Agnico Eagle Mines Limited (AEM) Earnings Call Transcript & Summary
July 28, 2022
Earnings Call Speaker Segments
Ammar Al-Joundi
executiveThank you, and good morning everyone, and welcome to the second quarter conference call for Agnico Eagle Mines. To start, I'd like to thank all of our employees for a strong quarter. When results come in strong — and they certainly did this quarter — people in my position and my executive colleagues here get the enjoyable task of discussing them, yet we fully recognize the tremendous effort behind these numbers from the thousands of workers at the mines, in the communities, in support roles, at the rock face, who truly give their all every single day as one team to achieve these outcomes; we felt it important to recognize that and express our gratitude to all. Turning to page five, I'll note upfront there are certain forward-looking statements we ought to acknowledge, and that everyone should acknowledge; having said that, moving to page five, we address the main points from this quarter. The clear top-line highlight is the exceptionally robust operating performance. Record quarterly production, outstanding cost management, particularly critical given today's inflationary conditions, which of course translates into solid earnings and, in this instance, record cash flows. We'll discuss the operational results, and what the team has accomplished, and crucially, accomplished it — maybe most crucially — safely and in an environmentally responsible and sound way. I believe the true message today, the genuine narrative of the last quarter, and I think the genuine narrative for Agnico Eagle across the coming several years, is the thrilling and meaningful advancement on our development projects and our exploration findings. I mention this because although we're firing on all cylinders operationally, our development projects and exploration findings genuinely represent the company's future, the upcoming 5 years, the upcoming 10 years, and I might add, in Detour's situation, beyond the upcoming 30 years, which is rather remarkable. Detour Lake, we offered a technical update. We'll delve into that. It'll be a central element of today's conversation, but a 38% in mineral reserves and adding 10 years to the mine life. Odyssey Underground, the two biggest gold mines in Canada, Detour Lake and Odyssey, both maintaining solid development, solid exploration. At Odyssey, production and development on schedule, on budget, with some initial production possibly arriving as soon as the first quarter of 2023. The Kirkland Lake region, advancement achieved there. Shaft Number Four anticipated for completion near the end of the year. Strong headway on the Amalgamated Kirkland evaluation. We're roughly two-thirds through the exploration drift, which will ultimately form part of the development. It's not only those projects, and we'll cover the shaft at Kittilä nearing completion. Amaruq underground commencing this quarter to begin production. Goldex, we've recently greenlit the Akasaba satellite project, which will benefit both Goldex and LaRonde, plus ongoing achievement and development throughout a number of our assets. Regarding exploration, we'll cover that in greater depth shortly. We are also continuing with a $0.40 dividend through the quarter. The outcomes are superb, and what truly stands out as exciting is what we encountered at Detour — a step-out hole spanning 2 kilometers that indicates continuity 2 kilometers west of the pit shell in the existing or current mine plan. Moving to Odyssey Underground, we see an extension of about 225 meters going westward. Then there's a potential extension hole 1.7 kilometers to the east, which yet again shows what these massive ore bodies might mean for continued development, since infrastructure and crews are already there in favorable jurisdictions. We also have some really positive updates from a number of our other operations. Hope Bay turned in exciting exploration results. Meliadine turned in exciting exploration results. Kittilä turned in exciting exploration results. A more comprehensive exploration announcement will come in August, and I'd encourage everyone to keep an eye out for it. Finally, just a quick note on the mergers. We want to talk about merger synergies during this call, because we made that commitment, but beyond that — synergies are always meaningful, and in the inflationary environment we have today they carry even greater weight. Our hope and expectation is that some operational synergies will act as a partial cushion against the cost pressures we're facing. Let's go to the next page; shifting to operating highlights, production reached 858,000 ounces, with cash costs of $726 and all-in sustaining costs of $1,026. To say it again, over 850,000 ounces at $726 in cash costs. Fantastic results; we'll open the floor to questions, and people have already asked how we've kept our costs in check under these conditions. We've implemented many proactive steps to that end. We covered this on the previous call, and on the one before that; our thinking was that inflation would turn into a problem in 2022. I remember Sean Boyd saying early on that this wouldn't be transitory, and that matched our view; so we moved ahead of time. In the end, the best way to control costs is by running efficient operations, and that's exactly what the team has done. We're proud of the entire company, but Ontario and Nunavut especially delivered outstanding results that really drove the rest of the business. Gold production beat expectations, grades beat expectations, and throughput beat expectations, with particular credit due to Amaruq, Detour Lake, and Macassa. We'll get into those as this discussion goes on. It remains true; we continue to see inflationary pressure. We managed it well through the first half of the year. We're working to manage it well through the second half of the year and in the years to come. That said, we aren't immune to it; we're holding production guidance steady, we're holding cost guidance steady, and we're continuing with a $0.40 dividend through the quarter, but based on what we're seeing, we expect costs will trend toward the upper end of the range. A strong balance sheet. Dave Smith will share a few remarks about what we've done. We're glad to share that in the quarter, as debt came due, we paid down $125 million, and after that we've taken out another $100 million, which lines up with what we promised — the right mix of giving capital back to shareholders and putting capital into the business, while still being able to strengthen our balance sheet. And of course, we continued the $0.40 dividend through the quarter. Let's move to the next slide, please. I'll go over a few Detour highlights, and then I'll ask Natasha and Eric to say a few words about some of the progress on the mill expansion and on the exploration results. Looking at the highlights, I think most of you have seen them already, but to be honest, we're so pleased with them that I'll go through them again. A 38% increase in gold reserves. At Detour, that comes to 5.6 million ounces; so we're now at 20.4 million ounces, and I'll add, that's going to keep growing. We've added 10 years to the mine life. Recovered gold rose by that same 38% as reserves. Importantly, a bit more than 400,000 ounces were added during the 2028 to 2031 period. The reason I call that important is that's precisely where we saw a bit of a dip in production. We mentioned on the last call that we're working hard to offset part of that dip. Roughly 100,000 ounces per year across those years moves things in a good direction relative to what we're trying to accomplish. 1.8 million ounces were added between 2032 to 2042, and then 3 million ounces were added at the end of the mine life. I want to talk about that a bit later. Importantly and impressively, better grade and lower costs over the next 20 years; that's quite good, given that this technical update factors in some of the inflationary pressures we've recently seen compared with the prior mine life. Being able to raise grade and bring down costs across 20 years at one of the finest gold mines anywhere in the world, I think, honestly, is tremendous. Our vision, and we've said this before, our vision for Detour is to reach 1 million ounces per year. That would come through a mix of boosting mill throughput and possibly underground mining; that's our vision. We're working toward it, and we expect to provide some clarity on that near the end of next year; it's a great deal of work, but the potential is definitely there to boost production, and also to extend mine life. The last point here, again, very exciting, and Eric will address this, some outstanding exploration results, including a step-out hole 2 kilometers west of the pit outline. With that, Natasha, perhaps I'll hand it over to you.
