Worley Limited (WOR) Earnings Call Transcript & Summary

August 26, 2026

Australian Securities Exchange AU Industrials Construction and Engineering earnings 69 min

Earnings Call Speaker Segments

Operator

operator
#1

Just a quick note that this conference is being recorded today. At this point, I'll turn things over to our first speaker, Chief Executive Officer Chris Ashton.

Chris Ashton

executive
#2

Thank you, and welcome everyone for joining Worley's full year results presentation for the 2026 financial year. As usual, I draw your attention to the disclaimer on slide two. I'd first like to acknowledge the Gadigal people of the Eora Nation, the traditional custodians of the land from which I'm calling today, and I pay my respects to their elders past and present, and to the emerging leaders. Turning to slide three, I'll begin with business performance, Justine will then take you through the financial results, and I'll return to cover our strategy and outlook. It's fair to say FY 2026 was a story of two halves, with resilient results and strong momentum in the first half followed by a more challenging second half. The main factor impacting our growth this financial year was the conflict in the Middle East. Together with foreign currency translation impact, we weren't able to achieve our FY 2026 outlook expectations. We've also navigated softer conditions in some markets, but elsewhere activity remains strong, particularly in the Americas, and we've stayed close to our customers, secured significant contract wins, and maintained a healthy pipeline supported by strong demand drivers. During the year, we repositioned resources towards areas of stronger demand and reset the cost base to support future growth.

Chris Ashton

executive
#3

During our Investor Day in May, we laid out the plan for growth, centered on securing additional full-project delivery assignments and using what we know about complicated critical infrastructure to move into neighboring markets—and traction is already looking good. This year brought meaningful strides on building Venture Global's CP2 LNG project in the US, and Phase 1 along with Phase 2 each achieved full and final investment decision. More lately, we were selected as preferred bidder for Uniper's Connah's Quay low-carbon power project in the UK. Momentum is clearly evident in major EPC and EPCM contract awards, which strengthens our confidence in medium-term growth. Moving to slide four, I'll now walk you through the headline figures, where aggregated revenue came to $12 billion, roughly matching FY 2025, and at constant currency, revenue was $12.3 billion, a rise of 2.3%. First-half growth was 5.4%, while softer activity in parts of the chemicals market and the Middle East conflict weighed on the second half. Underlying EBITDA stood at $734 million, mirroring those factors plus the effect of FX translation. At constant currency, underlying EBITDA came in at $773 million. Margin resilience held up, and cash generation stayed robust, with normalized cash conversion of 93.6%, comfortably inside our target range, mirroring sustained operating discipline.

Chris Ashton

executive
#4

Backing up future results, cost programs and restructuring of the business established our cost base, and we anticipate stronger earnings momentum as we move into FY 2027. For FY 2027, our outlook calls for mid- to high-single-digit growth in revenue and underlying EBITDA, and I'll say more about how we reach that through the group outlook. Beyond that, the opportunity stays compelling. Worley sits at the center of the long-term need for secure and affordable energy, chemicals, and resources, with the customer relationships, with scale, and the expertise to deliver more full-project delivery work and then expand into higher-growth markets, and that is how we achieve our FY 2030 ambition. Moving to slide five, keeping our people safe has always been our highest priority, and we had another year of strong safety performance, notable given the nature of some of the environments in which we operate, including in particular the conflict in the Middle East this year. Our total recordable frequency rate has improved to 0.07, and our serious case frequency rate improved to 0.006. That performance matters. It reflects the discipline and care of our teams around the world. I cannot overstate how deeply proud the board, my leadership team, and I are of our people in the Middle East.

Chris Ashton

executive
#5

The way they have conducted themselves professionally and committed themselves to backing our customers, even while carrying on through stretches of heavy military operations and elevated security danger, has truly been remarkable. Throughout this stretch, our leaders alongside our R3 teams have put in relentless effort behind our employees and our client base. It makes me glad that our staff, numbering over 4,000, together with the families they have in the region, are still safe, and our attention will stay on safeguarding our employees and standing behind our customers. Regarding ESG results, we reinforced how we report on modern slavery and have cut emissions by 76% against the base we set in 2020. Our Australian mandatory sustainability reporting disclosures were released within our annual report, consistent with the fresh requirements for reporting and disclosure. Moving to slide six, as I noted, FY 2026 proved difficult, yet the forces driving growth stay solidly in place. Robust demand fundamentals keep underpinning activity throughout the wider portfolio, above all in the Americas, which balances out gentler trading conditions in certain markets. During the latter half of the year, conflict in the Middle East caused project hold-ups and produced reduced volumes that weighed on growth, and we kept the market informed about how our business was affected as that became apparent.

Chris Ashton

executive
#6

This conflict has gone on for more time than anybody expected, and when things will recover is still unclear. During this stretch, we have remained near our customers and given them help wherever possible. Those ties have become stronger as a result, and that puts us in a good position once the work that was put off starts coming back — and that is what we are seeing. As we mentioned, FX translation was another drag on the reported result. Moving to slide seven, what sets Worley apart is how broad our capabilities are and the worldwide scale we offer customers across the globe. Our business model is capital-light, we hold long-standing relationships with customers, and our earnings are diversified across geographic regions as well as across energy, chemicals, and resources. Our skills and expertise spanning the entire project lifecycle keep underpinning our strategy for growth. Professional services stay at the heart of what we do, while construction, fabrication, and procurement expand as customers bring us into more of their capital programs. That move is intentional and backs our FY 2030 growth ambition. Now on slide eight, our leading indicators keep pointing to strong demand and bolster confidence in our FY 2030 ambition. The factored sales pipeline rose 24%, with the strongest momentum coming from the Americas and EMEA. The set of opportunities has expanded as Worley grows its portfolio in reimbursable EPC and EPCM work scopes and in future-facing growth markets.

