Thanks, Jonathan, and good afternoon to all of you; we're glad you could be with us on today's call. Here with me are George Sakellaris, who serves as Ameresco's Chairman, President and Chief Executive Officer; Doran Hole, our Senior Vice President and Chief Financial Officer; and Mark Chiplock, Vice President and Chief Accounting Officer. Before handing things over to George, I want to offer a quick note about forward-looking remarks. Today's call includes forward-looking information about future events and about how the company will perform financially going forward. Please be aware that these statements are predictions that rest on management's present expectations or beliefs. Because of risks and uncertainties related to our business, actual results could differ materially; for that reason, we point you to the Company's press release issued this afternoon as well as to our SEC filings; within those documents, you'll find discussion of significant factors that might cause actual results to diverge materially from what's set out in the company's projections or forward-looking statements. We take on no obligation to update any forward-looking statements made during today's call. Also, during this call we'll reference non-GAAP financial measures; those non-GAAP financial measures aren't prepared in accordance with Generally Accepted Accounting Principles. A GAAP to non-GAAP reconciliation, along with an explanation behind the use of non-GAAP financial measures, can be found in our press release and in the appendix of the slides, which you can download from our website. I'll now hand the call over to George. George?

George Sakellaris

executive
#2

Thank you, Leila, and good afternoon to all of you. I trust everyone is in good health and safe. Ameresco's first quarter proved to be another exceptional one — we posted robust financial results and completed our initial equity raise since going public over ten years ago. Poor conditions at several project sites and operating plants caused the quarter to begin slowly. As time passed and the weather improved, our focus on execution produced better results throughout the period. We exceeded our expectations by a wide margin: revenues increased 19%, net income grew 80%, and adjusted EBITDA was 40% higher. With such a solid start, we are raising our guidance for the year. Now. I'd also like to use this moment to express appreciation to our employees for their enormous commitment and hard work during these difficult times. Our project business turned in another strong quarter. Well, our energy assets once again delivered solid results. And we remain focused on executing projects; we were delighted to see a significant increase in awards this quarter, which will drive future growth in our contracted backlog; we were also delighted to have completed a successful equity offering that brought the company more than $120 million in proceeds. Well, in the past we have typically funded our long-term growth mainly through cash we generate internally and through non-recourse project financing. We decided this was the moment to accelerate growth by raising more money from outside investors. We've spent many years growing our portfolio of energy assets so it generates recurring revenue that's highly profitable, which strengthens both our long-term visibility and our profitability. Over the last few years, our team has performed so well that the assets now in development and under construction are larger than our current operating asset base. Specifically, we'll pick up the pace on advancing several renewable natural gas RNG assets that make strong financial sense. Thanks to this new capital, we now anticipate completing three RNG plants so they can be commissioned in 2022, plus four more in 2023. Over the last several years, we've seen an enormous surge of interest in RNG adoption from a wide range of event customers — big transportation and logistics firms, natural gas utilities, and owners of distributed energy resources among them. Only recently, Washington State made public its low carbon fuel standard, which puts it alongside Oregon, California, and British Columbia. Way back in 2010, Ameresco was among the earliest businesses nationwide to bring an RNG plan online. For a lot of these companies today, RNG represents the most obvious route toward lowering or eliminating their carbon footprint — thanks to the RNG assets we currently run, plus the ones we'll bring on board in the coming years. Ameresco is going to stay at the forefront of this technology, which matters for the environment and also turns a profit. A number of the initial policies, moves, and remarks coming out of the new administration in Washington are backing greater interest in RNG. On top of that, we think Ameresco is positioned very well to gain from the new administration's emphasis on a low carbon future. We've already witnessed the U.S. rejoining the Paris Climate Accord, and only recently they put forward a goal of cutting U.S. greenhouse gas emissions by up to 52% compared with 2005 levels by 2030. Beyond that, the current administration wants to channel funds straight into—and stand behind—the country's low-carbon destiny through an additional <<inaudible>> now moving through the legislature. One clear example of this kind of targeted spending is the infrastructure plan worth about $1 trillion, or $2.3 trillion, which will concentrate on efforts designed to curb climate change; that includes expanding solar and wind energy, EV charging infrastructure, carbon capture and storage solutions, and hardware that helps infrastructure endure extreme weather and other risks. These new governmental priorities are beginning to show up in the economy. We are already gaining traction with state and local governments and in the commercial and industrial markets, where we have satisfied a number of requests from companies seeking to report and show progress on ESG initiatives in order to hit carbon reduction targets. Ameresco is positioned well to prosper in this new environment. Not long ago we were ranked the #1 energy as a service provider in the guide house insights leader board report. That called attention to our ambitious energy as a service vision, our know-how in technology solutions, our record of success across customer segments, and our capacity to supply financing for energy and as a service projects. The powerful Ameresco brand and our standing as the industry's top provider of distributed energy resources ought to let us take advantage of the highly appealing growth opportunities in our clean technology markets. I'll now hand the call over to Doran for some remarks about our financial performance and our raised guidance. Doran?

