Algoma Steel Group Inc. (ASTL) Earnings Call Transcript & Summary

November 8, 2022

NASDAQ US Materials Metals and Mining earnings 45 min

Earnings Call Speaker Segments

Michael Moraca

executive
#1

Hello, everyone, and thanks for joining Algoma Steel Group Inc's quarterly earnings call covering our second fiscal quarter, which closed on September 30, 2022. On the line with us today are Michael Garcia, who serves as our Chief Executive Officer, and Rajat Marwah, our Chief Financial Officer. Just a note that this session is being recorded and a replay will be posted later today under the Investors tab of Algoma Steel's company website, www.algoma.com. I want to caution that what we say during this call could include forward-looking statements as defined under applicable securities laws, and those come with assumptions along with inherent risks and uncertainties. Results in reality could end up differing materially from anything stated today. Additionally, our financial statements follow IFRS, which is not the same as US GAAP, and during this discussion we will reference some non-IFRS financial measures. Yesterday evening, we put an earnings presentation online to go along with today's prepared remarks. You can locate the slides for this call under the Investors tab of our company website; so with that said, I'd ask all participants today to review the legal disclaimers found on Slide 2 of that earnings presentation, and to also look at the risks and assumptions described in Algoma Steel's financial statements together with management's discussion and analysis covering the full year that ended March 31, 2022. Keep in mind that our financial statements use the US dollar as the functional currency and the Canadian dollar as the presentation currency. Our fiscal year spans April 1 through March 31, and the financial statements we've prepared cover the three months that ended September 30, 2022. Also note that unless we say otherwise, every amount mentioned on this call is in Canadian dollars. After our prepared remarks wrap up, we'll move into a question-and-answer session. At this point I'll hand things over to Michael Garcia, our Chief Executive Officer. Mike?

Michael Garcia

executive
#2

Thanks, Mike. Morning everyone, and I appreciate you being on the call. As we always do, I'll begin by talking about what matters most to us — keeping our employees safe. Here at Algoma, safety is something we won't compromise on, and because we've stayed focused on it, our lost time injury frequency rate has gotten much better over the past 10 years. That said, we remain committed to staying diligent as we keep chasing zero injuries in the workplace. I'll walk through what happened and what we achieved in the quarter and after it closed. After that, I'll hand things to Rajat, who will dig deeper into the figures, and then I'll wrap up with my views on where steel markets stand right now. Results for our fiscal second quarter fell short of the bar we set for ourselves at Algoma. A number of operational difficulties showed up, and we told you about them last month — commissioning problems at the plate mill, a fire involving one of our 2 coal conveyors, labor shortages tied to COVID at our direct strip production complex, plus softer steel prices across the market generally. We're taking steps to put our operations on firmer ground and deliver better results. More specifically, we're tackling those operational difficulties directly so we can get back to running at full capacity; we're keeping our attention on controlling costs and managing working capital efficiently to get the most out of margins and cash flow. We're holding the same pace of spending on our EAF project, which will transform Algoma in a dramatic way, bringing greater capability and long-term sustainability. And above all, we're staying focused on running safely for our employees, our customers and the communities we serve. Through the quarter, we kept commissioning Phase 1 of the plate mill modernization project, working through automation upgrades that will boost quality and capability at Canada's only discrete plate mill. Those automation difficulties are still with us as we equip our legacy plate mill with modern, next-generation process controls. On the mechanical side, every upgrade is finished, and what's left involves the IT side of automation. During the quarter, technical and business leaders from our company toured the vendor's European facilities and sat down with their senior executive team here in Sault Ste. Marie to move forward on plans for finishing commissioning and to apply what we've learned to Phase 2 of the project. This work will carry on into the calendar fourth quarter, and we expect the plate mill to stay in the roughly 80% utilization range until things wrap up in early 2023. Phase 2 of the plate mill modernization project is presently set to kick off in the middle of next calendar year; we'll keep market conditions and other operational factors in mind when we make the final call to start. At our direct strip production complex, or DSPC, output came in below what we expected for the quarter. Our community wasn't spared from COVID's effects, and over the quarter we had a concentrated outbreak that hit the DSPC. We're putting a number of steps in place to deal with labor availability, and that includes cross training additional employees so we're better prepared when absenteeism hits. Back in August, a fire broke out at one of the coal conveyors serving two of our three coke batteries. Thankfully, nobody was hurt. Repairs have all been finished, and the coke ovens are running at full capacity. That fire hurt our ability to make coke in-house over the quarter, which meant we had to purchase product from a third party, and that weighed unfavorably on cost and profitability. Alongside those operational difficulties, we were also contending with what has been a volatile market overall for steel and for raw material inputs, which affected realized prices and cost. Our consolidated results featured shipments of 435,000 tons, revenues of CAD599 million and adjusted EBITDA of CAD83 million. Over the quarter, we kept moving forward on construction of our transformative electric arc furnace project, which is still on budget and on time for our planned 2024 startup. We finished the next phase of our capital allocation program through a $400 million substantial issuer bid, which led to the successful repurchase of 41 million shares, or almost 28% of our issued and outstanding shares at the time of announcement. Once the SIB wrapped up, we could resume activity under our normal course issuer bid, or NCIB. Over the quarter, we bought back 1.5 million additional shares. And as of September 30, Algoma has roughly 104 million common shares issued and outstanding. Early in the quarter, we reached agreements with both local chapters of the United Steel Workers that represent our hourly, technical and frontline supervisory employees. We're pleased that these five-year agreements give the Company labor stability throughout our transformation to electric arc steel making. Now, I'll hand the call over to our Chief Financial Officer, Rajat Marwah, to walk through the financial results for the quarter, closing with some thoughts on the markets. Rajat?