Natasha Vaz
executiveAlright. Thanks, Ammar, and good morning to all of you. On slide eight, we're giving you an update on where things stand with several key projects that we need in order to lift mill throughput up to 28 million tons per year. You can see on this slide's graph the six principal projects along with how many tons each one contributes. The first four projects — those shown in blue — have been finished. That covers bringing in drill and blast optimization aimed at maximizing mill throughput, plus choke feeding our primary crusher. The second bar represents swapping out the 75,000 ton per day cap for the annual permit allowing 32.8 million tons a year. Back in 2020, while that 75,000 tons per day cap applied, we had no fewer than 70 days when we hit that daily ceiling and needed to pull the mill back. Removing that 75,000 tons a day cap has made a significant difference to throughput. We also switched our pulp lifters from a radial configuration over to a curved one, and this change has allowed us to boost our tons per operating hour as well as our overall throughput. The six ten conveyor refeed initiative was successfully wrapped up this year — Q1, in fact — to pick up an extra 750,000 tons a year. Essentially, whenever maintenance work happens on the crushing circuit, our throughput takes a hit. What this refeed system is meant to do is simply top up the feed headed into the SAG mills whenever crusher downtime events occur; it has proven successful; we commissioned it in Q1, we're running it in Q2, and the system is performing according to design. A major contributor toward the 28 million tons per year increase is installing the screens on the secondary crusher. This particular project will add roughly 2.25 million tons per year. Essentially, the secondary cone crusher performs at its best when the fines — material smaller than the desired crushing product — are taken out of the feed. With the screen installed, we can filter out those fines, and that will make the crusher far more efficient. We started installing the first set of screens in Q3, and we anticipate having both commissioned by Q4 this year, so stay tuned. Lastly, next year we expect to add a further 750,000 tons per year thanks to planned runtime improvements. What we intend to do here is get better at analyzing our downtime drivers, get better at completing root cause analysis on breakdown events, and make adjustments to resourcing, planning, and scheduling. To sum up, everything is going well, and we remain on track to reach our 28 million tons per year in 2025; with that, I'll hand the call over to Eric Kallio, our EVP of Exploration Strategy and Growth.
Eric Kallio
executiveAlright. Thank you, Natasha, and hello everybody. Exploration at Detour moved ahead very quickly with the project, just as we had planned, and like Ammar Al-Joundi said before, it brings in several strong results along with solid overall advancement on the project. The current slide lays out the specifics of the program itself, which is a plan and long section of the project, and as it shows, there's roughly 62,000 meters of drilling, the bulk of it aimed at a 2-kilometer strike length west of the pit and along the Sunday Lake deformation zone, which you can see highlighted in blue here on the slide. If we assume a shallow westerly plunge, the majority of the holes are targeting somewhere around 300 to 600 meters below surface and along that plunge line, which appears in pink on the lower portion of the drawing. When it comes to results, all that we've observed looks quite strong, and a few of the best sit right west of the pit, where we had already reported multiple high-grade holes in Q1. As the image shows, we've since added a good number of additional holes, and pretty much all of them carry interesting results. There are broad, generally wide zones of mineralization, at times reaching 150 meters across, and similar kinds of things to what's in the west pit and saddle, frequently holding a combination of wide bulk and narrow high-grade values. Even though a few holes are somewhat deeper and perhaps somewhat better suited to underground, we also surprisingly found several others at fairly shallow depths, which we believe might also contribute to the overall pit potential. On top of that, we also got some quite strong results from a few of our initial step-out holes to the west, which both confirmed the general trend of the structures and hit high grades reaching 32 grams, 32.3 grams across 4.8 meters, 2.2 kilometers west of the pit. Significantly, this hole and a number of others appear to carry somewhat more quartz and visible gold than what's typically observed in the pit area, which would be quite favorable for the underground scenario. With all of that in mind, we're highly encouraged about the future and are carrying on with 12 drills on site, aiming for 230,000 meters by year-end and then perhaps a new resource update. Once we get there, we believe there's a very solid chance we can add considerably more ounces to either the open pit or the underground. Under the present plan, however, it looks like most of these new ounces would likely go in right west of the pit and beneath it, which would still leave plenty of ground further west for additional work and at depth for future additions. So in summary, everything is progressing very well and we're excited about what's ahead. With that, I'll hand it over to, I believe it's Ammar.
Ammar Al-Joundi
executiveThanks, Eric. So here's the broad view on Detour. As you're aware, across the coming two decades we've brought in a substantial number of ounces. Our costs have come down and our grade has gone up, and on top of that we added a decade of mine life — roughly 3 million ounces — taking things from 2042 out to 2052. Mind you, at present that involves treating the low-grade stockpiles, which is the way every mine gets optimized. What we're looking for — and you heard Eric address this — is that given the drill results that keep coming in strong, we're looking for additional gold and a longer mine life. Let me repeat that: we're looking for additional gold, and we believe there's a genuine chance of pushing the mine life out even more, and the effect of that would be that between 2042 and 2052, fresher, higher-grade ore would take the place of what today is anticipated to be low-grade stockpile processing. This is — and we've made this point before, so we'll make it again — the Detour plan, good as it is, is merely the next step toward a longer-range plan we're developing; this project still holds enormous potential. Turning to page nine, I'd note it isn't only Detour. Canada's two largest gold mines are Detour and Odyssey. Odyssey's numbers continue to impress, with 20 rigs active — 4 underground, 12 on surface, and 4 in regional areas. As we've noted before, the project isn't just moving forward within its budget — and when I say the project, I mean the underground portion, which is progressing on schedule and on budget — but we're also seeing some excellent drill holes, both those confirming existing mineralization and step-outs, once again, 225 kilometers to the west and, as of now, as far as 1.7 kilometers to the east. Over at Kirkland Lake, we mentioned shaft Number Four coming by year-end, along with the amalgamated Kirkland deposit, and our guidance remains that we think a portion of that gold could be delivered as soon as 2024. One clear example of how our operations can complement each other: we took an Agnico property with a long history and no supporting facilities attached, and processed its material at the Macassa Mill. Hope Bay also deserves mention, along with the strong assay results we've received from drilling there. I'd love to spend more time on this subject since it's genuinely thrilling, yet our goal at Hope Bay is 300,000 to 350,000 ounces annually. That's what we're pursuing. Drilling comes first, and up to this point I'd tell you it has come in at or above what we were looking for. Before we move on, though, keep in mind that every one of these are assets that are already there, with infrastructure already built and, crucially, teams already on the ground — something that has always mattered, though perhaps it matters more right now than it ever has given the conditions we're facing. Turning