Agnico Eagle Mines Limited (AEM) Earnings Call Transcript & Summary

July 30, 2020

New York Stock Exchange US Materials Metals and Mining earnings 56 min

Earnings Call Speaker Segments

Sean Boyd

executive
#1

Thanks, operator. Morning, everybody, and welcome to the call for our second quarter of 2020. Before we start the slides, a quick note: forward-looking statements are included in this presentation. There are two slides with disclaimers about those forward-looking statements. Please take a look at them when you get the chance. What I want to do is spend a bit of time on Q2 and how we got through the pandemic. I'll emphasize more how we're set up going forward, and on where the focus will be in our business when it comes to driving Cash costs and using that to reinvest in the business and raise our dividend as we move ahead. As you know, it's been a challenge. It's been a challenge for everyone. Looking at it from a business perspective, COVID-19 hit seven out of our eight mines — some were temporarily shut down, while others saw their activity levels drop considerably — since mining wasn't classified as an essential business in certain jurisdictions where we operate. We were lucky enough to bring those operations back online sooner than anticipated. We maintained ongoing conversations with government officials in each of our regions regarding our safety procedures and our readiness to resume work while protecting our workforce. In Quebec and Mexico, authorities permitted mining to resume ahead of numerous other sectors. Thanks to that, we could accelerate and move faster than our initial blueprint had envisioned. As previously mentioned, our top concern was making certain our staff felt secure—not merely safe—and that both they and their loved ones were at ease with how we handled things. The same went for the communities we serve, and our people contributed some creative proposals, especially around testing. That provided an additional measure of reassurance and safeguarding, which we'll touch on shortly. We finished the second quarter on a solid note. Q3 got off to a solid start for us, and because of that, we're anticipating a robust back half of the year when it comes to output, costs coming down, and cash cost generation as well. This mattered a great deal to us, since throughout many of the meetings we held with investors and analysts during the past few months, the recurring question was: what kind of expense will be involved in navigating the pandemic, whether from the impact or the costs of placing mines on care and maintenance, and even more significantly, looking ahead, how would that affect your productivity? How would that affect your unit costs? The breakdown appears on page five of the slide in our press release, where we've also laid out the accounting treatment. During the quarter, we incurred slightly more than CAD 22 million. About CAD 8 million of that came strictly from care and maintenance at operations under temporary suspension. An additional roughly CAD 14 million represented payroll for staff furloughed temporarily due to COVID-19. That CAD 22 million was excluded from our unit costs, whether cash costs or all-in sustaining costs, and we did not strip those amounts out of earnings when calculating adjusted earnings. Treatment has varied across the industry. Our choice has been to keep them inside our earnings calculation rather than backing them out of adjusted earnings. In my view, the more important focus is on costs going forward. During the quarter, we incurred CAD 2.3 million tied to heightened hygiene, screening, and testing; those went into our unit cost calculation, and we made no adjustment to normalized EPS for them. Looking ahead, there are a few moving pieces, I think. We know we will carry extra expenditures to keep up the protocols for screening, hygiene, and testing. Our estimate for that sits at approximately CAD 1 million each month, equivalent to roughly CAD 6 per ounce in added costs. That figure is one the market has definitely shown interest in for quite a few companies. That is where our figure has come out. We have also managed — thanks to our unusual circumstances, with employment levels having to come down at seven of the eight mines, and at some operations quite sharply — on the restart, we brought employees back in stages; we phased employees back in gradually, and that gave us a solid sense of things and let us align our employment and headcount levels with our productivity and production levels. We believe some cost savings will emerge there in terms of overall headcount, especially among contractors. Looking ahead, we expect to bring back fewer contract workers than we did prior to the pandemic, and we view that as a bit of an opportunity. There is, however, an extra expense we are carrying of CAD 1.4 million each month. As an initial move, given that communities in Nunavut are at elevated COVID-19 risk, protecting them was critical, which meant keeping our operations apart from those communities. As a result, as you are aware, we returned our Nunavut workforce home. They're still at home. We want them back, but only once they're comfortable. We think we provide a safe setting for their return, though talks are ongoing with Nunavut public health authorities, the government of Nunavut, local government and community leaders regarding the best time to bring them back while making sure communities remain protected. There's no set timeline for that, but as we've said, we keep working on it. We've bridged that gap with extra contract workers and some seasonal workers to help us manage while our Nunavut workforce remains at home. On second quarter highlights, output was slightly above 330,000 ounces, a bit better than we had expected. Once the virus's effects began showing up, considerable uncertainty surrounded the restarts. Unit costs ended up higher since we produced less gold during the quarter. Looking ahead, we anticipate those costs will decline. We'll get into that; we narrowed our guidance; we raised the bottom end of the range. Full-year 2020 guidance now sits at 1.68 to 1.73 million ounces. Our range had been fairly wide when we revised guidance to 1.63 to 1.73 million. That step was necessary since we remained in a highly uncertain period; at that moment we truly didn't know when restarting would be possible or how fast we could ramp up. Having now completed the second quarter, we feel comfortable narrowing that range and lifting its lower end; for full-year guidance, and looking out to 2021 and 2022, we kept things unchanged. This implies that across the second half of this year, we anticipate output of 480,000 to 500,000 ounces each quarter, with costs trending downward.

