5E Advanced Materials, Inc. (FEAM) Earnings Call Transcript & Summary

September 4, 2024

NASDAQ US Materials Metals and Mining earnings 42 min

Earnings Call Speaker Segments

Nathan Skown

executive
#1

Good afternoon, and thanks for being with us on this call covering 5E Advanced Materials' Fiscal 2024 results. Throughout today's session, members of management will be walking through the earnings press release as well as a webcast presentation, both of which are available in the investor relations area of our site. If you'd like a copy of the press release or the supplemental presentation, reach out to Alpha IR Group at feam@alpha-ir.com, or visit the investor relations page on our website. We've presented our legal disclaimers. This conference call will include forward-looking statements, among them our expectations regarding future loss, production capacity, market dynamics, liquidity, cash spending, and other items. Actual results could differ materially and adversely from what's projected or discussed in those forward-looking statements. More details about the factors that might cause results to differ materially and adversely from these forward-looking statements can be found in the press release issued earlier today, along with the disclosures in our public filings with the SEC. The company has no obligation to update forward-looking statements. Today's call might also cover non-GAAP financial measures, as that term is defined in Regulation G. Financial measures shouldn't be viewed in isolation from, or as a replacement for, financial information presented in compliance with GAAP; this afternoon's conference call is hosted by 5E's Chief Executive Officer, Paul Weibel, and Chief Strategy Officer, J.T. Starzecki. Management will begin with some prepared comments, and after that we'll open up the call to your

Paul Weibel

executive
#2

Thanks, Nathan, and I appreciate all of you being here today. We just wrapped up the books for our 2024 fiscal year. Fiscal year 2024 was a tough one for 5E, but even so, a lot of meaningful progress has been achieved, and that puts the business in a position for a far stronger and improved future in 2025. During 2024, we made major advances: we received our final approval from the EPA, brought the small scale facility online, reached first production, and just capped off the month of June by delivering initial customer samples. Looking ahead as we begin fiscal year 2025, our objectives include finishing phase one of engineering for our 90,000-ton boric acid commercial facility, locking in offtake agreements, investigating partnerships for the different byproducts we will generate, and kicking off the diligence phase for project finance. During this call, we'll cover the recent capital raise, where the small scale facility currently stands, give an update on our cost optimization progress, and lay out the outlook for fiscal year 2025. Kindly go to slide 4. Last week, we announced a $10 million capital raise. This new capital is made up of a $4 million direct common equity offering from a new U.S.-based shareholder, plus a commitment from our two lenders to issue, through private placement, $6 million of additional convertible notes. Our view is that this capital raise gives us the runway to finish phase one of commercial engineering and lets our management team devote its full attention to that effort. We have a strategy and a deliberate plan for how these recently raised funds will be used. The use of proceeds from this capital includes the following: moving forward the first phase of the commercial plant engineering program, which we aim to complete in December or January of twenty twenty-five. Once this phase of engineering is done, we expect to move quickly to update our technical report summary. Second, to fund operation of the small scale facility, where we'll keep working to optimize capital and operating costs and push forward production of our product for customer qualification. Third, the new capital will support our continuing pursuit of offtake agreements and commercial negotiations. And last, moving ahead various government initiatives that are already underway. Please go to slide five, where we'll report on how the small scale facility is progressing. I'm happy to report that we had zero safety incidents during the quarter. I'm proud of our team, and the behavior-based safety program we've put in place keeps driving accountability, awareness, and a culture of safety. In addition, we keep achieving head grades of 5.5%-6% boric acid in solution, which works out to roughly 10,000 ppm of boron when we sample; this result keeps showing that 5E holds a world-class resource. Even with these good results, we've faced headwinds that have caused some plant downtime. Recent maintenance issues included downtime to repair a leak in our heat exchanger, along with revising the design of our screw conveyor that feeds boric acid from the belt filter to the dryer. Also, during August we halted work for roughly 14 days so that a sifter could be put in and the bagging area of the facility could be enclosed, which keeps the finished material from being subjected to weather conditions. The team acted with good judgment, speed, and care in carrying out the fixes required to get us operating again. Thanks to those adjustments, we now turn out 1 short ton per day of product that meets spec. At the outset of production, the first objective was making boric acid. Objective number two involved reaching a product that satisfies the specs of potential buyers, while objective number three was to start raising output levels. Although we keep evaluating ways to lift production rates, at present we are at ease running at 1 short ton per day, since that gives us a liquidity position allowing us to finish phase one of engineering, keep refining costs, and move customer qualifications forward as we pursue offtake agreements. As we expand toward and evaluate greater production rates, we keep gathering essential data that gets folded into our commercial engineering design. Slide 6 lays out our optimization strategy. Among the significant adjustments built into our commercial design are a different crystallization approach and a changed temperature for the mine water injection solution. Ever since mining began in January 2024, our confidence in the resource and the head grade we can achieve has grown. Moreover, we think raising the temperature of our mining solution can push our head grade to higher levels. Higher solution temperatures will likewise cut residence time, resulting in a process that is more efficient. Basically, our data shows that heating the solution costs less and works better than blowing off and evaporating water. That opened the door for us to switch our crystallization method from evaporative to chilled crystallization. There are several advantages to chilled crystallization that deserve mention. To start, far less energy will be needed. A preliminary energy balance puts the drop in natural gas usage at 60% versus evaporative crystallization, which translates into lower structural OpEx. In addition, this approach lets us use less Hastelloy steel in the crystallizer design, cutting overall capital costs through cheaper construction materials. Our mine plan is another optimization target, and we think sustaining CapEx can be brought down by as much as a factor of 10 through horizontal wells and sidetracks. An outside party has reviewed our horizontal well program, and to raise confidence levels we intend to trial horizontal wells during the next fiscal year. We are also continuing to rigorously review possible byproduct credits. Lithium chloride has been verified as present in our solution as of today, and we are tracking rising concentrations of lithium and calcium so we can identify the best recovery technology. And lastly, we're still looking into calcium chloride and evaluating it as a byproduct in comparison to gypsum, plus we're actively seeking to explore partnerships alongside current producers as well as technology providers. Right now, I'm going to hand the presentation over to J.T. Starzecki, our Chief Strategy Officer, so he can discuss our commercial and government programs. J.T.?

