Agnico Eagle Mines Limited (AEM) Earnings Call Transcript & Summary

February 17, 2023

New York Stock Exchange US Materials Metals and Mining earnings 72 min

Earnings Call Speaker Segments

Ammar Al-Joundi

executive
#1

I really appreciate it, and good morning to all of you. It's great to be here and to have this chance to discuss 2022, but even more so 2023 and what lies ahead, where we're genuinely enthusiastic, and we're seeing some remarkable opportunities that I believe by the time this call wraps up, hopefully every one of you will recognize them alongside us. Right before we get started, there are some forward-looking statements you ought to keep in mind — the usual kind of items. But let's go ahead and dive straight into Page 5. So we'll be covering, once again, 2022 and 2023. In my view, the full year 2022 comes down to 2 things: first, robust and solid operational results; but second, and this matters, a number of highly strategic consolidations that have created and will create some excellent opportunities, which we'll get into; on the operational front, for the full year, we had a robust year on production, hitting our guidance. But even more notably, I'd say, costs landed at the upper end, marginally above the top of our guidance range where we had told the market we'd finish; we're all aware that inflation made 2022 a difficult year. Labor presented significant challenges this past year, but on the whole the company delivered strong results; we continued advancing multiple major development efforts — Odyssey, Detour Lake, along with other significant projects we'll cover. And we managed all of this while setting the company's finest safety performance in its 66-year history. That's impressive. At the same time, we retired $225 million in debt using cash as it came due; and we distributed a dividend of $0.40 per share, with the quarterly payout ongoing, which remains at a solid level. Concurrently, our mineral reserves increased by 9% to nearly 50 million ounces. So I'd characterize it as a very strong year operationally, across every measure. We'll now turn to the fourth quarter, which presented a few additional difficulties, yet I couldn't be prouder of what this team accomplished over the year. Regarding strategic consolidation, bringing Agnico Eagle and Kirkland Lake together and integrating them proved highly successful and proceeded without a hitch. I say past tense because it's finished. We captured synergies more quickly and to a larger degree than expected, which is great. And frankly, collaboration among the teams is outstanding, and that will become clear when I talk about 2023 and beyond. Next, we look forward to completing the acquisition of Yamana's Canadian assets that is still pending, including — most importantly — the second, meaning the remaining 50%, of the world-class Malartic mine together with everything it offers. The two strategic transactions we've completed — bringing Kirkland and Agnico together and acquiring Yamana's Canadian properties — sit right at the heart of what we're trying to do. Our aim is to bring together the strongest gold mining jurisdictions anywhere in the world. Let's move to the next slide, please. I want to pause here for a moment, because this is a topic that comes up frequently in our conversations, yet sometimes a single image says more than a lengthy explanation ever could. The point we're hoping to get across is just how much the Abitibi gold belt matters to us; it spans an area of about 160 by 200 kilometers, so let's walk through a few of these numbers. Mineral reserves exceeding 30 million ounces, resources exceeding 30 million ounces, inferred resources around 20 million ounces; those figures are roughly comparable to the entire Nevada Gold Mine JV. In this instance, though, we hold 100% ownership, and we've operated here for more than 50 years; so we believe this region holds substantial potential, and that's what we'll be discussing. We will be producing more than 2 million ounces out of this region at roughly $800 cash cost. This region is also essential to our capacity to operate, in our view, with a strong competitive advantage in Nunavut, since it serves as the foundation for many of those operations. Nunavut will again come in at 800,000 to 900,000 ounces of production. That gives you a sense of the size of this combine-and-consolidate strategy and what we've pulled off over the past couple of years. When we finished the merger with Kirkland — and at this point last year, when we held this call — there was a lot of focus on synergies. We said it plainly: synergies weren't the reason we went after the merger. We went after it because we saw huge potential to consolidate this region and to make the most of our competitive edge in what we regard as one of the best places on earth, judged by geologic potential and political stability. Turning to the future — could we get the next page, please? This is what we'll be covering for 2023 and beyond. Last year really centered on merging the companies, meeting production targets, and bringing this region together. For 2023, the focus is entirely on making the most of what we already have. We have plenty in the works. I'll go through three items, and I believe this slide matters most in the whole deck. These are just the three largest — many others exist as well. At Detour Lake, exploration results at depth and toward the west remain outstanding. We're still evaluating things, and Natasha and her team have already accomplished a great deal on the mill expansion. We believe there's room to grow, and we're examining ways to move from 28 million tons up to 30 million tons while keeping CapEx investment minimal. And keep in mind, permits allow for as much as 32 million tons, and importantly, the work continues. We made a commitment to deliver this by the close of this year. We're progressing well toward the possibility of this mine producing more than 1 million ounces annually for decades to come. We're keen to keep advancing that effort and to see where we land at year-end, when we'll be able to share more. Turning to the Canadian Malartic complex — we now refer to it as a complex because that's precisely what it will become. The price we paid for the second half of Malartic was fair, given its current life of mine, yet the rationale behind the transaction was our belief that considerably more potential exists, and we'll touch on that a bit. Once the deal closes, we intend to boost exploration in the areas already approved, since substantial exploration upside is there, and we'll get into that shortly. Initial production is set to begin in March. We're sinking the shaft, and at Malartic we're evaluating the possibility of extra ore sources; in our view, the Malartic complex — combining the ore at the mine site with opportunities to bring material in from nearby — could become another producer of more than 1 million ounces annually for decades ahead. That, then, is what we're striving to accomplish in what is arguably the best place on earth to mine.

