as I said, an exciting time.

Wesley Carson

executive
#46

At some point it does begin to flatten out, of course — what we're observing is that rise quarter by quarter. We're nearing roughly that $32 million figure we anticipate, and with throughput we expect further growth next year. Still, eventually the expansion witnessed across the past 3 quarters does start to taper off at a certain point.

Cosmos Chiu

analyst
#47

All right, that's the point I'd like to reach. Then regarding the payment, from what we understand, a payment is required for the expansion. When I look at your MD&A, in the other obligations and contingency section, you had $370 million marked for 2023 and $163 million marked for 2024, 2025 for this payment. My understanding is that you haven't made that payment yet. And if that's true, I know it's determined by the matrix. It's based on a maximum of $552 million if they reach $35 million by January 1, 2024. What I'm really trying to get at is this: when should we expect that payment to be made?

Randy Smallwood

executive
#48

Yeah. I mean, they aren't fully there just yet, but they ought to be within a really brief window. Our expectation is that we'll be paying the first phase in Q4 of this year. So that comes to $370 million. As for the second phase, we're hoping to make that payment at some point next year. That's clearly Vale's goal, and they're clearly on track. We can't see any reason it wouldn't happen. And so we'd hope that the $35 million, or 35 million tonne per annum, payment gets triggered next year.

Cosmos Chiu

analyst
#49

Turning to Penasquito, you said Q4 sales will be lower because of the strike that concluded in October. Could you walk me through the timing once more? In other words, will the strike's effect keep showing up in Wheaton Precious Metals' figures into Q1 2024, or should Q1 2024 be more or less back to normal?

Randy Smallwood

executive
#50

By the close of this year, production ought to be fully ramped to planned levels, no question. On the sales side, some residual effect could linger. As we said earlier, no sales from Penasquito are expected in Q4, unless a bit comes through late in the year. Q4 is always intriguing, honestly, since all of our partners have a habit of attempting to extract a little extra from the system — what we call squeezing the pipeline. And as the Q3 results made evident, that pipeline is currently somewhat full. It isn't beyond the normal range, but we hold a substantial amount of produced but not yet delivered material. So we do anticipate a modest bump in sales during Q4, though probably nothing from Penasquito. A residual slowdown may persist, given that the ramp-up will be gradual. And with the time required to reach the sales stage, a slight residual impact on sales could show up in Q1 of next year, but from that standpoint we'll certainly be able to give you improved guidance once the fourth quarter wraps up.

Cosmos Chiu

analyst
#51

Thanks. Perhaps a final question: on the broader scale, as you said, growth has been very strong and sector-leading for the company. You cited an average of 810,000 ounces of GEOs across the 5 years through 2027, and 850,000 ounces for the 10-year average over the 10 years through 2032. You also said, though, that in Q1 2024 you'll provide an update with revised longer-term figures. I imagine you can't share specifics right now, but at a broader level, given that you've added some assets to the portfolio, should those longer-term numbers be trending upward? Or am I wrong about that?

Randy Smallwood

executive
#52

We have certainly brought on additional assets. So what I mean is, quite a while back we decided we would simply keep our long-term guidance in place, issue it at the beginning of the year, and refrain from revising it as assets get added during the year. I wouldn't characterize it as significant growth ahead. What I believe we're doing is constructing a solid longer-term framework. A number of the assets we've developed and brought on — we're hopeful about how they'll perform, and we're essentially awaiting more clarity regarding timing as they move forward. So we are certainly headed the right way, but it would be difficult to hand you firmer guidance on something that we sit down with during the first quarter, the first couple of months of the new year, and examine closely across all of our production visits and similar items. Just to keep that in mind, or simply to remind you, Cosmos — our production forecast is built from our site visits and our read-through regarding how operations are progressing. So that is something we treat very seriously when it comes to dedicating the time to it.

Randy Smallwood

executive
#53

I don't want to get ahead of that work by pushing things forward. What I can promise you is that by 2027 we'll be producing more than 900,000 ounces annually. And we have a route that keeps us solidly up in that range. And I think we're on a path toward 1 million gold equivalent ounces of production not long after that — it might even happen at that point, but stay tuned. We'll provide more clarity in the first quarter, as we always do.

Cosmos Chiu

analyst
#54

Absolutely. That’s wonderful news. Congratulations on such a robust quarter, and enjoy your weekend.

Randy Smallwood

executive
#55

Cosmos, sorry once more about the technical problems here. And we're hoping to get Tanya back on the line again.

Operator

operator
#56

Tanya, the floor is yours.

Tanya Jakusconek

analyst
#57

Let me return to Haytham on the M&A topic, and then I have a question for Gary about the global minimum tax in Cayman. On M&A specifically, Haytham, I'd like to ask — I've noticed a few peers raising their exposure to existing assets, though it's come through royalties. What I'm curious about is whether, when you review your own assets internally along with your streams, there's anything I should be considering in terms of possibly seeing greater exposure inside your portfolio, such as increasing some of those streams in the portfolio? Is that something that's on the table too?