J.T. Starzecki

executive
#3

Appreciate that, Paul. Now, moving over to slide seven, let's briefly go over our commercial strategy and where we stand in moving along that essential path. By getting our plant commissioned and then running operations, we've been able to take that early output and kick off our customer qualification program, which got underway not long ago in late June. That marks an important move in our project's evolution, since it sets the stage for wide-ranging product acceptance, and that acceptance will serve as the foundation for carrying out offtake agreements with many different customers. Ever since we started the customer qualification program, we've been steadily pushing commercial talks forward with interested parties who are eager to broaden where they source boric acid, both at present and going forward. At the outset, two customers were part of our qualification program — both are leaders in making specialty glass for high-end consumer electronics and fiber optics, plus pharmaceutical glass products. Once we sent out our first samples as part of our expanding conversations, the feedback we got was positive, and we've moved ahead to the next stage with each of those two customers; we should point out that these prospective customers bring very appealing growth trajectories and long-term demand outlooks. For them, locking in a domestic source and a dependable boric acid supply chain matters critically, more so today than ever. More recently, we've brought two more prospective customers into our pipeline and have already dispatched samples their way. These companies are likewise industry leaders with robust long-term growth requirements and demand profiles — one operates in the energy transition sector, while the other is in a military defense-related field. It's encouraging that, with just a few months of formal talks under our belt, our commercial strategy has delivered and will keep delivering step-by-step progress. On top of that, our project keeps drawing attention and recognition in the market, and we keep getting inbound inquiries and fresh interest from parties wanting product samples for testing and qualification. Let's turn to slide eight for a brief update on how things are going with our federal government program. As part of our efforts in Washington, D.C., our government affairs program has always aimed at three primary outcomes. First, federal funding support to move current operations forward, along with financial commitments for our commercial phase I facility. Second, congressional backing on Capitol Hill for domestically produced boron and its derivative products; and third, getting boron onto the USGS critical minerals list. Several federal funding applications are still working their way through, for the Department of Defense, both through the congressional appropriations process and under the Defense Logistics Agency. During the last quarter, the company was recently accepted into a federal program known as Cornerstone, which manages investments under the Defense Production Act, and DIB, under the Defense Industrial Base, which likewise supplies funding to companies aiming to improve the U.S. defense supply chain; it's worth noting that we constantly seek out and apply for federal funding as both short and long-term solutions for the business. Just to give everyone the latest, we're still keeping an eye on an application we submitted earlier this year to the Department of Energy, filed under an open funding call. According to what the agency's website says, the award winners should be made public this fall. The last government-support item worth flagging involves an application sent to the U.S. Export-Import Bank for the Made in America initiative. Back in mid-July, 5E finished its initial application seeking a loan guarantee covering as much as $285 million in project debt finance tied to our phase I commercial plant; we're hoping for formal feedback along with a letter of interest on that application this fall. Finally, we stay quite active with key people in Washington, D.C., working to build backing for the newest domestic source of boron in the United States. Every one of our California representatives on Capitol Hill gets regular updates and in-person briefings covering how the project is progressing, and we managed to get 10 members of Congress to sign and submit a request that boron be added to the 2025 USGS critical minerals list under the Department of the Interior. With that, I'll turn the presentation back to Paul for some closing remarks.

