Agnico Eagle Mines Limited (AEM) Earnings Call Transcript & Summary

February 14, 2020

New York Stock Exchange US Materials Metals and Mining earnings 46 min

Earnings Call Speaker Segments

Sean Boyd

executive
#1

Thanks, operator. Morning, everyone. I appreciate you joining our call covering fourth quarter and full year 2019 results. Prior to diving into the slides, I want to note that forward-looking statements are part of this presentation. Let me start with a summary of 2019 and Q4; during the fourth quarter, we achieved record gold production thanks to bringing the two new mines in Nunavut online. We also hit record cash generation for 2019. Thanks to that extra output, we anticipate 18% growth in production between 2019 and 2022, and we'll share specifics about that growth shortly. Even though 2019 and Q4 2019 were very strong, there's still work remaining in Nunavut during the first quarter of this year as we ramp up those two newly constructed mines. We'll address that as well. Looking closer at the fourth quarter figures, we generated nearly 500,000 ounces during Q4, which is a production record; across the full year, we beat our annual guidance, which had been raised partway through the year. We ended at 1.782 million ounces with a total cash cost of $673 per ounce. Our unit costs during Q4 took a hit from the slower than anticipated ramp-up in Nunavut, and as mentioned, we'll cover the specifics shortly. Given the record cash from operations in 2019 and our capacity to keep expanding production while producing free cash flow, the dividend was raised this quarter to a quarterly rate of CAD 0.20 a share. Regarding the three-year guidance outlook, as noted, we have production rising 18% from the record level achieved in 2019. We expect costs to come down in 2021 and 2022. Turning to our 2020 guidance, our figure is 4% lower than prior guidance for total production at 1.875 million ounces, mostly because of the anticipated Q1 effect from ramping up Nunavut and doing extra ground support at LaRonde, and we'll cover those specifics shortly. For 2021, production guidance stays the same, though our cash cost guidance rises by $50 an ounce; that reflects cost increases as well as inflationary pressures within the business. Looking at Nunavut and LaRonde, beginning with Nunavut, as mentioned, the ramp-up came in slower than anticipated, and that's clearly on all of us. We ought to have done far better at anticipating and responding to these issues. Our expectations are high, and we fell short of them. Thankfully, we keep making steady gains in productivity and efficiency at Nunavut, and we anticipate production rising and costs falling in Q2 and throughout the second half of 2020. At Meadowbank, basically, as we explained during 2019, excess water caused us to be delayed. In October of 2019, we pumped out the whole pit, which let us boost efficiency in the open pit, though in the fourth quarter we were still constrained by a reduced footprint, since the pit had only just been pumped out that October. At present, we're observing gains in the mining rate as well as in drilling performance. Optimization work around those initiatives in the pit continues. Additional optimization will come as we ramp up construction and remove costs that remain on site once construction is finished. Equipment availability and maintenance is one area drawing our attention. Significant progress has been achieved there. The warehouse is finished now. We've started switching over to stock that warehouse from Meadowbank. As we move through 2020, all of this will support performance at Amaruq and Meadowbank. The underground opportunity at Amaruq is still being assessed. More information should be available in the second half of this year, and we could see production from the underground starting in 2022. At Meliadine, the ramp up continues. Mining at Meliadine is in fact going well. In December, mine performance was nearing budget levels. Almost 4,000 tons a day were mined in December of 2019, a major improvement compared with the third quarter of 2019. Underground maintenance on mobile equipment needs more work, but that's more about optimizing efficiency. The bigger challenge wasn't in mill recoveries. Our recoveries, as expected, are nearing 95%. The plant can handle, and did handle in the fourth quarter, an average of over 3,500 tons a day. What we're dealing with now is at the front of the plant, in the apron feeder area. A temporary fix there is capping the tonnage we can push through the plant. That should be repaired as we enter the second quarter of this year, leading to a far more efficient plant operation. We've also made the decision to proceed with the phase two expansion. That gives greater flexibility in the mine plan; it is currently underway, and we'd expect production from it as we move through 2021, 2022. At LaRonde, we've decided that as we move into the west mine area, our highest grade area, to add extra ground support. As we said, LaRonde delivered outstanding performance in the fourth quarter. That mine had record production. It had cash costs of $422 an ounce. It had an average grade in November of over seven grams per ton. That represents a big part of the mine's future at LaRonde and LaRonde's cash generating ability. Last year, LaRonde actually set a safety performance record, an all time record for safety performance. When we entered the west mine area, the geology gets a little more complicated, and we felt it was wise and careful to put in extra ground support throughout the main infrastructure. That covers more bolting, more screening, more shotcrete; we anticipate finishing this within a few weeks, with very little capital spending, and it also barely affects the future cost per ton. If you put that together in the first quarter with a slower ramp up in Nunavut, you get the effect we're seeing on guidance, which drops 4% for 2020, and you also get the effect on unit costs, and the bulk of that is being felt in the first quarter of 2020. Once we get into Q2 and after, not only does production rise, but unit costs come down. Turning past the three-year guidance, just regarding the production growth, as we said, production growth is 18% from 2019 to 2022, with the freshly released guidance for 2022 of 2.1 million ounces, with attention now on the project pipeline, to determine which projects truly make sense to put capital into and expand the business in a steady measured way past 2022. We keep working on Amaruq underground and on Kirkland Lake on Odyssey East Malartic.