Haytham Hodaly

executive
#58

That's something we're continually evaluating, Tanya, though most of what we're eyeing for future growth consists of new opportunities. Just over the past few months we've seen a wave of new opportunities come in — clearly, with equity markets having tightened and debt markets priced too high. Streaming generally ranks among the cheapest forms of capital funding available. So our attention is largely on relatively small deals — and by small I mean roughly 100 to 300. That said, a few sizable ones remain out there, and we're hoping to close some of them in the near term. So precious metals, clearly, stay the focus.

Tanya Jakusconek

analyst
#59

Right. So when you describe them as chunky, do you mean the ones ranging between $500 million and $1 billion of those kinds?

Haytham Hodaly

executive
#60

Honestly, what I'd put it at is more than 400.

Tanya Jakusconek

analyst
#61

All right, thanks for that. And regarding the development side — helping with development or financing those development projects — was that the capital?

Haytham Hodaly

executive
#62

Correct. Most of these are development-stage opportunities, though a few are fairly advanced.

Tanya Jakusconek

analyst
#63

Okay, and then if I could ask Gary something about the global minimum tax — we noticed your competitor in Barbados? Barbados has said a few things about their approach to that tax. I'm just wondering whether you can give us any update on anything from Cayman, and share whatever insights you have regarding the global minimum tax.

Gary Brown

executive
#64

Yes. Cayman hasn't put forward any plan to adopt the global minimum tax. So Canada remains the jurisdiction whose rules we're looking at to determine how GMT will affect us. So on that front, there's really nothing different. We continue to assume the draft legislation will be passed and approved by the Canadian government here, taking effect January 1 of next year, and internally we're fully prepared for that to happen. But I think a lot of work still needs to be done on the government side to get that across the line. So if it does get pushed out, I think that would just be a benefit.

Tanya Jakusconek

analyst
#65

All right. Now I just want to know whether Cayman had done anything. When all is said and done, Gary, we're all aware that taxes are rising. The only question is who absorbs that — it's 300 cans, correct?

Gary Brown

executive
#66

Absolutely.

Tanya Jakusconek

analyst
#67

That's really the key takeaway. From where you sit, it hardly makes a difference — it's 15% on whichever assets those were that had the contract set up in Cayman. So it doesn't change anything. The question is just whether Cayman has made any comment, and is that basically how they go about collecting that 15%?

Gary Brown

executive
#68

That is not the case.

Operator

operator
#69

The final question we have is from John Tumazos, who is calling in from John Tumazos Very Independent Research.

John Tumazos

analyst
#70

I've got three quick follow-ups about Mineral Park, and congratulations. Arizona beats Panama, Ecuador, or some of those other locations as a place to be. First, does that capital budget come to $600, or is it $600 plus your $115?

Randy Smallwood

executive
#71

The grand total comes to $600.

John Tumazos

analyst
#72

Can you give us some more detail on that $600 million budget? A mine was constructed and running 13, 14 years ago. At the end, was there stripping that got abandoned, or equipment that was sold off during the bankruptcy? I know a lot of equipment was installed that didn't work. That poor guy had at least 5 mill motors that failed on the original installation — like a bad one, similar to a car battery I'm having fixed at 3:00 o'clock, which didn't work when they put it in either. And then lastly, has Waterton copper ever produced anything before? And does that perhaps mean that if Cosmos came back — you started a project — we could bring it to Wheaton for a stream as well?

Haytham Hodaly

executive
#73

Okay, since I already handled the first question, maybe I'll grab your last one and address it before anything else. On that final question — have they produced? They've really assembled a fairly impressive technical group. What they've aimed at historically is acquiring projects that were somewhat capital-starved, building them up, and then selling them off. So they have indeed produced at small-scale projects that they attempted to divest. To be specific about Mineral Park, there's genuinely an active SACW operation producing on-site as we speak. So production has been underway for a few months — actually quite a few months by now. As for your second question, John, regarding capital cost, they've invested, I believe, nearly roughly $160 million since the acquisition. And so altogether, what I'd estimate remains is around 200 and, let's say, $260 million, plus contingency plus management — probably approximately $330 million of total CapEx still ahead. So all told, from the point they acquired it, they'll end up having spent nearly $600 million on it, and of that, roughly half, I'd say, has already been spent.

John Tumazos

analyst
#74

My apologies — I take it the money is being spent, but what exactly is it doing? Is it tearing out the old machinery and installing new machinery? Or is it simply tacking on 15,000 tons a day of extra grinding and flotation capacity?

Haytham Hodaly

executive
#75

Well, a large part of that comes down to crushing and grinding, which is roughly $70 million to $75 million. Flotation plus the control modernization and so on adds approximately $75 million more. Indirect costs, not counting EPCM, come to another $60-plus million. So those are the major items, the big pieces right there, John.

Operator

operator
#76

That brings the question-and-answer segment of today's conference call to a close, ladies and gentlemen.

Gary Brown

executive
#77

Yes. Randy needed to dash off to a meeting. So I just want to thank all of you for joining. And as you can see, we're elevating this company to a level never before seen in the royalty and streaming space, and we believe there has never been a better moment to hold more Wheaton. We're looking forward to talking with all of you again before long, and thank you.

Operator

operator
#78

That wraps up today's conference call. We appreciate everyone joining in. Attendees, kindly hang up your connections now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Wheaton Precious Metals Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Wheaton Precious Metals Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Wheaton Precious Metals Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.