Algoma Steel Group Inc. (ASTL) Earnings Call Transcript & Summary

February 7, 2024

NASDAQ US Materials Metals and Mining earnings 36 min

Earnings Call Speaker Segments

Mike Moraca

executive
#1

Hello, everybody, and thanks for joining the Algoma Steel Group Inc. conference call covering our third quarter of fiscal 2024 results. Michael Garcia, who serves as our Chief Executive Officer, and Rajat Marwah, our Chief Financial Officer, are the speakers heading up today's session. Just so you know, we are recording this call, and a replay will be accessible later on today within the Investors area of Algoma Steel's company site, www.algoma.com. I want to point out that anything said during this call could include forward-looking statements as defined under applicable securities laws, and those carry assumptions along with inherent risks and uncertainties. Results that actually occur could end up differing materially from what gets stated today; beyond that, our financial statements follow IFRS, which is not the same as US GAAP, and during this discussion we will reference some non-IFRS financial measures. Yesterday evening, we put an earnings presentation online to go along with today's prepared remarks. You can locate the slides for this call in the Investors area of our company website. With all of that said, I'd ask each person on today's call to review the legal disclaimers appearing on slide 2 of the earnings presentation that accompanies this session, and also to look over the risks and assumptions described in Algoma Steel's third quarter fiscal 2024 management's discussion and analysis. Please be aware that our financial statements use the US dollar as our functional currency while the Canadian dollar serves as our presentation currency. Our fiscal year begins April 1 and ends March 31, and our financial statements were prepared for the three and nine months ended December 31, 2023. Also note that unless we say otherwise, all amounts discussed on today's call are in Canadian dollars. Once our prepared remarks wrap up, we will hold a question-and-answer session. At this point I'll hand things over to Michael Garcia, our Chief Executive Officer. Mike?

