We appreciate everyone being on the line, and we're glad to have you join the Aurelia Metals quarterly conference call for September of FY '22. <<operator_script>> At this point, I'll turn the call over to Mr. Dan Clifford, our Managing Director and CEO. Go right ahead.

Daniel Clifford

executive
#2

Thanks, Rachel. Morning, everyone. Ian, Peter and Adam are here with me today as we walk through how we performed in the September quarter. To make things easy to follow, we'll be working from the deck called AMI Investor Presentation September 2021 Update and Outlook, which went up on the platform this morning. Before we get going, just a few quick remarks. For anyone who has listened to me or the team before, we aren't really known for reaching for words like fantastic, stunning or excited. But I have to say, going through these results and what we've delivered, it's honestly becoming very hard to avoid using them. That's a nice problem for us to have. And just to get started on all this, if you could turn to Slide 5. Performance, and in particular our operating performance, with some great results across sustainable development, production, especially Dargues, and at a group level beating our Q1 goal forecast for the quarter. Moving on to exploration. As a team, it feels like every time we put a hole in the moment, we're snapping back in our chairs with the success of the results we're getting from this program.

Daniel Clifford

executive
#3

Now turning to the growth projects, and here we've progressed past mere conceptual talk and gesturing—we're actually in execution mode at this point. Let's go to Slide 7. Looking at how we're performing against plan, it's great to witness the momentum in our sustainability results, with consistent and repeat gains in both recordable injuries and reportable environmental incidents. On to Slide 8. Our run rate is right where it should be for this year as we move forward, with gold ahead of the September quarter, as I noted earlier, and full-year guidance across every part of the business being reaffirmed. So, Peter, over to you.

Peter Trout

executive
#4

Thanks, Dan. I'll begin with Slide 9. The chart on the right-hand side of that slide shows we had a strong September quarter, with gold production coming in higher, driven by really solid performance from the Dargues operation. Zinc output got a boost from better grades at Peak and Hera, and we ran additional lead/zinc tonnes through the Peak concentrator, which added to our zinc production. At Peak, we pushed more tonnes through the concentrator, with 1 lead/zinc ore campaign and 1 copper ore campaign. Copper ore processed was lower this quarter, and that's what drove copper metal production down quarter-on-quarter. We also saw some exceptional lead/zinc grades and high gold grades coming out of the Kairos and Chronos mining areas, which helped deliver strong metal production and reduced all-in sustaining costs at Peak. Turning to Hera, our stoping took place in areas where grades exceeded the life of mine reserve grades — by 50% in the case of base metals. Those high grades offset the reduced processing tonnage, which was hit by 2 factors: first, ore supply was mine constrained for a period because we ran into rock mass conditions that were worse than expected, delaying stope access, particularly in a portion of the North Pod area.

Peter Trout

executive
#5

Also, near the close of the quarter, the concentrate filter became the bottleneck in the process plant, with daily base metal grades reaching as much as 20% lead/zinc being processed. Those exceptionally high base metal grades are going to keep limiting mill feed tonnage during the current quarter, though clearly they underpin very robust metal production. At Hera, we also wrapped up a competitive tender for the Hera and Federation Mining contracts, choosing Redpath Australia for both work programs. The new Hera mining contract starts in January, with development of the Federation exploration decline scheduled for later in 2022. Turning to Slide 10, which provides a bit more detail on how Dargues performed. I believe it's reasonable to say the Dargues mine met expectations during the September quarter. Feed grade, mined ore tonnage, backfill placement and processing volumes all came in at planned levels, helping deliver record quarterly mill throughput of 91,000 tonnes along with 10,800 ounces of gold production. The feed grade of 3.9 grams per tonne gold stood 63% above the previous quarter, since the mill processed higher-grade stope ore that had been deferred from the June quarter. Another point worth noting was the share of development ore in mill feed, which dropped from 46% to 30% quarter on quarter.

Peter Trout

executive
#6

As we look ahead to Dargues, our mining schedule still indicates that both gold grade and metal output will rise further throughout the asset's life, since stoping zones reach higher-grade material at depth. At this point I'll pass things over to Ian, who will walk us through the group's financial results for the quarter.

