Ameresco, Inc. (AMRC) Earnings Call Transcript & Summary

August 3, 2020

New York Stock Exchange US Industrials Construction and Engineering earnings 53 min

Earnings Call Speaker Segments

Leila Dillon

executive
#1

Thanks, Kevin, and good afternoon to all of you. We're glad you could be with us on today's call. Here with me are George Sakellaris, who serves as Ameresco's Chairman, President, and Chief Executive Officer, Doran Hole, our Senior Vice President and Chief Financial Officer, and Mark Chiplock, our Vice President and Chief Accounting Officer. Before handing things over to George, I want to offer a quick note about forward-looking remarks. Today's call includes forward-looking information about future events and the company's future financial performance; please be aware that these statements are predictions grounded in management's current expectations or beliefs. Actual results could differ materially because of risks and uncertainties related to our business. We point you to the press release the company issued this afternoon as well as our SEC filings. Those documents address significant factors that might cause actual results to differ materially from what the company's projections or forward-looking statements contain. We undertake no obligation to update any forward-looking statements made during today's call. Also, we'll be discussing non-GAAP financial measures on this call. Such non-GAAP financial measures aren't prepared in accordance with Generally Accepted Accounting Principles. A reconciliation from GAAP to non-GAAP, along with an explanation of why non-GAAP financial measures are used, appears in our press release and in the appendix of the slides, which you can download from our website. Now I'll hand the call to George. George?

George Sakellaris

executive
#2

Thanks, Leila, and good afternoon, everyone. I hope all of you remain healthy and safe. To begin, I want to say how proud I feel about the whole Ameresco family. Throughout our wide geographic reach, our staff moved quickly into the new way of working and carried out their duties very effectively, without any meaningful disruptions. The strong corporate technology foundation we have built over many years has allowed a large number of our team members to keep working from home; when our people perform at a high level, that translates into solid financial outcomes. The outstanding results we posted in the second quarter have kept us positioned for a record-setting year; we still enjoy very good visibility looking toward 2021 and later. During Q2, Ameresco saw revenue rise broadly across our project business, our renewable assets, and our operations and maintenance segment, as we stayed focused on delivering against our backlog. Conditions for our business got better as the quarter progressed, thanks to disciplined execution, workplaces becoming less restricted, and helpful weather. Not only did we carry out contracted projects efficiently, but we also worked diligently to expand our already-strong contracted backlog compared with a year earlier. Our smart solution projects keep generating cost savings, delivering resiliency, and producing measurable environmental gains for our customers, and I also want to call attention to a few areas where communities are gaining other concrete advantages. From the time we were founded, public housing authorities that serve low-income populations throughout Ameresco's footprint have represented a key market for us. Energy efficiency, renewables, and upgraded building infrastructure are among the kinds of work we have performed for these communities. That covers enhancements to HVAC, hot water, building envelopes, lighting systems, energy-efficient windows, and even roof-mounted solar PV. Such work doesn't just cut energy use — it also lifts residents' overall quality of life, particularly comfort, health, safety, and security. These advantages have grown especially significant in today's environment, since residents are at home more often. Ameresco has created and put in place specific COVID-19 related project management and construction protocols, and those have let us carry out these projects without any major slowdowns. Because of continuing budget pressures made worse by COVID-19, municipalities nationwide are seeking money-saving projects with quick payback. To address that need, Ameresco started a customer-focused initiative that promotes health and safety in the workplace. Touchless controls, upgraded HVAC systems, automated entry and exit systems — these are only some of the energy conservation measures capable of making an immediate difference as offices, schools, campuses, and facilities reopen. Often these measures can be delivered as part of the overall energy efficiency project with no upfront costs. On top of that, Ameresco kept up our extensive work on LED streetlight conversions. With decades of experience and numerous large deployments behind us, Ameresco now stands as the nation's largest ESCO provider of municipal LED streetlight conversion services. Sharp reductions in the cost of LED technology have produced a rapid payback for LED conversion projects, yielding energy savings of 60%-70% versus legacy lighting solutions. Beyond the quick savings on energy, switching to LEDs also cuts down significantly on pricey, recurring upkeep expenses, since LED technology lasts far longer; that's particularly relevant for lighting along high-speed roadways, where costly traffic control adds another layer of need. Although these savings are evident, roughly 50% of municipal streetlights and traffic signals currently in place have yet to be switched to LEDs; we anticipate that the added financial strain COVID-19 places on municipalities will simply speed up the long-running conversion trend and the uptake of sophisticated technology controls. Ameresco can carry out the conversion work, and beyond that, we're able to supply financing or help arrange it for these projects, which adds a further incentive with no upfront capital required. Ameresco's federal business kept up strong momentum during the quarter. We finalized a comprehensive contract covering installation and operation of the $38 million energy infrastructure project at Marine Corps Air Station Cherry Point. That project backs the investments we've directed toward development and toward broadening our advanced technology portfolio. Elements of the project encompass wastewater treatment optimization, airfield lighting modernization, electrical distribution upgrades, smart meters, and cybersecurity network improvements, a newer measure that's gaining importance. Ameresco also ranked among five awardees on a five-year large design-build construction contract vehicle carrying a capacity of $975 million. The project at the Naval Facilities Command Mid-Atlantic will bolster recovery work funded following Hurricane Florence at Marine Corps facilities located in North Carolina. Our long-term approach of growing the share of recurring revenue streams keeps reinforcing our business model, delivering a high level of visibility when economic conditions are uncertain. During the quarter, our Ameresco asset and operation and maintenance businesses experienced only slight effects from COVID-19 related disruptions, which shows how resilient these business units are; we keep expanding our assets in the development pipeline, including green gas and solar, along with additional operation and maintenance contracts. To sum up, the COVID-19 situation stays our top priority; we keep adhering to the highest safety standards and protocols to safeguard our customers, our partners, and our employees. Though this brings many difficulties, we expect to deliver record results for the year once again. We think our essential cost saving services and adaptable financing capabilities will be sought after even more in a post-COVID-19 environment. Our aggressive investments across the years in our people and capabilities leave us well positioned to execute within this greatly expanding market opportunity. I'll now hand the call to Doran for some comments on our financial performance. Doran?