Ammar Al-Joundi

executive
#2

So you can see that Detour and the Malartic complex potential could each exceed 1 million ounces annually for decades. Then the third point to touch on briefly is tapping spare capacity in infrastructure that already exists across the region and making the most of it. That's what we mean when we talk about capturing the full potential and building on our competitive advantage. We'll get into this later, but here's the headline. From the assets we'll already own and that sit near existing mill capacity, we believe there's potential for as much as 500,000 ounces of extra production by 2030. Things get going slowly in 2024, then pick up substantially near 2028, 2029 and 2030, after that mill capacity exists; that alone strikes me as notable. Folks often claim organic growth is the finest sort. Here we have the finest sort of organic growth, since it involves not just expansion in regions we already serve but possibly expansion needing very little additional capital spending. When you can get a mine up and running without constructing a mill or tailings facilities, you have probably cut that project's capital expenditure in half. And you've accomplished that in a jurisdiction you know is safe for operations, where your company enjoys the strongest reputation locally, where environmental consequences are minimal and permitting hurdles are minimal. This really represents the finest kind of organic growth. It produces the greatest returns for our shareholders, achieves that with the lowest risk, and achieves it with the smallest environmental footprint. That, in our view, is where mining is headed — not only gold mining, but mining of any kind. Let me briefly address 2024 and the fourth quarter. Looking back, the opening three quarters were outstanding operationally, in my view. On output, we beat the budget, and our expense management was very strong. As for quarter four, I'd call it a solid one. There were some difficulties we had to deal with, yet the team's performance remained quite good. I think we'll end up near the midpoint of the 3.2% to 3.4% production guidance we set. That means the low end for any given quarter works out to 800,000 ounces, and that is exactly where quarter four came in, with costs at $863 per ounce. I'll be honest: those costs were somewhat higher — actually, more than somewhat. Expenses rose during the fourth quarter, for two reasons. First, it shows the complete impact of inflationary forces reaching us. During 2022 our team performed excellently by getting ahead of part of what we anticipated would be inflationary pressure — we had bought additional inventory. We placed some hedges early on. We did many very effective things that kept expenses in check, yet we cannot escape inflation indefinitely. Therefore in Q4, you're observing part of that affecting us — particularly with the sealift up at Nunavut. As a result, the fourth quarter absorbed the entire weight of inflationary pressures, and expenses were also somewhat affected by certain operational difficulties. I'll begin by covering Kittila and Fosterville. Kittila is currently operating under a restriction — one related to permitting that limits how much the mill can process. We submitted an application to raise output from 1.6 million to 2 million tonnes annually. The permit was granted, but an appeal was filed against it. At present we are working through that appeal, which means our cap stands at 1.6 million tonnes per year. Our guidance incorporates an assumption of 1.6 million tons per year. We're hopeful it gets settled within the next couple of months, though we can't be certain of that — so our budget is, I wouldn't call it conservative, but it does assume the 1.6 million. If everything unfolds as we hope—and our outlook is optimistic—we would be able to generate additional output at Kittila, likely another 30,000 to 40,000 ounces, and beyond that, by the way, since that restriction remains in effect, it is also reflected in our forward year guidance. Next, at Fosterville, there is a noise restriction. We were in Australia—I visited Australia alongside the team a couple of weeks ago—and we are optimistic that this restriction, the noise restriction, which is capping roughly 25% of production at Fosterville, will be lifted; we cannot guarantee it. As a result, we have not incorporated the full production at Fosterville. Should that restriction be removed, we'd gain roughly another 50,000 ounces annually — that's the point I wanted to make. Some may feel we're erring a bit on the cautious side there, but here's the thing — I'm addressing the company's owners, and our task is to surface all of these matters, which is exactly what we're doing. LaRonde — we discussed it last quarter. I'll bring it up once more: LaRonde has now been producing for 35 years. It's a fantastic mine. It's a fantastic ore body. We're encountering some of the best reserve — some of the best grades we've ever encountered there. Yet what really defines LaRonde is sustainability. This mine has been through five expansions. It holds enormous potential, but the reason we've run it safely — and I'm putting emphasis on that word safely — for 35 years, and hopefully will keep running it safely for many more decades, is that we've done so sustainably. In this instance, sustainably means having a group of world-class rock mechanics experts along with internal and external advisers who steer us toward the best way to mine this multi-decade asset sustainably. Their recommendation was that we move to a slower mining rate. The objective hasn't changed; at depth, we're simply extracting at a slower pace. So the opportunity we have at LaRonde — and frankly, that's a positive. We're going to begin looking more laterally. You invariably chase the highest-grade gold, which is declining, and we know that gold keeps declining. But as we lower the rate at depth, we'll explore sideways, and that could take a couple of years. Still, we're confident we can locate additional operating phases and lift the production rate once more. And then, right before I turn it over, it was a strong year. I want to give a shout-out to Detour, which had a record year, Amaruq, which had a record year, and Goldex, which had a record year since the restart. Next page, please. Very briefly, some operating and financial highlights. The quarter's operating margin came in near $720 million, and for the full year it was approximately $3.1 billion. All of those figures are in your hands, so there's no reason to walk through them one by one. Let's move to the next slide, which is also quite striking. We didn't just increase reserves by 9% — equally significant, mineral resources rose 12%. The mineral resources we have today are what tomorrow's mineral reserves will be built on.

Ammar Al-Joundi

executive
#3

And we're really proud that we've grown reserves and grown resources as well. And honestly, we believe we can keep doing that in the years ahead; so at this point, we've discussed 2022. We're genuinely excited about 2023 and beyond. We identified Detour, and Natasha will now speak about that; we identified Malartic. Dominique will speak about that. And then I'll say a bit about the potential for that extra 500,000 ounces toward the end of the decade. Natasha?

