Ameresco, Inc. (AMRC) Earnings Call Transcript & Summary

May 1, 2023

New York Stock Exchange US Industrials Construction and Engineering earnings 62 min

Earnings Call Speaker Segments

Leila Dillon

executive
#1

Thanks, Carmen, and hello everybody on this afternoon's call. We're glad you could be with us today. On the line with me are George Sakellaris, who serves as Ameresco's Chairman, President and Chief Executive Officer; Doran Hole, our Executive Vice President and Chief Financial Officer; Josh Baribeau, Senior Vice President, Finance; and Mark Chiplock, who is on the road today. Prior to handing things to George, I'd like to offer a short note about forward-looking remarks. The earnings materials we released today include forward-looking statements, among them statements about what we expect. Risks and uncertainties apply to every forward-looking statement. For a discussion of the major risk factors that might cause our actual results to diverge from what those forward-looking statements suggest, please see today's earnings materials, the Safe Harbor language on Slide 2, and our SEC filings. We also present our financial results using several non-GAAP measures. Reconciliations to those measures appear in one of our supplemental financial information. At this point I'll hand the call to George. George?

George Sakellaris

executive
#2

Thanks, Leila, and hello everybody this afternoon. The first quarter was a strong way to kick off the year. We felt good about the meaningful strides we made in important areas, which underpin both our 2023 guidance and our longer-term financial goals. Once more, the Ameresco team performed well, turning in Q1 revenues that came in above what we had expected, with adjusted EBITDA landing at the top end of the range we had guided to; on top of that, we keep building the groundwork for continued success. Along those lines, we were especially happy to see $472 million of new project awards booked during Q1, lifting our total project backlog 13% quarter over quarter. We are working through our contracted backlog and anticipate turning a healthy share of the awarded backlog into contracts over the course of the year, which gives us strong visibility into the project revenue ramp we expect during this year's second half. Customer interest is extremely strong right across every one of our business lines. In fact, the aggregate value of proposals we turned in during Q1 of this year ran 50% above the level from the same quarter a year ago. That speaks to stronger demand along with more complex and broader-scoped projects; the pickup in activity stems from our compelling value proposition, which speaks to what customers need when it comes to resiliency, saving on costs and cutting carbon. We are enthusiastic about the recently passed Inflation Reduction Act, which delivers wide-ranging and substantial financial incentives and advantages across clean energy technologies. With its technology-neutral approach, Ameresco's business model is especially well positioned to help customers identify the optimal solutions for their energy needs while maximizing IRA benefits. Although Q1 showed a modest rise in awards tied directly to IRA benefits, we anticipate a bigger effect in the company's quarters ahead over the coming years. During the quarter, the Energy Asset team turned in another strong performance, bringing 34 megawatts online. Because our Energy Asset and O&M businesses generate recurring revenue, they help cushion some of the scheduling issues that naturally come with our project work. One of the assets we brought into service this quarter was a 27-megawatt solar facility located in DePue, Illinois. That site is now the largest operating solar asset we have, and it shows the kind of bigger solar, battery and RNG assets we're pursuing. Across this year, we expect to place between 80 and 100 megawatts of Energy Assets into operation. Those additions, along with continued solid performance in our O&M and other operations, support our confidence in the guidance for the full year. Doran will walk through more detail on our visibility when we get to the financial discussion. As we mentioned last quarter, Ameresco keeps extending its reach into the European market, building on the operations we have run successfully in the United Kingdom and Ireland. We anticipate that our expansion will take a number of forms, among them organic growth, acquisitions, joint ventures and partnerships. During this quarter, we moved into the Italian market by acquiring Milan-based Enerqos. Backed by a solid leadership group and a robust place in the market, Enerqos has spent over 15 years delivering energy efficiency and renewable energy solutions to commercial and industrial markets. Not long ago, we also shared news that our partnership is expanding with the Sunel Group, an Athens-based international developer and EPC contractor focused on renewable energy projects. Together, Ameresco and Sunel formed Ameresco Sunel Energy, which right now is proposing a project pipeline of 1.5 gigawatts carrying an estimated $500 million in potential contract value across the United Kingdom, Greece, Italy, Spain and Romania. That joint venture has already been chosen as a contractor for a 100-megawatt solar photovoltaic project in Greece, which is currently under construction, along with various other smaller PV projects throughout commercial and industrial markets. Since growth in Europe matters more and more to where our company is headed, and given how many of our shareholders are based there — a number that keeps rising — we've decided to host our Investor Day in London on May 11. The main themes for that gathering will be how we're approaching Europe, along with the market and policy forces that, in our view, turn this into such an attractive opening. When Ameresco moves further into Europe, the approach will be careful and deliberate, aiming to get the most shareholder value possible while keeping execution risk as low as we can. Acquisitions and partnerships are central to that effort, so we'll bring together a panel featuring leaders from Enerqos and Sunel, plus some of the people on our finance team. We're glad to have Bristol City Councilor Kye Dudd joining us today. He'll talk with us about our Bristol City project — a transformational one — from the customer's point of view. In the years ahead, we expect our growth in Europe to play a bigger and bigger role in driving both revenue and EBITDA. Last, it's always an honor when the industry acknowledges our company and what we offer; the market research firm Frost & Sullivan just named us the 2023 North American Energy Services Company of the Year. Our know-how in LED street lighting work also earned recognition once more, with the Midwest Energy Efficiency Alliance giving our Chicago Smart Light Program the Inspiring Efficiency Impact Award. At this point I'll hand things over to Doran, who will walk us through the financial results and what lies ahead. Doran, go ahead.