Sean Boyd

executive
#2

When it comes to our reserves, the calculation used a gold price of $1,200. There was a modest decline in reserves, yet our grade went up by nearly 5%, reaching 2.83 grams per ton compared with 2.7 grams per ton; we experienced a substantial rise in mineral resources as well as inferred mineral resources. Indicated resources climbed 4%, while inferred resources rose 19%. Those resources sit in our project pipeline, and we are studying them right now to determine capital allocation and which projects get built, so that growth continues past 2022 starting from 2.1 million ounces. Looking more closely at a few of the mines, specifically during the fourth quarter, we noted that LaRonde delivered record results. Putting LaRonde together with the LaRonde complex, that's 112,000 ounces at LaRonde, nearly 100,000 ounces, as mentioned, at $422 per ounce. Goldex also performed well and solidly, continuing to come in above budget. In fact, Goldex had its strongest year on record for safety. Canadian Malartic was a steady producer with a good cash cost of $630 an ounce. Kittila showed improved performance and also achieved an all time safety record in 2019. The effect of Meadowbank is visible in the fourth quarter, a bit more than 60,000 ounces, though a cash cost of CAD 1,400 pushes the overall combined cash cost figure upward. That is the problem in Q1 of this year as we keep ramping up with higher unit costs in Nunavut, which distorts all of 2020. That is the reason we expect improved cost performance in Q2 and afterward. In Mexico, that business keeps delivering solid cash generation. Turning to financial highlights, as mentioned earlier on the call, we generated record cash from operating activities of close to CAD 900 million in 2019 on production of 1.782 million ounces, which was also a record. On the financial position side, our cash position kept growing. We essentially finished December with CAD 328 million in cash. The CAD 1.2 billion credit line remains completely undrawn. A debt maturity comes due in April, and there are multiple options for paying it: use some cash, use a portion of a line of credit, possibly term out part of that CAD 360 million. Not the whole amount, but some portion could be done. Interest rates would be under half of what we currently pay on the CAD 360 million maturity. That gives us really strong financial flexibility going forward, enabling us to grow production by the 18% we mentioned and generate free cash flow. On page 12 of the slide deck, we see operating margin from the mines continuing to grow, with CapEx staying fairly flat as we move ahead. How that CapEx gets allocated is still undecided. Assessments of the pipeline are ongoing, our focus is on stretching those projects out, and stretching that CapEx out. Even as we expand, we continue producing net free cash flow that can be put toward the business, debt reduction, and higher dividends. Ahead of taking questions, I want to wrap up on the dividend slide. The dividend now stands at CAD 0.80 per share, following this quarter's bump in the quarterly amount to CAD 0.20. As you can see, over the past 6 years our total cash distributed through dividends has risen, and that happened while we were doing heavy construction on the expanded Nunavut platform. That's where I'll finish, and operator, if you would, please open the line, and we'll gladly take questions.

Fahad Tariq

analyst
#3

Fahad Tariq here, from Credit Suisse — hello and good morning.

Sean Boyd

executive
#4

good morning to you.