Michael Garcia

executive
#2

Thanks, Mike. Good morning, everyone — I’m glad you could all be with us today as we review how we did in the third quarter of our fiscal year. As we always do, I want to start by focusing on the thing we care about most: making sure our people stay safe. At Algoma, we never let up on that commitment, and it has produced a solid improvement in lost time injury results for the year to date. Our site is humming with activity, and it’s critical to underline how much safety matters, particularly as more contractors arrive while our EAF project advances. We keep pressing hard in the direction of zero injuries in the workplace. Next, I’ll take you through the big developments and milestones of our fiscal third quarter and what has taken place afterward, plus a status update on our transformative EAF initiative. After that, I’ll pass it to Rajat, who will dig into the figures and discuss our strong liquidity and balance sheet, and then I’ll finish with a review of market conditions. There are a handful of important points I want to be sure land on this call. Our long-range plan is unchanged and still on track, which puts us in position to finish the transition into one of North America’s greenest steelmakers. Results for the quarter came in right inside the range we had anticipated. Our operations are running once more, and we intend to return to full output as quickly and safely as possible, following the collapse of the coke-making utility structure. And finally, the market outlook for the sectors we serve suggests improved pricing relative to calendar year 2023. Now let me give you a little more detail on those themes. In the fiscal third quarter of 2024, we matched the guidance we had earlier provided for shipments as well as adjusted EBITDA, and we delivered year-over-year improvement in nearly every important metric. As a reminder, this fiscal third quarter included heavy seasonal maintenance, which we completed on time before winter arrived. Since our order book runs behind, the pricing we realized in the quarter had not yet reflected the market surge that took place near the conclusion of the UAW strike. We anticipate that stronger pricing will begin showing up in our financials during the fiscal fourth quarter, though sadly it will be largely offset by impacts from the outage caused by the incident at our coke-making plant, which I’ll address in greater depth shortly. Our fiscal third quarter is typically a busy one for seasonal maintenance, and this year was no exception. All told, the work was completed according to plan. We also built up seasonal inventories, which is our standard practice as the calendar year winds down. During the quarter, we kept moving forward on Phase II of the plate mill modernization project, which involved commissioning the in-line shear and raising its throughput through year-end. We also finished the quarter with roughly $750 million in liquidity. Turning to what's ahead, we expect plate production to increase, which presents an opening to capture market possibilities and build up stock ahead of the planned shutdowns required for putting in the final pieces of the modernization effort. Just to restate, we split the originally scheduled 40-day outage into a pair of shorter ones — the first in April, with the second aimed at late calendar year 2024, allowing it to line up with other planned maintenance and deliver certain downtime savings. Next, an update on where things stand with our transformational electric arc furnace, or EAF, initiative during this quarter. When complete, the EAF will lift our throughput capability by roughly one-third, moving us from CAD2.8 million tons per year of liquid steel capacity made today via conventional means up to CAD3.7 million tons with dual furnaces. That extra volume will match our expanded downstream finishing capability as we grow our plate mill. At full operation, we'll improve our overall product mix and reduce carbon emissions by approximately 70%. Given what will make up our electricity supply once EAF operations begin, we expect to rank among the greenest steel producers in all of North America. Cumulative spending on the EAF project this quarter reached CAD510 million. Committed contracts so far amount to roughly CAD750 million, with about 7% tied to time and material contracts and the rest fixed price in nature. Before this quarter ends, we expect to contract most of the remaining project elements; doing so will meaningfully lower risk in the EAF project budget as we approach our anticipated commissioning in late calendar year 2024. As a reminder, our start-up plan continues to call for normal production from our existing steelmaking facility while we ramp up steel output from our EAFs in calendar year 2025, after which we'll transition fully to EAF production. Before I hand things over to Rajat, let me update you on our current operations. As previously disclosed on January 20 and January 23, an incident took place at our coke making plant involving the collapse of a structure supporting utilities plankton. Fortunately, nobody was injured. That said, the event did impact several utilities serving the coke batteries and other facilities throughout the steelworks. Coke making operations stopped when the incident occurred, and within 72 hours of it we were able to stabilize heat to all three batteries and bring back partial coke production. Considering coke inventories on hand, third-party coke availability and our partial production capabilities, we can satisfy all of our steel-making raw material input while at the same time pursuing a permanent repair plan for the plant. As we also disclosed previously at the time of the incident, we temporarily halted blast furnace operations for safety reasons. Upon initial restart, the blast furnace ran into operational challenges stemming from unforeseen impacts related to the piping collapse. Every fix needed on the blast furnace is now complete, and we're steadily restarting those furnaces. We figure that within a week—seven days—we'll see usable hot metal coming out, and we expect to be back at full production in two weeks. Most importantly, as we do this recovery work, the safety of our employees and our community comes first. At the same time, the EAF project continues to progress on schedule. And with $750 million in liquidity, we have the financial flexibility to support these efforts. Again, I'd like to express my gratitude to all of our employees for their professionalism, their dedication, and their hard work. With that, I'll turn it over to Rajat, who will take us through the financial results for the quarter. Rajat?

