Aurelia Metals Limited (AMI) Earnings Call Transcript & Summary

July 28, 2022

Australian Securities Exchange AU Materials Metals and Mining earnings 56 min

Earnings Call Speaker Segments

Daniel Clifford

executive
#1

Morning, everyone, and thanks for setting aside time today. Peter and Ian are also with me online. During today's discussion, we'll be referencing the June '22 quarterly update and outlook, which was posted on the platform this morning alongside the quarterly report. Before we get into that, given the time of year and the sheer number of results and calls you've no doubt been listening to — and while the impacts are real and well understood — I'm fairly confident people really don't want to hear about COVID-related issues and labor risk shortages. So for us, it's all about performance on what we can control — and have controlled — and what our response would be, or will be, for the uncontrollables. So today, if we move on to Slide 4 of the presentation deck, we'll focus on operational performance — quarterly and full year — across production, AISC and capital. Major project advancements across Cobar, Great Cobar and the Federation operation, and then how the business is adapting to the headwinds that we — I think we can all see them — with the economy and particularly project development risk.

Daniel Clifford

executive
#2

Let me start with operational performance, and we'll go to Slide 6. Following 2 genuinely strong years of consistent gains, especially in health and safety and environment, this quarter actually saw a deterioration. It's fairly common to observe when a business is under pressure that injury rates begin climbing in certain cases, which is what we've seen here. As for these injury rates, where we did see the uptick during the quarter, one thing for us is that rather than being spread across the board -- a wide range of injury types and body parts -- they're very much concentrated in hands, and particularly among our contracting partners. That makes it considerably easier for us to focus where our improvement requirements must go and very clear on where we intervene to correct the issues. Environmental performance also rose during the quarter. During, particularly the second half of the year, with our governance and oversight over the operations, we initiated a number of internal compliance audits on our development consent across all 3 operations and tenements. And during that, we uncovered some minor nonconformances against those consents.

Daniel Clifford

executive
#3

And actually, quite a few of those truly had to be self-reported. That's where the increase came from, especially during the last quarter, through May and June. Moving to Slide 7. In my view, our results, particularly in that final quarter, have clearly fallen short of the standard that we, and I believe our shareholders, hold us to. It was certainly a difficult quarter: gold came in 5% below full-year guidance, though I should note that relative to what was expected for the quarter, it was substantially above 5%. Lead was 1% lower and zinc 8% lower. Copper, on the other hand, was 12% above, and I'll get to that shortly. What I find disappointing is that several self-inflicted issues on the things within our control genuinely played a part in this result. We'll go into those in somewhat more depth soon, and Peter will take you through each operation. The main driver of the shortfall — or rather, what chiefly explains the gap — was at peak, where the higher-grade lead, zinc and gold ore campaign ended up being pushed back because of operational interruptions. So instead we ran a copper campaign. That is the principal reason we missed on lead, zinc and gold at year end, while it is what drove the beat on copper.

Daniel Clifford

executive
#4

All-in sustaining cost, which we updated the market on last week, came in 10% above the range at just over $1,700 an ounce. That variance, again, as we've described, was mainly driven by equipment deliveries for the peak owner-operator transition and the late June TC settlement for Hera, which added roughly $110 an ounce to the $150 an ounce we exceeded guidance by. What was really good to see, though, was the capital investment, particularly in growth, which was mostly Federation plus consenting and exploration. And when you combine those 2 with the equipment, we did manage to successfully invest about $20 million in the quarter, putting money into the future of the business. And also against the backdrop of what's happening with inflation, the scopes that were achieved were actually either achieved or exceeded rather than being reduced to contain the spend given that inflationary pressure, and that meant we ended up in or below the ranges we committed to at the start of the year across sustaining, growth and exploration and evaluation. Well, while we did see growth in the gold equivalent, which you can see over the page, it was achieved, but the operating performance, as I mentioned earlier, was not there.

Daniel Clifford

executive
#5

I take personal responsibility for that outcome, as does the management team, and we have the ability to fix it across the quarters ahead. Growth is solid, but it might have been more robust if we had produced a better quarter. With that said, Ian, I'll turn things over to you.