Natasha Nella Vaz

executive
#4

Thanks, Ammar, and good morning to everyone. I'll give you a quick update on Detour and on our vision of reaching 1 million ounces per year. Let me begin with the mill expansion project. We keep advancing several initiatives aimed at raising our mill throughput to 28 million tonnes a year from 23 million tonnes by 2025. The final major initiative in our plan for reaching 28 million tonnes was successfully finished in 2022, when our secondary crusher screens were installed. That installation wrapped up in the second half of the year — line one was done in Q3 and line two in Q4. The early results were highly encouraging. We recorded a daily average throughput equal to 28 million tonnes per year, though those rates aren't yet sustained consistently over time. So the mill's focus has now moved to optimizing mill processes — analyzing the wear and tear that comes with higher throughput so we can optimize our maintenance practices, and really just improving mill run time so that the higher throughput grows more and more consistent over time. Based on the work still required, we see the potential for a faster time line than originally — than the one expected to be achieved in 2025. Beyond a faster time line for getting to 28 million tonnes a year, as Ammar mentioned, we're also assessing a pathway to push mill throughput past that level through further optimization and fine-tuning of our mill processes and maintenance strategy as we adapt them to higher milling rates. Mill optimization covers improved process controls. We're also implementing an expert system, similar to what we have at some of our other mills. These initiatives could potentially achieve a range of somewhere between 29 million and 30 million tonnes a year, with limited capital. Other ongoing initiatives include screening and sorting of low-grade ore, which could potentially bring throughput even higher; and then, just on the update for the underground study, an initial underground mineral resource tied to mineralization outside the planned final pit limits at depth and to the west is expected to be completed in the first half of 2023. That will then serve as the basis for the potential underground mining scenarios to be worked on in the second half of the year, and we expect an initial technical evaluation to be completed by — by year-end 2023. Moving to the next slide. I'll briefly touch on Detour's exploration highlights from the last quarter, starting with the infill drilling program; this program was completed in the Saddle zone, just below the west portion of the pit, the area you see highlighted in blue. The results shown on the right side of the slide, in the first bullet, continue to indicate a wide envelope of gold mineralization. And then right to the west of the infill drilling — just outside that mineral resource shell, as part of the expansion drilling program — you'll notice we keep demonstrating a comparable pattern, with a hole that cut a broad zone containing some quite high-grade inclusions. That hole returned 10.2 grams per tonne of gold across 28.9 meters. And lastly, the regional drilling program looked promising as well; that program was carried out roughly 2.4 kilometers west of the West pit mineral resource, and it indicated that these pockets of gold mineralization along the Sunday Lake Deformation Zone are still continuing. So overall, the quarter delivered very encouraging results for Detour. Another item I want to note is that the strong exploration results we discussed in earlier quarters produced the substantial boost in the mineral resource and mineral reserve update at year-end. However, the exploration highlights I'm referring to today, and in the news release, only came available following the MRMR year-end update; so it simply — it just demonstrates the potential for continued growth at Detour from the — from both the open pit resources and from advancing our understanding of the underground upside. With that, I'll hand the presentation over to Dominique Girard, our COO for Quebec Nunavut in Europe.

Dominique Girard

executive
#5

Thanks, Natasha. Over the next couple of slides, I'll bring you up to speed on the Odyssey project and on exploration infill drilling — what we're seeing and how we plan to develop that complex to supply the mill we have. On the production side — or the development ramp, I should say — we're right on target with development, and we expect the first blast in March. So, on time. And roughly 50,000 ounces will come this year from Odyssey South. On the construction project, all is progressing well, even though it isn't the easiest period to build, given logistics and workforce challenges. But we have <<inaudible>> team on site, and we're proud of the progress — there were some challenges with the wind and the crane that you can see at the top right of the picture last quarter. This quarter, though, we're back on track installing steel in the shaft, and we'll be ready to start shaft thinking at the end of this quarter. Maybe to give you a sense of where we'll stand at midyear with construction of the project — which will also feed the updated study we'll do this year, we're going to update our PEA study — at the middle of the year, 80% of surface construction will be finished; so the electrical line, the shaft, or let's say the head frame, the garage, the warehouse, the paste plant Phase I will all be done; so all those costs will be secured, along with the schedule. And we'll also have an idea, a better idea, of our mining rate at Odyssey South, as well as the sinking rate we'll achieve in the shaft. So all of that will be updated through the year, to give, let's say, a very good vision of where we'll take the project. But everything is positive. And on top of that, we see — I'll talk a bit about this in the next section — but we see very positive results from infill drilling; we completed the first conversion at Odyssey South at 100%, the equivalent of close to 200,000 ounces at the Odyssey — Odyssey South, and we're also seeing very positive infill drilling at East Gouldie Gold right now. If we move to the next slide, there are some holes we can see here. The middle of the East Gouldie zone, the dark blue, that — let's say a year ago, it was more patchy. But now, with better infill, this is taking shape; and we expect to convert part of that zone at year-end. And just to point out a few interesting things: at 1 kilometer below surface, we have roughly 7.6 grams over 43 meters. Then 300 meters down, it's 4.2 grams per tonne across 61 meters. And a bit lower in that zone, we get 93 meters at 2.6 grams per tonne; so the infill drilling is confirming what's in our study. We're also seeing the red — the reddish zone growing with the inferred resources, and all of that will be included in our updated PEA. So this is, let's say, the first spot where it will be easy, or easier, to bring more ounces to that mill — within that area that's 5.6 kilometers long, 1.5 wide and 2 kilometers deep; so we'll keep working and focus on drilling and getting a better understanding of that zone. If we zoom out to the next slide, Page 15, on the interior area, there are also other potential satellite deposits such as Camflo, the LTA property, where we'll focus on more drilling and more study to eventually bring that into the Canadian Malartic mill. Just the LTA property, which means the <<inaudible>> Goldfield in <<inaudible>>, 2 million tonnes have been processed there — no, 2 million ounces have been processed there, which was 10 million tonnes at 6 grams per tonne, and that was done, or only the first 800 meters have been drilled. So we're looking to eventually focus there. This year, we focused more on the Camflo deposit. There's already a drill running, and we'll need to better understand what we do. Could we mine an open pit crown pillar there. But this is the vision we have around the Odyssey project. Maybe to close, I'd just like to congratulate the construction team, which did last year, full year, with a 0 combined frequency. This is something not easy to achieve, but with the quality — it demonstrates the quality of the team we have in that region and the good work they did. On that, I'm going to pass the mic back to Ammar.