Chris Ashton

executive
#7

We are reinforcing our consulting positions at the early stage so we can capture opportunities in full-project delivery. Bookings for the year came to $15.5 billion, helped by wins mostly in energy and resources. Of those wins, 44% were sole-sourced, which reinforces the confidence customers place in Worley. As I've mentioned, CP2's Phase 1 and Phase 2 were both booked during the financial year. Keep in mind that we had already provided engineering, procurement, and construction services planning under a reimbursable contract, and only the remaining scope of work moved into backlog. Backlog rose 9% over the 12 months to $13.8 billion, and more than 62% of that is expected to be delivered in the next 12 months. That is lower than the $16.7 billion reported at the half year, because major project work is being delivered in the second half and because of the timing of new awards. As we noted at Investor Day in May, we removed ExxonMobil's Baytown blue project, which remains on pause. FX translation also affected backlog, which on a constant currency basis would have been $15 billion. Our focus for FY 2027 is clear: keep delivering backlog, drive revenue growth, and turn near-term pipeline opportunities into wins. Turning to slide nine, our strategy of winning more full-project delivery scope underpins our confidence in reaching our FY 2030 growth ambition.

Chris Ashton

executive
#8

Our attention is on finding chances for reimbursable EPC and EPCM scopes of work inside our pipeline, and active EPC, EPCM projects make up over 45% of the backlog we hold today. Early signs of success are coming through from this strategy. Over the course of the year, you've seen the strategic project wins we've taken to the market. Those wins cover both our established core markets and the future-facing growth markets we're targeting, and they mirror relationships we've built over time as well as new ones with customers. We're engaging closely with top global customers in high-demand growth markets. During FY 2026, we booked upwards of $10 billion of wins in the growth markets we've identified. That momentum has carried on since year-end, with contract wins secured spanning power, copper, integrated gas, and other energy projects, and on this slide we've flagged those project wins that sit within our major projects and programs. Energy is still our biggest sector, and its underlying demand drivers are strong. Aggregated revenue rose 8% to $6.4 billion, helped by major EPC projects shifting into execution. Integrated gas and LNG especially continue to be a key growth driver, and regulatory approvals affect the timing of projects. For Worley, the Middle East remains a significant market. Because of our long-standing customer relationships throughout the region, customers have brought us in for damage assessments, reconstruction planning, and advice supporting resilient rebuilding once conditions permit.

Chris Ashton

executive
#9

Power infrastructure keeps growing in importance, driven by higher electricity demand from data centers plus investment in gas-fired generation, renewables, and nuclear — a strong growth opportunity for Worley. Turning to slide 12, Uniper's Connah's Quay project in the UK is a major opportunity for us in power infrastructure. This planned development brings together rising electricity demand, energy security, and emissions reduction, and it typifies the growth and opportunities showing up in our pipeline. Onto chemicals and slide 13: chemicals stays an important long-term market, even though conditions proved challenging in 2026 and will likely stay that way in 2027. Aggregated revenue fell 22% to $2.4 billion, driven by project cancellations like Shell's Road to Green project and weaker activity in certain regions, especially those still working through oversupply. Meanwhile, investment continues in refining and asset optimization, covering debottlenecking, product slate changes, decarbonization, and life extension projects. Petrochemical rationalization and low-carbon fuels are opportunities, and how final investment decisions progress will be the key indicator over the next 12 months. On slide 14, Heidelberg's Padeswood project shows the ongoing investment in industrial-scale decarbonization that we're seeing. It illustrates how our EPCM capability supports customers in cutting emissions from existing operations while also building critical carbon capture infrastructure.

Chris Ashton

executive
#10

Turning to resources — over the past four years, that's been our sector growing faster than any other. Aggregated revenue for FY 2026 rose 6%, reaching $3.3 billion. The growth this year came from higher activity in mined fertilizers, copper, and battery materials, along with ongoing investment in iron ore. Demand is also picking up across the aluminum value chain. Copper matters critically here. Electrification, data centers, and grid investment keep underpinning long-term demand growth. Closing the supply gap will require both brownfield expansions and greenfield developments. This financial year alone, we've secured contracts with 16 customers for copper projects. Population growth and food security underpin fertilizers and fertilizer projects, though the Middle East conflict is impacting sulfur supply and phosphate projects in North Africa, while potash projects keep advancing rapidly. Battery materials are displaying signs of renewed activity. We're seeing a stronger pipeline and wider value chain exposure, spanning mineral extraction through to active materials and recycling. BHP's Jansen potash project reflects the attractive long-term fundamentals underpinning fertilizer demand and global food security. That project shows how we combine fabrication, modularization, and construction services to help deliver one of the world's largest potash developments.

Chris Ashton

executive
#11

At this point, I'll turn things over to Justine, who will walk you through the financial results in greater detail.

Justine Travers

executive
#12

Thanks, Chris, and good morning, everyone. Before I walk you through the detail, I'd like to highlight three key points that give context for our FY 2026 performance and how we're positioned going forward. First, activity levels stayed strong across much of the business during the year. Although earnings were affected by disruption in the Middle East and softer activity in parts of the chemicals market, we kept securing significant contract wins that supported booking and backlog growth, which gives us line of sight to future earnings. Second, we've taken targeted actions to simplify the business, reduce structural costs, and improve efficiency. These actions help strengthen the business today while also creating capacity to selectively reinvest in priority growth opportunities. Third, we've maintained a strong financial position throughout the year. Our balance sheet and cash generation give us the flexibility to invest in our ambition, navigate near-term uncertainty, and continue returning capital to shareholders. With that context, let me take you through the results in more detail, and turning to slide 18. Aggregated revenue for the 2026 financial year was $12 billion, broadly in line with FY 2025. On a constant currency basis, aggregated revenue was $12.3 billion. Underlying EBITDA was $734 million.

