Thanks, Valerie, and good afternoon to all of you. We're glad you could be with us on today's call. Here with me are George Sakellaris, who serves as Ameresco's Chairman, President, and Chief Executive Officer, Doran Hole, our Executive Vice President and Chief Financial Officer, and Mark Chiplock, Senior Vice President and Chief Accounting Officer. Before handing things over to George, I want to offer a short comment about forward-looking remarks. The earnings materials we released today include forward-looking statements, among them statements about what we expect. Every forward-looking statement carries risks and uncertainties. For a discussion of the major risk factors that might cause our actual results to come in different from those described in our forward-looking statements, please see today's earnings materials, the safe harbor language on slide two, and our SEC filings. We also present several non-GAAP measures when reporting our financial results. A reconciliation to those measures appears in our supplemental financial information. At this point I'll hand the call to George. George?

George Sakellaris

executive
#2

Thanks, Leila, and good afternoon to all of you. It's a real pleasure to share that for Ameresco, Q2 was yet another record quarter, in terms of both the financial numbers we posted and the outstanding way our team executed. We saw gains in each of our four business lines, and profitability rose considerably. This remarkable showing speaks to the caliber of our employees, the resilience of our business model, the growing opportunities in the market, and the operational variety and adaptability that stems from our entrepreneurial culture; those same company traits help Ameresco cope more effectively with the inflation and supply chain strain the whole industry is facing. I want to express my gratitude to everyone at Ameresco, as well as the customers, partners, suppliers, and subcontractors we value, who have joined forces with us to lessen these difficulties. Before we get into the strong quarter, I'd like to give you an update on our battery projects for Southern California Edison. In Q2, we advanced these projects significantly, hitting a series of important milestones even with COVID, supply chain, and permitting obstacles. Only last week, I visited all three sites on foot, and our team is performing superbly. I'm happy with how things are progressing at every project site. Roughly two-thirds of the batteries needed for the projects have arrived on-site, with the rest in transit; we now anticipate 200 to 300 MW of capacity entering service in September, and we still expect to wrap up by the close of this year. I'm also extremely pleased with the tremendous dedication shown by the teams at both Ameresco and Southern California Edison, who are working around the clock so these battery storage projects can be delivered this year. This genuinely illustrates what a partnership looks like, and together I'm confident we'll get it done, supplying the California grid with essential resiliency and reliability. Now, back to the highlights from Q2. Our projects business spearheaded our strong revenue growth; we kept executing not just on the Southern California Edison projects, but also managed to move faster on other big projects thanks to customer approvals arriving ahead of schedule. Even with the benefit of these great results, we maintained our momentum in new business during the quarter. We added $223 million in new awards to our project backlog. What excites me most is that our proposal activity hit multi-year highs in Q2, exceeding the level of prior years by more than double. This plainly shows that customers want solutions for their rising energy costs, their resiliency requirements, and their carbon reduction objectives. As an example, across the first half of this year we've seen seven comprehensive federal requests for proposals in total, versus just five for the entirety of 2021. Our proposal activity wasn't confined to federal work either. We're developing and delivering plenty of exciting advanced technologies, renewable energy, battery storage, and traditional energy efficiency projects spanning every customer segment and every geography we serve. There's also some thrilling development to share regarding the energy asset portion of our operations. We've executed our biggest combined PV solar plus battery arrangement to date — the Kapono Solar, LLC asset. It's a real pleasure to be collaborating on this alongside Bright Canyon Energy, which is a fully-owned subsidiary of Pinnacle West Capital Corporation. Bright Canyon is going to hold an equity stake in this asset as well, which makes it our inaugural equity partnership on an energy asset. The planned configuration for this asset includes 42 MW of solar and a 42 MW/168 MWh battery storage system. Installation will take place at Joint Base Pearl Harbor-Hickam through a 37-year enhanced use lease agreement with the Department of the Navy. When it reaches anticipated completion in early 2024, it will run under a 20-year power purchase agreement with Hawaiian Electric and deliver clean, resilient energy to Oahu; we're eager to execute on this and pursue additional future opportunities together with Bright Canyon Energy. At this point I'll hand the call over to Doran for some remarks regarding our financial performance. Doran?

