What were the key takeaways from Alliant Energy Corporation's October 30, 2026 earnings call?

In the third quarter of 2026, Alliant Energy Corporation reported GAAP earnings of $1.52 per share, reflecting strong operational progress and a year-over-year increase in ongoing earnings. The company narrowed its full-year earnings guidance to a range of $3.41 to $3.46 per share, while initiating guidance for 2027 with an expected range of $3.63 to $3.73 per share, indicating an 8% growth from the midpoint of 2026 guidance. The updated capital investment plan through 2030 totals $15.9 billion, a 19% increase from the previous plan, which supports an accelerated long-term earnings growth expectation of 8% plus from 2027 through 2030.

What topics did Alliant Energy Corporation cover?

  • Narrowing of Earnings Guidance: Management narrowed the 2026 full-year ongoing earnings guidance to the top half of the original range, now set at '$3.41 to $3.46 per share'. This reflects confidence in the company's performance through the year.
  • Initiation of 2027 Guidance: Alliant Energy initiated its 2027 earnings guidance with a range of '$3.63 to $3.73 per share', representing an 8% growth over the midpoint of the 2026 guidance. This indicates strong confidence in future earnings growth driven by increased demand.
  • Increased Capital Investment Plan: The capital investment plan for 2027 through 2030 has been increased to '$15.9 billion', a 19% rise from the previous plan. This increase supports the company's strategy to enhance infrastructure and meet growing customer demand.
  • Long-term Earnings Growth Expectations: Management raised the long-term earnings growth target to '6% to 8% plus', with a specific expectation of '8% plus' from 2027 through 2030. This reflects confidence in the durability of large load opportunities and operational excellence.
  • Affordability Initiatives: The extension of IPL's retail electric base rate stability plan through the end of 2030 was announced, providing customers with greater certainty about their electric bills. This is part of Alliant's commitment to affordability while continuing to invest in growth.

What were Alliant Energy Corporation's October 30, 2026 results?

  • GAAP Earnings per Share: $1.52
  • 2026 Earnings Guidance: $3.41 to $3.46 (narrowed to the top half of our original guidance range)
  • 2027 Earnings Guidance: $3.63 to $3.73 (represents 8% growth over the midpoint of our original 2026 earnings guidance)
  • Capital Investment Plan: $15.9 billion (a 19% increase above our prior 4-year plan)
  • Long-term Earnings Growth Target: 8% plus (from 2027 through 2030)
  • Cumulative Customer Savings: $1.2 billion (when compared to traditional debt financing)

Alliant Energy's strong quarterly performance and positive guidance revisions signal robust growth potential, particularly driven by data center demand. The increased capital investment plan and strategic financing initiatives position the company well for future expansion while maintaining affordability for customers. Investors should monitor the execution of the capital plan and the ramp-up of data center loads as key catalysts for growth.

Earnings Call Speaker Segments

Susan Gille

executive
#1

Good morning, everyone, and thanks for being with us on Alliant Energy's conference call covering our third quarter 2026 financial results. With me today are Lisa Barton, our President and Chief Executive Officer, and Robert Durian, our Executive Vice President and Chief Financial Officer. Once we finish our prepared remarks, we'll have time to answer questions from the investment community. Yesterday evening we put out a news release announcing our third quarter 2026 results, tightening the range of our 2026 full year earnings guidance, introducing 2027 earnings guidance along with a dividend target, and sharing our updated capital expenditure and financing plans through 2030. We'll be referencing that release and our earnings presentation during today's call, and both can be found in the Investors section of our website at alliantenergy.com. Before we get started, please be aware that our remarks and responses today will contain forward-looking statements; such statements carry risks and uncertainties that might cause actual results to differ materially. Those risks are described in last night's earnings release and in our filings with the Securities and Exchange Commission. We disclaim any obligation to update these forward-looking statements. Additionally, this presentation references ongoing earnings per share, which is a non-GAAP financial measure. Reconciliations to GAAP results appear in the earnings release available on our website. With that, I'll hand the call over to Lisa.

