Agnico Eagle Mines Limited (AEM) Earnings Call Transcript & Summary
October 31, 2024
Earnings Call Speaker Segments
Ammar Al-Joundi
executiveAppreciate that, operator, and hello everyone. Thanks for being with us on this call. First, I'd ask everyone to kindly review the forward-looking statements. To kick things off today, I want to express gratitude to everyone on the Agnico Eagle team, at every site and in every function, for turning in yet another strong quarter of operations — done safely, done responsibly, and with a positive impact on the communities where we work. On this call, we're pointing to steady, dependable operations — with a focus on keeping costs down and being disciplined about capital — and that's what made it possible to produce huge margin growth for the people who own our stock, plus the best financial results we've ever posted for a fourth quarter in a row. That includes all-time highs for operating cash flow and adjusted net income, and we did it while also making the balance sheet stronger, repurchasing shares, and paying a solid dividend. Our view is clear: when gold prices climb, that upside ought to belong to our owners — it shouldn't be spent driving up expenses or channeled into heavier capital spending — it should go to our owners. Keeping that in mind, on today's call we'll cover both the record financial results we achieved and the record operational performance turned in by our mines, our mills, and the entire organization — spanning everything from exploration and procurement to treasury and more — all stemming from ongoing work to make our business more efficient. Looking at the chart on the left, with 75% of the year behind us, we've reached 76% of the midpoint — the midpoint of our production guidance for the full year; landing within 1% of the guidance midpoint is impressive, since it reflects both solid operational execution and strong planning and forecasting; we continue to feel confident about hitting our production and cost guidance for this year. What I'm especially happy about is how well we've kept costs in check. On a year-to-date basis, we're running at $897 per ounce, and that sits $3 under the midpoint of the guidance we gave for costs. Given that higher gold prices so far this year, compared with the $1,800 we had assumed in the budget, have driven up royalty payments and tacked roughly $20 onto our reported cash costs, that result is quite solid. A really useful gauge of how well costs are managed is the cost per tonne measured in local currency. I reviewed that figure this morning. Across the whole company, our average cost per tonne in local currencies hasn't budged for more than twelve months. That's a remarkable achievement, and I want to congratulate the team. Even in a year when gold prices and financial margins both hit records, we haven't let ourselves get complacent. Instead, we've reaffirmed our focus on operational improvements and sped up those efforts. Let's move to the next page. Our results are out in the press release, so all of you have seen them, and over the next 25 to 30 minutes we'll walk through them in greater detail. Still, there are three main points we want you to take away. First, strong financial results and returns to shareholders; second, continued optimization of our operations; and third, exciting exploration and pipeline projects. Turning to financial results, expanded profitability and cash flow have come from the higher gold price combined with solid production and cost control. Through this year so far, we've returned about $700 million in cash to shareholders, divided between dividends and share buybacks. Additionally, during the same period, about $1 billion has been returned to them in an indirect manner by bringing down net debt — which has shrunk by around two-thirds since the beginning of the year. Jamie Porter, who serves as our CFO, is going to walk everyone through those figures in greater depth shortly. When it comes to ongoing efforts to optimize how we operate, we aren't sitting idle. Dom and Natasha are going to cover both the results from our operations in this quarter and a number of the many projects our teams have underway as we keep pushing to make our operations better. On the exploration and pipeline side, we've allocated a good amount of time for Guy to walk through the strong results we keep getting — at Detour, Odyssey, Hope Bay, Macassa, Meliadine, and Fosterville. Every one of those is fantastic exploration news, and each sits on ground we already hold, on top of existing infrastructure, with crews already in place, in jurisdictions that are safe. Let's go to the following slide; but before I pass things over to Jamie, I want to say a quick word on safety. Safety stays our number one priority, always. And during this call, I want to use the chance to offer congratulations to our Nunavut mine rescue team, which last month took first place at the 2024 International Mine Rescue competition held in Colombia, beating out 21 other mine rescue teams from around the globe. Earning the overall champion title is remarkable in and of itself, yet what matters isn't only the achievement but the manner in which it was reached. Our team passed along a great deal of detailed rescue expertise to multiple teams from other nations — knowledge sharing that might very well translate into lives saved in some of those nations at some future point. Remember, when things get dangerous, these are the folks miners depend on. They give up hundreds of hours of their own time to train, and they step up voluntarily — that's what the role means — to go into dangerous places, in dangerous situations, whenever they're needed, to rescue their friends and colleagues. That's a big job. That's a big responsibility. So, congratulations — and thank you even more — to everyone on our mine rescue teams. At this point, I'd like Jamie Porter, our CFO, to walk us through the third quarter's financial results.
