Ameresco, Inc. (AMRC) Earnings Call Transcript & Summary

March 2, 2020

New York Stock Exchange US Industrials Construction and Engineering earnings 44 min

Earnings Call Speaker Segments

Leila Dillon

executive
#1

Thanks, Valerie, and good afternoon to all of you; we're glad you could be with us on today's call. Here with me are George Sakellaris, who serves as Ameresco's Chairman, President and Chief Executive Officer; Doran Hole, our Senior Vice President and Chief Financial Officer; and Mark Chiplock, Vice President and Chief Accounting Officer. Before handing things over to George, I'd like to offer a quick note about forward-looking remarks. During this call, we'll share forward-looking information about upcoming events and how the company's finances are expected to perform going forward. Please be aware that these statements represent predictions grounded in management's present expectations or beliefs. A number of risks and uncertainties tied to our business could cause actual results to come out materially different. We'd point you to the press release the company issued this afternoon, along with our SEC filings. Within those documents, you'll find discussion of significant factors that might lead actual results to diverge materially from what's included in the company's projections or forward-looking statements. We undertake no obligation to update any forward-looking statements in light of what's said on today's call. Also, throughout the call we'll be citing non-GAAP financial measures. Those non-GAAP financial measures aren't put together in line with generally accepted accounting principles. You can find a GAAP to non-GAAP reconciliation, plus an explanation of why non-GAAP financial measures are used, in our press release and in the appendix of the slides, which are available for download from our website. I'll now hand the call over to George. George?