Rajat Marwah

executive
#3

Thank you, Mike. Good morning, everyone, and thanks for being on the call. Our results for the fiscal second quarter, though difficult because of the operational matters Mike mentioned, matched the guidance we had given for shipments and EBITDA. Let me repeat that every figure is in Canadian dollars unless stated otherwise, but the US dollar serves as our functional currency. The Canadian dollar depreciated significantly during the quarter, and that affects balance sheet comparisons from one quarter to the next. Net income for the quarter came to CAD87 million, or CAD0.36 per diluted share, versus CAD288 million and CAD4.02 per diluted share a year earlier, and the drop stems from market conditions plus the operational issues we are trying to fix; on top of that, the quarter took a hit from a one-time charge that raised pension and post-employment benefit expenses. That one-time charge arose from extending indexation for the contract period tied to ratifying new collective bargaining agreements with our unionized employees. Government loans tied to our capital projects remain the sole long-term debt on our balance sheet; we closed the quarter with CAD465 million in unrestricted cash and have not drawn on our revolving credit facility. Thus, even after we funded our $400 million SIB, our balance sheet is still solid; let me now turn to the main drivers behind our performance. Shipments for the quarter totaled 435,000 tonnes, a decline of 25.9% from the same quarter last year. As we said before, delays during commissioning of the plate mill modernization project had the biggest effect on shipments. Beyond that, volume at our DSPC suffered because of production shortfalls caused by COVID-related workforce availability events. Net sales realization came to an average of CAD1,266 per tonne, 20.6% lower than the prior year period. That drop mostly mirrors softening market conditions during the quarter. Steel revenue therefore reached CAD552 million for the quarter, 41.1% below the same quarter a year ago. Turning to costs, Algoma's cost of goods sold averaged CAD1,033 per tonne for the quarter, 20.7% higher than the prior year period. Among the main reasons for that rise are substituting purchased coke for internally-produced coke following the conveyor fire, along with higher purchase prices for many key inputs such as natural gas, alloys and scrap. Adjusted EBITDA for the quarter was CAD83 million, within the range we had guided previously, compared with CAD431 million in the year ago quarter. Taking into account the operational effects during the quarter, specifically the plate mill conveyor outage and DSPC labor issues, we estimate a CAD130 million drag on EBITDA. Of that amount, about 60% landed in our fiscal second quarter results, while the other 40% should affect fiscal third quarter results through the flow-through of higher production cost into inventory. If we look at cash flow, operating activities consumed CAD66 million during the quarter, whereas the same period a year earlier produced CAD380 million. Among the primary factors are a decline in adjusted EBITDA and substantial working capital consumption this quarter, since inventories of raw materials and work-in-progress both increased because our production volume and shipments were lower. We'll keep drawing on working capital throughout the third fiscal quarter, as contracted raw material volumes arrive before winter and we anticipate carrying above-normal inventory levels until the calendar year ends, with those inventories gradually unwinding in 2023. We ended the quarter with CAD465 million in cash and cash equivalents on our balance sheet. Turning to an update on EAF project spending, as I noted during the last call, roughly 8% of the expenditure took place in the previous fiscal year, about 60% should be incurred during fiscal 2023, and the remainder will come after 2023. Through the close of the September quarter, we've invested approximately CAD163 million in the EAF project. Considering the project as a whole, fixed price commitments cover about 62%, leaving 38% that has yet to be contracted. Alongside the headway achieved on the EAF project, we're happy to have finished our SIB this quarter; beyond the SIB, we continue returning capital to shareholders through several channels, such as our regular quarterly dividend and our NCIB. Our cash balance and strong liquidity serve us well when markets are volatile, carrying us through the cycle while enabling us to push forward with strategic capital projects and transformation. At this point I'd like to hand the call over to Mike for a market update and closing remarks. Mike?