Sean Boyd

executive
#2

Looking ahead to next year, we're talking a bit more than 2 million ounces, which works out to roughly 500,000 ounces each quarter, and past that, above 500,000 ounces per quarter as the ramp-up keeps going. Our dividend remains declared at CAD 0.20 per share. We will definitely take a look in the third quarter at revisiting it, and with a track record of 37 years of consecutive dividend payments plus the cash cost generation we have, I think it's logical to assume that over time that dividend keeps rising. In the second quarter, it was important to note that we did secure some critical permits during the quarter; we obtained a permit to raise our processing rate in Finland to 2 million tons a year. At Meadowbank we got the permit for the IVR open pit and for the Amaruq underground, and at Meliadine we also received approval to double the volume of saline water we can discharge to the sea; those were three important permits we had been anticipating, and we did receive them in the second quarter. On the ramp-up, we did discuss the faster ramp-up on the previous slide. As we said, we were able to restart in Quebec earlier than expected, roughly two weeks earlier. In Mexico we got to restart about 12 days earlier than expected. As a result, we finished the quarter strong in June, and that let us gradually ramp up; in July, we're above 160,000 ounces of production. That sets us up for a strong second half, as we said. On the operational update, I won't go into individual slides, although they are in the slide deck, and as we go through the next series of slides, I'll touch on each of the operations. At LaRonde, before the pandemic hit, we had completed the planned infrastructure upgrades in the West Mine area at LaRonde. We were actually developing in the West Mine area before we had to cut back activities there; we have been mining in the West Mine area in the second quarter, and we continue to see higher grade than we had forecast in the block model, which I think is important to see realized as we mine out those areas. We expect in the second half to average about 8,500 tons a day from the LaRonde complex. About 3,000 tons of that from LZ 5, with about 12% of the tonnage sourced from the higher-grade West Mine area. At Meliadine in June, our throughput in the mill exceeded 4,300 tons a day. We had always talked about 4,000 tons a day as the level we needed to achieve. We beat that in June. In the third quarter here, we will replace the repaired apron feeder. To reach 4,300 tons a day with the repaired apron feeder really speaks to the success of those repairs. During Q3, we'll install a new unit; we'll also upgrade the filter press system along with other components, which will let the plant reach 4,600 tons a day in Q4 of 2020. Another thing I think matters is that we've managed to pump out the third mining horizon at Meliadine, which was part of the plan all along. Those areas carry higher grades, and things are set up so we can begin mining those higher-grade blocks in August and September and on into Q4. We did mention our water discharge at Meliadine; we received approval to double the discharge limit there; we're doing that via truck in Q3; we can keep doing it by truck going forward, though we feel strongly that a waterline is the best solution. We're proceeding with the process to get that waterline permitted. That will involve considerable community discussion. One concern the community would raise about a waterline is whether it affects the caribou's ability to move. They had that concern initially back in the early days of Baker Lake, back in 2007. It became pretty evident pretty quickly once the road was built that the caribou weren't bothered by the road, and they crossed it easily. We think the same holds for the waterline. Along a 35-km-long waterline, there are 70 crossover points for caribou. Ultimately, if we need to cover the whole waterline, we'll do it. Longer term, eventually we'll get it approved, but in the meantime, we can keep trucking the water at Meliadine. At Meadowbank, we made a lot of progress, even with reduced activities, catching up on the maintenance backlog. You can see that in the June results, where we mined over 110,000 tons of ore and waste per day. Our target, as you know, was 100,000 tons of ore and waste per day. The mill restarted in late May, a couple of weeks sooner than we had planned. The mill is currently running above 9,500 tons a day, from both the mine ore and existing stockpiles. Over the balance of 2020, we expect higher grades of between two and a half and three grams per ton, which helps our production in the second half and helps us achieve our increased production for the second half. As we said earlier, we received the permits for the Meadowbank Complex to mine the IVR open pit and the Amaruq underground. At Kittila, that was the one mine where we were able to run our plant continuously through the quarter. We also received an important permit there, allowing us to proceed with the expansion of the processing facility to 2 million tons a day; we were impacted with our shaft sinking because the shaft sinking crew was Canadian. During the pandemic, those workers were sent home; at this point they’ve been permitted to come back and restart the shaft sinking work. We kept going with the remainder of the construction tied to that expansion program. In the end, we think Kittila’s future goes past 2 million tons a day, which is the reason we’re considering what chances we might find to raise the mining rate at that site; exploration there has given us some solid results. I’ll get into that shortly. When we take a step back and examine our production profile, we can see on our graph how output has risen steadily across time; at present we’re approaching roughly that 2 million ounces a year run rate. We anticipate going above that in 2021 and beyond. We keep advancing our project pipeline — the Kittila expansion is being built, and so is Meliadine phase II. Planning is underway for Amaruq underground. It was pushed back because of COVID-19. We’re looking at approaches that will keep it from affecting our 2022 production figure. We believe we can make that work where timing is concerned. In a moment I’ll discuss the opportunity at Canadian Malartic Underground, which is a significant project. Exploration remains a major area of focus for us.