Doran Hole

executive
#3

Thanks, George, and good afternoon to all of you. Please take a look at the press release and the supplemental slides we've put up on our website if you'd like more detail on the financials. Our momentum was clearly on display in Q1, with solid gains in revenue, net income, and EBITDA. You might remember that we entered the quarter with a fair amount of caution, since weather conditions were poor in several important markets across the country. Weather did create some drag, but that was more than made up for by disciplined execution and generally improved business conditions, and things got progressively better as the quarter went on. Revenue came in 19% higher than the same period a year ago, once again driven by how well our Federal Group performed. Our energy asset business also delivered strong results, thanks to a few things — specifically, more operating assets in service, favorable production levels, and higher RIN pricing within our renewable natural gas operations. That revenue beat, combined with strict cost discipline stemming from greater operating leverage, produced an impressive 80% jump in net income, to roughly $11.2 million, and 40% growth in adjusted EBITDA, to about $30 million. As George noted, we were quite happy with the more than 35% increase versus last year and 15% sequential gain in our awarded backlog, which now sits at $1.5 billion. The rise in origination activity and customer engagement that we're seeing today doesn't just help grow the awarded backlog — it also gives us a more normal rhythm for turning awards into contracts. Because of that, we're confident that our lower contracted backlog — which was largely the result of strong execution across the past several quarters — will be more than rebuilt in the coming quarters. Our assets in development posted another quarter of impressive growth, finishing at 386 megawatts spanning multiple technologies and geographies. Our 287 megawatts of operating assets carry roughly 940 million in long-term contracted revenue and incentives. Along with our $1.1 billion O&M backlog, we keep expanding our higher margin recurring revenue businesses, which gives us excellent long-term visibility. Ameresco's liquidity has never been in better shape, and we have ready access to the resources required to carry out our aggressive growth strategy. We hold a significant cash balance of $81 million plus over $100 million of capacity on our revolver. On top of that, we have broad access to non-recourse project financing and tax equity, and we can monetize development assets as well. As an example, during the quarter we upsized one of our committed sale leaseback facilities from $150 million to $350 million. Given our outperformance in Q1 and the clear improvement in business conditions, we're increasing our 2021 guidance. Our new revenue range is $1.11 billion to $1.16 billion. EPS is now expected to be between $1.22 and $1.30. And we're projecting EBITDA of $140 million to $150 million; at this point I'd like to hand the call back to George for his closing remarks.

George Sakellaris

executive
#4

Thanks, Doran. To wrap up, I'd like to once more pause and express appreciation to the people who work for us, our partners, and those we serve for the loyalty and teamwork they keep showing. Working side by side, we've demonstrated remarkable strength when difficulties have arisen. Thanks to supportive momentum from Federal policy along with a stronger financial standing, Ameresco holds a distinctive place to speed up growth over the long haul, since those we serve keep putting priority on saving on costs, resilience, and shrinking their carbon footprint. Operator. At this point I'd like to turn the call over for questions. Thanks.

Noah Kaye

analyst
#5

Good afternoon, and thank you for allowing me to ask questions. Hello, my first question concerns the project side of the business. In my view, execution during the quarter was quite strong. Could you provide some detail regarding what made it possible for you to bring in a portion of the project revenues this quarter somewhat above what had been anticipated earlier? Was it simply that logistics became less difficult? Did any pulling forward occur? Is there any indication that these projects are being prioritized, given sustainability factors? And after that, what effect does this have on the rest of the year?

George Sakellaris

executive
#6

Yes, that is an excellent question Noah. What I would say is that we pulled in, and Mark can contribute additional detail on this, roughly $30 million from what remained in the year, otherwise, for chorus two, three and four. And the main cause, despite the fact that we experienced some weather-related delays in the central region, within the federal group, we managed, particularly with regard to the large projects and Norfolk Naval Shipyard, we managed to obtain the permit approximately two and a half months before the planned date; and beyond that, certain approvals tied to that specific project arrived somewhat more quickly, in fact, we are roughly $25 million ahead when it comes to our advanced scheduling payments being issued from that project. So and then we encountered a few delays in New York along with the approvals, but the Federal Group was mainly the one that — they possessed the capacity to pull in some extra revenues of about $30 million, which naturally was taken off the other chorus.