Jamie Porter
executiveThank you so much, Ammar. Hello, everybody. What we delivered in this quarter truly shows a history of dependable operational execution and expense management, which keeps converting into exceptionally robust financial outcomes. As you may remember from earlier in the year, cost containment served as the central topic of our Q1 earnings call; when we held our Q2 earnings call, our attention shifted toward discipline around capital, putting money back into the business and expanding it at a consistent, carefully paced rate. This dedication to managing expenses and exercising capital restraint is evidently delivering returns, since the third quarter stood out for record-breaking financial performance in every category. By holding our costs down, we make certain that the advantage of elevated gold prices flows through to wider margins that in the end benefit our shareholders. I'm happy to share that we achieved record adjusted EBITDA of roughly $1.26 billion along with record free cash flow of $620 million, marking the fourth quarter in a row. Revenue grew 31% versus the third quarter of 2023, reaching roughly $2.2 billion. Significantly, our adjusted EBITDA rose 64%, and free cash flow climbed almost sevenfold relative to the same period a year ago. We're also posting yet another record quarter for adjusted net income of $1.14 per share, which represents one more substantial gain versus the comparable period last year. Beyond the gold price, a major factor behind these impressive financials is our ongoing emphasis on controlling costs and continuously optimizing. Turning to our cash costs, we landed at $921 per ounce for the quarter, which falls inside our guidance range for cash costs. Cash costs edged up somewhat versus earlier quarters, due to planned lower production volumes along with increased royalties, as Ammar mentioned during his remarks. Looking at the year-to-date figure, we're still under the midpoint of our cash cost guidance range, sitting at $897 per ounce. Regarding all-in sustaining costs, for Q3 we recorded $1,286 per ounce, pushed higher by increased sustaining capital expenditure, which, again, came as anticipated; we were at $1,169 in Q2; and on our Q2 call, we talked about the need to catch up on sustaining capital during the third quarter, and that's exactly what we did. For the year to date, though, we're still inside our guidance at $1,234 per ounce. Our all-in sustaining costs remain hundreds of dollars per ounce beneath what our peers report. In the quarter, our all-in sustaining cost margin reached 48%, placing it among the strongest in the sector; and compared with a year ago, the gold price has risen about 30%, whereas our all-in sustaining cost margin is up 70%. That's precisely the kind of leverage our investors look for; when it comes to operating costs, we clearly gain from our regional strategy. We're the preferred employer across many regions where we do business, which helps keep employee turnover at low levels. More than 80% of the gold we produce comes from Canada, where we benefit — we're presently benefiting from a comparatively weak Canadian dollar. Also, we're highly committed to ongoing enhancement so we can boost output and run our mines at peak efficiency, and Dom is going to speak about that in a moment; each of these elements feeds into really robust cost management. Across the whole of 2024, we anticipate landing inside our cost guidance range, which stands at $875 to $925 per ounce, plus $1,200 to $1,250 per ounce for all-in sustaining costs. On the whole, our financial performance has been outstanding for the quarter and the first 9-month of the year; let's proceed to Slide 7. During the quarter we substantially reinforced our balance sheet, cutting net debt to $490 million, down from $1.5 billion when the year began. That means we've bettered our net debt position by more than $1 billion across the first 3 quarters of 2024, all of it underpinned by record operating margins and free cash flow. In July, we paid off $100 million of senior notes when they matured; we additionally made accelerated payments amounting to $275 million against our $600 million term loan facility, which brings total debt repayment for the quarter to $375 million. Returns to shareholders also remain a priority for us; over the first 9-month of the year, roughly 45% of the free cash flow we generated has gone back to shareholders via the dividend and share buybacks; our plan is to keep this up, to keep reinforcing our balance sheet, to keep reinvesting in the business, and to stay opportunistic when it comes to repurchasing shares. Let's move along to Slide 8. This slide gives a solid picture of how we keep applying a disciplined approach to capital allocation. The pie chart shows that we're making sure the record free cash flow we produce ends up benefiting our shareholders, once again both directly via dividends and share buybacks and indirectly by making our financial position stronger. With that said, I'll hand the call to Natasha, who is going to walk through our consolidated operational results.
Natasha Vaz
executiveAppreciate that, Jamie, and good morning to all of you. It's my pleasure today to walk through the operational highlights on behalf of Dominique and myself. During Q3, our regions once again put up a strong operating and cost showing, and combined with a higher gold price, that produced record operating margins of $1.4 billion — marking a fourth straight quarter at that level. As you can see on the table in front of you, gold production for the quarter came to 863,000 ounces, while total cash costs landed at $921 per ounce. Each figure matches what we had anticipated. They also capture the impact of the planned shutdown and a lower grade sequence, both at Canadian Malartic and at LaRonde. Turning to the operations themselves, I'll begin with Nunavut. The teams there did a really good job this quarter, once again setting record throughput at both sites, with costs arriving below what we had forecast. Meadowbank hit an impressive milestone as well, pouring its fifth millionth ounce of gold during September. So congratulations are in order for Meadowbank, and really for both operating teams in Nunavut, on a solid quarter. On to Macassa and Fosterville, which were also strong performers during this quarter. Macassa posted another solid quarter of production at 71,000 ounces of gold, mostly thanks to productivity gains at the mine. What Macassa is focused on now is the shift toward mill optimization. At Fosterville, the team set yet another quarterly record for ore tonnes mined. I'm very proud of that group too — they also recorded one of the best quarterly mill throughput figures in the site's operating history. That emphasis on productivity and keeping costs in check is delivering results as the site keeps advancing its full potential model. Finally, and certainly not least, a few words about Detour. The site achieved a record quarterly throughput rate of roughly 77,000 tonnes per day, which is ahead of the 76,700 tonnes a day target. This result came mainly from stable mill run time of about 93% for a second quarter in a row, along with several small optimization initiatives carried out during the August planned shutdown. Looking back over the first 9 months of 2024, our sites keep demonstrating a strong operational and financial track record. And as Ammar noted, year-to-date we've generated 76% of the midpoint of our full year gold production guidance, while our cash costs remain inside the guidance range. Because of that, we're confident about meeting our gold production and cost guidance for 2024. To wrap up, I want to call out and once again acknowledge the many performance records set across multiple sites. Those records stem directly from the ongoing focus and dedication to raising operational efficiencies and controlling costs at every one of our sites. So, thank you. I want to express appreciation to every one of our locations for the work you've done in reaching the goals we've set so far, and likewise for the attention you've placed on making the business better—not only when it comes to expenses, but across every area, safety included. With that said, I'll now hand things over to Dom, who will walk us through a few of the efforts we're making to improve.