Ammar Al-Joundi

executive
#6

Thanks, Dominique, and thanks, Natasha. Let's move to the next slide and zoom in, if we could. Dominique mentioned the additional ore that sits essentially close to the mill, but this slide pulls back a bit and asks: what's the potential? And again, the potential is substantial. At this point I'm only discussing consolidating and optimizing the mill. There's procurement, there are central control centers. There's a whole set of initiatives underway. But in 2023, our focus is on what will move the needle very quickly, relatively speaking. Looking at the position here, the red line and the black line represent the road and the railway. Over the past 100 years of mining, the towns, the road and the railway have tracked the Cadillac fault; that stands to reason. That's where economic growth in this part of Quebec and Ontario has occurred. What the purple shows is our land positions. So you can see that we not only hold a lot of land positions, we hold a lot right along the Cadillac bolt, but also, importantly, in places with strong transportation infrastructure already in place. Now, just 3 simple examples, things we already own. Macassa near-surface additional production from the AK zone, Upper Beaver and Kirkland Lake satellite deposits, and Wasamac — roughly 11,000 tonnes of ore can be mined that conceptually could be milled at the Malartic or Lapa mill. That's only 11,000 tons; that's 1/4 of what we expect the excess capacity to be. And those 11,000 tons are potentially about 500,000 ounces a year. Now someone asked us: is this a fill-the-mill exercise? Or are you — is your focus IRR? What I'd say is, again, I'll repeat, and I was a CFO for a long time. This is how I think. Naturally, when you're putting together a production scenario without needing to construct a mill or a tailings facility, and your CapEx drops by 50%, your IRR — your return on capital — approximately doubles. The calculation gets more involved than that, yet it still comes out to roughly double. What this means is that it goes beyond ordinary organic growth; it represents the strongest form of organic growth available, delivering the highest return on capital alongside minimal risk and the smallest environmental footprint. Before we continue — and we want to keep some time open since I'm confident there will be many questions — this involves more than just those three items. Detour is impressive, Malartic is impressive, optimizing the belt is impressive — but we've also gotten great exploration results at Hope Bay, at Malartic, at Kittila, at Goldex, at Fosterville and at LaRonde. So I'd say everything is firing on all cylinders, though our focus stays on what lies directly in front of us, and that has always been part of the story — I come back to where I began. This was always part of why two great companies like Kirkland and Agnico merged; it's why we truly wanted the second half of Malartic; and incidentally, no one else could have taken the second half of Malartic and generated all of this value from it. Since no other company held the land positions and advantages that we did. Now turning to production for '23 through '25 — moderate growth, honestly, roughly 7% by 2025 compared with 2022 output. The figures are right there, approximately 3.35% — sorry, about 3.3% at the midpoint for 2023, 3.45% midpoint for 2024, and 3.5% midpoint for 2025. I'd like to stress again that these figures factor in constraints at Kittila and at Fosterville. Should we manage to lift those, that would mean an additional 30,000 to 80,000 ounces, perhaps slightly more, that could be added; and none of these figures account for any incremental production from filling the mill. Of course, that’s going to begin quite gradually in 2024 and won’t truly ramp up until ’28 and ’29. Still, I want everyone to understand that we believe there’s potential for us to add even more to these. Perhaps if we simply turn to the following page for the sake of time: we will keep conducting ourselves in the most responsible manner we can; it isn’t merely the right thing to do. But again, if your approach is not to go anywhere across the globe building mines one at a time, and instead Agnico wants to concentrate on regions for decades, then you have to be the best at ESG. Being welcomed into a community means more than being accepted—you need to be embraced as part of it—and you also need to prove environmental responsibility, since our goal isn't a single mine but multiple mines. Based on third-party data, I believe our figures show that we lead the industry on greenhouse gas emissions. We also lead the industry on freshwater usage. As I noted earlier, we just completed the safest year in our 66-year history, and we enjoy strong ties with local businesses as well as with local indigenous groups. We genuinely believe — and it's something we can actually observe — that by partnering with the communities where we operate, we enhance the living standards of the people who work alongside us, along with their families and the surrounding community. Our commitment is to reach zero carbon by 2050, with a 30% cut by 2030. A great deal of effort is going into figuring out how we'll achieve that, and achieve it we will. Moving to the next slide, please. Our financial position is strong: roughly $660 million in cash and $1.2 billion available under an undrawn credit facility. During 2022, we retired $225 million of debt as it reached maturity. Down on the lower left, our debt profile is shown. As that debt matures, we anticipate continuing to pay it down from cash. Moving on to the following slide. At this point, we have maintained dividend payments for 39 years. As far as I know, no other gold mining firm has accomplished that. To be frank, I'm uncertain whether any mining company at all has. Our dividend will continue, and the yield we offer is on par with competitors. Let's advance to the next slide. Now, to wrap up — and once more, we want to reserve time for questions, because there is substantial material here, and substantial material in our press release running nearly 150 pages — in summary, the industry faced a difficult year in 2022. It was difficult for us as well, but in my view the team performed very well: 3 outstanding quarters plus a strong fourth quarter taken as a whole. Also significant: during 2022 we pulled off the merger of two excellent businesses, and we're set to purchase the remaining fifty percent of a top-tier property right in our own region, generating value that no competitor could match. Looking at the bigger picture, bringing two organizations together isn't simple; even so, as I've remarked previously and will repeat, the process went remarkably smoothly, which happened purely thanks to how capable everyone was and the kind of cultures each business possessed. Therefore, though the past year presented difficulties, overall it was positive. Regarding 2023, we're genuinely enthusiastic: if 2022 focused on bringing things together, the coming year centers on fine-tuning. We're only beginning to tap into what's possible here. To revisit what we noted a year ago: the merger wasn't undertaken for synergy reasons, despite our strong delivery on that front. The deal was driven by the enormous opportunity we identified. I hope this presentation has begun to make that clear—and once again, we've barely gotten started. To wrap up the way we always do — since this reflects our steady strategy — we aim to remain a straightforward, reliable, and disciplined organization with a demonstrated method for generating value: bringing together assets in top-tier jurisdictions, companies that earn substantial profits and strong cash flow and, crucially, that keep a per-share focus at all times, along with tested leadership that has shown it can sustain a solid financial footing so we retain strategic flexibility. ESG matters to us, and we'll keep working to be a trusted and appreciated part of the communities where we currently operate and where we hope to operate for many decades to come. Bringing the Abitibi gold belt together gives us room to grow — growth that's high quality, with strong margins, solid returns on capital, and limited risk. We also intend to keep extending a long track record: 39 years of giving capital back to our shareholders. That's all from me, and thanks for your time. I realize we ran a bit past our usual length, but there was plenty to cover. Operator, please open the line for questions.