Noah Kaye

analyst
#7

That's fantastic insight. I'd like to ask something regarding regulation and decarbonization. It seems to me that regulating carbon is genuinely one effective route to decarbonize; and only 2 weeks back, an announcement came that the EU will roll out a package during June, which brings buildings into the sectors covered by an emissions trading system, where carbon pricing is genuinely being captured here. Plus there's even some momentum happening in certain states and at the FDA too. So I suppose, are you maybe increasingly bullish regarding the EU market opportunity, simply because of that dynamic? And after that, do you view genuine carbon regulation along with buildings' carbon emissions turning into a tailwind for the company going forward?

George Sakellaris

executive
#8

Yes, I'll give a slightly better remark than Doran. Listen, I believe what is happening across the EU is without a doubt a tremendous, tremendous tailwind for our business. And it wouldn't shock me that — don't be shocked; we could speed up the business within the EU community, using the U.K. as a foundation and then expanding from there. Yet even more significantly, what are we hearing out of Washington D.C. and what is taking place in this nation? We enjoy a tremendous tailwind regarding regulation, particularly among certain states emerging from the United States, and particularly Canada as well; and that's the reason in my commentary, I feel extremely, extremely positive about this business wherever we stand at present. Beyond that, the stars align sufficiently for our advantage. There's no doubt regarding that. And for us, it means being cautiously optimistic while but diligent in expanding the business in a prudent way. Yet the opportunities exist. And it wouldn't shock me that you'll witness us growing in Europe in the near term.

Noah Kaye

analyst
#9

Alright, that's excellent, George, appreciate it. I'm excited about what's coming. With that, I'll hand the floor back to you.

George Sakellaris

executive
#10

Thank you, Noah.

Julien Dumoulin-Smith

analyst
#11

Great. I appreciate it, and well done to everyone there. That's a strong way to kick off the year.

George Sakellaris

executive
#12

Thank you, Julien.

Julien Dumoulin-Smith

analyst
#13

If I could, let me ask for a few things here. To start, you've got those extra RNG facilities coming in '22 and '23. How do you see that fitting into the overall incremental EBITDA growth contribution? I mean, your double-digit EBITDA growth target certainly looks pretty solidly supported by those almost by themselves, but I'd love to hear how you'd describe that component, if that's alright?

Doran Hole

executive
#14

Sure, Julien, this is Doran. As you're aware, we don't provide guidance past the current year, correct. So that's really where we have to begin. On the EBITDA contributions, I believe we've discussed this previously, referencing megawatts, and with this question, I'll use the chance to speak a bit about that. We had mentioned 750,000 to 1.5 million of EBITDA for each megawatt equivalent. Converting that to MMBtu gives roughly $8.50 to $16.50 per MMBtu; naturally that hinges on RIN prices. It hinges on LCFS participation, with the midpoint representing about 50% margin. So on the revenue side, that's 1.5 million to 3 million of revenue per megawatt, or $17 to $33 per MMBtu. Looking at the cadence of the 2022 plants and the 2023 plants, I'd say 2022, those three plants combined, roughly 36 megawatts or so, or 3 million MMBtus, which by the end of 2022 is 2.5 times what we have today, right. So I think that's a key point, we're watching the cadence. So based on all of that, we keep taking a conservative approach to the company's medium-term, long-term growth, right; we look at it, and now we're in the low double-digits on revenue growth, a little above 20 on the EBITDA growth, and of course we hope to see that cadence continue, but clearly our investment in these RNG assets should hopefully give us a boost.

Julien Dumoulin-Smith

analyst
#15

Great. Given that you mentioned a few of these metrics, could you discuss your current hedge situation on RIN, and so on? Clearly, RIN has gone up nicely. From what I recall, early on you folks weren't completely hedged. Could you explain how that plays into the raised guidance here, and also how it relates to the calculations you just walked through regarding upcoming projects?

George Sakellaris

executive
#16

Yes, like we said previously, roughly 40% — what I'd describe as a forward sale — actually we signed some agreements that extend out five years; and as we expand, you'll notice that we're signing deals in the near term, since I believe RIN prices, with the market generally evolving, mean we're still at an early phase. So we're reluctant to commit to long-term agreements because we feel we'd give up too much in economics. But hedging roughly, or holding short-term agreements of around five years for approximately 50% of what our plants produce, provides us with fairly solid project financing; and we believe the economics improve, yet, with all these emerging markets — be it gas utilities, or universities, or hospitals, or those operating combined heat and power plants. Plus, since we're cutting our carbon footprint, they make perfect candidates for longer-term agreements; and I'm aware of certain individuals in the sector who price out long-term agreements. A few of those we've reviewed. And we spent some time negotiating, but we declined because we felt we're in early stages, or this market is still developing, so we intend to monitor it closely. But still, over the long — since we already have, as Doran mentioned, 12 megawatts next year and roughly that amount by 30 megawatts the year after on the plants we're adding. We'll hedge around 50% of what those plants produce. But for shorter stretches, though if, say, six months from now we get a solid deal extending 10 years or 15 years, we'll take it.

