Zen Technologies Limited (533339) Earnings Call Transcript & Summary

July 28, 2025

BSE Limited IN Industrials Aerospace and Defense earnings 60 min

Earnings Call Speaker Segments

operator

operator
#1

Good day, everyone, and welcome to the Zen Technologies Ltd earnings call. The results and investor presentation have been posted on the Stock Exchange so we can walk you through this quarter's results and take your questions. Joining us today are Mr. Ashok Athlouri, Chairman and Managing Director; Mr. Afzal Malkani, Chief Financial Officer; and Mr. Bilasha Athlouri, Investor Relations Officer. We'll begin with a short overview of the performance, followed by the Q and A session. I'd like to remind everyone that any statement on this call reflecting an outlook for the future — anything that could be construed as a forward-looking statement — must be viewed together with the risks and uncertainties the company faces. With that said, I'll hand the call over to Mr. Ashok Athlori for his opening remarks.

Ashok Atluri

executive
#2

Good morning, fellow investors and friends. To get right to the heart of it, this quarter has been somewhat disappointing, even from our own perspective—we had expected a bit better than what we delivered, and that's around 60 crores or so, you know, because of certain design changes that our end user requested. Given the evolving reality of war, we had to accommodate those specification changes, and our execution for that particular product has spilled over into Q2. So we expect that will be reflected in Q2. But overall, our feeling is that the government is very serious. And again, while Operation Sindoor has hastened some purchases, the regular purchases like simulators, you know, they took somewhat of a backstage position. And so, but again, we do feel that the simulator—we said by H1 we should have another 650 crores—we still feel that orders will come through by end of September. But the reality is that the regular procurements were somewhat slowed down because of the new emergency procurement happening after the post operations.

Ashok Atluri

executive
#3

And, you know, one thing—if we can call it that—my bright spot in all of this is that the subsidiary Ari has been doing well, and we believe that this year they'll bring close to 170 crores of top line to our turnover. That will be a 100% subsidiary by the end of the year. Right now we hold 76%, but it's transitioning, and the UTS will again add at least 80 crores even if you take out our cross transactions. So another expectation was that EBITA and PAT were in line with our expectations and with what we had indicated to the customers. So that's the overall picture, and I'll just quickly request Absolute to run through the financials, and then I'll continue from there. Abdul, can you take over please?

Executive

executive
#4

Okay, thank you sir. Good morning, everyone. As our CMD, Mr. Ashok Atluri, noted, the Q1FY26, FY26 results show temporary timing adjustments in execution, with the quarter's weaker revenue and profitability mainly due to a significant amount of equipment shipments being deferred to Q2FY26. Even with that softness, consolidated performance drew strong support from our subsidiaries UTS and aripl. Now, moving to the results, let's start with a brief update on standalone performance for Q1FY26. Revenue from operations came in at Rupees 111 crores, versus Rupees 253 crores in Q1FY25. That works out to a decline of roughly 55% in percentage terms. Operational EBITDA for Q1FY26 fell to Rupees 38.05 crores, compared with Rupees 103.20 crores in Q1FY25. Total EBITDA is above 40%, though operational EBITDA dropped to 34.26% from 40.64% in Q1FY25. Profit after tax declined to Rupees 37.12 crore, against Rupees 74 crore in the same period last year. In percentage terms, profit after tax is still 33.44%, compared with 29.20% in Q1FY25. So that's an increase of about 4% on our total revenues of 111 crores.

Executive

executive
#5

Equipment sales brought in 101 crores, and our AMC business added rupees 9.78 crores. Turning now to consolidated performance — it's considerably stronger than the standalone numbers. Revenue from operations stood at rupees 158 crore crores, against rupees 254 crores in Q1FY25. In percentage terms, that's a degrowth of 38%. Operational EBITDA for Q1FY26 fell to rupees 64.70 crores, versus rupees 111.35 crores in Q1FY25. As a percentage, operational EBITDA is 40.90% — above our benchmark of 35%, compared with 43% in Q1FY25. Consolidated profit after tax dropped to rupees 47.75 crores, from 76.81 crores during the same period last year. Profit after tax as a percentage is 30%, versus 30% in Q1 FY25 — the same. That wraps up our opening remarks, and we'd now like to open the floor for question and answer.

operator

operator
#6

Much appreciated, sir. At this point, ladies and gentlemen, the question and answer portion of the call is getting underway. Should you have a question, you can do so by clicking the raise hand icon located within the participant tab on your screen. We ask that each participant keep to a maximum of two questions. Should time allow. You're welcome to rejoin the queue and ask a follow-up. Ladies and gentlemen, we'll pause briefly as the question queue is put together. The first question comes to us from Jay Chauhan of Trinetra Asset Management. The floor is yours.

Jai Chauhan

analyst
#7

Hi there, this is Audible.

operator

operator
#8

Yes sir. Go right ahead.

Jai Chauhan

analyst
#9

Good morning, and thanks for the chance to ask. I’ve just got a single question. Considering Zen’s leading position in counter-drone systems, with IIT DM qualification and field testing that went well during operations in like, how do you expect the competitive landscape to develop as additional companies come into this area, and which particular technological distinctions will preserve, you know, Zen’s leadership over the next 3 to 5 years?

Ashok Atluri

executive
#10

One thing I should mention again is that back in 2023, there were open tenders—an IDDM category tender from the Indian Air Force and another one from the Indian Army. In both instances, we ended up as the single vendor. And at that time, no other player could demonstrate what the government of India required when it came to wideband requirements. Now, typically with wideband—most anti-drone systems developed in this country are designed to handle commercial frequencies, not non-commercial ones. What Zen had done much earlier was invest heavily in R&D for the anti-drone system to broaden its scope so it became band independent. It simply doesn't matter which band—commercial, military, or any other—we should be able to detect and jam it. That was a mandate we had set because, as Zen Technology, we always said that winning RFPs isn't the only thing—winning wars for the country matters. And fortunately, at that point they did opt for wideband, since most customers were going only for the commercial band.