George Sakellaris

executive
#2

Thanks, Leila, and good afternoon to all of you. Before we get into our results, I want to take a moment to speak to the recent talk about a possible sale of Ameresco. We don't usually weigh in on particular market rumors, but all we can say is that no sale process is underway at this time, and we are pushing hard on our business plan as a standalone company. With that said, let's turn to our results. Ameresco closed out 2019 with records on a number of important metrics. Just as important, we've entered this year with wide-ranging technical capabilities and the backlog needed to deliver yet another year of strong performance. Our team performed exceptionally well in the fourth quarter. We drew on the strength of each business unit to deliver across the board; total backlog rose 15% to $2.3 billion, and our assets in development jumped 80% to record levels. As we had expected, we turned a large number of major awards into contracts, and we executed against our contracted backlog, which let us achieve record revenue. We now look ahead with excellent visibility and real excitement as we capitalize on the industry advancements that are changing the game. The economics of advanced technologies have improved dramatically and are now a major driver for renewable energy, energy efficiency, combined heat and power, microgrids and energy storage projects. Over the past 10 years, the cost of these advanced technologies has fallen a great deal, which makes many installations and upgrades economical for our customers. While the steep drop in the price of solar power tends to draw the most attention, our other technologies have also experienced a major decline in cost and a rise in performance; take LED lighting, for example, where prices have fallen by more than 90% over the last decade, resulting in enormous cross-market adoption. Municipalities especially have seized on this technology to retrofit their street lighting. Ameresco recently swapped out more than 100,000 legacy streetlights for high-efficiency LEDs in the City of Phoenix. Lower electricity costs will save the city over $3.5 million per year, on top of substantial operation and maintenance savings. The cost of many of these advanced technologies, including LEDs, solar, battery storage, microgrids and CHP, keeps declining, which drives ever more attractive economics for our customers and for Ameresco. Looking ahead, the direction is clearly toward a low or carbon-free environment and away from fossil fuels. A report from Bloomberg showed that clean energy purchases by corporations through power purchase agreements are setting records. And these purchases rose by an impressive 44% in 2019. The report notes that corporations face growing pressure from shareholders to decarbonize their energy consumption and diversify their energy sources, as recent releases from Delta Air Lines, Microsoft and BlackRock illustrate. Ameresco is well positioned to capitalize on this trend as we work closely with our customers, providing them with best-in-class advanced technology solutions that fit their unique needs. On top of that, we can offer them true financial flexibility. Ownership of the solutions can rest with them, or it can stay with us. Both approaches work for us. Independence in our offerings, wide-ranging technical know-how, and room to maneuver financially set Ameresco apart in a marketplace that keeps getting more complicated. Demand for resiliency is climbing as well. The prominent grid shutdowns that hit California show how grid instability and interrupted power supplies hurt the economy. More and more, we see utilities, municipalities, hospitals, higher education, and corporations wanting solutions that let them bounce back quickly from these widespread outages that keep growing. The military has shown itself to be a key early adopter of new technologies that deliver on-site power, energy storage, and microgrid controls, boosting energy security and resiliency. Numerous bases nationwide are folding these solutions into their infrastructure. One strong illustration is the project we announced recently at Portsmouth Naval Shipyard in Kittery, Maine. Through this project, Ameresco will bring in a new 7.5-megawatt combined heat and power plant and put in a 1-megawatt battery storage system to extend the shipyard's microgrid system. Ameresco will additionally supply operation and maintenance services. Right now we are providing comparable solutions to other federal customers throughout the country. A recent report from Navigant Research puts the expected growth of the worldwide microgrid market at a 28% annual rate through the close of this decade. Our energy asset business stayed quite busy this quarter too, landing a number of new awards, among them 5 more renewable natural gas opportunities totaling roughly 25 megawatts. Thanks to our strong asset development pipeline, we will more than double the megawatts we have in operation over the next several years. That will substantially boost our base of recurring revenues, earnings, and cash flows. Although 2019 took a hit from lower RIN prices, we are happy to see a steep price recovery already this first quarter. Because of that, we seized on the favorable shift and expanded our hedging activity for RIN production in 2020. Renewable natural gas keeps drawing significantly more demand as organizations that rely on natural gas consider adding this green gas to their mix. While the transportation sector led the way in recent years, we now see notable interest from the natural gas utility industry and institutions, many of which have already announced plans to buy more renewable natural gas as part of their overall fuel supply. We think this rising demand will let us secure solid off-take partners for our green gas via long-term contracts, which gives us improved long-term visibility into cash flows from these projects. At the close of 2019, total assets in development hit 321 megawatts. We anticipate our assets in development will keep expanding at a healthy pace. On top of that, our operation and maintenance backlog rose an impressive 22% to $1.1 billion, which further reinforces our future recurring revenue base. Being a crucial driver behind a reduced-carbon tomorrow, we’re eager to share additional ESG information with both our clients and those who invest in us. We take pride in stating that during 2019 by itself, the renewable energy holdings and client initiatives of Ameresco provided a carbon reduction equal to more than 11 million metric tons of CO2; that matches the amount of carbon taken in by nearly 15 million acres of forest over 1 year; we head into 2020 with remarkable long-term clarity, thrilling market possibilities and a strong competitive standing and foundation, alongside the internal capabilities required to gain from this rapidly expanding market. Once more, 2020 ought to be a record-setting year for Ameresco. At this point I’ll hand the call over to Doran for a look at the financials. Doron?