Doran Hole

executive
#3

Thanks, George, and good afternoon to all of you. If you’d like more detail on the financials, the press release and the supplemental slides went up on our website once the market closed today. First quarter total revenue came in at $271 million, roughly $40 million higher than our guidance, since we moved faster on some projects and also saw a few early contract conversions. Energy Asset revenue rose 6%, as a larger base of operating assets and higher output from our existing solar assets outweighed the soft RIN prices we saw in the first quarter. Our O&M business turned in another strong quarter, growing 10%, as we keep securing O&M contracts on projects we’ve completed. Our other line of business also posted another quarter of double-digit growth, up 13%, helped by stronger demand in our utility, SaaS and consulting business. Gross margin climbed to 18.3%, since the lower margin SoCal Ed contract made up a smaller share of our overall revenue. Adjusted EBITDA for the quarter was $27 million, landing at the upper end of our guidance. Working capital improved considerably on a sequential basis this quarter. We brought down receivables and unbilled revenue during the quarter thanks to payments from our SCE projects. Cash flow from operations came to $56.7 million, and adjusted cash flow from operations was about $100 million, so we finished the quarter with roughly $176 million in unrestricted cash. We expect working capital to keep improving over the next several quarters as the last SCE payments get invoiced and collected. On the subject of SCE, as we noted in the press release, in Q1 we reached agreement on reimbursing additional costs Ameresco incurred because SCE asked to shift project completions into 2023. Under that agreement, SCE paid us $125 million in advance against future milestones, which shows up in the working capital improvement I mentioned earlier. Total project backlog stood at a solid $3.0 billion, up 13% sequentially, as we booked $472 million of new awards in the quarter, a Q1 record. Our energy asset visibility is about $2.3 billion; that figure covers both contracted energy asset revenue and uncontracted RNG revenue we expect to produce over the life of those assets. And as I said last quarter, this comes solely from our operating assets. We can see even more recurring revenue potential from our assets and development pipeline; when figuring the uncontracted portion of that metric, we applied conservative assumptions for asset life and merchant market pricing for RINs, as our release notes. Energy asset visibility, combined with our project and O&M backlog, gives Ameresco sight lines to more than $6.5 billion of future revenue; we’re glad to reaffirm our 2023 guidance, which calls for adjusted EBITDA growth of 5% at the midpoint, which is notable given the tough year-on-year comparisons tied to winding down and finishing the large SCE projects. At this point, I want to provide some detail on our view of the ramp from Q1 to Q4 in 2023, emphasizing how revenue recognition is patterned. Regarding projects, we closed Q1 with a contracted backlog for 12 months totaling $639 million, a large portion of which should be recognized as revenue across this year. Beyond that, in any particular year, we usually turn 10% to 15% of awarded project backlog into revenue. Also, roughly 5% to 10% of total revenue in a typical year is derived from aged proposals that are awarded, contracted, and converted into revenue during that same year. For our operating assets, there is a steady base of recurring revenue, though the solar side is subject to seasonality tied to weather. With 34 megawatts from the new Q1 assets commissioned and contributing for nearly the entire year, along with 22 megawatts of RNG and an additional 24 to 44 megawatts of solar and storage contributing partially later in the year, we anticipate quite strong growth from our energy assets lines of business. Our O&M and other lines of business are generally more linear, so the Q1 2023 run-rate serves as a solid estimate for the rest of the year. Adding those items to the Q1 results we have already reported gives us a clear route to our guidance levels, while acknowledging that this is a high-level look at near-term visibility, and we intend to go into more detail at our upcoming Investor Day. Shifting to Q2 guidance. After factoring in Q1 actual performance and the ramp just described, we anticipate second quarter revenue between $280 million and $300 million, adjusted EBITDA between $30 million and $40 million, and non-GAAP EPS between $0.10 and $0.20. At this point, I would like to hand the call back to George for closing remarks.

George Sakellaris

executive
#4

Thanks, Doran. Like we've gone through thoroughly on today's call, our longer-term visibility keeps expanding — right now we're looking at more than $6.5 billion of revenue visibility, plus over 400 megawatts of assets that are either in development or under construction. On top of that, we held onto a strong view toward both the 2023 guidance and the 2024 target of $300 million in adjusted EBITDA. Given the huge opportunities in the U.S. as well as abroad — with governments and institutions worldwide putting money into solutions for carbon and cost reduction, grid reliability and volatile energy prices — there's never been a better moment to be in our business. Once more, we're eager to meet with investors in London and at the conferences and events coming up. To wrap up, I want to thank our employees, customers and stockholders again for sticking with us. Operator, let's open the call to questions.

Noah Kaye

analyst
#5

Hello there, and thanks for having us on for questions.

George Sakellaris

executive
#6

Hey, Noah.