Ashok Atluri

executive
#11

The Indian armed forces did choose wideband, and they purchased it. What we’re seeing is that even very recently—just a couple of months ago—there was a demonstration of this system, an indigenous system, and as far as we can tell, we haven’t come across any company that has designed and developed wideband indigenously. So they are trying to cheat. When it comes to wideband, what they’re saying—one person said to me, “Listen, we’re doing wideband.” I asked, “What do you mean by wideband?” And they said, “In wideband we do 900, 2.4 and 5.8 gigahertz.” No—in wideband you have to cover anything from 100 MHz to 6 GHz or 8 GHz or whatever the requirement is. So they’re trying to play with the term wideband. Wideband means anything. And to the best of my knowledge, none of these companies have that. So we stand—we still stand a good chance if they really go for this kind of product with what is actually being used and will be used in the future; we stand a good chance. A lot of people are coming and saying—and by the way, when the RFP was last called, 12 people came for the pre-bid but only two came to the actual trial.

Ashok Atluri

executive
#12

So there were a lot of claimants present. Even at that point, in 23 and 25, those numbers are still going up. But we'll need to see who actually shows up at the trial to collect their equipment, since the government of India is extremely serious about this — you know, if someone takes foreign technology, or something passed off as technology, and tries to slip it through as indigenous, the government will come after them hard. Also in 23, and at the pre-bid meeting, many attendees asked how you plan to verify that the technology is IDTM — indigenously designed, developed and manufactured. The officers present were extremely clear: listen, we're going to go through your source code, your software code, and you have to walk us through each and every major block — we may dig deep wherever we choose. Then you'll compile the entire software in front of us, and then you'll run the anti-drone system in front of us, along with the electronics — all the PCBs, the designs, the Gerber files, everything we've taken. And we also want a GitHub, the version control system you have in place — when was it started? What are the different versions?

Ashok Atluri

executive
#13

The same goes for mechanical engineering—CAD drawings blew up, and you've got SolidWorks views and simulations, which you've already handled. So with all those rigorous checks in place, I think Xen stands a very, very strong chance of landing substantial orders for anti-drone systems. So yeah, that's the level of confidence we have. But it's only as things open up—we expect the tenders to show up fairly soon, and you know, we'll see who the participants are. But again, they have to demonstrate it physically and prove it's indigenously designed, developed, and manufactured. I hope that answers your question. J.

Jai Chauhan

analyst
#14

Yes sir. Got it, got it. And sir, the core competency you brought up — is this product patented?

Ashok Atluri

executive
#15

Okay, so what we do regarding patents is that some technologies can be copied and replicated without much difficulty. We examine the product and conclude that this one is straightforward to patent, that one is easy to replicate. You develop an intuitive sense about it. Those types of IP we typically do patent. However, when the IP is extremely cutting edge — for instance, where the algorithms are very, very hard-fought and complex — we don't patent that, because we don't want anybody, any foreign country, to copy it and build that product. So yes, some parts are patented, but certain parts are not patented owing to their sensitivity. Yeah, but as you said, yeah, it is patented.

operator

operator
#16

Thanks. We move to our next question, which comes from CA Garvit Goyal at seven Islands pms. Go ahead, please.

Analyst

analyst
#17

Hello, can everyone hear me?

operator

operator
#18

Yes, sir.

CA Garvit Goyal

analyst
#19

Hello, good morning, sir. My first question concerns execution—you noted that certain contracts are being pushed to Q2. So I'd like some clarity here: when you put it in the PPT that this year will be a muted one, what exactly does that mean? Is it consistent with the above 25?

Ashok Atluri

executive
#20

Honestly, that all hinges on the order book we hold by Q2 — the close of Q2 — and we can't attach a real figure to it. Whether it lands somewhat higher, somewhat lower, or a bit more, we simply aren't in a position to pin a number on it. Still, as has been noted repeatedly on numerous occasions, our confidence in overall revenue across the coming three years — counting this year, the next one, FY 26, 27, and 28 — remains strong that we can hit the 6,000 plus crore target. Yet, to your question, we cannot provide the precise number for this year at this moment.

Analyst

analyst
#21

All right, and you noted in the PPT that we expect a significant number of orders over the next couple of months, correct? So what's the execution timeline for the current order book, together with the orders we're looking to receive?

Ashok Atluri

executive
#22

So, you know, those orders we expect to receive by Q2 — our plan is to complete them in that same year. That's what the preparation work is focused on. And again, you know, there's kind of — because of company internal policy, we don't purchase raw material ahead of time until an order comes in, particularly for government orders. And we — even though it has happened — but we've seen businesses fail that bought raw material preemptively in expectation of orders, since the order never materialized and those firms went bankrupt. So, you know, we're being careful in that sense, but everything apart from the actual procurement — getting drawings ready, every conversation with our vendors, preparing them to take orders from us — all of that work is underway. And so, you know, what we anticipate is: if these orders arrive, how much of it can be completed over the following two quarters, Q3 and Q4? Our ambition would be to complete all of it. But I think some portion will spill into Q1 of next year.

Analyst

analyst
#23

Got it. And to build on what you said, you brought up raw material procurement. Are there any challenges we're running into regarding the use of any rare earth metals — medical rare earth metals — that China currently restricts?

Ashok Atluri

executive
#24

Right. So up to now, we haven’t encountered that kind of issue in our products, and as things stand our raw materials are clear. So the Chinese ban hasn’t affected us. That said, once we start placing orders — most of what we make is electronics-based, and dependence on China is basically zero. So there won’t be any impact from that, apart from our subsidiary Vector Techniques. They might see some effect there, because of the rare — the magnets you mentioned. But they’re also working right now on setting up alternative sources. For Zen’s order book or order execution, though, it shouldn’t create any problem.

Analyst

analyst
#25

Got it, sir. I won’t support the queue, sir. Thanks so much, and best of luck ahead.

Ashok Atluri

executive
#26

Appreciate it.

operator

operator
#27

Thank you. We move to Dipane Vakil from Philip Capital for the following question. The floor is yours.