Dominique Girard
executiveThanks, Natasha, and good morning to all of you. What I'll walk you through today is how we pursue ongoing enhancement at our operations, along with a number of the favorable results that have come from that effort. On this slide, there are numerous illustrations, and those are driven by the sites, which are having a beneficial effect on our expenses. Some of them are direct cost-cutting measures, such as the procurement items you see on the right-hand side, yet the bulk of the benefits originate from gains in productivity, which appear under the mining and processing columns. As you're able to observe, and as Natasha has told you, a great many sites are becoming more productive. If we look at certain wins — Meadowbank stands out as an obvious one. That began, for instance, back in 2023, when the team pinpointed long-haul trucking as a constraint on the operation. At Meadowbank, long-haul trucking functions much like a shaft does for an underground mine, moving the ore from the mine to the mill that sits 480 kilometers distant. Through a team and a focused approach that brought in truck drivers, the mechanical maintenance team, the road maintenance team and the training department, we raised trucking performance by 18% during the first 3 months — that is, the first 3 quarters of 2024, measured against the equivalent period a year earlier. We additionally set a quarterly record for underground production. And over at the mill, we achieved a new record of 529 tonnes per hour in this quarter. So that means more tonnes mined, more tonnes hauled and more tonnes milled. Every one of these efforts is locking in Meadowbank's 2024 gold production target of 480,000 to 500,000 ounces at a superior cost relative to what was planned. Meliadine, our other Nunavut operation, is likewise doing extremely well, on both the mining and the milling side. During Q3, the Nunavut platform produced more than $0.25 billion in after-tax free cash flow. What we've accomplished in Nunavut demonstrates our capacity to mine under remote arctic conditions. It helps extend the life of mine at both Meadowbank and Meliadine, and it is likewise having a favorable effect on our Hope Bay project, which has the potential to turn into our next mine in Nunavut at 400,000 ounces per year. Guy will give you an update on the encouraging exploration results that came in recently later on in the presentation. Turning to procurement, by consolidating contracts throughout Canada, we've managed to leverage our scale by improving the availability of materials and services and by keeping input prices under control. Lastly, when it comes to workforce, we gain from low employee turnover, and from a low contractor ratio as well; assigning an overall dollar figure to that is hard, but it delivers greater stability for our operation, which supports our continuous improvement efforts. At Detour, for example, by internalizing work for equipment rebuilds, truck maintenance, tire service and tailing construction work, we ended up saving more than $17 million. I want to thank our operating and technical teams for their dedication to unlocking the full potential of our assets through optimization. You can make — you do make the difference as we stay focused on delivering strong operational performance and cost control. Now let's move to Odyssey and Canadian Malartic. Next slide. At Odyssey, the development rate keeps coming in above what we expected. Sinking of the ramp has reached 873 meters in depth now. Progress on the shaft is likewise going nicely, hitting 839 meters in depth by the close of September; and during Q4, that shaft is going to overtake the ramp and wind up deeper than it. Activities at the temporary loading station on level 64 remain on target, with commissioning anticipated in mid-'25; and above ground, building is moving ahead on schedule too, centered mainly on the main hoist building and the operational complex. Taking everything together, the mine's construction is on cost and on schedule to turn into the biggest underground gold mine in Canada by 2028; yet what excites me even more regarding this project is the enormous geological potential. So now I'll hand things over to Guy, who will present a few results from the biggest exploration program we've ever run at Odyssey and the Canadian Malartic complex.
Guy Gosselin
executiveThank you, Dominique, and good morning to all of you. To begin, I want to express appreciation to every member of the exploration team and to the drilling contractors working throughout our site, because we are making solid headway on this extremely extensive 2024 exploration program. More than 100 diamond drill rigs are currently active across our different locations. And during 2024, we have achieved our strongest health and safety results since we began monitoring those metrics. In addition, I want to thank our exploration group, our drilling excellence group, and our procurement group — we have collaborated very closely with the drill contractor, and we are quite happy to report an overall unit cost decrease of 8% relative to our budget, along with a unit cost that is 16% lower than what we saw in 2022 following COVID, which shows our capacity to manage costs while keeping health and safety performance at a high level; so thank you to everyone who makes this happen daily. Now turning to the key specific driver project on Page 12 in Malartic. At the Odyssey mine, strong exploration results keep coming. To begin with, we have expanded the East Gouldie Zone within the Upper Eastern extension of the deposit. And we view those results as having positive potential for a significant effect on near-term resources and reserves. Also, the creation of a new mining area will improve the ramp-up in the upper portion of the East Gouldie deposit given how close it sits to the infrastructure. And in the Eastern extension at depth, we keep encountering very strong exploration results reaching as far as 700 meters beyond the mineral resources. As an actual example, in drill hole 316, that hole returned 3.4 gram over 16-meter within the main East Gouldie Zone, but also produced very interesting results in a parallel zone that keeps taking shape; that returned 3-gram over 51-meter estimated through thickness at roughly 1,400 meters, showing the potential to keep growing the main East Gouldie deposit, and the potential to add significant additional mineral reserve and resources in those parallel zones to the east. On Page 13, at Detour Lake mine, we continue to observe strong results in the area we are infilling, which forms part of the advanced underground exploration project that was described in June — at the June update. Strong infill results reaching up to 15-gram over 19-meter and 22-gram over 30-meter not only verify the presence of a wide, higher-grade mineralized corridor inside the large mineralized envelope. But we also — we — I am also quite pleased to see how they verify the continuity of the zone previously drilled at a wider drill spacing. As we keep integrating those new results into updated mineral resources and mineral reserves, we nonetheless see the potential for those recent results and the overall underground project addition to the current open pit mine to bring the Detour Lake mine to our vision of the 1 million ounces of gold per year operation in the future. Moving to Page 14 now, the Hope Bay project. Within the Madrid zone — that's the Madrid deposit area — Patch 7 Zone kept producing some very strong results, reaching as much as 16 grams over 27 meters true thickness at a depth of 430 meters. Those results, we expect, will make a meaningful difference to the mineral resources at year-end, and this new discovery at Patch 7 remains, in our view, a genuine needle mover when it comes to the project's economics. Also, thanks to help from our permitting team, I want to point out that we were recently able to finish the 2.3 kilometer exploration track heading toward Patch 7, which now makes it possible to keep — to drill this area aggressively through Q4 at Hope Bay, where the shift to winter weather has historically capped what we can do on surface exploration; those results, together with the exploration work still underway in Q4 and Q1, should, we expect, let us improve the project development scenario now under study. And given those recent Patch 7 results, we still foresee a possible project update by the end of 2025 or early 2026. Last, Page 15. The encouraging results at a number of other operations, including Meliadine, Macassa, Fosterville, where we still see room to extend the deposit at depth and laterally. All of this points to the potential for a bright future in exploration upside as we work on putting together our 2025 exploration program and on a long-term strategy to get the most value from those existing infrastructure, on top of our strong project pipeline shown on the previous slide. So thank you to our entire exploration team, who keep generating a great deal of value through the drill bit in a cost-efficient way as part of an important reinvestment in our business, and even more importantly, with the best health and safety performance our exploration group has ever had. With that, I'd like to hand the microphone back to Ammar.