Fahad Tariq

analyst
#5

In Q1, what key actions are truly needed to get Amaruq properly sized? I'm simply wondering. From what you're saying, dewatering appears mostly finished. Perhaps it's more related to logistics, such as having equipment available or relocating the workforce. Could you take us through the sorts of steps required, so operations at Amaruq can get back on course? Thank you.

Yvon Sylvestre

executive
#6

Hello, this is Yvon. Right now, drilling is basically going quite smoothly, along with drilling and blasting; at this point, that's fairly well managed. At this stage, our stockpile of broken material is likewise managed. We're exposing additional surfaces within the pit and gaining entry to what remains of the pit beneath the lake bed. There's considerable digging in those locations. It remains somewhat difficult since, in certain instances, water is still having an effect. On the whole, at this point, aside from weather problems right now, we're steadily ramping up and achieving a gradual rise in output essentially each month. This will keep going fairly well until the middle of the second quarter, when we'll essentially settle into a normal mining rhythm from then on.

Fahad Tariq

analyst
#7

All right, so specifically, the release mentioned something about equipment availability and shifting the workforce. What problems are you running into on that front?

Yvon Sylvestre

executive
#8

Well, I'd say early on, in late December and as the year began, plenty of attention went toward getting better utilization out of the equipment. That effort has moved forward considerably. The spot where we're still behind somewhat, and where help is coming from both inside and outside, is really maintenance. I think we've more or less reorganized our maintenance functions, since some infrastructure arrived late, meaning all servicing of our long-haul trucks is now handled only at our Meadowbank maintenance shops. The hauling and mining fleets at Amaruq are basically serviced on location, with the warehouse there. Rebuilding the team and redistributing personnel was largely wrapped up in Q4, and they're now working on getting the remaining pieces into position. I'd say through Q4, we still had a fair number of major rebuilds underway. Not every one of those is finished, though they weigh less on the overall crew. Essentially, it's about raising availability across the coming months.

Fahad Tariq

analyst
#9

All right, thanks.

Matthew Murphy

analyst
#10

Hello there. I wanted to ask about expenses. The release mentions inflation somewhat, particularly regarding consumables and labor. So, how recently have you noticed this, and how much of it do you view as a lasting shift as opposed to your efforts to boost productivity and bring costs back down?

Yvon Sylvestre

executive
#11

Well, I'd say inflation has been fairly consistent throughout the years. I believe a major factor we're likely facing is that contractors still account for a sizable share of our workforce. Given where the economic cycle stands right now, the caliber of certain workers and how productive some of these people are isn't really assisting us, which in some instances is leading to higher costs. That, I think, has been the bigger problem and is perhaps more pronounced in Nunavut, in fact.

Matthew Murphy

analyst
#12

All right. Based on how costs trend and where gold trades, I have a dividend-related question. Suppose costs stayed pretty stubborn and gold fell back to $1,400 or thereabouts — how would you think about covering the dividend?

Sean Boyd

executive
#13

At CAD 0.80, that dividend is safe. On the cost side, as we noted in the release, we anticipate lower unit costs as 2020 progresses and on into 2021 and 2022; our production base keeps expanding. With output growing and per-unit costs moving downward, we're able to fund that dividend of about CAD 200 million annually.

Matthew Murphy

analyst
#14

All right, thank you.

Josh Wolfson

analyst
#15

Thanks. If we return to the Nunavut expenses, my understanding is that in the past, when you looked at the all-in sustaining costs across Amaruq's mine life, the figure was roughly $800 per ounce, while Meliadine sat in the low $600 per ounce range. Do you anticipate any revisions to those longer-term figures, and roughly how large would any change be?

Yvon Sylvestre

executive
#16

Let me begin with Amaruq's costs for the moment. In my view, the 2020 figures largely reflect a greater strip ratio together with a weaker grade across the pit as a whole, which drives the reduced output profile and, in effect, a higher cash cost. Some low-grade material is also being processed, and that too feeds into part of the 2020 cost structure. Once we get into 2021 and beyond, the strip ratio stays somewhat elevated, yet the share of high-grade ore grows, and as a result, year over year, Amaruq's output profile should rise by 120,000 ounces next year. Over time, the cost structure will decline. At Meliadine, I believe there is spare capacity within the plant, and the mine has performed rather well so far and will keep ramping up in terms of tonnage. I think at this early point in the year, we are exceeding 4,000 tons per day out of the underground operation; we hold stockpile on surface, so over time we will push that tonnage to the maximum, and costs will likewise ease somewhat and return to the life-of-mine figures we are presenting at this point.

