Algoma Steel Group Inc. (ASTL) Earnings Call Transcript & Summary
June 22, 2023
Earnings Call Speaker Segments
Michael Moraca
executiveHello, everyone, and thanks for joining us on Algoma Steel Group Inc.'s call covering the fourth quarter and the complete fiscal 2023 year. Our Chief Executive Officer, Michael Garcia, and our Chief Financial Officer, Rajat Marwah, are guiding today's discussion. Just so you know, a recording is being made of this call, and a replay will be accessible later today through the Investors portion of Algoma Steel's company website, www.algoma.com. I want to point out that remarks delivered during this call might include forward-looking statements as defined under applicable securities laws, and those carry assumptions along with inherent risks and uncertainties. Results that actually occur could vary materially from what is stated today. Beyond that, our financial statements follow IFRS, which is not the same as U.S. GAAP, and during this discussion we will reference certain non-IFRS financial measures. Yesterday evening, we published an earnings presentation to go along with today's prepared remarks. Today's call slides are available in the Investors portion of our company website; keeping that in mind, I'd ask all of you on this call to review the legal disclaimers shown on slide two of that earnings presentation, and to also consult the risks and assumptions set out in Algoma Steel's fourth quarter fiscal 2023 management's discussion and analysis. Please be aware that our financial statements use the U.S. dollar as the functional currency and the Canadian dollar as the presentation currency. Our fiscal year spans April first through March 31st, and our financial statements were prepared for the three and 12 months ended March 31st, 2023. Please note, unless stated otherwise, every amount discussed on this call is in Canadian dollars. After our prepared remarks, we'll move into a question-and-answer session. At this point I'll hand things over to Michael Garcia, our Chief Executive Officer. Mike?
Michael Garcia
executiveThanks, Mike. Morning, everybody — glad you could join us, and I appreciate you taking part in this call about Algoma Steel's results for the fiscal fourth quarter and the full year. As is our habit each time, I want to begin with the subject we care about above all else: making sure our people go home safe. At Algoma, we hold to the principle that safety comes with no trade-offs. Last week we told you that a company we contract for specialized maintenance at our facility had an employee who died — he succumbed to his injuries, and this happened even though our emergency services crew, aided by the Sault Ste. Marie Fire and Paramedic Service, responded quickly and with professionalism. The loss of this man has been a tragedy whose weight all of us at Algoma have carried. We’re keeping that person’s family, friends, and coworkers in our thoughts. Turning to the numbers and key developments: fiscal 2023 was a very active stretch for Algoma, shaped by swinging commodity markets, better performance at our plate mill, and encouraging progress on the electric arc furnace, or EAF, initiative that will reshape us. We made it through a tough second and third fiscal quarter as we brought Phase 1 of the plate mill modernization effort into service, and after the new calendar year started, output at both our plate and strip operations returned to usual levels. The numbers we posted for the fourth quarter of fiscal 2024, along with what we're projecting for the first quarter of fiscal 2024, reflect genuine operational momentum — and we anticipate that continuing across the fiscal year, even while things pick up at our EAF project, which I'll walk through in a moment. Thanks to tireless effort from everyone across the Algoma organization, we were able to push past swings in commodity prices and hurdles on the operational side, which is what allowed us to deliver such a robust outcome for our fiscal year. During that period, we moved 2 million tons, brought in nearly $2.8 billion in revenue, posted adjusted EBITDA of $452.3 million, and produced $177 million in cash from operating activities. We also just bolstered our liquidity by enlarging and lengthening our ABL facility, and together with the cash we have and the robust cash flows we anticipate generating in fiscal 2024, that puts us in a strong position to achieve our objective of outstanding performance at our existing sites as we push forward with the later phases of building our EAF project. On the second phase of the plate mill modernization, I'm happy to share that the inline shear is being installed faster than we had planned, and we anticipate starting to ramp up plate output during Q3 of the 2023 calendar