Arihant Superstructures Limited (506194) Earnings Call Transcript & Summary

November 13, 2025

BSE Limited IN Real Estate Real Estate Management and Development earnings 32 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q2 FY '26 earnings conference call for Arihant Superstructures Limited, hosted by Arihant Capital Markets Limited. <<operator_script>> Kindly be aware that this conference is being recorded. I'll now turn the conference over to Ms. Yomika Agarwal of Arihant Capital Markets Limited. Thank you, and the floor is yours, ma'am.

Executive

executive
#2

Good afternoon, everyone, and welcome. I'd like to extend thanks on behalf of Arihant Capital Markets to all of you for being on this quarter 2 FY '26 earnings conference call for Arihant Superstructures Limited. With us today from management are Mr. Parth Chhajer, Whole-Time Director, and Mr. Udit Kasera, Chief Financial Officer. So, let's not wait any longer — I'll now pass the call over to management for the opening remarks. The floor is yours, sir.

Parth Chhajer

executive
#3

Thanks, and good afternoon, everyone. We appreciate you taking the time to join this Arihant Superstructures Limited conference call, where we'll discuss the Q2 FY '26 results along with business updates. I think you've all had a chance to go through our financials and the investor presentation, both of which have been filed with the exchanges. Our CFO, Mr. Udit Kasera, will now walk you through the financial highlights for the quarter.

Udit Kasera

executive
#4

Thanks, Parth, and good afternoon, everyone. I’d like to begin with a quick run-through of the financial highlights. Consolidated operating revenue in Q2 FY ’26 came in at INR 123 crores, compared with INR 112 crores in Q2 FY ’25 — a year-on-year rise of roughly 9.7%. EBITDA for Q2 FY ’26 is INR 30 crores, versus INR 29 crores in Q2 FY ’25, up 3.5% year on year. The EBITDA margin in Q2 FY ’26 is 24.4%, compared with 25.8% a year earlier. For the half year, operating revenue was INR 244 crores, up 25% year on year. Half-year EBITDA is INR 67 crores, a 70% year-on-year increase. Profit after tax is INR 26 crores, up 44% year on year, with a PAT margin of 10.6%. As of 30th September 2025, the company’s net worth is INR 430 crores. In the quarter, we paid the dividend for financial year ’24, ’25, which had been approved at the AGM. The promoter group waived its dividend, which came to INR 4.6 crores for last year.

Udit Kasera

executive
#5

Online performance was comparable to the prior financial year. With that said, I'll now pass things over to Mr. Parth Chhajer, who will walk us through the operational highlights.

Parth Chhajer

executive
#6

Thanks, Mr. Udit, and thanks once more to all of you. Turning now to the main operational highlights for the quarter. This quarter saw a greatly prolonged monsoon that began in the middle of May and ran through the first week of November, as all of us in the city of Mumbai observed, and that hurt construction work throughout the whole region, producing a weaker Q2 performance. Even so, the company recorded sales bookings of 280 units, equal to 2.89 lakh square feet of area and worth INR 236 crores. The average price per square foot came to roughly INR 8,100 this quarter against INR 7,493 in the quarter before, a rise of 9% quarter on quarter. The average price per unit sold was INR 84 lakhs. Total collections in the quarter were INR 111 crores. Unsold inventory at quarter end was 84 units, valued at INR 17.7 crores. In the course of the quarter, we obtained OC for Arihant Amisha Phase 2, where we handed over 134 units totaling 75,394 square feet of area. Over the last 2, 3 years, the company has launched several new projects, specifically World Villas, Town Villas, Arihant 7 Anaika, and Arihant Avanti Palace.