Doran Hole

executive
#3

George, thank you. Hello, everyone, and good afternoon. For additional financial information, please check the press release along with the supplemental slides; both were posted to our website after today's market close. The Ameresco team, as George noted, delivered exceptional second-quarter results. Really impressive top-line expansion came from our projects business, though it deserves mention that solid growth was recorded by all four of our business lines during the quarter. Beyond that, if you add total project backlog to the future revenues anticipated from our contracted energy asset and O&M operations, that number remains above $5 billion, providing excellent long-term visibility and predictability given the uncertain economic conditions we face. The main driver of that big increase in revenue compared with a year ago was our projects segment. It wasn't only steady progress on the SCE work that fueled it — we also got moving on other projects sooner than we had expected. We've mentioned this previously: executing the SoCal Edge projects has hurt our short-term cash flow and will continue to do so, since our working capital requirements have temporarily grown, particularly receivables and unbilled revenues. We knew this working capital rise was coming from day one, and it's one of the reasons we reworked our senior credit facility early in the year. Once the second quarter wrapped up, we collected an extra $33 million from SoCal Edison — money we had already billed for. On our balance sheet, you'll find a line called costs and estimated earnings in excess of billings — that's what we refer to as unbilled revenues. When those get invoiced according to the terms of a contract, they become accounts receivable. Those contract terms usually depend on time passing or on hitting certain contractual milestones. Revenue works differently — we recognize it through the percentage of completion method, which is not tied to contractual milestones. As a result, the timing of when we invoice generally won't match up with when we recognize revenue. That's the reason the SoCal Edison project has created a short-term increase in unbilled revenues. Once that SoCal Edison contract wraps up and we've collected the rest of what's owed to us, we anticipate each element of working capital returning to levels that are more normal for our business. Now, regarding energy assets, I'd like to highlight how disciplined we are when evaluating new ones. The number of early-stage assets and development projects we're tracking continues to expand at a strong clip, and the volume of proposals and awards we're seeing is remarkable. That being said, market returns on assets overall have been pressured by the recent uptick in inflation and interest rates. As a result, for the last two quarters or so, we've taken a particularly cautious approach to committing capital, ensuring our assets and development remain consistent with our hurdle rates. In addition, we're tightening our attention on getting our roughly 500-MW portfolio of assets in development executed. This quarter, you'll also notice a fresh disclosure in our supplemental slides covering our assets in development. Thanks to the Bright Canyon Energy partnership we told you about in Q2, our reporting now includes all assets in development, plus a pro-forma MW number that reflects our partner's equity stake. The goal is to give investors a better sense of the beneficial impact these assets should have on our financial results going forward. For those who are just getting to know Ameresco, I thought it would help to explain how we manage our exposure to the various environmental attributes generated by our energy assets business. RINs — renewable identification numbers — are generated through our RNG business. When we build a new RNG facility, our usual practice is to sell forward about 50% of the RINs we expect it to produce, doing so under a fixed-price offtake agreement running 3 to 5 years, which helps secure project financing. Beyond that, for most of the remaining RINs, we aim to hedge them dynamically over the course of the year as they're generated, using forward sales in large blocks; that approach cushions our financial results from the day-to-day volatility in RIN prices. Late in the second quarter, RIN prices began to decline after rising for several years. Even with that, we don't anticipate a significant impact on our 2022 results, because we've already hedged more than 90% of our 2022 exposure. The RECs—renewable energy certificates—that we turn into revenue are generated by our renewable electricity holdings, primarily solar, and they're clustered in a handful of specific northeastern markets where renewable portfolio standards are mandated by the government. Most of these holdings generate RECs through the legacy Massachusetts SREC one and SREC two programs, which come with effective price floors. Because of that, REC price swings have had minimal impact on what we report. We do have some exposure to volatility in RIN and REC pricing, but Ameresco takes a proactive approach to managing those risks. Moving back to the P&L, our adjusted EBITDA growth year over year was impressive, driven by strong operating leverage—again demonstrating that we can grow gross profit dollars without incurring additional direct operating expenses. We kept converting signed work into revenue at a solid pace, thanks to the SCE projects moving ahead steadily. On the business development side, things were equally strong, with fresh awards filling the pipeline. At the close of the quarter, our total project backlog was a healthy $2.8 billion. Like George mentioned, we're witnessing and participating in remarkable proposal activity across the market. We anticipate that will fuel additional award growth in the quarters ahead. People have been talking a lot about inflation, interest rates, and energy prices. Energy savings are the foundation of the value we offer customers. When material costs rise and interest rates climb, that typically creates headwinds for us, whereas higher energy prices give us a tailwind. Right now, the rise in energy prices compared with a year ago has significantly exceeded the same-period growth in what Ameresco pays to deliver projects on an all-in basis. Because of that, a greater number of projects can actually pencil, and it's fueling interest in and engagement with our creative demand reduction offerings. Given the solid results we've reported so far in 2022, plus the line of sight we enjoy across all of our business lines, we can reaffirm our annual guidance for 2022, despite the delays that have arisen in the SCE projects. As for how the quarters will take shape, we expect Q3 revenue to be slightly above Q4. For gross margins, we look for them to begin returning toward typical levels of about 18% in both the third quarter and the fourth quarter. At this point, I'll hand the call back to George for his closing remarks.

George Sakellaris

executive
#4

Thanks, Doran. With so many geopolitical, climate, and budget challenges around the globe, there has never been a stronger need or demand for the full range of clean energy solutions that Ameresco offers. We're really encouraged by how much more engaged customers are right now. Because market opportunities keep expanding, because we lead in this market, and because we offer a comprehensive set of clean tech solutions, we're confident we'll see strong growth over the coming years. To wrap up, I'd like to pause once more and thank everyone on the Ameresco team for how dedicated they are and how well they execute. We also want to acknowledge the continued backing of our customers and our long-term stockholders. Operator, at this point I'd like to turn things over for questions. Thanks.

Julien Dumoulin-Smith

analyst
#5

Good afternoon, and thank you, team, for making time for this call — I appreciate it. Let me dive straight into it. I'd really like to hear a bit more about the IRA and what opportunities you think it could unlock for your company. In particular, Doran, I caught what you said about RINs, but when you look at the RNG business, what sort of opportunity do you see when it comes to the tax credit that could become available to you — both for projects you've already originated and that are actively in development, and for what this might make possible? Again, I know my focus is on RNG, but I'd love to hear where else you see opportunity emerging for you folks.