Ian Poole

executive
#6

Thanks, Dan. Aurelia closed out the June quarter holding $76 million in cash. Sales revenue for June was basically flat versus the previous quarter, coming in at $101 million, as greater volumes were offset by weaker prices. Dargues generated $4.3 million in operating cash flow, helped by stronger quarter-on-quarter gold sales, while sustaining capital rose because of the Stage 3 tailings lift, which was moved forward from FY '23 to lower the future risk of the tailings facility hitting operational capacity during heavy rainfall periods. Hera's operating cash flow for the period came to $3.9 million, reflecting larger sales volumes offset by lower prices. Settlement of the 2022 zinc benchmark treatment charges at a rate above the provision treatment charges drove the overall higher expense of $4.5 million in the quarter. Peak's operating cash flow for the quarter was affected by elevated operating costs, reduced gold volumes and softer base metal prices. In the quarter, Peak received delivery of mobile equipment to support its move to owner mining. That equipment was funded through $6 million of operating loans -- equipment loans, sorry. Aurelia invested $4.8 million in enabling work for the Federation project, including the box cut, plus $1.3 million on studies and environmental approvals.

Ian Poole

executive
#7

We put $3.7 million toward infill drilling and exploration at Federation, $1.4 million into near-mine exploration at Peak, and $2.1 million into exploration at Dargues. We also freed up $14.4 million of working capital versus the prior quarter — compared with the quarter before, that's mainly a decrease in debtors. Aurelia keeps its balance sheet in strong shape, with $76 million in cash on hand and low gearing — low gearing. Over the quarter, the company repaid $4.3 million of debt. The term loan's outstanding balance now stands at $19.3 million. Aurelia also got back $5.1 million in bank guarantees tied to environmental bonding. Restricted cash now totals $30.7 million. I'll pass it to Peter now for the operational details.

Peter Trout

executive
#8

Thanks, Ian, and good morning to everyone joining the call. Let me start by echoing what Dan said — the June quarter's results fell far short of what we expected, particularly at the Cobar district operations. Our management team is determined to produce a stronger outcome over the coming financial year. Turning to Slide 10 of the presentation, I'll walk through how we've performed operationally of late, beginning with the Peak Mine. At a high level, metal production at Peak during the June quarter came down to lower processed ore tonnage and the fact that we ran 1 lead zinc and 2 copper ore processing campaigns. We couldn't carry out the second lead zinc processing campaign, since unplanned interruptions to mining operations pushed the delivery and processing of that ore into the September quarter. Mining performance tracked to plan through mid-May, when we hit 2 abnormal production interruptions at the mine. The first came from damage to a conveyance tailrope in the shaft hoisting system — and this happened shortly after the existing tailropes had been replaced as part of a condition-based maintenance regime. We switched to a less productive and more expensive method of ore haulage, trucking it to the surface, while the replacement tailropes are being manufactured and installed.

Peter Trout

executive
#9

And I’m glad to report that hoisting got back underway yesterday, once those new tailropes had been fitted. The second of our unplanned incidents stemmed from a misfire on a stope blast, which caused blasting work to be halted site-wide while the details of what happened were looked into. After that, we made our blast initiation system simpler so the chance of human error, and of a repeat occurrence, was removed. Over in the process plant, we ran a significant scheduled shutdown during the month of June, along with several refurbishment jobs on the plant. Those depended on specialist contractors from outside. Unfortunately, the schedule had been set around when that labor would be available, and we couldn’t process the ore that came from the mine following those 2 incidents in May, so ore stocks built up by quarter end. At Peak, our team is rolling out a range of initiatives aimed at raising operational performance, with focus on our asset management plans and on hiring professional staff to back that effort. We also have multiple cost containment efforts in progress, with benefits already coming through — from the electricity supply agreement that began in January of this year, for instance, which secured prices well below present market tariffs.

Peter Trout

executive
#10

There's also more good news to share regarding the shift to owner mining at South Mine. Commissioning is underway for the initial units of the new mobile mining fleet, and we'll begin operating with the larger trucks. Productivity at that mine has already improved in a way that's clearly noticeable. On top of that, we're currently hiring for operator and maintainer positions and securing consumables needed to underpin the owner mining transition. Moving to Slide 11, this covers how the Hera operation performed, which, put simply, mirrored the deficit in ore processed along with feed grades that came in somewhat above our plan yet were lower when compared quarter over quarter. Mine production held back the ore processing results, and that caused surface stockpiles to be drawn down during the quarter. At the mine, several factors combined to create stoping delays and, as a result, reduced ore output. We ran into extensive ground support rehabilitation needs across older mining areas, and those went beyond what we had expected. An underground loader sustained significant damage when it became buried in a stope during remote logging operations, and bringing it back into service required substantial component change-outs. Beyond that, part suppliers are taking longer to deliver, which has worsened some of the loader downtime experienced at the site.