Justine Travers

executive
#13

The hit to earnings from the Middle East conflict came to $58 million, which matches what we told you in our update on 25 June. As Chris mentioned, foreign exchange translation effects played a part in that outcome. Our EBITDA margin, excluding procurement, stood at 9%, and measured at constant currency it was consistent with FY 2025 and stayed inside the range we guided to. Restructuring-related one-off costs for the full year totaled $120 million. Just as at the half year, we've left these out of underlying EBITDA. Their effect shows up in our statutory NPATA. The savings delivered by the cost management program we kicked off a year ago have come in above the initial target we set. Through these initiatives we've built a leaner cost base that will underpin growth, AI and digital deployment, and future earnings, while also helping to partly offset inflation. Normalized cash conversion is still robust at 93.6%, comfortably inside our 85% to 95% target range, and it shows our ongoing discipline on cash and operations. Our financial position remains strong enough to fund growth and return capital to shareholders. The Worley board has resolved to pay a final dividend of 25 cents per share, unfranked.

Justine Travers

executive
#14

We gave back $359 million to shareholders, having finished the $500 million on-market buyback during full year 2026. A fresh $300 million buyback program got underway in May. If you turn to slide 19, I want to walk through a few of the main drivers. Total revenue came in at $12 billion, but on a constant currency basis it looked better, at $12.3 billion, which represents 2.3% growth. That growth fell short of what we expected when the year began, and it underscores the headwinds we've encountered as our results get translated into Australian dollars for presentation reporting. Underlying EBITDA went from $823 million down to $734 million. In constant currency terms, the figure was $773 million. The headwinds hitting the result included the extended conflict in the Middle East, which disrupted existing projects, though the bigger effect came from new awards starting later than planned. We also kept seeing a softer chemicals market. As we broaden the scope of our work across the project value chain, margins vary within that wider service offering. Phasing of major project activity shifted toward more construction, fabrication, and procurement.

Justine Travers

executive
#15

That drove revenue higher and brought with it a different margin profile. Excluding pass procurement, our EBITDA margin landed inside the target range, and on a constant currency basis our underlying EBITDA margin, including procurement, came in at 6.3%. If you move to slide 20 and the translation impact, roughly 93% of Worley's revenue is earned outside Australia. The chart shows that foreign exchange movements created a bigger translation headwind in FY 2026 than in recent years. Over the year, the Australian dollar appreciated against a number of currencies, especially during the second half, and that has directly affected how we present results in Australian dollars. Had FY 2025 average rates been in effect, FY 2026 EBITDA would have come in $39 million higher. Compared with the FX rates we assumed in our FY 2026 outlook, the translation effect was larger and cut FY 2026 EBITDA by roughly $50 million versus what we had expected in that outlook. Where relevant, we present results on a constant currency basis so underlying business performance can be compared. Worley is looking into changing its reporting currency from Australian dollars to US dollars. The group has a substantial economic presence outside Australia today, and the present and anticipated mix of foreign currency earnings is a key factor in assessing a reporting currency change, which would lessen translation volatility.

Justine Travers

executive
#16

Results for the year that ends 30 June 2027 will still be consolidated and reported in Australian dollars, and after that, the half-year and full-year figures to 30 June 2028 could potentially be reported in US dollars. We'll keep the market informed about this possible change. Moving to slide 21, throughout the year we kept working on reshaping the business so that future performance would be stronger. We took on $120 million of one-off costs tied to transformation and business restructuring. Most of these costs come from restructuring in Western Europe, where local labor protections led to higher severance and related expenses. Of these costs, $82 million was incurred in the first half and $38 million in the second half. That matched our earlier guidance that we expected additional costs in the second half, though they would be lower than those already incurred in half one. The cost-out program beat the initial target of $100 million, and we've delivered $132 million of savings. These actions focus on resetting the cost base, aligning resources to areas of higher demand, reducing complexity, and improving scalability. The team's efforts in taking these important steps to strengthen our cost discipline and improve our earnings quality benefit shareholders in this financial year, as we see this come through in lower global support costs.

Justine Travers

executive
#17

On top of that, those FY 2027 savings will partly offset cost pressures from inflation, and they'll go toward reinvesting in strategic hires, differentiated delivery platforms, and digital tools. As we laid out at our Investor Day in May, we're aiming to invest roughly $70 million across two years. These steps underpin an operating model that's more efficient and scalable, and they underpin stronger earnings performance going forward. Moving to slide 22, I'd like to finish by walking you through where we stand on capital management. Our capital framework stays disciplined, and it's built to support growth as well as returns to shareholders. We keep investing in the business while managing debt prudently and preserving balance sheet flexibility. Our balance sheet position is underpinned by an investment-grade credit rating of BBB with a stable outlook. Normalized cash conversion came in at 93.6%, comfortably inside our target range, and days sales outstanding improved to 44.3 days and remain well-controlled and comfortably within our target. Our balance sheet is still strong, with leverage at 1.8 times, and it stays below our target of two times. Total liquidity stood at $2.1 billion at 30 June 2026. The board's decision to launch a further $300 million buyback program reflects confidence in our business.

Justine Travers

executive
#18

Back in May, we refinanced that Euro Medium Term Note by issuing a fresh five-year Australian dollar medium-term note worth $375 million. Alongside a new 364-day liquidity facility and drawing part of the syndicated facility revolver, we've kept a diversified debt portfolio that balances loan markets against global debt capital markets. As of 30 June 2026, the weighted average cost of debt stood at 4.4%, though it will rise once the Euro Medium Term Note refinancing settles at prevailing market interest rates. On the whole, our disciplined approach to capital management is still a key differentiator and underpins long-term value creation. To sum up, it was a challenging earnings performance for the full year, yet activity levels remain strong across much of the business. We've delivered on the cost management program and built the platform to deliver our ambition. Our strong focus on cash conversion and balance sheet strength has continued, which positions us well to support growth and returns to our shareholders. I'll hand back to Chris, who will take you through our strategy and outlook ahead. All right,