Analyst

analyst
#28

Hello, and thanks for taking my question. First off, in your presentation you noted that of the 750 crores in water books, 600 crores comes from your code business, which we understand to be made up of simulators and ads. Could you break that down for us — how much of it is simulator ads? And within the remaining 150 crores, what would the split look like?

Ashok Atluri

executive
#29

Apologies — that’s the sequence we anticipate in the Q2 you’re referring to, correct?

Analyst

analyst
#30

No, no, no. Let's talk about the order book as it stands right now. What the order book looks like at present.

Ashok Atluri

executive
#31

So yeah, on that I'd say roughly — so, if you remove AMC from it, that comes to around 200 and some crores. The anti-drone systems themselves are 64, and the training simulation is about 292, I believe. Yeah.

Analyst

analyst
#32

Understood, sir.

Ashok Atluri

executive
#33

Yeah, yeah. Two hundred and eighty-two. Training simulators account for two hundred and eighty-two crores, and the antenna system is about 64.

Analyst

analyst
#34

Right, understood. So I'd like to get a bit more detail on the order wins. You're anticipating 650 crores of order wins over the next two months. Are those already in advanced stages of negotiation, or is there a larger pipeline at play from which you expect 60 crores, since as per your opening remarks this also leaves out the emergency procurement?

Ashok Atluri

executive
#35

You've got that right.

Analyst

analyst
#36

Right, yeah. So I was hoping to get a bit more clarity around the ordering. Which segment does this come from — is it purely simulators, or does the anti-drone system factor in as part of it as well?

Ashok Atluri

executive
#37

To clarify, this involves only simulators. As things stand right now, I’d put it this way: we’re the sole remaining player. Given that, an order arriving is close to a certainty. We see no obstacle there. The only open question is the timing of their signature and when they place the order with us. At this moment, no other competitor exists in this space. So we anticipate the order will come through. That said, as I mentioned before, the emergency procurement has caused a bit of a delay — otherwise, we likely would have received it by now. Aside from that, to answer your question, everything pertained to simulators, and we are already the only party that has qualified. Therefore, our expectation is that we will definitely secure the order.

Analyst

analyst
#38

Understood, sir. So, just a brief follow-up to the question the earlier participant asked. From the moment you secure the order to when deliveries begin, what would the lead time be? Since you said most of the products will be delivered within that same year, I simply wanted to get a sense of the time between order win and execution.

Ashok Atluri

executive
#39

Usually, simulator lead times run about four months, though the antidote system is somewhat bigger and can extend to six months or slightly beyond, given the electronics and certain components that have to be ordered. Beyond that, yes — the longest wait for any raw material is generally four months, while simulators and Anti drone systems take six months.

Dipen Vakil

analyst
#40

Understood. Sir, many thanks for taking my question. And best of luck with that 6000 crore goal of yours.

Ashok Atluri

executive
#41

Thanks, Deepen — I appreciate that.

operator

operator
#42

Thanks. We’ll take our next question from Akshay Patel at AK Investments. Please go ahead.

Analyst

analyst
#43

Hello, sir. Can you hear me?

Ashok Atluri

executive
#44

Yes, please.

Akshay Patel

analyst
#45

Yes, thank you for the chance to ask, sir. My first question, sir, is this: even though we are the only vendor for the government of India, and over the past 1 year we haven't seen any meaningful order inflow, what could be the reason for that?

Ashok Atluri

executive
#46

One thing to note is that the simulators are in process—they're being processed—and orders, honestly, have been extremely slow. They've dwindled down to a trickle. We believe the cycle has eased somewhat. I mean, intuition tells you that, and the facts tell you that too: these were orders we probably ought to have received a bit sooner. And once more, as I mentioned, the government has certain emergency matters to deal with. So routine procurement is moving along a somewhat slow path. But again, this ought to have taken place far, far sooner—far sooner, even before Operation Sindur—and we ought to have been sitting in a very solid order book position. Execution ought to have begun by this point. Yet again, we recognize that with Antitrone systems, we recognize this is an extremely fast-evolving domain. And right now the government is revising the specs, since these systems have now been proven in war—given the kinds of threats that actually arise, and the country's capacity to hold this technology domestically, because everything taking place keeps evolving. Earlier, you know, we tended to believe soft kill was sufficient, since every drone is controlled from the ground—sorry, from ground to, you know, to the drone.

Ashok Atluri

executive
#47

You’ve always got some form of control in play. After that, we moved to soft jamming, where jammers let you block the frequencies. But then, as you know, the drone people introduced something else: an autonomous drone that could operate purely off GPS. No ground control is required at all. They’d be pre-programmed with the destination, and off they’d go. So then we responded with spoofers, which let us spoof. In fact, when a drone is in India, you can spoof it so it appears to be in another country entirely—perhaps China or somewhere like that—and it would lose its way. Then, to get past spoofing, they introduced AI-based technology, such as vision-based technology with waypoints, and so on. And at this point we’re effectively saying that to make sure the waypoint gets eliminated, we need hard kill techniques—shooting it down with various weapon systems, and so forth. So this cat-and-mouse game keeps escalating. That’s why it matters so much that when the government purchases this product, it buys from a company with Indian IP ownership, because any software-level upgrade and all of that can be carried out extremely quickly if the system was designed and developed indigenously.

Ashok Atluri

executive
#48

Picture buying that from another nation — they would charge you an arm and a leg, frankly. They would tell you, and who knows, they might say look, upgrading your product isn't something we can do, so what's your move? You go out and purchase new products. Yet here in India, I believe we've got a really open architecture in which these evolving threats get accommodated with great ease, and upgrades happen — everything, even when the upgrade is a hard one to get, we're negotiating with them at a fair price and we upgrade them. That's why I feel it's really vital that the company — the country — follows the same route as IDDM procurement. So yes, owing to those changes that were taking place, the order flow wasn't — they're not — they're still finalizing, I think, but thanks to the operation the actual threat has now crystallized, the specs are finalized, and once they come out with this, I think significant orders will come in, including for anti drone systems.