Peter Trout

executive
#11

Given those conditions, Redpath — the contractor handling our mining — brought one more loader onto the site and built up larger inventories of spare parts so that any further interruptions would be kept to a minimum. It's also worth pointing out, I think, that because Hera is a mature operation, our mining sequences there offer only so much room to maneuver. What that means is that when 1 stope falls behind, it triggers a domino effect across scheduled production within that same stoping block, which pushes back ore production, exactly as happened during the June quarter. To address this — and this was shown in the March quarterly announcement — we are developing a fourth mining area up in the Upper Hays zone, with stoping there set to begin imminently. Having this extra mining front in place will support more dependable ore delivery and will also help extend the life of the Hera mine. Turning now to Dargues, with those results summarized on Slide 12. It is really encouraging to see the site post its strongest quarterly performance. Faster processing rates through the mill, together with a 26% uplift in grade, produced gold output of nearly 12,000 ounces, and that accounted for over half of the group's gold production in the quarter. It likewise brought the all-in sustaining cost down, since the additional gold sales outweighed the higher activity levels at the site.

Peter Trout

executive
#12

It's also worth noting, I believe, that these results came in despite some difficult circumstances. Following unusual rainfall late last year and earlier this year, the site management team had to keep the water buildup in the tailings dam carefully under control. While doing that, they moved the Stage 3 embankment left on the dam forward, which gave us extra storage capacity, and that added roughly $60 per ounce to the site's full year all-in sustaining cost. A further highlight was running the backfill plant and reconfiguring the underground reticulation system, which permitted greater backfill placement rates. These things matter more and more to us for cycling through stopes fast so ore production rates hold up. At the process plant, we recorded some very solid run times thanks to our asset management regime and ongoing optimization of the flotation circuit, which cut gold losses to tailings and so helped our gold recovery results. And lastly, the newest phase of the underground drilling program, or the infill drilling program, wrapped up. As data from this program becomes available, it will serve to define the extended mineralized zones and to upgrade grade estimates for use in mine planning.

Peter Trout

executive
#13

We'll kick off one more infill drill program this quarter, once drill sites open up further down in the mine workings, and that should let us test how the deposit extends at depth. That's all from me — I'll pass it back to Dan.

Daniel Clifford

executive
#14

Thanks, Peter. Clearly, I think what you'll take from this call is that, in our minds right now, nothing matters more than operational delivery and certainty — because that flat cash flow is what we're putting right back into the growth projects and future life extensions with the group's main assets. Let's go to Slide 14, because a genuine positive in all this, especially given the economic headwinds — particularly in Australia at the moment, I suppose — has been the progress on these projects. Beginning with Great Cobar and the maiden PFS announced earlier this year — in January this year. It's now followed by — and what I'd call something of a mine field in New South Wales — full government consent for the Great Cobar project, which we've now received, and that's a fantastic achievement. It gives us a really clear path to a valuable organic copper contribution into the business. A little later, in August, with our results at the end of August, we'll provide a further update and more detail on the time lines for the Great Cobar project.

Daniel Clifford

executive
#15

Turning to 15. Federation is advancing quickly as well. Slide 15 shows you just how much surface work and escalation activity has been carried out. The box cut now stands at roughly 90%, and we are finishing up cleanup and sidewall support. Surface civil works are at approximately 70%. Some photos of that are visible there. More importantly, I think, for anyone wanting fuller footage, a video was posted to our website this morning where you can view the entire scope of work underway there, all of it gearing us up to go underground. So let me go to Slide 18. Before that, though, I want to pull back for a moment and note that we have discussed the controllables and the areas where our performance must improve. But as I think ahead about where the business stands, especially in this climate, I mean, just considering a few of the external factors and some of the uncontrollables as I perceive them, and what our response can be under these conditions. I know everyone will have heard this, particularly from the mining houses, but the hyperinflation period we are in at the moment is something that is bearing down on us.