Chris Ashton

executive
#19

Thanks, Justine. I'll walk you through the strategy and outlook now, including what we're prioritizing to hit our FY 2030 growth ambition. To start, I want to revisit how growth has trended over time. As the charts on slide 24 show, growth seldom follows a straight line. The long-term trajectory is still upward, and although FY 2026 reflects a tougher operating environment, that doesn't alter the solid fundamentals of the business. Across several years, Worley has grown revenue, EBITDA, EPS, and backlog, backed by a diversified portfolio spanning sectors, geographies, and services. That diversification matters. It provides resilience through cycles and lets us move capacity toward areas where customer demand is greater as markets shift. Turning to slide 25, four drivers of earnings growth underpin our FY 2030 growth ambition. First, current market growth: we keep benefiting from tailwinds in our core end markets while also responding to broader demand for energy, chemicals, and resources as affordability and security come into greater global focus. Second, AI-enabled full-project delivery: we're growing the scale of projects we deliver by working with customers across the full project lifecycle and are using technology to improve execution, productivity, and scalability.

Chris Ashton

executive
#20

Third, growth markets that are oriented toward the future: we are expanding our scale in areas such as power and data centers, where demand is structural, driven by electrification, the energy transition, resource demand, AI and digital infrastructure, and energy security. Lastly, the benefits of scale: AI, GID, and cost discipline help keep margins resilient as we grow. It is our ambition to achieve medium-term double-digit underlying EBITDA CAGR by FY 2030. Turning to slide 26, within our current markets, our focus is on converting pipeline into backlog, growing revenue, and capturing a larger share of customer investment. Framework agreements and strong customer relationships will underpin that growth. In AI-enabled full-project delivery, the major projects and programs model we use is working effectively. We are growing reimbursable EPC and EPCM work, raising GID utilization, and embedding AI and digital tools to build a delivery model that scales more readily. In the future-facing growth markets, we are building on significant wins in gas and LNG, energy transition, materials, power, and data centers, while keeping discipline in the market and in the contracts we choose. On scale benefits, we will hold to cost discipline, reinvest selectively, and make greater use of GID where it delivers efficiency gains. Moving to slide 27, demand across our core markets rests on favorable medium- and long-term fundamentals, among them the need for secure and affordable energy, critical resources, and investment in export supply chains and critical infrastructure.

Chris Ashton

executive
#21

For this year, we anticipate delivering mid- to high-single-digit growth in underlying EBITDA, and that growth will lean more toward half two than has historically been the case. We likewise anticipate mid- to high-single-digit growth in aggregated revenue, with revenue spread across the half-year periods in a broadly even way. Disruption and uncertainty in the Middle East continue, and we are observing second-order supply chain effects, especially when it comes to sulfur supply for fertilizer projects in North Africa. Our Middle East customers are coming to us seeking damage assessments, reconstruction planning, and early-stage new projects aimed at helping them work around export constraints and rebuild resilience. Although the timing and scale of associate opportunity remains hard to predict, our outlook foresees work volumes in the Middle East rising in half two. Activity throughout the broader business keeps gaining from strong demand in key markets, and we are seeing tailwinds in our largest market, North America. A growing portfolio of major projects in the pipeline underpins our growth outlook. These are projects in which Worley already holds an established position through earlier phases of work. As those projects advance, we expect a greater share of that work to shift into execution. Moving now to slide 28, that brings the formal part of the presentation to a close.

Chris Ashton

executive
#22

Thank you for being with us, and Justine and I would be glad to answer whatever you'd like to ask.

Justine Travers

executive
#23

I appreciate it.

Operator

operator
#24

If you'd like to ask something, dial star one one on your phone and hold until we announce your name. Should you want to cancel that question, just hit star one one once more. We ask that you keep to a single question plus one follow-up each time. Anyone with additional questions, please get back in the queue. As a reminder, questions come through star one one. Give us a moment while we take the first one. The first question is on the line of Niraj Shah with Goldman Sachs. Niraj, go right ahead, your line is live.

Niraj Shah

analyst
#25

Morning, hello. I’ve got just a couple of questions. First, regarding the guidance — that mid- to high-single-digit EBITDA growth — does it include a currency headwind, or is that expectation on a constant currency basis?

Justine Travers

executive
#26

Hi, Niraj. So the way we've approached the outlook is by taking weighted-average forward currencies to set the exchange rate across our portfolio and the mix of currencies we have. As the year goes on, naturally we'll review how we're performing and give a view of that on a like-for-like basis against the prior year. As you can appreciate, we do business in roughly 30 different currencies, and their mix around earnings will differ, and that mix shifts from one period to the next, but it rests on an assumption drawn from that forward rate at a given point in time.

Niraj Shah

analyst
#27

Got it, thanks. Regarding the back half—since that guidance is weighted more heavily than usual toward the second half—given that skew, should we be expecting earnings or EBITDA to increase in the first half?

Justine Travers

executive
#28

When it comes to earnings across the first and second halves, if you look at the last several years, you'd typically have seen a pattern at Worley where the weighting was probably around 45% to 55% between the first half and the second half. For FY, we can certainly expect that earnings skew toward the second half to be greater than that.

Chris Ashton

executive
#29

Regarding 2027 — let me just build on that point. The opening half of the financial year is invariably affected by summer in the Northern Hemisphere. That's simply always the case. When you compare the initial six months of the calendar year with the latter six, or the back half of FY 2026 with the front half of 2027, a gap will always show up, since summer holidays in the Northern Hemisphere — people taking time away — invariably weigh on that first half. It's never the same.

Niraj Shah

analyst
#30

Got it. So my last question is this: how are you viewing possible restructuring charges as we head into fiscal 2027, or below-the-line items more broadly?

Justine Travers

executive
#31

Niraj, as we head into FY 2027, we don't have any plan for additional restructuring. As you can appreciate, we'll keep taking a very disciplined approach to allocating resources and to managing our cost base. Certainly, at this point in time, no restructuring plan exists for FY 2027. As for how we treat those costs, we've been consistent on that across a number of periods, and our view on it hasn't changed.