Rajat Marwah

executive
#3

Thanks, Mike. Morning, everyone — I appreciate all of you joining the call. Just a quick reminder: unless stated otherwise, all figures we talk about are in Canadian dollars. In the quarter, we shipped 516,000 tons, an increase of 12.6% versus the same period a year earlier. Our plate and strip operations did well this quarter, even with the usual seasonal maintenance, which included the annual inline work on our steelmaking vessel. Net sales realization averaged CAD1,079 per ton, a decline of 3.3% from the prior year period. That decline versus last year's level mostly reflects somewhat softer market conditions during the quarter — specifically, the lingering lower prices that followed the UAW strike, along with the lagging nature of our order book. Plate pricing continued to enjoy a substantial premium over hot-rolled coil this quarter, supported by resilient demand, especially from infrastructure project spending and durable goods. Steel revenue for the quarter was CAD 556.9 million, up 8.8% compared with the same quarter last year, which reflects higher shipments that more than offset lower average realizations per ton of steel. Turning to costs, our cost per ton of steel products sold averaged 10.07 in the quarter, down 11.2% from the prior year period. That decrease versus last year is mainly due to favorable leverage on higher volumes; this produced adjusted EBITDA of negative CAD 1 million for the quarter and an adjusted EBITDA margin of negative 0.2%, which is an improvement over negative CAD 35.9 million and negative 6.3% in the year ago period. Cash used in operations came to CAD 47.4 million for the quarter, versus a use of CAD 128.6 million in the prior year period. At quarter end, our inventories stood at CAD 886.6 million, up 7.8% during the quarter, reflecting normal seasonal build patterns ahead of winter. Normally, we would expect to release inventories in the first half of calendar 2024, heavily weighted toward the first calendar quarter. However, the impact of the Coke-Making plant incident will lead to higher inventory levels for inputs such as ore and coal, which delays some of that anticipated inventory release. Looking ahead, we do expect the fourth fiscal quarter to see directionally higher EBITDA than the third fiscal quarter. Promised performance will, of course, be affected by the production outage tied to the utility structure collapse. All told, we expect the incident to affect production and shipments for more than three weeks, amounting to roughly 120,000 tons to 150,000 tons; it's worth noting that Algoma carries standard insurance coverage meant to protect the company at times like this, including business interruption insurance. We've started the process of filing claims under our policy for covered losses, and insurance adjusters and advisers were on-site, so likewise, we're working closely with them to secure our protection. We expect to have more details on this front in the coming months. When it comes to how we handle working capital, we mentioned on the last call that our intention was to unlock a total of CAD 150 million by the end of fiscal 2025, with about CAD 100 million of that expected to come from a working capital drawdown in the fourth fiscal quarter of 2024. Due to the Coke-Making utility structure's collapse and the operational outages associated with it, what we now expect for the fourth fiscal quarter is a release that lands 70% under our original estimate. That shift in timing means the rest will come out over the quarters that follow, and over that period we still expect to unlock roughly CAD 150 million. Let me go over our funding plans for this year's projects once more. As we've previously stated, our estimate for the project's total cost remains between CAD 825 million and CAD 875 million. By quarter's end, CAD 510 million had been spent — 60% of the projected total — leaving CAD 340 million of investment demand. Our current position is solid, and we're evaluating the sources we anticipate for those expenditures throughout 2024. Our balance sheet has been structured so that government loans connected to our capital projects are the only long-term debt we carry, which allows us to maintain very low leverage, with substantial liquidity of almost CAD 400 million at quarter end to manage market swings and complete our capital initiatives; we hold close to CAD 95 million in cash, have an additional CAD 76 million of available capacity under our Federal CEF loan, and anticipate roughly CAD 150 million in cash generated by reducing excess working capital in the months ahead. $1,027 — $875 million. All together, that approximately covers the capital needed to finish the project, which highlights our ability to advance this transformative project as planned. At this point I'd like to turn the call back to our CEO, Michael Garcia, for closing comments. Mike?

Michael Garcia

executive
#4

Thanks, Rajat. Turning to how things look in the North American steel sector, index pricing for hot-rolled coil climbed sharply during October, once the settlement came through and the UAW strike grew clear, with steel buyers hurrying to rebuild the inventory they needed. Across the fourth quarter of the calendar year, prices rose out of the mid-$600 band and reached almost $1,100 per net ton as the year closed. So far in 2024, index prices have slipped by roughly $50, and futures have settled into a mid $800 per ton US average for the rest of 2024; although these levels sit below the year-end peaks, they still mark a substantial gain versus what was seen through much of 2023. As Rajat noted, we also gain support from plate pricing, which keeps showing a sizable premium while demand for plate products overall stays strong, and that in turn keeps helping our average price realizations, particularly as we increase output at our plate mill. The year 2024 will matter greatly in Algoma's story, since we keep pushing forward on work toward commissioning our transformative EAF project. That brings in the next chapter for our Company, one that shapes Algoma's future, lays the groundwork for long-term value creation for our stakeholders, and cements our leadership role at the leading edge of green steel production in North America. Many thanks for your ongoing interest in Algoma Steel. With that, we would be glad to take your questions. Operator, kindly provide the instructions for the Q&A session.

David Ocampo

analyst
#5

I appreciate you taking my questions. My first one is a broader picture kind of question. When you look ahead to 2025, you've always talked about being a hybrid operator, either leaning toward a pure-play EAF or adding a little bit of your blast furnace. When you consider what just occurred with the coke facility and even the blast furnace, does that alter your thinking on what you ultimately settle on for 2025, or does it simply boil down to cost? I'm interested in your perspective there.