Ian Poole

executive
#7

Thanks, Peter. It was another solid quarter, one that really lines up with the FY '22 operating guidance. Aurelia <<inaudible>> closed the September quarter holding $66 million in cash and is in a strong position to keep funding its exploration program along with the Federation and Great Cobar growth projects. At Dargues, the timing of concentrate sales and shipments led to a build in gold concentrate at the quarter's end. That rise in working capital weighed on cash generation over the quarter. The concentrate still on hand when the quarter closed carried a market value of $6.8 million. During the December quarter, Dargues is moving away from bulk concentrate shipments toward containerized shipping. That lets us improve cash flow, lower costs and trim working capital. Aurelia repaid $4.1 million on its term loan, which is set to be fully repaid by September '23. Aurelia also got back $4.3 million from its bank guarantees, which are used for environmental bonding. Over the September quarter, Aurelia invested $2.1 million in its Federation and Great Cobar growth projects, plus $5.8 million in its exploration program, which concentrated on Federation, Kairos and Great Cobar. Adam will now give an update on what these programs delivered.

Adam McKinnon

executive
#8

Thanks, Ian. Aurelia has delivered another highly successful quarter on the drilling and exploration front, with meaningful extension results across all 3 of our operations. If you turn to Slide 13 of the presentation. Exploration restarting at Great Cobar has yielded immediate outcomes, with follow-up drilling below the existing resources returning a spectacular intercept of 5.4% copper over 13 meters, plus a second intercept of 2.6% copper over 37 meters, which includes 4.2% over 12 meters. These latest results point to high-grade copper and gold mineralization that is entirely open at depth, and the next round of drilling will test the massive potential of this area. On Slide 14, very strong copper has also been intercepted at Kairos in a new area directly along strike to the north of the current development and stoping area. The grade tenor across a number of these intercepts is quite exciting, including 5.9% copper over 7 meters, 5% copper over 6 meters, and a 43-meter intercept of 2.4% copper, including 5.7% over 6 meters. Several of the high-grade copper intercepts sit close to established and planned underground development, which offers a convenient platform for accessing this new mineralization. The copper mineralization remains open up and down dip and along strike in both directions, and immediately -- and we are planning immediate follow-up drilling.

Adam McKinnon

executive
#9

Now on Slide 15. At Federation last quarter we drilled a record 17,000 meters, which brings the project nearer to operating status. Results from the new program keep confirming and extending the Tier 1 grade profile at Federation, and a possible new high-grade gold corridor may be emerging along the southwestern edge of the deposit. That takes in a fresh intercept of 9.7 grams per tonne gold across 23 meters, including 42 grams per tonne over 5 meters. Coarser-grained gold has also been observed in other drilling from this zone, and all lab assays remain pending. To show just how remarkable the grade tenor at Federation is, an intercept from the central portion of the deposit released in June this year — 70 meters at 18% lead/zinc — on a length-weighted basis is still the best base metal intercept put out by any ASX-listed company this year. Those results will probably add upside to the resource profile now under review as part of the feasibility study. It's also worth noting that, given where the project stands today and assuming the required approvals come through, we could potentially see early production from Federation a bit more than 3.5 years after discovery — an extraordinary achievement when industry norms run 7 to 12 years.

Adam McKinnon

executive
#10

We’re carrying intensive drilling into this quarter as well, and our geologists keep extending the known deposit across several areas. Now turning to the Dargues mine on Slide 16. During this quarter we received the last results from the Phase 1 drilling program, which represented the first meaningful exploration work at the project since 2017. One intercept stood out in particular: 4.2 grams per tonne gold across almost 10 meters, which is the deepest ore-grade gold mineralization found at Dargues so far, roughly 80 meters down-plunge and east of the current main load resource. Together with earlier results announced this year, this zone has substantial potential to grow at positive depth. The company has already begun the Phase 2 drilling program at Dargues, with an underground rig now drilling the lower portion of the Main and Bonanza Lodes. Better geological and structural understanding from the Phase 1 program, plus detailed underground mapping and handling, has contributed strongly to shaping the Phase 2 drilling program. That includes identifying many new mine targets, a priority target along the long strike of Dargues to the east and to the west, and nearby regional targets, with surface drilling to start during this quarter.

Adam McKinnon

executive
#11

Dan, the floor is yours again.

Daniel Clifford

executive
#12

Now if we turn to Slides 18, 19, and 20, we'll walk through those. So Pete, to wrap things up, Kairos sits on the EIS and is running ahead of schedule, and the drilling we're delivering, along with the results we've been getting from Great Cobar more recently, just go over the top and right alongside — alongside plus the PFS we currently have underway. Shifting to Hera-Federation: boots on the ground in that background photo, all the peers in for the camp expansion. Those modules are now all in place. The enabling work for the projects, across the civils and the decline for the Federation development, or operations development, is well and truly on track for the business. At Dargues, as Adam said, Stage 2 exploration drilling is now in place ahead of schedule. And we are significantly front-end loading the approvals process for extending this operation. So taking a step back, we've just seen and heard from the team across 3 key areas. It's fantastic to see performance to plan. That's driving certainty in our operating platform, with the standing results from exploration continuing to deliver in the business.