Sean Boyd

executive
#3

I think what we've come to understand over the past 12 to 18 months, as we've noted previously, is that these mature mining camps still hold a great deal of upside. Be it LaRonde, Malartic, or Kirkland Lake. As we stated regarding Kittila, that asset has a very long life, yet we keep drilling that deposit; we keep hitting ore grade material outside the current resource boundaries; we will keep probing at depth, and that has formed a major part of our success. We are comfortable drilling deep holes simply because, for planning purposes, we want to know what we own. The same held true at Canadian Malartic Underground. East Gouldie came to light after we launched a drill hole targeting roughly two kilometers below surface—that was the plan, tracing the downward continuation from the historic East Malartic underground—and that hole intersected the East Gouldie deposit. Right now we have 10 rigs running at that site, and we've expanded the program to increase drilled meters by almost 20%, which is important both for learning about the possible scale and for bringing the holes closer together so we gain greater confidence in the East Gouldie deposit. This East Gouldie deposit is what justifies the underground operation. Absent it, even with gold at these levels, Odyssey and the East Malartic side would have stayed low grade. East Gouldie brings both the scale and the quantity of mining horizons, along with the possibility of turning this into a big-tonnage underground operation. Alongside Yamana and Agnico, we definitely have the expertise to grasp what we hold and which actions are required to optimize it and make it a significant contributor to our business. That work is underway right now. Stage 1, as we've mentioned, involves stepping up our drilling. We're progressing on a preliminary economic assessment that should be complete in early 2021, plus the first work on an underground exploration program — basically the ramp. That work kicks off this quarter; we've already made significant progress in advancing that project. Basically, it will lengthen the life of the Canadian Malartic mine and could potentially add many, many years to it. At Upper Beaver, another historic mining camp, drilling keeps going at Kirkland Lake. It's a mine — the real question is where it fits within our pipeline. Drilling and economic assessment both continue. More targets across that land package are now being drilled, among them Amalgamated Kirkland, situated near the border with Kirkland Lake Gold. We're eager to see what those drill results show. Mexico is still delivering strong results at the Amelia deposit, though additional drilling will be required. The team is concentrating on finishing those drill programs and afterward updating a study regarding Santa Gertrudis's potential. Let me also mention LaRonde: drilling continues at LZ5, the former Bousquet Barrick property situated to the west of LaRonde. Our eventual goal there is to generate several hundreds of thousands of extra ounces, and we are drilling east of the main LaRonde ore deposit as well, where during the past several months we hit massive sulfide mineralization in the 20N Zinc South Zone. That continues to be a key exploration priority for us. On the operating side, we've already discussed most of the mines, but let me turn to Goldex. Goldex was in fact performing very strongly before the pandemic. It was beating its budget, achieving excellent productivity from the Railveyor system, and strong productivity in the high-grade sub-zone; as we progress through this year, we anticipate being able to raise the mining rate in the sub-zone. We expect additional output from Goldex in the second half. The team has done an excellent job optimizing that asset and generating cash cost. At Malartic, we've discussed the underground potential, and during the second quarter the mine actually performed very well in terms of ramp-up. In May, monthly tonnage milled reached 64,000 tons per day. That's a record, and we must congratulate the team, because in the second quarter they produced their 5 millionth ounce since the mine began operating. That's a tremendous accomplishment in a short span of time. Many more ounces are still to come, especially as we look at the underground. There's a top-notch team there doing a really good job maximizing the open pit and now examining the opportunity to extend mine life through the underground component. In Mexico, the focus remains on advancing satellite opportunities, whether that's Cerro or Cubiro at Pinos Altos, or Chipriona at La India. I should also express our thanks to our Mexican team. Unfortunately, the communities around our mines have been quite severely affected by the virus. I believe the result is that our teams have been able to make a real difference locally. What we and the team have managed to do is bring in extra medical supplies and staff to support those communities. We have the logistics in place. In some of these communities we have superior medical facilities, so we're better equipped to respond. Our team has done a remarkable job collaborating with the communities to help them cope with the pandemic there. Our screening program has worked well; in most cases, we've managed to screen employees out before they reach the site. Some asymptomatic individuals did get through screening; we isolated them right away. We're doing rapid testing, then the more detailed testing after that. Testing has played a big part in our ability to get through this. As I said earlier, our team did an outstanding job rolling out testing in April up in Nunavut; there's now a testing site in Quebec, at Val-d'Or, that basically pre-screens and pre-tests every worker we fly up from the South into Nunavut. Essentially, once the plane touches down in Nunavut, the results are already available, and if all tests return positive, every one of those workers is cleared to start their 14-day rotation. From my perspective on testing, what really stood out for us was how early we embraced it, the fact that the concept originated with our own people and they were able to execute it, and the fact that in the areas where we operate, we found ourselves well positioned to assist the communities, and our team genuinely stepped up and delivered. Moving briefly to financial highlights, even though output was down this quarter due to COVID, we still produced solid earnings and Cash cost. We anticipate those figures will all get better as we progress through the second half. We drew down CAD 1 billion on our credit line when the pandemic hit, purely as an extra precaution. That CAD 1 billion we had drawn on the credit line has now been repaid in full. We've touched on the dividends.