Ammar Al-Joundi
executiveThank you, Guy, and thank you to everybody. Congratulations as well, Guy, not just for those thrilling drill results, but also for the incredible work on controlling costs. And above all, for the safest quarter we've ever had, based on how we track safety within our exploration team. So nicely done there. Let me wrap up by stating that here at Agnico, we will keep pursuing the very same approach that for more than 60 years has produced steady, dependable operating results, with a focus on expanding value on a per share basis. And we accomplish that, first, through our regional concentration. We concentrate on regions that a, possess the geological potential for several mines across several decades and b, offer the political stability that lets us run several mines for several decades; and by doing so, to build a competitive edge in the areas where we operate and, as far as we can, improved cost control and reduced volatility, and that's what we're witnessing in the current environment. Second, we aim to be the finest gold company we possibly can. Our attention is on quality, on per share metrics rather than on size. To us, that means not only outstanding operational results, but also the very highest ESG standards. All of us give our best effort. But when you intend to remain somewhere for 60 years and construct your second, third and fourth mine, you adopt a far more long-term view toward the environment, toward the — the communities where you're located, and toward good governance. We maintain disciplined capital investment. That disciplined capital derives mostly from a knowledge edge. In the areas where we operate, where we've been — we usually possess very strong insight into the investment opportunities. It's far simpler for someone like me to decide to invest somewhere where I have people, where we've operated for decades, than to invest in a nation I've never visited, in a location where we truly lack any particular expertise. We think we are positioned in a way no one else is. We're in strong regions. We hold strong assets, strong long-life assets, and we've shown a capacity to build on those assets to deliver not only a solid return on capital, but an outstanding risk-adjusted return on capital. And lastly, consistently for more than 41 years, we have distributed a dividend. We believe in maintaining a strong balance sheet, we believe in per share metrics, and that has always been what motivates us. So that's the approach we've followed since 1957. It serves us well, and we'll keep doing it. And with that, operator, let's open the line for questions.
Ralph Profiti
analystI've got a couple of things to ask. Perhaps I'll begin with Guy, and it's about the exploration work at Detour. That lengthy interval returned some robust intercepts beneath the 600-meter mark. As I understood it, the resource update drilling was going to target depths that sit, roughly speaking, above 600 meters. I'm just curious whether that's still how you see it. And what's your current thinking regarding how deep that 3-year program you announced in June might reach?
Guy Gosselin
executiveYes, that's a great one. Appreciate you asking. I'd say those are things we're actively addressing. Clearly, near surface, our focus will be on the range from 0 up to 600 meters. Then, as the ramp continues to advance, we'll keep pushing ahead with infill drilling to bring the spacing down to what's needed for indicated resource classification; so a portion of the shallow zone is getting some work, and we'll keep using wide drill spacing out on the deep extension toward the west; however, now that our study came out in June, our real priority is raising confidence in those resources that formed part of the June PEA, in order to back the underground project.
Ralph Profiti
analystUnderstood. All right. Yes, that's useful. Then, as a follow-up for Dominique or Natasha regarding the prepared remarks about optimizing the Macassa mill, now that the constraint has shifted from the mine to the mill: I'm just curious, is this a debottlenecking initiative aimed at greater throughput? Are you trying to raise the mill's baseline availability, or extend coverage? A bit of detail on that would be helpful.
Natasha Vaz
executiveAppreciate the question, Ralph. Yes. So regarding the mill, we are optimizing — optimization of the mine continues; at Macassa we now have new infrastructure including the shaft and the ventilation; as a result, the bottleneck has shifted increasingly toward the mill. Given that, we're examining how to maximize, or squeeze, the tower using the infrastructure the mill currently has. So on grinding efficiencies, we're focused on the secondary — or pardon me, the tertiary mills, examining upgrades to conveyors and crushers, simply to adjust the system and determine how much we can push through the mill at Macassa.
Ralph Profiti
analystAll right. So there aren't any fixed goals, let's say, when it comes to recoveries or throughput that we ought to be considering?
Natasha Vaz
executiveNo, none. Our target remains 1,650 tonnes per day.