Noah Kaye

analyst
#7

Hey there, how's it going? To start, it's great to see that milestone payment acceleration on the SoCal Edison contract. I'd like to ask about other EPCM bid activity. I recall a press release you put out regarding some of that activity a short while back. I'm not sure whether that falls under your remark, George, about bid proposal yield to-date being 50% greater in dollar value, or whether it was a separate thing you were referring to with the traditional project business — could you clarify?

George Sakellaris

executive
#8

Yes. No, that was part of the additional 50% rise in activity level we've observed up to now. And I might add, business is improving, and we felt it was important to highlight that. Yes. As for the press release about Sunel, though, no, that isn't part of that 50%. That represents bidding activity still to come that we've strategically collaborated with them on deciding to pursue, with an aggregate dollar and megawatt amount there for the market to see.

Noah Kaye

analyst
#9

All right, that's great. So the bidding work you mentioned is separate from that. Could you give us some color on that $472 million in awards you got, plus part of what you're currently bidding on, in terms of the mix or main trends? I think investors would be keen to hear a sense of what, after the IRA, might have more momentum and attention. But any thoughts you have on mix would be welcome.

George Sakellaris

executive
#10

Sure. Regarding that $472 million, it spans every category. There are a fair number of energy savings performance contracts, plus I believe a single battery storage project sits in there, along with a few smaller microgrids. Then, as for the 50% increase, that too spans every category. Activity levels everywhere have risen. And I'd say the stronger areas are battery storage and microgrids, with solid progress on C&I and certain federal work too.

Noah Kaye

analyst
#11

Yes. Given how limited our time is, could I squeeze in one final question? This may not affect your RNG work in the near term at all — I noticed a Reuters piece today saying the EPA could separate out the eRIN rule-making so that it can essentially finish the RVO rulemaking on schedule for 2023. Any thoughts on how you view that kind of regulatory landscape right now, and how you're handling project development when it comes to landfill gas electricity versus RNG?

George Sakellaris

executive
#12

Yes. Regarding eRINs — I'll say something, and Doran can give a bit more detail — they aren't part of our plan, neither for 23 nor for 24 either. That said, we do want to make clear to everybody that we hold more than 75 megawatts of landfill-to-electricity assets, which could become an upside later on. We've been negotiating the contracts, watching how the EPA has defined earnings and similar matters previously. Conversely, if they change course and the EPA concentrates on the RVO, that may be helpful, since we supplied them a substantial amount of data demonstrating that the analysis they relied on wasn't representative and wasn't up to date. We're cautiously optimistic they may raise the figure they arrive at.

Noah Kaye

analyst
#13

Yes. Many thanks for that context.

Stephen Gengaro

analyst
#14

Thank you. Good afternoon, everyone. Pardon me, there’s some background noise since I’m traveling; so I have two points for me, and I’d begin with the first one — when you speak with customers and review different projects, in what ways has inflation affected those conversations? What I mean is, it seems like your order flow and what you’re saying suggest things are really robust. I’m simply wondering what you’re observing on that side currently, whether you notice any modest deceleration regarding the pressure from inflation.

George Sakellaris

executive
#15

Inflation cuts in two directions. Yet the factor that has boosted the value proposition is that energy prices have risen too, and at a quicker rate compared with materials, and so forth and so on; therefore the value proposition remains quite strong. And as for the level of activity, they’re eager to bring their costs down. So they pay closer attention to energy expenses and to infrastructure upgrades, and so on.

Doran Hole

executive
#16

Right, Steve — I'd say this is the same idea we've discussed previously, and as far as I can tell, nothing has shifted in terms of what those conversations involve…

Stephen Gengaro

analyst
#17

All right, that's excellent. I appreciate it. As for my second question, it concerns the path we're looking at toward 2024. I'm certain you'll expand on this somewhat when we're in London, and I'm eager for that. Could you offer some indication of what portion of that goal would need to come from added acquisitions given where things stand right now, versus what portion rests on the operations already in place?

George Sakellaris

executive
#18

No, it's mostly — added acquisitions are, yes, we never factored in a great deal, despite the fact that under the initial plan, we had a few modest acquisitions included in it. But it's — I'd say, not significant in any real way.

Doran Hole

executive
#19

Sure, Steve, it's not a significant figure.

Stephen Gengaro

analyst
#20

All right, wonderful, thank you. I'll rejoin the queue.

Tim Mulrooney

analyst
#21

Hello there, Doran and George. I appreciate you taking my question.

George Sakellaris

executive
#22

Hello, Tim.

Tim Mulrooney

analyst
#23

Regarding the 2023 guidance, your outlook, as I understand it, presumes $60 million to $65 million in EBITDA during the first half, which means roughly $150 million would have to be produced in the back half. That is a big step-up across a brief window. Could you help connect those dots a bit for investors, broken out by segment? Your prepared remarks were useful, but for the second half, how much of that EBITDA increase do you anticipate coming from the project segment compared with the energy asset side of the business?

Doran Hole

executive
#24

Tim, you’re taking the question logically from what I said about revenue ramp and shifting it to the EBITDA ramp. I believe we’ll hold that for the Investor Day. We intend to provide additional color on the ramp.

