Leila Dillon
executiveThanks, Haley, and good afternoon to all of you. We're glad you could be with us on today's call. With me are George Sakellaris, who serves as Ameresco's Chairman, President, and Chief Executive Officer; Doran Hole, our Executive Vice President and Chief Financial Officer; and Mark Chiplock, Senior Vice President and Chief Accounting Officer. Before handing things over to George, I'd like to say a few words about forward-looking remarks. The earnings materials we released today include forward-looking statements, among them statements about what we expect. Every forward-looking statement carries risks and uncertainties. For a discussion of the major risk factors that might cause our actual results to differ from those in our forward-looking statements, please see today's earnings materials, the Safe Harbor language on slide two, and our SEC filings; beyond that, when presenting our financial results we use several non-GAAP measures. Reconciliations to those measures appear in our supplemental financial information. I'll now hand the call over to George. George?
George Sakellaris
executiveThanks, Leila, and hello everybody this afternoon. It's a pleasure to share that the Ameresco team turned in yet another quarter of outstanding results, with all four of our business lines growing, which produced a striking rise in revenue and profits. Since we gathered for our Investor Day at the close of March, we've come a long way; our addressable markets keep widening, both at home and abroad. You'll see that more and more of our projects and assets now feature broader advanced technologies, including energy storage systems and intricate micro grids. Beyond that, we're rolling out smart solutions for buildings, lighting, and water systems. Our recently awarded critical micro green projects at Fort Campbell and at the White Sands Missile Range, along with our $92 million Joint Base McGuire energy savings performance contract, are excellent illustrations of our newest advanced technology projects backing the federal customers' energy security strategy; and on the asset side, we recently announced a combined five megawatt PV and 15 megawatt-hour battery energy storage system at Colorado Mountain College, which will be the largest subsystem in the State of Colorado. We're also continuing to grow our business in Europe, where the need for clean energy solutions is urgent, given the geopolitical situation and spiking energy prices. During the third quarter, we were chosen alongside a local partner as contractor for 100 megawatt PV projects in Drama, Greece. For us, that's the biggest project in Continental Europe, and we think it's just the start. We're aggressively chasing several other opportunities, and we expect to expand in Europe, both organically and via strategic partnerships and acquisitions. Recent R&D market activity shows the rising interest in and importance of this asset class, with considerable investment and acquisition activity. Ameresco ranks among the most seasoned players in the biogas industry, holding a large portfolio of operating assets and a strong development pipeline. In just this quarter, we added two RNG plants to our assets and development. In our view, RNG is a key clean tech solution and will remain a major value driver for Ameresco's shareholders. We also believe the Inflation Reduction Act, or IRA, which was enacted in the third quarter, will prove to be the most impactful environmental legislation shaping the company's long-term performance since our founding. The IRA supplies unprecedented amounts of clean energy incentives to ensure energy security, reduce carbon emissions, increase energy innovation, and support environmental justice objectives. The bill contains a wide range of clean energy provisions backing energy efficiency, solar, energy storage, micro grid, electric vehicles, and more, with a goal of cutting U.S. carbon emissions by approximately 40% by 2030. This legislation not only creates a 10-year runway for many energy tax incentives, but it also fundamentally revises the tax code to create a technology neutral approach to incentivize the development of zero emission technologies. A few particular provisions are going to affect our business quite directly. Those cover production tax credits for renewable or zero-carbon power and clean hydrogen; investment tax credits for clean electricity and energy projects, which takes in standalone energy storage, biogas, micro grids, and geothermal heating and cooling; tech credits for clean vehicles and charging infrastructure; plus carbon capture credits. The bill also widens the 117 ID energy efficiency tax reduction. Everybody is still working through how broad and how deep the incentives, grants, and other benefits in this bill go, but our expectation is that it will be a terrific long-term tailwind for our business. We've already pinpointed quite a few ways this bill would help our customers and Ameresco directly. Thanks to our customized solutions — everything from solar micro grids and battery energy storage to renewable natural gas and electric vehicle infrastructure — combined with our innovative financing structures, Ameresco is positioned well to serve as a long-term industry partner and a key beneficiary of this legislation. Drawing on what we've seen with comparable legislation, however, we expect it will take a while for these benefits to show up. Now I'd like to give an update on the Southern California Edison project. During the quarter we kept making progress, with every battery cell and container now on site and early commissioning steps under way. Just recently, though, Southern California Edison told us to shift the project schedules into 2023. The contract's terms entitle us to recover the costs tied to a schedule adjustment, and we're working alongside Southern California Edison to analyze and estimate those costs. We're also still talking about whether and how far any force majeure relief applies. Given the schedule adjustments Southern California Edison asked for and the delays we disclosed earlier, we expect the projects to be in service and to reach substantial completion before the summer of 2023. Our relationship with Southern California Edison remains very cooperative. I'd also like to point out that in the third quarter we were honored to become a Great Place to Work-certified company for the first time. That designation rests entirely on employee input, which makes it all the more meaningful, since it mirrors the positive experience of our more than 1,300 employees. Hiring and retention matter greatly to the company's growth, and we'll keep striving to make Ameresco a great place for our employees to work, which ensures we draw in and hold on to the best and brightest in the industry. I'll now hand the call over to Doran for some comments on our financial performance. Doran?