Lisa Barton

executive
#2

Hello, everyone, and good morning. We're pleased to share strong results for Q3 and the year so far, plus meaningful headway on our growth strategy. In addition, we've updated our outlook covering the remainder of this year and 2027, revised both our capital expenditure and financing plans, and sped up as well as stretched out our earnings growth expectation plans through 2030. Extraordinary momentum is evident at Alliant Energy, fueled by increasing customer demand and economic development. Because the communities we serve keep expanding and thriving, reliable and reasonably priced electricity matters more than ever to their long-term success. We're operating from a strong foundation, building on a consistent record of growth and delivering solid results that investors can count on. That foundation stems from the Alliant Energy Advantage: favorable regulatory environments, adaptable resource planning, sensible and down-to-earth leadership at both the state and community levels, and a company dedicated to helping our customers and communities reach their potential while prioritizing affordability. In today's update, we show how that advantage produces consistent growth, helps customers, and opens up investment opportunities past what our present plan covers. To begin, our view of the growth outlook has become clearer. Five data centers underpin our forecast of over 60% growth in contracted demand by 2031. Construction is actively underway at three of them. Google is receiving transmission service, with a load ramp that matches the accelerated schedule we filed with the Iowa Commission. At QTS Cedar Rapids, the first two buildings are scheduled to finish commissioning later this quarter. In Wisconsin, meanwhile, Meta now receives distribution service and expects to shift to transmission service in the first quarter of 2027. As a reminder, we proactively look for sites where large loads can connect without major extra transmission investment—this supports speed to power, helps with customer affordability, lowers execution risk, and reinforces our competitive standing. We've kept a high bar for adding new opportunities into our financial outlook. A signed electric service agreement is still essential, but we also need clear visibility on land, transmission, and generation; and moving forward, local permitting is now part of that elevated threshold as well. Given that large load projects are now bigger and more intricate, we are setting higher standards—not only regarding what goes into our disclosures, but also concerning the river supporting them. Our aim is not to showcase the largest figure; it is to give investors the strongest confidence that our growth can actually be executed. That rigorous method for deciding when projects enter our CapEx plan is what we call dependable growth that investors can rely on. During the first quarter, we announced an executed electric service agreement covering new demand. We're happy to report that this deal backs Google's growth at its locations in Cedar Rapids, Iowa; that prospect has now cleared our planning threshold and ranks among the projects underpinning our updated resource plan. We're also making headway on a varied range of load prospects outside of big data centers, such as edge data centers and manufacturing growth in Wisconsin and Iowa. Based on our conversations with Mesabi Metallics, that firm expects to situate its plans within our service territory in Lee County. Demand in this sector is typically expected to include a sizable share that can be curtailed, as is normal here. In line with the way we expand together with our customers, we match our capacity resources to those customers' non-curtailable requirements. Our revised plan incorporates the initial capacity needs for Masabi. If subsequent phases of this project proceed, more resources would be required. Moving on, our growth converts directly into infrastructure outlays and earnings expansion. Compared with last year's plan, our updated capital investment plan through 2030 is 19% higher. That diversified plan spans natural gas generation, renewables, energy storage and grid investments, which bolster reliability and get our system ready for rising customer demand. That lifts our projected investment growth rate to 13%, and it supports long-term earnings growth accelerating to 8% plus between 2027 and 2030. Equally important is that customers come out ahead thanks to how this expansion has been structured. Our commitments are simple: existing customers ought to benefit from significant load growth instead of paying for it. Customers with large loads will cover the full cost of serving them, plus their share of the system investments those customers require. We're pleased to report that in Iowa, IPL's retail electric base rate stability plan has been extended by one year, running through the end of 2030 and giving customers an additional year of predictability when it comes to that portion of their electric bill. Meanwhile, we anticipate continuing to invest in our business and to earn our authorized returns during this stretch; this extension stands as a concrete, best-in-class illustration of advancing affordability. It also shows that keeping base rates steady, investing consistently, and delivering solid financial results can all move forward together. In Wisconsin, economic development gives us a chance to spread the fixed costs of the system over a larger pool of customers, and the large low tariff we filed recently sets up a clear, consistent framework for customers going forward. Along with supporting stability in Iowa's electric base rates through the 1-year extension, our financing approach helps keep costs manageable for customers in both Iowa and Wisconsin. This week, the U.S. Department of Energy said it had finalized a $5.1 billion guaranteed loan program with Alliant Energy. Assuming the 30-year loans are fully funded, we project cumulative customer savings of as much as $1.2 billion over their term relative to conventional debt financing. This financing with federal backing reduces expenses for constructing generation and essential energy infrastructure that our customers rely on, and it also makes the grid stronger. Last, our pipeline reaches far past what we have in the current plan. As of now, we hold 3 sites, adding up to 3.4 gigawatts of load growth. Throughout our service territory, our emphasis is on converting prospects into projects. We anticipate that this effort will yield roughly 1 more gigawatt of contracted large load over the coming 6 months, which would create meaningful upside to the capital plan we have today. In line with our pledge to raise the bar, we would revise our CapEx plan to reflect that. All told, what these updates show is the Alliant Energy Advantage at work — our capacity to turn economic development into lasting growth while also pushing affordability forward, reinforcing reliability, and earning the returns we are authorized to earn. Before handing the call to Robert, I want to acknowledge our employees — from the field teams responding to storms and keeping our diverse generation fleet running, to those moving critical projects ahead and serving customers. It is their skill, their dedication, and their care that propel our progress. This team makes me proud, and I am thankful for everything they do. We have established real momentum, we can see our long-term growth more clearly than before, and we stay committed to disciplined execution that our investors and customers can rely on. With that, I will pass the call to Robert.