Lawson Winder
analystThanks for the update today. May I ask about cost inflation? And with regard to some recent news on cost inflation within the industry, particularly labor — are you observing labor inflation that's above average? Then, might you break out the labor inflation you're seeing between employees and contracted labor? It would be quite helpful as well if you could remind us of the split at Agnico between employees and contracted labor.
Jamie Porter
executiveLawson, this is Jamie. Sure; perhaps I'll begin and handle the first portion of the question regarding our workforce, and I'll hand it to Dom or Natasha to discuss what we're seeing on the contractor side. But right now we're in the middle of our budgeting process. We're assuming an increase of about 3%, which would be in line with Canadian CPI on labor. And then, to answer the question about the percentage of our workforce that's labor versus contracted, roughly 2/3 are Agnico employees and 1/3 are contractors.
Dominique Girard
executiveYeah. So when it comes to inflation overall, we're seeing the same pressure affecting both our staff and our contractors. In Canada, where our operations are located, there isn't really a major rise on the contractor side. We constantly aim to maximize, or at times we shift the proportion of contractors we have on a given site based on how that site is performing. For instance, if we happen to be shutting down a site, we may bring in more contractors; but while it's running, that number is smaller. On the whole, contractors make up 35% of our operational workforce. And regarding that contractor base — to me, a contractor is just like an Agnico employee; they're the same individuals. In fact, many of our contractors are actually the children of our own employees. That's because it serves as the entry point to get started in this industry. Over time, as they gain experience, we bring them on board. So when it comes to safety and how we ultimately treat them, the goal is to collaborate so we're more productive and achieve the results. So there's no problem with contractors.
Lawson Winder
analystAll right, that's great. Then, James, I just want to make sure I understand what you said about that 3% — are you talking about 2025? Or does that reflect what actually happened during 2024?
Jamie Porter
executiveRight. So moving from 2023 to 2024, the figure was nearer to 4.5% as we headed toward 2025. Once more, our current budget assumes 3%. That isn't a guarantee we'll land precisely on 3%. It might fall between 2.5% and 3.5%, but at this moment our projection is a 3% rise as 2024 moves into 2025.
Lawson Winder
analystIs that only for labor, or does it cover inflation more broadly?
Jamie Porter
executiveIt's specifically labor. Like Dom mentioned, we're observing the same thing when it comes to contractors. Labor plus contractors make up roughly 45% of what our costs consist of. Within that 45%, we're again projecting an increase of about 3%.
Lawson Winder
analystAll right, that's great. And could I also ask about Hope Bay? The drilling results there are truly outstanding. I'm interested in how this is shaping your current view of the project. Do you see any shift in when construction might begin, or even in what the project encompasses?
Dominique Girard
executiveYes, Lawson, this is Dominique. It's certainly encouraging news. Patch 7 changes everything. At this point, we simply have to resize or refocus the project — for instance, given what we now have, should the mill be relocated to Madrid? That hadn't been the plan. But the team requires some time to reassess and weigh the trade-offs. Mining it is simpler. It will need less development to yield, say, more ounces. It's a big zone, with a higher grade — somewhat better grade than our other one. And as Guy said, we're targeting late 2025 to early 2026 for a formal study and a potential construction announcement.
Lawson Winder
analystJust so I have it straight, when is that construction scheduled to happen?
Dominique Girard
executiveLate '25, early '26.
Lawson Winder
analystRegarding when building begins. All right. That's excellent...
Dominique Girard
executiveFor a study.
Lawson Winder
analystOh, for the study. All right. Understood. All right. That's excellent.
Tanya Jakusconek
analystCongrats on the Detour coin — the one that incorporates your gold — that's pretty exciting. If I may, I have 3 questions. First, I'd like to build on what Lawson asked regarding labor. So I appreciate that. It seems 15% of your cost structure is contracted. I just want to go over a few points about your cost. First, could you remind me, Jamie — for your budgeting, you've built in roughly 3% inflation for 2025 costs. Can you also confirm for me that you aren't observing any significant shifts in consumables and other items, since that represents about 25% of the cost structure?
Jamie Porter
executiveSorry, Tanya, first I'd like to clarify your remark. I believe you said 50% of our workforce was contracted, which is...
Tanya Jakusconek
analystNo, between 1 and 5. Right, 45% comes from labor, and contracts make up a third of that...
Jamie Porter
executiveYeah, that's right, that's correct. So with that 45%, when you include both employees and contracted workers in that portion of our expenses, we're once again expecting an increase of roughly 3%. Looking at the remaining parts of our cost structure, we've actually observed energy prices coming down. So diesel and power have declined somewhat, and those account for another 12% of our total costs. As for everything else, like consumables, inflation is sitting at about 5%. But once again, we're currently working through our budgets. When you consider our performance during 2024, price increases were hovering around six to seven percent, while the target we set was a three percent rise. That's precisely what we're here to do—push our mining operations to run as lean as they can so we can offset rising costs wherever possible. We intend to keep at that effort as we move into 2025.
Tanya Jakusconek
analystRegarding your labor agreements — could you refresh my memory on whether any at your major operations are set to expire? During 2025?
Dominique Girard
executiveCorrect, Tanya. This is Dominique here; we redo a contract each month. It isn't a single, all-at-once arrangement. That depends on which contractors we're dealing with. A year ago — actually 2 years back — the bigger batch came together, and that included the former Kirkland Lake division. This year, the division we're seeing more of is the Canadian Malartic division. Still, no particular date stands out. Every contract differs; take this month, for instance — I noticed two of them arriving on <<inaudible>>, and inflation has not been a significant factor.
Tanya Jakusconek
analystAll right. And I suppose, to wrap that up, one more thing — since cutoff grade clearly plays a role in affecting costs too — I need to ask about reserves and resources: when you factor in the oil price at year-end, cutoff grades, and input costs, at a high level, how do the grades we're putting in look? Are we holding our cut-off grade where it is?