Parth Chhajer

executive
#7

Getting environmental approvals across the sector was at a standstill until August 2025. Over the past two months or so, clearances have come through for 3 of our projects — World Villas, Arihant 7 Anaika at Taloja, and Arihant Avanti Palace at Shilphata. For Town Villas, the approval process is still ongoing, and we expect to launch that project in the next financial year. Along with this, we've also begun construction work on the projects that had been on hold because of the EC clearances. And I believe we can pick up momentum now, given that the season has dried up and the monsoon difficulties are behind us. We stay committed to keeping a robust development pipeline, backed by our existing land bank, and we anticipate steady value creation as our ongoing and upcoming projects move through the various development stages and take shape over the coming few years. In the quarter, the company also kept reinforcing its business development. We added another 5 acres of land at Chouk Manivali for the Town Villas project. That brings the total project size to 93 acres as of today. Turning to the industry now, in this month of October, we saw the grand opening and inauguration of the airport, which has generated tremendous buzz in this area, sparked a great deal of enthusiasm among homebuyers, and drawn many people from different parts of the country to come and explore the opportunities available in Navi Mumbai.

Parth Chhajer

executive
#8

Alongside this, we're seeing strong employment expansion across the coming decade as industrialization takes hold, infrastructure projects come to life, and both blue-collar and white-collar roles spread throughout the whole airport region. So we anticipate roughly 1 million jobs being generated across the next 6 to 7 years, particularly with the airport having been inaugurated just last month. As we're aware, the markets have been flat during the past 6 months when it comes to overall consolidated performance across Mumbai MMR, as well as NCR, Bangalore, and Pune. That said, Navi Mumbai has recorded excellent sales and is likewise experiencing consistent growth relative to the sales that were occurring during the prior year. So I believe we're in the right position and at the right location, and there's still a solid, healthy pipeline ahead of us to execute and capture. With that, I'll simply open the floor for questions and answers, and we'll be glad to take as many questions as we can.

Operator

operator
#9

<<operator_script>> Our first question comes from Shlok, who is an investor.

Analyst

analyst
#10

My question is this: given that supply in Mumbai and the MMR region has been rising sharply of late on account of all the redevelopment activity taking place, from a consumer standpoint, do you expect demand to stay roughly flat over the next 2 to 3 years?

Parth Chhajer

executive
#11

In places where development is strong and solid infrastructure projects are being carried out, we aren't seeing that. We're not operating in the Mumbai zone. So regarding the supply coming in there, or on the redevelopment side, I'd rather not comment. But over in Navi Mumbai, wonderful new landscapes are opening up, with excellent infra corridors being delivered by the government. The whole infrastructure drive from the Maharashtra government is taking place in this belt, in and around the airport area. And I believe this will be a very good market to be in across the next 5 to 7 years.

Kamal Vaswani

analyst
#12

And sir, are there any restrictions we would run into when putting up a project close to the airport area — things like regulations or anything of that kind?

Parth Chhajer

executive
#13

Right, naturally, height limits apply based on your distance from the airport — whether you're nearer or farther away. So those are rules we must always comply with, and we plan around them accordingly.

Analyst

analyst
#14

And sir, one final question from me regarding the company's debt outlook. So over the coming years, or in the next quarter or 2, what is our plan for bringing the debt down?

Parth Chhajer

executive
#15

Look, the company is in a growth phase, and over the next 3 years we're also building up annuity assets right now. So debt will rise from here going forward, but the asset side will grow as well. And I think some debt will also get repaid at the same time for projects that have already hit certain thresholds — like Arihant Aspire, where the debt from Tata Capital will be repaid. So today it's an influx and outflux model, where projects that are maturing are getting repaid, and with the new projects where we're developing assets, we're taking on more debt. So blended average debt will be, say, somewhere around INR 125 crores more than where we are today.

Operator

operator
#16

<<operator_script>> Our following question comes from Aman Singh, who is an investor.

Analyst

analyst
#17

Sir, my question is this: is the company on track to hit its annual presale target of INR 1,100 crores?

Parth Chhajer

executive
#18

Right, we ought to stay on course, since the correct launch pipeline is set for Q3 and Q4, and the approvals are nearly finalized. So my view is that we should — those new launches across the Navi Mumbai areas are going to help us grow both our presales volumes and our values.

Analyst

analyst
#19

Alright, sir. And sir, just one more question. So what entity is going to operate the 5-star hotel that forms part of World Villas' project?

