Aurelia Metals Limited (AMI) Earnings Call Transcript & Summary
January 27, 2022
Earnings Call Speaker Segments
Operator
operatorAt this point we'd like to pass the conference to Mr. Dan Clifford, Managing Director, so he can take over. Please proceed.
Dan Clifford
executiveThanks, Melanie, and good morning, everyone. Joining me this morning are Ian Poole, Peter Trout, and Adam McKinnon. Earlier today, we posted three announcements: the quarterly report, the Federation Exploration and Operations update, and the eagerly awaited package of work on the Great Cobar pre-feasibility study, plus the December 2021 quarterly update and outlook presentation, which we'll be referring to throughout this morning's talk. To begin with, H1 was on plan. All of our activities were aligned with what we're aiming for this year, but also with the threats as well. When that threat loomed, the only option for us was to absolutely get on the front foot, and that's what we did. With COVID-19 and the Omicron variant, I'm immensely proud of what our site teams through and through have delivered when it comes to protecting the businesses and our shareholders' investments in us, the business, with that threat coming at us. Looking back over the last couple of years, I don't think anyone would be surprised to hear me say that I think, as a business, we got quite match fit when it came to this and how we managed this threat. With Omicron arriving over the last couple of months, while it hasn't been without impact on us, the actions we've taken within the business have contained all of this, and we may remain well within the commitments we've made to the market through the course of this year.
Dan Clifford
executiveThis morning we're going to go over that performance in light of those remarks, especially on resourcing, and also address how steady our metal output has been along with the tailwinds from where we sit on forecast gold equivalent across production, grade, and commodity pricing. We'll walk through the solid footing we have as we look ahead in the business, with some small tweaks to production, a better cost outlook, and a really strong cash build. Then we'll move into a discussion of Great Cobar and Federation, both of which are ours, and as we've mentioned quarter after quarter now, they represent a huge opportunity for our business. They're an absolute classic case of organic growth, and once again we're progressing step by step toward execution of these projects. Moving now to slide six of the presentation deck that was loaded this morning. I just want to begin with a few comments about our sustainability performance. Looking at our injury frequency rates, they've again halved over the past 12-month period as we push the business forward toward what we as a management team believe good looks like. That will keep going as the business matures. Group environmental incident frequency did show a slight uptick during the last quarter, particularly through November.
Dan Clifford
executiveThere were two small water-related problems, either at Peak alone or at both Peak and Hera, and those played a part in that slight increase. But across a full year, delivery of improvement throughout the business remains very steady and consistent. Let's move to slide seven. As a business, we've spent a long time now concentrating on those basics — injury frequency rate and environmental performance. This year in particular, the business has put real emphasis on how durable the foundation is that we're using to take this business forward. Over the quarter, we made meaningful progress when it comes to ground truthing. That's my term for ground truthing what we see, what we think, and what we feel about the way our business is run. We ran our first full employee survey across the business. That survey is, and can be, internationally benchmarked when it comes to responses, and we achieved a 75% strike rate for people taking part in that ground truthing of what it's like working within Aurelia. We launched our diversity inclusion working groups, and we've assessed our performance in that area so that the experience of working within this company can be significantly improved. Also, on code of conduct and how we want this business to perform, how we carry ourselves in the business arena, 50% — over half of our workforce — has now gone through our code of conduct.
Dan Clifford
executiveOn top of that, we are well into year one of how the business is responding to climate change. Once again, I lean on that ground truthing idea — getting a clear picture of our risks and opportunities as we build that foundation inside the business. Peter, over to you.
Peter Trout
executiveThanks, Dan. I'll cover our operating results on slide eight of the presentation deck. To build on a point Dan made earlier, it's genuinely encouraging to witness the steadiness that's showing up in how we operate. That's an area we've focused on improving over recent years. As you'll note in the December quarter's figures, we once more produced roughly 27,000 ounces of gold at an all-in sustaining cost of slightly under AUD 1,400 per ounce, in line with the previous quarter. That really is a tribute to the teams at our sites. Over the past quarter they've put in tremendous effort to achieve safe production while contending with a tight labor market, limited movement of people, and shifting protocols to handle the COVID-19 threat, for both our workforce and our local communities. We posted reduced quarterly output of lead and zinc metal, partly offset by increased copper production. That mirrored one lead zinc mill feed campaign and two copper ore campaigns at the Peak Mine during the quarter. Output at Peak was held back by underground mine ore delivery. Processed ore tonnage came in 8% lower than the prior quarter. Labor shortages were the main drag on our underground mining performance, with roughly 10% of roles unfilled during the quarter.