George Sakellaris

executive
#6

Sure. Go ahead.

Doran Hole

executive
#7

Absolutely, Julien. To start with, I'd say the credits being expanded and extended is definitely going to benefit the whole industry. We're still in the process of examining the clauses tied to qualified biogas property. We've been evaluating how the statute is worded. We need to wait and observe what unfolds from this point until it's enacted, to gauge how much clarity emerges regarding how that could be applied to the specific kinds of renewable natural gas facilities that we build and where our focus lies. Crucially, like with everything in our sector, we don't favor any particular technology. We're examining every kind of technology out there, and that takes in RNG. Then turning to the rest, obviously battery storage, solar, the solar extension, and after a couple of years, once the technology neutral provisions take effect, you know, that aligns really nicely with what we do and we're thrilled about it. On top of that, I believe Ameresco. Unlike, you know, a lot of other players, I think, in this industry, we're pretty well versed in the parts of the law that will deliver the increase of the credit from 6%- 30%.

George Sakellaris

executive
#8

That's right.

Doran Hole

executive
#9

Specifically things like prevailing wage requirements, union labor, and domestic content rules. This is terrain we have plenty of experience navigating within our sector. Our view is that those requirements are manageable, and we can genuinely fulfill what the legislation from Manchin and Schumer is meant to accomplish. Once more, though, the bill hasn't been signed, and it hasn't been passed. Our analysis of it is still ongoing.

George Sakellaris

executive
#10

If it does get signed, no question about it, there's tremendous upside potential.

Doran Hole

executive
#11

Yeah.

George Sakellaris

executive
#12

When it comes to our business — be it solar, battery storage, or RNG — there's a lot happening. In RNG particularly, we've got more than 18 projects set to be constructed across the coming three to four years. Beyond those, quite a few additional ones are in the works. That would represent a massive boost for us as a company.

Julien Dumoulin-Smith

analyst
#13

George, only to make sure we've got this straight — the tax credit could be captured on essentially all of the projects already in progress, even those that weren't originally planned for it, correct? That, again, strikes me as an important distinction in this case.

Doran Hole

executive
#14

No, you've got it. As long as construction hasn't been finished.

Julien Dumoulin-Smith

analyst
#15

Yeah.

Doran Hole

executive
#16

You know, everything involved is going to be newly placed into service once those effective dates have passed.

Julien Dumoulin-Smith

analyst
#17

Yep. Great. Apologies — just one additional point of clarification, if I may. Clearly, it's encouraging to have greater certainty and visibility regarding SCE. Regarding that advancement, could you share a bit about whether there's any added expense on your side tied to these modest adjustments? In other words, how are those discussions progressing, if you're able to describe them? Clearly, things are fluid. Clearly, you're reaching a certain level of resolution; the delays aren't especially significant, but what about the added expense and offsetting it, and so on.

George Sakellaris

executive
#18

Regarding the added expense, that's among the positives with the battery provider. It kept its pricing unchanged. That's actually one of the benefits Southern California has, since we finalized that agreement essentially prior to signing our deal with Southern Cal. As for the delay, immediately after we reported the quarter last time, around the end of that week, they returned with a revised timeline, and essentially we lost 4 weeks on battery delivery. The positive aspect now is that roughly two-thirds of the batteries are at the site, with the remainder aboard ships; we feel far better than we did previously, since we now have control over that, along with all the other materials tied to that specific project. That's why we're fairly confident they'll be finished this year. In fact, what occurred this past quarter and particularly over the last 6 weeks, I'd say it raised our own confidence about completing the project this year.

Doran Hole

executive
#19

Yes. Julien, the one other thing I would mention is that nothing has shifted regarding the character of our conversations and the ties we maintain with Southern Cal when it comes to completing these projects.

George Sakellaris

executive
#20

Right.

Doran Hole

executive
#21

What we're concentrating on is getting those projects done, tightening up the timelines-

George Sakellaris

executive
#22

Yeah

Doran Hole

executive
#23

doing it in a safe manner.

Julien Dumoulin-Smith

analyst
#24

Understood. Okay, that's reasonable. I'll stop here. Thanks, everyone.

Doran Hole

executive
#25

Thanks, Julien.

Stephen Gengaro

analyst
#26

Thanks, good afternoon, everybody.

George Sakellaris

executive
#27

Good afternoon.

Stephen Gengaro

analyst
#28

There are a couple of items I'd like to cover. First, regarding how many energy assets went into service during the quarter, plus what the outlook or cadence looks like for energy assets in the back half of next year. In the actual quarter, it appeared to fall a bit short of what we had anticipated. I wanted to know whether something was happening there, or if it was simply a matter of project timing.

George Sakellaris

executive
#29

Yes, timing plays a bigger role here, and certain projects get pushed back due to interconnection or whatever else may be the cause. From our standpoint, we told the street we would install somewhere between 60 to 80 MW of assets this year. That guidance still stands. The one thing that has turned into a significant problem is utility interconnections. To put it another way, several projects are already complete, yet we can't interconnect them since those utilities follow their own schedules. Demand for their work is so high that it has become a major bottleneck.