Michael Garcia

executive
#4

Appreciate that, Rajat. If we examine where the North American steel market stands right now, prices have been falling fairly consistently across most of this year. The peaks we saw back in March, near when the Ukraine conflict began, gave way quickly, and through the summer and on into autumn, pricing has bounced around different support thresholds. Both the steel sector and our own customers are still dealing with pressures tied to inflation and interest rates, problems in supply chains, and worries about a recession. Even so, because a large share of our sales comes from contracts, our order book gives us confidence that demand for what we make will stay in line with what we've projected, and that covers sales into automotive, construction, oil and gas, plus other industries that use steel heavily. On top of that, trade policies and the way prices are moving globally make our market less appealing to importers. Our attention stays on making operations more dependable, and right now we're carrying out several scheduled seasonal maintenance projects before the winter stretch of the fourth fiscal quarter arrives. When we look at the fiscal third quarter, we anticipate shipments will rise compared with the prior period, though planned maintenance work and reduced output at our plate and strip facility—where we're finishing Phase 1 commissioning—will hold that back somewhat. Combined with where steel prices sit today, we expect lower net sales realizations, which will weigh on margins for our products. Even with the uncertainty out there, the published forward curve for hot-rolled coil right now points to prices climbing a little between now and next summer, but those levels are still far under what we've achieved over the past few quarters. Given all of this, our main priority stays on disciplined financial management, getting back to full operating capability, and carrying out our EAF project, which opens the next chapter for our Company and lays the groundwork for creating long-term value for our stakeholders. The market is still tough and we're in the middle of commissioning our plate mill, but my position matches the Board's: over the longer term, we expect to generate substantial free cash, and that backs our transformation efforts, which include our two key capital improvement programs—phase two of the plate mill modernization and the EAF. We're determined to move past the operational difficulties we've encountered so that our existing facilities produce safely, reliably, and efficiently, all while we push the EAF project forward. Many thanks for your ongoing interest in Algoma Steel; we're excited about what lies ahead. With that, we'd be glad to take your questions. Operator, could you please provide the instructions for the Q&A session.

David Ocampo

analyst
#5

Thanks. Mike, you mentioned that 40% of that $130 million hit ought to show up next quarter; I'd like to know if you can split that out according to the operational problems you're dealing with — the plate mill modernization, the coke operations, and then the labor availability.

Michael Garcia

executive
#6

Absolutely, David. We've got some more detailed information ready on that; so I'll hand it to Rajat, and he can take you through it in a bit more depth.