Peter Trout
executiveWe've started a set of adjustments aimed at reducing those effects, and we're collaborating with our mining contractor on a resolution for the longer term. Turning to Hera, throughput rates at the concentrator were once more limited by unusually elevated base metal feed grades, which produced record monthly figures for both base metals feed grade and concentrate output during the quarter. Some solid effort went into partially bottlenecking the filtration circuit so that reasonable throughput could be sustained despite the higher base metal feed grades. Additional December quarter highlights at Hera included Redpath's successful mobilization and the launch of underground mining activities at the beginning of January. We also began development toward the Upper Hayes deposit, which is expected to supply several months of extra mill feed and thereby extend Hera's mine life by several months. Shifting to Dargues, the operation performed in line with expectations during the quarter, posting consistent quarterly results across all mined and processed feed grade and gold production. We additionally observed improved gold recovery and concentrate grade, driven by a higher gold to sulfur ratio in the ore feed along with optimization of the flotation circuit. Underground infill drilling has resumed for purposes of mineral resource estimation and mine planning. We further spotted a chance to open a new scoping area in the upper portion of the deposit, which will mean sustaining capital expenditure carries on into the June quarter.
Peter Trout
executiveWith that said, I'll turn things over to Ian so he can walk us through how we performed financially.
Ian Poole
executiveThanks, Peter. Aurelia has delivered another strong quarter, and it remains on track with its FY 2022 operating guidance. At the close of the December quarter, Aurelia held AUD 95 million in cash on hand — up AUD 29 million from the September quarter — and is well placed to keep funding its exploration program along with the Federation and Great Cobar growth projects. Sales revenue rose 38% during the quarter, driven largely by volume, though realized prices across all of Aurelia's metals stayed robust. The realized gold price was unchanged from the September quarter. Realized copper and lead prices rose by 12%, while zinc fell by 2%. Dargues generated operating cash flow of AUD 9 million, helped by higher sales as concentrate stocks built up in the prior quarter were realized. Peak's operating cash flow of AUD 32 million also benefited from increased gold sales and from the realization of lead and zinc concentrates that had built up in earlier periods. Spending during the quarter included AUD 2.3 million on the Hera Federation Village, which provides enabling works for the Federation project, AUD 1 million on studies for the Federation and Great Cobar projects, and AUD 700,000 on environmental approvals.
Ian Poole
executiveIn the quarter, we spent AUD 4.3 million on exploration, covering infill drilling and exploration at Federation, and AUD 1.8 million on drilling at Great Cobar. Aurelia keeps making its balance sheet stronger, and we repaid AUD 4.1 million of debt on the term loan, which is due to be fully repaid by September 2023. Aurelia also got AUD 5.5 million back in cash from its bank guarantees that were used for environmental bonding. I'll now hand things back to Dan, who will bring you up to date on the FY 2022 operating guidance.
Dan Clifford
executiveThanks, Ian. Our outlook for the year has been adjusted a little, especially given that we're now halfway through it and have also given in-depth thought to where things stand with Omicron and COVID-19. For gold, we've guided to the lower end of the original range, and that mostly comes from Peak. As Peter mentioned, we're dealing with some resourcing issues there. Also, as we look ahead this year, Q3 and Q4 should show smoother quarter-on-quarter production than what was indicated previously for the first half of the year. Lead and zinc sit at the upper end of the range. Copper remains unchanged, or is within the range. Given both metal prices and productivity, along with the activity levels we foresee going forward, we're lowering all-in sustaining cost guidance to AUD 1,350 to AUD 1,550, down from AUD 1,500 to AUD 1,700. I mentioned that we've factored COVID into this. It's really important for us to note here that, as I said earlier, we've seen the impacts of this coming through not only in our operations but in society in general. We've factored these in. We see that, particularly in New South Wales, we've gone through the Peak, and we're making that assumption as we go that our labor constraints and supply chain constraints start to alleviate as absenteeism, or absences from work, alleviate as the wave goes through.