Fahad Tariq

analyst
#7

Thanks for taking my 2 questions. Ammar, perhaps first regarding 2023 costs, which I believe may have caught some people off guard. It looks like that figure is roughly 14% above the prior 2023 guidance, around 5% above the year-over-year comparison, and about 9% above, I think, what consensus expectations had been. What is the market failing to see when it comes to underlying inflation? Which piece of the picture are we not seeing that is affecting the costs?

Ammar Al-Joundi

executive
#8

Yes, that is a great question, Fahad. And part of what you are not seeing is — and I mentioned this on earlier calls, costs depend on 2 things. They depend on inflation, but they also depend really on throughput. So for 2023, I will give you an example at Meadowbank. The stripping at Meadowbank in 2023, the ratio is 16:1, the strip ratio; in 2024, it is going to be 4 or 5:1. That simple shift in stripping ratio affects the entire company by roughly $37 an ounce in costs, just from about one item; and it is difficult for you guys to see that, and I appreciate that, but that is sort of your question. The other thing is, clearly, with the restrictions, simple things like 80,000 ounces of restrictions, once those are lifted, costs at those operations go down. So you are right. There is inflation, but there are things that are hard for people to see. And those are really the operating things. And we hope to be able to outperform what we have given, but we have had to give cost guidance where it is because we do not know if those restrictions are going to be lifted; we think they will be, but it would not be good of us, to assume they will and then surprise you guys all at the end of the year.

Fahad Tariq

analyst
#9

All right, that's fair; and now a brief second question. That synergy figure being incorporated into the guidance looks like it comes to $12 an ounce. From what I recall, the figure shared earlier had a range considerably higher — something like $30 to $40 an ounce. Did anything shift on synergies and on what's included in the 2023 cost guidance?

Ammar Al-Joundi

executive
#10

Yeah; so the synergies become somewhat more complex owing to inflation. And — but what I'd say is we remain ahead of schedule on the synergies. The administrative synergies are simple to track, I think, and I had these figures, my apologies, but the procurement synergies are on track. So I'd need to work through — if I had the figure you just mentioned and compared it against our figures.

Fahad Tariq

analyst
#11

All right, that's fine. We can discuss that separately. That's all from me.

Emily Chieng

analyst
#12

My first question follows up on the cost side and perhaps looks ahead past '23 toward '24 and '25, where you anticipate some sequential declines in cost. Could you perhaps bridge some of the items you're thinking about that would let you get there? I know you brought up Meadowbank stripping, but could you also speak to maybe your strategy for procuring diesel, labor, fuel, and consumables there?

Ammar Al-Joundi

executive
#13

Yes. I think that — good question, Emily, a nice interior voice. Really, it's just the operations. The operations, since we're going to have more production, as we move into different areas in the mine sequence, the costs are expected to come down. So we haven't really assumed any relief on consumables or labor or anything like that; we will work hard to get there. But mostly, it is higher throughput and mine sequencing.

Executive

executive
#14

And I would just add to that, Emily, that as we stated in the press release, our guidance does not include any assumption of hedging success on any of these inputs, such as currency or fuel, because there is no guarantee those things will work out; but we will keep trying to add to those hedging programs during the year, if it's beneficial.

Ammar Al-Joundi

executive
#15

Also, we aren't factoring in any of the optimization work we're doing on either the production side or the cost side. That work would bring costs down even more. So we can say with a fair degree of confidence — barring unusual market movements — that costs ought to decline, since we can see what the life of mine is, and we know the cost per tonne, and we know the throughput, and all of that, and it's all going to get better; but some of the optimization we're working on hasn't been included. And clearly, when you produce more ounces with the same infrastructure, your cost per ounce comes down.

Emily Chieng

analyst
#16

Got it — that's extremely clear. And perhaps for my second question, about the progress and your strategy in the Abitibi gold belt, and how you're optimizing mill throughput: how do you think about prioritizing the cadence of when each of those nearby resources fills in and when they should begin contributing the initial ounces you're referring to?