Tim Mulrooney

analyst
#25

Okay, that's fine. We'll save that topic for the Investor Day, Doran. Thanks.

Doran Hole

executive
#26

Yeah, I think so — when you examine how revenue splits out, we've discussed at a broad level what our margins tend to be in those segments, so you could likely work through some arithmetic yourself to gain a bit of clarity there. Still, I think we'll keep that under wraps for the moment.

George Sakellaris

executive
#27

Yeah. Still, the single item I keep thinking about is that ramp, the one you're expecting — the projected increase shown right there. It may come across as somewhat bold, yet we've managed it on both fronts.

Tim Mulrooney

analyst
#28

Alright, thank you, George. Staying with energy, there are three RNG facilities you're anticipating finishing during this year. Could you assist our modeling by laying out when each of those three is expected to reach mechanical completion?

George Sakellaris

executive
#29

Sure. As for the first, mechanical completion has in fact already happened, and commissioning is underway at present. It's simply in the direct commissioning phase, so full operation ought to begin within the coming two months. For the second facility, we're expecting mechanical completion to occur early in Q3. That one experienced a minor slippage — a small hold-up involving delivery of certain equipment — amounting to roughly 1 to 2 months. Consequently, commissioning would begin early and continue through Q3. The remaining facility should reach mechanical completion early in Q4, with full commissioning occurring prior to year-end. That one is located in California and was hit by the unprecedented weather conditions there — the flooding and such — which caused roughly a 3-month delay for that project. What we'd like to emphasize, though, is that Ameresco operates a highly diversified business. So should we, hypothetically, lose three quarters of output at any single facility, the effect isn't as severe as it might otherwise be. There are additional levers within the company — project construction and similar areas — or the solar facilities we've brought into service, a couple of which actually came in ahead of schedule. That affords us somewhat greater flexibility instead of depending on any single or pair of individual plants.

Tim Mulrooney

analyst
#30

Understood, thank you. And if I may quickly squeeze in one additional question regarding RNG. Following the 3 this year along with the 4 to 5 you've planned for the coming year, what number of RNG plants are included in the backlog guide from those?

Doran Hole

executive
#31

The total remains at 20.

George Sakellaris

executive
#32

Twenty.

Tim Mulrooney

analyst
#33

All right. Thanks.

Julien Dumoulin-Smith

analyst
#34

Hi there, everyone, good afternoon. I appreciate you taking the time. Thank you.

George Sakellaris

executive
#35

Good afternoon.

Julien Dumoulin-Smith

analyst
#36

Actually, if I may — hi there, good afternoon, everyone. So, if you don't mind, I'd like to briefly piggyback on that prior question. Clearly, you folks have disclosed a few additional bigger renewable projects over in Europe. Your expansion across Europe is going well. RNG, as expected, is proceeding according to schedule alongside eRINs, yet just how much flexibility are you really generating here relative to your '24 guidance? I realize people have attempted to nudge you on this in several ways. Still, I'm just wondering whether you might address the degree of added flexibility this provides compared with meeting the '24 plan, mainly through those new European announcements.

Josh Baribeau

executive
#37

Julien, it's Josh here. Let me first confirm that I've got your question right. When you refer to a new European announcement, were you asking about the Senal one?

Julien Dumoulin-Smith

analyst
#38

Yeah, my apologies, you're right. And the hint that additional things were on the way.

Josh Baribeau

executive
#39

Right. So back when we set the ‘23 target, that reflected what our business could earn in 2024. And we're always putting forward opportunities — a few we already knew of at that point, a few we sensed were coming, and a few still haven't shown up. But in the end, you can't take that figure from March of 2022 and simply tack on each press release as it lands. Much of it was already factored into the target, either because we expected to announce those things or because we had a sense of where business development would concentrate across those following 2, 2.5 years. So briefly put: first, these are proposals, and no award has happened yet. We believe we're well positioned on many of them, though the timing remains somewhat unclear. And second, they aren't entirely incremental. A good portion was essentially already accounted for in the plan.

Julien Dumoulin-Smith

analyst
#40

Understood. Then perhaps, if I could ask about prolonging the plan and possibly, as a component of the rate case, what's your thinking on the schedule at this point, whether for eRINs or, honestly, just carrying out the roughly 20 projects you currently have underway, which would give us a target further out? Clearly, 24% is nearly upon us. What sort of duration might we anticipate? Could the revised plan encompass, in some form, the multitude of projects already underway, as you consider achieving a certain level of confidence regarding your RNG program in a more comprehensive way?

Doran Hole

executive
#41

For this quarter, I believe we are definitely concentrated on the '23 ramp and the '24 guide we provided previously; if we reach a stage where we're prepared to discuss how matters appear past that point — beyond whatever we've included in our usual slides concerning our total revenue and EBITDA growth across time — then we'll do that. However, that isn't something we're addressing today.

Julien Dumoulin-Smith

analyst
#42

Understood. But when it comes to Analyst data, correct?

George Sakellaris

executive
#43

I'm not sure what you're asking.

Doran Hole

executive
#44

We'll be sure to pass that along.

Julien Dumoulin-Smith

analyst
#45

Understood. That's reasonable. We'll keep an eye out for it. Thanks, everyone.