Dan Clifford
executiveOne thing worth highlighting is that our confidence in where we're going this year remains very strong. The first half came in precisely as planned, and we're eager to keep that momentum going as we move through the rest of this year. Over to you, Peter.
Peter Trout
executiveThanks, Dan. I'll turn to slide 13 in the deck and discuss the Great Cobar project. We completed the Great Cobar pre-feasibility study during the quarter, and that study showed the technical and economic viability of building a new satellite mine at Great Cobar, with the operation feeding the Peak process plant across a span of roughly five years or so. This baseload feed from Great Cobar will also support feed from other sources, so that we can make better use of the process plant capacity available at Peak. In how we approached Great Cobar, we applied a methodology similar to the one used for our Federation project. We now hold enough information from drilling and studies to give us confidence to invest in an exploration decline. That decline itself delivers an economic return on the cost of accessing and producing from an initial mining area. This gives us a lower risk way to establish underground drill platforms that will let us unlock the deposit's potential and shorten production lead times, assuming our drill programs see further success. In the Great Cobar PFS, we assessed four mine design options around an initial mining block, and that initial mining block was based on the higher confidence indicated portion of the 30 June 2021 mineral resource situated near the path of the exploration declines.
Peter Trout
executiveThe chosen design relies on the identical mining techniques that are used at the Peak Mine. It's also worth noting that no changes to the process flow sheet are needed in order to treat the copper gold feed coming from Great Cobar, and we expect that feed to yield both a high-quality copper gold concentrate and a doré product. On a standalone basis, the project economics in the PFS are highly leveraged to metal price, and they give Aurelia greater exposure to copper prices as part of our copper ready strategy. Through the PFS, a maiden ore reserve of 840,000 tons has been declared at Great Cobar, and it forms part of the Peak Mine's ore reserve. At the end of December 2021, the ore reserve at Peak had risen by 19% to 3.2 million tons, which allows for mining depletion from the prior estimate as well as the addition of Great Cobar. The PFS also pinpointed some great opportunities for realizing more value from Great Cobar, and I'll hand over to Adam, who will take us through those.
Adam McKinnon
executiveThanks, Peter. As you noted, the PFS pinpointed meaningful opportunities for value uplift — from additional growth in the mineral resource, from extending the mine life, from the possibility of processing the high-grade lead-zinc mineralization within the deposit, from stronger metal prices, and from the chance of finding further economic mineralization near the deposit. During the last quarter, the company reported some very strong results down plunge of the project PFS area, including 5.4% copper over 13 meters and 4.2% copper over 12 meters. Those results pushed the mineralization as much as 100 meters beneath the prior mineral resources, yet because of when the data cutoff fell, they were left out of the PFS analysis. Over the last quarter, surface drilling at Great Cobar carried on, testing the zone as far as 300 meters further down plunge once more. Given the longer assay turnaround times the whole industry is now seeing, complete assay results for this particular program are still pending. Turning to slide 15 of the investor presentation. Aurelia has by now finished over 31,000 meters of diamond drilling at the Federation project during the first two quarters of FY 2022, as the project edges nearer to operating status. The most recent assay results from the program keep confirming Federation's incredible grade profile.
Adam McKinnon
executiveThese results we're announcing today are the strongest set we've had so far. Among the standout intercepts are 18 meters at 34% lead zinc along with 13.1 grams per ton gold, 57 meters at 24% lead zinc, 30 meters at 24% lead zinc and 3.9 grams per ton gold, plus a remarkable 18.6 meters at 48% lead zinc and 1.3 grams per ton gold. Worth pointing out is that among these results are several bonanza grade base metal intercepts, such as 5 meters at 62.7% lead zinc and 10 meters at 61.6% lead zinc. To put that in perspective, the combined lead zinc grades here exceed what the bulk concentrate product being turned out right now at the nearby Hera mine contains. These recent results have also verified that a new high-grade gold corridor exists at the southwestern edge of the main deposit, including 5 meters at 47 grams per ton gold and 3 meters at 23 grams per ton gold, and that area stays open or only sparsely drilled along strike. The drilling data cutoff for the Federation feasibility study is set for the end of this month. That said, despite the extended assay turnaround times I mentioned earlier, intensive drilling aimed at upgrading and extending the Federation resources will keep going through the March quarter.