Michael Garcia

executive
#6

Hello, David. Mike here. Yes, I believe at this moment our plan is still to run in 2025 in a hybrid mode. That has been the approach for a while, and we think it makes sound financial sense too, and clearly, from a financial standpoint we will keep watching that very closely. Because of the incident over the past two weeks, we'll need to grasp the condition of the assets and ensure we're at ease with the asset integrity of both the blast furnace, which we devote a lot of attention to and which stands out significantly in our asset integrity and asset reliability plan, and also the coke ovens; but if nothing meaningfully shifts in either of those viewpoints or analyses, we are at ease with our present plan.

David Ocampo

analyst
#7

Got it. It may still be early days, and I think this one's for Rajat, but on the cost structure side — when you operate as a hybrid, should we think of it as a no cost plus kind of model, or are we simply wondering how much additional expense the dual cost structure, that DuPont dual manufacturing process, is going to create?

Rajat Marwah

executive
#8

Hi, David. The best way to put it is this: we will operate one more facility, the electric arc facility; and as we've mentioned previously, from a mining standpoint it will probably require 100 to 140 more people, and that becomes your fixed cost, while the rest mostly becomes variable, whether it's metal utilized in the electric arc furnace or metal utilized through the blast furnace; so when it comes to the additional fixed cost you're asking about, that's the sum of it, and maintenance costs won't be major because the asset is new; so we don't expect it to be materially higher as we go through this. It will definitely be higher during the transition — as we transition and start shutting down the facilities and start bringing down the fixed costs at those facilities, those costs will start to come down. That figure comes to roughly $40 million.

David Ocampo

analyst
#9

And for my final question, Rajat. You laid out some capital plans, at least concerning the year — I was hoping you might reconcile the overall CapEx figure for this year, splitting it into maintenance, plate modernization, and then adding the app on top of that?

Rajat Marwah

executive
#10

So when you refer to this year, do you mean fiscal 2025?

David Ocampo

analyst
#11

I suppose we're talking about the 2024 calendar year.

Rajat Marwah

executive
#12

Yes, the 2024 calendar year, so that should be pretty much consistent. From a CapEx standpoint, we'll likely spend roughly CAD250-odd million during the year. That figure is gross CapEx rather than net, and beyond that, there will also be maintenance spending. On maintenance CapEx, we're looking at approximately CAD100 million to CAD120 million. That's what we'll be putting out, so that gives you the total. Some plate mill CapEx is going to be incurred in the first quarter, with a bit more coming afterward, in order to finish the complete replacement projects. That's the way CapEx will unfold. The funds directed toward recovery of the coke batteries will certainly be included as part of the overall analysis we're conducting together with insurance, but that amount will come on top.

David Ocampo

analyst
#13

Understood. I really appreciate it. I'll pass the call along now.

Katja Jancic

analyst
#14

Hello. Thanks for taking my questions. To start, just to verify: you're anticipating that EBITDA will rise on a sequential basis in 4Q?

Rajat Marwah

executive
#15

Yes, that's right.

Katja Jancic

analyst
#16

so will pricing be the main thing pushing that, or do costs play a role in either direction?

Rajat Marwah

executive
#17

pricing accounts for nearly all of it. On the cost side, things should look fairly comparable, and where variable costs are concerned, fixed costs will certainly rise in line with volume — yet the bulk of it traces back to pricing.

Katja Jancic

analyst
#18

So at this point, that's based on a loss of three weeks in production, correct?

Rajat Marwah

executive
#19

That's right — somewhere in the range of 120,000 to 150,000 tons when it comes to both output and shipments.

Katja Jancic

analyst
#20

And perhaps regarding the blast furnace, nearly at the point where a complete reline is required, could that pose a risk of making the restart more difficult?

Michael Garcia

executive
#21

Hello Katja. Mike here. Not truly. In my view, the blast furnace outage stemmed more from the utility service event at coke making; we have brought it back up and are gradually returning it to a solid condition. The interval since the most recent reline, in my opinion, does not genuinely play a role in what occurred, nor in the condition we will restore it to once we are producing good metal. Is that useful?