Guy Gosselin
executiveYes, that's what we intend to do. I'd put it this way: we are — as Jamie and Dominique and I discussed — making refinements to our operation costs, so the OpEx, and what we intend is to keep cutoff grade unchanged. Clearly, if gold prices are higher, and if we were to have extra milling capacity available at certain operations, we might benefit by adding. But the plan — what we intend stays consistent: keep cutoff grades where they are, feed the mill the correct tonnes and the correct grade. And where capacity is available beyond what we need, look to capitalize on a possible opportunity.
Tanya Jakusconek
analystAll right. To wrap up on expenses, if I may, and after that I'll pose just a single additional item regarding tailings. So, Jamie, taking a bird's-eye view, suppose your total cash cost sits at $900 per ounce, and you apply that 3% to 4% inflation to a cost structure like that going into 2025, plus you adjust the gold price by $3 per ounce on your royalties for each $100 move. Would it be fair — a sensible estimate, presuming no shift in cutoff grade, no change in volume, and no movement in the Canadian dollar? Would that count as sensible?
Jamie Porter
executiveCorrect. Tanya, what I'd tell you is that, once again, our budgeting work is currently underway. My perspective is much like what we experienced a year ago, correct? Inflation was at 6% to 7%, and our result beat that. So what we're observing is — once you include the elevated royalties and all the rest, our costs have risen roughly 5% compared with the prior year, and we'll aim to hit that figure or improve on it.
Tanya Jakusconek
analystYeah. No, thank you for that. My last item here concerns tailings, if that's okay. I'd just like someone to walk me through it. When you consider your tailings, I'm aware that roughly $1 billion went into CapEx. Could somebody remind me what portion of that relates purely to the yearly tailings work? Also, do you anticipate any sites spending beyond what tailings normally require over the coming 2 years? At Canadian Malartic and Detour, I understand both have sufficient tailings capacity. Still, I'm curious whether you expect any extra tailings outlay.
Jamie Porter
executiveYes, Tanya, regarding that, I don't currently have the detailed figures with me, but I'll have Jean-Marie or Rhea follow up and provide you with those details.
Josh Wolfson
analystMy first one concerns Fosterville. It appears that quite solid headway has been made on those initiatives to push higher volumes. Looking at where output sits right now, it seems to annualize at more than 250,000 ounces, compared with the 150,000 that guidance implies for the periods ahead. At some stage, there was talk about revising a mine plan, or at least giving some fresh details about what the forward-looking expectations look like for that asset. What's the timing for that information? And would extrapolating from some of the year-to-date results be a sensible thing to do?
Natasha Vaz
executiveNatasha here. I appreciate the question. Regarding Fosterville, yes, work continues on the full potential model, or the study tied to it. That's where a portion of the productivity gains are originating. So the team is striving to get the most out of the mine and incorporate that into their mine plan — the newest and best life of mine plan. So we anticipate seeing that — those results at some point in early 2025.
Josh Wolfson
analystAll right, and then perhaps a question regarding a few of those equity investments made lately, plus some of the media chatter about M&A during Q3. I'd like to know whether any commentary can be offered about which criteria the company examines when considering transactions, and how that gets weighed against the pipeline of development projects Agnico already holds? Then, concerning the latest deal, how does the company position that investment alongside its long-standing focus on its established mining regions, given that this one is a new region?
Ammar Al-Joundi
executiveJosh, Ammar speaking. Our method when it comes to capital investment stays quite consistent, whether it's organic or from outside. As you would do with your own personal account, our capital investment is always about whatever delivers the greatest return with the smallest risk. So for us, an advantage always exists — we've stated this, and our strategy shows it — for organic growth, because in most cases you've already put in a lot of the capital, so you can build on capital that's already there. You also enjoy a far stronger degree of confidence about it; that has always served us well. Another thing we consistently do, and this connects to the second part of your question about ATEX, is this: when something is external, we have a lengthy record of acquiring small strategic stakes so we can learn more about what we're dealing with. At times we'll hold a position for years; and gaining that knowledge edge is worthwhile, since it lets us make capital investments more prudently. For us, a major element of discipline isn't merely declaring it will yield a 15% return. It's really about doing the diligence and acquiring the knowledge. So with our ATEX investment, consider what we do; we want regions. To start with, we seek strong geologic potential. After that, we seek political stability so operations are possible. Now, we're a gold company, yet our focus is on earning money for our shareholders. And when it comes to copper, given geologic areas with a lengthy record of being operable, let's be honest, Chile sits at the top globally. Well, quite literally up in the Andes; but it is the finest location and has been so for decades. For us it would be a new jurisdiction, though it is a solid jurisdiction. Still, let me make this clear. Nothing is being built by us there. We have no plans to do anything; this is an early-stage investment, and we'll watch where it goes from here. But I want to be clear, it isn't as though we're hurrying in to construct a project at the top of the Andes.
Mike Parkin
analystNice work on the strong quarter. One thing I'd like to ask Guy about. In your presentation, the deeper Phoenix area is shown as a pit with very high grades and considerable depth; but does that sit within a zone — the Cardinal structure you're pointing to on Slide 15? Is that area relatively new for you? Or how do you see it? Does it get you excited that there's smoke associated with a high-grade pit? And thinking along those lines, could this perhaps signal another Swan Zone? Any thoughts you could share would be welcome.