Ammar Al-Joundi

executive
#17

Well, that's a great question, and over the last few months we've really concentrated a lot on exactly that. The best way to answer it, Emily, is that we're approaching this on 2 levels. We're approaching it at the most senior level, and Jean Robitaille is working on this alongside Guy and Natasha and Dominique. But also — and this is the crucial part — importantly, each of these projects has a project leader and a team and a time frame with milestones. So talking about a vision is one thing, but what you actually really need is a plan. And we have the teams in place. We have the resources in place; and the cadence, to your point, will be driven by those specific opportunities — both regarding when these projects can come on stream and also, frankly, regarding when the mill capacity comes on stream.

Greg Barnes

analyst
#18

Ammar, your guidance points to capital spending in the neighborhood of $1.4 billion to $1.6 billion for '24 and '25. Given all the optimization programs and plans in place for Abitibi, does that figure decrease after 2025? Or will it remain within that band as we move toward the end of the decade?

Ammar Al-Joundi

executive
#19

Greg, I'd say — and apologies, right before addressing Greg, I wanted to answer your question, Emily: we'll give more guidance with a specific cadence near the end of the year on a number of these projects. I didn't want to leave you without a response there; so, Greg — we've in fact finished many big-ticket items on the CapEx side in 2022, such as the filter-press at LaRonde, which will let us carry out dry stack tailings, which serves environmental purposes, and so on. The CapEx forecast past '24, '25 is projected to fall under the current life of mine. Our task remains, as you're aware, to seek out opportunities for profitable investments on behalf of our owners. So I'm optimistic that we'll keep finding solid opportunities to create value per share. But to address your specific question, yes, under the life of mine models we currently have, CapEx should decline after '24, '25.

Greg Barnes

analyst
#20

So over at Macassa, it looks like you've kind of hit reset there when it comes to the production profile going forward. I believe there was some discussion at one stage that it would be 350,000 to 400,000 ounces a year, but — that isn't what we're seeing in the 3-year forward look, anyway. What's the thinking on Macassa at this point?

Ammar Al-Joundi

executive
#21

Okay, I'll kick things off, and then perhaps Natasha can add a little. A year ago at this time — and I recall that call quite clearly since it was my first one — we tackled Macassa directly. We stated, look, the earlier guidance was 350,000 to 400,000 ounces a year. In our view it's a fantastic ore body. There's plenty of upside, but it won't reach 350,000 to 400,000 ounces within the timeframe that had been laid out; and we said that on the basis of the due diligence we carried out, and it's a fantastic ore body; but as I mentioned back then, this is a mine that Kirkland was taking from the 1930s to the 2020s, and they were progressing well; we've progressed very well this year at Macassa. The team is energized and Natasha can speak to many of the achievements. What I'd say, Greg, is that Macassa is probably a 300,000 to 350,000 ounce mine rather than a 350,000 to 400,000 ounce one, but maybe Natasha?

Natasha Nella Vaz

executive
#22

No, that's right. Thanks, Ammar. Greg, apologies — regarding the guidance as it stands, it captures 2 primary factors: a slower ramp-up in mining operations, and a lower gold grade relative to earlier guidance. As for that reduced forecast grade, it stems mainly from changes we made to the resource model after additional definition drilling. Then the slower ramp-up during 2024 comes in part from reassessing the development rate and the mining sequence once shaft 4 and the new ventilation system were finished; we're constantly seeking ways to boost our productivities, but at this point, we believe these are rates we can achieve. The site has put in substantial effort on optimization — whether that's adherence to the plan or the maintenance program initiatives; yet opportunity always exists, and I believe there's opportunity with #4 shaft and the ventilation upgrade coming online to enhance that. Looking at the long run, as Ammar said, I see the same thing at 300,000 to 350,000 ounces. The deeper mine, the South Mine Complex and the Main Break, we expect to remain at roughly 300,000 to 310,000 ounces; and then we anticipate an additional, say, 20,000 to 40,000 ounces from the near surface deposits, the 8-K deposits, which potentially could be trucked to another mill.

Ammar Al-Joundi

executive
#23

Yes. Once more — Macassa’s performance this year makes us quite proud; to be completely honest, around this same point last year that mine was somewhat difficult. These days it runs far more smoothly, and our confidence in it is strong.

Anita Soni

analyst
#24

Apologies — I had said I had... I was muted just then. Since my question matched Greg's, I'll simply pass it along to whoever's next on the line.

John Tumazos

analyst
#25

If we move away somewhat from the details in today's press release and look more at the long-term strategy in mark: is there a depletion level that would be too big to offset through yearly reserve replacement, or a threshold you'd prefer not to hit — 4 million, 5 million, 6 million, 7 million ounces per year? And is there a capital spending level — $2 billion, $3 billion, $4 billion a year — that would be too much? Yes. Obviously, you had a few problems this quarter, and running a company gets harder the more moving pieces there are, even when they're all in the same neighborhood in Eastern Canada. And there are 5 or 10 companies lined up hoping they'll sell out to you. And maybe that's too many projects for you to build at once.

Ammar Al-Joundi

executive
#26

John, you're absolutely right. I think, on all accounts; so one, I think there is a limit where it does become unwieldy, even if they're all in areas where we are. And you're right, there are a lot of companies that are hoping that someone else will buy them out. So one, I would say, yes, you're right. At some point, a certain size likely grows too large and turns unwieldy—but you're fairly familiar with how we operate. Size has never been something we cared about. I mean that genuinely. Absolute size isn't our concern. Our only concern is per-share metrics; and I think—I hope what we've demonstrated today, and this is genuinely what I'm attempting to do, is that neither the merger we completed with Kirkland nor the acquisition of Malartic was undertaken to become bigger. After all, paying full value for something and simply—that generates no value per share. Here's what we're aiming for — and I believe we'll pull it off better than most people anticipate, better than they expect. Over the coming few years, I think we'll genuinely demonstrate that putting these pieces together will generate substantial value by capitalizing on the edge we hold in this region. When everything is going completely your way, you don't want to expand too much. Honestly, every one of our teams is stretched thin right now; we addressed Emily's question about cadence earlier, and we're directing resources toward each of these efforts to bring them to fruition, working at full capacity. So it's a fair question, and I hope my answer met your expectations.