Rajat Marwah

executive
#7

Hello David. This is, in my view, the key question this quarter, and from a business standpoint it's straightforward, though it's one where the accounting introduces a great deal of complication. I'll do my best to make it as clear as possible. The $130 million represents the entire effect of the three events that took place in the quarter — in the second quarter — and the three major events, in order of impact, were the plate mill commissioning delays, the coke fire, and DSPC. Roughly 50% of that impact stems from the plate mill commissioning, about 30% comes from the coke conveyor fire, and 20% relates to the DSPC labor shortage caused by COVID; those are the percentages. Now regarding how the impact divides between the two quarters, taking them one at a time: on the plate mill side, we began running at 80%, but a portion of the plate mill effect is moving into inventories and carrying into the cost for the third quarter. It's approximately a 70%-30% split — 70% of the cost gets absorbed in the second quarter and 30% goes into the next quarter. It's simply the way the higher inventory cost tied to production becomes trapped in inventories and shifts into the subsequent quarter. So again, from an accounting standpoint, 50% of the impact is the total impact from those quarter issues, but 30% of it carries into the next quarter. On the coke batteries, I'd say that has the largest carryover into the next quarter, simply because we held a lot of coke inventory that we had already contracted for the year, which we were consuming, and we had to purchase extra coke on the spot market at higher prices, which passes through coke inventory and also passes through a higher cost of steel produced using purchased coke. So that one has the biggest impact — it's roughly 20%-80%. 20% in the second quarter and 80% shifting into the subsequent quarters, meaning the third quarter. And for DSPC, we see the bulk of the impact in the second quarter, with nothing moving into the next quarter, since most of the impact occurred mid-quarter and doesn't greatly affect inventory; so in short, 50%, 30%, 20% is the ratio of impact for the three events, and how it flows from one to the other is — plate mill, roughly 70%, 30%. Coke batteries is 20%, 80% and DSPC is 100% in Q2.

David Ocampo

analyst
#8

Thanks, Rajat — that's really useful context. Then turning to the inventory piece, I believe during your prepared remarks you mentioned it would remain elevated, and it appears that even after stripping out FX, the figure sits roughly CAD250 million to CAD300 million higher than typical levels. So how should we frame the unwind of that as we move into fiscal 2024? Should we anticipate the entire CAD200 million or CAD250 million coming back in roughly even amounts across each quarter?

Rajat Marwah

executive
#9

I'd say expect the release to begin starting in the first fiscal quarter. The usual drawdown that occurs during the initial calendar quarter — which corresponds to our fourth fiscal — will still take place, since we'll be building more again in December and afterward drawing that down, while the remaining portion of the release will land in the first and second quarters of next year from an inventory standpoint; that's the pattern it will follow. We've also accumulated certain raw material along with some web, given that we're shipping lower volumes. There's a certain amount of web we've developed that we'll draw down across the coming couple of quarters too. So your observation holds: it will come out during the first and second fiscal quarters of next year, and to a greater degree than what we've witnessed previously.

David Ocampo

analyst
#10

Also, could there be any exposure regarding the work in progress at this point, considering the weakness we are currently observing in the market?

Rajat Marwah

executive
#11

No, my view is that we shouldn't — typically, we purchase slabs externally to fill the gap that exists to some degree in our own manufacturing plant, and whatever inventory we hold will assist in substituting for that; therefore, we anticipate little danger of getting that cleared across the coming two quarters.

David Ocampo

analyst
#12

Then the final item from my side concerns your fixed annual contracts. My understanding is that's 10% yearly. What's the status of those conversations with customers? Do they genuinely accept that the futures curve sits in contango and bargain with that in mind, or are they pushing for quite deep discounts compared with current levels?

Michael Garcia

executive
#13

Sure, David — we are currently in the midst of multiple negotiations involving our contracted customers. Each of them, I'd say, has a distinct order book to fill, and frequently they already know the pricing or hold pricing expectations within their own order book, and they want to lock in contracted supply of the raw materials they require. We have not encountered substantial pressure or expectations that we'd have to discuss pricing levels significantly below where they stand today, though I'd say everyone we talk with held some expectation of a recession or recessionary conditions arriving next year. Still, they're each evaluating their own unique situations, and despite anticipation of an economic slowdown, they might have an order book that gives them a great deal of clarity and perhaps less risk than you'd typically anticipate during an overall recessionary stretch. I'm referring to customers producing either parts within a supply chain or an end product with solid visibility. Naturally, when a customer is a service center that must consider the pool of products it stocks and supplies, which aren't necessarily contract-bound, they'd be more attuned to where they believe pricing is headed and to an expectation of lower pricing. Does that answer your question?