Doran Hole

executive
#3

Thanks, George, and good afternoon to all of you. It's a pleasure to walk through how the company performed financially in the second quarter. For more financial detail, please see our press release and the supplemental slides. Revenue in the second quarter showed robust double-digit expansion throughout our main business lines, rising 13% versus the same period a year ago. Ameresco kept dealing with a difficult working environment stemming from a range of COVID-19 related restrictions, yet during the quarter we did experience sequential gains in our capacity to carry out project work. Less restricted site access, together with the favorable weather conditions George brought up, drove solid results across many of our key geographies. As we've said before, we've witnessed substantial growth in design-build projects; we bolstered our design-build capabilities more than one year ago through a small acquisition. This offering has expanded quickly — it consists of fast-turnaround projects with little or no upfront auditing work and no continuing performance guarantees. We can take advantage of our existing project and operational infrastructure, since the work actually performed closely resembles our traditional performance contract work. Such projects come with lower gross margins, yet they add to our EBITDA because of this operating leverage. I wanted to address our gross margins for the quarter, which came in at 17.7% versus 21.8% a year earlier. In our first quarter press release, we provided specific details about the factors we expected would affect our second quarter results, among them incremental COVID-19 related expenses we would incur while executing our projects; that did happen, and the overall impact came in under our original cost expectations thanks to better than expected execution. That said, the project revenue mix during the quarter included increased levels of design-build work as well as other lower margin projects; we also took on some unplanned maintenance costs in our O&M business that exceeded the quarterly maintenance expense levels we had expected. These items were specific to the quarter, and we expect gross margins to strengthen in the second half of the year. Operating expenses came to $26.6 million, 12% under last year's level. The company responded very quickly to the COVID-19 operating environment, putting tight cost controls in place throughout the organization. Net income attributable to common shareholders was $4.4 million versus $9.2 million, reflecting the impact from non-controlling interest activities during the quarter of $4.5 million. We note that these are non-cash accounting adjustments made to results. Non-GAAP net income was $9 million versus $8.6 million. Adjusted EBITDA, a non-GAAP financial measure, was $24.1 million versus $23.6 million, an increase of 2%. EPS was $0.09 versus $0.19, and non-GAAP EPS was $0.19 versus $0.18, an increase of 3%. Even with the slowdown in new business development activity we had anticipated, our awarded backlog rose 6% quarter-over-quarter, making for a surprisingly strong quarter for new awards. Our contracted project backlog of over $1 billion grew 29% year-over-year, giving us substantial visibility. The segments of our company that generate repeat income made up roughly 78% of EBITDA for the period measured from the start of the year, and they hold more than $2 billion worth of long-term contracted revenue along with incentives. That provides us with revenue streams of annuity-like quality well into the future. Ameresco's liquidity is still solid, with plenty of cash and credit available to carry out the plans for our asset development pipeline; when the quarter closed, we had $42 million of cash on hand, having paid down $15 million against our line of credit. A stronger push on collecting cash throughout the quarter brought our DSOs down to less than 100 days, compared with 122 when Q1 ended. Over the quarter, we completed a number of non-recourse financings, which further strengthened our liquidity and gave the company more room for upcoming investments in renewable energy assets. As George mentioned, both our assets and our development activity are growing. Having financing available, together with our capacity to monetize development assets, gives us the confidence to carry out this development pipeline with conviction. Now to our outlook: we are happy to reaffirm the 2020 full year guidance we laid out in our earnings press release, and at this point I'd like to hand the call back to George for closing comments.