Daniel Clifford

executive
#16

This began 3, 4, 5 months back, and it keeps hitting us. We're looking at labor increases of 10% to 12%, and that's before you even factor in whether we can actually secure that labor at all. Beyond that, energy costs are climbing, and so are consumables and supplies — across reagents, explosives, and steels — and in many cases we're hearing about escalations of 25%. Alongside all of that, I'd point to project blowouts throughout the sector, both overseas and here at home in Australia. And from some of the most recent results or data I've come across, especially from commodity analysts, take 78 projects globally — particularly in copper — and not a single one of them was delivered on budget, with brownfields and greenfields projects alike seeing CapEx blowouts of between 30% and 50%. That has an enormous impact on what those projects are expected to return. From where we sit today, it's generating high risk, or higher risk. What I believe matters greatly for us at this moment, especially given where we are and the timing of our project, is that we won't simply — and I think every one of our shareholders would expect us not to do this either — charge in blindly to this environment clinging to the assumptions we built into the business 6, 12 months ago.

Daniel Clifford

executive
#17

And I think beyond that — well, also including the main factor behind how we’re operating is delivering on these growth projects. The costs we are encountering are creating pressure on lower-grade material — on lower-grade material across all of our projects, especially at Peak. We have a high-grade to low-grade spread over 2 mines, across 6 different mining areas. There are a number of actions we will take to restrain the cost pressure that is arriving, but it is like swimming against the tide. And in some cases, some of the lower-grade material may go negative, and that is to be understood if it is marginal. What matters for us, though, is that every tonne we mine is positive, and ensuring that going forward will require a review of our operating strategies, particularly cost structure and debottlenecking, so we can bring as many of those tonnes as possible into positive territory. In addition, and I have spoken about this a great deal in strategy really over the last 2 years, and that is prioritizing the highest NSR from Federation, Hera, Peak and Great Cobar through our mills over their time frames. If you put those 2 together, and there is the potential that we see some existing capacity open up as tonnes mined, we are not mining negative margin tonnes.

Daniel Clifford

executive
#18

The capital expenditure inflation we're observing on the project risk side makes it very sensible for us to weigh against the stand-alone alternative for Federation. It's certainly worthwhile for us to evaluate optimizing the existing mill capacity they have in the basin alongside that stand-alone option. For us, I think that's a logical step given where we sit at this stage of the project junctures. I think the reality right now — and I'd even go so far as to call it not merely a reality but a genuine advantage — is that having 2 polymetallic mills in the basin gives us options. And that positions us — when I consider how we prioritize the highest NSR material, it isn't a loss of ore. It's deferring lower-grade ore to a later time, and that places us in a strong position to adjust the business for the risk we can see approaching the sector. And I think that's the work underway right now through the feasibility as we bring it to completion. I'm certain plenty of other mining houses out there are conducting precisely the same reviews we are doing now. So with that said, Peter, I'd like to please hand things over to questions.

Operator

operator
#19

<<operator_script>> Dylan Kelly of Ord Minnett has our first question.

Dylan Kelly

analyst
#20

I have a couple of questions. First, looking at the results, I think last week brought a bit of sticker shock on the production and cost side. But when I look at your cash balance for the period, it seems net cash is up slightly, and you've cut debt by $5 million. So could you walk us through — maybe I just need to go straight to the waterfall chart — how this ended up this way? Is it largely a working capital unwind of all those concentrate stockpiles sitting behind it? What was that bridge between what would look like a loss of $30 million to $50 million that suddenly seems benign, if I'm reading this correctly?

Daniel Clifford

executive
#21

Dylan, Dan here — I'll field that one. Regarding operating cash flow from the business, the waterfall makes it clear: concentrate stock levels definitely rose. So I think folks saw that during the investor trip late last calendar year — the stock build we had. The team acted quite decisively on sourcing containers as well as extra rail paths to move that coin out over the half. And as Ian mentioned, you'll see working capital returning where receivables in the business are concerned. So that's flowing through to the business. We knew they were coming. That's why it speaks directly to what operating performance looked like at that moment. So we carried on with the investment. And you're right, we did repay debt. We also keep returning cash to the business. And we look forward to the end rule and the Federation maiden reserve, which would let us extend our lives out, so we can obtain some relief, if possible, on that cash backing. So overall, for us, cash is slightly down, from $80 million to $76 million, as we keep running the operations and reinvesting into the future.