Paul Weibel

executive
#4

Thank you, J.T.. Now moving to slide nine, we're going to talk about what comes next for our project as we work through our strategic playbook and bring catalysts to fruition across the coming five to six months. Like J.T. said, we've submitted our application to the EXIM Bank's Made in America initiative; the letter of interest should arrive this fall, and that represents an invitation into project diligence. To get project finance across the finish line, we must advance the initial phase of commercial engineering and lock in firm offtakes with bankable customers. Back in June, I laid out that we'd spend the summer refining our design. Today, because of the superior research we've done, we understand that chilled crystallization is the best process design for making boric acid at our commercial facility. Fluor, the EPC firm we work with, is already advancing on this design, has kicked off the process for budgetary bids, and our team runs a parallel work stream evaluating gypsum versus calcium chloride for our byproduct mix. Dedicated sub-work streams sit with our engineers, covering vendor and equipment testing, on-site lab testing aimed at further processing improvement, plus multiple scenarios of material and energy balances. Through all of this, a data-driven methodology will be applied to test CapEx and OpEx, which creates the ability to push total cost down and identify the optimal design. Today, we know multiple potential pathways exist for co-product revenue streams, and each one is being put under its own standalone test. These potential revenue streams, along with the enhanced operational optionality they bring to the project's economics, have emerged as a function of our ongoing project cost optimization work. As that first phase of engineering moves ahead, we'll report on this progress and lift the veil on catalysts that we expect will drive our share price higher. On top of that, the product made at the small scale facility will serve to grow the customers in our pipeline and our announceable letter of intents, and to work towards offtake agreements that will underpin bankability for project finance. Such efforts will drive completion of the first phase of engineering and a refresh of our technical report in early twenty twenty-five. Finally, we keep advancing our already submitted applications and keep monitoring the appropriations, DoD, and DOE submissions, hoping for a favorable result in the near term. I'll wrap up on slide ten. Ultimately, with both the progress made on the ground at our small scale boron facility and the successful recent capital raise, we have runway ahead of us to complete the first phase of commercial engineering. That has given our management team the latitude to focus on the business, improvement of economics, and reporting on our progress. This matters greatly for 5E's next stage of development, and I'm highly confident in the plan we have in place. Despite the headwinds of twenty twenty-four, which we have overcome and advanced, our business case remains firmly intact. All of our essential permits have been secured, we've kicked off the qualification process with customers, and we have a well-defined path to move ahead in 2025. As I always do, I want to express gratitude to everyone on the 5E Advanced Materials team for their dedication and the value they deliver to our shareholders. With that said, let's turn the call over to your questions. Operator?