George Sakellaris

executive
#4

Thanks, Doran. Not only is Ameresco well positioned to get through the short-term difficulties that today's business climate is creating, but we also have both the personnel and the resources on hand to seize the many promising chances for expansion that lie ahead of us. Prior to taking your questions, I want once more to express gratitude to our employees, our customers, and our partners for turning Ameresco into a great success story and for putting in extra effort throughout these tough times. Everyone at Ameresco hopes that you and your family remain safe. Kevin, at this point I'd like to open the call for questions.

Noah Kaye

analyst
#5

Hi everybody, good afternoon, and thank you for letting me ask a few things. To begin, regarding the energy assets — the megawatts under development rose by 25 MW compared to the prior quarter, which is encouraging. The worth of those in-development energy assets climbed quarter over quarter by what appears to be close to $100 million. On the RNG side, you added 11 MW sequentially. So my question is, what caused that increase in the value of energy assets in development? Was it because you hit some significant project milestones? Is there anything you can tell us?

George Sakellaris

executive
#6

Sure. The reason is that we have a solid green gas plan entering the pipeline, and it moved into the award category. Everyone's aware that the worth of those assets is substantially above what the PV comes to. Doran, is there anything you'd like to add?

Doran Hole

executive
#7

Thanks, Noah. In my view, the dollar figure for renewable natural gas facilities, as George said, is considerably greater, and a substantial quantity of RNG was part of those pipeline additions. That, I believe, is the reason behind it.

Noah Kaye

analyst
#8

Yeah.

Doran Hole

executive
#9

As you're aware, the PV can vary quite a bit depending on whether it's carport or ground mount. Even so, RNG is the asset class with the higher value.

Noah Kaye

analyst
#10

Mm-hmm. So that's one more project on top of the 3 you brought up — McCarty Road plus the 2 other ones that you're aiming to have up and running before next year wraps up?

George Sakellaris

executive
#11

It comes on top of what we'd already made public earlier. Which is the reason we exclude it.

Noah Kaye

analyst
#12

Great. Could you give us an update on what you're currently expecting for this year in terms of MW placed in service? Is roughly 50 MW still what you're anticipating? Is McCarty Road part of that?

George Sakellaris

executive
#13

Correct. That figure remains at approximately 50 MW. Due to the COVID-19 circumstances and certain utility interconnections, delays could occur, as you're aware, but at this point we're holding firm on that number.

Noah Kaye

analyst
#14

All right, that sounds good. I want to pivot to the project side of things. Given what you're seeing in terms of activity and what you're hearing from customers, how long can this level of deal signings in the conventional project segment hold up? The reason I'm asking is that in earlier cycles, you clearly witnessed periods where contracting slowed down while the economy was getting back on its feet. Now you're talking about cities and towns pursuing cost reductions. On top of that, the pandemic introduces a fresh set of factors into what customers are weighing. I'm just interested in hearing your perspective on whether this contracting tempo can be maintained.

George Sakellaris

executive
#15

In our view, the tempo — particularly when it comes to awards — is starting to rise, based on the pipeline and current conditions. I'd describe it as quite solid. It can be maintained. There's no doubt in my mind. Like I mentioned during my prepared comments, the fact that we provide the financing, along with a situation that's budget neutral in a positive way and generates positive cash flow for the end customers, and on top of that, we're factoring in certain health and safety protocols tied to COVID-19 — all of this means our business is going to speed up. That will require some time, but my belief is that it will come to pass.

Noah Kaye

analyst
#16

All right. I really appreciate the additional detail, and my best wishes go out to everyone.

George Sakellaris

executive
#17

Thank you.