now to page 10. A few highlights from our sustainability report: the first thing I'd note is that it's a really strong report. We released it on June 20th, and the feedback we received was overwhelmingly positive. Trying to boil it down in this setting wouldn't do it justice, so I'd urge everyone to give it a read, and we're glad to arrange meetings to talk it through. Two points I'd make. First, in a broad sense, ESG has long been a cornerstone of our identity as a business and of our culture. If you intend to run operations somewhere for 30, 40, 50 years, you need to be a good neighbor and be welcomed by the community, and that's still true. What's different, or at least what's gotten more emphasis from us over, I'd say, the past 24 months, is a focus on climate change. We keep investing a lot of effort there. Across the last 12 months, we examined every one of our sites, essentially every opportunity, whether simple or complex, for cutting greenhouse gas emissions, and we've established processes to examine that more closely. One quick point, which I think matters. Much of this will involve shifting from fossil fuels to electricity, and I'd say we're as advanced as anybody in examining that. Ultimately, if the electricity isn't clean, you aren't achieving much. I'd say our push toward greenhouse gas reductions can't be solely a mining industry matter, can't be solely an industry matter, but it also needs to be an electrical grid matter. That's a major matter. We get that, and our view is that industry plus government have to work together if we're truly committed — and committed is exactly what we are. Let's move to the following slide. Turning quickly to some operating financial results, slide 11. The number that stands out to me is operating margin of $923 million for the quarter. That's a robust business, and all of our mines have done well. Rather than walk through each one individually, since they appear in the appendix, I'll group them by region. Quebec turned out about 213,000 ounces, with cash costs averaging a little over $700. Outstanding, outstanding results. Ontario, around 250,000 ounces at cash costs of roughly $625. Nunavut, close to 200,000 ounces at cash costs just past $900. At Fosterville, we produced 85,000 ounces, and cash costs came in at an excellent $350. Kittilä delivered roughly 65,000 ounces, with cash costs of $828. In Mexico, output was 43,000 ounces, and cash costs were slightly above $1,000. We know Pinos Altos had a difficult quarter. The people working there are a very strong team. When you're running 12 mines, you'll sometimes see certain operations run into more trouble than others. Dave, let's go to the next page. That's 300,000 to 350,000 ounces annually.
David Smith
executiveThanks, Ammar. Naturally, those outstanding operational numbers have translated into a really strong financial outcome too. Our balance sheet is in excellent shape, with $2.2 billion in liquidity available. As Ammar noted earlier, we repaid $225 million of debt during this year, which brought net debt down to $434 million as of the end of June. Looking ahead, our maturity schedule is light over the coming years, with roughly $100 million coming due annually; this positions us to keep paying a dividend that's both stable and growing. We launched our NCIB, the share buyback program, for the first time, and it was only $22 million in size. That's definitely meant to serve as the flexible piece of the buyback, and we'll review it during the back half of the year to decide our next steps. We're also quite proud that Fitch raised our credit rating to BBB+, with a stable outlook. Third parties clearly recognize our strong balance sheet, and I believe our financial standing is excellent. Naturally, inflation is a hot topic right now. It's on everyone's mind, and our results show we've managed to offset it by optimizing at the assets wherever possible. Capturing the synergies, along with some gains from our hedge book, has helped protect us. Because of all that, we kept our cost guidance the same for the year. That was tough to achieve, but we're extremely proud of every team, including finance, for contributing to this outcome.
Ammar Al-Joundi
executiveAppreciate that, Dave. Now let's turn to page 13. Once more, congratulations to Dave and the finance group for everything you've accomplished, not only regarding synergies but also on the hedging front and your cost control work. On the subject of synergies, back in February we made a commitment to share our progress every quarter, and that's exactly what we're doing. A summary is provided here. I won't take up much time with it, but I will note that the team did an excellent job in the press release, spelling out point by point where things stand and where we anticipate they'll go. In short, by and large, we're running ahead of plan and seeing more synergies than we'd expected. I'd even go as far as saying that when it comes to corporate synergies, our target has been met, exceeded actually, and we've bumped up our guidance for corporate synergies once again by a meaningful amount, in fact. As for operating and strategic synergies, our guidance stays the same. Within the company, we're slightly ahead of what we expected, though for now, guidance remains unchanged. That matters and is positive in itself. Once more, let me stress that none of our guidance factors in these synergy figures, so we're hoping and, honestly, expecting that some of these synergy numbers will keep helping to counter some of the inflation we're encountering in the business. Wrapping up on page 14 before we take questions. Our strategy hasn't changed — it's the same as it's always been. It's a straightforward, steady, disciplined approach built on a handful of key elements. First, solid operations in solid regions with low costs, emphasizing high margins and per share metrics. Second, making use of the assets already in place wherever possible in the finest jurisdictions, judged by geologic potential and the capacity to run multiple mines across multiple decades. As for Odyssey and Detour, both of them — we've discussed this — they aren't merely world-class mines, but let me repeat, world-class mines in world-class jurisdictions. When you're discussing output in the 2050s, it's reassuring to know you're operating in a stable environment. Last, proven leadership with a solid track record and an emphasis on per share value. On that proven leadership point, he's seated right next to me. Sean remains deeply engaged on the strategic front. We speak very frequently — not only Sean and myself, but the entire team — and it's been tremendously valuable. On the ESG front, that's always been part of who we are. We remain focused on it. When you're a company full of engineers, we're all genuinely eager to explore ways to concentrate more and more on cutting greenhouse gas emissions. We're eager to discuss it, and we'll share further specifics about our strategy on that later in the year. And last, we have a lengthy track record when it comes to giving cash back to investors and being disciplined with our capital. To wrap up, I'd like to note that although what we've been discussing, I hope, hasn't been solely about output, but also concerns our development and exploration efforts, we intend to advance this pipeline responsibly, in a way that continues to let us increase production per share, all while delivering returns to shareholders and making the balance sheet stronger. With that, operator, let's open the line for questions.
Fahad Tariq
analystHello, and good morning. I appreciate your time for my questions. Regarding Detour Lake, during the presentation you noted there could be a chance to perhaps raise throughput past 28 million tons annually. I realize it's still early, but do you have any indication whether that might be a capital-light form of expansion opportunity?
Ammar Al-Joundi
executiveOh, Natasha, would you like to?
Natasha Vaz
executiveYeah, we're examining the possibility of enlarging the mill. Actually, we're considering 3 options — 3 distinct alternatives: low-grade screening and ore sorting, pebble low-grade sorting, and possibly an HPGR as well. The studies are only just beginning, and plenty of work remains to be completed; as far as CapEx goes, we don't have an estimate at this point.