Stephen Gengaro

analyst
#30

Great. Thanks. And just to follow up — I realize, Doran, you likely don't want to get into too much detail on this — but that gross margin guidance you gave for the second half of the year appears to suggest that you've already booked a bigger portion of the SCE revenue than perhaps we'd anticipated or put in our models. Is that right?

Doran Hole

executive
#31

No, I wouldn't say a bigger portion. I'd say it's tracking as planned.

George Sakellaris

executive
#32

I think it's within our expectations.

Doran Hole

executive
#33

Yeah

George Sakellaris

executive
#34

That is the reason we actually made that change.

Doran Hole

executive
#35

What you see in the second half simply shows the mix shifting back toward the usual business, and it is not different from what we had anticipated.

Stephen Gengaro

analyst
#36

All right.

George Sakellaris

executive
#37

Yes. The proportion represented by those other projects is growing somewhat larger.

Doran Hole

executive
#38

Yeah.

George Sakellaris

executive
#39

And, uh...

Stephen Gengaro

analyst
#40

Great. Thank you. That's helpful.

Stephen Gengaro

analyst
#41

You're welcome.

Noah Kaye

analyst
#42

Questions. I want to follow up on what you said regarding these unprecedented amounts of bidding proposal activity. You mentioned the federal side, I know, but it would help to understand, more generally, where that demand is appearing and which areas seem to be emerging as the incremental points of emphasis. The key thing, I think, is how we should think about the contracting and sales cycle for these. Federal projects, for instance, might be perceived by us as having a longer conversion cycle than other kinds of customers do. So as we examine award and backlog trends, how should we keep that in mind going forward?

George Sakellaris

executive
#43

Yeah. Well, you know, once we submit the proposal, the typical cycle to secure the award runs 12 to 18 months, but particularly with the federal government. The federal government, enormous activity. Most likely, we won't see that accelerate until next year in terms of it appearing in awards and contracted work. A number of the C&Is we look at have a quicker turnaround, perhaps 6 months or thereabouts, and at times even shorter. At that level, we're seeing very strong activity. I mean, the Canadian group, enormous activity, and particularly in the C&I market. A lot of the activity we're picking up comes from utilities or the cooperatives — some of those battery storage projects where we've now become a recognized player in the marketplace, so we're putting forward quite a few proposals at this point tied to battery storage. I'd say, no, probably 6 to 12 months out is when you'll see it — the award and the executed contracts will show a very healthy increase.

Noah Kaye

analyst
#44

Yeah, great.

George Sakellaris

executive
#45

It's going to arrive gradually, though the pace of activity we're sensing — I'm really enthusiastic about that. What I mean is, the level of activity is significantly stronger than what we'd run into. Alongside that, however, we've brought on roughly 100 additional staff over the course of this year, so we can match this sort of activity level.

Noah Kaye

analyst
#46

Yeah. Of that activity you brought up — the federal side, Canada — what portion might wind up in Europe? After all, the EU could be staring down a winter energy crisis. The opening for what you offer seems bigger than it has ever been. So what are you observing over there, and could it really move the needle when it comes to landing business and growing the backlog?

George Sakellaris

executive
#47

Well, a great many customers are worried about their carbon footprint. Take Bristol City. That's increasingly serving as a model; I believe during the prior quarter we were in talks with 1, and at this point we're in talks with 3 prospective new cities moving in that same direction. With energy costs at such elevated levels, that has turned into a catalyst. Lots of folks — particularly the C&I segment, or for that matter others, be it the federal government or institutions — are uneasy about how expensive energy has become. As Doran mentioned, despite project costs rising by roughly 10%-12% and interest costs going up somewhat, average energy prices have climbed more than 40%, which means the value proposition has gotten stronger.

Noah Kaye

analyst
#48

Yep. Thanks so much for the color.

George Sakellaris

executive
#49

Mm-hmm.

Eric Stine

analyst
#50

Thanks for letting me ask. At the Investor Day in March, you provided a 2024 outlook — I think it was $300 million+ in EBITDA. I'd really like to hear where your confidence stands on those targets, and perhaps your thinking on how you'll reach them. In other words, is another large storage contract required, or is the momentum and uptick in both new awards and proposal activity roughly what you had assumed to drive a step up in 2023 and then ultimately hit your 2024 goal?

George Sakellaris

executive
#51

Yes. I'll take that one first, and then Doran may wish to add further detail. Our confidence remains very strong regarding $300 million of EBITDA by 2024. When it comes to securing another big contract tied to battery storage along the lines of the Southern Cal one, no. That isn't part of the plan, neither as it stood then nor as it stands now. I believe the development of our assets — be it renewable natural gas or the solar plants — the growth in O&M, and what I'd describe as the ordinary stream of contracts you've watched us pursue previously, give us a fairly good feeling that it will get there, that it will bring us there. Naturally, with energy prices rising the way they have, that's aiding our situation more than was the case back when we put that particular plan together. The sole worry is supply chain difficulties, and once those disappear, once we move past them, we'll be better placed to execute; our confidence about it remains very strong.

Eric Stine

analyst
#52

All right. That's excellent, and it's quite useful. Perhaps I'll just build on something you said during your prepared remarks — you brought up that award, or rather that initial venture, the one done in partnership with Bright Canyon involving energy assets. Could you expand a bit on what else is in the works there and how you expect that to shape up as time goes on?