Doran Hole

executive
#18

Thanks, Noah.

Leila Dillon

executive
#19

Thank you.

Jed Dorsheimer

analyst
#20

Hello, and thank you. Well done on the quarter despite what has been a tough stretch.

George Sakellaris

executive
#21

Appreciate it.

Jed Dorsheimer

analyst
#22

For my first question, I want to go a bit further into the project side of things. In the short run, I suppose COVID and its constraints are still something we're handling; over a longer horizon, though, it appears the work from home trend will probably persist, at least to some degree. Given that, I'd like to hear your views on what you expect from municipalities and where the pressure points originate, especially when taxes are going to be under strain, yet at the same time there's an enormous amount of capital available in the markets.

George Sakellaris

executive
#23

Yes. Project activity is going to keep going, even under a work from home setup. On our end, we've managed to adjust to that setup quite successfully, so it won't impact us. Turning to the customers, given the infrastructure upgrade they may require, be it a boiler or be it a chiller, that could be in need of replacement, and they lack the money for that replacement. That's the point where we come to them and tell them, "Look, those boilers can be replaced, those chillers can be replaced, and we will provide the financing." The great part, and the reason we remain so optimistic, is that this project's financing stays very robust.

Jed Dorsheimer

analyst
#24

Right, that's the reason for my question, George. It wasn't meant to be negative. My assumption is that you ought to be witnessing a pickup on the project side, and that this isn't a brief occurrence — rather, even if you figure there's a 50% or 30% chance this represents the new normal, it ought to keep going for some time.

George Sakellaris

executive
#25

I'm with you on that, though I'd rather not come across as too optimistic. Still, regarding what I said, as you noticed, we basically hold a strong view that with the COVID-19 situation, on the flip side, we're going to see business speed up. Now, how big an effect will it have that folks are operating out of their houses, that they can't assemble their boards, or that they can't gather the school committees to give projects the green light? That's where challenges could show up. I believe I brought that up during the prior call — as people grow accustomed to things, and last time we managed to convene some school committees and deliver presentations or project evaluations within the RFP process. Adoption is starting to happen, not just for us and our staff, but on the flip side, for our customers too. That's the reason I said we're seeing quite strong activity in the pipeline. It caught us off guard that quarterly awards increased. At first, if you recall the prior call, I stated we'd largely experience flat business development; on the flip side, we witnessed a bit of a pickup. We believe on the other side, they'll speed up. We'd like to stay cautious. We don't want to come off as too optimistic. The trend — our view is that the offering, that flexibility when it comes to financing, sometimes people undervalue how strong that effect is for customers. I've spent 30 years in this business, and the concept over the last five years is gaining better and better traction in the marketplace. That's the reason you're seeing our business speed up across the board — not only us, but every one of our competitors; on top of that, what's taken place is that all the advanced technologies, their costs have dropped, so projects are becoming bigger and much better for the clients.

Jed Dorsheimer

analyst
#26

Understood, that helps. From a metrics standpoint, I'd figure employee count is probably the best gauge for that. Can you give some detail on staffing levels right now and whether we ought to anticipate expansion, no change, or a decrease? How should we frame that alongside what you said regarding the new hires?

George Sakellaris

executive
#27

Yes. My expectation is that our number of employees keeps rising, though there is some operating leverage available to us. To take on additional construction projects, additional project managers become necessary. Additional design engineers become necessary. Getting more output from existing staff, or simply replicating them, is quite difficult. You'll observe us bringing on additional personnel. More back-office workers, perhaps additional accounting staff, additional billing personnel, and similar roles. Some expansion is coming, yet revenue growth will outpace the rate at which OpEx increases.

Jed Dorsheimer

analyst
#28

Thanks. A final item for Doran. Three months ago I raised a point regarding credit markets, specifically during that stretch of instability tied to yields. Yields have declined, and capital availability looks as abundant as it has ever been. I'm curious whether you might share some thoughts regarding what you're observing across credit markets right now. Yeah, that covers it.

Doran Hole

executive
#29

Certainly. So, I believe we referenced a few non-recourse financings during my remarks on liquidity, and my sense is that we keep receiving inquiries regarding the non-recourse area along with asset-based financing. That particular market remains pretty busy. As for other capital markets, it's reasonable to state that things are extremely active at present. My view is that we see ourselves as having several different paths available to us for raising capital today, and nothing appears to be decelerating. To speak directly to George's remarks regarding certain municipal and even federal contracts, the money flowing toward ESPC contracts, rates keep arriving, and enthusiasm for the projects keeps climbing. My sense is that we currently feel reasonably assured about our capabilities when it comes to raising capital.