Doran Hole
executiveAppreciate that, George, and hello everyone this afternoon. For anyone who wants a deeper look at the numbers, the press release and supplemental slides are available—they were posted to our website after today's market close. As George noted, Ameresco turned in another financially robust quarter, because each of our 4 business lines grew steadily, and our projects business was the strongest performer; beyond that, when you combine our project backlog with expected future revenue from our contracted energy asset and O&M operations, the total remains close to $5 billion, providing excellent long-term visibility and resilience despite the uncertain economic climate. Top-line revenue gains were driven mainly by our projects business, as we continue to carry out the SoCalEd projects. Additionally, our operations and maintenance segment delivered strong top-line expansion, because we tie O&M agreements to the projects we build, especially those involving the federal government. Separately, I'd like to take a moment here to highlight the solar O&M operation we run nationwide. That division currently manages in excess of 564 megawatts, and close to 400 megawatts within that figure comes from third-party clients. When we acquired this company in early 2019, it oversaw merely 45 megawatts. We could not be happier about the trajectory of this operation, and we will continue to stress a disciplined strategy for acquisitions, one in which we purchase and scale businesses, fold in their offerings, and generate value for our shareholders. Another bright spot was the ongoing, robust expansion of our integrated PV business, which sits inside the other revenue category. Demand kept climbing for off-grid solar systems from customers in oil and gas, rail, and additional sectors that need power where no grid connection exists, and that drove this unit's performance. Gross margin improved from one quarter to the next, matching what we had expected, since the SoCalEd contract — which carries a thinner margin — accounted for a reduced portion of the revenue mix. For the fourth quarter, we anticipate gross margins at a similar level. Adjusted EBITDA again delivered exceptionally strong double-digit growth compared with the same period a year earlier, which reflects our operating leverage and demonstrates our ability to grow gross profit dollars while avoiding any direct incremental operating expense. Even with the working capital demands that come with executing the SoCalEd projects, we closed the quarter holding $122 million in available cash. On a GAAP basis, operations produced $35 million in cash. Adjusted cash flow from operations reached $87 million, a figure that includes proceeds from federal ESPC financing. We had signaled that the SoCalEd projects would continue to weigh on our working capital needs in the near term. That impact was anticipated from the outset, and it is one of the factors behind our decision to amend the senior credit facility earlier this year. Once the SoCalEd contract wraps up and the outstanding amounts are collected, we expect every working capital component to return to more typical levels for our business. Total project backlog stood at a healthy $2.6 billion at the end of the quarter. On a different note, we're noticing more activity coming from the C&I sector, since this market segment is paying close attention to sustainability metrics; on top of that, our projects and asset lines of business keep expanding in Europe amid the continuing energy crisis. Ameresco's portfolio of operating energy assets grew to 360 megawatts, and we built our owned assets in development and construction pipeline to 452 megawatts. Just a note before we start: we're now breaking out two figures — total assets in development, plus a pro forma net megawatt number that accounts for our partners' equity stakes. The idea is to give investors a clearer picture of how these jointly owned assets should lift our financial results down the road. Sure, interest rates are climbing and equipment costs have inflated, but energy prices remain persistently high, and that keeps delivering attractive long-term expected returns across the different kinds of energy assets Ameresco deploys. We're also seeing more proposals and awards come through for our energy assets. One standout: our newer greenfield solar and storage development team, which works nationwide, has been sourcing early stage front-of-the-meter prospects — and once those are de-risked, they'd add to our assets in development metric. To give you some context, we started putting money into a dedicated group focused on greenfield development a few years back, and it's great to see that organic approach beginning to deliver. On top of that, thanks to the incentives included in the IRA, we anticipate these types of opportunities will keep coming faster. Since debt makes up a significant piece of how we fund our business, I want to take a moment to talk about our exposure to interest rates. Right now, roughly 90% of our non-recourse debt is shielded from rising rates, because it's either locked in at a fixed rate or was swapped at the time of closing. The senior secured credit facility is the sole meaningful component of our debt structure that carries a variable rate. Although the SCE contract has caused the total amount available under the facility to grow, once the projects are finished and the related cash payments come in, we expect funded debt under this facility to fall substantially. That ought to keep elevated interest rates from having much effect on our financial results over the medium or long term. Elevated rates could also affect our projects business. Most of our project customers pay for implementation through performance contracts backed by bank financing from third parties. When rates rise, project sizes may shrink, because interest expense then absorbs a larger share of the energy savings. In the same way, while we evaluate proposed new energy assets, the possibility exists that elevated interest rates could impact the equity returns we project. That said, our customer projects, along with our renewable energy assets, are competing with traditional energy sources—electricity and natural gas in particular—and those have experienced significant price escalation during this year. On a year-over-year basis, the increase in energy expenses is larger than what Ameresco encounters for all-in costs associated with delivering projects, plus financial materials and labor. It's our position that, considered as a whole, this preserves a favorable economic outcome for our customers as well as for us, on both the project side and the energy asset side. We keep a close watch on how quickly things shift and on these macro-economic forces, and we stay highly disciplined in how we approach risk-adjusted returns. It's a pleasure to reaffirm the annual guidance for 2022 — being able to do that amid today's difficult conditions reflects the diversification and durability of our business model along with the dedication of the Ameresco team. Consistent with prior years, our intention is to give guidance for 2023 at the time we report Q4. Our optimism about the strength of both our business model and our end markets is unchanged, and we hold the same confidence in the target we previously put forward: reaching $300 million of adjusted EBITDA in 2024. At this point, I'd like to hand the call back to George for closing remarks.