Adam McKinnon
executivePeter, I’ll turn it back to you now.
Peter Trout
executiveThanks, Adam. Federation is simply a remarkable ore body and deposit, and we're really excited about the contribution it can make to the future of our production hub at the Hera site. The most recent drill results are especially encouraging, since a lot of the intercepts sit outside and right next to the mining area that the March 2021 scoping study delineated. The long section on page three of the announcement shows where these recent results are positioned relative to that scoping study mining area. Because of this, we anticipate the latest results will make a positive contribution to the feasibility study mine design. The feasibility study program carried on across multiple work streams in the December quarter, and the study is still on track for completion in the middle of this calendar year. Alongside the study program, we also hit an early project milestone, with stage one of the Hera camp expansion delivered on schedule and on budget. That facility is now able to house the extra workforce needed for the on-the-ground work beginning in the months ahead at Federation. You'll find a photo of the camp expansion on slide five of the presentation deck, slide 15 of the presentation deck.
Peter Trout
executiveOn the site works side, we've brought contractors on board to handle the civil works, the box cut excavation, and the development of the exploration decline at the project site, and that's going to give us a clearer picture of the deposit's geology as well as let us do bulk sampling. Regulatory permitting work for the full project approval is also still on track, and we've been helped by the Commonwealth Government confirming that the full mine development doesn't need approval under the EPBC Act. Dan, back over to you.
Dan Clifford
executiveThanks, Peter. I'll give a brief summary before we move on to questions. I'll go through it in reverse order. I think you can sense the team's enthusiasm about what's ahead when it comes to delivering on these projects — the organic projects inside the business. What I really want to highlight here is that as we finish up these feasibility studies — these are pre-feas or final feas — drilling keeps going. The upside emerging from these results is opening up even more opportunity across all three of our assets. Over the year, including last year and this first half of this year, we've genuinely established a solid foundation, and that has placed us in a tremendous position as we move toward executing these projects. Declines, box cuts, surface work, civil works, ventilation work, particularly at Federation and Peak in the near future. With the balance sheet strength, the operating performance and our outlook, we truly are well placed to take the business home. Even with the threats facing the business, we're highly confident about where we've positioned the business and where we'll have it by the end of this year. With that, Melanie, I'd like to open it up to questions, please.
Operator
operatorThanks. Should you want to pose a question, kindly hit star one on your phone and hold until your name is called. To withdraw your request, hit star two instead. In case you’re using a speakerphone, please lift the handset before asking your question. Our first question is from Dylan Kelly at Ord Minnett. Go ahead, please.
Dylan Kelly
analystMorning, everyone—congratulations on what is genuinely a strong result. It's terrific to watch several of those figures come through, especially cash flow. Great to see. There's plenty to cover, so I'll aim to keep this tight and then return with further questions. On the guidance revisions, especially regarding costs, could you take us through the various components involved? My understanding is that at present the sector is moving the opposite way when it comes to raising cost guidance. You're headed in the reverse direction. What exactly is driving this? Is it largely base metal prices? Lower TC's? Yes—could you tie that together with the balance you're attempting to achieve, and perhaps mention labor or development crew availability as things stand right now?
Dan Clifford
executiveDylan, this is Dan. I'll take a shot at responding to that. I think it's fairly clear to us as we head into the year, given how the year went. We formed a view on base metal pricing as we entered the year that we likely set or locked in around April or May. Since that point, we've watched base metal commodity prices climb. That feeds the tailwinds of a declining all-in sustaining cost. On top of that, we're seeing some strong grades coming out of Peak and Hera in particular when it comes to base metal grades. You can see how the mix of base metal guidance landing at the upper end or within range, the commodity prices, and, to some extent, some of the activity levels underground while we're short staffed, has pushed that all-in sustaining cost down by that AUD 150-AUD 200 bracket.
Dylan Kelly
analystRight, I get it. So if Hera is coming in at around AUD 46 per ounce — which, sure, isn't a huge volume — that still helps push things the right way a bit. All right.