George Sakellaris

executive
#53

That specific one — the way it came together is pretty interesting. We were selected for the enhanced use lease for the Navy in Hawaii. Bright Canyon Energy already held the PPA, which they'd secured through the Hawaiian Electric process, so it was an ideal fit. They came to us — actually, it was the base folks who said, "Look, you fellows got the lease contract, but these people have been collaborating with us for quite a while, and they're the ones who landed the PPA. How about the two of you join forces?" So we joined forces with them, and as partners they've been terrific to work alongside up to this point. There are additional deals we're examining where we might possibly collaborate with them. So far it's been a fantastic relationship. Now, in the past we haven't pursued this approach all that often — we do have some general partners in place. My sense is this will assist us and speed up the business going forward. For instance, we brought in a partner to handle a few projects in Greece, and that relationship has turned out extremely well. This connects back to what Noah raised in his question — we're seeing a lot of activity across Europe, and we've got strong momentum in the U.K., plus certain other European markets we aren't prepared to discuss just yet. So don't be caught off guard when we share some positive developments in the future.

Eric Stine

analyst
#54

Okay, thanks for the color.

George Sakellaris

executive
#55

You're welcome.

Tim Mulrooney

analyst
#56

Yes. I appreciate you fielding my questions. I have 2 brief ones. George, I want to confirm that I understood what you said earlier during the Q&A. You mentioned that you were in discussions with a few additional cities regarding signing the same kind of contract you've already signed with Bristol City. Are all of those limited to cities in Europe, or are you also holding some of those kinds of conversations with cities in the U.S. as well?

George Sakellaris

executive
#57

That's actually a fair question, no, no. One of them is also from Europe, and the remaining two are from the United States.

Tim Mulrooney

analyst
#58

All right, that's helpful. I appreciate it. Good to hear it's over here on this continent too. And then maybe just one more, likely for Doran or Mark. It seems like there's been some distortion in cash flows during this year, mostly from the SCE project. Once things settle down — so I'm thinking about 1 or 2 years ahead — what would be the appropriate range for the cash flow conversion rate that you believe this business could sustain as we consider those upcoming years?

Mark Chiplock

executive
#59

Okay, so regarding working capital — we've taken a look at that. If you set aside SCE and consider what a normalized working capital level looks like, ours has typically been in the range of 10% to 15% higher, measured against annualized revenue. Honestly, we haven't experienced much in the way of swings there. And I'd say our expectation is that we return to those levels. On the cash flow side, we're attempting to give a few additional metrics that can assist with calculating free cash flow. Once again, on a trailing twelve-month basis, we've been posting fairly steady positive free cash flow. And I think once Southern California Edison is behind us, our expectation would be to get back to that and keep it going, you know, as we move forward.

Tim Mulrooney

analyst
#60

Okay. Thanks very much.

George Sakellaris

executive
#61

Sure.

Kashy Harrison

analyst
#62

Hello, everybody. I appreciate you allowing me to ask questions, and congratulations on what you delivered. Regarding the backlog — that's the subject of my initial inquiry. Because of what happened with the SCE project, getting a read on it has gotten somewhat tricky. I was wondering whether you might assist us in putting a figure on the portion of the backlog as it stands that ties to the SCE contract, and after that I have something else to ask.

George Sakellaris

executive
#63

Breaking that out isn't something we do. The one point I can make is this: when you take the total backlog — what we're looking at and what we'll sign during this quarter along with the following one — it's going to leave us well positioned for yet another strong year when the next one comes.

Doran Hole

executive
#64

Right. I think one way to approach this is to examine the revenue projections and how revenue was recognized across the quarter along with earlier quarters, comparing the SCE contract against the overall contract value.

Kashy Harrison

analyst
#65

Yeah.

Doran Hole

executive
#66

Well, you know, we haven't really talked about what that would look like without the SCE contract, mainly since the SCE contract did go through. We keep adding awards, and we keep backfilling while that revenue burns off. You're seeing both sequential and year-over-year growth in awarded and contracted, or total project backlog, and I think that basically confirms we're holding onto our visibility and can refill the backlog through awards while the actual revenue from SCE burns off. Once again, that backlog is still $2.8 billion, which works out to somewhere between 2 and 5 years of revenue, correct?

George Sakellaris

executive
#67

Yeah.

Doran Hole

executive
#68

That hasn't changed.

Kashy Harrison

analyst
#69

That's useful, thanks. For my second question, I'd like to examine the RNG segment a bit more closely. In early June, you know, the EPA lowered the RVO for D3. As you noted, that had a short-term effect on pricing. But since then, prices have started to bounce back. I'm just wondering what you're picking up from counterparties regarding supply growth in the RNG industry. Is it falling short of what was expected? And tied to that, perhaps, do you have any read on the market about how the EPA could approach setting the RVO when we consider 2023? Thanks.

Doran Hole

executive
#70

Sure, Kat. On the second part, I think the response will basically be no. I don't believe we're going to share our views about what they may choose to do. As for the broader market, I think we've been, as you'd probably anticipate, looking inward at the 18 projects we have underway in development and construction, correct? When it comes to how supply functions, the supply chain has created delays regarding execution for a lot of the people in the market who are developing and building RNG projects. I think that's an issue we encounter, and we keep seeing it. I mean, I dislike labeling them competitors, since it's not as though we're truly pursuing identical assets, right? I mean.