George Sakellaris
executiveThanks, Doran. Around the world, our customers are confronting climate, geopolitical, and budget challenges, and both government and industry are now making significant moves to tackle them. Ameresco sits right at the center of that trend, thanks to our portfolio of comprehensive clean tech solutions, and that puts us in position for strong growth over the years ahead. Once more, I'd like to pause and express gratitude to the whole Ameresco team for how dedicated they are and for the superb execution they deliver. We also want to acknowledge the continued backing of our customers and our long-term subconscious. Last, after a successful Investor Day back in March, we're opening our doors again to analysts and institutional investors so they can learn more about Ameresco. On November 15th, we'll host a tour at our Phoenix, Arizona R&D Facility. This plant stands as the biggest wastewater treatment biogas to renewable natural gas facility anywhere in the US. Our hope is that this tour gives everyone a deeper grasp not just of how impressive this facility is, but also of how strong Ameresco's RNG business is. Operator, at this point I'd like to open up the call for questions.
Noah Kaye
analyst— Regarding what's happened over the past 2 months since the IRA was passed, and specifically the changes it has really driven.
Noah Kaye
analystMany thanks. Let me begin once more. And thank you for fielding the questions. I wanted to ask, given that you mentioned it during the prepared remarks, whether you could elaborate a bit more on what the IRA has done, perhaps walking us through how the last 2 months have looked in terms of where customer attention has genuinely increased, and where pipeline growth opportunities have risen for you? Are there 1 or 2 areas you'd particularly call out? And where do you expect that might have an effect as we look ahead 1 or 2 years?
George Sakellaris
executiveYes. And it's an excellent piece of legislation, without a doubt, it will benefit us enormously. And gaining traction is going to require some time. As you may remember, even during the Obama administration when we had the recovery plan, it took roughly 6 months to 12 months before it truly kicked in — before things got moving; but the place where we're seeing the most activity is the asset base. The asset business has sped up; I'd say more quickly than anything else. Certain other elements, such as the cogeneration ITC, involve some customers now weighing whether they ought to own the facility and take the — monetize the rebate, in other words, take that cash, and in doing so own the facilities themselves. So, it's just 2 months old and I believe customers are attempting to work out how to gain the greatest advantage tied to the bill. And Doran, would you like to —
Doran Hole
executiveNo, what I’m saying is, Georgia’s correct — the place we’ll be concentrating on is the asset side of the business. What I’d tell you is that over the past 2 months, we’ve done an enormous amount of analysis. On that asset question, we’re engaged with a number of clients, particularly around the direct pay. And, you know, a large share of our customer base is government and not for profit. So we’re thinking about what owning assets would mean for those customers and how the economics would shift. We certainly expect this will remain a subject people keep discussing. When it comes to our own assets, there’s the near-term question of what we do from now until the guidance is released; and then there’s the longer horizon — what to do with many of the assets we have in development, where there are a lot of different elements. I mean, the list goes on, right — solar ITC, PTC, the battery ITC, biofuels, the direct pay, and then in 2025, the clean electricity, zero emissions, right — all of that was going to need a great deal of planning. And like George said, tremendous tailwinds for the business.
Noah Kaye
analystThat's really useful context. You also discussed RNG development a bit, mentioning that a few new projects are being added to the pipeline, and you brought up what's happening in the market. Yesterday, we saw Avista <<inaudible>> release their RFP for RNG procurements. There have also been a few prominent deals lately, so I'm curious — especially after the IRA and the biogas incentives — how would you size up the competitive landscape and the opportunity set around RNG right now? I realize we'll likely get more detail at your investor event, but I was just wondering whether you could lay out the big picture on how the landscape is changing?