Dan Clifford
executiveYes. With Hera, it's also worth pointing out — Peter didn't bring this up — but, you know, we've run that plant extremely hard, and it's generating metal output considerably beyond what its nameplate capacity says. There's a cause for that. That's the main cause its throughput has declined. We have to dial it back. Measured per ton, it's coming out above nameplate. That definitely helps under any circumstances. You can see what that has delivered. The outlook for gold equivalent as well, not just from the half one result, but from what we expect in half two. For us, it has been a terrific outcome.
Dylan Kelly
analystThat's good to hear. So does that create an opportunity, maybe, to truck some ore up to Peak once you begin hitting some of those higher grades? Or is that still a fairly minority situation, where the grade is too high for the mill to handle?
Dan Clifford
executiveHonestly, from an economics standpoint, we'd likely be better off at this point putting a bit more into stock — especially given any potential headwinds around labor availability. That's what we're doing right now. As most investors are probably aware, we're examining that. We're working toward that flexibility through the approval status of the Federation project, so we can either truck it up the road or leave it on that site.
Dylan Kelly
analystAlright, that's reasonable. The second question relates to Great Cobar and the study. I'm just trying to get a handle on the options. So the options you examined regarding volume — I mean, 450,000 to 500,000 tons. How should we think about that with respect to the strategy of filling Peak's mill? Will it be something like a 50/50 split, or 60/40, between Peak and Great Cobar and the existing Peak North operations there? Could you just take us through that, and then we can return to timing.
Peter Trout
executiveHi Dylan, Peter here. In reviewing the various alternatives for Great Cobar, we faced two key constraints. The first involved ventilation and airflow; the second concerned the ability to rotate through the stopes while maintaining steady output. The choice we made delivers the greatest ventilation volume, and it will bring us to that 500,000 ton per annum rate at Great Cobar, given the sequencing and turnover of stopes and the mining methods we've applied. As for how it fits into the overall feed composition, that will shift from one year to the next, based on what's occurring at our other deposits in the Peak complex. We've said before that value guides us, so in any given period we're seeking the highest NSR material to run through the plant. We weigh that against the logistical difficulty of campaigning separate lead, zinc, and copper feeds through the processing plant. We've found it works best when we can accumulate a reasonable stockpile of material and feed it for more than a month, which minimizes the losses incurred when we halt the plant, clean out, and switch to a different feed. I suppose that's a lengthy way of saying it will vary, period to period, Dylan, depending on what's happening within the broader operation.
Dylan Kelly
analystAlright. And building on that, when could this realistically be presented to the mill? Forgive me if I don't state this accurately. The timing is permits by the end of this calendar year, with 18 months of development time. Where does that leave us regarding first ore at some point in 2024?
Peter Trout
executiveDylan, I'd point you to slide 20 near the back of the deck, where we lay out the timeline for Great Cobar, and as you mentioned, we're aiming to have all permits in hand for the complete mining operation by the close of this year. The EIS has already been filed, and we've been through the public submissions and feedback stage. The exploration decline has its permits in place right now. We expect to kick that off around the middle of this calendar year, followed by approximately an 18-month stretch to develop and reach the deposit, with initial stoping production targeted for roughly the beginning of calendar year 2024.
Dylan Kelly
analystAll right, I hear you. Appreciate you clarifying that. That helps. I’ll come back around with additional questions later, everyone.
Operator
operatorThanks. As a reminder, if you'd like to pose a question, hit star one. Our following question is from Sam Berridge at Perennial. The floor is yours.
Sam Berridge
analystGood afternoon, guys. A quick question about costs at Peak. I noticed your all-in sustaining costs rose slightly versus the prior quarter, though by-product credits clearly climbed substantially, which implies your gross costs in dollar millions before those credits were considerably higher. That seems like a meaningful increase. You mentioned staffing problems and that sort of thing, but I'm just wondering whether anything else is affecting it and how we should think about the coming quarters?
Dan Clifford
executiveDan here, I believe, Sam. Right now, the main factor for us at Peak, I'd say, is reduced throughput levels. Operating costs and sustaining capital in actual dollar terms are not significantly above our planned level for the year. At this stage, regarding what we are observing at Peak, cost per ton is going to come in above our plan for the year, given that we expect throughput to fall short.