Parth Chhajer

executive
#20

Right now we're in the discussion phase. So once we've signed up, we'll be glad to get back in touch with you and let you know. But as things stand today, it's in the discussion phase.

Operator

operator
#21

Aman from AUL Capital has the next question.

Analyst

analyst
#22

Sir, I’d like to ask this: since Navi Mumbai Airport is expected to begin operations around December this year, how does the company intend to take advantage of that structural shift in demand, particularly in <<inaudible>>?

Parth Chhajer

executive
#23

We had actually secured our land parcels in this region long before the airport was inaugurated. And as of today, just so you're aware, the prices of land we purchased — for instance, in the World Villas project, the land we bought came to roughly INR 1 crore, INR 70 lakh per acre on average. At present, neighboring plots are being quoted at somewhere between INR 6 crores and INR 8 crores. We have already enjoyed the early benefit, that first-mover advantage when it comes to land acquisition, and that is going to help us achieve healthier and higher EBITDA margins on this project. As for the other sites where we were already very well positioned in Panvel, Kharghar, Taloja, we have witnessed volumes rise after the airport's inauguration, and given the locations where our projects sit and the inventory mix we hold, I think we ought to be able to capitalize on it to the maximum potential possible. New launches are also slated in this Panvel area in the coming Q3, Q4. So we see a lot of great action coming from there as well.

Analyst

analyst
#24

Understood. Yes, on the next point — with World Villa Hotels launching in <<inaudible>> diversification — how do you reconcile capital-intensive luxury against core affordable housing?

Parth Chhajer

executive
#25

My apologies — I missed the final thing you said.

Analyst

analyst
#26

How do you plan to strike a balance between capital-intensive luxury and core affordable housing?

Parth Chhajer

executive
#27

No, we've spread our portfolio out evenly. So affordable is at almost 37%, mid-income sits at 38%, and luxury is around 25%. That way we've diversified the portfolio in a healthier manner. So that's with respect to the area we're developing. And we'll keep following this model going forward as well.

Analyst

analyst
#28

All right, that's fair. Understood. And sir, one more thing — as shown in the report, presales came in at roughly <<inaudible>> sold during Q2. So would you say that's just temporary, or does it point to demand moderating?

Parth Chhajer

executive
#29

No, no. I think the monsoon was the only reason for that. Sales were a bit slower in Q2 and Q3, and in Q4 we're already seeing a better response.

Analyst

analyst
#30

What would the expected target be for FY '26 and '27, then?

Parth Chhajer

executive
#31

For FY '26, we've already stated that our target is roughly INR 1,100 crores, and for '27, growth will be 25% on top of that.

Operator

operator
#32

<<operator_script>> Our following question comes from Deepali, who is an investor.

Deepali Kumari

analyst
#33

I’ve got a couple of questions. For instance, regarding the EBITDA margin, it fell from 30% to 24% quarter on quarter. What exactly drove that? Was it pricing mix or cost <<inaudible>>?

Parth Chhajer

executive
#34

It has to do with how revenue from different projects comes together and blends. So that's just how it behaves, since you can't assume the same margin each quarter. Our advice would be to view the company on a yearly basis — that gives you a clearer picture of how the company is doing and which products are getting more recognition on the revenue side.

Deepali Kumari

analyst
#35

And sir, operations have generated negative cash flow across several years now. At what point does the company anticipate that it could turn positive?

Parth Chhajer

executive
#36

Yes. For example, over the last 2 years we've put a lot of money into our developments at Vashi, and we've also begun investing in the developments at Chowk. So, however, customer cash flows have yet to come in, but the assets are being readied and are under construction. So, for instance, at the Vashi project, Arihant Advika, we're almost 75% through with respect to cost. And physically, if you look, around 80%, 85% is already done. And now that market behavior is such that once the product is ready and visible from outside — and we've also begun the external paint work now — demand is going to pull in, because this is very much a ready market. So I think in the next 1.5, 2 years, we should be able to bring in the surplus and also repay the debt that we've taken.

Deepali Kumari

analyst
#37

All right. And sir, regarding the project that's <<inaudible>> and has reached 30% completion, what would management say are the top 3 execution risks <<inaudible>>?