George Sakellaris
executiveTo me, this represents an excellent catalyst, or valuable assets, for us, since we have a strong pipeline under development, and we've been working on — we'll report, as we have with the development pipeline — the development metric, but when you look at our pipeline, it's considerably larger, though we won't move them into the actual development pool and deal. We negotiate some gas agreements, secure additional rights with the lenders, and so forth, to derisk. But look, natural gas accounts for 40% of the juice in the United States. One way or another, we have to decarbonize that — the pipeline, as I call it — and that's the reason you saw NextEra take a big step toward entering this business; and our bet — back when we began, we were among the first companies to build the first RND facility down in San Antonio back in 2012. We believe this is an excellent catalyst for our business, and what's happening within the IRA will help us even more; and going into market raises the visibility, but since we have the track record in the marketplace, we're not short of having a good backlog. <<inaudible>>
Analyst
analystThanks, everyone. Hi, everyone. There are two points. Perhaps, Doran, to begin with, could you give us some detail regarding the SEE project? I mean, the full delivery has slipped into 2023. In what way does that affect the manner in which that project appears on the income statement?
Doran Hole
executiveWell, we examined the project as a whole and what we're going to be completing prior to the end of the year and afterward what will shift into 2023 when it comes to putting those assets into operation. We're still, sort of, a significant chunk of the profits — I believe we say this in our Q — apologies, the revenues are going to be produced in 2022. I believe we're discussing perhaps a deferral of $30 million to $35 million in revenue into 2023 from the overall total. So, not a small figure, yet not a major share.
Analyst
analystAll right, that's useful. I figured as much based on some guidance, but I wanted to check whether anything additional within that guidance had shifted. The other brief item concerns RNG — could you provide an update regarding facilities currently operating, plus the schedules for the next several that are set to come online during 2023 and 2024?
George Sakellaris
executiveSure. One of those plants, in all likelihood, will reach mechanical completion before this year ends; the remaining two should get there in Q1 of 2023. What we do want to highlight, however, is that after mechanical completion is achieved, roughly 3 to 4 months are needed to actually work through commissioning and everything associated with it. Consequently, when it comes to producing revenue and income for us, that happens 3 to 4 months following mechanical completion. We did run into some — despite holding environmental permits, we faced building permit delays, along with other issues, meaning the equipment did not arrive at the site for a period of time. And then, as we previously stated, 5 to 6 plants will be mechanically complete and operating before 2023 is over. We keep holding to that visibility.
Eric Stine
analystAll right, am I coming through? So I'd like to ask about the Bristol project and get an update on it; on the previous call, I believe you mentioned two comparable potential projects in the U.S. and one in Europe. So I'm just wondering how that first project is progressing, and then what's new with those additional ones?
George Sakellaris
executiveSure, well, it's among the most thrilling efforts we've got; we're also involved in a number of other series. In fact, some have made moves toward getting underway. But this is a long-term process — it requires a couple of years. Getting to the point we're at now with Bristol City took more than 2 years; what I want to highlight about that specific one is that it's a 20-year concession. So although you've identified more than $1 billion — well, £1 billion of investment, that's spread across a period of over 20 years. So you'll begin to see some projects appear. Some will be EPC, some will be asset, and given where we stand, they won't begin to appear until the second quarter of 2023, but everything is progressing; we've moved some people into our unit who were operating — who were working for the city and have now begun working for us. So we're making progress, but we won't have anything, it seems, to discuss early next year.
Eric Stine
analystAll right, got it — and looking further out —
George Sakellaris
executiveThis one, despite its size, comes in above a £1 billion, and it isn't something you finish within 12 months. Consequently, we won't be discussing it on a quarterly basis to the same degree we did with Southern California, since that project ran past $800 million yet we managed to build it out inside a single year. That one, therefore, was considerably more —
Eric Stine
analystGot it. Got it. All right. So I'd like to hear about what you're seeing over in Europe — clearly those wins, plus the natural growth and possible purchases in that region. Perhaps you could describe the situation, taking into account the power market there and what it means for available targets — and what kind of prices you'd be considering? My guess is these would lean toward being strategic and bolt-on instead of big, but mostly I'm after your thinking regarding buying things?
George Sakellaris
executiveEric, I'd say that — well, the approach we take is no different from what we do in other markets. When it comes to Europe, we seek out deals in which we won't feel forced to pay too much for a property. We keep an eye on the multiples. We target companies we can bring in that boost EPS and that we feel are a strong strategic match. We appreciate the management team. And I believe we're — if there were something, we'd be discussing it. Right now, we're simply — we're reviewing every kind of possibility throughout each of our business lines in that region.
George Gianarikas
analystAfternoon, everybody, and I appreciate you fielding my question. I just wanted to ask something further regarding the M&A deals that have happened lately in this sector. What I'd like to know is how you view the collection of assets you hold. Would you be open to swapping things around, mixing and matching, using money generated by a divestiture and putting it to work somewhere else? What's the right way for us to understand your approach to managing the portfolio?