Dylan Kelly

analyst
#22

All right, that's fair. So when it comes to operations and the situation at Hera and Peak, I get that there are quite a few moving pieces involved. But regarding the limited operating flexibility and your capacity to alter that over, let's say, the short to medium term under present conditions — do your plans or your approach for addressing those kinds of issues produce a concrete near-term effect when it comes to restoring that reliability to the business?

Peter Trout

executive
#23

Dylan, Peter here. Yes, briefly. I said that at Hera right now we have just 3 stoping blocks running, and we felt that impact — there was nowhere else to turn when we hit a hiccup in a few of those areas because of last quarter. Adding Upper Hays gives us a fourth area, which brings somewhat more flexibility on that front. I'd note, and you know this, Dylan, that Hera is a fairly mature mine, and we do have some old areas there that degraded more than we expected as we mined stopes over the quarter. What that means is we must go back and install considerably more ground support to make the area safe prior to reentering. We won't be able to sidestep that going forward, but an additional mining block definitely gives us a bit more flexibility than we had last quarter. At Peak, we have the North Mine and the South Mine in operation. It's really last quarter that was affected by what happened at the South Mine with the shaft outage. We've used that period to set up areas so we give ourselves a cleaner run into the current quarter.

Peter Trout

executive
#24

The team has really stepped up now that truck orders have been coming in for nearly 2 months, working to hold rates steady and ensure a strong start once the shaft is back up and running. Even so, this underground mine will stay difficult, since we're once again in retreat sequences and several of these stopes simply don't carry much tonnage at present. We're cycling those stopes at a fairly rapid pace in order to keep production at both Peak and Hera at a sustained level.

Dylan Kelly

analyst
#25

All right, that's fair. Peter, let me dig a bit deeper into a few of the closing remarks you made about the hoist. I get that this is an area where you've been steadily dedicating considerable effort toward boosting reliability. Do you have any view on what we ought to factor in regarding extra capital so that we can secure somewhat greater availability from that equipment?

Peter Trout

executive
#26

As you mentioned, Dylan, we’ve already been carrying out work on the shaft aimed at making it more reliable. Its infrastructure is now well past 30 years old. When we provide guidance, we will include capital set aside for that program across the year. I should note that this incident was especially disappointing since we had only just swapped out the tailropes. That replacement was carried out according to the condition assessment at that time. And the damage that happened within just a few weeks put us behind where we had been, because we had just installed the spare set of ropes that were available on site. So that hit the team quite hard, I have to say. But we have definitely improved practices in the past when operations were essentially being run until failure. And we are now operating under a far more proactive approach for how we run that shaft as well as the process plan.

Dylan Kelly

analyst
#27

All right, got it. Let me squeeze in just one last question, if that's okay. Dan and Peter, it sounds like you're emphasizing flexibility quite a bit when it comes to what's going on with Federation. Am I correct in picking up that maybe there's somewhat of a shift in churn around the strategy for building or expanding the Hera mill — and possibly just using the Hera mill along with the Peak infrastructure to process that material? Or am I overreading that based on how you phrased things?

Daniel Clifford

executive
#28

Not really, Dylan. As I said before, I believe the main issue is the considerable risk involved in project development right now, along with the costs we're seeing emerge — and as I noted, shareholders would want us at this point to be looking at ways to safeguard value within the business. That is precisely what we intend to do. So alongside our stand-alone option — whether a full rebuild or a stand-alone Federation plant — we're also weighing it against maximizing the existing facilities as much as possible and adding tonnage incrementally to back their own capital. We'll certainly examine that. And as I said, I actually think — there aren't many mornings when I wake up thinking, thank God we have 2 polymetallic mills in the region supporting the business there. It's a genuinely great chance for us to safeguard value going forward. So that's an option we will be assessing.

Operator

operator
#29

Matthew Griffiths, a private investor, is up next with a question.

Matthew Griffiths

unknown
#30

Regarding the announcement earlier today about FY '22 production, the discussion appears to center on the main growth projects, namely Federation and Great Cobar. I notice that Dargues is not included among them, even though it was acquired fewer than 2 years ago. Is it still considered a key growth driver within Aurelia?