Doran Hole

executive
#17

Also, one more point I'd like to mention: through this equity raise, we've gained somewhat greater flexibility than we previously had, and that's the reason we felt more at ease moving forward and speeding up work on these assets, since we're sitting on an enormous backlog — alright, at present we've constructed 6 assets on the RNG. Plus, 6 more sit within the development pipeline, and never mind whatever else exists in the actual pipeline.

George Sakellaris

executive
#18

Correct, indeed. Julien, my apologies, since this formed a piece of what you asked. So regarding RINs, the effect during the quarter was likely around 2 million dollars greater. As for RNG on the whole, it likely added 3 million to what we might term outperformance. Yet a portion of that stemmed simply from sheer volume. What I mean is the facilities simply generated more, with output running higher, and then roughly 2 million came from RIN prices being elevated.

Julien Dumoulin-Smith

analyst
#19

Then, if you'll allow me, very quickly and briefly, how are you approaching your disclosure package? As you consider the different businesses at play — you mention Europe, you mention RNG — how are you thinking about refreshing and maybe offering more detailed disclosures on various segments of the business? By the way, Doran, thanks for those heuristics you just provided regarding the RINs and RNG side. But clearly, as you become involved in various aspects of the business, have you given that much consideration?

Doran Hole

executive
#20

Yes, Julien, I believe we keep giving that thought. Right now, we're remaining on the same path; you'll see the supplemental slides, the manner in which we show the material graphically. I think we felt quite good about offering extra color during the Q&A, such as what I've just shared with you; but beyond that, I think we'll simply proceed one step at a time.

Julien Dumoulin-Smith

analyst
#21

Great. Once more, I want to say congrats, and wishing you the best.

George Sakellaris

executive
#22

Appreciate it, Julien.

Doran Hole

executive
#23

Thanks, Julien.

Craig Irwin

analyst
#24

Hello there, good evening, and I appreciate you fielding my questions. Could you go over again the six facilities that are already locked in for your RNG pipeline? What timing do you have for constructing those, plus their locations and expected build dates? Also, how do you anticipate them becoming operational across the coming two years?

George Sakellaris

executive
#25

Sure thing, Craig, let me handle that one. As we've discussed previously, there's a single facility during this year, correct, at 12 megawatts, roughly one million MMBtu. For 2022, we're currently arranging three facilities, amounting to 36 megawatt equivalents, or 33 million MMBtu, correct; these are the trio of California facilities we referenced earlier, right. For 2021, our expectation is that it reaches full commissioning prior to the close of Q2 of this year. Turning to 2023, we have another four, somewhat smaller, totaling 29 megawatts, 2.5 million MMBtu. Beyond that, within our asset and development pipeline, there are an additional six facilities where gas and land rights have been signed. Naturally, a considerable amount more sits in the development and negotiation phases beyond those. That said, this represents the cadence; we aren't prepared to discuss particular timing details inside 2022 or 2023 regarding those facilities, yet we remain fairly confident about that cadence during those years.

Craig Irwin

analyst
#26

All right, thanks for taking that. Over the past 2 months or so, there's been some debate regarding the cash flow from these assets. Ameresco has substantially enhanced what it discloses about the assets and has done a lot to help us grasp this across the last several years. That said, could you walk us through what you anticipate in terms of cash generation from these assets across the coming 2 years — 2022 and afterward? I'm not after exact figures, but perhaps internal thresholds you use, and then what portion of the capital budget — and if you can share specific figures for '21 and '22 — will be directed toward building out these projects' assets?

George Sakellaris

executive
#27

Let me begin at the tail end of what you asked, which concerns these projects. I believe we included a few figures in the press release regarding what we expect for the remaining portion of the year when it comes to CapEx on energy assets in total. That covers RNG, solar, microgrids, and any other energy-as-a-service items; the range there is 165 million to 215 million left for the year. On the cash flow matter, Craig, I don't believe we're ready at this point to begin officially reporting cash flow or net income on an energy-asset-category-by-energy-asset-category basis. We are examining whether we can offer somewhat greater clarity there; however, as you're aware, in contrast to yield cos or other stocks that pay dividends, we're putting all of that cash flow we generate from these assets back to work. On top of that, as the portfolio expands the way ours is, and as we add to our plants over the coming years, a great deal of that cash flow detail will end up being shaped by the revenue mix tied to the offtake and the kind of project financing, or non-recourse financing, that we bring to these assets. So there's more to come. I appreciate the question. I recognize how important it is, and we'll be working on it.