George Sakellaris

executive
#46

Thanks.

Eric Stine

analyst
#47

Hello, everyone, and thanks for taking my questions.

George Sakellaris

executive
#48

Hey there, Eric.

Eric Stine

analyst
#49

So turning back to the Sunel joint venture — I'm just wondering about those 1.5 gigawatts of bids you're involved in. What's the mix across small, medium, and large? My hunch is the big ones take longer and come in chunks, while the rest could move faster. Any sense of how that might shake out?

Doran Hole

executive
#50

Let me address that briefly. Take the project we're currently carrying out in Greece alongside them — roughly a 12-month build for 100 megawatts. My sense is much of what we're looking at, and what we'll put forward together, falls in a comparable size band — a few larger, a few somewhat smaller. That makes them somewhat more granular. Obviously, execution risk gets a lot of our attention. And I'd add that we're happy to see these distributed across the jurisdictions named in the press release. George, anything you'd like to add?

George Sakellaris

executive
#51

This is happening everywhere. And the majority of it involves customers, since we're aware they're on the opposing end. Those projects are going to be built by individuals we already have connections with — yet they still must seek out competitive pricing, and may the finest candidate come out on top.

Eric Stine

analyst
#52

Understood; and regarding the follow-up, I'll limit myself to two; but how would you describe the competitive landscape, since it sounds like you're picking and choosing which bids to take part in? I'm just wondering whether the European market differs at all from what you've observed in the U.S., though I suppose it's still early days.

Doran Hole

executive
#53

Well, yes — obviously there are certain distinctions when it comes to jurisdiction, but even so, Sunel has demonstrated a solid record of getting things done over there. Beyond that, these are clients for whom Ameresco is a familiar name; so that — that's the source of our confidence. And I believe our real emphasis is on the opportunities we're confident we can win, correct? What I mean is, we won't simply head out and chase after every single one we can spot across a range of jurisdictions where we've never worked before. Our attention is genuinely on those places where we believe a strong chance of success exists. That said, the clients in that region do tend to be among the bigger asset owner developers there, right? So they aren't the usual sort of government clients that we encounter here in the U.S. But that doesn't mean there's zero competition. So we still need to show up with some strength.

Eric Stine

analyst
#54

Okay. Thanks.

Doran Hole

executive
#55

Thank you.

George Gianarikas

analyst
#56

Hi there, good afternoon to all of you, and thanks for having me on to ask a few things.

George Sakellaris

executive
#57

Good afternoon, George.

George Gianarikas

analyst
#58

Could you discuss whatever effects your company has experienced due to the strains in the financial system during the past 90 days? And what about any projects?

Doran Hole

executive
#59

Yeah, absolutely; regarding projects? Nope; we have not experienced any sort of direct effect, nor any direct exposure to any of the banks that have been mentioned by name while the FDIC took control. That is basically the first point, correct? Lenders are beginning to become somewhat more cautious, yet we have revealed that we have in fact raised one of the covenants within our credit facility. We finalized a very big construction loan, and we have finalized several sale leasebacks. And I believe it is — essentially the power of our track record and our profile that keeps propelling us forward — the final thing I would mention is that our lenders on the non-recourse side for our projects or the assets that are actually heading onto our balance sheet are not solely banks. We possess a varied funding pool; we have insurance companies included; we do have banks. We have non-bank lenders participating. And so that represents the consequence of what is confronting essentially just the banking sector in particular.

George Gianarikas

analyst
#60

Thank you. And maybe — you touched on this a bit before, but have supply chain effects shown up at all? Any delays with equipment, any permitting problems that you mentioned during the past 6 months? Are those still going on? Or has availability of transformers gotten any better? Is there any electrical equipment where you've noticed shortages?

George Sakellaris

executive
#61

I'd say with certain items, we've observed a slight improvement. Others are staying fairly steady, since manufacturing capacity continues attempting to match demand. I won't get into particular equipment categories, necessarily. But on the whole, I believe there's been a modest gain, while certain other things are basically sitting right where they did previously; we're monitoring that very carefully, as you might expect. And we track those timelines quite closely.

George Gianarikas

analyst
#62

Thanks.

Kashy Harrison

analyst
#63

Hello, and good evening, everybody. Appreciate you fielding this. During the prior quarter, you pointed out that awards were taking somewhat more time to become contracts, purely because of swings in interest rates. Yet the press release says you anticipate turning a sizable sum of awarded work into signed contracts in 2Q. Could you explain what gives you that confidence? Have those deals already been converted? Or what makes you confident we'll witness a major shift in Q2?

Doran Hole

executive
#64

Yes. Those weren't projects that got converted in Q1. The ones discussed at the close of Q4, I believe we noted it would probably be late Q1, the start of Q2, running into early Q2. So we anticipate those arriving, along with simply the usual rhythm of moving awards into contracts.

George Sakellaris

executive
#65

The reason we feel assured is that, in our conversations with customers, we can tell where things stand in the process — how many additional approvals are still required, and so forth. And a solid quantity of sizable contracts are, as I'd put it, at a late stage of being carried out.