Sean Boyd

executive
#4

I think it's worth pointing out that during the past six years, despite being in a period of heavy construction and with gold prices averaging roughly CAD 1,200, we still raised our dividend in every single one of those years. We increased the dividend this February. Considering the current gold price and our production growth trajectory, we would anticipate that dividend continuing to rise going forward. To close things out, we discussed how we managed through COVID and ensured not only that employees stayed safe, but also that the assets stayed properly positioned to handle and address certain matters we needed to complete, mostly in Q1 and then somewhat into Q2. We accomplished that successfully, which puts us in a good position for a strong second half as well as a strong 2021 and 2022. Once more, a renewed exploration focus where we believe we can keep adding substantial value at some of our mature mines. There remains solid opportunity there, and those ounces are high-quality since they're at existing mines, close not only to physical infrastructure but also to our skilled workforce, which has shown a track record of adding value. Operator, that concludes the formal portion of our presentation. If you could open the lines, we'd like to take questions.

Ralph Profiti

analyst
#5

Hello there. Good morning, all of you. Our guidance for the full year 2020 now stands at 1.68 million ounces to 1.73 million ounces.

Sean Boyd

executive
#6

Good morning.

Ralph Profiti

analyst
#7

Sean, mind if I ask a few questions? To start, what's your instinct on just how big Kittila might eventually get? You said the sweet spot is above the 2 million ton per annum mark. Could you give us some background on your thinking — how substantial the investment could be, and whether this ends up being a bigger high grade or a bigger low grade deposit compared with what we have today?

Sean Boyd

executive
#8

We see it as a step-by-step process. It's pretty evident that we bought it at the outset for CAD 150 million, back when it contained just over 2 million ounces of reserve, because we expected it to grow. My understanding is that reserves and resources now total approximately 8 million ounces or thereabouts. We've produced in excess of 1 million ounces, and we're halfway through the program designed to get us to 2 million tons a year. We started out at roughly 1 million tons a year, I believe, so that means we've doubled it. What made this hard from the start was aligning the production rate with the size of the ore body; as you're aware, it's an anomaly in Scandinavia, where most deposits generally come in at about 1 million ounces. This one will likely produce perhaps 10 million ounces over its life, since it's still wide open. It keeps growing. I think the next level — our team is starting to look beyond 2 million tons a day. A sensible next step, in my view, might be 2.4 million to 2.5 million tonnes a day. That's going to take a few years, but we're already in the early stages of working out how that could be done. As we drill the Sisar Zone at depth, that may well open up an additional mining horizon for us, which would let us increase the mining rate. It's early days yet, but considering how big the opportunity is, and the fact that we've been phasing investment across a number of years to expand capacity there, I think that was the right approach. We'll keep going with that steady, measured approach to getting the most out of what is a strong geological asset for us.

Ralph Profiti

analyst
#9

Yeah. Okay. Sean, before the reserve and resource statement for year-end 2020 is released, will we get additional drill results from East Gouldie? Perhaps a wider question: considering the caution and the due diligence you're applying across all of these operations when it comes to replacing reserves and resources, how are you fellows positioned as you restore the exploration program to its full capabilities?