Guy Gosselin
executiveAll right. Thank you. As you — I'm aware you know the deposit fairly well. It's a deposit controlled by structure that follows that plan, and there are spots being developed through the system. It formed part of the reality in the upper portion. Then at depth, when examining the Lower Phoenix, the base of the Swan Zone at a certain point down within the Swan, we began to observe that parallel play starting to emerge; that sits a couple of tens of meters from the typical — our comprehension of the typical <<inaudible>> Swan and extensions of the main deposit. But that's entirely usual for this type of deposit. There's a kind of en-echelon structure down plunge. We're very happy to see those sorts of results. And we do see that. And at some stage, you come to understand that en-echelon feature, perhaps the main structure might have wound up shifting into that space. So because of that, our interest and clearly, that recent result of 72-gram over 5-meter is very exciting. And inside it, there was a wide — a narrow, I'd call it, a couple of tens of centimeter with super high-grade at 1,300 grams. That has a somewhat similar appearance to the Swan. It's a bit smaller still. So we keep seeing here and then, some — here and there throughout the deposits, some smaller version of the Swan. And it's still early days and it simply demonstrates that the system stays open at depth, and we will keep pursuing the investigation of that going down the plunge of the ore body.
Mike Parkin
analystAlso, is this the initial sort of drill hole showing that grade in that? Or — right now I can't recall what was done with that...
Guy Gosselin
executiveNope, we have been receiving — at times during the prior quarter we hit some 10 grams across 10 meters. So looking back at, let's say, our latest six press releases, we've reported intercepts that were particularly pinpointing the Cardinal's play. And it keeps developing as we keep moving deeper. And in certain spots, you'll get a few higher grade hotspots within the system similar to that; from a factor-grade thickness perspective, it's among the good ones, though a few other pretty good ones have also shown up.
Mike Parkin
analystAlright. So, I suppose for my final question, this is likely for Ammar, or perhaps someone from the leadership team with a closer focus on Ontario and Quebec. On the staffing side, we've clearly witnessed a few new mines in Ontario starting up and increasing production. Word is that labor remains reasonably tight. We know you folks are benefiting from being a preferred employer. But could you address whether there are any initiatives or conversations happening with government officials, where immigration policy is bringing in what appears to be quite large numbers of people, yet they're settling more in urban centers and not — is there some sort of program designed to draw them northward into the resource extraction sector? And if such a program exists, what are the obstacles? Is it housing, the way it is in this region, or a shortage of skills? Any thoughts on that would be welcome.
Ammar Al-Joundi
executiveWell, that's an excellent question. What I'd like to do is have Natasha discuss a few particular efforts we're undertaking; and after that, perhaps I'll address the second part, since it's a good question. Are you also examining urban areas to determine if you can source workers there? And the response is yes, but I'll have Natasha start first.
Natasha Vaz
executiveRight, Mike, thanks for raising that. Indeed, what we continue to observe is a market that remains tight. That said, since we hold the position of employer of choice, the number of open positions we carry stays fairly limited. It is — trades in particular are where conditions are really stretched; therefore, what we're focused on is, and I believe we touched on this previously, a pilot initiative that's currently underway. This involves targeted immigration, done alongside our partners in Mexico. Earlier in the year, we relocated 12 families here so we could assess circumstances in Kirkland Lake and determine whether everyone settles in successfully. Things have been going very well up to now. A month back, we were on site speaking with the team, and we genuinely value that. They arrive with substantial expertise, plenty of fresh thinking, and the whole effort is progressing nicely. Where the government is concerned, we're collaborating closely with them on critical infrastructure, as you pointed out. Our attention is on housing, especially around Cochrane and the Kirkland Lake region, plus medical care, specialized facilities for that purpose, and educational centers for kids as well. A further piece is that earlier in the year, the government granted us a Skills Development Fund amounting to roughly $10 million, which supports developing and training people across the north.
Ammar Al-Joundi
executiveThen, Mike, regarding urban areas—it isn’t only mining. Canada broadly runs a trade deficit. We’re partnering with people in cities to explore chances for young folks who might not choose the post-secondary path but honestly feel unsure about their direction. We’re trying to spark their interest in skilled trades, which would definitely benefit Agnico, yet would also support many other sectors across Canada.
Daniel Major
analystI have a handful of questions. On the operations front, throughput at Fosterville is holding up well, even if grades are declining. Could you share some color on how Q4 shapes up and what next year looks like at that site?
Natasha Vaz
executiveDaniel, regarding Fosterville, we're in the same situation as our other operations — we've been focused on the budget and the life of mine plan. So early next year we'll be better placed to give further guidance.
Daniel Major
analystAll right, that's fine. On the second item, we spent a fair amount of time discussing inflation in labor and operating costs. Could you offer anything on CapEx? Are any pressures showing up there? And also, given the encouraging drilling results in the project pipeline, do you have any guidance on how CapEx might trend directionally next year?
Ammar Al-Joundi
executiveYeah. On the CapEx side, we aren't really seeing anything out of the ordinary when it comes to inflation. It's fairly consistent with everything else. Drilling has delivered some solid results for us. That said, we'll stay disciplined and pace out our capital spending. Looking at Detour underground and Upper Beaver, for those two combined we're putting in roughly $100 million annually across the coming 3 years, largely to derisk them. With CapEx, the key question is always whether you've completed sufficient engineering. It's preferable, first, to have a strong team; and second, to allow yourself time so the engineering is done properly. If not, that ends up costing you far more than any inflation would; and our team handles that quite well.
Daniel Major
analystAll right. If I may, just two additional questions. When you look at the quarter, cash flow came in fairly robust, helped somewhat by working capital movements, especially that $96 million tax variance, I believe. Could you offer some indication of how you see that trending in Q4, as far as working capital and free cash flow go?