year. That added volume positions us to seize market opportunities and to stockpile material before the scheduled Phase 2 hot mill shutdown, which will involve upgrading the hot mill drives and is set for April 2024. Let me take a few minutes to bring you up to speed on where we stand and what we see ahead for the transformational EAF project. Once this initiative wraps up, we'll move from about 2.8 million tons a year of liquid steelmaking capacity produced the conventional way today to running dual electric arc furnaces built to deliver a combined annual liquid steel throughput of 3.7 million tons. That higher output will line up with our bigger downstream finishing capacity as we expand capacity at our plate mill, and at the same time, once fully operational, it will cut our carbon emissions by roughly 70%. On the power supply needed to run two furnaces, we just hit two significant milestones. First, Ontario's Independent Electricity System Operator gave us conditional approval on the System Impact Assessment. That approval confirms our EAFs can be connected to the existing 115 kilovolt electricity grid up in northern Ontario, together with Algoma's Lake Superior Power combined cycle natural gas power plant located on-site. The purpose of the IESO's SIA was to evaluate how this project might impact reliability of Ontario's grid when it comes to large-scale projects. Dedicated, dependable electricity is critical if EAF operations are going to succeed. The upgrades that support our project will be implemented in three phases. Phase 1 is made up of the current 115 kilovolt transmission connection, with LSP on-site generation serving as backup. Phase 2 A involves the construction of a fresh 230 kilovolt transmission line at the local level, giving us access to additional power from the existing grid. With Phase 2 B, we'll achieve full power after upgrades are made to the Northern Ontario electricity grid, and completion is anticipated by 2030. Our second milestone: at the Lake Superior Power plant, we successfully brought in two new GE LM6000 turbines along with every control system, finishing on schedule and within budget, and we anticipate this will deliver 115 megawatts of baseload capacity generated internally, enabling us to kick off production at our EAF steel facility. Back in 2020, when the initial budget for the EAF project was established, it came to roughly CAD 700 million, and commissioning was projected to begin near the middle of calendar year 2024. Under our startup strategy, we'll keep the existing steelmaking operation running at regular levels while gradually increasing output from our EAFs over calendar 2025, and after that we'll transition entirely to EAF-based production. The project continued to advance throughout fiscal 2023, and by the time that fiscal year closed, roughly 80% of the budgeted project costs had been contracted, leaving the remainder still uncontracted. As is typical for a build of this magnitude, completing the contracting on the remaining portion hinged on finishing detailed design work, and we recently hit that milestone right on schedule. Cost pressures affecting major capital projects across other industrial firms since 2020 have likewise begun to affect us as we move into the next stage of this project. Management's latest projection puts the project's overrun at between CAD 125 million and CAD 175 million. A mix of newly arising issues is behind that figure, including broad market forces pushing up what materials cost, steeper rates for skilled workers, and shifts in currency values. Beyond those items, interruptions in the supply chain tied to particular microprocessing chips should delay when commissioning begins for the first furnace, moving it to the close of calendar year 2024. The leadership team remains fully committed to confronting these obstacles directly, aiming to soften their impact and see the project through to a successful finish. Funding for finishing the EAF project is anticipated to come from cash on hand, cash produced by operations, and borrowings available under the company's current ABL credit facility, which is undrawn and was recently increased in size and had its term extended. Although commissioning is now set to begin at the close of calendar year 2024, our updated launch schedule will not have a material effect on shipping performance during calendar year 2025; things are hectic at our Sault Ste. Marie location, and the fact that we can run our current asset portfolio as usual, without operations being affected by construction progressing on this transformational project, speaks to our team's execution. I'll now turn it over to Rajat, who will walk us through the numbers for both the quarter and the full fiscal year. Rajat?