Kashy Harrison

analyst
#66

That's useful, thanks. Maybe one more quick question, just a small administrative point — it appeared that your net assets in development went down to 432 megawatts from 470 in the prior quarter. Did you happen to sell a few projects? Or did you scrap some projects? What caused that quarter-over-quarter drop in net assets and development megawatts?

Doran Hole

executive
#67

So Kashy, the largest shift, naturally, is that 34 megawatts were put into service. I want to be sure you're making an apples-to-apples comparison, since we sort of have a gross figure and a net figure, which is after removing our partner — the joint venture partner's share; and so at the close of last quarter — or at Q4's end, I believe we stood at 460, and we finished this quarter at 431; so we had — if you subtract 34 from 460, and we added a couple — that's how the math comes out.

Kashy Harrison

analyst
#68

Understood. Thanks.

Joseph Osha

analyst
#69

Hi, everyone. I appreciate you taking my question. There are two things I want to ask. First, you both told me not long ago that you believed the solar plus storage share of the mix, especially within your asset portfolio, was climbing sharply. I'd like to know whether that trend is still holding up in your view. And separately, when it comes to the sold projects, is the storage attach rate rising there too? How does that compare with the rate you see for your asset portfolio? Thanks. I have one more question after that.

Doran Hole

executive
#70

All right, Joe. On the storage attachment rate for projects that combine solar plus storage, I may need to verify that statistic. As for everything else, looking ahead across the rest of the year, my expectation is genuinely that this solar and storage mix will keep growing relative to the total mix, because for specific George, both of us have been hands-on with quite a few opportunities out there that we're eager to discuss. Still, I believe that mix will carry on expanding, yes. That's — it's — as you're aware, our standards are extremely tight regarding what goes onto the balance sheet, whether we're talking about return hurdles or risk, risk-adjusted returns, yet we continue to come across some genuinely appealing opportunities.

Joseph Osha

analyst
#71

All right. And then — okay, please continue.

George Sakellaris

executive
#72

Sure. I simply wanted to share a fast figure regarding the storage. So, roughly 68 megawatts of batteries are linked to solar systems, and then approximately 57 megawatts are purely standalone storage.

Joseph Osha

analyst
#73

Okay, so that leads into my next question, doesn't it? Clearly, while folks keep processing this—the ITC that applies only to storage, plus any adders that could result from it, and everything along those lines—how are you weighing your mix of solar cash against storage-only?

Doran Hole

executive
#74

I'm not sure I could offer that sort of predictive analytics, Joe, since, once again, we evaluate opportunities one investment at a time. So development keeps moving forward in every area, no doubt about it. There's lots of solar under development—standalone solar, solar paired with storage, and the standalone storage business too—I mean, it's arriving from every direction, and it truly boils down to where we're going to direct our resources.

George Sakellaris

executive
#75

Right. And the one point I'd perhaps tack on is that the storage piece keeps expanding relative to the solar side, and our — completing that big Southern California project and building our name in that region, that allowed us to gain solid momentum and even simply stronger standalone storage deals.

Joseph Osha

analyst
#76

All right. Sorry, but may I squeeze in one more question? Clearly, you've moved from negative to positive cash flow from operations, and clearly SCE has been going back and forth; still, I'm wondering, with this result, do we think we can see a path to sustainable positive cash flow from operations, perhaps by the close of this year as we head into the next one?

Doran Hole

executive
#77

Well, the brief answer would be yes, and that's because of adjusted cash flow from operations overall, when you consider it prior to deciding how much we'll put into new assets, and as you're aware, our excess cash flows do go into those new assets, we have a modest maintenance CapEx portion as the SCE projects continue through to their complete finish, then what we've observed over the past several quarters is going to flip, and we're fairly confident about that.

Joseph Osha

analyst
#78

Okay. Thank you very much.

George Sakellaris

executive
#79

Thank you, Joe.

Pavel Molchanov

analyst
#80

Thank you for giving me the chance to ask. Returning to the Sunel collaboration in Europe, regarding that 1.5 gigawatts figure, do you have a schedule in mind? Put differently, should we expect 50 megs annually, 100 megs annually, or roughly what pace do you envision?

George Sakellaris

executive
#81

I'd estimate roughly a pair of years, possibly 3 years maximum. A couple of those, I'm aware, have a shorter window — roughly the coming 18 months; however, typically these big institutions, despite being in the same sector — we share that same sector. They need time, they assess the RFPs, and afterward move to construction, and that alone requires a year to 2 years regardless. So I'd say a 2-year to 3-year horizon; yet a few of the tinier ones, that's the reason I wanted to give my commentary. A few of those tinier projects serve some industrial and commercial clients, and we're pursuing them through that specific partnership, which feels quite promising. Those should wrap up roughly within the coming year.

Doran Hole

executive
#82

Absolutely. The smaller ones might move along more quickly. What I mean is, there is some lag while a proposal turns into an award and contracts get signed, but because these are more private and commercial clients rather than government ones, that process doesn't take as long. Then we get into construction. After that, everything depends on how long building takes, and that, I believe, brings us to roughly 2 to 3 years.