Jamie Porter
executiveYes, Jamie speaking. Predicting the change in our working capital for the fourth quarter is genuinely difficult. Frequently during the third quarter, working capital ends up consuming cash, simply because of certain expenditures needed for our Nunavut operations; in Q3, the outcome was reversed, yet it's tough to give you any detailed guidance regarding where we'll land in Q4; a great deal hinges on when tax installment payments occur, accounts payable, and all the rest. So yes, we'll see.
Daniel Major
analystAll right, and let me squeeze in one final question, if that's okay. Has there been any news regarding the talks about San Nicolas?
Natasha Vaz
executiveNothing fresh to report on that front, Daniel. Permitting remains underway, and so does the feasibility study.
John Tumazos
analystCongrats on everything that’s going well. I saw that grades dropped at 10 of the 12 mines, and at 5 of those mines, grades declined by more than 10%. And rather than seeing a $100 cost increase because of lower grades and a big drop in production, you processed 18,000 tonnes per day more companywide, with 5 sites setting mill throughput records. How much further can you push mill throughput at Fosterville or Meliadine or Macassa? How did you manage to add 18,000 tonnes a day without spending $0.5 billion or $1 billion on a new mill? Were the earlier capacity figures too low? Or take us through how that happened. It seems like you’re saying you avoided a $100 cost increase by milling more; and nice work on that.
Dominique Girard
executiveJohn, this is Dominique. I’ll handle one part, and maybe Natasha can take the other. But where we do have capacity, as you know, the main one, the largest one, is Canadian Malartic, where throughput is now in the 60,000 tonnes per day range, and we’re going to gain more capacity as we go underground; we have won 2/3 of the mill capacity available, and we’re working on that. A lot of it comes down to exploration. But maybe with current operations, I’d say Meliadine has some capacity we’re looking at — we just started the new <<inaudible>> mill and the new filter-press, and we see that we’ve reached 6,500 tonnes per day; now we just need to make it happen on the calendar day, but there’s opportunity at that site. Meadowbank, well, since 2020, they are increasing year after year. So we’re going to keep continue pushing on that. But the other one about Fosterville, Detour, I’ll let Natasha talk.
Natasha Vaz
executiveYeah. That sounds fine. Thank you for asking, John. Regarding Fosterville, we enjoyed a strong quarter for throughput in June. During that month, we set a record — our average was roughly 2,700 tonnes per day. That's quite impressive on that front, exceeding what we thought the mill was capable of; it showed us some things, and we're continuing to learn more about how to keep that level going. As for Macassa, like I said before, our aim is a run rate of 1,650. Once again, though, we're examining what's possible — using the infrastructure already in place to push it further. So we're still in the early stages, but the team is putting together a plan to determine whether we can exceed that figure. Then at Detour, everything went according to plan. Our goal was a run rate equal to 28 million tonnes a year by the close of this year. We've arrived at that point. We're nearly there. Now we simply have to keep these rates going beyond a single quarter, and we'll continue striving to raise it. As we put out in our technical report, we're aiming to lift that to 29 million tonnes a year by the end of 2028. To that end, we're considering changing the VFD or adding VFDs to the secondary crusher, plus installing a Malartic-style discharge box for the SAG advanced process control that's in place at our other mills. So some work remains there. Still, we're making headway, and we believe there's potential.
John Tumazos
analystAt Fosterville, things are especially intricate given the white quartz free gold along with the black sulfides, which need the heated bioleach. How were you able to add that much extra capacity so fast across every part of the Fosterville mill?
Natasha Vaz
executiveRegarding that, we actually had a small amount of spare capacity. On the whole, we're operating at the pace the mill — the site had anticipated. Since June was somewhat unusual for us, we're looking into it more deeply and trying to understand it; however, if we were to possibly go above 950,000 tonnes per year at Fosterville, you're correct, John, we would need to expand capacity at the BIOX circuit.
Martin Pradier
analystStrong quarter. What I mainly want to ask about is capital allocation. Will you keep paying down debt, or where do you expect debt to land by year-end? And given that you now have net debt of nearly $500 million, should we expect a bigger dividend down the road? Will there be additional share buybacks?
Jamie Porter
executiveYes, this is Jamie speaking. Appreciate the question. I really do believe we'll keep making the balance sheet stronger. On the term facility, $325 million is still outstanding, and it comes due in April of next year. We might look at paying down part of that ahead of schedule during the fourth quarter; we'll aim to — at the gold prices we're seeing now, I think there's a real chance we could actually finish this year in a net cash position. That said, the near-term priority is to keep strengthening the balance sheet; as for dividends and share buybacks, well, a meaningful share of our cash flow is going back to shareholders. According to our forecast, roughly 45% of the cash we generate this year will go straight to shareholders by way of dividends and share buybacks. We'll keep paying a strong dividend, and we'll pursue opportunities on the share buyback side that are really aimed at keeping dilution to a minimum.
Ammar Al-Joundi
executiveOne more point, and I suppose we're almost out of time here, is that this cash is the property of the people who own shares in this company. It's theirs, as owners. And we won't — regardless of how much surplus cash there may be, we won't take what belongs to those owners and put it toward anything that lacks sense. Discipline is going to remain our approach. We take pride in 41 years of paying dividends. And with gold priced where it is now, should that hold, my expectation would be a growing return to shareholders as time goes on.
Anita Soni
analystI believe nearly everything has already been covered. Honestly, the final item about capital allocation was the only thing I still had left to ask. So congratulations on a solid quarter. That was everything from my side.
Ammar Al-Joundi
executiveHappy Halloween to all of you. Thanks for being with us; and perhaps, operator, at this point, we can wrap up the call.
Operator
operatorEveryone, that wraps up the call for today. We appreciate you joining us. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.