Josh Wolfson

analyst
#17

All right. Perhaps to frame it differently — regarding those historical cost targets, can we safely presume that what Nunavut has experienced with inflation sits higher than the approximately 3%-5% figure that came up, specifically when it comes to the underlying input-related items?

Yvon Sylvestre

executive
#18

My sense is that during the opening six months, we'll see comparable pressures on costs, or perhaps some. But once we push forward with the ramp up and reach what I'd call a steady state, we anticipate costs declining, since we've brought in a considerable amount of resources behind our continuous improvements initiative, aimed at bringing productivity and cost structures down. Right now, we expect to see some, and indeed some results have already appeared. It isn't merely a hope on our part that costs will come down. We're deploying efforts and an action plan to make certain that happens.

Josh Wolfson

analyst
#19

All right. My next thing relates to expenses. In Mexico, 2019 costs were generally higher than 2018, and for 2020 the guidance looks roughly the same versus the prior year. Should we take it that La India and Pinos Altos costs will remain at a steady state, around where they are now, moving forward?

Sean Boyd

executive
#20

Briefly, that's right. The expenses from the prior year, I'd say, stem largely from certain instabilities at Pinos Altos. As for La India, clay present in the ore was the cause.

Yvon Sylvestre

executive
#21

The steps we took in 2019 were aimed at lessening those pressures, lowering expenses, and lifting output — that's the foundation for 2020. Costs will come down over the course of 2020, but really, that's the situation as it stands.

Josh Wolfson

analyst
#22

All right, that's quite useful. Thanks.

Anita Soni

analyst
#23

Morning, everyone. Am I coming through?

Yvon Sylvestre

executive
#24

Yes, we hear you.

Anita Soni

analyst
#25

Thank you. I suppose what I want to ask about is more focused on Meliadine. To be blunt about it, regarding those throughput figures, you said December saw us at 4,000. After the apron feeder gets repaired, which I believe happens in Q1, should we anticipate returning to 4,000 tons per day? Does it look really weak in Q1, followed by a bounce back in Q2 and Q3?

Yvon Sylvestre

executive
#26

So, the 4,000 tons per day figure I gave refers to the underground mine.

Anita Soni

analyst
#27

Correct.

Yvon Sylvestre

executive
#28

Back in 2019, the mill was actually run at levels ranging from 3,000 tons per day all the way up to nearly 5,000 tons per day.

Anita Soni

analyst
#29

All right.

Yvon Sylvestre

executive
#30

After we remove the crushing element from the calculation, we anticipate getting back above 4,000 tons each day. During Q4, when we line up the mining sequence and the pit becomes active, the expectation at that point is already that the mill will increase to roughly 4,600 tons per day, though prior to then we will likely be working to make up ground.

Anita Soni

analyst
#31

Alright. Regarding those expenses — and I don't want to dwell too much on Amaruq — but with that $145 figure, what portion stems from problems with equipment availability, and what portion comes from the mill running at roughly 7,700 tons per day when it's actually a 10,000 tons per day mill? How much does that number hinge on bringing in fresh ore sources during 2022?

Yvon Sylvestre

executive
#32

Honestly, at this point the main driver is mining cost along with grade. That's the core problem. Processing costs, I'd say, have run somewhat elevated since we've been running at reduced tonnage; that's simply part of what happens while ramping up. I'm not certain I'm actually addressing what you asked.

Anita Soni

analyst
#33

I believe that's right. Regarding how LaRonde is sequenced, you're shifting toward roughly a 350, 360 level for unit cost — sorry, I mean on the production side. Once the rock mechanics problems are resolved and you work out how to make improvements in your mining there, is there still room to bring unit costs down?

Yvon Sylvestre

executive
#34

I'd say probably not. Our biggest challenge ahead, I think, is that as we keep advancing the mining sequence at LaRonde deep, tonnage per day overall continues to decline across the life of mine sequence. Productivity is in fact declining, so pressure will build on cost. We're working on adapting strategies involving manpower and automation further out, which will in time become something like the template for LR3 at depth. At this point, I think our cost structure is going to remain pretty well within that range.