Daniel Clifford

executive
#13

The equilibrium around our exploration program has genuinely changed. What we're seeing are no longer merely intercepts. All of them represent material extensions of mine life at high grade. As Adam noted, certain of these high grades are currently the strongest available anywhere in the market, and we are truly leaving the intercept-only approach behind. Turning to our projects, it's exciting to see that we now have personnel onsite carrying out work on them, with a very clear line of sight toward generating or creating value for our shareholders. That said, I believe, Rachel, this is a good moment to open things up for Q&A, please.

Operator

operator
#14

<<operator_script>> Our initial question is from Dylan Kelly at Ord Minnett.

Dylan Kelly

analyst
#15

I've got a couple of questions. First one is on Dargues. It's really encouraging to see that run rate climb so fast. Given the production cap you have in place and the output you achieved in this quarter, how should we think about the way you'll manage production going forward?

Peter Trout

executive
#16

Peter speaking now. At Dargues, the 355,000-tonne-per-annum cap is measured across a calendar year. So obviously, our aim is to get the most out of that capacity and fully utilize it in every calendar year. And based on the prior quarterly reports, you can see our year-to-date position — we are on course to achieve exactly that.

Dylan Kelly

analyst
#17

All right, that's fair. Regarding concentrate sales, you said you're aiming to tighten working capital by using — was it containers rather than, well, is it simply bulk at present? How would that help improve things going forward? Just to give us a bit of clarity on that.

Ian Poole

executive
#18

Alright, thanks Dylan — this is Ian here. As things stand right now, our bulk shipments leave in increments of about 5,000 tonnes. Once we shift over to containerized load — containerized freight — that figure will come down to between 1,000 and 2,000, which means shipments will arrive on a more regular basis; that's the way we'll bring down our working capital and achieve improved cash flow.

Dylan Kelly

analyst
#19

All right, that's clear as well. And just one last thing, regarding...

Daniel Clifford

executive
#20

Dylan, this is Dan. I just wanted to jump in and add something here. What stands out clearly when you compare the assets is the gap between gold produced and gold sold. At Peak and Hera, for the vast majority of the time, they'd be selling pretty much what they produced. That isn't what happens at Dargues. Because of the buildup needed to reach a decent number of trains and the shift load, you can see it sitting there toward the end of the quarter. And the difference there between tonnes produced — sorry, ounces produced and ounces sold comes to nearly 3,000. By moving to the containerized approach, we'll be shifting stock out for sale much more often instead of letting it accumulate, and that puts an end to these swings between building inventory and selling.

Dylan Kelly

analyst
#21

All right, that's pretty clear. Just one last thing on Hera — I didn't really follow the reduction in tonnes, and have those issues been sold? Could you give us some detail on that? And how much longer might you be able to draw on grades that high compared with the resource model as it stands?

Peter Trout

executive
#22

Dylan, Peter here again. So I noted earlier in the quarter that we'd run into difficulties accessing stopes at the North Pod, and those are now sorted out. We also had remediation to carry out around existing developments further down the line, and that's been resolved too. So we're back to steady ore delivery. In fact, looking at the quarter, you'll notice we actually mined more tonnes than we milled. During the latter half of the quarter, since blending capacity wasn't available, we fed considerably higher base metal grades into the circuit, and that created a real bottleneck in the process plant. Looking ahead, we expect those elevated grades to persist through the current quarter but to ease afterward. That said, I'm never going to complain about grades through the concentrator coming in above expectations.

Dylan Kelly

analyst
#23

That makes sense. Could this create a chance to begin tracking additional North to Peak material so we can deal with that high grade? Or would that still be somewhat further out?

Daniel Clifford

executive
#24

That one's somewhat further out, Dylan, mainly because of consenting.

Operator

operator
#25

<<operator_script>> Andrew Bowler from Macquarie has the next question.

Andrew Bowler

analyst
#26

Clearly, today’s vaccine rollout in New South Wales has gone quite well. I was just wondering what assumptions you built into your guidance regarding restrictions and that sort of thing. Obviously, people can move around a bit more freely these days—or was your guidance based on a fairly insular model at your sites?