Rajat Marwah
executiveThanks, Mike. Morning, everyone — I appreciate you all joining the call. Let me repeat one more time that, unless we state otherwise, all figures we talk about are in Canadian dollars. We finished our fiscal year, which concluded in March 2023, with a strong quarter. For our fourth quarter, adjusted EBITDA was CAD 47.9 million, translating to a 7.1% adjusted EBITDA margin, and cash generated by operating activities totaled CAD 95.4 million. At the close of the quarter, we had CAD 247 million of unrestricted cash plus CAD 279 million of undrawn capacity under our revolving credit facility, adding up to about CAD 526 million of total liquidity. Following the end of the quarter, we expanded our ABL credit facility by $50 million and extended its maturity by five years, giving us even greater available liquidity. Bear in mind that government loans related to our capital projects represent the only long-term debt remaining on our balance sheet. To begin, let me walk through what drove our performance; quarterly shipments totaled 572,000 tons, up 24.7% sequentially and 4.5% higher than the same quarter last year. On our prior call, we noted that our plate and strip operations were operating normally as of January first, and that is still the case today, as our fiscal fourth quarter shipments show, along with the guidance for our fiscal first quarter 2024. Our average net sales realization was CAD 1,066 per ton, 4.5% lower sequentially and 33.7% below the prior year period. That year-over-year decline stems from broadly soft market conditions. Throughout the quarter, plate pricing continued to command a significant premium over hot rolled coil, supported by resilient demand, particularly from infrastructure project spending and durable goods. As a reminder, we are Canada's only discrete plate mill. This produced steel revenue of CAD 609 million for the quarter, up 19% sequentially but down 30.8% from the same quarter last year. Moving to costs, Algoma's cost per ton of steel products sold averaged CAD 934 for the quarter, down 19.3% from the previous quarter and down 1.4% from the prior year period. Higher volume was among the main reasons for that slight decline versus the prior year period, more than offsetting the expense of substituting purchased coke for internally produced coke as well as higher costs for other key inputs. Cash flow from operations was CAD 95.4 million for the quarter. Beyond EBITDA, the primary drivers behind our cash flow were a CAD 189 million release of inventories, offset by growth in accounts receivables and a decrease in payables. As we mentioned on our previous call, we expect to continue releasing inventories through the year as quantities return to normal alongside consistent production. Now for our fiscal 2023 full year results, shipments for the year reached 2 million tons, a decline of 12.8% from the prior year. The year-over-year decline was caused by commissioning difficulties at the plate mill following Phase 1 of the modernization project, along with production problems related to staffing. Our average net sales realization was $1,274 per ton, a 17.6% decrease from the prior year, which mirrors market softness. Net sales realization averaged $12.74 per ton, down 17.6% versus the prior year. Steel revenue therefore reached $2.6 billion, down 28.1% from last year. Now for costs: for the full year, Algoma's average cost of steel products sold was $1,004 per ton, an increase of 17% over the year before. The main reason for that rise versus the prior-year period was replacing internally produced coke with purchased coke, plus higher purchase prices for key inputs such as metallurgical coke, coal, natural gas, and alloys. In addition, we ratified the collective bargaining agreement, which increased pension and post-employment benefit expenses. Next, I'd like to cover the financing activity we completed last month. Because our previous ABL credit facility was set to mature in November 2023, we stuck to our usual approach and collaborated with our lender groups to amend and extend it. Given our financial strength and cash flow profile through the market cycle, we were pleased to expand and extend our ABL credit facility on terms favorable to Algoma. We raised the size of the ABL credit facility to $300 million from $250 million previously, and extended the maturity date to May 2028. Altogether, between cash on hand and undrawn capacity, total available liquidity at fiscal year-end was $526 million, and that number has increased by $50 million once the ABL upsizing is taken into account. Now let me turn to the outlook for the first quarter of fiscal 2024. Steel prices have fluctuated so far this year, with another spike in March to nearly $1,100 per ton for Midwest hot-rolled coil, before retreating to roughly $850 per ton. The forward curve appears fairly flat, sitting near $850 per ton in the months ahead. Recent mill announcements leave us cautiously optimistic that market conditions are improving. Considering our operations so far this quarter, our order book, and what we expect for shipments through month-end, we anticipate delivering strong fiscal first quarter adjusted EBITDA in the range of $170 million-$180 million, with total steel shipments of 550,000 to 560,000 tons. At this point I'd like to turn the call back to Mike for his closing remarks. Mike?