Craig Irwin

analyst
#28

All right. Then one final item, if I could. With that successful IPO that wasn't discussed, plus the clear win at Ameresco tied to your green gas portfolio, it appears dozens of these green gas firms are emerging from nowhere. A lot of them lack much in the way of an experience base, yet they're attempting to raise cash so they can buy projects and development at various stages. I'm aware there are projects being shopped around; however, the majority of these are things that people truly must go out, locate on their own, and develop the way Ameresco has. Could you perhaps offer some color on how difficult it is to bring a project to an operational state beyond the initial paperwork of, say, submitting some permits or initial agreements — could you maybe just explain, for us, what these new entrants are genuinely facing when it comes to longer term execution challenges?

George Sakellaris

executive
#29

That's exactly why some of these companies, when they sometimes give me forecasts with certain numbers, it's very tough, particularly in California and quite a few other states, to permit in addition to getting its pipelines arranged for interconnection with the utility, the gas companies and so forth. And that's a tremendous differentiator we possess in the marketplace. We don't just possess the engineering know-how — because we maintain ties with a number of landfill proprietors, we've spent the past 21 years doing exactly this. Beyond that, our work covers design, construction, operation, and upkeep of these facilities. Once you begin — suppose you locate the customer, execute a letter of intent, then work through the contract, whether that's a gas agreement or something similar — by the time the plant is operational, you're looking at roughly a three-year timeline. In California, I can share that with a few of our earlier projects, the permitting alone stretched out even further. Still, with regulations shifting somewhat, the timeline could get compressed, which is exactly why our confidence is so high. A great deal of capital is flowing toward RNG, including many funds and similar investors. Even so, we believe we hold an edge, since we've already established a presence and built the relationships. Our development backlog is in place. Honestly, even without adding any new projects, we're set up well for 2024 — and I was just thinking about this the other day regarding '25. Beyond what's already in our pipeline, there are several additional opportunities coming; and we don't just construct these facilities, we run and service them too, which is fairly complex work. Let me offer an illustration, and explain why we're somewhat hesitant. When we were putting together the Annual Report, here's what the numbers for this quarter looked like: the freeze in the San Antonio area had knocked out three of our facilities there, and we figured on something like 3 to 4 weeks of downtime. Our team actually got them running again in 10 days. As for the Woodland plant, the expectation had been 2 weeks offline, but we brought it back in fewer than 7 days. Then there was the other plan — as you know, in confection — which we needed to take down because of the freezer and similar issues, and while we anticipated being down a couple of weeks, we only lost 4 days. So the capability is there. That matters enormously when it comes to building these assets. They are extremely intricate. They are not simply solid, which would make them far simpler, and we feel quite confident about this. Conversely, you have likely come across the book by Andy Grove titled "The Paranoid Survive" — with all this capital flowing into this market, I am paranoid, and I constantly work to remain ahead of the competition.

Craig Irwin

analyst
#30

Excellent. Honestly, none of us questions that you'll keep outpacing your rivals. Congrats on what is genuinely outstanding results here, George, plus everyone on your Ameresco team — that's remarkable delivery.

George Sakellaris

executive
#31

I appreciate that. Craig, many thanks. Craig.

Doran Hole

executive
#32

Thanks, Craig.

Ben Kallo

analyst
#33

Hello, and thanks — good evening. My colleague George asked me to wish George a happy Dave day for yesterday. So, I suppose what I want to ask is…

George Sakellaris

executive
#34

Thank you.

Ben Kallo

analyst
#35

You're welcome, and same here for me. Until this point, with the fresh capital—and you brought up the 10 years—you hadn't brought in any capital. It seems like every question has sort of clustered around the renewable natural gas chance you're concentrating on. I'm just curious about the other possibilities, since you just mentioned this is tougher than solar. And I'm wondering about what comes next, or maybe that's how you view batteries, microgrids, or whatever else, whether this capital unlocks that…

George Sakellaris

executive
#36

Absolutely, no doubt. I realize we highlight the RNG asset above all the others, but I believe at some point we stated that every other renewable asset, or microgrids, combined heat and power included, isn't going anywhere—distributed generation, I feel, is what lies ahead. Some folks believe it'll happen through adding more transmission lines for resiliency, yet ultimately they'll discover it's going to be microgrids plus distributed generation. That's exactly why we're so thrilled about energy as a service. We've drawn some really, really strong interest, since essentially that's yet another asset class we'll possess—we're in discussions with certain commercial and industrial customers who are heading down that direct path. So this is capital, and that's why, when we reached the decision, we examined where the business is headed, not just green gas—solar will also be there and get sped up too. We've discussed that before, though I suppose we didn't stress it as heavily. But as you can tell with generation, energy as a service, and microgrids, I think those represent the future trend. You'll watch us take on an expanding and expanding part in that specific market. I foresee really solid momentum there too, given that we hold the needed capabilities.