Parth Chhajer

executive
#38

What does that 3 refer to? Execution risk.

Deepali Kumari

analyst
#39

Yeah. Execution risk, you know, for <<inaudible>>.

Parth Chhajer

executive
#40

No. There’s zero execution risk. What I mean is, once we’ve kicked off a project, our aim is to finish it as quickly as we can. At none of our sites do we foresee any danger of the work being stopped.

Deepali Kumari

analyst
#41

And so, sir, once the Navi Mumbai International Airport was announced, what kind of incremental shift have you noticed when it comes to inquiries as well as site visits?

Parth Chhajer

executive
#42

This is a really encouraging shift. I can't give you the Q3 figures at this point. We'll need to wait for the next con call, but things look very positive since the airport inauguration. Sales are up, foot traffic has grown, and from October on we're posting stronger numbers.

Operator

operator
#43

Following that, we have a question from Mohit Upadhyay, who is an investor.

Analyst

analyst
#44

Can everyone hear me okay?

Parth Chhajer

executive
#45

Yes.

Analyst

analyst
#46

Alright, I had 2 questions. The first one is about World Villas — looking at the current quarter, we've sold 51 units there so far, which is only a marginal 5-unit increase compared with the prior quarter, if we look at it. So is that simply because the environment clearance hasn't come through yet? And if I may ask, how many projects are still awaiting that environment clearance?

Parth Chhajer

executive
#47

In the current quarter, we obtained the environmental clearance for World Villas, and that happened in September, with construction now already underway on the project. So sales, I believe, will improve. This isn't causing us much concern. Additionally, we're boosting our margin by implementing a fairly decent price increase in the project as well, so that we can raise the margin.

Analyst

analyst
#48

And sir, just an industry-wide question: where do you see overall industry demand now? Is it in luxury or in affordable?

Parth Chhajer

executive
#49

Demand exists across the board, honestly. What matters, I think, is being smart about positioning your product the right way — do that, and you can outperform the market. And I think over the last 1, 2 years we've managed exactly that, with the launches of World Villas and Arihant Avanti at Shilphata, where our product was placed quite differently, and we succeeded in capturing the market and getting bookings closed as well. So it isn't the case that only affordable will perform or only luxury will perform. My view is that demand is present in every single segment, since India is such a diverse nation, with so many income groups and such a huge population. That means demand will exist for each segment at any given point in time across the coming 1.5, 2 decades.

Operator

operator
#50

Vishal, who is an investor, has the next question.

Analyst

analyst
#51

My question is about Town Villas. You picked up 5 acres of land during this quarter. So what incremental GDV do you expect from that? And how many units will Town Villas comprise?

Parth Chhajer

executive
#52

Look, this was acquired only recently, in the last quarter. So we're still at the planning stage for it, but the concept is to put it together with the layout we already have. So it's land that's contiguous. It will lift the GDV a bit, though that hinges on the way we design it. But on a per-acre basis, we ought to be able to achieve a GDV increment of, let's say, INR 30 crores, so an additional INR 150 crores should come from this acquisition of 5 acres.

Operator

operator
#53

Rishikesh Jain, an investor, has the next question.

Analyst

analyst
#54

Sir, is any new geographic company planning to come in?

Parth Chhajer

executive
#55

No, we don't have any plans to move into new markets.

Analyst

analyst
#56

Second question from me, sir: what would the strategic roadmap look like for growing the area under development to, say, 10x, as referenced in the IP?

Parth Chhajer

executive
#57

And your second question — I didn’t catch it.

Analyst

analyst
#58

Sir, for my second question, what kind of strategy would you lay out for the roadmap aimed at growing the area under development to 10x to 8x?

Udit Kasera

executive
#59

We’ve already taken that up to 8x over the past 10 years. So that figure reflects history, not a forecast.

Analyst

analyst
#60

Sir, going forward, how do you expect the mix to be split between the luxury premium segment and the affordable segment?