Pavel Molchanov

analyst
#83

Alright. Roughly 1 month back, you made an announcement about purchasing batteries from Redflow, which is based in Australia. My understanding is this marks your first acquisition of batteries that aren't lithium ion. Do you have confidence that end users at commercial institutions will feel at ease with a battery chemistry that is, after all, somewhat novel?

Doran Hole

executive
#84

The brief response is that in Redflow's particular case, a customer of ours actually needed to evaluate that technology and asked us to proceed with it, since they were keen to use it. An interesting point — I should fix something in your statement. This wasn't our initial purchase of a non-lithium battery. It was the second manufacturer for us. So we bring prior experience into this, and before we agree to anything, we examine the data extremely carefully, as you might expect, along with whether these batteries can realistically be deployed in commercial settings. As I've mentioned, I believe in a piece written not long ago, our goal is to reach a point where, provided we have confidence in a product, the growth in our need for it will effectively mirror the growth in production capacity at many of these battery makers, since they're generally on the smaller side, correct? They build momentum as we build momentum, yet we genuinely feel at ease. Not long ago I joined an internal expert call alongside several of our team members to discuss those technologies, and yes, we've gained considerable knowledge and remain very conscious of the applications these batteries suit, the ones they don't suit, and which case study fits best; we understand the appropriate use cases. Everything comes down to putting them to work in the proper setting, correct, at the proper price point for the proper customer circumstance.

George Sakellaris

executive
#85

And this specific client had really dug deep into them. That’s exactly what they were after, as we told the customer, whatever the customer asks of us, we’ll do it. But then again, we’re going to ensure that the thing we’re doing holds up and works well.

Pavel Molchanov

analyst
#86

Understood. Thank you again.

George Sakellaris

executive
#87

Thanks.

Chris Souther

analyst
#88

Hi everyone. I appreciate you fielding my questions; it's encouraging to observe that SCE has made an expedited payment. Could you provide some clarity on how much has been disbursed so far, or what amount is still outstanding from SoCal Ed? Additionally, it appears they've given the go-ahead on certain cost items you've mentioned before, which might become a possibility; and it would be useful to get a sense of the general margin structure for those projects and where you think we ought to factor that in right now?

Doran Hole

executive
#89

Yeah. What I mean is, the plan is that we'll wrap things up around this summer, correct. From that point, you can track where the money goes. My anticipation is that our unbilled balance will return to a typical level at some point during Q3. That's likely the clearest guidance I can offer, without giving exact figures, naturally, but you'd have noticed the rise in unbilled as we approached the close of 2022, since we mentioned in our Q that we — in our K that we had booked most of the revenue from that agreement during 2022. Consequently, that ought to provide you with a reasonably dependable unbilled figure for comparison.

Chris Souther

analyst
#90

Understood. Alright. That's genuinely useful. Now regarding Europe, I suspect much of this will be addressed in a week, but might you provide some sense of what the anticipated revenue contribution looks like for 2023 in that region? It appears many variables remain in play that might affect 2024, yet I was hoping to understand your view on how the European investments will ultimately pan out during this year; and after that, you mentioned Europe among the factors behind higher OpEx. I'd like to know the scale of that and what amount we're actually putting into Europe?

George Sakellaris

executive
#91

That's our finance person's territory. Well, at present Europe represents roughly 5% of our sales. And I believe that will — growth in that region, at least over the short term, will mostly come from the Bristol City Leap project. So it could reach around 10% within the coming year or 2 years. The ENERQOS acquisition is a good one, we're quite enthusiastic about it, though it's not nearly as significant as Bristol, for example.

Chris Souther

analyst
#92

Understood. Alright, that's useful. I'll get back in line. Appreciate it, everyone.

Chip Moore

analyst
#93

Hi all. I wanted to pose one question — let me inquire about that rise in dollar value for proposal activity you're observing, wonderful to see it climbing well. But regarding this pattern of rising project complexity, I suppose mostly about your assurance in the ramp for the second half of the year and then possibly that $300 million EBITDA goal for next year.

George Sakellaris

executive
#94

What I'd say is the proposal activity is assisting us considerably. Yet as you likely realize, moving from proposal to actually executing it takes 6 months to 18 months. Initially, you have to secure the contract, proceed to the award. After that, 6 months or a year later, we receive the actual contract allowing us to build it out. That's a solid signal that our team, and that's the reason we see a bit of an uptick in development expense out there developing these projects and capturing a good portion of the projects. So essentially, it gives us even greater confidence regarding that specific figure for the $300 million EBITDA number.

Doran Hole

executive
#95

In my view, a decent share of that proposal activity originated from Federal too, since things there had slowed down somewhat for a stretch after COVID. So what you're beginning to witness is a fairly robust rebound.

Chip Moore

analyst
#96

Right. And regarding those projects that normally get awarded and then turn into contracts within a year — or that are already baked into your guidance — do you feel you've got solid visibility into the second half? Thanks.

George Sakellaris

executive
#97

Beyond what's already moved from awarded into contracted, our visibility is quite strong, which is exactly why we're fairly confident about the 2023 figure. And the contracted backlog level we expect to reach by the time this year wraps up should give us a significant boost going into the next year. Yeah. I'd say this is quite a detailed, granular process on our end — examining how the conversion rate will shape up for contracts signed during the rest of this year. This isn't some vague instinct; it genuinely rests on concrete information about our awarded backlog — which specific projects, what stage each one is at, how much progress they've made, and how near we are to turning them into new contracts. We monitor that extremely carefully. That's precisely what underpins my confidence in the pace of conversions I mentioned regarding the ramp.