Kashy Harrison

analyst
#71

Yes.

Doran Hole

executive
#72

What I believe you will likely observe, in terms of the trend, is that we keep witnessing buyers place greater emphasis on buying renewable natural gas voluntarily. That pattern, in my view, is in fact shaping up favorably for the whole industry. It definitely might for us as well. I mean, during this call, in the script, I laid out our approach to monetizing RINs rather explicitly. Our view is that we are quite confident about how the economics appear for the assets we currently have under development, and then for what we intend to build over the coming 7 years or so.

George Sakellaris

executive
#73

Yes. And if I could just jump in on that, our outlook on that business remains really positive even with RIN prices having come down and all that. Even from the angle I raised regarding inflation, the numbers still look quite strong for those assets. The one sticking point is securing the equipment, finishing on schedule, executing, and obtaining the permits.

Doran Hole

executive
#74

Mm-hmm.

George Gianarikas

analyst
#75

Thank you very much for fielding my question. Just real quick, I'd like to probe a bit further on the momentum over in Europe — could you elaborate on that and let us know which technologies are picking up steam? And second, do you believe you've got the people and resources in place on the ground to capitalize on the momentum you're witnessing? Would you grow that through more sales offices, or by way of acquisition? If you could just walk us through your thinking on that. Thanks.

George Sakellaris

executive
#76

All of the above is what we're examining. In essence, we're seeking acquisitions, and we're seeking to bring on more assets. In fact, we've brought in a couple of headhunters to assist us in building out our infrastructure — the people who handle assets. But a number of the projects we're looking at are becoming more sophisticated, much like what we see here, comprehensive. I mean, I went to see one of the jobs we completed at South University of London, and geothermal heat pumps were part of it. Pretty much across the board, solar, microgrids, battery storage, lights, all the other things we do over in the United States — they're doing those there and more. One thing they'd done with the solar: they had the solar panels as well, but on top of that, they supplied water heating for the dorms. Given what energy prices are like in Europe, I know we're trying, in the southern part of Greece, to put in some solar installations. I put the question to the government there: "How likely do you think it is that they'll happen?" Their answer was, "Every kW or kWh we can generate, we desperately need." But building up our infrastructure there is where we need help, and we're working on it.

George Gianarikas

analyst
#77

Could I get one more question in, specifically about the supply chain? Throughout this call, you've brought up trouble spots there a handful of times. Could you help us understand what those trouble spots actually consist of? Battery cells sound like they might have gotten somewhat better. Is labor a bigger part of it? Which kinds of equipment are still proving hard for you to source? Thanks as well.

George Sakellaris

executive
#78

Regarding the batteries, when it comes to the projects currently being delivered, we already have them. At times, obtaining certain other equipment, particularly for the RNG plants, has grown somewhat harder. Take transformers; for the Southern Cal projects, we're in the fortunate position of having them, yet for certain other installations we're evaluating, that's turned into a bottleneck. What essentially occurs at this point is that it stretches out how long new projects take to implement.

Doran Hole

executive
#79

Mm-hmm. The timelines are the key issue.

George Sakellaris

executive
#80

Yeah.

Doran Hole

executive
#81

Right? It's all about delivery timelines.

George Sakellaris

executive
#82

Yeah.

Doran Hole

executive
#83

Fortunately for us, the sector we operate in — public procurement — lets us set out credible schedules right from the start whenever proposals come into the picture, so we're able to build those expectations in, and should things move faster, we can then hand over ahead of schedule, correct? That said, we aren't counting on any acceleration until we genuinely witness it beginning to occur. So our aim is to stay grounded on that front. And then, at the same time, honestly speaking, we've kept growing how many vendors we use across every equipment category. That way we make certain those players face competition not just when it comes to pricing but also on customer service, on how quickly they deliver, and on quality, right, in every respect. We're definitely putting resources toward extra, let me call them procurement management practices inside the business.

Chip Moore

analyst
#84

I appreciate it.

Chip Moore

analyst
#85

I'm grateful you're taking my question.

Doran Hole

executive
#86

Of course.

Chip Moore

analyst
#87

I'd like to dig deeper into what's going on in Europe in particular. Clearly, Vattenfall had a significant part in Bristol. Could you perhaps discuss what kinds of conversations you're having with certain domestic partners regarding some of the bigger projects you might pursue? Have those talks been increasing ever since your profile has risen somewhat?

Doran Hole

executive
#88

There are several markets beyond the U.K. where this is taking place. Of course, in the U.K., Vattenfall was a major collaborator, but for the most part, a substantial portion of the efficiency work and much of the proposal pipeline we're observing in that country, we're handling independently, very much the way we operate here.

Chip Moore

analyst
#89

Yeah.

Doran Hole

executive
#90

Correct? As you know, Ameresco keeps positioning itself as a one-stop shop, so we usually bring these proposals forward on our own. That said, once you move into other European nations, it often makes a great deal of sense to team up with a local partner in order to win more business. With energy prices having risen, we're beginning to observe that, and those opportunities are starting to appear. On the technology side, George brought up solar. Wind is definitely applicable. Street lighting is definitely applicable; yet we also think the wider energy efficiency that we're witnessing in the U.K. will likewise be turning up in a number of these other countries. I believe that we, yeah, we're fairly bullish about the opportunity over there. Go ahead, George.