Niraj Shah

analyst
#32

Alright, thanks a lot.

Operator

operator
#33

Appreciate it. We're ready for the following question now. The following question is from Ramoun Lazar? with Jefferies. Ramoun, go right ahead — your line is open.

Ramoun Lazar

analyst
#34

Morning, Chris and Justine. I’ve got a couple of questions. I was hoping you might walk us through the backlog, especially during that June quarter. It looks like a fairly significant drop from the March period you gave at the Investor Day through to June. What’s causing that? It would help if you could give us some detail on the first couple of months of this year.

Justine Travers

executive
#35

Sure. So, as we examined that backlog at the half, you've seen a step-down in it. The main reasons behind that are, clearly, we've delivered the work that was sitting in the backlog, and that has demonstrated a decline from what we had at the half year. We had also — and we advised this in May — taken the Baytown blue out of that backlog figure as well. Then, naturally, you also see a currency translation effect present in that backlog too. The primary impact really is the burn profile going into the second half. As Chris genuinely mentioned, we've witnessed a number of strategic wins coming through in FY 2026, and certainly, given the conversations we're having with customers today, we hold some optimism regarding our backlog going forward, especially if you look at the pipeline and the bookings growth we're showing.

Ramoun Lazar

analyst
#36

Okay, so — during the first two months of 2027, have you noticed any of that backlog shifting into the backlog, or are some of those project wins still taking longer to realize?

Justine Travers

executive
#37

We have demonstrated this, and you can look at one of the material sets in the presentation where we've called out several of the strategic wins achieved to date. Several of those — and Chris discussed Connah's Quay for Uniper — naturally are not yet included in the backlog we're displaying. For that scope of work, we hold preferred contractor status. Quite a few of these that we've flagged are absent from that backlog figure since, naturally, it captures a specific moment in time, namely 30 June 2026.

Chris Ashton

executive
#38

Building on that point, when you consider the EPC for Connah's Quay with TC Energy, those represent substantial awards that will contribute significantly to the backlog once FID is reached — a material addition to backlog. This is really a matter of timing, not any fundamental change. As you'd expect, as awards progress from studies or engineering into full delivery, that path is never linear. We are, I suppose, subject to the customer's whim. The very large projects we're working on, yeah, hold strong potential for entering backlog during this financial year.

Ramoun Lazar

analyst
#39

Understood. I have just a single very brief question. Perhaps: are you incorporating any assumptions about additional Middle East effects into your guidance?

Chris Ashton

executive
#40

When we look at the Middle East, the way I frame it is to picture a band. All-out war would sit above the top edge of that band, peace sits below the bottom edge, and we're working in that middle zone—that space where it's neither full-scale war nor full peace. What we've discovered is that our customers are sort of normalizing things and beginning to return to normal, as normal as that can be. We're seeing deferred projects—ones that got pushed back when the war started—starting to come back onto the table, and we're having discussions with them. We're actually seeing growth in the Middle East for 2027. Like anything, you open the newspaper, and the US leader says one thing one day, and then a few days later, something different. Right now, what we're seeing from the customer is a normalization of operations and investment. Again, the key indicator for me is that those projects deferred when the war began, at the end of February, are now back on the table and we're discussing them with them. It gives me confidence, with everything staying as it is now, that we will deliver the growth we're expecting and projecting for 2027.

Ramoun Lazar

analyst
#41

Thanks very much — that’s helpful.

Justine Travers

executive
#42

One thing I’d add, Chris, is that through the work we’ve done, we definitely see that showing up in the second half of the year. As Chris said, we do acknowledge the ongoing uncertainty in the Middle East that we’ve observed this year. Our assumption is that we see that materialize in the second half.

Operator

operator
#43

Thanks. Our next question comes from John Purtell of Macquarie, on the line. John, please go ahead — your line is open.

John Purtell

analyst
#44

Morning, Chris and Justine. On the subject of what will drive earnings growth in 2027, would you mind giving us a bit more detail on the key drivers you see? Justine, you've obviously discussed the cost-out, and I assume you expect some tangible benefit from that. CP2 is clearly progressing into full-phase construction. And then, Chris, you mentioned you're seeing growth in North America. If you could just expand on some of that, it would be great. Thank you.

Justine Travers

executive
#45

Hi, John. Well, you've definitely hit on several of the main items there. Perhaps I'll begin with, as Chris mentioned, the work and the discussions we're having with customers regarding the Middle East, plus one item stemming from work deferred out of FY 2026 and into FY 2027, and then some extra scope, which I'm certain Chris will address. As you pointed out, and as we've previously discussed with the market in connection with Venture Global, certainly as part of CP2, the team is now in that project's construction phase, and there's very substantial momentum there along with scope of work scheduled for delivery over the course of FY 2027 and then into FY 2028 as well. You may have noticed in the material, and Chris touched on it very briefly, that within our backlog, we do see roughly 62% of that backlog being delivered over the course of FY 2027. Chris, perhaps you'd like to mention a couple of things?

Chris Ashton

executive
#46

So, look, obviously we can discuss VG, but I think that's fairly well understood. We have Phase 1 and 2, and then there's the Phase 2 expansion, which we expect will reach FID in 2027. We have Connah's Quay, where we're well along in terms of the early-phase work. That one will reach FID in 2027. We have Heidelberg, which we discussed. Look, we do have a recovery in the Middle East, John. Now, the recovery in the Middle East — and look, as I said, we're projecting growth overall year-on-year. The growth in the Middle East has been offset by a slowdown and deferral of investment in North Africa. That's simply because the customer base can't get sulfur through the Hormuz Straits, they can't get sulfur at the volumes they need to produce the fertilizers, to sell the fertilizers, to generate the free cash to invest. There's been a significant slowdown in that space, offset by what we think is solid growth in the Middle East. Look, there's growth in each of the regions. It's just that some of it isn't necessarily obvious because of North Africa offsetting the Middle East growth. America's going to show growth.