Katja Jancic

analyst
#22

okay, thank you. I'll hop back on the call.

Ian Gillies

analyst
#23

hi, everyone, and good morning.

Michael Garcia

executive
#24

good morning, Ian. On the $120 million figure, that's noted.

Ian Gillies

analyst
#25

To double-check those working capital figures you gave us — are you saying fiscal year 2024 will see a release of roughly CAD40 million to CAD50 million, and then fiscal year 2025 brings another CAD100 million release?

Rajat Marwah

executive
#26

Yes.

Ian Gillies

analyst
#27

And, related to that, does it also take into account bringing on or injecting additional working capital before the EAF is fully up and running? Because my thinking is you'll need to start buying some scrap ahead of startup and commissioning, at year-end?

Rajat Marwah

executive
#28

Yes, it does. Just to provide a bit of context, we will be buying scrap, though it won't be a big quantity, since by the end of this year we aren't purchasing much, and as we ramp up, it probably will be larger the following year as we buy. And at that point, our iron ore and coal inventory is also going to drop substantially. So yes, it does factor in whatever we purchase, for the ramp-up, and we would still be reducing that CAD100 million or CAD150 million in total by next year, along with the $50 million.

Ian Gillies

analyst
#29

Rajat, with the way the schedule has shifted around spending on the EAF and drawing on that credit facility, is there any condition attached to the government loans you currently hold that would block you from taking on more debt, or anything along those lines that might restrict what you can access?

Rajat Marwah

executive
#30

No — there are suitable buckets or baskets in place that we can use, so if the need arises to go into the credit market, we're able to do that.

Ian Gillies

analyst
#31

All right, and then I guess, as we begin to look at what's left of this year and as we consider when the capital expense for the EAF will land, will you give that update along with the usual guidance you put out early in April, or do you think it'll come at some point afterward?

Michael Garcia

executive
#32

We don't know what you're referring to when you mention the capital costs in.

Ian Gillies

analyst
#33

Okay, apologies — let me clarify. You'd indicated your belief that all projects, along with the capital cost, would be locked in before this calendar quarter wraps up, and normally you give guidance around EBITDA for a quarter, roughly at the start of the next month or in early April. I'm simply asking whether, in that announcement, you expect to include a status report on the EAF and the costs, and so forth?

Rajat Marwah

executive
#34

Yes, absolutely, we will. As is our usual practice, we'll give a hub covering where we stand on the year regarding capital cost — our expectation being that most of our cost ought to be settled by then, and we will certainly deliver an update at that point.

Ian Gillies

analyst
#35

Okay, many thanks. I’m going to pass it back now.

Michael Garcia

executive
#36

Appreciate it, Ian — and just to note, the figure we’re referencing here is $250.

Ahmad Shaath

analyst
#37

Hey, guys. Maybe just a quick follow-up first. In terms of shipments for Q4, what reference point would you suggest we use, compared with that 120k to 150k you mentioned, since shipment volume has been quite variable year to date?

Rajat Marwah

executive
#38

Yes, so usually our average comes to roughly 550,000 for every quarter. So that's a reasonable place to begin.

Ahmad Shaath

analyst
#39

Great, that's really useful. Regarding pricing, I believe you mentioned expecting somewhat stronger prices directionally across calendar '24 versus calendar '23. Is the current futures curve the thing driving that, or what assumptions underlie this remark?

Rajat Marwah

executive
#40

What's actually driving the pricing is the future curves that we are observing. Another factor certainly shaping our expectation for this year is the spending taking place on the — in infrastructure and other consumption areas; demand as such has remained stable, so we don't anticipate major shifts as such beyond the sentiment-driven changes that occurred; and additionally, we are incorporating the cost — the cost component that has held loans at an elevated figure and kept average through-the-cycle pricing at an elevated figure too. So, several of those elements are taken into account; but yes, futures are likewise signaling where pricing is headed.