Canyon Hayes

analyst
#5

Hi everyone, Canyon Hayes is here filling in for Matt Summerville today. I appreciate you letting me ask some questions. Could we get an update on how spot market pricing has looked lately? Also, J.T., I recall you saying a few months back that some of the bigger players in the market were dealing with tailings problems. I'd like to know whether that situation is still going on.

J.T. Starzecki

executive
#6

Canyon, sure — to start, I appreciate you being on the call and sharing your thoughts. Let me begin by responding to that caking remark, which involves other manufacturers in this space. Depending on the conditions that product gets shipped into, we continue to get reports that specific producers still find it difficult to move large volumes into markets where caking remains a persistent problem that prospective buyers are trying to address. Turning to spot pricing, Fastmarkets recently began providing coverage of boric acid, and they keep offering some direction to the market, with boric acid spot prices falling between $1,100 and $1,250 per ton.

Canyon Hayes

analyst
#7

Great. Thanks. Turning to the balance sheet, there are a few things in motion here. You've had the capital injection recently. Where things stand right now and those current cash burn rates, perhaps an update on where that takes 5E over the coming months, years, and so on.

Paul Weibel

executive
#8

Yeah, I think, thanks for asking. As was mentioned in the remarks, this carries us through our first phase, the FEL 2 engineering program, and I believe that brings us into early 2025.

Canyon Hayes

analyst
#9

Great. Thanks for those questions.

Tate Sullivan

analyst
#10

Hello. Hello, and thanks. Paul, you brought up the customer qualification program. Is seeing consistent grade quality more important to those customers than seeing volume go up? Also, could you give us more details on how that qualification program is going to operate, please?

Paul Weibel

executive
#11

Yeah. So I believe when you speak with various customers, each one has their own specification, correct? Boric acid gets labeled unfairly as simply a commodity, but, you know, from what we see with the customers we're engaged with, they've got particular specs that mean it isn't really a commodity, right? Moisture content is important, impurity profile too, and particle size as well. So ultimately, to some degree, right now, we're largely in a situation of whoever has the best spec, right? That's partly because, if you look at the chlorides and sulfates we need to hit, you know, if theirs are twenty-five PPM, we will, you know, other customers might be at fifty. We're on the present customer spec, so, you know, it began with KG samples, and after that, you know, the following stage will be material handling, where they'll take one or two tons, right? So I think we have, you know, and J.T. had this in here, but in the end, every customer differs, and their process kind of changes from customer to customer.

Tate Sullivan

analyst
#12

Sorry about that, J.T. And is that one ton per day?

J.T. Starzecki

executive
#13

No, please, Tate, you go ahead.

Tate Sullivan

analyst
#14

Is that sufficient? And does one ton per day meet the needs of the majority of the customer qualification program?

Paul Weibel

executive
#15

J.T., would you like to field that one?

J.T. Starzecki

executive
#16

Alright, Tate — so as things stand right now, it does satisfy what the customers need, along with both the testing programs we've already kicked off and those we're beginning to line up. Paul touched on this during his opening comments: that figure of one ton per day is, in our view, the cost-optimized volume of tonnage the small-scale facility is currently producing, which then feeds the customer qualification program. It also provides us runway while we keep at that work, allowing us to bring additional customers into the program. So at this point, we genuinely believe that's the correct balance for us.

Tate Sullivan

analyst
#17

Great. And then could you share — sorry, Paul, did I interrupt you? Regarding operating costs for running the small scale facility, is the bulk of it now on the processing side rather than the injection side? Or could you describe where the majority of expenses will sit when operating the plant going forward?

Paul Weibel

executive
#18

Yeah, I think so. Look, at one ton a day, the way we're running, the variable cost burn is reasonable — really that's hydrochloric acid, LNG, a little lime, plus some sulfuric, since we sort of regenerate HCl. Fixed costs make up the larger piece at present, correct? That's due to us running 24/7. So, you know, that's the larger piece; so that, you know, that's sort of the reason, now that we've reached that one ton and we sort of understand what those utilizations look like, we feel comfortable here, right? Since we raised ten, right? And so that provides us that capability to keep the customer qualification going. What I was going to add, sort of following up on the other question, is that ultimately a ton a day is sufficient to get the offtakes in place, right? Because the majority of these customers, like, their main emphasis is, like, long-term supply when we're at ninety thousand tons, right? Listen, if we can — and we will aim to build some inventory and offset some incremental sales against production credits. But where we stand today, in sort of our liquidity profile, it's sort of the best of all worlds.