Sam Berridge
analystGot it. I may say a bit more about that offline. Moving on from there—with those strong grades coming through from Federation drilling—is there room, or is it even worthwhile, to consider something like a DSO component for that ore feed within the feasibility study? Or are these zones too small right now, such that you're better off simply blending it through?
Dan Clifford
executiveHonestly, the way I see it right now, it would simply be a smooth blend.
Sam Berridge
analystRight. Okay, understood. And finally, regarding Dargues — the solid gold guidance still seems to call for somewhat of a grade improvement from that deposit during the second half. I'm just wondering whether there are particular stopes, you know, individual stopes and such coming through that you've observed, which, you know, give you a degree of confidence that those second-half grades will be delivered.
Dan Clifford
executiveYes. The drilling out is complete. In fact, Sam, we're well into the second round of underground drilling out for the LOM. We're confident that the average contribution from Dargues in the second half will be stronger than what we saw in the first half. As we drill through, there are some ups and downs, but our confidence remains that Dargues will deliver a stronger second half.
Sam Berridge
analystUnderstood. Okay, wonderful. Appreciate it, everyone. I have nothing further.
Operator
operatorThanks. The following question comes from Dylan Kelly at Ord Minnett as a follow-up. You have the floor.
Dylan Kelly
analystApologies once more, everyone. I just want to ask about when the Hera mill refit is scheduled. Looking at slide 21 in the deck, is there a window during 2023 when we'd begin discussing development moving into early production of trucking, or going back up to Peak given where things stand now? How should we be thinking about that?
Dan Clifford
executiveDylan, neither path is closed off for us. We are, you know, still completing the feasibility work right now, and once the final call is made on how that configuration—how that mill—will look, we'll put those to the test. But across the planning work we've been carrying out for quite a stretch now, we're aiming to guarantee that optionality remains in place. Given a longer mine life ahead, you know, with this drilling program, especially at Federation, it will come down, for us, to which route delivers the strongest cash flow during the early phases of developing and commissioning the operation. That hinges on whether the material can—and on the final choices we land on regarding mill configuration—go through the current Hera plant to produce a bulk con, versus what the economics look like for trucking it up the road to a separate plant. There are costs tied to improved payability, and there's simplicity in running it through the Hera mill as a bulk con, though that gives you lower payability. It comes down purely to economics. We're ensuring both options stay available so we secure the best cash flow result in the project's early stages.
Dylan Kelly
analystAll right, got it. I guess I keep circling back to this question about, you know, filling the mill at Peak, and how we should model that going forward. Starting in 2023, should we be assuming the mill operates at full capacity?
Dan Clifford
executiveYeah, that's exactly it — that's what we intend to do. I mean, across the past two to three years — three years, really — our mill feed, or throughput, has been going up by double-digit figures year on year. Getting to that point is absolutely our intention. You know, what Great Cobar brings online is significant baseload at a good copper grade feeding into that plant, which supports further discovery, I suppose, of lead, zinc, and gold ore bodies in and around the existing Peak operation. The absolute intention is to choke it.
Dylan Kelly
analystAll right, that's reasonable. Would you mind if we returned to Dargues for a moment? Do you have any response to what Sam asked about anticipating a pickup during the second half? Big expectations. Why is it currently sitting at roughly sub four? Is there still some dilution flowing through? What is the situation on the ground there regarding what the model expects versus what you are actually seeing? And on that same topic, what has been restraining it, and what is this opportunity Peter, I believe, mentioned earlier, involving certain stopes positioned somewhat higher in the sequence? Could you give us some detail on that?
Peter Trout
executiveYes, Dylan — Peter here. I’d rather not comment on how each individual stope at Dargues has performed. As at every one of our sites, we see some stopes beat expectations and others fall short in terms of performance. What I would say is that we now have additional information feeding our grade control model, and that model is the basis for our short-term planning. During the last quarter, it reconciled very well. We have hit zones where geological complexity is greater than the wide-space resource drilling would indicate, and we take losses in those zones. Meanwhile, in other zones we find upside, and across a quarter or a year those results will shift. Through our infill drilling program and our development work, we are seeking the best possible information to inform our mine plans. That work has produced this upper levels opportunity — establishing another mining front — which positions us well to raise capacity should we need to later on. It also provides somewhat greater operational flexibility, so we are not stuck in a tight retreat sequence across stoping areas where any hiccup carries downstream effects on mill feed.