Daniel Clifford

executive
#27

I'll handle that question. Dan here, Andrew. So the fact that we've reaffirmed our guidance is likely tied fairly closely to the COVID situation, and we're 3 months into the year. Restrictions are easing, and I'll return to that after this remark. Our thinking is that once restrictions begin to ease, what we usually observe at these inflection points, where a change occurs, is that labor scarcity reappears. And whenever a change happens between us and our major contract partners, we can settle things down over a period of time. But when these changes or inflections begin and the gates open, for want of a better term, we held the view that labor scarcity or shortage will persist during this period when restrictions are opening up. So we're quite cautious about what that means for us. In addition, regarding the protocols we're putting in place, I think we mentioned this at the last quarterly. Now Aurelia has all 3 of its operating assets located in regional New South Wales. We are clearly still seeing a gap between the state average and the regional averages, particularly by separate LGAs, and because of that, our protocols are not changing.

Daniel Clifford

executive
#28

We're keeping in place some pretty significant protocols, I suppose, when it comes to reducing or removing the possibility of COVID reaching our sites. And alongside that, there will still be certain ongoing inefficiencies tied to those restrictions. We'll be watching that closely. But right now, our guidance — the reaffirmation of that guidance — has factored in COVID, and I think partly the reality that we're still just 3 months into a 12-month guidance period.

Andrew Bowler

analyst
#29

On the vaccination rates side, I suppose — clearly, as you said, it's been widely covered that New South Wales doesn't have rates quite up at metro levels. Obviously, in Western Australia the minerals industry alone has made vaccines mandatory for its staff. So is New South Wales considering that kind of step? Or would you say things there lean a bit more toward pro choice?

Daniel Clifford

executive
#30

We're more pro-choice on this. When it comes to the state government's mandatory vaccination directions, the minerals industry—or resources industry—wasn't included. Like a lot of producers in New South Wales, I'd say we're monitoring that very closely to understand what it means for us. So from where we sit, whenever we know there's a gap between our LGAs generally and the state average, we'll keep these protocols in place to make sure we reduce as much as possible the risk of an outbreak at our site. It's really—we describe climate change as fast-moving, and COVID is exactly the same for us. We're confident in the controls we have; I'd say we've probably been overly cautious until we get a clearer line of sight, at an individual level, on where people stand in terms of status. And like many operators in the state, I think we're probably on the fence about our views on mandatory vaccination versus not. We've decided to encourage vaccination and provide extra opportunities for people at our site and in our community until we get a better fix on what those numbers look like, and then we'll reassess that decision pretty much on a 2 weekly to a monthly basis.

Daniel Clifford

executive
#31

To add a little more detail on that, I think it's visible that vaccination numbers seem to be easing somewhat. What that has allowed us to do as a company is place pop-up clinics at our locations now. So they're not only there for the good of all our staff, but also accessible to the communities, especially in and around the Nymagee Hera area, and hopefully, as we move further into the Peak and Cobar area. And that's simply something we can do for the community, but it also makes getting vaccinated much easier for our people.

Operator

operator
#32

That brings us to the end of the question-and-answer session. At this point, I'll return the call to Mr. Clifford for his closing comments.

Daniel Clifford

executive
#33

Thanks, Rachel. So to wrap up, the phrase I’d like to use here is this: I believe you’ve seen that we are close to moving past this complexity—especially when it comes to how operations are performing and the strategy supporting that. For us right now, it’s straightforward. The highest-grade ore gets priority at the mills. For us, cost per tonne—our all-in sustaining costs—combined with throughput equals cash flow. Now, when we discuss complex ore bodies, management’s job is to manage that complexity. That means drilling out the model, planning, planning, planning, and executing. So our role is to make this as simple as possible for our investors. It’s durable. And you can see from the exploration results we’re achieving—just the sheer opportunity to extend our mine lives here is genuinely extremely valuable. I also think the commodity mix for us—gold-dominant, high-grade base metals, and copper now—really gets to the core of what our strategy is. Let me just give a bit of a recap across the 3 areas we covered and really state it plainly. We reset this paradigm of complexity with simplicity through our operating performance, supercharged the IRRs with our exploration and development, and the opportunities ahead of us are tested in the near term and tangible across the range of precious and base metals.

Daniel Clifford

executive
#34

As we turn that corner, I think you can likely feel this — I considered whether there's a better word for it, but regardless, a contagious kind of enthusiasm about the business, grounded in complete confidence and conviction regarding what the team is driving out here and placing us and our investors in a truly compelling position with the platform that's laid out. We look forward to the one-on-ones following this presentation over the course of this week and next. And also importantly, just as a reminder to everyone, the Aurelia AGM will be held on the 4th of November. With that, thank you very much, everyone, and we will speak later on in the quarter. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aurelia Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Aurelia Metals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aurelia Metals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.