Chris Ashton

executive
#47

In the Americas, we're seeing something of a rebound, with really strong activity—particularly on the power side and the data side—and we're looking forward to making some announcements shortly that will reflect some significant progress in the data center space. I'd just suggest that people watch out for that.

John Purtell

analyst
#48

I appreciate it.

Operator

operator
#49

Thanks. We now have a question from Rohan Sundram at MST Financial. Go ahead, Rohan — your line is open.

Rohan Sundram

analyst
#50

Hi, Chris and Justine. With the questions already handled, I’ll ask about the CP2 project, since it remains such a huge contributor. I’m just curious: how big a driver can it be toward the revenue guidance you’ve provided? And how are margins tracking relative to expectations? Thanks.

Chris Ashton

executive
#51

Let me take the second part first — margin expectations on that project have been met. In fact, the customer's project director was present before the board yesterday morning. Things are going exceptionally well on this project. The project director on the customer side had very high praise for how the team has performed, and from a commercial standpoint it is delivering in line with what the contract calls for. Now, Justine, would you answer the other part, yeah?

Justine Travers

executive
#52

Thanks, Chris. Rohan, we don’t discuss specific projects inside our profiles, though from the conversations we’ve had, we know Venture Global certainly has an effect and is a strong source of revenue during FY 2027, given where that project stands—but as Chris said, it sits within the wider portfolio of other major projects and the global operations portfolio work we do. Yes, it contributes to FY 2027, which definitely gives us confidence when we look at that backlog and at what is due to be delivered over the course of this year.

Rohan Sundram

analyst
#53

I appreciate that.

Operator

operator
#54

Thanks. Our following question comes from Nicole Penny at Regal Equity Research. Nicole, please proceed — your line is open.

Nicole Penny

analyst
#55

Good morning, and thanks for taking my questions. I have a quick follow-up about backlog. It was discussed, but I just want to confirm once more that backlog declined in the second half compared with the first half — you addressed that — and naturally, we'd anticipate a lower revenue trajectory in the subsequent period. Could you reconcile that once again with the positive revenue growth outlook for FY 2027? And perhaps on that point, since backlog decreased in this period even with a strong pipeline and bookings, is backlog still the metric we should be watching for a read-through on future revenue, or should we really focus more on bookings and pipeline conversion instead? Just a second one, a follow-up on the Middle East that was discussed: we're six months into the disruption there, and you've said it's affecting business activity, but you note that customers are seeing normalization. Could you give us clarity again on any impact and flow-through to medium-term energy projects outside of the Middle East, please?

Justine Travers

executive
#56

I'll take that first question. What I'd say is — you're right to focus on pipeline and bookings as a really strong, key signal of where that growth profile comes from, not only across the next 12 months but further out, when we think about the coming two to three years. On backlog, one thing we have to keep firmly in mind is that when we present it, we present it at a single point in time. It captures the position as of 30 June, when we apply a cutoff. As we said earlier, it doesn't necessarily capture those strategic wins that we see flowing through the portfolio. I think you're right to look at bookings — at the momentum and strength of bookings and the pipeline growth we're seeing — as a window into that aggregated revenue growth we expect over the near and medium term. Chris, I'll let you comment on the Middle East.

Chris Ashton

executive
#57

Yeah. Let me just go over your question another time, just to be sure I've got it right. Oh,

Nicole Penny

analyst
#58

Regarding the Middle East — I just want to ask, because you mentioned that certain customers are referencing normalization. That said, can you provide any clarity about the medium-term effect on energy projects beyond the Middle East, given that, I assume, the Middle East situation has already happened? Has anything shifted to a greater extent outside the Middle East as a result of that?

Chris Ashton

executive
#59

When I think about that, having reflected on conversations I've had with customers, you still see Middle East operators—the national oil companies and national energy companies—continuing to invest. What you have with the international energy companies is that they're looking at where else capital investment opportunities sit, without necessarily the risk premium they would need, or would apply, to invest in the Middle East. Looking at what drives investment in the region, it really comes from the national energy companies more than the international energy companies. We continue to see NOCs investing, and as for the IOCs, if they were willing to invest, they may still do so, but they are certainly looking at investing in different jurisdictions and different basins.

Nicole Penny

analyst
#60

I appreciate that.

Operator

operator
#61

Thanks. We'll go ahead and take the following question now. The next one is from Nathan Reilly at UBS. Nathan, please go ahead — your line is open.

Nathan Reilly

analyst
#62

Thanks, and good morning. I have a quick question about that $58 million Middle East impact that you quantified as a drag on 2026 earnings. Could I just get an update on what that actually represents in terms of the impact from either project deferrals or the incremental costs that might have been incurred because of the issues over there?

Chris Ashton

executive
#63

That comes from deferrals, Nathan. When you look at the Middle East, costs tied to managing workflow levels aren't something you really see. What we actually didn't see was headcount growth needed to deliver that incremental $58 million — not any portion of the $58 million connected to severance for people being let go. The reason is that in every Middle East country, for each month a person works, they receive what's known as long service accrual, so if you do end up having to let them go, that cost has already been recognized. You don't incur restructuring costs in the Middle East the way you do elsewhere in the world. That $58 million really relates to revenue and margin deferral, project deferral — it isn't about restructuring.

Nathan Reilly

analyst
#64

Alright, that helps, thanks. Following up on the margin guidance that's implied, your FY 2027 guidance essentially points to a margin that's roughly flat. My thinking was that as CP2 shifts into that bigger construction phase, it would be somewhat dilutive to margin—could you tell us whether that's a reasonable assumption, and also whether there might be any offsets related to that, especially concerning cost-outs?