Ben Kallo

analyst
#37

So, are the customers the same, or are they different? And then, how do you go after them across those various opportunities? I'm asking because you've excelled at what you're already strong in. So when you want to unlock a fresh opportunity, how do you shift direction? Or is it unnecessary to move away from that same customer?

George Sakellaris

executive
#38

No, we don't have to. We've been providing energy as a service for 10 years now. Really, there's no distinction, since we're pursuing energy savings performance contracts — even though everything is funded by a third party and appears on the customer's balance sheet under energy as a service, it typically doesn't appear that way when the customer uses off balance sheet financing. And we secure a deal on the savings from the other contracts, the energy performance contracts. And we receive payment that includes the savings under the energy as a service contract. Incidentally, back in 1981, the very first contract I handled was energy as a service — don't be the <<inaudible>> that we'll capture more than 50% of the savings, we'll earn another 40% margin, so — we have clients who are able to pivot from the performance contract to energy as a service contracts.

Doran Hole

executive
#39

Yeah, Ben, I'd say the chance to own assets is going to track alongside those clean energy targets and the carbon-cutting objectives that are spreading throughout the marketplace. That covers a big chunk of the market, and clearly the federal government too, plus the corporate side; so my sense is that this will create substantial demand, and we'll keep providing flexibility regarding how these projects are funded. So whether a client prefers energy as a service — meaning we carry the asset on our balance sheet — or a PPA, or whatever arrangement, we'll be prepared to deliver that. And I believe this equity deal hands us additional firepower just to pursue it.

Ben Kallo

analyst
#40

And for the final question, I really appreciate it, everyone. Regarding the balance sheet, is there anything further you could pursue, or are you considering doing, perhaps from a debt standpoint or something along those lines, simply to keep growing your reach? Thanks so much, everyone.

George Sakellaris

executive
#41

Absolutely; so Ben, I believe when it comes to the debt side, and I won't make any forward projections, but clearly we keep working on non-recourse financings that are significant for the company given the asset portfolio we have, and we'll keep doing that, and of course, should we choose to do additional ones, we'll discuss it down the road.

Tim Mulrooney

analyst
#42

Hello there, and I appreciate you fielding my inquiries.

George Sakellaris

executive
#43

Of course, Tim.

Doran Hole

executive
#44

Hey there, Tim.

Tim Mulrooney

analyst
#45

I realize that the sales cycle you deal with tends to run long. Still, I'm wondering whether that recent cold snap down in Texas has led to additional discussions regarding distributed generation and energy security among the folks you serve, or those you might serve?

George Sakellaris

executive
#46

Absolutely, there's no doubt about that. It began with a storm on a Sunday quite a while ago, particularly in New York and New Jersey. More lately, though, it has essentially turned into a normal part of how things operate, I'd say. What I mean is, each site where we're currently involved in a project across the United States includes some form of resiliency and solution. Consider the Norfolk Naval Shipyard — it features combined heat and power along with battery storage. Consider Parris Island — exactly the same situation. We're in discussions with certain clients, commercial and industrial customers, though I won't say which specific ones, but they serve colleges, and we currently have three colleges that have made a commitment to resiliency. Because think about it this way, and I believe I've brought this up previously, I handled generation planning for New England Electric right up until 1979; and at that time, we considered the single contingency, after which we'd look at double contingency, essentially losing 10% of the load at New England, which would amount to two nuclear units<<inaudible>> and that would give us plenty of low probability, 1 in 100 years. Yet today, with 30% of the load arriving from wind farms or solar, you get nearly 30% of the load dropping out on a simple contingency, and there's simply no way to allow your line to recover from that — it's going to be distributed generation and battery storage and microgrid that's going to people, who will come to see it's the path forward.

Tim Mulrooney

analyst
#47

Understood, thanks.

George Sakellaris

executive
#48

So traction is building for those.

Tim Mulrooney

analyst
#49

All right, thanks. So given everything in the news lately about ESG and corporate responsibility, plus the new administration coming in, I'm wondering whether you're beginning to notice more interest from CNI clients, even compared with, say, the same point a year ago — and if that's translating into any environmental momentum, what about for something like the energy-as-a-service offering, George?