Robert Durian

executive
#3

Appreciate that, Lisa, and hello everyone. We posted third quarter 2026 GAAP earnings of $1.52 per share yesterday. The results for the third quarter and year to date on an ongoing basis demonstrate the solid financial and operational strides our teams have made throughout the business. Slide 8 shows how ongoing earnings rose year over year in the third quarter, which speaks to steady execution of our strategy—mainly from greater revenue requirements in AFUDC tied to capital investments at our Iowa and Wisconsin utilities, along with the timing of income tax expense, a factor that reverses in the fourth quarter and leaves full year results unaffected. Equity earnings came in higher from our corporate venture fund investments. Electric margins got a $0.05 per share boost from temperatures that ran above normal this year, versus $0.03 per share during the same period a year ago. We also saw higher temperature-normalized retail electric sales, which reflects continued commercial and industrial strength — particularly in Wisconsin — along with early contributions from data center loads that are ramping up in Iowa. Those positive drivers were partly offset by the expected costs of supporting our growth. That includes higher other operations and maintenance expenses tied to growth in our business and an expanded generation fleet, plus higher financing and depreciation costs connected to our growing rate base. Given how well we performed during the first nine months and with clearer visibility into Q4, we're tightening the 2026 full-year ongoing earnings guidance to the upper half of the range we initially issued—$3.41 to $3.46 per share. As shown on Slide 9, we announced yesterday both our 2027 earnings guidance range and our dividend target. These together strengthen our confidence that we can keep delivering an appealing total shareholder return, which is projected at more than 11% annually across the 2027 to 2030 planning period. Our 2027 full-year ongoing earnings guidance, $3.63 to $3.73 per share, reflects 8% growth relative to the midpoint of the 2026 earnings guidance we originally provided. For 2027, we're aiming for an annual common stock dividend of $2.25 per share, which comes to a 5% rise compared with the 2026 annual dividend target we set. We're slowing how quickly the dividend grows so that we can fund our bigger capital plan efficiently. A payout ratio of 60% to 70% remains our target, and while investment opportunities stay elevated, we expect to run near the bottom of that range. Slide 10 shows how strong our progress has been, and that underpins a raise in our long-term earnings growth expectations. We've lifted our long-term annual earnings growth goal to 6% to 8% plus, and we've both raised and stretched out our expectation to 8% plus for the years 2027 through 2030. That reflects how confident we are in the staying power of our large load opportunities, which are fueling our investment growth, along with the revenue and cash flow that data centers will contribute as they ramp up within the plan, plus our ongoing operational excellence. As you can see on Slides 11 and 12, our updated capital investment plan covering 2027 through 2030 comes to $15.9 billion, which is 19% higher than the previous four-year plan. That translates into a 13% compound annual growth rate for rate base plus construction work in progress, versus 12% a year ago. The added investments made last year that underpin this expansion consist of 1.2 gigawatts of extra natural gas combustion turbines to serve growing customer energy demand, alongside another 200 megawatts of energy storage for system resiliency and to integrate new load growth. The gap between the projected 13% CAGR and the earnings growth target of 8% plus through 2030 mainly comes from roughly 375 basis points of anticipated dilution tied to equity issuances, together with about 50 basis points of anticipated dilution from refinancing maturing nonutility and parent debt. Our capital plan follows a disciplined approach to putting money into customer-focused infrastructure, covering natural