George Sakellaris
executiveAny and all possibilities tied to the properties we hold get assessed by us at all times, particularly given certain RNG pricing levels that buyers in the market are currently offering, among other factors. That said, as things stand today, because we enjoy recurring revenue at high margins alongside really strong EBITDA, plus an enormous backlog tied to that asset — be it green gas, solar, or turbine power — our sense is that keeping things as they are serves us better for the moment. That isn't to say we'd refuse to weigh every opportunity presented to us while keeping an open mind; also, I believe we've already refinanced a number of the projects in our portfolio. Perhaps Doran could provide a bit of additional detail on this. And there's a fair amount of solid cash.
Doran Hole
executiveYeah. What I mean is, we refinanced a handful of the plants that are in operation. And one thing I'd say matters here, building on what George said, is that when you're the one holding the asset and you keep control of it down the road, that gives you options. You can see how the incentives are developing as each year-end approaches. On the hydrogen side, we've been exploring quite a few different approaches tied to renewable natural gas, and there's a great deal happening there that's genuinely exciting, plus we prefer to have those assets in our hands, because then we can shift them around and put them to work in whatever manner creates the most value for our shareholders.
George Gianarikas
analystThank you. And as a quick follow-up, there's a lot of curiosity out there about how the makeup of Congress might shift — meaning a larger number of Republicans and Democrats — and what danger that poses for the renewable portions of the Inflation Reduction Act. Could you tell us what you think about the possibility that a shift in Congress might alter particular pieces of the Inflation Reduction Act during 2023?
George Sakellaris
executiveI'll offer my instinct on it, and Doran can chime in. Listen, politics isn't our business, but here's what I'd say: things went quite well for us when the prior administration was in power. That said, with the Inflation Reduction Act, well, that's currently quite favorable. And suppose Congress, say, divides or something along those lines occurs — so long as the President remains in office, my sense is no modifications will come to it. That leaves us with a solid path ahead from our present position. Listen, no matter what the federal government does, the states are stepping up increasingly. De-carbonation, along with climate change, is affecting everybody. The commercial and industrial side — they've begun to act. So, yes, we give it plenty of consideration and we're careful about what we're doing, yet we don't anticipate anything significant shifting. Doran, would you like to provide additional perspective on that?
Doran Hole
executiveYeah, I'm with George on this. Trying to predict how the election will play out politically and what comes after it isn't something we can do. Still, when it comes to how many parts of that bill touch us, I look at a single page, and even if I removed two or three lines, there would still be a dozen lines remaining covering the areas we're pursuing. So right now, I don't believe we're overthinking that. What we're concentrating on is whatever in there will work — for us.
Chris Souther
analystGreat. I appreciate you fielding my question. Perhaps — you brought up that Greenfield solar represents a fairly new front-of-the-meter segment you'd be pursuing. Could you give us the big picture and perhaps the approach regarding whether these are assets you aim to hold on your own balance sheet, which regions or geographies you're evaluating, and any particular projects you might tell us about? Also, what working capital requirements would that involve if it grew into a more significant portion of the business?
Doran Hole
executiveCertainly. Since it's Greenfield, a great deal is early stage; we approach site control and interconnection queue position directly; it spans a range of markets. Our focus is on those we believe have either strong community solar or another tariff program that we think generates the appropriate level of value. Broadly, the way we handle it, as with everything, is that in the end, we'd want to move those assets into our asset and development metric and expand the asset portfolio. Large utility scale is not what we're pursuing. We remain committed to this sort of DG. That's the reason I brought up community solar. Having said that, should those opportunities come about, we can generate substantial value. And if in the end the assets won't clear our return hurdles, then as all of us know, a substantial market exists for those kinds of assets, and we would, naturally, look at monetization, I'd say, working capital. Regarding the development side, working capital isn't so substantial, so your early-stage development moving through permitting, moving through interconnection, securing revenue contracts, all of that is fairly reasonable. Working capital truly comes into play once you move to build the assets, and it's no different from the assets we build today. We would anticipate using construction facilities, bank facilities to assist in financing that working capital on a non-recourse basis.
Chris Souther
analystUnderstood. Alright. No, that's all logical. So regarding the 50 to 70 megawatts commenced for the year, would that first RNG facility need to be finished in order to be counted in there? And I was just hoping to gauge whether there was any chance a few of the solar projects could be pushed into 2023 so as to capture a bit more benefit from the ITC and such, or whether there was any sort of momentum on that side? Thanks.
Doran Hole
executiveYeah. There's nothing particular to mention on that front, the RNG isn't part of that number. So we're only considering the other assets there. But I couldn't identify any that we've specifically flagged as ones we'd want to postpone for any reason. Right now, given the sort of pre-guidance construct of the IRA, we believe we're simply going to charge straight ahead and finish whatever is ready.
Tim Mulrooney
analystHello there, it's the afternoon. Is my voice coming through for everyone?
Doran Hole
executiveYes, I can hear you. Hello, Tim.
Tim Mulrooney
analystHey, that data point you shared last quarter was really fascinating—you mentioned blended energy costs had risen roughly 40% compared to the prior year, yet blended project costs for your customers had climbed only about 10% to 12%. That discrepancy is quite striking, so much so that I wanted to ask whether you could give us an update on what a blended project cost looks like for your customers at present, considering certain expenses might have leveled off while others, such as interest rates, keep climbing.