Spencer Hole

executive
#3

George, thank you, and hello everyone on this afternoon's call. While I go over the company's Q4 and full-year 2019 financial highlights, I'd encourage you to review our press release and the supplemental slides, since those materials provide more complete financial details. The capital we've directed toward expanding our advanced technology capabilities is beginning to produce results; we achieved record growth in project and O&M backlog, and we also posted another solid quarter of additions to our assets in development. When the quarter ended, backlog for our Smart Energy Solutions projects totaled $2.3 billion — comprising $1.1 billion of contracted backlog plus $1.2 billion in awarded projects — and during that quarter we secured $290 million in new awards. One thing that stands out is our contracted backlog, which hit a record $1.1 billion — that's up 52% compared with the prior year, and it strengthens the visibility we have into 2020 and later. On top of that, assets we have in development finished the year at an all-time high of 321 megawatts, which works out to 80% growth year-over-year. During Q4 alone, we brought in a net 34 megawatts, and that figure includes several fresh RNG opportunities plus a sizable comprehensive microgrid project in the C&I sector — something we're eager to share more details about down the road. What these additions demonstrate is our capacity to win market share within the expanding green gas and microgrid markets by way of Ameresco asset ownership. For the fourth quarter, we brought in $307 million in revenue, which showed really robust growth, because we moved those big federal government contracts out of awarded backlog and into contracted backlog. Across the entire year, revenues rose 10%, reaching $866.9 million, up from $787.1 million the prior year, and the projects business drove that strength. On the other hand, our yearly performance took a hit from falling RIN prices, which cut gross profit, net income and EBITDA by roughly $7 million, and about $4.3 million of that landed in Q4. That said, after the year closed, we moved proactively to capitalize on the recent RIN price recovery by hedging a larger share of the production we expect. Our view is that this approach will lessen how much RIN volatility affects our 2020 results. The retroactive renewal of the 179D tax deduction helped counterbalance what RIN pricing did to us, lifting net income for both Q4 and the entire year. We booked that entire advantage during the fourth quarter of 2019. It consisted of $4.2 million, equal to $0.09 a share, tied to projects finished in 2018, plus $3.3 million, or $0.07 per share, tied to projects finished in 2019. Through the close of 2020, the 179D benefit keeps going. Let me now share some detail on what we anticipate financially. For 2020, we look for yet another year of healthy growth in both revenue and earnings. With our robust backlog behind us, Ameresco's projection for 2020 total revenue falls between $910 million and $980 million, which works out to 9% growth versus last year at the midpoint. For adjusted EBITDA, our guidance is a range of $102 million to $112 million, which works out to 17.5% growth at the midpoint. When it comes to non-GAAP EPS, we're looking at somewhere between $0.86 and $0.96. Gross margin, we expect, will come in somewhere in the 18.5% to 19.5% band, and the reason is that a bigger portion of the contracted backlog we'll be working through this year consists of projects carrying lower margins. On interest and other expense, the figure should climb to approximately $17 million to $19 million, reflecting our continued financing of additional company-owned assets. As for the effective tax rate across the full year, our expectation sits at roughly 8% to 12%, given that the company keeps benefiting from the 179D tax deduction's extension. This guidance doesn't include the effect of any noncontrolling interest activity, any further charges tied to the company's restructuring activities, or any related tax impact; at this point I'd like to hand the call back to George for closing comments.

George Sakellaris

executive
#4

Thanks, Doran. There are 4 things I'd like to leave you with. First, the market's still going strong, and Ameresco keeps earning recognition for our flexible offerings and the great value they deliver. Second, we're expecting 2020 to be a strong year, thanks to our sizable backlog of contracted projects and our asset development pipeline, which is growing quickly. Third, the money we've put into technology, people, and platforms ought to pay off for Ameresco and its shareholders in 2020 and beyond. And fourth, we think this industry's growth is still in its early stages, as we keep pushing toward our mission, a sustainable, low-carbon future. We're looking forward to seeing many of you at the investor conferences we have coming up. And with that, Valerie, we'd now like to open up the call for questions. Thank you.

Chris Van Horn

analyst
#5

For a moment, I'd like to discuss the guidance. On that revenue range, could you walk us through the puts and takes? Is the main driver the timing of awards? Or might there be additional macro factors you're considering?

Spencer Hole

executive
#6

Yes. My view — Doran, this is — when I look at that range, it's likely more a matter of how quickly awards turn into contracts than of whether we actually win the awards.

George Sakellaris

executive
#7

Also, we're sitting in a strong spot no matter what portion of revenue arrives through signed deals versus awards we intend to turn into contracts. Still, we're fairly comfortable with the range we provided. Would you like to add something?

Chris Van Horn

analyst
#8

All right, understood. Then, regarding your remarks about the outlook, you said gross profit would increase at a faster pace, though that margin could be somewhat impacted by mix. Is there anything particular worth highlighting on the mix side?