Peter Trout
executiveWith every underground operation we run, there's a certain balancing act involved here, and the crucial piece is working to secure the strongest information in advance so that our decisions turn out well.
Dylan Kelly
analystAll right, that makes sense. I’ll come back to this in just a moment. Thanks.
Operator
operatorThank you. As before, if you'd like to pose a question, just press star one. We'll take a brief pause now so that any additional questions can come in. Our next question is from Anthony Wallace, a private investor. Please proceed.
Anthony Wallace
unknownHi, gentlemen. Excellent results, and thank you very much for the presentation. I just wanted to ask something about marketing and public relations activities for the year. Then I was speaking with a market analyst before Christmas, and he saw — I believe it was Daniel Macquarie's presentation — and said he was really impressed. He said you guys are just off the radar a lot when it comes to, you know, articles and conferences and things like that. Are you looking at increasing some of that marketing this year?
Dan Clifford
executiveWe definitely are. Yeah, during the first half of the year we put resources in place for what I discuss as sustainability and the business's non-financial performance. You know, there's a great deal of maturity and foundational work involved, and across the year we've carried that out. To really speed up our performance in that area, we've appointed a senior position within our business. You'll have seen that come through toward the end of the year.
Anthony Wallace
unknownSure.
Dan Clifford
executiveHaving said that, Anthony, it has been remarkably different—tough, I should say—to actually meet people face to face because of travel restrictions, clearly, both within the country and abroad, and that international piece matters a lot for our investor relations efforts. As a way of offsetting that, we have done—and I suspect many would agree with this remark—what has struck us is how efficient online conferences have become now. We have filled our schedule with every chance available through one-on-ones throughout Europe, North America and APAC, and we are beginning to see some new holders appear on the register from those regions. So yes, we are indeed working toward, you know, developing and stepping up how we perform there. It sits firmly on our radar.
Anthony Wallace
unknownAll right, thank you so much.
Operator
operatorThanks. That brings us to the end of the Q&A. I'll turn things back over to Mr. Clifford for his closing comments.
Dan Clifford
executiveThanks, Melanie, and I appreciate everyone taking the time this morning. I know it's a busy stretch for many of you. Just a few closing remarks. What really drives us is pursuing and delivering on our foundations and continually strengthening them. At this point, we have a great problem to have, which is these fantastic optimization opportunities within our portfolio as these feasibilities come together. Some cracking exploration results that don't make the cut for those feasibilities are leading to further resource extension as the feasibilities come through now. I think we've just seen it with a milestone at Great Cobar now with reserve conversion. We have mine design work as part of this and constant assessment of the capacities within the business and the execution of these opportunities that, when you think about it, ultimately is what delivers value for our shareholders. That optimization exercise for us — and I mentioned earlier the upside that's pouring out of these every time we put a drill bit around these three assets — has been great. Added to that, there's taking a view on the adaptation of the business and being agile in adapting our business to suit these opportunities and the upsides that have been delivered to us.
Dan Clifford
executiveOne big plus of the crew we’ve got, and, you know, as a small mid-cap company, is that we’re able to act fast on these things. Those are the main points for the quarter as far as we’re concerned. Turning to what’s ahead, our half year results come out in February. We’re looking forward to that. As Adam and Peter mentioned, given the delays in assays and exploration results, everyone is going to have to show some patience on that front. You know, we can’t release results before we have them assayed externally. That’s simply how things are for us right now. As one last note, I believe the market knows this is Adam McKinnon’s last quarterly presentation with us. On behalf of the management team, and especially on behalf of shareholders, thank you, Adam, for your commitment to the business. We look forward to seeing you on the airwaves with other companies, and the value you’ve brought to the organization has been enormous. Thank you so much and best of luck. Thank you all for your time. We’ll be back with a conference in February for our half year results. Thank you, everyone.
Operator
operatorThat brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aurelia Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aurelia Metals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aurelia Metals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.