Jed Dorsheimer

analyst
#30

Perfect. I'll get back in line again. Thanks.

George Sakellaris

executive
#31

Of course, Jed. Thanks to you.

Craig Irwin

analyst
#32

Evening, and well done on yet another very strong quarter — quite impressive.

George Sakellaris

executive
#33

Thanks.

Doran Hole

executive
#34

Thank you.

Craig Irwin

analyst
#35

Something I picked up while reviewing the P&L: your opex appears to be running somewhat below what the revenue beat might have implied. We're down $2.3 million quarter over quarter and $3.5 million versus a year ago, even with solid growth. Could you talk about what's driving that lower operating expense? Is it something we can count on lasting, or does it tie to new project development? What can you tell us about where these expense reductions are coming from?

George Sakellaris

executive
#36

Yeah. Like Doran said, we were very deliberate about making some smart trims, so to speak, when it came to bringing costs down and so forth. The biggest thing helping us at the moment is the move away from heavy focus on development toward the execution side. Since, if you remember, we mentioned we may ease up on development and sales. Certain folks who had been in development are now assigned to live projects, meaning their pay gets allocated to direct costs; that's the reason, as we keep directing more and more money into development to expand our business, grow the top line, and boost both awards and contracted backlog, you'll see a portion of these costs rise again. Doran may want to provide a bit more detail on that.

Doran Hole

executive
#37

Craig, unsurprisingly, I'd say there still isn't much travel happening. Our focus is going to stay on keeping expenses in check. The way we guide OpEx isn't actually shifting. That's because we believe, as George said, that once business activity and business development activity increase, we might then be able to allocate more of those salaries and benefits toward pre-award costs, which land in OpEx rather than in cost of goods sold during contract execution or in capitalized costs while we move through awards. That's a pattern I think we'll keep watching closely. And at the same time, obviously, as I said, we're examining every possible avenue for controlling costs, tailored to the COVID working environment, thinking about real estate; we're not ignoring ideas for holding our cost base down, provided we can stay as productive as we've been.

Craig Irwin

analyst
#38

Great. Could you give us a bit more detail on that? Is it possible to tell us roughly the number of staff who shifted from business development into operating execution?

Doran Hole

operator
#39

Please go ahead. Actually, Craig, it isn't about a count of staff. No particular assignment exists. Our people handle several duties at once, and basically, what occurs is that chunks of their hours get attributed to specific projects rather than being attributed to business development work, and that's all there is to it. This isn't a headcount transfer calculation.

George Sakellaris

executive
#40

So, take this as an illustration: roughly 100 engineers on our development side — and a solid share of that group spends their efforts on creating new projects. At this point, quite a few of them are billing a portion of their hours to work on projects while those projects are in the design-build stage, across the various efforts we currently have in the pipeline.

Craig Irwin

analyst
#41

Got it, thanks for explaining that. What caught me off guard this quarter was seeing both the awarded backlog and total backlog rise quarter over quarter, given that my understanding was customers were handing out fewer contracts overall. Could you tell us whether you believe you beat the market here? Do you see room for that kind of momentum carrying into Q3 and Q4? And what other factors matter when we look at Ameresco's ability to compete for new projects?

George Sakellaris

executive
#42

Let me take the last question first and work backward. On competitiveness, we feel extremely confident about our standing. Our position in the market is strong, and we capture a solid share of the projects we pursue, particularly those where we decide, "This is one we want, we're ready to put money behind it." We're performing extremely well. Honestly, our team has astonished me quite a bit. They've done a fantastic job, both delivering on projects and getting customers involved. We launched an initiative roughly 2 months back, telling everyone, "We need to get back out and reconnect with our customers." We also put in place a program giving us direct lines to chief executive officers who've been collaborating with developers and others. That's benefiting our business. As I've mentioned previously, we believe some momentum exists, yet the scale and timeline remain uncertain. It requires patience, which is why we stay somewhat careful to ensure we follow through on our commitments. The direction of the business looks positive, and I believe that's an encouraging sign we now feel more confident about; that's the reason I mentioned exciting growth opportunities ahead, since we're essentially seeing our market grow instead of shrink thanks to new elements we can incorporate into what we offer, which customers are able to benefit from.