Analyst

analyst
#49

Yeah, thanks for that detailed response. So can we take it, can you take it that demand isn't scarce and it's just that orders have slipped by some period owing to certain geopolitical matters? And if you're saying yes to that, then can we take it that once this first half is done, order inflow will improve, and next year we'll see a solid amount of inflow — and also, we talked before that starting FY27 we'll get some order inflow from the US too, since we've set up there as well. So what is — could you shed some light on that?

Ashok Atluri

executive
#50

Regarding your first question, yes, I believe H2 is going to see a substantial inflow of orders—there's no question about it. And we anticipate a considerable volume of orders for anti-drone systems, along with simulators, and we're hoping to capture as large a share of that as we can. As for the USA matter, I'd say some very interesting things are developing there right now. As you're aware, we acquired a company by the name of Ari. They have a fully established operation with a dealer network across America, South America, and other nations. So we're in discussions with—in fact, they're also quite strong in Japan and the Far East—so we're talking with their vendors, who are already working with the armed forces in those places, to promote our products, both ours and those from India as well. So we anticipate that by FY27, meaningful orders will start arriving, and we'll be in a position to supply not just the US but South America too, via the US contact.

operator

operator
#51

Mr. Patel, could we ask you to get back in the queue? Quite a few participants are waiting for their turn. We're moving on now to the next question. It comes from Darshal Zaveri at Crown Capital. Please go ahead.

Analyst

analyst
#52

Hi there. Good morning, sir. I hope you can hear me clearly.

Ashok Atluri

executive
#53

Yes, go ahead.

Darshil Jhaveri

analyst
#54

Hello there, hi sir. Many of my questions have pretty much been covered already. So I was just hoping to find out, regarding order flow — you're in negotiations already and those parts have slipped, but what about the emergency procurement? Is there also a sizable opportunity to be had in that area? And what timeline should we expect there as well?

Ashok Atluri

executive
#55

So, you know, when it comes to the government requirement, if they put out the RFP and repeat it, usually they have to procure — they'll wrap up procurement by March, although there have been instances where they pushed it out to June and September. But typically the mandate is, you know, please get the orders placed before March. And in most cases, most of the time it has turned out that they manage to finish placing the orders sometimes even in Q3 — they issue the thing and within 45 days they try to wrap it up. There have been cases like that. So our confidence is that all the orders should come in and be concluded before the end of March, and whatever orders they receive then, you know, should be placed by them. So did you place — did you ask any other question besides this?

Darshil Jhaveri

analyst
#56

No. Another thing I wanted to ask about is the chance we have on exports. I mean, last year seemed really strong for our exports, and this year, I believe, we have 100 crores in our order book for export. So yes, I get that the Indian government has moved somewhat slowly, but what about other regions? Because I think drones are the hot item at the moment — every country wants them. Right. So. And it's a major threat to every country as well. So where do we stand in, you know, being able to secure a newer export market? Do we have any plans? So, like, could you just, you know, go into a bit more detail on the export opportunity and what, how, what our role is in that, sir?

Ashok Atluri

executive
#57

Regarding exports, we've received numerous inquiries and hosted many visits over the past few months, particularly following operations indoor—the government of India has been performing quite well—and we are also seeing inquiries for antidote systems. Our expectation is that in H2, we ought to secure some export orders. That said, FY27 is going to be a significant year when it comes to exports. So yes, our sense is that exports will begin arriving in H2, covering both simulators and anti-drone systems. However, FY27 will be a big year for us with respect to exports.

Analyst

analyst
#58

So can we get a count of which countries those are, and is there any kind of certification needed — you know, do we have requirements such as, say, general farmer standards, US FDA, or something along those lines? Like what we hold for any country where, you know, we've qualified so we can supply these. And which countries are we aiming to expose to, sir?

Ashok Atluri

executive
#59

So, you know, I’ll generally frame this by region. We refer to Africa, the Middle East, and CIS countries, and we’re also now considering Southeast Asia. Those are the main regions, for clear reasons. Some countries, you know, don’t want to be identified when negotiations are underway or something similar. There’s also a confidentiality element there, in that if they realize we’re purchasing simulators for this product, they’ll know we possess this equipment. And if they know we have this equipment, they can also gauge the strength of our equipment. Although most of the time, you know, Wikipedia provides a decent estimate, they still expect us not to disclose it. So we respect that. That’s why we never identify the countries. And so we believe that yes, in these four regions, significant orders will be coming. Naturally, the US, the South America market, and the NATO countries will be something where next year we expect some orders to come through in that region as well.

operator

operator
#60

Thanks. We'll take the next question from Amit Dixit at Goldman Sachs. Go ahead, please.

Amit Dixit

analyst
#61

Can everyone hear me?

operator

operator
#62

Yes, sir.

Amit Dixit

analyst
#63

Morning, and thanks for the chance to ask. I have a couple of questions. First, Defense Secretary has recently been on air saying that simulate—simulate sectors are the way forward for speeding up procurement of defense equipment and are part of reforms in dap. Are we getting some traction from the government? Some feelers? I know it's early days, but are there feelers suggesting that over the long term there would be greater use of simulators across various platforms, including Air and Navy? That's my first question.

Ashok Atluri

executive
#64

Sure, so I think there's no question about that at all. Actually, if you look back a bit to September 21st, the government published a simulation policy framework on its own website. So, as you know, within that simulation framework they stated very plainly that all training has to begin shifting onto it, and also, you know, when it comes to procurement — if simulated procurement, simulated equipment can be handled — then we ought to simulate that equipment and move forward more quickly through the procurement cycle. So I believe there's no question about it. And we've witnessed that growth starting from 21. If you look at 22, 23, 24, 25, we've grown really, really substantially — 60, 160, 430 to 930 crores. So for us the growth has been significant, and we expect that to keep going. Again, as I keep warning our investors, quarter-on-quarter growth and even at times year-on-year may not materialize. But the overall trajectory is set — the government will keep increasing more and more. And I personally think that perhaps we've covered 78% of the simulation market so far.