Anita Soni

analyst
#35

Okay. The final question concerns Canadian Malartic. Last night, I believe I was talking with Brian about difficulties reaching a few of the better grades within the older stope workings. At what point do you expect that to be settled, and at what point will you return to mining that is more stable there?

Yvon Sylvestre

executive
#36

Just to add regarding LaRonde, I believe that even though tonnage is declining, grade is rising, and since a greater share of ore comes from the mine's western sector, grades there exceed eight grams per ton; that has somewhat stabilized. Even though costs per ton are increasing, cash costs are essentially holding steady. Where Malartic is concerned, roughly 2.5 years of mining remain in the pit, as I see it. Underground workings will keep being handled the way they were before. The difficulty, I believe, will essentially be to keep ramping up, and in Barnat we are making solid progress. It's possible we will sequence portions of Barnat in a different way. Blasting presents a daily challenge, and at this point the most significant problem has involved remote mucking, essentially; that's the largest difficulty we've faced, and we're completing certain access work on the main ramps and on the walls, which in the second half of the year will make things simpler for the operation.

Anita Soni

analyst
#37

All right, my apologies — may I go back to LaRonde for a moment? You brought up the better grades, that eight gram per ton figure. Clearly, two sources of ore feed that operation, isn't that right? It won't simply be material running straight at eight grams per ton.

Yvon Sylvestre

executive
#38

That's right. Yes.

Anita Soni

analyst
#39

Once you get to eight grams, how does that impact the remaining byproducts? If I'm remembering right, that's gold, copper, silver, and zinc, isn't it? You'd likely see more copper, but less silver and zinc?

Yvon Sylvestre

executive
#40

That's right. Yes.

Anita Soni

analyst
#41

All right, that's clear.

Yvon Sylvestre

executive
#42

The copper price is climbing, while zinc has basically disappeared.

Anita Soni

analyst
#43

Okay, that covers everything I wanted to ask. Thanks very much.

John Tumazos

analyst
#44

I appreciate you fitting me in, and I also want to say thanks for what you've done for this organization. Would you share your thinking when it comes to repurchasing stock? None of us enjoy wild swings, and we experienced a small dose of that earlier today. Next, could you expand a bit on the increase in inferred resources we've seen this year? Altogether, you hold 55, 60 million ounces across reserves and resources, so which of those zones do you expect to convert into reserves by the close of 2020, then 2021, and then 2022? As I understand it, the paperwork invariably runs behind schedule.

Sean Boyd

executive
#45

Absolutely. Regarding repurchasing stock, I'd say that with the additional cash flow, our priority is going to be bringing down total debt. Right now, buying back shares isn't something we're considering. Our preference, I think, is to make the balance sheet stronger. And when it comes to the added resources, I'll hand it over to Guy for some of his perspective on that.

Guy Gosselin

executive
#46

Hey John. So essentially, like you noticed during this year, we've been putting additional resources into Kirouac Lake, for instance, while we keep drilling and expanding those deposits' footprint. The same applies at Amaruq, where we've added further drilling and are enabling, via a study, the section of the deposit sitting above the permafrost boundary so it can be converted into reserves, and at Malartic too, where ongoing successful drilling at East Gouldie has expanded that zone; regarding the most recent one, I believe additional drilling will be required, so we'll keep extending the footprint in order to infill it. That won't be entering reserves at any point soon, since far more drilling is necessary before we get there and can better evaluate the viability; progress is solid and we're enlarging the footprint in Mexico as well at Santa Gertrudis, which has proven a solid contributor to inferred additions. I'd say we've received encouraging news on multiple fronts when it comes to growing resources. As you'd expect, occasionally a few of those projects will wind up backed by a study and get converted into reserves. That's a continuous process. During this year, we added a satellite open pit at Meliadine to reserves and added Amaruq underground, and we're now focused on the following large block that will shift from resources into reserves. Thanks.

Ralph Profiti

analyst
#47

Hello. I appreciate you answering my questions. First, I notice you described what share of the ore feed comes from LaRonde's western zone. I'm just curious about the strategy or the mitigation approach — if we reach 2020 and 2021 and those ground conditions don't really allow for the mine plan as it currently exists or your visibility, what would the mitigation plan be at that point?