gas generation, renewables, energy storage, and electric and gas distribution. We remain sure we can responsibly deliver this wide-ranging plan. Turning more of the large load expansion into added capital spending inside the plan is expected to give us meaningful extra investment potential. As soon as projects satisfy the standards we use for inclusion, we will incorporate those chances into future capital plan updates. To pay for this larger capital plan, we have put together a financing approach through 2030 that is both efficient and disciplined, as shown on Slide 13; under this financing plan, a strong balance sheet is maintained throughout the planning period. Based on how things have gone so far, we're confident we can fund this expansion while keeping our financial flexibility intact and safeguarding value for customers. This increasingly efficient financing mix rests on several pillars: rising cash from operations as data center loads come online according to contract terms; continued strong execution of our tax credit monetization program, with roughly $2 billion in tax credits anticipated over the planning period; benefits from the Department of Energy's recent commitments of about $5 billion, which provide lower-cost, long-dated and flexible financing and reduce costs for customers; hybrid financing instruments that carry equity credit at a lower after-tax cost than common equity; and disciplined common equity issuances. On the equity side, about 40% of our incremental capex is being funded that way — the low end of the 40% to 50% range we laid out before. Through forward equity agreements, we've already locked in roughly $1.1 billion of the $2.7 billion in common equity under the updated four-year financing plan. That effectively takes care of our expected equity needs through the first half of 2028 and gives us real flexibility as we continue growing. We're confident we can execute the remaining equity requirements over the planning period, with settlements weighted toward the next several years and moderating thereafter. We expect to keep using ATM programs while retaining the flexibility to act opportunistically when market conditions are favorable. Now on Slide 14. We show what's left of our debt financing work for 2026 and what we intend to do in 2027. Through the remainder of 2026, we anticipate finishing as much as $200 million in extra long-term debt at IPL, plus as much as $300 million at WPL. Looking ahead to 2027, we intend to issue up to $2.8 billion in long-term debt, of which as much as $1 billion would be at Alliant Energy Finance for the parent, as much as $1.3 billion at IPL, and as much as $500 million at WPL. Across those two years, we expect that financing at our 2 utilities will involve money from the U.S. Department of Energy Loan Program that was approved not long ago. To wrap up, I'll cover the regulatory efforts shown on Slides 15 and 16, plus the filings we intend to submit down the road. We continue advancing this work by engaging openly and constructively in both states; recently we submitted a large load tariff in Wisconsin and an ICR application tied to a second Google project in Cedar Rapids, with rulings on each anticipated during the first half of '27. Regarding the regulatory submissions we have planned, alongside our revised capital expenditure plan, we anticipate filing additional regulatory requests for energy resources that boost reliability, add further diversity to our portfolio, and serve rising customer energy demand. Regarding the QTS Clinton data center, our plan is to submit a rate application for that individual customer during the first half of 2027. Then, come spring, we anticipate submitting Wisconsin's next retail electric and gas base rate review, which will cover forward test years 2028 and 2029. We take pride in the progress these results demonstrate. Our teams are carrying out their work with discipline. Our financing strategy sits in a well-positioned spot, and the opportunities in front of us strengthen our confidence that we will deliver on the strategy. With that, I'll return the call to Lisa.