Chip Moore

analyst
#98

Perfect. Yes. Understood. Thanks very much.

George Sakellaris

executive
#99

Okay.

Craig Shere

analyst
#100

Afternoon, and thanks for taking my question. I'd really like to follow up a little on what Chip and Tim asked earlier, and it comes in three parts, though they're quick, so let me just spell it out. First off, could you share your view on how much confidence you have in that revised 2023 RNG rollout? Second, does the guidance bake in any assumptions about RINs getting better during the back half? And third, assuming you hit the guidance implied for the latter half of this year, since that run rate already reaches your 24% guide, wouldn't continued growth point to you surpassing your '24 guide?

Doran Hole

executive
#101

Let's begin — I'm not ready to say that just yet. On confidence, we'll begin with how confident we are in the construction schedule. My sense is that confidence in the schedule is really high. As for RINs, we don't typically discuss the particulars of RIN figures. What I'd say is that the approach we're taking follows what we believe we should expect regarding how 2023 RINs will turn out. It's widely known that we're roughly targeting mid-June for the final rules, and that's about where things stand on that. Then regarding 2024 — look, we feel really good about that 2024 figure. If we sensed that some kind of material adjustment were needed, we'd go ahead and make it. Given what's happening, we believe there are plenty of contributors that we think we'll be able to leverage to hit that figure. I'm not sure I'd dive into any changes to it right now.

George Sakellaris

executive
#102

Actually, no. The encouraging trend we've been noticing out there in the market really does support that figure.

Craig Shere

analyst
#103

Understood. What I’m getting at is that you’re suggesting a second half of ‘23 that is essentially a full-year 2024 run rate, and you’re indicating that this business keeps expanding?

George Sakellaris

executive
#104

No, since Q3 and Q4 are our strongest periods, given all the active building work for schools, colleges, universities, and similar projects. After that, during the first two quarters of next year, activity would be much slower compared with Q4 — compared with Q3 and Q4 of this year, so that run rate isn’t there.

Doran Hole

executive
#105

Yeah. When you take a look at what's happened historically, that's just how it goes — the first quarter and the second tend to be softer compared with the third and fourth.

George Sakellaris

executive
#106

Even so, taking Q3 and Q4 and projecting them onto the next year isn't something you can do. That's right, I can't.

Craig Shere

analyst
#107

Got it.

Ben Kallo

analyst
#108

Hi everyone. Could you perhaps discuss the international expansion and what's behind it? In the States, thanks to the IRA, we seem to enjoy some of the strongest tailwinds anywhere. So what's the push to grow abroad? Is it about returns? Fewer rivals? Or something else? Then, returning to that earlier question about the seasonality in this business — one point you both stress is that as asset ownership grows, visibility ought to improve annually, since the EBITDA is generated by those assets. So why wouldn't we move from a second-half run rate into next year, assuming roughly 75% of EBITDA or so is coming from the assets? Thanks.

George Sakellaris

executive
#109

All right, let me begin with Europe. Europe is genuinely thrilling. Plenty of regions across Europe are places where we truly think we can compete extremely effectively. It is, and always has been, mostly on the project side, correct. The asset side, I expect, will follow — yet on the project side, the EU is pushing around a substantial amount of incentives and funding. They've set remarkably ambitious targets, with corporates, industrials and governments all aiming for net zero, much as what happened in Bristol has generated numerous discussions with other municipalities in the area; so we view this as a chance for a volume game while once more substantially growing our operating base. We're not proposing to go out and recruit hundreds of staff simply to be placed on the ground to chase opportunities in Europe, correct; we're relying on our strong operating leverage, our organic growth model for the business, with the one exception being the ENERQOS acquisition, which naturally was opportunistic, though we feel terrific about it. That's how we're approaching our European expansion. I concur that the U.S. offers an enormous quantity of incentives, which will boost business volume there too, correct; and once more, that's a volume gain, with more funding available to our customers, so they'd want to take on additional work. Still, we aren't pulling anything away from the U.S. in order to grow in Europe; this isn't zero-sum; it's more like a slight magnifying effect on the expansion potential we possess as a company, given how we run things; so, turning to your second question, which I've already lost track of.

Doran Hole

executive
#110

Absolutely, I believe I can address that. What you're essentially wondering is why that figure wouldn't represent the steady-state rate, considering the energy assets. To get there, you need to look at our company as four distinct business lines. For the energy assets, yes, that would be the run rate. However, the project side of things, which George mentioned to the earlier questioner, carries quite a bit of seasonal variation. So with the energy assets, that's your run rate — when you observe that number, it's a fair steady-state figure. There's some minor solar-related seasonality during winter — but then — and after that comes the project business's seasonal pattern into Q1 and Q2 of 2024.

Operator

operator
#111

Thank you as well, everyone. That brings our question-and-answer portion and today's agenda to a close. We appreciate your joining us, and you're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ameresco, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ameresco, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ameresco, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.