Tate Sullivan

analyst
#19

Great, and for my last one, you brought up a few of the August items. Has that shutdown-linked work wrapped up, or could additional shutdown-linked work still arise, and did that work tie into the bagging machine process? Could you elaborate?

Paul Weibel

executive
#20

Yeah. Yeah, no. So, the plant is essentially entirely outdoors, correct? And it's very much solution mining, so it's pipes into your crystallizer into ultimately your belt filter; and so, and then from belt filter, it goes to screw conveyor to bagging, right? And so, we sort of came to see we needed to enclose the back end of the plant where we come off the dryer and then into the bulk material handling, where we fill our Super Sacks. And so we sort of, you know, it was a fairly simple job, but we sort of halted any production while we enclosed that. Listen, I think there's. You know, we are doing preventative maintenance, but there some of that's always a little tricky, and I'll be candid, like, there's a bit of a novelty to our process, and as we've sort of kicked off and gone through, there's been teething pains, right, and we've worked through those issues. We've sort of highlighted a couple of them here, and we get back up, so you may take a step back, but we continue to find ways to take two, three steps forward.

Tate Sullivan

analyst
#21

Thanks — that's really helpful, and I appreciate all the specifics.

Matthew Key

analyst
#22

Hi there, good afternoon, Paul and J.T. I appreciate you both taking my questions. Clearly, there's been substantial advancement when it comes to boric acid output. I did want to briefly ask about lithium. From what I recall in your prepared remarks, you're right now assessing a number of different recovery approaches for the byproducts. Could you expand on that a bit more? Also, what does the timeline look like at present for getting a lithium product that's ready for customers out of Fort Cady?

Paul Weibel

executive
#23

What we're observing at this point is ppm levels, you know, within that range. Right now, in the sample we're testing, you'd see something in the range of roughly 40 to 60 ppm — that's a solid result, isn't it? It's present. Part of that material might be the source, and where this all comes from is our desire for additional data, correct? Then, when we think about the byproducts generated down the line: suppose calcium chloride is what you get — lithium levels might rise gradually, and that could precipitate out alongside your sodium, or you might be able to run ion exchange using what's left of the calcium. Alternatively, should you choose the gypsum path, it's possible to pull the lithium out through ion exchange once the metal salts have been taken away; therefore, from that angle, there's… So basically, direct lithium extraction is costly, and the way the market looks right now — with prices sitting where they are — has created significant challenges for newer companies trying to make it in this industry. We're keeping that top of mind. While we remain optimistic about where lithium is headed, we want to pull it out and recover it as cheaply as we can, correct? There are a few paths we can take to get there with the design we currently have. And yeah, I'd add that we're also running continuous tests, and in those lab results, the 40 to 60 ppm figure has actually tripled once we adjust and alter our HCl rates. At 9%, we've tripled it. So that's encouraging data — it's sort of like, wow, this might completely change the economics. That's really the takeaway. It's just been great and reassuring to see that string sitting there. It's in the resource table, and eventually — this ties into the DOE grant application we submitted — the question is how do we truly get the most out of it? Once we've done a bit more homework, I think we'd be in a position to talk about timelines, but that's a great question.

Matthew Key

analyst
#24

Understood, that answers my question. Thanks. You also said that 5E has sent in funding applications to the DOE and the DOI. If everything goes through, can you give me a rough estimate of the amount of financing those programs might provide?

Paul Weibel

executive
#25

J.T., do you want to handle this one?