Sean Boyd

executive
#10

Okay. Let's begin with East Gouldie. What we intend is for drill results to be released alongside the Q3 results. In Quebec, exploration work was halted for a longer period than production was, actually. We couldn't drill things such as LaRonde Deep and the targets at Canadian Malartic underground; that has restarted, as we mentioned in the release, with 10 drills. There's definitely a great deal of information that will be at our disposal before the end of October, when we publish our Q3. The expectation is that we will release those results. The plan calls for an updated resource in February, and a PEA to be published sometime in the first part of 2021. Our feeling is that a larger decision on the overall project, which would involve a shaft, will be necessary, and that decision will have to rest on the resource. We won't have it all drilled off to reserve-level confidence, nor will we be in a position to. We're comfortable proceeding on that basis given what we know, we believe. We think the drilling underway now, where we tighten the spacing, will raise our confidence enough to allow that. We've been through this a number of times. In East Gouldie, what we appear to have is thickness and higher grade, with a higher-grade core. It remains open. That, I think, is what we face when it comes to decisions as we go forward. That's the reason we aren't hurrying it; we're proceeding one step at a time, but I think it matters. I think both Yamana and Agnico now appreciate that it contributes a great deal of value, since you could potentially have an underground mine of significant size in tonnage terms that would extend Canadian Malartic's life for a long time. Now it's about combining our collective experience. Trying to fit it into our respective pipelines. Given the potential here, it's plainly our priority, and that's how we'll approach it. That will require us to keep the market updated on our thinking on a regular basis, which we're able to do as we go forward. On reserve and resource replacement, a further question. I would expect we're working on several areas where we believe resource can be converted to reserve. We saw a slight decline this year; drilling isn't the only factor, studies need completing. That's a really good question, since while our rigs weren't operating we devoted some time to discussing strategy regarding which resources we need to deploy during the second half of the year to compensate for that drilling time we lost, and also to make sure the studies get finished on a timely basis so resources can move to reserve; we're confident that at a minimum we can hold onto what we have. With luck, we can grow it; this isn't a forecast. The only thing I can tell you is that the plan is built to ensure we accelerate drilling in the second half to compensate for the time lost in Q2, and we're well-positioned to finish the studies that we believe need to be completed to convert resource to reserve. What the final number will be, we never know. I think we're well-positioned.

Ralph Profiti

analyst
#11

All right, that's excellent, Sean. Thank you.

Jackie Przybylowski

analyst
#12

Thank you so much. I suppose I'd like to raise another question on exploration. Those results you released for the zinc deposit at LaRonde appear tremendous. I realize it's still quite early. More from a strategic standpoint, I suppose, how do you folks view zinc within your portfolio? Would you be at ease mining this yourselves and holding it in your portfolio over the longer term?

Sean Boyd

executive
#13

Without question. Years back, our friends at Barrick — at a time when Agnico drew 50% of revenue from zinc and 50% from gold at LaRonde — and we were glad to take that zinc, since we were selling it at CAD 1.50, my friends at Barrick would run into me at conferences and ask, "How's the zinc mine going, Sean?" Zinc is part of our history. We've earned a great deal of money at zinc; the money we earned at zinc went toward building a gold business, in part toward building a gold business. We would be quite at ease with that; we're hoping it's a sizable lens. These things are lenses. It sits relatively close to infrastructure down there; it would definitely provide us with flexibility. The NSR value of a number of these holes is extremely high. That doesn't come as a surprise. It's the sort of thing we're accustomed to seeing. I believe that having hit something, I think, simply reinforces that we must keep up the systematic drilling. What we've chosen to do is concentrate more drilling in that area. In the end, do we have to extend the ramp eastward to provide a better platform for drilling below 3 kilometers as we progress to the east and possibly advance onto the adjoining property that we own, which formerly belonged to Barrick and is called El Coco, because that one wasn't really drilled at depth at all. As we progress to the west, Barrick on Bousquet never really drilled that at the depths where we're mining at LaRonde. There's plenty of potential there, and what you really have is a very wide felsic package of rocks, which run through that belt, and there remain plenty of open areas that haven't been drilled. It falls to us over the next few years to make sure we keep the drills turning, to find out what we have there. It isn't only the physical infrastructure we can leverage off of, it's the skill set that we have in place there. That's part of our strategy.

Jackie Przybylowski

analyst
#14

That's great. Thanks very much, Sean.

Sean Boyd

executive
#15

Thanks.

Sean Boyd

executive
#16

Hi there, John.

John Tumazos

analyst
#17

Great to hear about the good times — congrats.

Sean Boyd

executive
#18

Thanks so much.

John Tumazos

analyst
#19

Looking ahead to 2021, how are you thinking about planning and where you put investment dollars? Two years ago it probably wasn't CAD 1,200 gold, and right now you're probably not anchoring on CAD 1,950 either. In your planning, how are you dealing with health protocols and staffing? Clearly, fewer people on site means less virus transmission, and that's a big step forward. Thank you.