Yvon Sylvestre

executive
#48

We're already doing something along those lines in Q1, since we've changed the sequence of development toward the eastern sector to make up for the tonnage we lost, and the team has done really well with that. Looking further ahead, we're also working on opening up other zones among the satellite ore bodies, such as Zone 113 at Bousquet, which will deliver some output later on. We constantly think about supplying not only risk tonnage but additional tonnage to the plant, since we have spare capacity. That's where the plan stands right now. Regarding this period, when it comes to adding more support in the western sector, the goal is basically to guarantee output there, and we feel fairly confident at this point that the measures being implemented will lock in that production through the remainder of the year.

Sean Boyd

executive
#49

Let me just build on that point, Ralph. When it comes to the approach we're taking at LaRonde, we've chosen to move forward very carefully as we go to greater depths. Basically, under the conservative mine plan, tonnage drops by roughly 13% compared with the initial plan once we get into the deeper section of the ore body. What we're aiming for over time is making sure we can reach that better-grade material by adding more ground support within the key infrastructure. This is simply a prudent stance, and it was suggested to us back in January by the crew on site, who've built up a rather distinctive expertise in rock mechanics. I'd say that's essential for LaRonde's future — staying measured as we head further down. Looking across the Abitibi, I'd note that with some of the drilling we're seeing on the old Bousquet property, plus what we're getting at East Malartic and East Gouldie, these longstanding camps clearly still hold plenty of potential. To reach that material, capitalize on it, and create value as those resources expand — as John mentioned — you require the capabilities to operate at greater depths. We definitely observe the same thing at Kirkland Lake, another longstanding camp, where Upper Beaver gives us a mine we can build. I believe the chance is right there. We simply need to stay measured and prudent in how we proceed; we've got some truly solid capabilities developed entirely in-house, and we basically follow the guidance of the team on site regarding the way we should handle it.

Ralph Profiti

analyst
#50

Right, right, I appreciate that. Sean, could I stick with you on another subject? You brought up that CAD 360 million payment that's coming due in April.

Sean Boyd

executive
#51

Yes. Half of it, and that portion would get refinanced. That's a bit different from what I'd previously heard, which is retiring debt when it matures. Yes. What's your thinking on capital allocation? Did that shift during the first half of 2020, or is the financing cost simply too appealing? I'd say the financing cost is extremely appealing. The debt we're paying off right now carries 6.4% or 6.6%. 6.6, as Dave reminds me. You'd likely swap that out at an interest rate under half of that. Some of the gross debt will be repaid. That's included in the plan. We're just going over those options during the next week or two.

Ralph Profiti

analyst
#52

Understood. Alright. Yes, that's quite clear. Thanks.

Tanya Jakusconek

analyst
#53

Hello, everyone. I believe I'm next.

Yvon Sylvestre

executive
#54

Good morning.

Tanya Jakusconek

analyst
#55

Yeah, I know, right? We really need a simpler name. I'd like to go back, if possible, to LaRonde, just so I can grasp what's going on. The way I understood it, from what Yvon said, is that the mine plan has shifted because as we've dug deeper, the rock mechanics suggest this will become more of a 360,000-ounce mine over the long term. Is that the right interpretation?

Yvon Sylvestre

executive
#56

What you should take from it is that in the western sector, we can't sequence as fast as we originally expected, and that's been clear since development began in that zone. The main issue we face in that sector hasn't been mining up to now — it's been the development. The protocols required in the different headings matter much more there, and the order in which we can proceed with the remaining sequence is impacted by that. This zone is a very high-grade area, and we simply have to make sure the mining is done correctly. Up to now, we've had considerable success on the production front. Our impact on production has been very minimal, and we plan to keep it that way. That's one reason we're taking this pause to add more support.

Tanya Jakusconek

analyst
#57

I understand, and I do value that. My focus is really on a further-out horizon. As I recall our discussion about the camp, the eventual goal was for it to produce 400,000 ounces annually. Does that remain your expectation, setting aside the zone you just mentioned? I believe we touched on reducing the tonnage at some point. Eventually we have to reach reserve grade. So what I'm asking is whether balancing a lower tonnage against achieving reserve grade still leaves us producing 360,000 ounces, or whether over the longer term we return to 400,000 ounces.