Lisa Barton

executive
#4

Thanks, Robert. The update we're giving today shows what the Alliant Energy Advantage means: disciplined execution, growth that's speeding up, and more value for both our customers and our shareowners. Because our team executes so well, we're positioned to deliver, and we're excited about the opportunities in front of us. We're looking forward to sharing our progress and talking with many of you at the EEI Financial Conference. With that, I'll hand the call back to the operator for Q&A.

Nick Campanella

analyst
#5

Thanks for making time. I just want to sort of verify — with the updated growth rate outlook and clear acceleration in rate base and load — is '27 basically the new base from which to grow 8% plus? And factoring in dilution, how are you thinking about the plus? Could you be above 9% under this plan?

Robert Durian

executive
#6

Yes, sure, Nick. You could take either the midpoint of the original 2026 guidance, which is 341, or the new 2027 guidance of 360, and build off whichever of those base amounts you prefer. Then on your second question about the Plus side, think of the Plus line as representing earnings growth of at least 8% each year across the 2027 through 2030 planning period. We'll probably see some periods of higher earnings growth than that minimum 8%, and think of that as usually in line with years when we have somewhat higher capital expenditures.

Nick Campanella

analyst
#7

All right. So from everything I've heard so far, it sounds like with those additional sites you currently have in development, you're being quite rigorous about locking down local permits, land control, and transmission studies. Given that, how would you compare those 2 to 4 gigs in advance with the Penn sites that are in active discussions right now? And what does that total of 10 sites amount to in gigawatts?

Lisa Barton

executive
#8

Right. We're not attaching a particular label to any single one of these sites. The best way to think about it is that each site differs somewhat, I'd put it that way. The figure is at minimum in the hundreds of megawatts, and it can exceed that level. The exact magnitude differs case by case. What we aimed to accomplish with this is to make certain that the growth we deliver to you is dependable. We have consistently ensured that our developers possess the land—that they have visibility into it, that they maintain control over it, and that they are not engaging in speculation. We also want to be confident we understand the load ramp. That assists us in collaborating with both ATC and ITC to secure the transmission access required, as well as in our capabilities on the generation side. Our confidence is very high regarding our capability to produce the power we require. What you're observing, I believe, is that on the timing front, these data centers are genuinely working closely with local communities, and that pleases us greatly. Transparency has increased. The resistance you've heard about has consistently existed at the national level. This kind of involvement is truly helping communities grasp and value what these data centers bring. Let me offer a brief illustration from Clinton; QTS, for instance, has been actively discussing the property tax advantage, which falls potentially in the vicinity of $60 million annually. For context, the runner-up where property tax payments are concerned contributes roughly $5 million annually, so dedicating effort to these conversations matters. What we'll do is this: whenever an ESA gets signed, you'll refresh it each quarter. The load figures and CapEx, though, are items we'd revise at either EEI or AGA; and honestly, given the outlook ahead of us, it would let us down if we didn't land an additional gigawatt within the coming months. On top of that, we'd be let down if we weren't revising our CapEx at AGA.

Nick Campanella

analyst
#9

That is quite clear, and I appreciate it. Just to clarify, though: does that 10 sit on top of the 2.4 gigawatts, or is it partly reflected in that figure?

Lisa Barton

executive
#10

Here's how to think about it. From the 3 sites we have at present, data centers totaling 3.4 gigawatts have committed to those 3 existing sites. On top of that, there are further growth opportunities inside those sites. So then consider this: there are another 7 more. It's been one of those questions...

Bernice Singh

analyst
#11

So I guess to start, you brought up that 1 gigawatt over 6 months. How are you viewing the next few — for those next ones, what's the capital intensity needed to serve them, particularly with the MISO accreditation changes and the generation you announced alongside the prior ESA in Q1? And how are you thinking about the timing there — does that capacity need to come in parallel? Or does it more or less hinge on the curtailability?

Robert Durian

executive
#12

Yeah, on the capacity requirements here, we always aim to match generation capacity with the load ramps so that we're consistent in making sure capacity is ready to go and that cash flows are lined up from the point we finish the construction cycle with the low ramp; so yes, what we've tried to signal to folks is, figure that our capital expenditure plan updates will mostly be for each gigawatt of added loads, you'll likely see roughly $2 billion to $3 billion of extra CapEx; and again, that's mostly since we're focused solely on the capacity resources required to serve these customers; we might have more opportunities later on to supply energy resources, but consider that as kind of upside further out in the plan than what we're targeting right now.

Analyst

analyst
#13

All right. And then regarding that big low tariff in Wisconsin — how should we be thinking about the proposal there, the economic benefits for existing customers, and possibly the differences or similarities versus the earlier ICR filings?

Lisa Barton

executive
#14

It truly builds on those earlier ICR filings, and what it does is place that umbrella around them, in line with what the commission sought? Essentially, it simply delivers that degree of clarity, though we anticipate no differences at all. Approval from the commission isn't something we have to wait on. The commission told us quite plainly that if we have another data center, we should keep moving forward with it and let them know about those provisions, those ICR positions.

Julien Dumoulin-Smith

analyst
#15

I appreciate you fitting this in, and congratulations as usual — credit where it's due. Perhaps I'll focus only on the expense part of this, correct? You brought up an announced incremental customer. In what way do you expect that to extend into the rate case stay-out, possibly in Iowa beyond that 2030 timeframe, again, insofar as this represents incremental savings? And tied to that, what's your view of the route for data center load to support possibly parallel Wisconsin stay-outs here? And maybe any additional associated remarks regarding Crowley and a few of the more recent term comments, if there's anything you'd be willing to share at this point?