Ammar Al-Joundi
executiveNo projection on that yet — though certainly, Fahad, compared with any other option, the amount of capital required is smallest whenever you build on top of infrastructure you already have. Excuse me, there's a bit of noise coming through. The three items Natasha brought up are, honestly, fairly small. We still lack the figures, yet within a project of that magnitude, whatever capital you commit is modest next to what comes back. And beyond that, what matters just as much is that this capital is adjusted for risk. It isn't merely the size of the investment — it's the degree of risk attached to it, and nothing delivers a stronger risk-adjusted capital outcome than growing what already exists.
Fahad Tariq
analystGot it. Alright, so let's move over to Macassa. You brought up the possibility of perhaps bringing the amalgamated Kirkland deposit into the Macassa mill. What's the right way to frame that for 2024? Would it be taking the place of Macassa ounces, or could it instead be topping up spare capacity at the plant, in case Macassa fails to ramp up as anticipated that year even with the productivity gains?
Ammar Al-Joundi
executiveThat would be additional, drawing on the spare capacity in the mill.
Fahad Tariq
analystAll right. Considering the efficiency improvements you delivered during this quarter, and perhaps — as you mentioned before — the possibility of returning to diesel machinery and boosting output across the coming several years, could it be that no spare capacity remains in 2024?
Natasha Vaz
executiveHello, Fahad. Yes, that's something we'll examine. Macassa just posted a solid quarter. Over the last six months to a year, quite a bit of headway has been achieved through continuous improvement work at the operations. So far this year, we're noticing greater availability from our electric trucks. Much work remains ahead, yet availability is trending upward; additionally, we're witnessing better availability and utilization across our equipment fleet. Naturally, ventilation has improved too. Things are settling down; our intention is to raise throughput, though we must hold off until we refresh our life of mine and issue annual guidance before knowing how AK fits into that plan.
Ammar Al-Joundi
executiveYes, absolutely, Fahad — you've hit the nail right on the head. What we're aiming for is zero surplus capacity at the mill. What we're aiming for is raising the mining rate. We're aware that chances already exist to boost throughput at the mill. Your questions make sense under ideal conditions, and that's exactly what we're striving toward: the mining rate will completely fill the mill, at both Macassa and Amalgamated Kirkland, but beyond that, we also have chances to expand the mill.
Fahad Tariq
analystUnderstood; that's useful context. Appreciate it.
Josh Wolfson
analystThank you. I wanted to dig a little deeper into what was said regarding favorable grade reconciliation at Detour and Amaruq. Could you share any specifics on what the impact was, perhaps as a percentage, what might be driving that, and whether we can expect it to keep going? Thanks.
Ammar Al-Joundi
executivePlease go ahead. Guy Gosselin, would you like to address that?
Guy Gosselin
executiveYes. As for Detour, we're still seeing a favorable reconciliation between grade and tons, running 4% to 6% on a yearly basis; that comes from a mix of certain steps we're taking at Detour to keep enhancing our grade control, plus the historical patterns we see with the model we put out in 2020, which has matched within that range over the last 3 or 4 years.
Ammar Al-Joundi
executiveRegarding Amaruq, our expectation had always been that the shallower portion of the deposit would carry somewhat weaker grades. As we progressed deeper at both IVR and Whale Tail, grades were supposed to improve. That made the result a welcome surprise. It arrived somewhat earlier than scheduled, so we've enjoyed a little upside on that front, reaching higher-grade material roughly 2 months ahead of what we'd anticipated this year. That pattern looks set to persist, and in fact our plans called for a far more robust second half. We expect that trend and that strength in the grade to carry on going forward.
Josh Wolfson
analystUnderstood, thanks. There's one additional item I'd like to ask about. Regarding the Kittilä permit that is still pending — I'm curious whether any further details exist about what the specific problems involve. And if throughput stays at 2 million tons, what production effect should we anticipate across the next two years relative to the guidance already in place?
Guy Gosselin
executiveYes, right now we're reviewing what the administrative court decided. At present, our plan is to keep throughput at that same level while we hold talks with them. We should have a clearer picture during Q3 regarding this.
Josh Wolfson
analystOkay, thanks. My apologies — regarding the guidance that's already out there, what throughput figure had been assumed across the coming years?
Guy Gosselin
executiveTwo million tons annually.
Josh Wolfson
analystso there's nothing different from the permit that's already in place?
Guy Gosselin
executivecorrect, at this point it stays the same.
Josh Wolfson
analystAll right, that's excellent. Many thanks.
Jackie Zielinski
analystAppreciate it. I'd like to pick up, if I could, on what Fahad was asking regarding Detour. You've released the life of mine plan, I realize, and that's extremely useful. Even so, it appears that stockpiled ore is essentially the primary source of feed in the later years. Could you say a bit about the exploration that's still ahead, and perhaps what evidence you're seeing that things continue between the main pit and the saddle zone? And in the event that works out, what effect might that have on the mine plan as a whole — not really regarding the expansion, but rather regarding grade across the life of mine? Many thanks.
Eric Kallio
executiveRight now, exploration is mostly concentrated on the west extension, I'd say, and then on pushing things deeper; in fact, we've already drilled the bulk of the saddle and the west pit area at a spacing comparable to what's in the main pit. It ought to be possible to assess it for open pit. Going forward, we'd likely be considering tighter spaced drilling, which could be beneficial for the underground, since we do observe that a good deal of the higher grade sits in smaller lenses. I'd frame it less as exploration within the pit area and more as a question of whether we require higher definition.
Ammar Al-Joundi
executiveJackie, it's possible I didn't fully grasp what you were asking, but to whatever degree — so, looking at those stockpiles of low grade material, I can't recall the exact figure right now, but my sense is it's roughly 0.35 grams, something in that vicinity. To whatever degree you're running some of that extra exploration material through, even if what we've already got comes in nearer to, say, 0.97, that plainly multiplies output by about three during those years, which brings you nearer to — particularly with a bit of underground included. We've provided some quite rough figures, and at this stage they're extremely rough. To whatever degree you can boost some of that throughput by way of an underground operation at, say, 5,000 tons each day, running at, let's say, somewhere between 2 and 3 grams, you can see that genuinely moves you far nearer to that roughly million-ounce goal we've been discussing. Once more, these are extremely rough, but the idea is plainly that as you uncover additional gold resembling the kind of gold included in the mine plan, you can push back — effectively, by extending the mine's life, you can push back the throughput, the milling of the low grade material, and swap it out for higher grade.
Jackie Zielinski
analystThank you. You did grasp what I was asking, though I simply wanted to confirm that I've got the full picture on the response. When it comes to ore that can be mined from an open pit, the primary pit and the saddle zone are already fairly clearly delineated. So, if I followed what was said correctly, where might there be a chance to add fresh open pit-able ore right now? Would that be toward the west?