George Sakellaris

executive
#9

Yeah, that's a valid observation. Here's what's going on: the business is moving somewhat, and we're getting more of what I'd describe as design-build projects. A solid illustration could be a few customers for whom we were engineering the plant's assets that we would ultimately own and run — partway through the process, they tell us, no, those assets will belong to us, so you'll handle the design, development, and construction for us. And naturally, on those specific projects, the risks are much reduced, unlike the margins we earn on performance contracts; plus we have a number of what I'd term legacy, including certain streetlights jobs we hold and certain design-build jobs we hold for the federal government, and those carry significantly lower margins; and for some of them, there's a 2-year window to get them implemented. But one of the good <<inaudible>> regardless of whether we constructed an asset for a given customer or a street lighting job for a given municipality. We have a fairly strong trailing operation and maintenance contracts tied to those specific clients, and those provide us with fairly strong margin on the O&M contract. On top of that, a lot of these clients are our customers. There will be plenty of repeat business connected to them. So while on the top line, we might observe the gross profit margin dipping somewhat. But from an accretive standpoint, or the profit standpoint, they're adding substantially; so ultimately it's a positive thing.

Chris Van Horn

analyst
#10

Yes. Okay, understood. That's my final question. From a dollar standpoint, SG&A didn't move, even with revenues growing really nicely and strongly. Is that purely because of the operational controls you've got in place? Or should we be factoring in anything else there?

George Sakellaris

executive
#11

No. It comes down to the operational control we've established; we never lose sight of the fact — one thing about a company that's growing, and particularly given that during the prior year, roughly $5 million had to go into OpEx for what I'd describe as people and platform, so that we could compete in this competitive market, the advanced technology market. On the other hand, we've either succeeded at, or maybe are, fine tuning the organization somewhat and adding where we need them while subtracting where they aren't as effective.

Chris Van Horn

analyst
#12

All right, understood. Also, nice work on the quarter.

George Sakellaris

executive
#13

Thanks.

Spencer Hole

executive
#14

Appreciate that, Chris.

Noah Kaye

analyst
#15

I've got a few things to go over. To start, how many megawatt equivalents went into service during 2019?

George Sakellaris

executive
#16

Into service...

Noah Kaye

analyst
#17

Right. What quantity of megawatts went into operation...

Spencer Hole

executive
#18

Went into operation.

George Sakellaris

executive
#19

36 or 34?

Spencer Hole

executive
#20

34 placed in service.

Noah Kaye

analyst
#21

All right. So for 2020, what figure are you working with?

George Sakellaris

executive
#22

Roughly 50. I also want to mention that this year's megawatts placed in service left us somewhat unhappy with our installations. As you may be aware, the majority of the assets we intended to put into service were located in Massachusetts and Rhode Island, with a few in New York; however, particularly in Massachusetts and Rhode Island, we ran into major delays stemming from the cluster studies and the work the utilities are required to perform. That pushed us back, I'd estimate, by 6 to 9 months on roughly 20 megawatts of installation. Beyond that, certain other projects took a hit and had their timing moved to a later date.

Noah Kaye

analyst
#23

Okay, so you just mentioned that 25 megawatts were added to the RNG pipeline that's in development. Could you tell us, or remind us, when you expect the 66 megawatts to come online? And when are those projects going to hit full ramp? Just the broad timeline over the next couple of years would be helpful.

George Sakellaris

executive
#24

Yes. We've provided some color on this previously. McCarty Road would be at the end of this year. Actually, it started a bit late in the fourth quarter; then we have 2 more, Keller and Forward, which will be coming close to the end of next year; then at present, our plan — we're hoping we'll have 3 for the year after that. That's the plan we've built within the organization to get 1, 2 and then 3 of these plants into service. And what I'd like to point out on — regarding the green gas development, it's an area where we've placed a lot of emphasis because of what's happening in other markets besides the transportation sector. And we hope that by the end of this year, we'll be in a position where we'll have executed some long-term contracts with some of the good credit-worthy entities. And that will give us better visibility as far as the revenues, earnings and cash flows associated with this project.

Noah Kaye

analyst
#25

All right, and that — I appreciate it, George, for getting ahead of what I was going to ask next. So in the release, you mentioned that RINs acted as a $7 million drag during '19. When it comes to the 2020 guidance, what RIN price are you working with?

George Sakellaris

executive
#26

That figure isn't something we make public, but what I can tell you is that over 50% has already been hedged by us out in the market as we speak. I believe it's 52% to 54%, and we keep looking for more opportunities. Largely, however, those hedges were put in place by us over the past couple of months, and figuring out what those prices are doesn't require a brilliant scientist. And I think that's — what you'll discover is that we're in the vicinity of where the numbers are trading.