Lisa Barton

executive
#16

Julian, you've got quite a few questions lined up there — I applaud that. To start, we're thrilled to announce that our rate stability plan in Iowa is being extended. I believe that has really shown how appealing the jurisdiction is for other economic developments. As you mentioned, we have Mesabi, and we're extremely excited about it. In fact, Raj and I had the chance to tour their state-of-the-art mine in Minnesota, and the progress there is just great. Regarding Mesabi, I'd note that we have solid demand supporting the first growth phase in the plan they've made public. Should they decide to invest further, we'd revise our capacity requirements accordingly. As my talking points noted, our attention is on their non-curtailable needs; this kind of load can be curtailed quite easily—that's simply how the sector works. So what we'll ensure is that we build to serve their non-curtailable capacity requirements. When it comes to the outlook, our ongoing practice is to figure out what we can reasonably anticipate regarding how long the stay-out will continue. We definitely don't want to end up overpromising and under delivering. So as we move along the timeline, we'll keep assessing that at EEI and similar venues. On Wisconsin, our rate review proceeding is set for next year, early next year. We keep seeing that data center growth genuinely assists with affordability by taking those fixed costs and distributing them across a wider base. A CSI paper came out recently in Iowa that referenced those advantages, so we're eager to have those conversations with anyone who actually proceeds with the commission. At the level, we've consistently had sensible, pragmatic leadership, and we still believe that once we present everyone with the facts, the backing for data centers will be there beneath the figures. It truly speaks for itself, and I do think that is what distinguishes us. I mean, we offer best-in-class affordability solutions. I mean, where else in this country can you actually get a 0% rate increase.

Julien Dumoulin-Smith

analyst
#17

Yeah, no, that does address it. Let me ask a quick follow-up about the cost side — the other part of the equation. Is the move to 5% more of a structural item, or is it mostly a pull forward on O&M? And there's a second piece baked into that. How are you thinking about taking risk out of procurement and EPC, right? You folks were quite deliberate. Some of your peers are moving in new and novel ways. As you announce this uptick here, how are you thinking about that part of the equation?

Robert Durian

executive
#18

Yes. Julien, starting with the O&M expenses. Think of it this way: we're highly focused on making sure our customers get strong reliability. So we're putting more money into the energy delivery side of the business and into the generation side as well — we know how important the generation facilities are for meeting capacity requirements and the growing demand from our customers. So we're investing more, as you can imagine, as we build more generation. Those costs will keep increasing because we have more facilities that need maintaining. From a pull-forward standpoint, not significant amounts. We've actually had, I'd say, overall temperatures that were fairly neutral so far this year. And so we're just running the business based on roughly our original projections for the year.

Lisa Barton

executive
#19

And Julien, regarding your question about how we're handling things on the CapEx side. Obviously, this isn't our first rodeo. We've been doing this successfully for a long time. We include contingencies in our projects, and we're very mindful of the market conditions in the places where we're building these facilities. So all of that is connected. We have a high level of confidence in our ability to execute.

Julien Dumoulin-Smith

analyst
#20

Understood. And only a quick point of clarification here. A '26 or '27 base — or I mean the outcomes differ slightly. That doesn't matter. Either way you can read it. Could you clarify the next question earlier?

Robert Durian

executive
#21

Yes, you're right, Julien. The math comes out the same, whether it's 341 off of 2026 or 360 in '27, you'll arrive at the same point.

Paul Fremont

analyst
#22

So I suppose the first thing I'd ask is whether Mesabi is now part of that 2 to 4 gigawatts under advanced discussion. And is Mesabi also among the 1 gigawatt that's likely within the next 6 months?

Lisa Barton

executive
#23

Regarding the 2 to 4 we've discussed, that remains data center growth; Mesabi isn't part of it. Nor is it part of what we expect for that additional gigawatt.

Paul Fremont

analyst
#24

And can you put some kind of capacity size figure on what Mesabi might demand?

Lisa Barton

executive
#25

Not right now. I mean, when you consider it — we've been talking with them actively. In the end, it's their call and their decision regarding when to discuss how big that plant will be. So that's very much in line with how we handle all our other customers. But once more, we do have the firm demand, they're non-curtailable and factored into our plan for their first phase.