Sean Boyd

executive
#20

My sense is that we're operating on the assumption that most of the protocols stay in place. Eventually, I imagine a vaccine or an effective treatment could come along, and if that happens, then in my view masks would go away and testing would go away too. I think hygiene—and the attention paid to it, plus possibly screening—will probably remain going forward. Strategically, since we didn't know whether a second wave would arrive or whether we'd stay at an elevated level, what we set out to do in the second quarter was engage with governments that had determined mining wasn't essential. The early reopening—ours, and mining's more broadly—led governments in those jurisdictions, I believe, to conclude that mining can be done safely, given the considerable natural physical distancing involved. They grew quite comfortable with how we handle screening, hygiene, and testing. That played into our thinking, I'd say. One reason for taking this step was the uncertainty we faced. If additional cases had emerged in the regions where we operate, we wanted to be positioned to argue convincingly that mining was essential, so we could continue operating. I believe we achieved that, and the fact that we could reopen sooner than other sectors reflects it. In our discussions with government officials, they have congratulated us on the approaches and protocols we implemented to protect our workers and the communities — measures such as flying the Nunavut workforce home and the extra testing. They also mentioned their conclusion that mining will matter going forward, given the economic damage done to large parts of the economy. In their view, as in ours, mining—gold mining especially—has the potential to be quite lucrative, and that translates into substantial tax payments from us along with plenty of well-paid positions. We believe we've shown that we're able to keep going. As for how we're thinking about investment choices going forward, a few factors are at play. The question we hear most often is whether the industry will do better this time than it did roughly 12 years ago, when gold rallied but we failed to achieve margin expansion. There are a couple of important points there. One key difference is that we aren't facing the same input cost pressure that was present everywhere 12 years ago — likely because there hasn't been much large-project activity on the resources side. We aren't in the same spot we occupied 12 years back, when gold rose rapidly from below CAD 300 to above CAD 1,000. As you know, the industry blundered strategically by persisting in computing reserves using ever-rising prices annually, and that caused notable dilution of business quality in a brief period. Today, as a sector, we've had a rather stable reserve price—roughly CAD 1100 to CAD 1,300 across several years—so the basis for mine plans intended to deliver margin growth over the next three to five years is fairly sound and conservative. The industry must hold on to that conservatism when it comes to reserves and resources, and at CAD 1,200 we won't be inclined to chase much higher levels. On our side, I think the focus is on generating cash costs, staying disciplined, and moving our pipeline forward in a measured fashion, while acknowledging that the price environment is favorable. Let's keep exploring. Let's keep understanding what we own. Let's keep examining early-stage opportunities we might add to the pipeline. There's no real change in how we tackle this. The genuine question is how we remain a high-quality business that continues driving per-share value; someone asked us today whether it mattered that this week our stock passed CAD 100, that we'd hit an all-time high in CAD while other companies haven't gotten back to their all-time highs. Does that matter? I told them it only serves as meaningful proof that the approach we assembled back in the late 1990s was correct—back then we held just one asset, brought in CAD 50 million of revenue, generated CAD 4 million in EBITDA, and ran a single mine. The aim was to expand beyond that one mine and grow larger, while ensuring the growth truly created value. As I remember it, the stock traded under CAD 5 in August 1998. Reaching CAD 100 is pretty strong confirmation that the plan succeeded. It really boils down to maintaining our focus and making sure we remain a top-quality operation, mindful that a $1,000 investment made back then at those early prices would be worth far more than $50 today.

John Tumazos

analyst
#21

Thank you.

Anita Soni

analyst
#22

Morning, all. I'd like to return to Canadian Malartic and East Gouldie for my question. I know we're very early in the process and a PFS is due in early 2021, but I'm attempting to envision how one should view this opportunity — what kind of tonnage might an underground operation deliver? There's a 50,000 ton per day mill that you would be feeding.

Sean Boyd

executive
#23

Right. It's premature to offer much certainty on that. I believe the explanation—and for both Yamana and Agnico, I see a couple of factors behind why this has climbed in priority—was that we can now count on several mining horizons, once you factor in Odyssey, factor in the former East Malartic, and then add East Gouldie, which is thicker and carries better grade. As for what the final figure will be, it's premature to publish one. The work remains to be done. My sense is it sits at a level that provides both Yamana and Agnico a degree of reassurance. By bringing in the higher grade from East Gouldie, you potentially have a meaningful opportunity on your hands. I think we need to be capable of drilling it. The key point, I believe, is that we're beginning the ramp this quarter. We secured that permit some time back. Advancing it at this stage is logical; doing so gives us the means to drill it more effectively; within our planning, the exploration ramp is readily convertible into a production ramp, and in the end a shaft will be required. Ultimately, ore will come up both from a ramp and from a shaft. As for the shaft, that comes later on. There could be some production effect prior to the shaft's completion — not all that large. It would help, though the impact wouldn't be major. In the end, the shaft has to add to the output from the ramp, and we'll give you more detail on figures like those early in 2021.

Anita Soni

analyst
#24

All right, thanks. I've got a question about 2021 costs. For the second half, your guidance is now CAD 740 to CAD 690 on the cash cost range, and looking at the graphs you've published, it's clear you're beginning to reach those sorts of figures with higher production levels. Is that an acceptable run rate to apply for next year, given that production levels are similar, or perhaps a bit higher?