Noah Kaye

analyst
#27

Or perhaps the cost of RINs has climbed twofold over the past 2 months due to those court decisions. So are you stating that your hedges were placed once that price had already doubled?

George Sakellaris

executive
#28

The hedges were put in place following that rise.

Noah Kaye

analyst
#29

Yes. All right. That's great, that's great. So looking further out, based on what you said in your last response, it sounds like there's a chance we could secure long-term offtakers for a few of these projects. How near do you think you are to getting some of those agreements signed? Should we expect that kind of announcement in 2020?

George Sakellaris

executive
#30

I'm not going to say anything about that, probably near the end of the year. There's a lot of back and forth, and with certain ones, since they're big institutions or some utilities, things move slowly; even so, I'll say this, we've got a great deal, a great deal of interest.

Noah Kaye

analyst
#31

All right, and after that...

George Sakellaris

executive
#32

We also need to bring them to price points that work for us over the long haul. A lot of these customers — they're aiming for 20-year agreements.

Noah Kaye

analyst
#33

OK, so you mentioned agreements lasting 20 years?

George Sakellaris

executive
#34

Well, there are a few individuals we're searching for. Yeah, that's not to say we'll hand them over.

Noah Kaye

analyst
#35

All right, just a brief question about the project side. And congrats on that enormous jump in contracted backlog. I mean, clearly, that's the largest figure you've ever carried into a year, by a wide margin. I just want to get a sense, when you examine the mix within that backlog, do the mix headwinds you're flagging for 2020 carry over into 2021, given what you've booked in the contracted backlog? Or, looking a bit further out past 2020, does the margin profile appear somewhat improved? How should we frame that?

George Sakellaris

executive
#36

Here's what I'll say. The headwinds we projected for 2020, they're tied heavily, naturally, to project mix. And the fact is — another thing about these projects folks need to understand is that a lot of them are 2-, 3-year efforts, and it's 2-, 3-year construction; that said, during 2021 and beyond, we're observing that margins will progressively begin rising. And the other item that in 2020 that <<inaudible>> us somewhat, say, you've got 20 megawatts of solar plants that were pushed back, postponed by 6 to 9 months, had we finished those in the prior year, they'd deliver, if you revisit our analysis, $0.25 million EBITDA per megawatt, we'd have an additional $5 million of EBITDA arriving this year. So...

Craig Irwin

analyst
#37

So George, looking at the various EBITDA disclosures by line of business throughout the year, I realize the math isn't exact, but it leads us to a figure for the assets business in Q4 that's actually above $20 million, over 70% of the quarter's EBITDA for that segment, and significantly greater than anything you've posted historically. Could you perhaps walk us through what was fueling the strength in the asset business during Q4? Were there particular items you managed to monetize? And how does that trend progress as we move into 2020? Should we anticipate building on this incrementally in Q4 of 2020 as more new projects come online?

George Sakellaris

executive
#38

Yeah. Like we've mentioned before, from time to time, since we don't want to overleverage our balance sheet — and when you look at our backlog, you might say, "Oh, George, you folks have 321 megawatts of assets in development." A substantial portion of that, we're going to monetize, particularly if we can find the rates or cap rates that buyers will underwrite, especially for solar projects. So during Q4, we monetized not just one, but several projects we had under construction — instead of building them for our own balance sheet, we sold them. And you'll see us keep doing that on a periodic basis. We've done so before. It's going to be a component of our business. Even in this year, we have it in our plan; but in all likelihood, we won't hold off until the last — until Q4 to do it; we intend to do it across the year.

Craig Irwin

analyst
#39

All right. Great...

George Sakellaris

executive
#40

However, looking at what those assets add in EBITDA across the entire company over a full year — this is exactly why we're pushing the recurring revenue — we're at 68% for the year once O&M plus the assets are put together.

Craig Irwin

analyst
#41

Really robust — extremely, extremely robust.

Spencer Hole

executive
#42

Craig, allow me to step in for one brief item. Should you be reviewing those supplemental slides, I want to point out that a minor tweak was made regarding how our corporate OpEx gets allocated for...

George Sakellaris

executive
#43

There's one more thing to mention here.