Paul Fremont

analyst
#26

And then, since that 2 to 4 used to include Google as well, should we assume you've added 400 megawatts to it?

Robert Durian

executive
#27

No, my take is that it was among the 400 megawatts announced earlier this year — it fell within the 2% to 4%.

Lisa Barton

executive
#28

Yeah, just 1 point.

Paul Fremont

analyst
#29

So that works out to between 1.6% and 2.6%, and that's all from me.

Anthony Crowdell

analyst
#30

I've got just 2 quick questions. First, for Iowa, being able to hit your authorized ROE under the rate freeze — I suppose that free cash flow integration — can you walk us through how much of that hinges on tax credits, or on flexing O&M? And what kind of cushion exists if O&M depreciation starts running somewhat ahead of plan?

Robert Durian

executive
#31

That's a good question, Anthony. What I'd say is, if you look at the capex plan we've laid out here regarding the refresh plan, roughly 1.2 gigawatts of energy storage is included in it. And you can view that as generating a fairly substantial amount of tax credit for us; it gives us strong confidence that we can steer the plan through any modifications we might encounter, whether in sales, O&M expenses, or other costs, across the 2030 period — and that is precisely what gave us the confidence to extend it out through that timeframe.

Anthony Crowdell

analyst
#32

Understood. And I believe Nick raised this point earlier. The '27 midpoint of 368 sits roughly 7% higher than the narrowed midpoint for '26. So what would need to shift, when I think about 20 to 30? What would have to change there to reach 8% plus? Would it be a slow ramp in data center load? Or rate base growth? Or what changes now? What moves me from 7% to 8% plus over 2 to 3 years?

Robert Durian

executive
#33

Yes, Anthony, the way we look at it is that we start from the midpoint of the original 2026 guidance, which was 341. If you apply 8% to that, it comes out to roughly the 368 you're citing for the 2027 period. Consider the biggest factor in how high we might climb in earnings growth: it depends largely on capital expenditure plans. We've clearly updated the refresh plan to reflect the $15.9 billion we now have over 4 years, and we keep working on what I'd call capital upside across different opportunities, including the extra load growth we might see from the data center prospects we have. Then there are some additional items we're pursuing, such as wind repowering—things that might become additions to the plan. So if you keep an eye on the CapEx, that ought to be a solid indicator of where we'll land in the growth rate going forward.

Andrew Weisel

analyst
#34

Hello, everyone. Let me add my congratulations to the brewers. I realize Milwaukee isn't on your service map, yet that project matters across the whole state.

Lisa Barton

executive
#35

No, all of us were tuned in.

Andrew Weisel

analyst
#36

That's a lot to take in today. Congratulations on the good updates, though there are a couple of points I'd like clarified. First, regarding the CAGR: you have 2 figures out there. It sounds like the guidance is clearly 8% or better. So what does the 6% to 8% actually refer to? In what scenario would it come in below 8%?

Robert Durian

executive
#37

Yes. Picture that as a much longer-term CAGR for us, but our visibility into the 8% plus across the 2027 through 2030 period is strong. From where we sit, we'll keep working to extend that and, hopefully, raise it over time as we keep adding what I'd call future upside capital into the plan. ; so right now I'd put more emphasis on the 8% plus for the 2027 through 2030 period, and we'll keep updating you folks as we move further along with the upside that's largely tied to the load growth we're chasing at present.

Andrew Weisel

analyst
#38

So essentially, from 2031 onward the range is 6% to 8%, but your focus will be on pushing that toward 8%-plus on a sustained basis. Is that the right way to frame it?

Robert Durian

executive
#39

That's an excellent way to frame it, and I have a fairly high degree of confidence that we'll manage to sustain that more 8% plus as we move forward.

Andrew Weisel

analyst
#40

All right, sounds good. Now regarding equity — the equity change — you're showing 40% financing of incremental CapEx, yet the new outlook sits at $2.7 billion against the prior outlook of $2.4 billion, which works out to just a $300 million increase versus $2.5 billion of CapEx, roughly 12%. Having less equity than 40% is a great thing, but help me bridge that gap.