George Sakellaris
executiveYes. I believe I noted in my remarks that it is exceeding expectations; we have reviewed the figures, and I think this is something we keep monitoring internally, though we do not plan to begin reporting it on a routine basis going forward. The key takeaway and significance of this pattern, I felt, was essential for people to grasp—that the economic value proposition we present to our customers, and to ourselves, regarding the energy assets remained sound. Indeed, it continues to hold true given the recent shifts. However, we—I do not have any statistical updates to offer you today.
Tim Mulrooney
analystAlright. So there's no change to that 10% to 12%. Doran, a person can't be faulted for making an attempt. Let me ask something else. At this moment, in the present, are you noticing that elevated interest rates are having any meaningful effect on demand for projects? I'm simply wondering whether you're picking up on any indicators — maybe longer sales cycles, I don't know, or shifts in customer behavior — that might point to a more difficult climate for the projects business until inflation gets brought under control and interest rates are able to decline somewhat?
George Sakellaris
executiveWe have not. The sole item we've observed recently, after the bill — everyone is attempting to determine which direction they'll take, how they'll get the most use out of it; however, let me say this to you, certain projects, such as a few co-gen projects, previously didn't even pencil out, and now with the ITC, even though we're at as much as 30% and perhaps slightly above that, they do pencil out. So, but at this point we're attempting to determine — we handed him six proposals the other day for a specific customer — which direction will they choose for the project? So we haven't witnessed it; however, what we have witnessed in the C&I sector, owing to climate change and people's desire to de-carbonize, is that we're gaining more traction in that market.
Pavel Molchanov
analystYes. Thank you for fielding that. When we think back on the SoCal Edison initiative, it's fairly clear that problems have surrounded that effort — and naturally none of that was your doing — it's the supply chain. Does this teach us that pursuing low-margin, extremely high-volume work like that might not be the wisest approach going forward?
Doran Hole
executiveMy answer to that is an emphatic no. My view is that when we handle those kinds of figures without meaningfully growing our OpEx base, what we're doing is capturing the operating leverage. So as we observe proposal activity — and we are observing it in comparable projects, possibly not the same scale, but we are definitely seeing some sizable ones arrive on our desk — we pursue them with determination, since we now understand the supply chains. We understand what can be done. We understand what is practical. And we are feeling extremely, extremely at ease with our capacity to get costs up, reduce risk, and carry out projects of that kind for many varieties of utility customers as well as developers throughout the country.
George Sakellaris
executiveRight, and from one of my divisions, that specific initiative taught us quite a bit. We built a strong name for ourselves within the sector. A handful of other utilities are now approaching us as a result of that initiative. Plus, with the ITC now applying to a stand-alone battery storage project, you're going to see a considerable amount landing on our balance sheet across the coming years thanks to that initiative.
Doran Hole
executiveI mean, as more renewable resources come online — intermittent resources on the grid, the offshore wind arriving here on the East Coast, all of it — storage is really gaining momentum. I mean, going forward, that is going to be an essential piece of our clean tech integrator industry as a whole. And I think we would be remiss if we didn't pursue it.
Pavel Molchanov
analystAll right. One more question regarding Europe — back in 2021, before the conflict and the energy situation, that region accounted for 4% of your revenue. Where do you expect that figure to land once this year wraps up?
George Sakellaris
executiveAs far as 2022 goes, I'm not — Mark, do you happen to have any particular details on that — I'm not sure we should anticipate anything meaningfully different when it comes to 2022.
Mark Chiplock
executiveJust a moment, please.
George Sakellaris
executiveHold on a second there, Pavel — we're just going to glance at something here quickly.
Mark Chiplock
executiveThere will be a rise, though it won't be a big one, and my view is that this comes down to timing. Even so, we are observing a certain amount of year-over-year growth when comparing 2021 with 2022.
Doran Hole
executiveAlright. So there's a slight year-over-year uptick from 2021 into 2022, a modest rise in 2022. Come 2023, our portion of the revenue from that PV project we announced is going to begin flowing in, and part of it lands in 2023. And then Bristol City is going to see some of that begin to take effect as well.
Mark Chiplock
executiveBeyond that, there's a fairly solid backlog across the remaining UK operations. So no, you'll see it gaining momentum in the coming year.
Pavel Molchanov
analystVery good. Thank you, guys.
Mark Chiplock
executiveThank you.
Julien Dumoulin-Smith
analystHello there, good afternoon, everyone. I appreciate you fitting me in. Is my audio coming through okay?
George Sakellaris
executiveYes, I can hear you, Julien.
Julien Dumoulin-Smith
analystThanks, everyone. So, I'd like to dig deeper into what's been said regarding RNG. Could you expand on that — I mean, recently we've observed certain deals involving the possible conversion of landfill sites into electricity, making use of the ITC? Given the asset base you currently have, how are you approaching the goal of getting the most out of it and achieving peak efficiency to secure that ITC first, and then, second, turning current projects into ones that also meet RNG criteria, considering the improved financial picture?