Craig Irwin

analyst
#43

Excellent, one final question, if I could. Many investors

George Sakellaris

executive
#44

Of course

Craig Irwin

analyst
#45

People in the market are enthusiastic about how RNG facilities will keep getting added in steps across the coming years. First one, then a second, then a third — that's a terrific trajectory.

George Sakellaris

executive
#46

Yes, indeed.

Craig Irwin

analyst
#47

From an outsider's vantage point, it's really hard to put a number on how large these steps up actually are. Could you give us a rough sense of what we're dealing with when it comes to the scale of these steps — in megawatts, in gallon equivalents, and in the other elements that will shape the incremental EBITDA, for instance LCFS eligibility, RIN lock agreements, plus the offtake agreements that are needed with the parties at whose sites you're placing the landfill CAPS or the new generating facilities?

George Sakellaris

executive
#48

Yeah. At this moment, once more, let me begin with the final portion of what you asked, since we're engaged on some possible long-term arrangements for the offtakers, and there are 2, 3 prospective customers, and we're in talks with them. As you're aware, since RIN prices had dropped, those folks, they were looking to lock in favorable deals, and at present they're coming around because RIN prices have risen. To put it briefly, I truly do think that a lot of the gas utility companies, given that we've been in discussions with them, will in the end sign long-term contracts for those green gas projects. When it comes to the sizes, I don't believe we've devoted too much effort there. The sole item I think we previously revealed is that McCarty is roughly half the size of Woodland, the one we have up in Michigan. Regarding the remaining 2, I don't think we've provided any specifics on them. They're smaller. That's the kind of color I can offer at this moment. In the end, we will produce some figures for them.

Craig Irwin

analyst
#49

Great. One more thing regarding this topic. From looking at other firms and speaking with folks who work at privately held businesses in this sector, it seems Ameresco has done better than a lot of competitors that operate green gas generating assets. I think one factor is the cautious approach you take to hedging gas. Could you perhaps give investors on this call a bit of an explanation about that? It would be helpful if you could provide some detail on how long your hedge agreements typically last on average, plus what level of protection currently exists for the 3 facilities already in operation.

George Sakellaris

executive
#50

Let me begin by saying there are 2 dimensions to the results that I've noticed some street research discussing regarding our operations, particularly when it comes to landfill gas to energy or green gas results. As you may remember, we were among the earliest entrants into this area, and we've assembled what I'd describe as a top-quality team, covering everything from evaluating the quantity of landfill gas present at those locations — our own staff handle that analysis — to figuring out how to pull it out, how to process it, and then construct the power plants or the electric or green gas facility. We have our own crews, and we handle our own EPC. I'll add this as well: we spend somewhat more money than certain others when putting up the plants, yet those plants run better than several others across the industry. Regarding hedging, I'd put it this way: 50% — actually slightly under 50% — of what we produce is hedged for roughly 3 years at present. Roughly 70% of production is hedged for the remaining portion of the year, for this specific year. That's our current position. We review the market every day, and I personally make no fewer than one call, and we keep watching it, and when market conditions are favorable, we add to the hedges we already have. Previously, I believe we stood at 55%-60% hedged for the remainder of this year, and at this point we've reached 70%, at relative prices compared with what you've been seeing recently.

Craig Irwin

analyst
#51

That's great. Thanks for the detail, and once more, nice work on such a robust quarter.

George Sakellaris

executive
#52

Thanks, Craig.

Doran Hole

executive
#53

Many thanks.

Eric Stine

analyst
#54

Hello, all. Appreciate you fielding the questions.

Doran Hole

executive
#55

Of course, Eric.

Eric Stine

analyst
#56

A lot of this has already come up, but perhaps regarding M&A. You've got a track record of buying when chances arise, I realize. As you consider what you offer—whether that means moving into new regions, adding product features, or building out project abilities—I'm wondering what your thinking is there and what you might want to add. And beyond that, I'd like your view on whether COVID-19 could create a situation where you're able to act somewhat opportunistically.

Doran Hole

executive
#57

Eric, honestly, there's nothing particular I can point to right now. That said, your observation regarding COVID-19 is valid. What I'd tell you is that the amount of conversation and the possibilities, as we survey the marketplace to figure out what we could pursue, are growing. Even so, we won't embark on any kind of acquisition spree simply because that's a topic bankers enjoy bringing up. We're approaching this with a great deal of care, weighing what choices we have, and my expectation is that we'll stay opportunistic in the very manner George did ever since he started this company.