Eric Kallio
executiveSure, the west is definitely among the primary targets. That might be suited to open pit or underground, based on its proximity to surface and naturally the widths and grades encountered. Exploration hasn't wrapped up at depth beneath the west pit or the saddle, so additional drilling remains to be carried out in that area. As you know, we have certain inferred resources inside the pits. Those might still be converted; however, beyond that, we're also examining holes that might lie beneath the north wall, in the north pit region too. There are numerous areas, I suppose, that we're considering, but.
Ammar Al-Joundi
executiveYou should also realize that these two things—the open pit and the underground—don't have to happen one after the other. As a matter of fact, our aim would be—and Jackie, keep in mind we're still developing this—if it's possible to have the underground operating at the same time as the open pit, that's something, that would also be included in the plan. Is that useful?
Jackie Zielinski
analystYes. Yes, definitely. No, that's extremely useful. So could I perhaps request a bit more detail regarding your hedge book? You've clearly had a lot of success this year when it comes to controlling your operating costs. Could you provide us with some detail about what your approach will be for hedging inputs or effects or whatever else for next year, and whether you've sort of begun on that already at this point? Thanks.
Ammar Al-Joundi
executiveYes, certainly. The biggest input we have, aside from gold, is the Canadian dollar, and on the Canadian dollar we are already roughly 30% hedged for 2023 at rates that are much better than budget. The budget rate is 1.25, and so far this would round out to approximately 1.29. We actually think we'll get the chance in the near term to keep adding to that position. You know, it's essentially an insurance policy. We don't know with certainty what the Canadian dollar, US dollar, et cetera, will do going forward, but it does provide us with some reassurance on our cost guidance when we hold hedges at rates better than budget. I think one of those chances is sort of right now. We'll keep examining that as we move forward.
David Smith
executiveDiesel comes up in questions constantly. Its effect is far less significant. We're talking roughly 300 million liters on an annual basis. Right now, spot pricing sits around 1.20-ish CAD for each liter, and for 2023 we've got 26% of it hedged at rates that are honestly worse than what we budgeted, though significantly better than what spot is showing. That's not a terrible spot to be in either, yet compared to the Canadian dollar it's a far, far less substantial input, no doubt about that.
Jackie Zielinski
analystThat's really useful. Thank you, Dave. I'm done with my questions. Appreciate it.
Lawson Winder
analystHello, Ammar and Dave. Thanks so much for the update. I just want to praise all of you, since Agnico stands out when it comes to controlling expenses amid today's inflationary conditions. I find that quite impressive. I wanted to begin, in a way, with costs and ask about Finland as well as Australia. During the prior quarter, you pointed to Finland as the area hit hardest by cost inflation. I wanted to check whether that remains true. And then, looking at your Q2 figures on a cost per ton basis — I mean, mine site costs have risen 6% year-over-year, which honestly doesn't look too bad. Are you discovering ways to counter the cost inflation in Finland?
Ammar Al-Joundi
executiveWell, I'll begin and then perhaps Dominic. From an overall inflation standpoint, Finland is still the toughest, and that's understandable given conditions there; relatively speaking, they had a very good quarter when it comes to efficiency. I believe that's the main thing they've managed to accomplish. Once again, it's a mix of, you know, steps we can take to keep costs in check, but ultimately, efficiency is what drives much of that. Dominic?
Dominic Lavoie
executiveThat's correct, Ammar. I'd say they achieved solid gains in drill and blast along with the rest of the underground mining, and that's a favorable cost. The euro exchange rate is another factor working in our favor, and it's contributing a positive effect there as well.
Lawson Winder
analystThat's quite logical. A comparable inquiry regarding Australia. I mean, when it comes to that area, I mean, others in your space are pointing out fairly major problems involving wage inflation and worker availability. Once more, I mean, judging by what you spend per ton, it seems you're handling things quite well. I mean, perhaps you might address what Agnico has seen when it comes to wage inflation and worker availability in Australia.
Ammar Al-Joundi
executiveWell, go ahead.
Natasha Vaz
executiveOkay, Lawson, hello. Regarding the people we have working in Australia — and in Bendigo in particular — most of them live right there in Bendigo. We haven't had much turnover, so from a staffing standpoint, the effect hasn't been very large. On cost per ton, there's a modest increase showing up, though honestly that just reflects the stage our mine sequencing is at. Grade has made up for it. Because grades are higher, our cash costs are right on track, maybe even a bit stronger.
Lawson Winder
analystAll right, that's excellent. Pretty impressive, honestly. Regarding Detour Lake, of all the possibilities you mentioned for improving things over there, a few strike me as things that could reasonably move forward pretty quickly — trolley assist, say, or perhaps more automation on the haulage trucks. There's a study that all of this feeds into, and it won't be finished for another 18 months. So I'm wondering: might a number of these improvements be put in place even before that first assessment is done?
Ammar Al-Joundi
executiveLook, there are plenty of items we're evaluating, and the truth is a few of them might arrive sooner rather than later. Our habit is to consider these matters from a broader, more holistic standpoint, Lawson, yet without question, certain ones could land earlier. As I believe Natasha demonstrated when it came to Detour, we laid out the specifics of the present mine plan at 28 million tons, though she and her group have spent a long stretch developing that, and our progress on it is substantial.
Lawson Winder
analystIf there's time, I'd like to squeeze in another question about Odyssey. Given that underground development at Odyssey has moved ahead quite nicely, might you share a few observations about the ground conditions you're encountering and how they stack up against what you expected? And also, how deep have you gotten with development at this point? Thanks so much.
Dominic Lavoie
executiveHello, Lawson, this is Dominic. As far as ground conditions go, they're excellent. The team has offered very positive feedback. Our meters are being achieved. Schedule and budget are both being met. First assays are still targeted to arrive in Q1 of next year. On that front, all is proceeding according to plan. Would you mind restating that final question of yours?
Lawson Winder
analystOh, right. I just wanted to know how far down you've gotten so far at Odyssey?
Dominic Lavoie
executiveLet me verify that. I don't have it in front of me. We'll circle back to it.
Lawson Winder
analystAlright, that's all I had. Many thanks, everyone, and congrats on a strong quarter.
Ammar Al-Joundi
executiveAppreciate it.
Anita Soni
analystMorning, everyone, and thank you for fielding my questions. Congrats on keeping costs well managed given the conditions. Most items have already been covered, though I have a few regarding Akasaba. Looking at the Goldex satellite deposit and the ore feed — I believe you mentioned Akasaba would contribute 1,500 K tons. Does that come on top of what the mill currently receives, or does it fall inside that existing feed? I noticed Goldex grades sit at 1.6, so I'm curious why you'd swap in the 0.84 instead of the 1.6.