George Sakellaris

executive
#50

Yeah, we're seeing fairly solid momentum when it comes to energy as a service and regain energy. I believe I brought this up on the prior call — I told someone that for the very first time we had CNI customers reach out and say, hey, we need assistance; we have to address our government reduction, and we've got the software that shows them where they stand, and so on — and that's the reason I put it into my remarks here, in my remarks, that we are indeed getting some activity.

Tim Mulrooney

analyst
#51

Great. Thank you so much.

George Sakellaris

executive
#52

Thanks, Tim.

Eric Stine

analyst
#53

Hi, George.

George Sakellaris

executive
#54

Hi, Eric.

Eric Stine

analyst
#55

Eric, no problem — let's stay on CNI. It's an area where you're beginning to gain some traction, and clearly, when you look ahead 3 to 5 years, what portion of your total business do you figure that could represent? Also, do you anticipate it landing more heavily on the project side, or is that something you'd consider more on the energy asset side as you think about it going forward?

George Sakellaris

executive
#56

At this moment, our project side is bigger than our assets. There's, say, we can bring up this Wells Fargo, the bank — we began, intending to own those 30 megawatts of solar. Then they came back and said no, you handle development, the design gets built for us, and we'll hold ownership; so that's one way we could see it. On the other hand, a few transactions exist that we hope to discuss before long, and those move in the opposite direction; so telling at this point is premature, though I'll hold off on judging until we've gathered a bit more information. I'll let Doran add something if he wants.

Doran Hole

executive
#57

My sense is that what will determine this is whatever the customer needs regarding their ability to finance, and that will likely vary based on whether we're discussing a big, solid company with a strong credit rating that can obtain cheap funding, or a borrower positioned somewhat lower on the credit spectrum, so it really comes down to the specific situation.

Eric Stine

analyst
#58

Understood. Then, regarding the mix — I mean, looking three to five years ahead, do you see this becoming a very significant portion of your mix, or do you expect most of the business will still come from more traditional areas?

George Sakellaris

executive
#59

When it comes to the project business, I believe it will be significant.

Doran Hole

executive
#60

My sense is that this will matter, and it will definitely go up. That said, I'd note that cities, our usual merger market, and federal accounts are all picking up their pace just as much when it comes to bids, RFPs, carbon-cutting targets, and so on. So yeah, the corporate side is definitely going to expand at a quicker rate than the rest, but the rest are still expanding.

Eric Stine

analyst
#61

Okay, that's great. Thanks.

George Sakellaris

executive
#62

Certainly. Thank you.

Doran Hole

executive
#63

Thanks, Eric.

Jon Dorsheimer

analyst
#64

Hello, and thank you. Nice work on the solid execution, everyone.

George Sakellaris

executive
#65

Appreciate it.

Doran Hole

executive
#66

Thanks.

Jon Dorsheimer

analyst
#67

So for my first one, I'm just kind of interested — we keep hearing about cost increases hitting the materials side. So I'd like to know what your thinking is there when it comes to the project business? My assumption is that because of how the contracts are structured, you can pass those higher prices along to the customer through a cost plus kind of arrangement. But is there a point where you'd start to see a downside, meaning once you cross some threshold the project ends up being cancelled or handed over —

George Sakellaris

executive
#68

No. Not to where the project would get cancelled, it's just that the payback period shifts, though we are seeing a bit of pressure when it comes to pricing, plus certain equipment delays, particularly with a few of the microgrids and some of the advanced controls used for street lights, where equipment has been late arriving. And then there's the battery storage as well, but up to now, it hasn't made a big difference to the business overall or to how our company performs. And another point is, as you'll recall, we handle those risks extremely well, since we set the price on the jobs first, and after that we sign the contract. And typically, we've already purchased the equipment, and often we're actually in good shape acting as a subcontractor, yet on the flip side, with certain contracts that run over longer stretches of time, we do carry some exposure. And we're keeping a very close eye on it. Buying panels of lights ahead of time and so forth.

Doran Hole

executive
#69

What I'd say in addition is that no single part makes up an especially big share of what we source, what we require, or what we purchase, correct. Take inflationary pressure on steel, for instance, right. Did it have an effect? Of course it had an effect, yet the majority of our agreements are subject to negotiation. That gives us protection on margin, though even so, that item doesn't account for a meaningful slice of what we spend to execute or of our cost of goods sold. So my sense is that buying such a range of equipment types shields us to a degree.

Jon Dorsheimer

analyst
#70

Great. And as a follow-up, specifically about CNI, you know, with companies getting ready to return to the office or some kind of arrangement, I'm curious — occupancy across most buildings is fairly low both on the commercial office side and the industrial side, and I'd imagine that <<inaudible>>, its broad resiliency, is top of mind. So I was wondering if you could break down for me the difference when it comes to the driver: is resiliency the bigger factor pushing some of that project business, or is it offering features and functions for in-office use, like a charging station in the parking garage or an improved HVAC system? How do the projects get categorized in terms of what drives them on the CNI?