George Sakellaris

executive
#58

Yeah.

Doran Hole

executive
#59

I think that's

George Sakellaris

executive
#60

Opportunistic, I should mention, plus disciplined. When all is said and done, should we buy a business, we need to be certain it adds value. Beyond that, it fulfills what I'd describe as a strategic aim. I'm not going to hand over money otherwise. Perhaps it needs to sit in a region where our presence isn't particularly strong and where we believe the market there is growing, and that specific business could be priced below its worth given what we reckon we can achieve with it. Maybe it's a product line suited to this new landscape that we believe will benefit us; our reach throughout the United States is quite solid. Our capabilities are quite strong. As far as we're concerned, there's no need to pay too much to purchase any business. Discipline and caution will guide us, since organic growth is happening, it has served us well, and our momentum is fairly solid. Should a fantastic chance appear, we won't allow it to slip past.

Eric Stine

analyst
#61

No, I get it. Appreciate that. Perhaps one more from me, and it's a big-picture question. To start, I recall that on the previous call, you expected roughly $10 million to be delayed into the third quarter as a result of COVID-19. With such solid numbers, can we say that this didn't occur and instead it was completed during the second quarter? And at a high level, is there any way to consider the linearity of results given what your project schedules are showing you right now?

Doran Hole

executive
#62

Briefly, some of that revenue did indeed slip away from us, though other projects actually saw us pull more forward. You've seen the quarter's results. That's likely the clearest way to put it. Regarding the remainder of the year, I believe we'll simply keep following how we've described our expectations for the year. Owing to the rising case counts, uncertainty around COVID persists; it remains quite difficult to predict how events could develop. Given what's currently in front of us, we continue to feel positive about the year, which is why we reaffirm guidance.

Eric Stine

analyst
#63

All right, that sounds excellent. I appreciate it.

Chris Souther

analyst
#64

Thank you. I appreciate you fielding my question. Regarding the solar segment, it appears you increased operations by 7 MW while continuing to build the development pipeline at a solid pace. Could you walk us through that pipeline by region or by customer category, and tell us where the majority of those opportunities are showing up, plus how the competitive landscape looks for these kinds of new projects?

Doran Hole

executive
#65

Absolutely. I don't believe we've provided much detail when it comes to a granular geographic split, but what I can say is that we have robust development teams along the East Coast, across the Midwest, in the Central region, and out in the Southwest; the assets are originating from all of those regions. If you were to look at this company's history going back several years, you'd have noticed that many of those assets sat right here in the Northeast. That said, I believe we're now doing a solid job of distributing that activity more broadly. We've got a blend that includes some community solar development here in the East. Naturally, we also serve our longstanding market customer, the MUSH market, which gives us the chance to build solar on landfills, solar on carports, and rooftop installations too, both within the MUSH market and across the C&I space. The one item I left out is your conventional large 200 MW utility scale ground-mounted solar project. That happens to be a market we do not participate in.

Chris Souther

analyst
#66

Right.

Doran Hole

executive
#67

Otherwise, it's fairly evenly balanced.

George Sakellaris

executive
#68

Yeah, so let me jump in there. On the competition front, something that's really benefited us, and we expect will keep benefiting us, is that a lot of the projects we've got — the solar ones — come after, say, clients we already served, like Wayland Public Schools, for instance. We handled their energy savings performance contract, and after that, the solar. Same story with Newton Public Schools, and others like that. That's the reason we're so enthusiastic about what the market offers in distributed energy resources, and obviously solar is among them. The costs have dropped, plus folks are looking to shrink their carbon footprint. You're seeing a big volume of solar being installed across municipalities, school districts, and these days colleges, universities, hospital systems, you name it. That's precisely where our edge in the market lies, since, first, we've got distribution channels nationwide — East, Central, Southwest, wherever — and second, we've got those relationships. Every developer out there is able to begin conversations with the customer. When you're dealing with a solar developer, right, because the RECs in Massachusetts were a fantastic program, they show up in Massachusetts, and then it stops being so attractive. They've got to pack up and relocate elsewhere. That's not something we face, and it hands us a tremendous competitive edge in the market. On top of that, that's how we make the organization work for us. Our platform is excellent, and that's the reason I'm enthusiastic about our position; we're watching all these opportunities appear. We're going to capitalize on the platform we've already built.