Parth Chhajer

executive
#61

Our aim will be to split that blend evenly — 1/3 luxury, 1/3 mid-income, 1/3 affordable. That's the approach we'll keep using from here on as well.

Operator

operator
#62

<<operator_script>> Our following question comes from Kamal Vaswani at U First Capital.

Analyst

analyst
#63

I was curious about the club that opened close to the World Villas — what sort of traction is it seeing? Beyond the people booking for the World Villas, are we bringing in independent members, and how many members have signed up so far? Also, what number of independent members are we aiming to have there?

Parth Chhajer

executive
#64

Right now, I believe we're at roughly 600 to 650 individual members. And what we're aiming for across the coming 8 to 10 years is to get to somewhere in the neighborhood of 5,000 to 7,000 members.

Analyst

analyst
#65

All right, that’s great. So these 600 members are separate from the <<inaudible>> Villas?

Parth Chhajer

executive
#66

This is the total amount I'm referring to.

Analyst

analyst
#67

And typically, what membership fee have we maintained for this membership?

Parth Chhajer

executive
#68

At the moment, we are — it starts at 11 lakh.

Analyst

analyst
#69

And that would be the lifetime membership?

Parth Chhajer

executive
#70

That spans 75 years.

Analyst

analyst
#71

All right, understood. So is there any competition of that kind in that region where we operate — is it up and running as of now? I mean...

Parth Chhajer

executive
#72

No, it’s still under construction.

Analyst

analyst
#73

And when do you expect it to be finished?

Parth Chhajer

executive
#74

Roughly 2 years from now.

Analyst

analyst
#75

And at the same time, World Villas gets built alongside it.

Parth Chhajer

executive
#76

Yes. The villas are already <<inaudible>>.

Analyst

analyst
#77

And what's the situation with the 5-star hotel that's likely coming to that same area as well?

Parth Chhajer

executive
#78

Work ought to get underway around January, I'd say.

Analyst

analyst
#79

All right, so getting that ready is going to need at least 2 or 3 years, right?

Parth Chhajer

executive
#80

Yes, that's 3.5 years.

Operator

operator
#81

Following that, we have a question from Aman at AUL Capital.

Analyst

analyst
#82

I had a question about the auditor recognition. So as we noted, the company’s resignation and the new appointment of KK Associates. So may I know the reasons for changing the auditors?

Udit Kasera

executive
#83

The main reason was that the existing auditor was located in Jaipur. So he had to travel, and his team also had to make the trip from Jaipur to Mumbai. And it -- so basically, that is why we changed the auditors. And they also had delays when it came to reviews and all. So that is the main reason we are changing the auditors.

Analyst

analyst
#84

All right, so on the topic of the new auditors and how they affect revenue recognition, the cost forecast, and project profitability estimates — could you fill me in on that too?

Udit Kasera

executive
#85

I didn’t catch your question. Could you repeat that?

Analyst

analyst
#86

Is there going to be any effect from the new auditors on how revenue is recognized, on the cost forecast, or on the project profitability estimates?

Udit Kasera

executive
#87

No, no. All of this comes from Ind AS accounting—the financial statements and the published estimates included. So bringing in a new auditor won’t affect those accounting principles and policies at all.

Operator

operator
#88

<<operator_script>> Since nobody has any more questions, I’d like to pass the call over to Ms. Yomika Agarwal.

Executive

executive
#89

We appreciate the management and everyone taking part in joining us for the quarter 2 FY '26 conference call of Arihant Superstructures Limited. At this point I'll pass the call over to management for their closing remarks.

Parth Chhajer

executive
#90

Yes. Thanks to all of you for being on this earnings call. I hope every question you had was answered to your satisfaction. Should anything further come up, don't hesitate to get in touch with our Investor Relations team at Valorem Advisors, or you may reach our finance department as well, and our CFO's team will take it from there. We'd also like to thank Arihant Capital for hosting this call on our behalf. Many thanks.

Operator

operator
#91

Arihant Capital Markets Limited has now wrapped up this conference call. We appreciate your participation. Your lines can be disconnected at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Arihant Superstructures Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Arihant Superstructures Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Arihant Superstructures Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.