Dominic Lavoie
executiveYeah. At Goldex, our present license allows 9,500 tons per day.
Ammar Al-Joundi
executiveYeah
Dominic Lavoie
executiveRight now, Goldex is running at 8,000 tons per day, and we've already got room in the mill. I'd say we'd likely need a few tweaks — minor changes — to push past 9,000 tons per day, but our expectation is that we'll land somewhere in the 8,500 to 9,000 range. The second thing is that at Goldex, we're heading deeper than 1.2 kilometers with Deep 2. That's
Natasha Vaz
executiveYeah.
Dominic Lavoie
executiveThat's going to provide us with flexibility. Throughput will likely decline step by step as time goes on, and we'll have the ability to supplement what the mill receives with material from Akasaba. At a broad level, perhaps, the tons coming out of Akasaba carry roughly the same value as Goldex ore. Akasaba additionally contains copper, so that's 0.5%.
Dominic Lavoie
executiveYeah, when you get right down to it, we're going to fill the mill up with Goldex and/or Akasaba, purely so we can get that solid cash flow coming from it.
Anita Soni
analystRegarding that CAD 50 million you plan to disburse — will it assist in determining the method for handling that copper? I'm simply curious. That's what I intended to inquire about.
Dominic Lavoie
executiveConcerning the $50 million, the bulk of it relates to mining expenses, so infrastructure needs are quite limited, since processing will occur at Goldex and the concentrate will be shipped to LaRonde. So it truly is
Anita Soni
analystOh, got it.
Dominic Lavoie
executiveIt's mostly a stripping expense spread across the coming 2 years. We'll see first production in 2024.
Anita Soni
analystAlright, that wraps up what I had to ask. Wait, actually no — LaRonde. So I believe you mentioned that the mine would be resequenced during the back half of the year. Does that mean things will return to how the original plan looked, the one tied to the guidance you issued in February? When we model, should we keep using what we anticipated for 2023, or do we need to adjust our assumptions because of this resequencing and the stricter ground condition protocol we're dealing with?
Dominic Lavoie
executiveWe remain inside the guidance range we provided; it will land somewhat beneath the midpoint, I'd say, since additional protocol is now in place, again, mostly at the East Mine; LZ 5 will make up for that. At present we're extracting 3,200 tons per day; the goal is to reach 3,400 tons per day at LZ 5 as compensation. Another point worth noting is that with Akasaba entering the picture, we'll send a richer copper grade to the LaRonde Mill, giving them greater flexibility to eventually add more satellite deposits. On the exploration drift, things are moving along nicely. We don't have drilling results yet, but we recently began drilling at level 215 and level 9, and at some point, I'm not sure when, perhaps next year, we ought to see intriguing results emerge and possibly bring additional satellite deposits to LaRonde. Our situation mirrors Goldex, where the mill has spare capacity, so the teams are examining how to add satellite zones to feed it.
Anita Soni
analystAll right. That covers everything I had.
Greg Barnes
analystI was hoping to get Natasha's take on how Detour's mill capacity is expanding — you're on track to reach 28 million tons annually given what's underway, and the plant will probably deliver beyond that. Have you factored in a buffer, expecting something like 10% or 15% extra? If so, that alone would push you near 32 million tons with no further work required.
Natasha Vaz
executiveFair question, Greg. At present our goal sits at 28 million tons; the six-ten refeed has been commissioned and is running according to design specifications. High-intensity blasting plus choke feeding have delivered certain gains, though quantifying them will take somewhat more time. As things stand, 28 million tons remains our target.
Greg Barnes
analystSo after that, how probable is it that the allowed cap could go higher than 32 — I believe it's 32.8 million tons?
Natasha Vaz
executiveI'd describe the probability as high, since our limit moved from 75,000 tons each day to 32.8 million tons annually. That represented an increase in yearly throughput. I don't expect any problems, though perhaps I should hand things to Mohammed so he can add further clarity there.
Mohamad Ali
executiveAbsolutely. Thanks, Greg. When it comes to the probability, looking at things through a permitting and regulatory lens, we don't anticipate any obstacles to reaching that figure. Like Natasha said before, we managed to boost that throughput previously, and we'd be following the very same procedure.
Greg Barnes
analystAll right, one last item, and this one's for Natasha as well. You mentioned those very high grades arriving in Q4 at Fosterville. What sort of grade are we looking at, and how does that pace out across the year?
Natasha Vaz
executiveFor Q4, our expectation is that it will be greater. Our planning involves sequencing. Purely from sequencing, several stopes with high grades are scheduled. I'd say—I don't have those details in front of me right now—but I'd put it likely around the 20-gram mark, maybe a touch above that.
Greg Barnes
analystAll right. Thanks.
John Tumazos
analystThanks for the strong numbers. Two questions from me, both about the successful deep drilling west of Detour and west of Malartic, 1 to 2 miles beyond the established reserves or resources. Looking at it from a share buyback compliance and legal angle, can you actually repurchase shares while you're drilling, posting strong results, with assay turnaround somewhat unpredictable and transportation labs being a problem? So the first question: does this alter the buyback windows or shrink them considerably? Someone could argue as well that with so many reserves already in place at Detour plus the Malartic underground resources, what you're adding is for the 2050s at Detour, or the 2060s or 2040s at Malartic, and perhaps that isn't material. The second question, once we get past the legal side of buyback windows, is this: for your own planning purposes, are these results strong enough to warrant changing the mining sequence and mining these new zones first? Or, if they sit 20 to 40 years out in the production plan, they're somewhat lesser NPV ounces.
Ammar Al-Joundi
executiveWell, Chris, how about you take the first one, and then I can address the second. Thank you, John.
Chris Vollmershausen
executiveYes, absolutely. Thank you, John. That's right. When we hold material, non-public information, we cannot carry out purchases through the discretionary buyback program. That said, we clearly have a duty to make any material information public without delay. If those results did indeed rise to the level of material, we would need to issue them through a press release right away. But as you basically point out, typically, you know, for a company the size of ours, any single drill result is not likely to be material. On top of that, under our NCIB, we also have the automatic plan available should we decide to utilize it. If we go that route, we can provide instructions to the broker, and once that happens, our discretion is gone and the broker carries out those instructions; we are only able to modify those instructions when we do not hold material information.
Ammar Al-Joundi
executiveJohn, about being able to mine the drill results faster than we expected. The mining sequence is going to depend on the drill results and where the ore sits. The good news is, you know, a few of these step outs demonstrate how vast these ore bodies are. You know, the bad news, I suppose, is that, you know, they sit quite a distance from existing infrastructure. What I'd say, though, is if, for example, we get some exceptional results at Detour at a decent depth, we could, and I'll stress once more, you know, we could begin the underground development to reach those much more quickly. It doesn't need to be sequential with the open pit. It'll simply be determined by the drill results, and then we would optimize the mine plan based on that.