Chris Souther

analyst
#69

Got it. That adds some useful context. You mentioned positive momentum across numerous verticals where you compete. Is there any area that COVID hit harder, where things are decelerating? With so many chances it appears to capture value from customers reviewing their spending and seeking savings, I was simply wondering whether you saw any sort of muted reaction.

Doran Hole

executive
#70

Looking across this room, I'd say the consensus seems to be that hospitals may be one segment in which getting onto a site could prove somewhat tougher.

Chris Souther

analyst
#71

Yeah.

Doran Hole

executive
#72

So, when you think about how awards move through their cycle and then into contracts, getting the focus of top-level executives at certain of these organizations is necessary — and at the moment, there's quite a lot occupying their attention.

Chris Souther

analyst
#73

Yes.

George Sakellaris

executive
#74

Oh.

Chris Souther

analyst
#75

Understood. Please continue.

George Sakellaris

executive
#76

Let me tack on something about a few projects where we got quite close, only to be informed we weren't allowed to proceed — a handful of hospitals, in fact. Once patient counts dropped, they gave us the word, and we returned; that's the reason on the previous call we noted we'd had to pause operations at those locations, disinfect the facility, and then begin from scratch, mobilize again, and all the rest; that situation did come up for us. Conversely, certain school districts closed their doors. They removed us initially, and afterward they said, "Since nobody is on-site now, you can come back." When it comes to hospitals, I'd say they're likely the toughest ones.

Chris Souther

analyst
#77

Got it. As we approach the election, is any effect on the federal contract cycle something we should anticipate? For the majority of what you folks are examining, is that basically not a consideration?

George Sakellaris

executive
#78

Here's what I can tell you. The federal sector has remained extremely robust. Something that gives us a great deal of confidence is that they are shifting somewhat further toward design-build contracts, and in prior years we secured a substantial share of those projects. Judging by the activity I'm observing, it appears that record is carrying forward. During the most recent quarter we signed a single contract; we expect that we'll enjoy another solid year in the federal market.

Chris Souther

analyst
#79

Got it. I'll jump into the line. Appreciate it, everyone.

George Sakellaris

executive
#80

Thanks.

Doran Hole

executive
#81

Thank you.

George Sakellaris

executive
#82

Of course.

Pavel Molchanov

analyst
#83

Thank you for taking my question. With the expertise you have in building out RNG projects, I'd like to hear your thoughts on green hydrogen. We keep seeing more headlines on this topic, though actual construction is probably not happening as much, at least not so far. But I'm wondering whether that's a space you'd consider entering, since it sits adjacent to what you've been doing for many years.

George Sakellaris

executive
#84

We are examining that space quite closely. If you'd like to hear a lot more detail on it, you should probably speak with Michael Bakas, who heads that business for us. We've been in discussions with certain parties who operate in that field. I believe you'll find that down the road we'll be doing something in this area. Unless I have concrete specifics, I won't say much more about it. It's a technology on our radar, and I think that with the assets we hold — the pre-gas plant, for instance — we can transition to hydrogen afterward, and those plants we own carry enormous potential upside; that's something we're mindful of. Incidentally, I believe the hydrogen market will grow; it could be 1 or 2 years away at this point, but it is on its way.

Pavel Molchanov

analyst
#85

All right, that's useful. Could you also share your thoughts on what's happening in Europe? Since the previous call, it seems like a lot more stories have been coming from Brussels regarding the climate law and the European Green Deal. Obviously, you have operations in the U.K., but I'm wondering whether you're exploring possibilities inside the EU as well.

George Sakellaris

executive
#86

Yes; as we mentioned before, our business in the U.K. is gaining momentum, and the pipeline they've got there has us quite enthusiastic. At this point, they're in a really strong spot. We've been reading those same articles you are, and I've instructed our team to look into whether we can put together a strategy, and how we might capitalize on what lies ahead. We're well aware of this chance, and we'll examine it extremely thoroughly. It wouldn't shock me if we come up with a strategy that allows that European division to expand for us.

Pavel Molchanov

analyst
#87

Thanks for that.

George Sakellaris

executive
#88

Yeah, so, I'd say we've got momentum working in our favor. Given everything that COVID-19 has set in motion around the world, my sense is that the chances before us are expanding instead of contracting. That said, we need to be cautious — when we put together our plans and push into new markets in particular, we have to proceed extremely, extremely carefully. At this moment we're on a really solid path. Things are going quite well for us, and our growth is quite strong. At the same time, these kinds of openings appear and then disappear, so you should seize them when possible, and do so sensibly.

George Sakellaris

executive
#89

Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.