John Tumazos

analyst
#27

Ammar, just for our planning purposes, could we take a numerical view — should we assume that we remain at 4 million ounces or less, and that CapEx does not exceed $2 billion in a year? And although you hold 10% or 20% of 4 companies, plus another 14 that expect to sell to you, perhaps you don't need to worry about building all those mines until 10 years from now.

Ammar Al-Joundi

executive
#28

Yes. Yes.

John Tumazos

analyst
#29

Thanks — and I'm happy to be a shareholder.

Ammar Al-Joundi

executive
#30

Thank you. It makes us glad that you hold shares with us.

Carey MacRury

analyst
#31

I noticed in the press release that you're looking at raising capacity at Malartic to 60,000 tonnes a year, obviously, with the open pit winding down and spare capacity there, so I was just wondering what's behind that?

Dominique Girard

executive
#32

Good morning, this is Dominique. The mill's capacity is 60,000 tonnes per year — per day, sorry; and we'll begin to have some capacity free starting in 2028; so that's where we're all seeking to bring additional ore to that mill. The mill is already there.

Carey MacRury

analyst
#33

All right. And then regarding Macassa, I brought up greater dilution. Has that been included in the revised reserve model for that site?

Natasha Nella Vaz

executive
#34

Yes, it has.

Carey MacRury

analyst
#35

All right, great. And then perhaps one final question for Ammar. You really stressed the regional approach that you folks have, and I'm just curious how Kittila and Fosterville fit within it. Just to get a sense of the ore relative to your other regions?

Ammar Al-Joundi

executive
#36

Yes, thanks Carey. Let me begin with Fosterville. Fosterville is a wonderful asset with wonderful people, and being in a place such as Australia for only one mine doesn't make sense. So we're examining that, and we're examining Australia more widely — Australia already contains plenty of strong miners, but plenty of opportunity exists too. So what I'd say regarding Fosterville is it's a wonderful asset, but over the long term we must decide whether we can generate shareholder value in Australia better than others can. And that assessment is underway right now, as we speak. And honestly, I'd say the same holds at Kittila. We're currently producing nearly 3 million ounces from Canada, correct? So we'll be moving to 2.1 million in the Abitibi. We'll be moving to 900,000 in Nunavut. So that's a reasonable question. And it's also a reasonable question in Mexico, though I must say we're very optimistic about the work we're doing with tech at San Nicolas.

Mike Parkin

analyst
#37

You mentioned the significant increase in power costs at Kittila during 2022, and that caught my attention. As I remember it, a nuclear power plant was due to come online around the end of that year. Is it operating now? Are you beginning to see any benefit in energy costs from it being online yet?

Ammar Al-Joundi

executive
#38

Dom, would you like to take that one.

Dominique Girard

executive
#39

Yeah, I can take that. Yeah, in December we saw the price climbing up to 5,600 per megawatt-hour because of the situation. And that — I'm not sure if that's what you're referring to, but in that case, we ran our generators, purely to save costs, and we also cut back on some activities at site. But we view the future positively, since there's a nuclear plan underway, and they're finalizing the commissioning. So we expect a better path for next year.

Ammar Al-Joundi

executive
#40

Yes, Mike, I believe that's the point you're getting at — whether the plant is online and commissioned. I'm not sure, Anni, are you on the phone? Sorry to put you on the spot. No, Anni isn't on the phone. So my latest update on that, Mike, was that commissioning was underway. They ran into a couple of issues with water pumps, of all things. You'd think a water pump isn't that complicated. But from what I understand, it's back online now or will be shortly; and we have — we're seeing a material reduction in power costs at Kittila; so again, we are — I'll just say that in the budget, we've assumed higher power costs than what we're seeing right now. So there's upside there for us.

Mike Parkin

analyst
#41

All right. So that's roughly what I was understanding the guidance to be built on? And then regarding the Canadian Malartic mill — previously, you mentioned there might be a need to adjust the front end of the grinding circuit, so it would better balance the reduced tonnage that will eventually come through with Odyssey. But now, with this possibility of filling the mill or getting nearer to running it full — building the mill out with regional upside — is that something you might be able to avoid having to do?

Dominique Girard

executive
#42

Yes, definitely, Mark, that's an opportunity we have at present within our PEA study — we have funds set aside to decommission one portion of the mill. Now we view that as a chance to keep it operating. And perhaps if I go back to Terry's earlier question regarding mill capacity: right now, we're mining from the open pit at 55,000 tonnes per day. We are exhausting those pits with those. Canadian Malartic will finish this quarter, and everything is going to shift to the Barnat pit, but the tonnage from the pit is going to drop while underground tonnage is going to rise. As we get into 2029, throughput is going to be a third of that. We'll be at 19,000 tonnes per day, but the grade is going to be 2.5x, 3x greater than where we stand today, which is going to deliver equivalent ounces — those 2.

Mike Parkin

analyst
#43

All right, and moving on to Kittila regarding that final decision on the larger tonnage permit. You mentioned that should this ruling, due out this year, not go your way, you'd file what amounts to a fresh permit application. In that scenario — which everyone obviously hopes won't happen and that you can sidestep — but if it does become necessary, do you have any sense of how long it would take to get a new permit approved?

Ammar Al-Joundi

executive
#44

Yes. My sense is — we remain quite optimistic that we will — so keep in mind, the permit was granted to us. And every regulatory body gave us its backing. An appeal was filed, and while that appeal was underway, the court instructed us to revert to 1.6. So our hopes are high. Should that not happen — and once more, simply to stress that the guidance we presented, to stay on the cautious side, sits at 1.6. In the unforeseen event that we are refused or something already authorized gets overturned, resubmission would be required, and that might take a few years.