John Tumazos
analystMight I ask something else as a follow-up? I value how direct your responses have been. Regarding Amaruq, how much did the second quarter exceed the geologic model by? Was that 10%? 20%? One would think top cuts and conservative assumptions within the area of influence were a factor. Given those second quarter results, does that create an opening for potential underground mining, if there happen to be zones rich enough that you could spoon feed some brown sugar to the Meliadine mill, assuming the Meadowbank mill is oversized?
Guy Gosselin
executiveTaking the grade question first, John, this is Guy. At Amaruq, there was a known pocket of super high-grade mineralization. What surprised us in a good way is that, you know, it appeared a bit earlier, and so copper band exceeded expectations, possibly due to some folding feature. We know without a doubt that we're riding into that. According to the mine plan, there was also higher, bigger — you know, the majority of the ounces were scheduled to come in during the latter half of the year. We saw some of that arrive sooner, in the second quarter, so that's basically the add-on; from here on, we now treat those high-grade zones as well factored into the plan. They might; we could still hit a pleasant surprise. It has to do with reconciliation around top cut and all that, as you said. You know, so far it's just a nice add-on, extra high grade that turned up earlier in the second quarter. We're mining 33,200 tonnes per day.
John Tumazos
analystPerhaps we ought not to tack on additional years to our models, yet we might bump up your projections by 5% or 10% for the coming few years, assuming we believe those sweet spots will show up again.
Guy Gosselin
executiveI'm not certain I fully grasped what you asked, but definitely, if we are able to keep going and we're still drilling deeper, you know, with the goal of, can we stretch out the mine's life, can we keep building? Now, what I brought up is that, yeah, a little extra of that high-grade material got done earlier in the year within the plan. Over the next couple of years, you know, we're back on track and we might, again, we're not there. We haven't mined very much of those yet, and perhaps our estimate of the grade in that high-grade material is somewhat cautious. Even so, it has to be. The proof is in the pudding, so we'll find out over the next couple of quarters, you know, how things perform once we mine those high-grade sections of the deposit.
John Tumazos
analystMy apologies if it sounded like I was questioning those projections. Still, everyone knows how cautious you tend to be, so perhaps we're allowed to wish for slightly stronger results — we can dream, right? Thanks.
Guy Gosselin
executiveThanks, John.
Tanya Jakusconek
analystMorning. I believe I'm up first. Thanks for taking my questions. Ammar and everyone, could I return to Detour, specifically the mine plan? I appreciate you sharing some of the assumptions behind that mine plan. The only thing I don't have is the oil price assumption you applied, since it covers such a long period, so I'm just trying to figure out which oil price you used.
Natasha Vaz
executiveHello, Tanya. For the short-term model, we used $1.10 per liter. For the long term, I can't recall the exact cost per liter, but it was based on our forward-looking curve, and I believe it was raised by $0.10 a liter versus the prior plan.
Tanya Jakusconek
analystAll right. Let's move that discussion off the call, and perhaps I could simply obtain a sensitivity figure from somebody, because, as you're aware, this spans quite an extended stretch, and should fuel prices shift, that would provide a bit of cushion. I'm only looking to secure a sensitivity on that. Natasha, since I now have you available, perhaps we could discuss this mine plan, which, as you know, involves those stockpiles being drawn down in 2042. Given what you're observing at present, with exploration success to the west that you're witnessing, and the possibility of an underground operation that you see, at what point might that underground come into play? For instance, near the close of this decade, or do you envision it arriving in the early 30s? I'm merely attempting to determine when an underground could arrive while the open pit is still operating, and possibly ahead of the stockpiles being used?
Natasha Vaz
executiveCorrect. Yes, Tanya. That's a good question. We're engaged in exploration drilling; we're engaged in studies regarding the future. We fully expect that the underground plan's viability will mean bringing it in at some point earlier than the 2040 mark. Our intention is to mine the underground while we mine the open pit.
Tanya Jakusconek
analystPrior to those stockpiles being added, prior to 2042, at some point during the 2030s, does that seem like a fair assumption?
Natasha Vaz
executiveThat works. Yeah, that's correct.
Tanya Jakusconek
analystAll right. On a broader note, I believe I picked up that this property might see its resource expanded by the end of the year. Could somebody tell me whether that growth would land in the inferred bucket, and which zones would account for it?
Eric Kallio
executiveIn my view, there's room to grow resources in both the open pit and the underground. The most probable spots are close to the western edge of the west pit, plus ground that could sit along the north wall or beneath the west pit. As of now we hold nearly 80,000 assays, counting even those gathered after we last locked the database on February Fifth. Come year-end, that figure ought to reach somewhere around 150,000. Many of those will fall within that same zone. It's tough to predict which category all of this ends up in, though I suspect much of it may remain inferred, with at least a portion classified as indicated.
Ammar Al-Joundi
executiveTanya, that speaks to the question of, you know, the reason behind our giving. We're kind of expecting that we'll be able to provide a fulsome update once next year comes to a close. A natural question is, well, why does the mill alone require that much time? It isn't only the mill. It also involves factoring in all of this exploration. There's a great deal of work that needs doing. You know, it's quite remarkable, how much drilling we've completed; but there's a lot of potential, yet there's a lot of work required to bring it all together.
Tanya Jakusconek
analystNo, I'm aware. Ammar, thanks. Yeah, I'm grateful for that. I realize the mill got most of our attention. My aim was simply to look conceptually at a broader view of this asset and attempt to determine whether we can get the mill to that point — which appears achievable, though I shouldn't claim it's simple. These matters aren't simple, yet it's achievable. Then it's a matter of examining the mine plan and figuring out how you order all those areas to reach that million ounces, and roughly when that becomes visible — whether those stockpiles can be deferred, and whether we can top up 2042 using only the open pit and underground for roughly another 10 years before returning to the stockpiles. I'm just attempting to grasp that, nothing more.
Ammar Al-Joundi
executiveYeah, Tanya, you've asked precisely the correct questions. Absolutely.
Tanya Jakusconek
analystThanks. I'm eager to hear additional details about that mine plan. May I pose one more question? It returns to the topic of inflation once more. I'd like to revisit this: we've observed significant turnover and problems at certain remote operations, specifically fly-in, fly-out sites globally. Clearly, that's the case for you up in Nunavut. Could you describe what you're experiencing regarding your workforce in Nunavut when it comes to turnover and/or cost pressures? We've witnessed so much of this at numerous other operations, so I'm simply attempting to grasp how it's affecting you.