Yvon Sylvestre

executive
#58

Somewhere between those two, I'd say. It'll land at 360 to 400. A significant portion of that is going to be driven by LZ 5 producing more as we achieve higher output levels at that location. That site also gives us considerably more room to maneuver, and we intend to take full advantage of it so the complex remains as close as possible to its target.

Tanya Jakusconek

analyst
#59

That definitely helps, so thank you. Let me circle back once more to Nunavut, because I'd like to restate my own read on what needs to happen at Amaruq for the mine to get back on track. In the pit, it seems what's required is simply exposing additional surface areas so you can hit your mining throughput, and you believe you'll be there by mid-year. From what I can tell, maintenance has now been rebalanced between the work at the Amaruq site and the work at Meadowbank. Is the remaining piece just better equipment utilization in order to reach that point? And if that's the case, when would that happen?

Yvon Sylvestre

executive
#60

Well, it comes down to bringing everyone up to speed, and it takes time. I believe we're on top of all of it. We're working to optimize during what is likely the toughest stretch of the year.

Tanya Jakusconek

analyst
#61

Yeah.

Yvon Sylvestre

executive
#62

We're dealing with really tough weather. How quickly we move forward during Q1 is one thing; once Q2 arrives, we'll pick up the pace considerably, though right now it's more about whether the equipment is available, especially for loading. Availability issues with equipment still persist somewhat on the drilling side, yet it's mainly the loading side where our attention needs to go, so we can get more hours out of some of our digging equipment. Everything else is fine at this point.

Tanya Jakusconek

analyst
#63

All right. Perhaps regarding the Amaruq underground, if I may just check, I noticed that a portion of that production guidance is included in your 2022 figures and eventually past that. On the capital expenditure side, is it reasonable to think that the bulk of the spending occurs in 2020 and 2021?

Yvon Sylvestre

executive
#64

Should we give it the go-ahead, it would largely fall in the latter half and in 2021.

Tanya Jakusconek

analyst
#65

Got it. So that figure would fall within the CAD 650 million to CAD 700 million band, and that's what gets captured in the guidance range? Are you still there?

Sean Boyd

executive
#66

Correct, for the coming year? That's right.

Tanya Jakusconek

analyst
#67

Yes.

Sean Boyd

executive
#68

Can you hear that?

Tanya Jakusconek

analyst
#69

Okay, yes, I appreciate it.

Sean Boyd

executive
#70

For the following year, the range is 650 to 700 Canadian dollars.

Tanya Jakusconek

analyst
#71

So that lands in the following year, then. All right, that clears it up.

Sean Boyd

executive
#72

Correct.

Tanya Jakusconek

analyst
#73

I'd like to pose a single question regarding Meliadine. We discussed the situation at the mill concerning the apron feeder. Yvon, will that unit have to be swapped out, or can it be repaired within a short timeframe?

Yvon Sylvestre

executive
#74

We are indeed awaiting components. This unit was manufactured in Italy; it is a custom-built piece, so both the parts and their delivery take a very long time. We're working with a supplier nearby to get fabricated components that can serve as replacements, and the intention is to swap out the unit following barge season, later in the summer. After the new parts are installed in March, we anticipate being back up and operating at our standard capacity.

Tanya Jakusconek

analyst
#75

All right. Perhaps regarding the underground, since the mining sequence for lower grade has also been altered there. Could you explain what took place in that regard for the 2020 plan?

Yvon Sylvestre

executive
#76

For the most part, I'd say the sequence was mined quite closely to what had been planned. The sole spot, our P3 area, is where we encountered somewhat greater ceiling water within that zone, and we had to grasp how things behaved there. A number of those stops carried substantial tonnage along with substantial grade, which somewhat strained the grade profile overall across the remaining months of the year; that should correct itself, likely during this year's second half, and mining in that area is anticipated to begin again. I believe we will return to the grade profile from that point.

Tanya Jakusconek

analyst
#77

All right, the back half of the year. All right, excellent. Many thanks.

Sean Boyd

executive
#78

Thanks, operator, and thanks to all of you. Should you need anything further after this call, don't hesitate to get in touch, and we're happy to arrange individual calls if that works for you. Thanks a lot.

Operator

operator
#79

This concludes today's conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.