Michael Garcia
executiveThanks, Rajat. If we look at where the North American steel market stands right now, fiscal Q4 pricing came up sharply, and after that we've seen much more steadiness around today's appealing levels, and we think that will translate into strong cash generation during fiscal 2024. Prices did decline across the first fiscal quarter, so it's been a positive sign to hear several producers in North America announce increases over the past few weeks. Our customer base is diverse, which opens up selling opportunities throughout Canada and the U.S., and in a typical calendar year we serve about 150 customers. A large share of our sales is targeted toward contracts. Those volume commitments give our order book and our operations more stability, and because the price mechanics lag, they help dampen some of the swings that come when prices move quickly in either direction. What we care about most is maintaining sound financial discipline and operational excellence so that we can carry out our EAF project, bringing in Algoma's next chapter, which lays the groundwork for creating long-term value for our stakeholders; that effort shapes Algoma's future and cements our leading role at the front of green steel production in North America. Fiscal Q4 capped off a very thrilling year at Algoma on a strong note. As we keep ramping through the later phases of building our EAF project, rest assured we'll maintain our unwavering attention to running our current facilities safely, reliably, and efficiently so we can capture the gains of robust markets. We'll keep advancing from this point and make Algoma an attractive value proposition for every one of our stakeholders. Many thanks for your ongoing interest in Algoma Steel. We're eager to see what lies ahead. With that, we'd be glad to take your questions. Operator, kindly provide the instructions for the Q&A session.
Katja Jancic
analystHi there, and thanks for taking my questions. Let's start with capital expenditures — for the EAF project, I think there's still CAD 590 million left to spend. How much of that is going to be used this year, so in fiscal 2024?
Rajat Marwah
executiveIn this fiscal year — fiscal 2024 — we'll spend about $300-something million, so $300 million to $350 million, with the remainder coming after that.
Katja Jancic
analystCould you give us an update on what's left in CapEx beyond the EAF? What does that come to for this year?
Rajat Marwah
executiveAbsolutely. So what remains in CapEx — typically, given all the maintenance work we've got going on, we lay out roughly CAD 80 million to CAD 90 million. Given the inflation we're seeing in both labor and construction, I'd say it'll come in a bit above CAD 100 million; that figure covers the maintenance portion. On top of that, our plate mill project is wrapping up within this year. Our outages ought to be finished by early next year. That area will see an additional CAD 30 million. So excluding the electric arc furnace, the rest of the CapEx will land somewhere between CAD 110 million and CAD 150 million.
Katja Jancic
analystRegarding the plate mill, that CAD 30 million figure — does it apply to Phase 2?
Rajat Marwah
executivePrecisely, it's tied to Phase 2.
Katja Jancic
analystSo the entire amount is going to be used during this year, fiscal 2024 — correct?
Rajat Marwah
executiveYes. Yes, all of it will be spent this year.
Katja Jancic
analystTurning to the plate mill modernization. You said the Phase 2 hot mill outage would be finished in April 2024. Could you give an update on when Phase 2 will be entirely done? Do you still anticipate a capacity boost of 350,000 tons, bringing it to roughly 700,000 tons? What's the right way to think about the ramp-up after it wraps up?
Michael Garcia
executiveSure, Katja, it's Mike Garcia here. Like we said in our remarks, the inline shear — part of the plate mill modernization project — is now being commissioned. Cold commissioning gets underway in August, which is actually ahead of schedule. Our view is that with that commissioning done, by October we'll begin seeing additional shipments and capacity coming through the plate mill. Across the rest of the third fiscal quarter and then the fourth fiscal quarter, we'd anticipate plate mill shipments rising 15%-20%. One caveat: a portion of that added plate output will move into stock as we get ready for the 40-day outage in April of calendar year 2024. That's the shape of things for the remainder of this fiscal year. After we exit that plate mill outage next April, our intent is to build the higher plate mill capacity completely into the annual plan and commercial strategy, and to capture as much high-margin plate in the order book as we reasonably can. Does that answer it?
Katja Jancic
analystOkay, I've got one more quick question, sorry. Regarding that 15%-20% growth in the back half of the present fiscal year, is that measured against where things stand right now — meaning the quarterly figure — so what's the right way to look at it?
Michael Garcia
executiveThe starting point is what we're running at each quarter presently, which is 70,000 to 75,000 tons of plate per quarter.
Katja Jancic
analystOkay, perfect. Thank you so much.