Ashok Atluri

executive
#65

There's still another 92 to 93 per person that has to be purchased when it comes to simulator. So there's a long, you know, playing game — a long game that remains for both antid and simulators. And of course, you know, with the antidote system, you're asking about simulators. I think a huge market is still out there waiting to be tapped.

Amit Dixit

analyst
#66

Then regarding the second question, it concerns the acquisition we recently completed involving a company in UAVs and loitering munitions. Now, that fits well with, or rather complements, what we already offer in ads. But what’s the use case there? I mean, which kind of UAV and loitering munition market are we aiming to enter, and how long will it take before we commercialize that specific product? And if you could point out a few of the products we are actively considering in this domain.

Ashok Atluri

executive
#67

To take you back a bit in time, you know, back in ’24 — we had looked at the field in 2018, we wanted to get into drones, but we saw there were so many players there, and we thought, listen, I think this is a winner’s curse. Even if they win, you’ll never make money in drones. So we moved to anti-drone systems, and there again, you know, nobody was working on that. As we say sometimes, the signal silence is the signal. So we went into that, and that paid off well. But in terms of drones, I know in 2024, when we looked, government was blacklisting companies for using Chinese parts. And we think, what’s — why was the R and D not done? Why was this not done? And we consciously took a decision that we have to get into this field. And then when we started looking around into the ecosystem, almost everybody said, Ashok, these parts are not available except from a company like a company called Vector Technics, who are actually supplying, but their supply is on and off. But in a strange coincidence, a week later Vector approached us for investment, and we looked into them, we saw their capabilities, and we said we’ll go ahead and invest.

Ashok Atluri

executive
#68

Okay, so these folks are actually — our plan was to enter the drone systems space so we could speed up indigenization of full systems. So when we got — at this point we're solidly inside the drone ecosystem. Then we started asking what else the government of India is going to require in a war scenario. That's why we looked at loitering munitions, and Tisa has a demonstrated track record. They've carried out an order with the DRDO. So the technology is there, the product is there. But once again, we're doing some very, very high-end work again. Again, as I keep saying, we don't want to sell to the Indian government and merely do well — it should be. Our aim is to become the global number one in that. So a lot of money is being invested right now as we speak, and we expect that in a year and a half the loitering munition version ought to be ready for a full-fledged demonstration and, you know, competition with other players in the field. And obviously we expect to outperform others when it comes to specs, etc. Yeah.

Amit Dixit

analyst
#69

So sir, which types of drones are we considering here? The ones we're considering are Kam Kazi drones.

Ashok Atluri

executive
#70

Kamikaze drones. Right now, it's just kamikaze drones. Yeah.

Amit Dixit

analyst
#71

Understood, thanks very much, sir — and best of luck.

Ashok Atluri

executive
#72

I really appreciate it.

operator

operator
#73

Thanks. We have a follow-up question from Garvit Goel at Seven Islands bms. Go ahead, please.

CA Garvit Goyal

analyst
#74

Hello, and thanks for the follow-up question. About those emergency procurements taking place right now, the ones that are causing regular procurements to be delayed — at the same time, we're saying we'll receive some orders later through emergency procurement. So I don't understand why we didn't get those orders, given that emergency procurements are happening at this moment, correct?

Ashok Atluri

executive
#75

No. So they've only just begun Garbit, and it isn't the case that they've placed, finished, or used up every bit of the funds. Our expectation is that orders will keep coming in Q2, Q3 — even in Q3 orders will still be coming — and normally they need to finalize the placing of the Orders by March of the year. So I think so far they've done their placing for only a very small amount of emergency procurement. But the genuine emergency procurement needs to proceed on a, on a large scale. That will get underway over the coming few weeks.

operator

operator
#76

Thanks. Our next question comes from Sanjeev Zarbade at Antique Stockbroking. Go ahead, please.

Sanjeev Zarbade

analyst
#77

Thank you, sir, for taking my question. Sir, could you give us a sense of what sort of opportunity exists for us in the government's emergency procurement plan?

Ashok Atluri

executive
#78

We think emergency procurement is going to take place in the anti-drone systems area. Importantly, there’s one point I’d make, and what they would all want is an anti-drone system that has hard kill capability. So Zen has been able to do that. And typically, hard kill — unmanned hard kill — would be preferable because you don’t want people physically holding a weapon and firing, since you become a target very easily. People can detect your location. So you should be able to shoot and scoot, as they say. You fire from your weapon and then you relocate. So we have this remote control weapon station that can be loaded easily onto vehicles, and we have tested it with most of the vehicles the government of India is using, and they work perfectly well — remotely, you give the coordinates of the drone, it can display through the anti-drone system, and it is able to point and shoot them down. So I think this hard kill and soft kill system of anti-drone system is where the big market is going to be.

Ashok Atluri

executive
#79

And I think those will be part of the emergency procurement, the anti- portion. And I think in that area we have a solid chance of securing a few more.

Analyst

analyst
#80

Sure, but could you put a number on the total overall?

Ashok Atluri

executive
#81

Actually, the truth is we don’t yet know what share of procurement will happen in this field. So until the tenders come out, we’ll be able—you know—to calculate our likelihood and then perhaps arrive at the favor.

Analyst

analyst
#82

Alright, let me address my question about the other expenditure, which dropped quite sharply quarter over quarter. So is there some spending that we largely book in Q4?

Ashok Atluri

executive
#83

Sure, I think I’ll let Abdul handle that one.

Executive

executive
#84

Right, okay. So the explanation for the drop in other expense—if you look at it as a percentage, it's 7.35% in Q1FY26, and in Q1FY25 it was 5.5%. So as a percentage, it hasn't actually gone down. Most of these other expenses are semi-variable by nature. Other expense came down from 14.10 crores to 8.16 crores. In the last quarter it was higher, significantly higher. The reasons: in the last quarter, Q4, there was a substantial amount of professional charges and incentives, which were variable and tied to revenue. And also, last year consumption of stores and spare parts was higher. Last year there were some exceptional one-off expenses, like impairment of investments, return of advances, provision for expected credit loss, provision for warranty charges. So those are the five to six reasons why it was higher in Q4. But compared with Q1 FY25, it's at the same level only.

operator

operator
#85

Thanks. We move on to a question from Aditya Muna at yes, securities. Go ahead, Mr. Mona — please unmute your microphone and ask your question.