George Sakellaris

executive
#71

I'd say, mainly for returning to the office, it centers on charging stations and then perhaps some filtering or new HVAC systems to ensure people come back and have a safe environment, and so forth. But if you're talking about a data centre or a bank or something along those lines, then resiliency is the driver. Because I know we're developing some solar, we own a couple of projects since they want the solar, but then we figured out that we do the microgrids and the battery storage. And that's why we got selected — we provided a more comprehensive solution.

Jon Dorsheimer

analyst
#72

That’s excellent. I appreciate the additional detail. And once more, congratulations, everyone.

George Sakellaris

executive
#73

Many thanks.

Doran Hole

executive
#74

Thank you.

Pavel Molchanov

analyst
#75

I appreciate you taking my question. We've already talked about the infrastructure proposal and some of the discussion surrounding it. What I'd like to ask specifically is about the Department of Defence. Over just the past 100 days, have you noticed any tangible changes in the way contracting gets handled, or in whether the duty or the army corp engineers are more open to embracing efficiency solutions?

George Sakellaris

executive
#76

That's a great question, yes; though I actually asked her the very same thing last week when she visited. As you see it, during the first six months of last year, we received no RFP requests at all from the federal government. Up to this point in the year, we've got five — those are for energy savings performance contracts. We also have others that were designed and built, quite a few actually, but the energy savings performance contracts are specifically the primary thing pushing our business. This year we landed five; a year ago at this same point, plus another three months — because honestly, the second quarter of last year was basically already in place. Even so, everything had shut down. But it's the mindset that moves things, and that's the reason we included it in the comments. The tone is far more encouraging now. Beyond that, when you factor in both resilience and renewable energy sources, I believe you'll notice that even the prior administration favored these infrastructure improvements, since with this particular project they weren't required to put up any funding. Yet today's administration will expect not just upgraded infrastructure and resilience, but also renewable elements across the different projects. Several of the initiatives we're developing under this infrastructure legislation will provide substantial support. That means they can choose either to include something like a solar farm within the energy saving performance contract, or remove it and pursue it through a PPA, or power purchase agreement, which offers greater flexibility in reaching their objectives.

Pavel Molchanov

analyst
#77

Yeah, that's a fascinating comparison against the prior year. And I do appreciate those specifics. One more thing, DOD, same topic. That contract you called out in Norfolk at $173 million — I believe it's the biggest ever, though tell me if I have that wrong. How does the revenue get recognized across this year and the next, more or less allocated?

George Sakellaris

executive
#78

Actually, it isn't the biggest one — there was one on the river, long, long ago, that we handled. We made note of a 25 megawatts coal fire cogeneration plant, tore down the building, put up a completely new Woodchips Power Plant; that was unquestionably an energy savings performance contract, roughly a couple of $100 million project, so near enough in any case. And it proved worthwhile. That was a transformative project for us. As for that $173 million, payment comes to us based on percent complete. In fact, they've got a schedule, and at this point it's around two years.

Doran Hole

executive
#79

Sure — across a 2-year span, once we hand over that project, it will be recognized, correct? While we're building it, it's at 100% completion, and after that we shift to the O&M Phase 1 CET — so what can that project actually deliver?

Pavel Molchanov

analyst
#80

Okay, so…

George Sakellaris

executive
#81

Once that specific project wraps up, this becomes a really strong item contract on it,

Pavel Molchanov

analyst
#82

Got it. So it's split evenly between this year and next?

Doran Hole

executive
#83

Nope, I'm hoping — actually, I think…

George Sakellaris

executive
#84

No, I would say less than half of this year.

Doran Hole

executive
#85

Yes.

George Sakellaris

executive
#86

Likely under 50% of the current year, with the remainder…

Doran Hole

executive
#87

And there will be additional ones in the following year.

George Sakellaris

executive
#88

That's right; the explanation for that is, as I mentioned, we received the permits at the beginning of March, and we began relocating equipment and such.

Doran Hole

executive
#89

It will require a bit of a period before it truly gains momentum, though indeed, my expectation is that we witness a greater amount of that in the following year.

Pavel Molchanov

analyst
#90

All right, that makes sense. Thanks so much, everyone.

George Sakellaris

executive
#91

All right. Thanks.

Operator

operator
#92

Appreciate it. That brings the Q&A portion to a close, and it also wraps up everything on today's agenda. Thanks for taking part. Everyone, you're welcome to drop off the line now. Have a good day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.