Ahmad Shaath

analyst
#41

All right, that's quite useful. Thank you, Rajat. And for the final question, I don't know whether you gentlemen addressed this yet, but perhaps as the EAF gets nearer to being commissioned, could you give us an update regarding the expected cost reductions and the OpEx framework? It has been some time — I believe the most recent update we received comes from the roadshow figures that were becoming public. I'm just curious whether there's an opportunity for us to hear updated figures on those sometime during this year?

Michael Garcia

executive
#42

Yes, Ahmad, Mike here. We are going to keep doing that as we refresh the information and move nearer to the point when commissioning begins on the EAFs toward the close of this year, covering both what our final state is going to be, plus additional details about how that brief hybrid stretch will appear from that standpoint.

Ahmad Shaath

analyst
#43

That's a big help. I appreciate you taking my questions.

Lucas Pipes

analyst
#44

Thanks a lot, operator. Morning, everybody. I may have missed it, so forgive me if that's the case, but I was hoping you might give us a bit of detail, in terms of dollars and cents, about the coke incident, and I was also curious what the OpEx effect for this year could look like. And on the CapEx side as well, what extra costs will come from the incident over the longer term — any sort of longer-term cost we should factor in? Thanks so much.

Michael Garcia

executive
#45

Certainly. I'll begin, Lucas; we've finished putting together the repair plan, drawing on it, with both outside engineering and internal resources; so the total repair costs, we expect, will fall in the $20 million to $30 million range and ought to be done at some point in the April time period as far as costs go. Past that, we're aiming for a complete recovery back to full production of the coke batteries. Fortunately, during the incident, none of the three batteries had any thermal integrity degradation — we managed to protect the thermal integrity of all three batteries. So after the repair is carried out, our goal is to return to pre-incident coke production levels.

Lucas Pipes

analyst
#46

Understood. Are there any costs over a longer horizon tied to this?

Rajat Marwah

executive
#47

Honestly, it's too soon to tell. But the way we've examined things up to this point, and the situation we're in with batteries, those are fine, and the walls are fine too. So we don't anticipate much — significant deterioration in that area, which matters most when you think about expenses over the long run. When it comes to the corridor, meaning the piping, that's the expense we've evaluated, and it comes to $20 million to $30 million. So at a high level, I don't — we don't believe there will be extra costs, though we'll have a clearer picture once the furnace is back up and running at full production; and just to add a bit of context for that stretch, we'll likely be operating at 30% to 40% of our production while relying on external coke throughout this quarter. Then, once the next quarter arrives, we ought to be back at our full production levels.

Lucas Pipes

analyst
#48

That's quite useful, thanks. I want to move to something at a broader level now — M&A. Over in the US, I noticed a really busy process involving US Steel. So I'm curious: at this particular moment, what's your read on the dealmaking environment? Could there be anything out there that, strategically speaking, might be a possible win for Algoma? Or how do you see that environment shifting, perhaps more on the Canadian side? I'd welcome your perspective. Thanks.

Michael Garcia

executive
#49

Hello Lucas. It will certainly change, I'm sure, but our stance is that we don't speculate about or discuss how we might be viewing particular M&A possibilities. Still, I'm glad you asked.

Lucas Pipes

analyst
#50

Is there anything that would make sense strategically, perhaps something that only Algoma would really gain from? Or are you essentially just centered on the EAF?

Michael Garcia

executive
#51

Right. Well, clearly, the near-term direction we're taking strategically isn't in question. In our view, the EAF delivers enormous strategic worth to Algoma. Our attention is completely fixed on carrying that out, and we're hitting our schedule and our spending targets; plus, we're eagerly anticipating starting up commissioning toward the close of this year.

Lucas Pipes

analyst
#52

Okay, that's helpful. Thanks a lot.

Michael Garcia

executive
#53

Thanks, Lucas.

Mike Moraca

executive
#54

Once more, many thanks for joining us on this call about our third quarter fiscal 2024 earnings and for the ongoing interest you show in Algoma Steel. We're eager to share our results and the progress we've made when we release our fiscal fourth quarter numbers. That's set for June. Thanks.

Operator

operator
#55

That brings today's call to a close. You're free to hang up now. Thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Algoma Steel Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Algoma Steel Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Algoma Steel Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.