Analyst

analyst
#86

Hello there, this is Audible speaking.

operator

operator
#87

Yes.

Analyst

analyst
#88

Yes. So my first question was about how the order book translates into execution in Q2. Right now, our order book stands at roughly 750 crores. Of that, how much do we expect to be executed in Q2? FY26? The second question was on the order book — one is the 650 crores of orders that we expect over the next two months. Beyond that, for H2, what order intake are we expecting, and what's the execution timeline for that? Hello.

Ashok Atluri

executive
#89

Yeah, so regarding your question about Q2, Aditya — we aren’t in a position to provide specific guidance for that quarter. And on the order side, as we talked about, we expect roughly 650 crores by September related to the simulators order.

Analyst

analyst
#90

Okay. Yes. Yeah. Apart from that 650 crores, in September's orders, is there anything else we're also expecting during H2?

Ashok Atluri

executive
#91

No. Like we said, aside from that, this antidote system is going through emergency procurement, and we don't know whether it can happen by September or not.

Analyst

analyst
#92

All right, all right, all right. Then for FY27, what should we expect on orders? Will that be considerably bigger than FY26? And.

Ashok Atluri

executive
#93

I believe this is going to be bigger than—hello. Just a moment.

Analyst

analyst
#94

Correct.

operator

operator
#95

So we can't actually hear you.

Ashok Atluri

executive
#96

For FY27, we anticipate orders will be significantly, significantly bigger than what we've done in FY26. This is going to be substantial. Again, you know, we need to accommodate what we're projecting. That implies, when we say 6,000 crores, we do expect 27 and 28 to be very, very large years relative to 26.

Analyst

analyst
#97

All right, that covers everything. Thank you.

operator

operator
#98

Thanks. We’ll take the next question from Jatin Jadha at Sahasrara Capital. Go ahead, please.

Analyst

analyst
#99

Hi there. Can you hear me okay?

operator

operator
#100

Yes,

Jatin Jadhav

analyst
#101

Honestly, every question I had has already been addressed. I did want to offer one small thought, sir. There's a US company named Duality AI, and I've visited your facility and seen how impressive the simulator software you build is. What they do, in essence, is create a digital twin of the environment and then use it to produce synthetic data for training and testing AI models aimed at counter-drone work. On top of that, they also use it as a simulator for FPV drone pilots. So this aligns really well with Zen Technologies' foray, and in my research I found that a lot of US military bases — what do you call them — have placed orders with them. So it accomplishes two things: it provides training data for training AI models, and it also provides a simulation platform for your FPV and kamikaze drones. So it's something worth looking into, sir. That's about all. On my end, I didn't have a specific question. They've all been answered.

Ashok Atluri

executive
#102

Thank you very much. I've written down Duality AI, and you also just sent an email to provide additional information. Still, we genuinely appreciate these ideas coming from our investors. In my view, we're looking far beyond what others are doing. I will certainly try to follow up on this. But once more, just to bring everyone up to date, we are extremely focused on AI right now, and we've launched an initiative inside the company called transforming Zen into an AI native company, where — you know — everywhere, not only the products, not only the R&D but throughout operations, throughout finance, throughout IT infrastructure, throughout logistics, everywhere AI is being used and everyone is getting post, and you know the results are some — some of the results, you know, something that used to take weeks is being done in, you know, a few seconds, if not a few minutes, if not seconds. So things are really, really exciting on the AI front, and everybody is in a learning mode right now. And I think you'll see the benefits of AI find the tech in terms of not only just the product and building LLM within our simulators, which are learning and becoming better as customers interact with them.

Ashok Atluri

executive
#103

Yet overall, spanning finance and beyond—and I believe this—it will be a, this is a truly, truly thrilling period from that point on and, and we at zenith are extremely, extremely energized. Still, thank you; we genuinely value these suggestions. As you know, we can always—these provide us with ideas at times. Not only can we take the idea, but we can also work together with these sorts of firms. Thank you for that.

Analyst

analyst
#104

Thanks a lot. Thanks. I just had one question — where should I get the details? On the company IR investors at Zen Technologies. All right, thanks very much, sir. Best of luck.

operator

operator
#105

Thanks. Our next question comes from Harshit Kaparia at Alara Capital. Go right ahead.

Harshit Kapadia

analyst
#106

Yes, hello, good morning. I have just a few questions from my end. At the beginning of the call, you said certain orders and certain revenues were deferred, which is why you couldn't hit your target. I may have missed it — could you put a number on that value? And second, is it that you've already completed the production and the customer hasn't accepted that delivery, and that's the reason it got deferred, as you know? Or is it that you're expecting some orders to come in, and you'll execute them and then it was meant to be delivered?

Ashok Atluri

executive
#107

The orders have gone through — well, nearly all of them are executed as we speak, at this point. The reason execution took longer was that the customer altered the specifications. Those changes kept coming right up to the final moment, and we had to take them on board. So what got deferred was the revenue, not the order — really it's about revenue recognition. So whatever we deferred in Q1, we'll now recognize it in Q2.

Analyst

analyst
#108

So how would you put a number on that, sir?

Ashok Atluri

executive
#109

My estimate on that is a bit more than the 60 to 70 crores range.

Harshit Kapadia

analyst
#110

All right. And second, sir, regarding that 650 crore simulator order, what sort of simulator orders are you anticipating in this particular quarter, sir?

Ashok Atluri

executive
#111

These are simulators for the army, and for clear reasons I’d rather not name the product, but they’re army — not navy or air force — though mainly army simulators.

Analyst

analyst
#112

Is there a specific area within the Army you could point to — guns, tanks, or anything at all? Any color you can give us would help.

Ashok Atluri

executive
#113

You know, I think as those orders come in — these are somewhat sensitive matters, Harshit, and you know how it can be sometimes. So let's try to get the orders in hand first, then check with them, and after that make the announcement.