Spencer Hole

executive
#44

We're putting together those doughnut charts right now. So please pay attention to what the footnote on that slide says about the change. We reviewed it again and concluded that spreading this across the entire year, using each line of business's share of revenue as the basis, makes more sense than leaving it out, all right? When you go through this, it's worth comparing what those 2 footnotes say, all right?

Craig Irwin

analyst
#45

All right. Could we shift to those projects that probably will begin adding value during 2020? Those fresh builds you're putting up in the coming months, the ones expected to be placed in service prior to year-end. Which locations specifically are involved? And given the geography or other operational considerations — whether it's a landfill gas facility, a wastewater facility, or perhaps another type — should we anticipate start-up and nearer-term profitability above or below the usual pattern?

George Sakellaris

executive
#46

One facility is set to come online during this year — you're referring to the renewable natural gas facility. That one is the McCarty Road facility, and it won't deliver any revenue or EBITDA during this year. Our expectation is that this facility arrives late in Q4. Were I someone who bets, I'd point to the Christmas holidays and similar things as we work to get this facility up and running, so you won't see a great deal until Q1. Then the remaining two facilities that are due in 2021 — as things stand, they're slated to contribute late, meaning Q3 and Q4, and chiefly Q4 of 2020.

Craig Irwin

analyst
#47

All right. So considering those California locations where you meet the criteria for RIN generation as well as the low-carbon fuel standard, would profitability typically look like this?

George Sakellaris

executive
#48

Regarding the facilities — Forward and Keller, those 2 — they're located in California, correct. The remaining one, McCarty Road, sits in Texas, and we're working on securing it there. We believe we may succeed, though at this moment I wouldn't count on it. Would you like to chime in on that?

Spencer Hole

executive
#49

No.

Craig Irwin

analyst
#50

All right, and if I could, one final question. Looking through the specifics on the Canadian — my apologies, Doran, I believe you had something to add?

George Sakellaris

executive
#51

No, please continue, Craig.

Spencer Hole

executive
#52

No, please continue.

Craig Irwin

analyst
#53

After reviewing what the Canadian clean fuel standards contain and what we're told will be released during the summer, a lot of folks are taking the messaging to mean that essentially, beginning likely at the close of June this year, customers may begin banking carbon credits tied to future compliance from green gas projects. It appears a surge of green gas projects is about to hit Canada, and we'll soon have 2 major markets — not only California and the remaining LCFS markets, but the Canadian LCFS markets joining in too. Could you perhaps address how broad your capacity is for taking on additional projects. You referenced your balance sheet as something that limits you; but might you possibly pursue another 5 projects, assuming you could locate trustworthy ones with highly compelling economics capable of delivering appealing returns across the coming few years?

George Sakellaris

executive
#54

Yes, yes, yes, we can. The sole issue — and this explains why historically I didn't move very aggressively into this business, despite my belief that we possess — that we hold capabilities, superior capabilities compared with anyone else in this industry, since we retain the ability to originate our own projects, engineer them, construct, run them and service them, whereas numerous competitors simply purchase projects developed by others. What held me back previously was precisely the situation we encountered during the most recent quarter, namely being able to secure what I'd describe as sensible long-term agreements, 10-year agreements and similar. And although we may give up something and accept a reduced price relative to what the open market might pay for RINs, that gives us improved leverage on the project plus improved return — improved predictability and improved return on equity ultimately, since a large number of these projects we currently hold are structured with 50% equity, 50% debt. So while they appear excellent from a leverage standpoint, they add greater strength to your balance sheet. So — but we do have the capabilities, and we are ramping up. As I've said, we intend to reach 3 projects by 2022. And should we be able to secure the projects, we could accomplish that somewhat earlier. Another point I'd like to flag for you, Craig, and for everyone else listening, it's — at the license, many — and obtaining permits for various plants, the facilities we operate in California, they prove extremely, extremely hard to site, whether it's the transmission line you must connect into the main pipeline or the local permitting for the plant, that represents the largest bottleneck facing us at present; and that's the reason the timing of — we remain cautious regarding the timing of these projects. Permitting is hard. That much I'll say. Yet conversely, once you've got them operational, they become excellent assets to own.