Justine Travers

executive
#65

Right, Nathan — regarding that EBITDA percentage margin, you're correct that we'd probably anticipate it staying fairly level with what we recorded in FY 2026. Naturally, the mix and the timing of projects at any given moment drive that figure. You bring up Venture Global as an illustration of this when it comes to the construction phase. Something we can do when examining how resilient our margin is over time is take a close look at our GID utilization — we obviously keep up that cost discipline — so there are a few quite intentional levers we watch in order to try to make sure that margin resilience holds. It's worth pointing out, I think, that we aren't seeing any margin erosion in the work we're bidding or selling into the market. That has held and remains strong. As we go and grow across the value chain with the various scopes of work we'll take on, we do see a mix of margins inside those scopes of work. Chris, did you want to

Chris Ashton

executive
#66

Exactly. The margin at which we're securing contracts isn't shifting. We're securing contracts at a healthy margin. As with anything, the mix is going to vary, but the margin at which we're securing contracts across the entirety of our work — energy, chemicals, resources — matches what we've been securing; it's a mix effect. Then, for work in the future-facing market, particularly in power and data centers, we're achieving improved margin. Any movement in margin relates to mix rather than the margin at which we're genuinely bidding and securing contracts.

Nathan Reilly

analyst
#67

Much appreciated — that's useful.

Chris Ashton

executive
#68

One more point to add, Nathan: with certain of these bigger delivery projects — be it reimbursable EPC or reimbursable EPCM — performance milestone payments are frequently built into them. That's simply another thing worth keeping in mind. It isn't every project, but a number of the larger ones include performance milestone incentives within the contract.

Operator

operator
#69

Thanks. We'll move on to the following question now. Gordy Ramsay from RBC Capital Markets is on the line for the next one. Gordy, please go ahead — your line is open.

Gordy Ramsay

analyst
#70

Thanks a lot. Chris, you said customers in the Middle East are coming to Worley for assistance, and that work volumes will rise in the second half. Could you confirm whether you've won any projects to repair facilities that were damaged?

Chris Ashton

executive
#71

Sure, we're handling quite a few of the damaged facilities, yes, in the nations where we operate. Right, that work is already ours. Then, when it comes to the Middle East, much of the work that goes into EPC is going to be lump sum turnkey, and that's something we won't take on, but what happens is that for the customers awarded that work, we'll frequently handle the engineering on their behalf, or we'll serve as program manager for those customers overseeing the contractors. We're engaged in a substantial number of damage assessments of facilities that were harmed across the countries, Saudi Arabia, UAE, in particular, yeah, which bore the brunt of the damage. We're not doing anything in Bahrain. Some damage occurred in Bahrain, but the bulk of what we're doing on damage assessment and rebuild support is in Saudi Arabia and the UAE.

Gordy Ramsay

analyst
#72

Is it reasonable to think that this work falls under the business relationship you already have with them? I believe you've said this before, or at least you put out a release about it, that you've broadened the relationship with Saudi Arabia. Would that simply be covered by that continuing relationship? Okay. If you just — yeah. To begin, I'd really value it if you could go into a bit more detail here. Are you noticing any shifts in how the workflow breaks down among professional services, fabrication, construction, and procurement as we move ahead?

Chris Ashton

executive
#73

And what about the Middle East?

Gordy Ramsay

analyst
#74

Everywhere.

Chris Ashton

executive
#75

We will be taking on additional big full-project deliveries, and going forward those will involve a greater share of E, a greater share of P, and a greater share of C or CM. How detailed an answer are you hoping for,

Gordy Ramsay

analyst
#76

Yeah, so just to put it in percentage terms — as CP2 has matured, for example, is the effort there shifting further into construction, having started out with a lot of professional services work? I'm just curious whether you're seeing that across other projects generally, or whether that mix is staying fairly constant.

Justine Travers

executive
#77

Let me jump in on that, Gordy. For FY 2026, procurement accounted for roughly 30% of the makeup of our revenue, construction and fabrication came in at about 17% or so, and professional services still made up more than 50% of what we delivered. As Chris mentioned, going forward, as we take on more full-project delivery and essentially aim to capture a larger share of a larger pie, we'd anticipate that each of those incremental components would grow. I don't foresee any major change in how those different services are proportioned within that mix.

Chris Ashton

executive
#78

The overall direction for delivering projects in full — whether that's reimbursable EPC or reimbursable EPCM — is that you'll see a larger amount of services that aren't part of the professional services bucket. Just

Gordy Ramsay

analyst
#79

Finally, regarding the risk from currency translation — this may come across as a silly question, but has the idea ever come up of pricing every one of your projects in US dollars?

Justine Travers

executive
#80

As we move forward, we will be examining—and in fact already are examining—what currency we present in. Up until now, Worley has always reported its results in Aussie dollars. With a growing share of revenue coming from beyond Australia, we are definitely looking into a switch to presenting in US dollars. That change isn't something we anticipate making in FY 2027, but for the FY 2028 year, we would consider shifting our reporting currency to US dollars.

Chris Ashton

executive
#81

I think it's a very — I think, look, it's — in a sense, it's a good question. We've discussed this internally, and we're examining what it means from a systems standpoint: what is it that we need to do? From an operational standpoint, what does it mean? That work is underway. By — for FY 2028, we'll be looking to come back and let everyone know that we'll move to US dollar reporting currency. Just small — the amount of revenue that's coming through the Aussie dollar is not significant compared to US dollar or US dollar or US dollar-pegged currency. For me, it makes a lot of sense, as a number of other ASX-listed companies have done, to shift to US dollar reporting. I — I think, I think your line of questioning is, for us, in line with what we're thinking.

Gordy Ramsay

analyst
#82

I appreciate that.

Operator

operator
#83

Thanks. Our next question comes from Nikolai Dale at Barrenjoey. Nikolai, please go ahead — your line is open.

Nikolai Dale

analyst
#84

Hello Chris and Justine. For my first question: FY 2027 EBITDA growth, clearly at this point, will come in somewhat below the double-digit target through FY 2030 that you presented at the recent Investor Day. What's the right way for us to think about getting back to that double-digit target across the next three years? Do you have a degree of confidence or line of sight for a return to double-digit growth in FY 2028? Thanks.