Sean Boyd

executive
#25

That seems reasonable to me. Our budgeting process is still underway, but I'd say it's reasonable.

Anita Soni

analyst
#26

All right. On the capital side, I realize you mentioned there's roughly an ongoing CAD 500 to CAD 700 million that folks ought to factor into their projections for combined growth and sustaining capital, with exploration added on top of that. Do you figure that still holds as a reasonable assumption, or should we be adjusting things on the exploration front given the higher gold price, with some projects advancing and spending possibly accelerating?

Sean Boyd

executive
#27

Yeah, I believe the fact that Kittila begins to decline gives us a bit of headroom to add items. At Canadian Malartic next year, it isn't all that material; that's the ramp, which is not a particularly large figure. We'll shift some items over there to replace things such as Kittila. It seems fair to assume we land at the top end of that range at CAD 700. Exploration sits at about CAD 100. I wouldn't call that unrealistic, though the work still needs doing, and that forms part of the budgeting process, which wraps up in November and December of this year.

Anita Soni

analyst
#28

For my final question — since investor inquiries have centered on this — regarding gold companies broadly: do you see any intention to revise the gold price assumptions underlying your reserves as we head into next year?

Sean Boyd

executive
#29

No, not to any significant degree. That is always a lively debate around here. Exploration's inclination is toward more ounces, and they would prefer a higher price, yet our operating teams have prevailed in that arm wrestling match for the past several years. The inclination is an awareness of how important it is to hit production and cost targets. In our view, you have to remain conservative when we calculate reserve and resource. Our plan is structured to hold reserves steady, perhaps grow them somewhat without needing a gold price adjustment. We'll see how it all plays out over the coming six months as we resume drilling and attempt to compensate for the meters we missed in Q2.

Anita Soni

analyst
#30

All right. One final thing — congratulations to Yvon for getting out. I realize you'll remain with us through the end of the year, but well done, and to Dominique on his promotion.

Sean Boyd

executive
#31

Yes. Thanks. You left out Ammar, who has more reports reporting to him.

Anita Soni

analyst
#32

Yeah, I'm not sure whether I ought to congratulate Ammar — poor guy.

Sean Boyd

executive
#33

No, that's fine, since Ammar has been roaming the corridors here ever since he returned from Barrick a second time with nothing to occupy him. We thought, we'd better give him something to do.

Anita Soni

analyst
#34

All right.

Sean Boyd

executive
#35

No, only joking. I believe everyone has rightfully earned greater responsibility. I feel we're lucky here to possess fairly substantial bench depth. We've stayed sharply focused on the way we develop our younger staff and provide them with varied exposure plus differing degrees of responsibility. Dominique is a fine illustration of that. He joined as a summer student more than 20 years back. He has worked at several of our operations across the Abitibi and Kittila and Nunavut. He has moved through tech services, mine planning, and environment strategy. I think we're lucky, and that is simply part of a natural process that strong companies follow. They cultivate people; we're fortunate. Thanks for congratulating Yvon. Still, Yvon's real focus — his wife defeats him at golf constantly, and he simply couldn't stand it any longer, so he declared he needed to devote more time to golfing.

Anita Soni

analyst
#36

Right, thanks a lot, and congratulations to Ammar too.

Sean Boyd

executive
#37

All right.

Carey MacRury

analyst
#38

Hi, good morning, Sean.

Sean Boyd

executive
#39

Morning.

Carey MacRury

analyst
#40

Good morning. Perhaps one more question regarding Cash cost for the second half; you've now had that fast ramp-up back at Meliadine and Amaruq, so I'm just curious what we should expect on the Cash cost side at those two operations?

Sean Boyd

executive
#41

Yeah. Dominique, go ahead.

Dominique Girard

executive
#42

Yes. At Meadowbank, that figure will come down, since the unit cost is obviously going to land between CAD 1,100 and CAD 1,200 during the second half there. For Meliadine, it will sit at roughly CAD 650 or so over that same second half — that is our current forecast.

Carey MacRury

analyst
#43

There may have been plenty of inquiries regarding Malartic underground, but do you see this operation running alongside the open pit, or is it really more of a post-open-pit operation?

Sean Boyd

executive
#44

That's a difficult one right now, given the shaft requirement. The timeline is a major consideration. You can observe how we handle the timeline in Nunavut. We didn't move too quickly. We wanted to ensure we were cautious regarding the timeline, so we don't want to be forced to accelerate. If a gap exists, a gap exists, since the underground could last for 10 to 20 years. We must ensure all the proper infrastructure is put in place within the correct timeframe.

Carey MacRury

analyst
#45

If the situation were underground only, is it possible simply to adjust the mills so they run at a reduced level? What's the thinking there?

Sean Boyd

executive
#46

Yes, that's possible. Yeah.