J.T. Starzecki

executive
#26

Okay. So Matt, during the opening remarks, we discussed how large that EXIM loan guarantee we're seeking actually is. We've submitted fairly substantial grant applications during 2024 — looking at tens of millions of dollars spread across several separate programs — and we've observed some movement in terms of how far those applications have progressed. Naturally, there are various stages involved, and when you bring up one of them, an appropriations request, well, there's a process you have to work through, just like with any other federal funding item sitting under appropriations, correct? You've got 12 appropriations spanning from agriculture right through to defense. And we're constantly monitoring things and receiving updates. Because of the election season, the political side has kind of slowed things down for the time being. But the funding we've lined up — from the ask we submitted to the DOE, and even more importantly from the DoD — is of a size and scale that will have a very, very significant impact on that phase I CapEx figure. And bear in mind, all of it works alongside the credit backstop guarantee. So if we succeed in the EXIM process, we'll receive the $285 million we requested to backstop project finance. And beyond that, we'll receive the grant money as well. I'd say the secret sauce among the grant programs at the DoD is that some of these programs can be applied for annually, right? Appropriations, after all, is a yearly request. With DPA Title III, you aren't restricted to a single request. So there are numerous pathways — almost resembling a spiderweb. We don't dictate the timelines, but the applications and the amounts we've requested will definitely be very impactful and very advantageous for the wider stakeholder group.

Matthew Key

analyst
#27

Understood. I appreciate that. That is really useful. Yeah, I have nothing else to ask, and best of luck going ahead.

J.T. Starzecki

executive
#28

Thank you, Matt.

Matthew Key

analyst
#29

Appreciate it, Matt.

Tate Sullivan

analyst
#30

Thank you. This is Tate Sullivan with Maxim, circling back. Since your fiscal year wrapped up in June, you've got some runway before the 10-K is due. Any chance it goes in this evening, or is that still up in the air?

Paul Weibel

executive
#31

Right, so — as you'd expect, with that deal from last week, every subsequent-event disclosure is being refreshed. They're in final review right now. Assuming nothing slows us down, it lands early next week.

Tate Sullivan

analyst
#32

All right. And J.T., the final item: you brought up securing a spot on the USGS critical materials list for 2025. Would that make more funding sources available? Could you please just run through a few of the advantages of possibly appearing on that list?

J.T. Starzecki

executive
#33

Oh, that's a wonderful question, Tate. Would it open the door to further financing possibilities? Broadly speaking, the answer is affirmative, given how the critical minerals list functions, and it reaches across both the DOE and the DoD. It does encompass funding possibilities for extraction projects that are pulling out critical minerals. So, if boron were to be included on the Department of the Interior's list, which is the USGS list, that would make other pools of money accessible, particularly within the Department of Energy. And then, in a sense, it opens up the chances to enter the loan program office, if we choose to go down that path. There are additional gating items, which fall under what Paul has already described regarding our strategy, that would in fact also factor into this. But the brief answer is affirmative. Being added to it would enhance our profile and would likewise open up further funding possibilities.

Tate Sullivan

analyst
#34

Thanks a lot.

Joseph Caminiti

executive
#35

Thanks, John. Right now, I'm going to read out several questions we get often, which investors sent in before this call. A lot of those same questions were also raised again by the sell-side analysts covering us, but I'll take the ones asked most frequently and put them to the management team. Could you give us more specifics about the funding applications this company has turned in, along with whatever expectations you might have about how much money those applications could bring?

J.T. Starzecki

executive
#36

Paul, do you want to take that, or would you like me to?

Paul Weibel

executive
#37

Yeah. No, you, that's coming in government, so go, go for it.

J.T. Starzecki

executive
#38

All right. Thank you, Joe. I appreciate it. That's something we end up addressing pretty often. What I'll do is share some ranges — give stakeholders some ranges for the funding requests. I won't go into specifics about how it lands, you know, in terms of the details at the DoD, but earlier this year we submitted an appropriations request for $20 million that basically aligned with the defense budget for continuing and expanding output of domestic boric acid, since it feeds into many different derivative products. We also submitted a request through DPA Title III, via the Defense Logistics Agency, to examine further engineering work, equipment pre-purchase, and scalability at the existing facility, and that request's magnitude reached as much as $35 million. Now, I'll qualify all of that by noting the U.S. government retains the right to modify those figures so they can issue a recommendation, and they can lower that number, they can raise that number, they can reach an agreement on whether it's divided between, you know, the DLA, or whether it's divided under the industrial base. They can make those kinds of calls internally. But I believe the takeaway here is quite clearly that this is significant funding we've applied for, and we do feel our use case and the case we've built in these funding applications is as strong as anything available in the market today.