Chris Ashton

executive
#85

We do. Look, several of the difficulties we faced in FY 2026—those aren't gone. They remain, and we have to own that. I believe we could have shown everyone that we were on course to deliver the same kind of growth we'd historically produced. My reason for saying that is our pipeline is stronger, bookings are solid, and backlog is substantial. When we consider certain projects we've won and been awarded and are in the early stage of, delivery will gain traction in the latter part of 2027 and into 2028, and when we consider future-facing markets like power and data centers, where we'll deliver full projects, that gives me confidence we can return to double-digit growth by FY 2030. For some of these future-facing markets, particularly power and data centers, what drives those customers is speed to market, and they're less sensitive to cost than the markets we've historically operated in. I'm confident we can reach that growth level as we head toward 2030.

Nikolai Dale

analyst
#86

Thanks, that's useful. Just a second one about labor — clearly you've trimmed headcount somewhat in recent years. I'm just wondering how the rate of employee attrition and access to labor have changed over the last 12 months. And then, what do you figure the appropriate headcount is going forward for the business into next year?

Justine Travers

executive
#87

Let me jump in on that, and Chris may want to add something. I think what you're getting at is really the headcount question — what the appropriate level is for that kind of resource base. Our workforce figures are going to move around as project volumes shift, as phases change, and as we progress through time. One thing we're very focused on — and this was true when we carried out the restructuring in FY 2026 — is making sure we have the right people and the right resources positioned in the areas of greatest demand and growth, and in the places where customers genuinely need those people to be. I don't think it's the right framing to ask whether we're at a fixed number and whether that's the correct headcount level. I firmly believe it will vary based on project volumes, the phasing of the work, and the type of work we're undertaking over a given period.

Chris Ashton

executive
#88

I believe that's accurate. And, well, when you examine the headcount, as I mentioned, it has been affected—project deferrals have occurred in the North Africa business, if they can't obtain sulfur. Naturally, that is having an effect on headcount. Headcount has always gone up and down for us, but it doesn't concern me. I consider the work that lies ahead of us, we consider the bookings we've secured, we consider where we stand in some of the early stages of some significant projects. Connah's Quay is a substantial project. It will gain traction in the second half as we move into 2028. I'm not overly worried about where we are right now. Again, it's somewhat like backlog—it's headcount at a particular moment. It's one data point in the mix, but you can't treat it as a single data point.

Nikolai Dale

analyst
#89

That's reasonable. Thanks.

Operator

operator
#90

Thanks. Our next question comes from Nicholas Rawlinson at Morgans. Nicholas, go ahead — your line is open.

Nicholas Rawlinson

analyst
#91

Hello, Chris and Justine. I appreciate you taking my questions. Thank you for the extra detail on those metrics for the debt portfolio. I just wanted to ask why we should still anticipate leverage climbing to two times when earnings are projected to increase in FY 2027, please?

Justine Travers

executive
#92

Honestly, the leverage figure we've laid out serves as guidance — it's a target reflecting our view that roughly two times is a sensible level. For FY 2026, as we observed, we ended up at 1.8 times. We do indeed publish an indication of the level where we're comfortable from a leverage standpoint. We'll steer that across the year, making sure the business keeps solid liquidity, which gives us the flexibility to keep moving forward and fulfill what we're aiming for by FY 2030.

Nicholas Rawlinson

analyst
#93

Okay, that’s useful—thanks. And just building a little on what Ramon asked before: I know Connah’s Quay came up, but could you speak a bit more broadly about the EPCM pipeline? I suppose it just seems like that backlog drop may be somewhat difficult to stop with EPCM wins alone. I’d like to get a clearer picture of the EPC pipeline.

Chris Ashton

executive
#94

You know, clearly we have Connah's Quay, we have TC Energy, and we have some work that we'll be announcing around data centers and power generation. There are quite a few bigger EPC jobs — I believe the count is 20, 20 larger projects that we're engaged in at different stages. From my perspective, I'd point to the fact that our pipeline is genuinely healthy and expanding, and then I'd point to the bookings coming in. We're witnessing more and more of the bigger ones — what sits within the major projects and programs portion of our business — a large quantity of those are showing up. Actually, the interesting thing is a customer spoke publicly last week, or maybe it was even earlier this week, about their worry that only a handful of firms are capable of supporting delivery of large projects of the type we're discussing, and for their capital investment plan, having access to that capability matters to them. That market, in our view, offers us expanding opportunity. When we consider how many large projects and programs we're working on, they are going to arrive. They will flow into backlog, though the timing of that simply isn't something we can control.

Chris Ashton

executive
#95

Justine noted that the backlog reflects a snapshot at a single moment, yet when you consider the pipeline of future factored work, it looks quite robust, and a solid share of it sits within the bigger projects — EPC and EPCM. To stress this again, as I've consistently stated, we will not accept any lump sum turnkey EPC work. When we refer to EPC and EPCM, everything there is reimbursable.

Nicholas Rawlinson

analyst
#96

Perfect. I have nothing further to add. Thanks.

Operator

operator
#97

Thanks. That wraps up the last question we had for today. At this point I'd like to hand the conference back over to Chris so he can give his closing remarks.

Chris Ashton

executive
#98

Oh, look, I want to express appreciation to everybody for being on the call and for the questions. Of course, we'll be in Sydney on Thursday and Friday, and in Melbourne on Monday and Tuesday, where we'll see a number of you either at the group lunches or in one-on-one meetings. Looking forward to seeing you. Should you have any additional questions, definitely reach out to Kylie, and we'll make sure you get answers.

Operator

operator
#99

We appreciate everyone joining the call today. That brings the program to an end. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Worley Limited transcript — plus 131,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Worley Limited earnings transcripts and 131,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Worley Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.