David Ocampo

analyst
#14

Got it. Appreciate it, everyone. I'll get back in line again.

Anoop Prihar

analyst
#15

Hello there, good morning. I have two or three fast things I'd like to ask. Rajat, would you mind letting me know how much CapEx is still left before the plate mill modernization wraps up, and could you provide that figure after subtracting government funding?

Rajat Marwah

executive
#16

Sure. Roughly CAD40 million in CapEx still has to go toward the plate mill, which is largely Phase 2, where the work is taking place, and that amount is net of any government funding.

Anoop Prihar

analyst
#17

So, to put it plainly, what would be a sensible estimate for how much your plate mill will produce during fiscal 2024? I realize this figure tends to shift around. I simply want to confirm, you know, roughly what range would make sense?

Rajat Marwah

executive
#18

Well, regardless, for fiscal 2024 we ought to be sitting at levels we've seen historically. The major unknown remains our second phase and the timing of its completion. Right now, the target is the middle of next year; and as we've mentioned, we'll exercise great caution and care regarding proceeding with phase two — although the bulk of the work is going to be finished, actually committing to it and finishing all the integration plus automation is something we'll study and carry out very carefully, since we can't afford to lose more than the usual downtime on that mill; so that represents a significant wild card. Suppose, for instance, it wraps up midway through next year, meaning, say, somewhere in June or July, then you'd need a minimum of five odd months before beginning to ramp up toward greater volume, given that this upgrade is going to double our present volume, yet hitting that full percentage is going to require a bit more time.

Anoop Prihar

analyst
#19

Alright then, thanks. And one final thing — are you still participating in the NCIB?

Rajat Marwah

executive
#20

Yes, we are; that initiative remains active, and we continue to be selective about it.

Anoop Prihar

analyst
#21

Thanks.

Ian Gillies

analyst
#22

Hello, everybody.

Michael Garcia

executive
#23

Hello, Ian.

Ian Gillies

analyst
#24

From what I gather, agreements for coking and the rates tied to them typically get discussed around this point in the year. Could you offer any insight into how you're viewing that expense line as we move toward, say, calendar 2023, plus the volumes involved and the volumes involved, considering what has unfolded across the prior couple of quarters and the buildup in inventory?

Rajat Marwah

executive
#25

Certainly; regarding coal and coke, you're spot on. Usually this is when a majority of those contracts are finalized, and we have finalized ours too. Coal is trending flat compared with a year ago, and on the coke side things are quite comparable. So on a year-over-year basis, long-term agreements — meaning those with an annual term — carry unchanged pricing. That's our expectation, and any gap, as I noted, stemming from the coke battery fire, we secured under spot rates, which were clearly elevated, and that is flowing through our costs this quarter — the previous quarter and this one.

Ian Gillies

analyst
#26

All right, that's quite useful. Thanks. Regarding the EAF construction contracts, it appeared there was a slight increase in what has been locked in. Could you give us a brief refresher on when you expect some of the other sizable items to be settled? It would appear that perhaps some of those costs could be shifting in your favor, considering the deflationary pressure on certain inputs.

Rajat Marwah

executive
#27

Yes, absolutely. So we anticipate a significant portion will be completed within the next, shall we say, 5 months to 6 months, which is, let's say, near the conclusion of our fiscal year and —

Ian Gillies

analyst
#28

Yeah.

Rajat Marwah

executive
#29

Yeah, and from a cost standpoint, it's certainly going to be beneficial; so Mike, did you already share some detail on that?