Analyst

analyst
#114

All right, sir, that covers everything from me. I want to wish each of you the very best. Thanks. Thanks. I appreciate it. Many thanks.

operator

operator
#115

Thanks. We move to our following question, which comes from Nirmal Ravat Singh at Access Max Life. The line is yours.

Analyst

analyst
#116

Sir, good morning. Can you hear me okay?

Ashok Atluri

executive
#117

Right, now you are.

Analyst

analyst
#118

Yeah, I’m an individual investor, not Axis. Sorry, we don’t take individual investors. I’m joking. Yeah, go ahead. Yeah, so what I wanted to ask about was the kamikaze drone.

Ashok Atluri

executive
#119

Alright.

Analyst

analyst
#120

Also, an article came out in ET about a startup out of BITS Hyderabad. Two guys, you know, they built a kamikaze drone and then went ahead and sold it to our Indian army. So what I wanted to ask was whether we too have received an order for kamikaze drones or not?

Ashok Atluri

executive
#121

No, we didn’t receive that order. This was the DRDO project that Tisa, the company we acquired, had worked on. They had carried it out for DRDO, so now it has to be productionized and then offered to the end user who purchased it from them, as well as to other Indian ecosystem participants, other Indian users, and overseas customers too. But we have not sold anything to the end user so far. At this point in time, it is in the R D stage.

Analyst

analyst
#122

Yeah, but even though we’ve seen that article, we’re quite excited if they’ve achieved what they said they did — which actually looks very, very exciting.

Ashok Atluri

executive
#123

Yeah, yes, absolutely — collaborating with them is something you could definitely consider. Yeah, for sure. And again, to be very frank, Nirmal, here's what we're after: if there are companies out there with a product superior to ours, and, you know, they've got a head start, we would absolutely want to work with them. We have no interest in offering something that's second — you know, second grade, or that isn't the best in the world. Best in India, at minimum — that's the minimum criteria. So definitely, you know, if these folks have a product better than ours, we'd be delighted to collaborate. And you know, it's rather surprising, because Vector is the only outfit doing indigenous components in India. They aren't aware of these guys either. So you know, we really need to find out where they sourced the components from, and so on. But if they've pulled this off, that's quite significant, and we would love to collaborate with the best in the field.

Analyst

analyst
#124

Yes sir, that is what I wanted to ask. Thanks.

Ashok Atluri

executive
#125

Thanks.

operator

operator
#126

Thanks. We’ll take the next question from Manish Gupta at Equinox Investment Advisors. Go ahead. Manish Gupta, please unmute your line and ask your question.

Analyst

analyst
#127

Can everyone hear me at this point?

operator

operator
#128

Yes,

Analyst

analyst
#129

Yes, sir. Thank you very much for taking my question, sir. With wars evolving more towards drones and anti-drones, particularly hard kill. So does Zen have the capability and technology for hard kill? Sir, this is my first question.

Ashok Atluri

executive
#130

So, you know, we had — again, there was a sort of semi-trial where every capable company over in India was brought in for demonstrations. The Army had put out the call, and ours was the only firm that actually brought a Hard Kill System along with guns and everything else to that particular trial — maybe they labeled it a demonstration or something like that, but they did call it trials, in fact. So yes, not only do we have an anti-drone hard kill system, we're out demonstrating it to our end users, and this capability runs very deep with us, and it's at various commands. They've seen the product — the remote control weapons station with surveillance — and they've genuinely appreciated it. And I think, and, and I think Hard Kill is an area we're really concentrating on. As you, as we move through the coming few quarters, you'll see some very good announcements in this space — you know, these are the new products, and again, all of these come about in consultation with the customers. Customers have been telling us that they want this, so we're going ahead and accommodating their request.

Ashok Atluri

executive
#131

Hard Kill is a space we genuinely aim to lead in, delivering the strongest offering anywhere globally. So, on your question — yes, Zen is heavily involved in Hard Kill, and I'd say that's going to be a meaningful investment focus for us over the next few quarters.

Analyst

analyst
#132

Okay, so as a quick follow-up, sir: looking ahead to the coming years and quarters, which area makes you feel more optimistic when it comes to contributing to the top line — would that be stimulators, or would it be NT drone systems?

Ashok Atluri

executive
#133

My own view is that anti-drone systems are going to keep catching up and keep growing. So it could reach as much as, you know, 40 or even 50 of the simulator. So I'd say that in hard kill, when we talk about an antidote system, we're trying to add other things too, such as the hard kill system, including surveillance, all of it, the camera, the electronic optics. So once we begin adding the non-simulator revenues, which would cover all of these and even robotic automated systems, I think they'll become a significant part relative to simulators. So I'd prefer to classify not as a simulator antenna system but as simulators and non-simulators. I think they could become as big as 50, 50.

Manish Gupta

analyst
#134

Okay, and the second question is kind of a layman's sort of thing. I mean, compared with some advanced countries, like Israel's Iron Dome — you know, we read about them in the media and how efficient they were. So where does India, and Zen in particular, stand as far as that kind of capability goes?

Ashok Atluri

executive
#135

Just so you're aware, the feedback we've received from end users has been extremely positive and very encouraging — in the sense that, you know, they managed to stop all kinds of drone attacks, and we have so many testimonials stating the products perform extraordinarily. And we're very grateful that an Indian company developed these products using fully indigenous technology. We received many testimonials along those lines. And once more, they also praised how focused and committed our staff were — you know, they were there assisting them, and wherever gaps existed, our people tried to help out. So overall, I think it's been an extremely good experience. And regarding your question, we definitely believe we're among the top two or three globally. We're not number one right now, but that's our goal. How do we get to number one? And we definitely need to step up the hard kill game, where, you know, we try to integrate as we move forward. As I said again, hard kill is the area of focus for us.