Joseph Caminiti

executive
#39

Thanks; and here's one more question that came in from an investor: what should we expect as the upcoming next phases of the qualification effort with your customers?

J.T. Starzecki

executive
#40

Let me walk through this at a fairly general level, step by step. No two customers handle boric acid the same way when it comes to their manufacturing. You'll get some who basically run tests on the impurity profile and the chemical content, and their real focus is on particle size. Honestly, once you meet that spec, they'll move ahead and work it into what we'd describe as production testing. Other customers, depending on the discussions we've had and the stage we're at, will tack on things such as storage and handling testing, given the conditions it's exposed to going in and out. So the starting point is always lab testing, and that's where we've begun with, you know, a small number of customers. From there, you begin working your way down the value chain. Certain ones will include storage and handling, certain ones bypass that entirely, it just depends on where we're headed with the end market. After that, you'll usually see some small scale production, where they turn out laboratory-based, extremely small scale finished goods, and they approach it more from a raw materials angle. Then, if you carry it all the way through, a number of customers will actually want to run full batches with every input, boric acid included. So it really spans the whole range; we're tied to customer timelines because they're the ones using their facilities, they're the ones using their personnel, and they're slotting this into their work schedules. What I think the broader audience would really want to understand is that dialogue between us never stops. So feedback keeps coming in, along with where things stand in the testing process; we keep mapping out what the following step is. We keep mapping out how much tonnage or KGs or pounds will be required for the next round of testing or the next set of customers; so we truly have a very clear roadmap of where we sit today, what's in the pipeline, and where we're going to end up, and as that evolves, we will continue to update the market.

Joseph Caminiti

executive
#41

Thanks; here's one more question that came in from an investor: Are you expecting to generate any revenue tied to production during fiscal 2025?

Paul Weibel

executive
#42

Appreciate it. I'll handle that one. Yeah, my view is that we should be accumulating stock of material that meets spec, while we keep moving forward on getting customers qualified. Then, once we get past those obstacles and have vendors lined up, whatever additional inventory there is — we'll be able to move that product, and those sales return to us as production credits, correct? So, to maintain that rate of activity, yes, we'd want to move any product we have beyond what's needed.

Joseph Caminiti

executive
#43

Thanks. And our last question from investors concerns the FEL 2 engineering program that the company already has underway. Looking ahead to finishing 5E's FEL 2 commercial engineering program and filing a pre-feasibility study, what are the largest risks?

Paul Weibel

executive
#44

Appreciate it. That's a solid, solid, solid inquiry. Look, I believe our position on the boric acid front feels quite strong, and as I mentioned earlier, Fluor is proceeding with budgetary bids, which is excellent. As you know, we basically know our standing right up to that calcium stream, and that's the piece we keep evaluating, so I'd say that's somewhat of the mystery at this point, though we do have the parallel work stream, where, you know, we hold optionality to continue advancing on gypsum, and as we perform additional diligence and explore partnership possibilities, whether that's, you know, current manufacturers or on the licensing front with established technology packages, could we attach that since it delivers a superior result for project economics? So I think we're quite conscious of what we need to accomplish, and teams are working tremendously hard to ensure we meet that timeline.

Joseph Caminiti

executive
#45

Thanks. That wraps up the questions sent in by investors, and now I'm going to hand the call back to Paul Weibel, who serves as CEO of 5E Advanced Materials.

J.T. Starzecki

executive
#46

We appreciate all of you taking the time and showing interest in 5E Advanced Materials; that brings our comments to an end. Ahead of us lies a huge chance to turn into the world's next maker of boric acid and lithium. That asset of ours is indeed proven, and we possess a plan to grow it in a modular fashion across the next several years. We're eager to share this path with each of you during the quarters ahead. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete 5E Advanced Materials, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to 5E Advanced Materials, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in 5E Advanced Materials, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.