Ralph Profiti

analyst
#45

First off, regarding LaRonde, you mentioned that shifting to a slower mining rate—would that same benefit carry over to development rates? In other words, if mining rates are slowed, is there a chance to perhaps boost productivity through, say, reduced dilution? So does a slower mining rate also have an impact on development rates? And could you also touch a bit on the lateral exploration prospectivity, as opposed to at depth?

Dominique Girard

executive
#46

Yes. This is Dominique. Yes, effectively we will — the mining — the development rate will be adjusted. But that is also offset because we all need to do additional paid backfill and more rehandling of not — yes, we can't bring the waste in to use as backfill. So overall, the cuts are somewhat offset at the moment, but we will work alongside the team to really fine-tune the cut; and we will also see this year what the actual pace of money we could do at LaRonde will be. So overall, the LaRonde deposit will be 200,000 ounces per year. There are 75,000 ounces coming from LZ5, but we will have coming in the second half of this year 30,000 ounces coming from Zone 11 to 3, which is what we're looking for to keep bringing more ore from a new zone. And on that, I'll hand the mic to Guy, who could give you some sense of where we are in terms of discovering more answers laterally speaking.

Guy Gosselin

executive
#47

Ralph, regarding the lateral prospectivity, well, we've already brought some of that to fruition. LZ5 shows what we're advancing and attempting to duplicate. On the neighboring property — the former Bousquet property, which contains LZ5 — mining historically ceased roughly 1.6 kilometers beneath surface. And those zones remained open at depth. So between the existing tenant shaft and LZ5, there are recognized mineralized zones, specifically Zone 3 to 1 and Zone 3 to 4, which stay open at depth. We also see solid potential beneath LZ5. That's precisely why we're placing heavy emphasis on building out that exploration drift on Level 215, and this drift will extend one more kilometer westward to put us in a stronger position. So we're going full steam ahead to get that platform — that exploration platform — in place so we can target those known zones we identified previously and keep examining how they expand at depth.

Ammar Al-Joundi

executive
#48

Ralph, that's a fair question. I tend to see the glass as half full. In fact, over the long term I view this as a positive. I mean, any mining company naturally pursues the highest grade while developing ore. But eventually, we truly needed to move laterally, since plenty of opportunity exists in that surrounding area. And that's something we ought to do. Again, that's roughly why I mentioned it could take a couple of years, yet we're confident we can locate additional ore face for the LaRonde complex and hopefully get back to where we were last year.

Ralph Profiti

analyst
#49

Understood. Okay. And perhaps to follow up, I'd like to turn to Fosterville. With the technology we have now, can you reach that 16 to 20-hertz threshold and be more or less within specs on that low-level noise? Is that technology currently available? And is this really just an engineering fix that still needs to be worked out?

Ammar Al-Joundi

executive
#50

Yes; so we've devoted a great deal of effort, along with the finest technology anywhere, to solving this. For perspective, I was out there myself, and I couldn't hear a thing — literally nothing. And so we will be able to — I mean, we've spent heavily. We've brought in specialists from across the globe. Sound, as you might imagine, is a rather complex matter. We will be able to bring it down. But it will never reach 0. It simply won't. And that's what we're discussing with the regulators. This is essentially something that the overwhelming majority of people cannot even perceive. And so the regulators, I believe, have asked us to do everything we can; we have; it has improved. Getting to 0 is physically impossible, and so I think we — there's a degree of sympathy there that we've — that this is — we've done everything possible and that it isn't an unbearable situation. But they are the regulators, and we do our utmost, yet we are truly hopeful this is settled quite soon.

John Tumazos

analyst
#51

Picking up again on Fosterville. About 6 years back, I headed out on my own following a <<inaudible>> iron ore trip, driving on the left-hand side and all that. I ended up lost, went through Bendigo, and looped around for a bit. There really aren't many houses near the mine. Other mining districts in Australia, Kalgoorlie for instance, have the town sitting right beside it, and it's enormous. So — why would noise abatement be such a big issue at Fosterville? Is there some kind of environmental impact on the thousands of green parakeets around the <<inaudible>> or something like that?

Ammar Al-Joundi

executive
#52

Well, John, we're glad you made it back safe after that left-hand driving. But this kind of thing isn't unusual in our line of work. And at times — in this instance, it could be one particular individual using this as a means to accomplish something different. So I'd rather not go into the details, but the key point is that we will always comply with whatever the relevant legal authority asks of us. We respect people's viewpoints. And we're hopeful this is settled reasonably soon.

Ammar Al-Joundi

executive
#53

All right, thanks, operator, and thanks to all of you. I realize there have already been a few questions regarding production and the adjustments. I simply want to remind everyone that 3 years ago we dealt with rehabilitation and a ramp at LaRonde; an apron feeder broke down on us. We had water issues. At Meadowbank we needed to pump water from the bottom of a pit; everything was resolved within that same quarter. So these kinds of — in the fourth quarter, the team performed well, 800,000 ounces. Yes, a few operational challenges came up. That's just how our business works; but looking at the big picture, we're a far stronger company than we were 12 months ago. We're only beginning to scratch the surface when it comes to delivering, in my view, exceptional value. Much of this involves minimal capital. Keep in mind, our business isn't merely about producing ounces — it's about producing profitable ounces and a solid return on capital, and we believe we're on the right track. So with that, everyone, thank you once more for your time, but more importantly, thank you for your support, and we'll be doing marketing over the coming days and glad to field more questions at that point. Thank you.

Operator

operator
#54

Everyone, that wraps up today’s conference call; we appreciate your participation and request that you disconnect your lines now. Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.