Michael Garcia

executive
#30

Yes, Ian, one thing I'd mention is that when we approach our contractor network and prospective partners with these proposals for additional sections and segments of the big build, we're encountering a competitive landscape. Contractors are keen to secure the work and provide some certainty for their own project pipeline going into next year. And with a number of the bid packages we recently wrapped up or are close to wrapping up, we feel fairly good — we're pleased and upbeat about the pricing conditions we're observing. Those are arriving — a few concrete cases are landing comfortably under the budget figure we'd set for our project. That doesn't mean every single one will turn out that way, but certainly, contractors seeking clarity in their upcoming workload share the same recession-related worries and might generally think, if this job doesn't come my way, what else is available that I could put a bid on, and I believe we're gaining from that on the cost side and in terms of interest from possible vendors as we choose the strongest ones for this project.

Ian Gillies

analyst
#31

Understood. That context is useful. One item I'd like to clear up: the wording in the MD&A shifted somewhat regarding the EAF's completion. One remark mentioned it wrapping up midyear, while a different remark mentioned wrapping up at year's end. Could you confirm once more that nothing has moved on the in-service date and the anticipated start-up, or if something has moved, what is happening there?

Michael Garcia

executive
#32

That's right. Midyear remains the case. My apologies for the confusion there. To give a bit more detail, the bid packages — the last critical ones — are being awarded to suppliers, and our strategy is fixed pricing. So absent any scope change or change order coming from us, we're quite confident we have line of sight on pricing once that bid package is awarded. We keep pushing very hard on supply chain matters that must be handled for a project this large. The one genuinely specific matter we're dealing with involves a certain — a vendor of cards that depend on semiconductor chips. So in one particular case, certain cards destined for some control panels in the new melt shop are involved. Those cards are running six months late as we speak. So we needed to establish plans to finish all the remaining periphery work in those panels and cabinets, get them on the boat, ship them to Sault Ste. Marie, and have them installed, and the cards will go in at a later date, once the panels or cabinets are here in Sault Ste. Marie rather than being installed at the vendor's construction site. Now, the overall critical path and timeline won't be put at risk by that, but we simply have to stay mindful of where we're doing that and ensure that nearly daily — though at minimum weekly — we're in contact with the actual semiconductor supplier to our vendor, doing all we can to make certain we know precisely when those cards will arrive; and we're doing all we can to ensure nothing slips, or if anything does slip any further, that we pursue mitigation plans. And this is a global supply chain matter, and the suppliers of these cards follow a global sort of criteria for deciding who receives what's coming out of the supply chain, with their first preference being medical devices, then items tied to National Defense, and then items tied to more typical industries such as ours.

Ian Gillies

analyst
#33

All right, that was — again, extremely useful. If I may squeeze in a final question. Regarding the high-voltage transmission line that the PUCs are going to put in, the disclosure on that hasn't shifted. Still, I'm wondering whether there's anything new — any operational news on how you view that essential component of bringing the EAF online and getting it ramped up?

Michael Garcia

executive
#34

Correct. The timeline remains unchanged. It's yet another absolutely vital element of how the whole thing fits together. There's the 230 K volt line spanning 11km, running across Sault Ste. Marie from one end to the other; the local utility provider is carrying out that work and it's all proceeding on schedule. The second element of power involves the grid upgrades being handled by Hydro One, and we're in frequent contact with them, assisting with answers to their technical questions, and circling back whenever they raise additional technical questions to work through those together. That element — it's less critical, because although it would be a letdown if the grid turns out not to be as strong as we'd prefer at the moment we first need to begin supplying power to the electric arc furnaces, there's — our analysis shows there's sufficient power available in Sault Ste. Marie to operate those furnaces, even factoring in all the other electricity demand that could expand within the community over the next couple of years. Yet eventually, during unusual maintenance problems or weather occurrences, it might require additional power generated internally by us, and that's among the reasons we're enhancing our in-house power generation capacity through the new GE gas turbines, which have arrived on-site and are in the process of being installed.

Ian Gillies

analyst
#35

Understood. That's much appreciated, thank you. I'll hand the call back now.

Michael Garcia

executive
#36

Of course.