Doran Hole
executiveSure, so in brief, it's something we give a lot of thought to. As you pointed out, you've essentially enumerated each of the different optionality pieces I discussed earlier. Some programs will definitely be appealing for certain assets we already own. However, when it comes to fresh development, I believe we're looking at the ITC, what RNG could offer, the direction RINs might take, and even the arrival of eRINs. We're seeing numerous possible routes for that set of assets. And since we have a pipeline of assets beyond the 20 we've already mentioned that sit within our asset and development metric, we'll keep pushing on the development side to raise the count of assets we're genuinely concentrating on getting through permitting. This involves assessing locations — everything from reviewing sites to hammering out gas contracts and securing site control in certain regions, including those not covered in the 2020 announcement we made earlier; we're quite optimistic about all that optionality, and we examine these sites individually as we consider how to build a pro forma for our expected economics. We factor in every one of these possible alternative approaches to ensure those projects turn a profit and that — as I mentioned, it relates to certain existing assets where PPAs might be expiring as well as the new ones currently in development.
George Sakellaris
executiveAnd particularly in the event that eRINs become reality, should they arrive alongside the more than 30 facilities we already operate that produce power. A number of those sites have surplus gas; we'd have the option of installing an additional engine or two, or whichever approach makes sense, or else hold off until we grow and then pursue the RNG path. So it's an excellent moment to hold some of those assets; and should eRINs materialize, I believe that would generate substantial value for us.
Julien Dumoulin-Smith
analystUnderstood. However, could I get a bit more detail from you on this? I assume that when you held your Analyst Day at the start of this year, that happened before the IRA was passed. Given all the RNG projects that were already part of your forecast, when do you expect to be better positioned to revise that forecast so it captures how these negotiations turn out, including some of those credits? And I realize you might not get the full advantage of the 30% or 40% ITC as things proceed; and — you may also have to give up a portion of it; but it seems like that would represent a fairly large difference compared with the Analyst Day at the start of this year, at least when it comes to the RNG portion of growth.
Doran Hole
executiveJulien, I believe we will — that's probably something to cover when we come out and discuss 2023 guidance at the time we report Q4. As we said, we're going to hold the tour and do some Q&A on — presentations about the RNG plant. Yet at that moment, my expectation is that we won't be giving any especially new information; we need to maintain our usual cadence when it comes to offering guidance at the time we report Q4. And on top of that, as you're aware, guidance under the IRA is anticipated by the end of the year too, which I think, as may not surprise you to hear, is something we'll be quite eager to see.
Greg Wasikowski
analystHello there, and good afternoon, everyone. Is my audio coming through clearly for all of you?
Doran Hole
executiveHi, Greg. Yes, I can hear you.
Greg Wasikowski
analystGreat. I appreciate you letting me ask. I don't want to keep harping on the SoCal Edison situation, but I just need one quick clarification. It seems like every one of those adjustments was made basically at their own judgment. That said, do you believe — had no changes been applied to the timeline or approach — that you'd currently have 200 to 300 megawatts of service, with anticipated completion by year-end, as was indicated in last quarter's update?
Doran Hole
executiveAddressing what might have been isn't something I think we'll do. That sort of conversation involves details that are quite speculative, and it spans several projects. So — right, commenting on that isn't something we intend to do.
Greg Wasikowski
analystGot it. That makes complete sense. Let me shift topics to something more technical. Could you discuss what you're observing regarding EV charging and the options for — or substitutes for addressing the pressure on the grid, whether that involves battery integrated solutions, incorporating alternative fuels such as RNG or hydrogen and fuel cells, or perhaps simply a smarter software approach? Is this something your customers are prioritizing? And what do you view as the most elegant solutions currently available?
George Sakellaris
executiveWell, at present, when it comes to electric vehicle charging stations, we include and trial it in each project we undertake for the federal government, each project we undertake at the colleges and universities, and so forth. And returning to what we accomplished with this greenfield development when we brought on a couple of specialists and then, 2.5 years ago; and today we have a truly excellent group. We did bring in someone from Tesla to build great expertise on the charging stations and so forth; so we will be very active in that space. And then we have secured a contract where we'll transform part of the RNG fuel into a fueling station for hydrogen; and that is going to take place over the next 12 to 24 months.
Doran Hole
executiveWhen it comes to RNG, setting hydrogen aside, a great deal of that connection — whether biogas or landfill gas being used for EV charging — is likely to be pushed along by eRINs. It shouldn't come as a surprise that we're examining projects not only at the federal level but also many across various regions where fleet opportunities exist for us. Yes, batteries being integrated. Yes, renewables being integrated. We see ourselves as being somewhat at the leading edge when it comes to our capacity to assemble those kinds of projects. That said, growing that broader business to a scale past simply deploying the technology involved in our solar or carport installations remains at an early stage.