George Sakellaris

executive
#91

No, that's pretty much it, and a few of them—say they've got solar projects in the works, for instance—need financing partners to get them past the finish line, or wind farms and the like; we receive every sort of pitch, you could say, for possible joint ventures and whatnot. That could speed up what we're building there, given that we don't have sufficient presence on the ground.

Chip Moore

analyst
#92

I see. That makes sense, and it's useful. Okay, thanks.

Doran Hole

executive
#93

Thanks.

Doran Hole

executive
#94

Yeah.

Chris Souther

analyst
#95

Regarding 2024 and how the situation is developing, it sounded as though matters remain fairly on course. I simply hoped to gauge, at what point do you figure we will have, you know, some sight into sort of the energy asset portfolio, you know, that could provide reassurance such as, hey, it is, you know, 80%, 100%, you know, depending on sort of the project backlog and, you know, the energy asset portfolio. Like, what timing might there be when we could, you know, anticipate you folks to state, hey, this is when we ought to have it sort of secured, if you will?

George Sakellaris

executive
#96

Why don't you take that, Doran Hole. That question is meant for you.

Doran Hole

executive
#97

Yeah, that's, you know, I'll open by saying not today.

Chris Souther

analyst
#98

Yeah.

Doran Hole

executive
#99

Naturally, we've just covered Europe, and we've discussed the possibility of more asset growth both there and in the U.S. and Canada. The market, the kinds of assets, and the energy as a service segment are still developing. We're continuing to build it. At this point in time, I don't believe there's any kind of plan to change the frequency with which we offer guidance moving forward. Our expectation is that when we report the full year this year, for 2022, we'll provide full year guidance for 2023.

George Sakellaris

executive
#100

Right.

Doran Hole

executive
#101

Regarding 2023, we'll discuss 2024 once we've reported the complete year. If we reach a point where we have a reasonable degree of confidence, we could come back to your question sometime before issuing 2024 guidance, to determine whether we want to address it, or perhaps we might choose to hold another investor day — we'll keep you informed. For now, though, I believe we'll most likely maintain the same cadence we've followed previously.

George Sakellaris

executive
#102

Yep.

Chris Souther

analyst
#103

Alright. That tracks. Hey, regarding the SCE project, could you give us a little more detail? I realize you mentioned receiving $33 million in cash after the Q closed, which is encouraging. What I'd like to know is whether you can share the cumulative cash collected on that project up to now? And then, with respect to accounts receivable — or accounts payable, sorry — could you address whether there's any effect on SCE tied to those items too?

Doran Hole

executive
#104

Once the Q gets filed, you'll be able to look and determine what's available there regarding disclosures on cash collections. Mark, anything you'd like to add?

Mark Chiplock

executive
#105

Yeah. So Chris, what I'd tell you is that from SoCal, we've kept on collecting on a timely basis, right, as we issued those invoices to them, correct? The amount sitting in AR hasn't actually been shared by us, though we did share some subsequent receipts. You know, they pay like clockwork. I think that's the good part there. We're billing as fast as the contractual milestones let us, and they pay us inside the terms. That's, I think, the positive direction we're moving in, and I think that's about all we can say on that.

Doran Hole

executive
#106

Right. So, like we mentioned earlier, once that contract has fully worked its way through, we're anticipating things getting back to normal. That working capital figure sits at 10%-15% of revenue over roughly a 12-month period.

Chris Souther

analyst
#107

All right, understood. That's clear. So, one final item regarding the Inflation Reduction Act, Doran Hole; it could be too soon to determine, yet it appears there are a few fresh avenues for nonprofits that might be able to leverage the investment tax credit in a more direct manner. I'm wondering how you think that could shift the composition of those clients who favor, you know, having ownership of the projects as opposed to, you know, the leasing PPA route. You know, could you offer any sort of segmentation of either the energy asset portfolio you currently hold or the pipeline that is, you know, nonprofit versus sort of C&I category customers?

Doran Hole

executive
#108

At this point, I believe it's too early to offer any sort of segmentation concerning how that might appear. What I can say is that many discussions with customers are taking place regarding those particular provisions.

George Sakellaris

executive
#109

Yeah.

Doran Hole

executive
#110

About the restricted direct pay provision included in that legislation. Like I mentioned earlier, it remains to be seen how that bill ultimately ends up.

George Sakellaris

executive
#111

Correct.

Doran Hole

executive
#112

We'll have to watch how that evolves from this point until the moment it's actually signed. As you can imagine, matters like this often shift once folks begin speaking up. Still, should it go through exactly as written, that clause would matter a great deal to us.

George Sakellaris

executive
#113

Yeah.

Doran Hole

executive
#114

Like we've discussed before and mentioned in our filings, roughly 70% of what we bring in is from government-related organizations. A significant portion of our operations involves working with cities, nonprofits, educational institutions, and medical centers, and we're going to assess how those initiatives — especially solar and other projects that qualify as energy projects — get funded, because the direct pay option is going to let us move forward on developments without using tax equity, correct? Naturally, we're examining this very carefully, and we believe it will matter provided that it remains included.

Chris Souther

analyst
#115

Alright. Regarding the labor component, it seemed as though that wouldn't represent too heavy a burden for you all to incorporate a great deal of the, you know, approaches they tend to use. I'm simply wondering, is that, you know, 75% you believe that you're already sort of reaching those kinds of milestones they'd want to see as of today? Is it, you know, essentially 100%? Like, how closely aligned with, like, the way the business runs right now in terms of reaching those various targets, would you say?