Ahmad Shaath

analyst
#37

Hey everyone, I just have a quick question about the plate modernization project. Did I hear that correctly — there's a modest CapEx bump, going from $120 million up to $135 million? And if that's the case, could you elaborate on it?

Rajat Marwah

executive
#38

Yes, that's right — we've seen a small rise to $135 million for the plate mill modernization. That reflects the holdups we've run into in getting this project finished. It had been slated for completion sooner, and we moved it into this year, with the following one pushed to next year, plus there have also been commissioning delays. So all of that is taken into account, along with the inflationary pressure we experienced. So all of it is baked into that $135 million figure.

Ahmad Shaath

analyst
#39

Great, thank you for that. And based on what you said about the Phase 2 schedule, would it be reasonable to describe mid next year, as things currently stand, as more of a soft target that depends on how commissioning of Phase 1 turns out and how that goes for you, or are you firmly committed to mid next year for Phase 2?

Michael Garcia

executive
#40

I'd say — I'm not sure "soft" is the right term, but it is flexible, and it hinges on our complete confidence that we grasp every problem we encountered with the plate, during the first phase of the plate mill modernization. And we grasp everything that has to take place in advance that can significantly reduce those — the likelihood of running into those kinds of difficulties while we're live and we're waiting and we need to run steel through the plate mill. So, there will come a moment. It's already underway, but it truly can't be finished until everyone who's part of this — and certainly there are folks still part of the actual commissioning — we have to ensure we've conducted a rigorous after action review, so to speak, grasp every problem and its root causes and how we can take measures to mitigate, as much as possible, all of that offline before we shut down for Phase 2. And then, ensure we have an oversight function to verify and guarantee that everything we're discussing doing offline is in fact happening at the level of detail it must happen at. And then, only at that point will I be convinced and will I be able to convince my Board that we're ready to move forward with Phase 2. But the current plan is that we can accomplish all of that, and all of that level of preparation, so we can proceed with Phase 2 at midyear. But if for any reason we don't get to that level of comfort and confidence, then we won't go down as planned until we're ready. Does that help?

Ahmad Shaath

analyst
#41

Absolutely, that helps a lot. Appreciate the response. I'll get back in line.

Alex Jackson

analyst
#42

Hey, thanks everyone. Considering where the market's at right now — softer pricing and increased OpEx — I'm curious whether that has changed your view on returning capital, or perhaps on certain capital projects that aren't essential, or is it too soon to say? Thanks.

Michael Garcia

executive
#43

Yeah, good question there, Alexander. Given the fiscal calendar we follow, we've already kicked off the yearly business planning process for the fiscal year ahead, and we recognize that it — that required extensive scenario work around the sorts of commercial assumptions you have to make, though one scenario that's definitely both robust and significant, and which we're actively developing, involves a persistent environment of weak pricing alongside soft demand. And we recognize that under those — under circumstances like that, reining in whatever discretionary expenses you're able to is essential, and those calls need to be made with an eye not only toward how vital it is to be capable of doing so when supply, demand and pricing are difficult, but equally toward grasping what follows from taking such steps, and only taking them when it not just — when it's sensible both for the situation right in front of you and also where the fallout isn't so damaging that you end up simply making bad choices for the company across a longer horizon; yet this company is quite conscious of that, and particularly Rajat, having had to navigate that amid tough conditions, and we essentially have something like a playbook, so to speak, covering the moves we understand we must be ready to make, the levers we recognize are available to us, and the matters we have to weigh as we move into an evolving business landscape.

Alex Jackson

analyst
#44

That's helpful, thanks.

Michael Garcia

executive
#45

All right, I appreciate everyone joining us for this second quarter fiscal 2023 earnings conference call, and thanks as well for the ongoing interest you show in Algoma Steel. We're eager to bring you up to date on how we're performing and the progress we've made when our fiscal third quarter results are released early next year.

Operator

operator
#46

Thanks. That brings us to the end of today's call. At this point, feel free to hang up, and we appreciate your joining us — have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Algoma Steel Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Algoma Steel Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Algoma Steel Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.