Michael Garcia
executiveYou're welcome.
Ian Gillies
analystMorning, everyone.
Michael Garcia
executiveMorning.
Ian Gillies
analystI'd like to revisit a few of the financing remarks and pose the question another way. Is it possible for you to simply verify that you have no plans to bring in outside equity to help cover what's left of the EAF, and that your view is that credit facilities, cash, and operating cash flow can handle it?
Michael Garcia
executiveYes, that's right. We have no plans to finance it by issuing securities or equity.
Rajat Marwah
executiveTo add to what Ian said, if you examine our present cash position and liquidity situation, we hold CAD 250 million in cash. There's also ABL capacity available to us of approximately CAD 300 million or more. Our inventories will be drawn down. During the March quarter we made a very large draw, yet inventory at March's close remains high relative to what we've seen historically, and that excess is roughly CAD 250 million or so. We recognize there's a certain amount of disprice involved, yet the volume portion, approximately CAD 100 million to CAD 150 million, is going to be freed up across the coming quarters. Once all of that is factored in, sufficient liquidity exists to handle the EAF CapEx, and we aren't even counting the strong quarter that has just concluded, meaning the first fiscal quarter, or how our profile shapes up for the rest of the year. As you're aware, there is no debt whatsoever on the balance sheet. Our confidence in funding the EAF is quite high.
Ian Gillies
analystOkay, that helps, and it ties directly into my follow-up. Regarding inventory, the hard figures you provided are certainly beneficial, yet because each of us constructs our own models with our own strip assumptions, could you frame it relative to the goal for inventory days? In the past, as I recall, it sat under 80, and you stood at about 100 in the prior quarter. Is there any indication you can offer about where you expect to end up when the year concludes?
Rajat Marwah
executiveIn my opinion, it should come down, and it should come down beyond the $80s. Say, by the fiscal year's end, we ought to witness a release of $100 million-$150 million. That is compared with the levels you are seeing right now. Going from March to the next March, that range is where we should arrive. That does not unlock all the extra tonnage we hold. As I mentioned earlier, given the fixed tonnage contracts that exist, reducing those inventories requires a bit more time. We ought to reach below 80, though in absolute dollar terms, $100 million-$150 million of inventory reduction over a year, with additional decreases in 2025 as well. And an $80 to $90 million figure is part of that picture.
Ian Gillies
analystAll right. For my final question, regarding shipments, plate got a fair amount of attention in the earlier questions. Looking toward the second half of this fiscal year, do you believe shipments could reach that range of 600,000 to 650,000 tons, or does that seem too ambitious?
Michael Garcia
executiveIan, my view is that would be somewhat ambitious. My sense is that our run rate across the year ought to resemble the volumes we showed in the quarter we're discussing, along with the quarter we're in right now. There's always a bit of potential from upside, I'd note, but going beyond 600 is likely somewhat ambitious.
Ian Gillies
analystAll right, that answers my question. I'll hand the call back now. I really appreciate all the specifics.
Rajat Marwah
executiveThank you, Ian.
David Ocampo
analystI appreciate you taking my questions. My first one relates to the CapEx figure. Looking back at the prior quarter, you had roughly 70% of CapEx secured at fixed rates — about $210 million — yet a contingency remained. That final portion you still need to contract out appears to have risen by approximately 100%. I was hoping you could elaborate on that a bit, so we can grasp it more clearly.
Michael Garcia
executiveOf course, David. When we kicked off this project, it helps to view it as a set of major construction packages. The earliest ones — the biggest — which we secured on fixed price and fixed duration, were the Danieli contract, naturally for the equipment, followed by the Walters contract covering building construction. Back then, the project was too young to award certain other sizable packages, since detailed engineering had to be finished before those bid packages could be released and priced by the market. That detailed engineering concluded roughly six to seven weeks ago. Once those bid packages reached the market, we encountered a construction cost environment quite different from what we saw when the early large bid packages went out in 2021. Those packages covered equipment installation, the fume treatment plant, electrical install, and piping. We began noticing an emerging risk that those packages would come back above the original budget. As we worked through an iteration with the contractors to confirm they possessed all the details required, we started considering how to remove costs. That was when we began seeing the total cost rise past the CAD 700 million budget, reaching the figure we disclosed today, which reflects a great deal of work and which we feel very confident about. That's essentially how the cost increase came about.