Craig Irwin

analyst
#55

For my final question on this live call, I should ask about the contracted backlog sitting at $1.1 billion — I believe that was roughly $290 million above your previous record, which I think was just under $820 million. You did raise guidance beyond what we and the Street had been expecting for this year, but that level of strength in the contracted backlog seems to hint that the duration of that backlog may be longer than what you've experienced looking back across the last many quarters?

George Sakellaris

executive
#56

Exactly right. Yes, exactly right. The durations are longer. And another thing with certain of these longer duration contracts is that you don't have all that much flexibility to speed up revenues and so on. They get financed across the 3-year terms. The payment schedule spans 3-year terms or 2, whatever the situation may be, for 30 months. So you build in line with the schedule on those plans; yet on the other hand, it's great, great visibility. And we lever the company by taking some of the design-build opportunities where they might be with an existing client with the federal government; and you heard about the great post office job that we did in New York, but the post office is a great client of us. We're doing some assets that we will own about 5 of their facilities and so on. So it's a good opportunity.

Craig Irwin

analyst
#57

Well, congrats on all that solid headway — once more, a really excellent quarter.

George Sakellaris

executive
#58

Thanks a lot, truly. Appreciate it, Craig.

Pavel Molchanov

analyst
#59

Let's start with how things moved quarter by quarter. During the year just ended, the weighting was unusually tilted toward the end — over 1/3 of total annual revenue landed in Q4. Should we expect 2020 to carry that same kind of back-end skew?

George Sakellaris

executive
#60

I'd say to a lesser degree, though the third and fourth quarters will still carry more weight; and when it comes to this project's timetable, Mark has a far better grasp of it than I do.

Mark Chiplock

executive
#61

Not really. I'd say this is just the usual pattern. What I mean is, 2019 stood out somewhat because of a few big federal jobs we signed later in the year. Still, I'd expect next year to look somewhat more typical than the years before it. That said, because of how construction timetables and seasonal factors work, the heavier portion usually falls in the second half of the year.

George Sakellaris

executive
#62

Yeah, that's a fair observation. We had roughly $35 million, or pretty near that amount, in what we refer to as investments in development. However, as soon as every one of those contracts got executed, that amount moves straight into revenue, since we have it during this year. And if you look at that backlog, it had been built up over the prior 2 or 3 years. It was essential that those contracts be executed before the year ended, given the IDIQ expiration date, the sunset date in this case. And I'm happy to report that all of those contracts, without exception, were executed.

Pavel Molchanov

analyst
#63

Got it. I'd like to pose something that's more of a big-picture, conceptual nature. An increasing number of privately held firms — big Fortune 500 corporations — are establishing goals for low carbon, or even zero carbon; and your company has traditionally leaned toward serving the public or nonprofit side. Is there genuine growth in your business coming out of these corporate decarbonization efforts that are pushed by ESG?

George Sakellaris

executive
#64

Absolutely, without a doubt. I mean, Kaiser Permanente has come up in our discussions previously. And in fact, nearly all the large banks are now bringing up their customers; and design build is something we handle. So we're able to shift direction, and at present we're engaged in a substantial volume of what I'd describe as C&I sector work, mainly solar facilities or combined heat and power plus microgrid resiliency problems those clients have encountered; yet the ESG matter — which is the reason I brought it up during my remarks — is turning into the thing that propels it. It propels things since the economics for every one of these advanced technologies have declined, and for those specific customers, these projects make financial sense. And Doran, would you like to add anything?

Spencer Hole

executive
#65

No, Pavel, here's how I'd put it: when C&I customers assess these projects, they're beginning to factor in what carbon costs them, and once that's part of the equation, the math works out differently than it does in a standard ESPC calculation—yet they're still proceeding. On top of that, the ESG driver is unquestionably present across every enterprise contract we've secured on the solar side that comes with nationwide coverage. As I noted in my remarks, we have a microgrid arriving in the C&I segment, and it will serve as an asset on the balance sheet—a genuinely thrilling step. So without question, it has come to pass.

Leila Dillon

executive
#66

Thank you.

George Sakellaris

executive
#67

Thank you, everybody.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.