Ashok Atluri

executive
#136

What's the path for incorporating missiles and other more advanced technologies to take out drones once we spot them—particularly since these drones are increasingly AI-driven, carrying out vision-based attacks and so on? With all of that in mind, yes, I'd say we aren't there yet, but we will certainly get there over the coming, maybe 1 or 1.5 years. We ought to be at the top of the game by then.

operator

operator
#137

Thanks. We just want to let everyone know that we’ll be wrapping up the call in 5 minutes. Our next question comes from Manan Vandoor at Walford pms. Please go ahead. Sir, could you unmute your microphone and ask your question. Since we’re not getting a response, we’ll go to our next participant. That’s Krishna Doshi with Ashika Institutional Equities. Please go ahead.

Krishna Doshi

analyst
#138

Thanks for giving me the chance, sir. Because we’ve already brought up the NATO countries on today’s call, I was hoping for an update on how big an opportunity we’re looking at from that direction, now that we understand NATO is preparing this huge rearmament program. So what types of opportunities are we seeing there? Can that be quantified, and would it lean more toward which segment of ours?

Ashok Atluri

executive
#139

So one factor is NATO countries — the simulator piece is definitely significant, in the sense that training requirements have risen. And one hard reality I see across all NATO countries is this: even though Ukraine has received the world's most modern equipment — whatever you name, tanks, the missiles, handheld missiles, everything was supplied — they still didn't stand a chance against Russia, which mostly used very old equipment. And the realization is that this comes down to training, and because of that we feel there's a great deal of emphasis on simulators as a requirement for taking on any formidable enemy down the road. So yes, that's there. The second thing is anti-drone systems and drones as well. As we speak, our subsidiary Vector is discussing exports to both America and Europe, and very, very big names at that. So I think the opportunity exists. And of course anti-drone systems — anti-drone systems are something we will be pushing a lot. And again, once we expose it to their environment, we'll get real-time feedback.

Ashok Atluri

executive
#140

And I believe our ability to adapt and tailor the product to what they need is far quicker, you know, than what any competitor out there can offer. I think the approach will be holistic overall. Every one of our products is going to be pushed into the NATO market and the US market, and South America as well.

operator

operator
#141

Thanks. Our next question comes from Hitesh Chaudhary at ULJK Financial Services. Go ahead, please.

Analyst

analyst
#142

Thanks for the chance to speak, ma'am. On the operational side, I was actually noting that margins have been fluctuating. So could you shed some light on which segment is doing that fluctuating? As far as this EBITDA margin goes, does it come from the anti drone system, or from training simulators?

Ashok Atluri

executive
#143

I’ll let Abzal respond to that.

Afzal Malkani

executive
#144

Looking at the EBITDA margin, the operational figure on a standalone basis comes in at about 34.27%. The total EBITDA margin sits at roughly 52%. So once you take out the other income, it works out to about 34.27%. Our guidance is approximately 35%. As we said earlier, the simulators carry a somewhat higher EBITDA margin while the Antidron system is somewhat lower. On average, though, it lands at 35%. In this quarter, too, we hit about 34.27% — nearly at that 35% EBITDA level. And on a consolidated basis, yes, this time the EBITDA margin itself is around 40%, thanks to the strong contribution from both of our subsidiaries, ARIPL and ups. Thank you, sir.

Analyst

analyst
#145

That’s all I have to share.

operator

operator
#146

Thanks. We’ll take the next question from Nikhil Purohit at Fident Asset Management. Go ahead, please.

Analyst

analyst
#147

Thanks for the chance to ask. My first question just follows up on something an earlier participant raised. Regarding the existing order books of N50 crores, what are the timelines for execution, and how much of that would be executable by this year? You're on mute.

Ashok Atluri

executive
#148

Yes, Abdul will provide that as well — it includes the AMC component too. So I'll let him take that one.

Executive

executive
#149

So looking at the overall order book, it stands at roughly 754 crore rupees. Of that, 148 crore belongs to the subsidiaries. On a Zen standalone basis, it comes to about 605 crore rupees, and within that, AMC accounts for around 260 crore rupees. If we take that 260 out of the 606 crores, the equipment order total comes to roughly 346 crores. These are purely equipment orders. So execution will happen by at least Q3. Maybe most of the equipment orders get executed in Q2, but yes, a few months' worth of orders will spill over into Q3 as well.

Analyst

analyst
#150

And what order book are we aiming for by year end for our subsidiaries? If you could, please also provide a breakdown of the order book for these subsidiaries, and shed some light on figures such as Revenue EBITDA pad for ARI or unistring TiSA FY26.

Executive

executive
#151

Okay, so those standalone figures for this year — you can add 250 crore rupees at the consolidated level as a top line, maybe coming from ARIPL at 170 and then roughly 80 crore rupees from the other subsidiaries. Obviously it'll end up being more than 250, but there will be an Indus effect that gets knocked off. So once that effect is knocked off at the consolidated level, you can add 250 crore rupees of revenue from the subsidiaries, and EBITDA — this will be in line with 35%, per Zen's benchmark, and profitability will also be 25% as per this Zen benchmark, and we saw that in Q1 as well — they achieved the same.

Analyst

analyst
#152

Understood, understood. One final question, then. How much will capex be for FY26?

Executive

executive
#153

During FY26, there isn’t anything major—perhaps 40 to 50 crore rupees. Capex will be present.

Analyst

analyst
#154

Understood — those cover everything I wanted to ask. Thank you.

operator

operator
#155

Thank you, ladies and gentlemen — that brings us to the final question for today. I'll now turn the call back over to Mr. Ashokat Lahori for some closing remarks.

Ashok Atluri

executive
#156

Thanks, fellow investors. I truly value the dialogue, and once again for this year we expect it to be muted, but for the next two years, I think we are very, very hopeful that they’re going to be very exciting. As a further update, thanks to somebody bringing up the AI part, we are really, really working on getting AI into our products, our operations, everything, and that will start yielding results — significantly results — in the next few months, and we will probably keep you updated on that too. And thank you so much for the interaction, and looking forward to the next earnings call with you. Thank you.

operator

operator
#157

On behalf of Zen Technologies Limited, many thanks. That brings today’s conference to a close. We appreciate your joining us. You can now click the leave icon to exit the meeting. Thank you for taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Zen Technologies Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Zen Technologies Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Zen Technologies Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.