Ammar Al-Joundi
executiveHello, Tanya. This is Dominic. Yes, we likewise observe that strain, particularly in Quebec, Abitibi, and Nunavut, places from which a large portion of our staff also originates, yet thus far, we've managed to keep it in check. Once more, our rapport with our workers is solid. They enjoy being with us; generally speaking, they tend to remain. I'd add that in Nunavut, during the previous quarter, we brought 50 Nunavummiut into our team, and we keep recruiting as many local people as possible. Following COVID, we needed to return the Nunavummiut to their communities, but at this point we're simply returning to our prior position. That is offsetting or assisting in reducing that factor. You know, Tanya, this is a fine moment to stress again. Take Odyssey, for instance: we can secure staff because, as you're aware, we've operated there for 60 years; we can bring in workers who are ours — our engineers, our mechanics. It's far harder when you're developing an entirely new operation in an entirely new area. Once again, you know, we gain from that.
Tanya Jakusconek
analystIn Nunavut, what kind of labor inflation are you experiencing relative to your other operations? I've just been hearing numbers as high as 8 to 10% in certain remote locations, so I'm simply attempting to get a sense of where you stand on that in Nunavut. Just putting that out there.
Ammar Al-Joundi
executiveWell, we sit down with our employees, I believe it's in November each year. So, from what I remember, the most recent round of talks landed at 3.5%-4%. We're collaborating with the team and our employees to determine what that figure should be, but we'll likely have a clearer picture on it, Tania, further into the year; as things stand, though, we're mostly covered by what was agreed earlier.
Tanya Jakusconek
analystAll right. That's great. Perhaps I could continue with a question on inflation. What I mean is, one more place where we've observed pressure and difficulties has been shaft sinking, and you'll be kicking off the Odyssey shaft sinking in October, which is coming up soon. I'm simply attempting to get a sense from you, or what might you tell us that assists us in grasping that, well, a few of the problems we've witnessed at other companies, well, you're in a position to. How at ease are you regarding your budget for that portion of shaft sinking at your Canadian Malartic, which I believe came to $1.2 billion in CapEx?
Ammar Al-Joundi
executiveYes. At Canadian Malartic we have the chance to be in a, shall we say, favorable location, near Highway 117 in Abitibi, where, shall we say, mining and working are simple, it's a nice spot. We also have, we're wrapping up shaft sinking at Kittilä and at Macassa as well, so a portion of the workforce is also going to, going to move over, to Odyssey; right now we're in the process of staffing those teams, and we continue to anticipate beginning shaft sinking in Q4 of this year. Okay. Are you indicating that a few of your own staff members are the ones you're bringing back, or is it contractors you're bringing back to assist, and situated at Canadian Malartic, so near home for working on the shaft sinking and i.e., not stuck in a camp? Yes. At Odyssey we enjoy that benefit. It's a, shall we say, it's an appealing workplace at the moment. I'm not certain about appealing. Well, it's a fine workplace. Every one of the shaft sinking staff will be working via the contractor, but this is a modest job, and between one contractor and the next one, it's normal that the shaft sinkers' staff are getting to the finest location and they're going to be hired via the contractor. Okay. If I could just turn to Dave, just regarding the inflation estimates, or inflation pressures you're observing, could you just go over with us once more, well, and I pose this question on each call, well, it. I get it, well, we've noticed a bit of easing in fuel, so all of us are seeing that, and a few other oil-based products. But could you just tell us where you're noticing the greatest inflationary pressures coming through? We discussed your labor at Kittila, but perhaps anything else you'd like to tell us where you're noticing additional pressure, or perhaps you've noticed easing in a few areas. Any observations would be valued.
David Smith
executiveRight, so to address the Detour study's oil price assumptions: for the initial 3 years, it's CAD 1.10 a liter, and following that, it drops to $0.90. When it comes to inflation in the business, I'm likely not the ideal person to discuss it, since my focus, naturally, is mostly on the financial side. Fortunately, things are performing as expected, and right now the Canadian dollar is fairly weak, which is genuinely a benefit for us. Where the largest components are concerned, perhaps Natasha or Dominic would be better placed to speak to that.
Dominic Lavoie
executiveYes. Tania, we are noticing inflationary pressure tied to regions and steel-related products and the like. Even so, as Ammar Al-Joundi said, we are striving to get costs as efficient as possible through productivity across various areas — automation, fleet management, ventilation on demand — and that is counterbalancing those rising costs; these are the levers within our control that we focus on, and it shows in our numbers at this moment. Once again, we anticipate remaining within the guidance through the close of the year. I'm not sure, Natasha, whether you want to chime in with anything.
Natasha Vaz
executiveRight, no, it's comparable, Dom. Tanya, a modest uptick is showing up for us in mill reagents. We notice it with grinding media, and naturally with diesel too. As Dom said, we're examining optimization initiatives. A great illustration would be Detour, correct? On diesel, we certainly have exposure there, yet we're exploring payload optimization and figuring out how to get the most from the payloads on our 795 trucks, determining how frequently we can leave them idle and put them to better use. Yeah.
Tanya Jakusconek
analystBroadly speaking, would you describe the inflationary pressure you're facing as being in line with what shows up in your own cost base? Each company reports something different, yet would you fall somewhere around 7% to 8%?
Ammar Al-Joundi
executiveThat estimate seems about as reasonable as any, yes. Tanya?
Natasha Vaz
executiveGreat. Thank you so much. I'll leave it to someone else to ask.
Mike Parkin
analystThanks, everyone, and congratulations on a strong quarter. Could you bring us up to speed on the Detour situation, specifically the impact benefit agreements with the First Nations? Also, are all permits now in hand for what you're proposing under this life of mine plan update, or would you need permit amendments or entirely new permits to proceed?
Ammar Al-Joundi
executiveMohammed?
Mohamad Ali
executiveAppreciate that, Mike. Mohammed speaking. On your two-part question about the agreements with the Indigenous communities and then the permits — like you said, right now that's the sequence. To move forward with the expansion, we already hold every agreement required. As for the expansion, we're only at the start of consultation, and after that comes the permitting stage, which will closely mirror what we did for the West Detour expansion. We don't anticipate any additional surprises, and the process will be the same one. Does that address what you were asking, Mike?
Mike Parkin
analystYeah, no, that works great. Thanks a lot. Yeah.
Mohamad Ali
executiveThanks.
Ammar Al-Joundi
executiveAlright, I realize we went past our scheduled time, so I appreciate all of you joining the call and for your support. Once more, the main point: a strong quarter from an operational standpoint, yet the real narrative, in my view, comes from the development projects along with the exploration, which are going to move this company ahead for years to come. Have a wonderful long weekend, everyone, and thanks for spending your time with us.
Operator
operatorEveryone, that wraps up today’s conference call. We appreciate your participation and ask.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.