Robert Durian

executive
#41

Sure, Andrew. I believe there's roughly $600 million or $700 million that we'll actually execute before year-end. So we've factored that into the plan. When you add that $700 million to the $2.7 billion, which will go from $27 million to $30 million, you actually arrive at up to $3.4 billion of future equity; so it's simply a timing difference relative to the base year you begin with. If you begin with '26, it's actually $3.4 billion.

Andrew Weisel

analyst
#42

Understood. All right. So quite a bit is still slated to arrive before year-end, right; and then finally, a question about the IPL data. That extra year — it sounds as though you're putting in cash credits; are those arriving better than you'd anticipated? Or does that additional year stem more from the DOE loan savings, or from stronger underlying demand trends? Or is it everything together? You keep emphasizing the tax credits, but I had assumed those were fairly well understood and anticipated.

Robert Durian

executive
#43

Excellent question; so look at it as a few separate things we've been observing regarding benefits in recent times. First, we keep adding more energy storage. So we put another couple of hundred megawatts of energy storage into the latest capital expenditure plan. . Second, I'm genuinely proud of the team. They're sharply focused on working out how to maximize the tax credits. So frequently with something like a battery storage project, you'll receive a 30% baseline ITC, but then there's the chance, if you place those in particular energy communities, to obtain an extra 10% credit, and more lately we've been concentrating on determining whether we can reach domestic content. So if we're able to source enough of the equipment for the projects from domestic sources, you receive another 10%. And so you can land anywhere between 30% and 50%. And for some of the more recent projects we've placed into the plan, we see a better pathway toward reaching those higher percentages. So we're quite excited, and quite proud of the team's focus on — we actually know how it's going to benefit our customers down the road.

Aditya Gandhi

analyst
#44

Lisa and Rob. Robert, I want to go back to that figure you gave of $2 billion to $3 billion of CapEx per 1 gigawatt, and tie it in a bit with the 1 gigawatt you expect to contract over the next 6 months. Could you give us some sense of how much of that we should expect within the current planning period versus after it? And is 40% a sensible rule of thumb when thinking about the equity content for the additional CapEx?

Robert Durian

executive
#45

Yes, great question. So yes, when you think about those next gigawatt loads, the ramp from that is really going to begin more in that 2930 time frame. So the capacity resources for that are probably going to be targeted later on in the plan. So I tend to think of gas generation as more of a 2030, '31 kind of timeframe. And you'll see a mix. Part of it falls in the 27 to 30 window, but some of that CapEx will actually land in the 31 and beyond period. So it's somewhat a blend of the two. On your second question, in my prepared remarks we discussed how equity dilution affects incremental capex and the investment CAGR's growth rate, plus how the gap between those two and the growth rate works, with the main factors being what I mentioned: equity dilution and refinancing dilution. One thing I really want you guys to grasp is that when we peer further ahead, we genuinely believe the investments and additional CapEx coming down the line will be covered by a comparatively smaller amount of new common equity than the 40% to 50% we previously guided to. We'll share more detail on that when we give future updates regarding incremental CapEx, but you should probably anticipate that we'll outperform that 40% to 50% range going forward.

Lisa Barton

executive
#46

And something I'd highlight is that, as I said, we'd be let down if at AGA we weren't updating our CapEx plan. What you'd see there would be a resource plan tied to serving load. So bear in mind, we always view this on a portfolio basis. So definitely, stay tuned.

Aditya Gandhi

analyst
#47

That's really useful. Just to make sure I understand, Robert — would the equity come in below that 40% to 50% simply because the data centers generate more cash flow once you move past your current plan?

Robert Durian

executive
#48

Yes, that's right. As you consider how load growth ramps up, the cash flows will clearly ramp alongside it. So we reach a peak in that 2031 time frame with the load included in the plan, as we add more load on top. We're seeing somewhat stronger cash flows toward the later portion of the plan. That's what gives Jesus the confidence that we might not require as much incremental new common equity alongside the incremental CapEx that gets layered in going forward.

Susan Gille

executive
#49

That wraps up the Third Quarter 2026 Earnings Call for Alliant Energy, since there are no further questions. You'll be able to find a replay on our investor website. We appreciate your ongoing support of Alliant Energy, and if any follow-up questions come up, don't hesitate to reach out to me.

Operator

operator
#50

That wraps up today's call. We appreciate you being with us. You can go ahead and disconnect now. Thanks for taking part in Alliance Energy Corporation's Q3 2026 Earnings Conference Call. The line will drop on its own.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Alliant Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Alliant Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Alliant Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.