Doran Hole

executive
#116

Well, you know, without putting any specific percentages out there, I think we simply possess such a deep familiarity with what those requirements entail. I think the devil will be in the details once you get into the nuts and bolts of, you know, the apprenticeship requirement and et cetera. Even so, that's just going to simply become a you know, a contractor discussion. We, you know, we have to take into account what our subcontractors are doing.

George Sakellaris

executive
#117

Mm-hmm.

Doran Hole

executive
#118

the way they're weighing whether to go union, non-union, prevailing wage, and so forth. Once more, that's a space we know very well. It's

George Sakellaris

executive
#119

Most of our work it covers. You know, it's prevailing wage or unions.

Craig Shere

analyst
#120

Understood. All right. Appreciate it, everyone.

Joseph Osha

analyst
#121

Hi, all. Only a handful of items from me. Let me begin once more with the RNG segment. As you're aware, the current shape of that segment — with contracts on the shorter side, plus the RINs and all of that — largely reflects where things stand today. Looking at how the world is evolving, I'm curious whether we might see you pull off certain RNG projects structured around, say, 15 or 20 years, backed by something like a utility-grade offtake, since that would transform how that segment appears; I have one more question after that.

George Sakellaris

executive
#122

Right; that's among the reasons we aren't signing those long-duration agreements at present, since our view is that in time utilities — and we're in discussions with a number of them — along with colleges and universities that operate cogeneration plants, will require long-term agreements to reach carbon neutrality. As for pricing right now, the discount attached to some of those 10- or 15-year contracts isn't appealing. Looking ahead, I have a lot of confidence that long-term contracts will emerge, and we'll sign a few of them. It could be 10, 15, perhaps 20 years. That would obviously deliver far greater predictability for our figures and so forth.

Doran Hole

executive
#123

Improved funding for projects.

George Sakellaris

executive
#124

Precisely. That is something we're watching very closely, and it takes up a great deal of our time. Ultimately, we picture a time when we'll be carrying out those long-term agreements at the appropriate price.

Joseph Osha

analyst
#125

What's holding things back at the moment is simply that pricing outside of RINs hasn't arrived yet.

George Sakellaris

executive
#126

Correct. So, the approach we've taken in the marketplace — as you noticed, we're hedged beyond 90% for the current year. Despite the fact that rates declined, there was no meaningful effect on our business. Our analysis has been thorough.

Joseph Osha

analyst
#127

Right.

George Sakellaris

executive
#128

When the board looks ahead, they raise those sorts of questions — for instance, how much of a discount would apply if we signed contracts with longer terms, and similar matters. We decided we were more at ease sticking with the approach we currently have. Should prices rise, don't be taken aback if you find that figure of 50% perhaps climbing to 60 or 65%. That's because the price is.

Joseph Osha

analyst
#129

Thanks.

George Sakellaris

executive
#130

For a portion of those agreements, the direction is moving higher.

Joseph Osha

analyst
#131

Understood. Now, for my second one — I suppose this is a question with several connected parts. Up to this point, every energy storage effort you've undertaken has relied on lithium-ion. Might we possibly see you exploring, or even putting into service, alternative storage technologies of some kind? The reason I ask is that one starts to wonder if, on top of each of those credits we've discussed, there could also be some DOE loan financing available. I'm simply curious what your thinking is on that.

Doran Hole

executive
#132

It's something we give a great deal of thought to.

Joseph Osha

analyst
#133

Yeah.

Doran Hole

executive
#134

We maintain a sort of central hub where we review emerging technologies, and we're always evaluating new ones. There's a project in Nova Scotia we've already made public, and that particular one — without getting into details about which manufacturer or what chemistry — isn't lithium-ion. As part of an installation, we're placing a battery there. Construction is underway on it at this moment. When we're confident in how good the product is, we do provide that, and we will continue to, and we're able to stand behind the installation just as we do for everything else in our lineup. Should that lead to a chemistry that's more efficient, cheaper, offers improved degradation tables, runs longer, or whatever else, all it does is open up additional options regarding what our customer wants.

Joseph Osha

analyst
#135

Alright. And regarding the Department of Energy, I'm wondering if you believe the Loan Programs Office might play a role for certain newer technologies, and whether that has any relevance for you.

Doran Hole

executive
#136

Yes, it absolutely might; without a doubt. That's what I'd say.

George Sakellaris

executive
#137

I think the call is working with them or something like that.

Doran Hole

executive
#138

Yes. On the LPO — apologies, let me clarify: the manner in which they go about things, considering how large and extensive the kinds of projects we take on are, well, it's not immediately apparent. That said, particularly because of the direct connection we maintain with the federal government across so many areas, it would be. We would be negligent if we failed to hold ongoing discussions with them.

Joseph Osha

analyst
#139

Correct.

Doran Hole

executive
#140

regarding the activities they are engaged in, the purpose behind those activities, the parties they are collaborating with, and how it aligns with our operations. Indeed, such discussions continue.

Joseph Osha

analyst
#141

Thank you.

George Sakellaris

executive
#142

Okay.

George Sakellaris

executive
#143

Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.