Joseph Osha
analystHello there, and thanks. Good day to everybody. I have a few things to ask. To start, here's an easy one. Doran, you brought up the hurdle rate for your projects. Clearly, the cost of financing you face is climbing. I'd like to know whether all of you evaluate your business through the lens of the spread on your incremental cost of capital? Can you give me a bit of clarity on the direction that hurdle rate is taking? After that, I have a few more questions.
Doran Hole
executiveInterest rates have moved up and down across the years, and in my view our hurdle stays fairly stable, essentially a target ROE in the mid-teens for assets held on the balance sheet. Naturally, since the asset types within the battery, the solar, and the RNG differ, those figures often shift considerably. If you examine levered returns where advance rates are extremely high, such as with sale leaseback or tax equity, those hurdles frequently change when you assess things asset class by asset class. So we approach it on a portfolio-wide basis.
Joseph Osha
analystAll right. But the thinking there isn't — your debt rate itself remains unchanged while your funding cost behaves however it behaves. Yet as time passes, it settles back, and you aren't raising your hurdle rate in reaction to what funding costs you, at least not automatically?
Doran Hole
executiveNo, not automatically. No, Joe.
Joseph Osha
analystAlright, thank you. Now for my follow-up — I believe this is roughly the point Julien was hinting at. Something you've mentioned before is that the sort of pricing available from a utility-grade offtaker on a 20-year basis for RNG simply hasn't materialized, correct? And if it did exist, one advantage you'd have is the capacity to arrange a distinct — and possibly better — capital structure for an R&D project, correct? So given how things are developing, could one possible result be, let's say, a 20-year offtake with a utility-grade offtaker plus a capital structure that might be somewhat more attractive than what we're seeing today?
Doran Hole
executiveHey, Joe — if the price is right, then yes. That's correct. Of course, all factors need to be factored in, right? As you're able to observe, there are plenty of developments, plenty of varying incentives in play, plenty of different participants joining the discussion. What we're observing are five-year and 10-year contracts outside the transportation sector. Those don't equate to a 20-year. When it comes to project financing and leverage, clearly the elevated interest rate climate is something we must factor in. So it comes down to a calculation, but we continue monitoring that market very attentively on the long-term side, in case the appropriate contract appears.
George Sakellaris
executiveRight. We've discussed this previously. In the end, we believe it's going to happen, since the utility and the gas company must reduce the carbon in their pipeline. So it's just a question of when. Our sense is that pricing will rise, and at that point we'll sign contracts with longer terms; meanwhile we keep a constant watch on that market, since we share your view that it will lead to improved financing for us.
Ben Kallo
analystHi there, everyone — hope you're having a good afternoon. Actually, good evening.
Doran Hole
executiveHi, Ben. Good afternoon to you.
Ben Kallo
analystHey, everyone. A question that comes up often is whether margins improve as things become more intricate — as the products grow more complex, do you see a higher margin? Or how do you handle that, particularly when you think about complex projects and whether that could make execution harder for you folks?
Doran Hole
executiveYeah. It really hinges on how that complexity turns into risk, Ben. Our approach to pricing is risk-adjusted. I'd say there are many different elements beyond merely how complex the technologies involved happen to be. It isn't simply a straight-line thing where greater complexity means a bigger margin. You have complexity risk tied to time lines, performance guarantees, whatever it might be, all of which is part of the overall project. We essentially factor all of that in. And then, naturally, the customer and customer type competitive nature of the business, right? If we have to sharpen our pencils on pricing to win deals that we want then sometimes we do it, right? So it's more than just the complexity. But generally speaking, if you think about more complex projects that might have a little bit more risk in the execution, then yes.
George Sakellaris
executiveThis intricate undertaking, I'd argue, hands us an edge over rivals, since only a limited number of firms are able to deliver such an all-encompassing method for that specific job. When it comes to margins, though—the gross profit margins—there isn't much of a shift. What did occur, however, is that the undertaking grew bigger, and its input into total profit, into gross profit, is extremely strong.
Ben Kallo
analystWhat's the way we should be thinking about your backlog? Since — and given the IRA, as it expands, are we in a lull at the moment and afterward we see significant gains flowing into the backlog? Or what's the right way to look at it? Thank you.
George Sakellaris
executiveRight, calling it a lull isn't something I'd do. What I'd tell folks who are weighing which paths to take is that there's a great deal of activity. In fact, we're putting together a greater number of proposals and speaking with a greater number of customers than at any point previously, yet reaching the yes takes a bit of time; and this is the direction we'll be taking. Still, that sort of setting is what we're accustomed to, since moving a customer between stages typically requires six to 12 months. After that, once we secure the award, another 12 months pass before it becomes contracted; however, as we mentioned before, the asset portion of the business — since it's somewhat more evident which direction they'll choose, it's advancing more quickly. Right now there's greater traction there.
George Sakellaris
executiveThank you very much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.