Carey MacRury

analyst
#47

All right. Good. That's all from me. Thank you.

Tanya Jakusconek

analyst
#48

Morning, everyone. I'd like to pose a question, I suppose, to the technical team. I'm not sure who wants to field it: Yvon, Dominique, Ammar. What would you folks need to observe at Amaruq before we resume underground operations?

Dominique Girard

executive
#49

So, development has kicked off again. We're continuing with the ramp. The underground represents an opportunity — a higher grade that we combine with the open pit. Underground on its own isn't a project, but combined with the pit ore, it becomes a project. We're still working on that study to finalize our numbers, and starting next year we'll share information regarding those results.

Tanya Jakusconek

analyst
#50

So how does it ultimately fit into the mine plan?

Dominique Girard

executive
#51

Sorry, could you repeat the question?

Tanya Jakusconek

analyst
#52

Yes. How does it fit into the mine plan? Will we have more details on more of a mine plan in February of next year?

Dominique Girard

executive
#53

Yes. That's going to be integrated. Again, the underground could be as long as we have open pit, so we should be able to have ounces starting in 2022, going to the end of the life of mine that we have right now of 2027.

Tanya Jakusconek

analyst
#54

All right, there's more to come on that front. All right. Sean, maybe this one is just for you — I'm looking at your number of 480,000 to 500,000 ounces per quarter coming in through the back half of this year and on into the next one. Choose whatever gold price you prefer, but it looks like you'll be generating a substantial amount at Cash cost, then you take off that CAD 700 million of CapEx, and my sense is that debt repayment is minimal. You're going to generate a fair amount at really Cash cost and unallocated Cash cost. Could you talk a bit about how you see that, along with your priorities for it, and what minimum cash balance you'll hold on the balance sheet, so we can get a sense of where we might go with this dividend?

Sean Boyd

executive
#55

Yes. I'll start with how the Cash cost gets allocated. Dave can speak to the strategy and thinking regarding the balance sheet. It seems fairly clear to me that with our existing dividend at CAD 0.80, which comes to roughly CAD 200 million annually at the current gold price, we can definitely pay more — considerably more — and our inclination and our track record is to pay more. That's definitely something we're examining now that we've gotten past the effects of the virus on operations in Q2, and we're moving into a stronger stretch for production and cash generation. That will definitely be a priority. We'll keep working the project pipeline. Exploration is a focus for us. I think Canadian Malartic Underground has climbed somewhat higher on the priority list. That's a focus, though it doesn't consume much cash next year; it's more that when we decide to proceed with a shaft, we'll need to make room for that as we look at it. Certainly, some of it will go toward boosting our financial flexibility. I think this is a moment when the gold industry will find itself holding plenty of cash, much like it did back in the late 1970s and in 1980, when gold went from sub CAD 50- CAD 800. As for debt repayment, as you said, nothing comes due until 2022, so we're going to build up a good deal of flexibility. I'll let Dave share some of his thoughts on that.

David Smith

executive
#56

Okay, Tanya — as you probably remember, we historically kept roughly CAD 100 million in cash on hand to cover working capital needs. But with the virus and everything that's uncertain around it, holding a larger cushion seems wise, at least for now. Because of that uncertainty, I'd expect we'd sit more in the CAD 150 to CAD 200 million range as a minimum cash balance. Like Sean mentioned, beginning essentially right now, we anticipate producing solid net cash cost, and I believe you'll see our cash position climb quite rapidly, particularly in the coming year — which naturally brings up the nice problem of what to do with all that money. Sean has already discussed raising the dividend, and I think there's a good chance we'll get the opportunity to do so. Again, in the near term we'll hold more cash. Over the longer term, since we're a larger business than before, perhaps we'll keep somewhat more cash around for working capital needs. Let me just wrap up my answer by putting it at roughly CAD 150 million as the minimum.

Tanya Jakusconek

analyst
#57

All right. That CAD 100 million for exploration that Sean brought up — we have that. Looking through it, we have roughly CAD 700 million of CapEx, and honestly there isn't much when it comes to paying down debt, and anything beyond about CAD 150 million on the balance sheet could potentially be directed toward dividends.

Sean Boyd

executive
#58

Yes, in theory. It's simply a matter of how we divide it up, and I just don't believe the whole amount is going to end up as dividends.

Tanya Jakusconek

analyst
#59

Thanks for that, yes.

Sean Boyd

executive
#60

Our balance sheet will carry a larger cushion. Given a 37-year track record, plus the fact we kept the dividend going when others cut theirs a few years ago, and we were first to restart and then raise it, with increases in each of the last six years, I believe that shows how we think about dividends. It does suggest it's rising, though the board ultimately decides, and we'll take up those discussions with the Q3 results.

Tanya Jakusconek

analyst
#61

Alright then, many thanks indeed.

Sean Boyd

executive
#62

Thank you, Tanya.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.