David Ocampo
analystI'm just curious — does that CAD 875 include any sort of contingency, say, at the upper end? I'm basically wondering whether costs could creep even higher than this.
Michael Garcia
executiveWell, what I'd say is that the contingency, you know, is reflected in the fact that we provided a range, and that upper bound would represent, you know, drawing on that contingency.
David Ocampo
analystUnderstood. Rajat, one thing I'm curious about — it looks like maintenance CapEx has been creeping higher as well, in step with inflation. What's behind that, once you're at EAF at last? Since I think you said earlier it would come in CAD 20 million under what a blast furnace's CapEx would run. Does that put you at CAD 80 million?
Rajat Marwah
executiveThe number will be $20 million-$30 million U.S. lower. If we're spending roughly 110 on CapEx, once the EAF is fully up and running and the blast furnace and coke batteries are closed, we should end up at about CAD 70 million-CAD 80 million of CapEx, in Canadian dollars. Though something north of $600 million is probably a bit aggressive.
David Ocampo
analystAll right. That works well. I'll pass it along now. Many thanks, everyone.
Ahmad Shaath
analystHi folks, perhaps just a single question from my side regarding the outlook. There's a pattern we're picking up on, which is that you continue to surpass the outlook you give. Could you share your thinking behind how you set that guidance, along with any difficulties or shifting elements, so we can better shape how we approach our modeling once those guidance figures come out?
Rajat Marwah
executiveCertainly. Since we operate just one location, variability always exists when it comes to material leaving the plant. The largest swings we typically encounter involve transportation by water — the barges being dispatched — and multiple barges depart throughout each month. We do observe fluctuations in those circumstances. That's the reason we also issue guidance near the quarter's conclusion, or nearer to when the quarter wraps up, so we're at least nearer to the actual figures. Things tied to that are constantly shifting. As far as we can tell, it's mainly on the shipping side. When we finalize the books, a handful of variations occur both in terms of pricing and costs. Aside from one quarter when we had a coke fire — something unforeseen — plus the plate mill, which caused some problems, we've consistently exceeded expectations. We've remained steady in offering sensible guidance. Depending on how the quarter wraps up, it usually lands nearer to the upper end.
Ahmad Shaath
analystOkay, that makes sense, and it's quite useful. Perhaps — and this may already be in the disclosure, so I apologize if I overlooked it — can you walk us through the revolver? Its collateral is the receivables along with the inventory, and you've mentioned some release of that. How would that function, given that you intend to fund a portion of the CapEx through that facility too? Could you explain the various components involved and whether there might be any effect on your liquidity stemming from the revolver?
Rajat Marwah
executiveCertainly. That's a good question. We have a substantial amount of untapped availability through our revolving credit facility, and it simply reflects the level of inventories and receivables sitting on the balance sheet. The sum we're able to draw under the revolver comes to $300 million, or shall we say CAD 400 million. If you examine our balance sheet, we hold CAD 700 million in inventories and roughly CAD 300 million in receivables, which adds up to nearly CAD 1 billion. Even once the inventories I'm proposing to reduce are taken out, our ABL will still provide sufficient capacity to draw the full amount; that's how the mechanics would work. We'd be in a position to free up a significant quantity of inventory and generate liquidity in the process, yet from that standpoint it ought not to affect our revolver.
Ahmad Shaath
analystThat's really useful. Thank you, Rajat, and I'll rejoin the queue.
Michael Garcia
executiveThanks. Once more, I appreciate all of you for joining our earnings conference call for the fourth quarter of fiscal 2023, and for the ongoing interest you show in Algoma Steel; we're eager to share our results and progress with you when we report our fiscal fourth quarter results later this summer.
Rajat Marwah
executiveThank you.
Operator
operatorThanks. My apologies. That brings an end to the call for today, so you can go ahead and hang up now. We appreciate you joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Algoma Steel Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Algoma Steel Group Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Algoma Steel Group Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.