Daniel Clifford

executive
#31

No, that isn’t what we intend with it. We have timelines set for Dargues regarding consent changes and the ongoing, I suppose, enhancement or expansion of the facilities already there. What we are really waiting for is the drill results. Right now, we are still waiting on some of the exploration outcomes. So Dargues remains, in our view, an important part of the portfolio. It is simply that it likely does not carry the same level of capital expenditure and project spending that we are looking at for the 2 current projects in the Cobar Basin.

Matthew Griffiths

unknown
#32

Also, when compared with your initial expectations at the time you bought it, is it performing the way you anticipated?

Daniel Clifford

executive
#33

No, that isn't the case. I believe we were quite explicit earlier this year, when we flagged the year-end impairment on those assets back in the March quarter — late in that quarter. So that by itself indicates it isn't living up to what we expected. As for Dargues, when you look at its physicals — tonnes mined, development, throughput, backfill, feed rates — it is performing in line with our expectations. What clearly hasn't is the grade. I can't frame it any differently than saying we raised that issue early, alongside the impairment. So logically, on that front, it is not meeting our expectations — not compared with when we bought it.

Operator

operator
#34

Anthony Wallace, a private investor, has our next question.

Anthony Wallace

unknown
#35

I just wanted to circle back to a question that came up a bit earlier about how much marketing and promotion the company was planning to do. And then you mentioned that you'd brought someone on staff to improve that. I've — just recently, we've had the Noosa Mining Conference, Gold Coast Resources Rising Stars, Sydney Gold Conference, and we've got really little companies out there with one deposit, one project, spooking that and getting themselves out on the market. I haven't seen anything from Aurelia. What's happening?

Daniel Clifford

executive
#36

Yes. I believe we’re familiar with the Noosa Mining Conference. As far as we’re concerned, that’s on our radar for next year. It has definitely developed considerably over the past 2 years. I think, for us, we’ve been concentrating on a number of the more virtual events, including certain domestic broker-led events too. It is definitely on our radar. And I know we said earlier that more activity is needed in that area. I think we are definitely working toward that. And in some situations, there are also conferences we attempt to get into but actually cannot obtain an invitation for. So it’s somewhat mixed. I think I understand your point, and it is definitely on our radar.

Anthony Wallace

unknown
#37

I mean, a few of those conferences run by brokers are all right. The trouble, though, is that if you aren't a client of that particular broker, you basically don't see a thing — you don't get that broad exposure that you'd get at the other events, Diggers & Dealers and all those other kinds of things out there. So the broker-run ones are fine, but you just don't get any exposure from them.

Daniel Clifford

executive
#38

You're right about that, Anthony.

Anthony Wallace

unknown
#39

Look, there's another matter I'd appreciate you bringing up at a Board meeting, and that concerns how much — well, it's about directors and management purchasing stock in the market. Speaking for myself, I'd like to see a few directors buying right now as a sign they back the company, visibly backing it in that way. I realize it's — I realize everyone has different reasons for doing or not doing that. But I noticed Adam McKinnon, who spent years with you folks, has moved over to Magmatic. And he's made at least 2 or 3 purchases online, and that alone has lifted shareholder morale. Given that we see our current share price sitting as low as it is, those windows when the Board can buy shares — might I suggest that this be given consideration?

Daniel Clifford

executive
#40

I’ll carry that forward, Anthony. Still, as you said before, each person has their own personal limits regarding how they invest their own money. So I will definitely raise it.

Operator

operator
#41

Michael Evans from Acova Capital has our next question.

Michael Evans

analyst
#42

Two fairly straightforward ones. Sorry if this was covered in the announcement and I missed it, but no guidance has been given for FY '23. What's the timing you expect for that? And my second question relates to Federation. Do you have any thoughts on capital buyout? I realize it's extremely hard for mining companies to draw a line in the sand, since that sand keeps shifting with CapEx costs and so on. Still, some of these projects are ones where a 30% CapEx buyout can wreck the IRR, while other projects worth a 30% CapEx buyout don't actually wreck the IRR. My sense would be that Federation falls into the latter group? How do you approach flex testing? Right, this is our base case CapEx. But even so — do you run sensitivities and maybe in due course show that sensitivity to the market, along with an IRR that remains pretty robust? Is that the way you think about it? Is that one of the things you consider?

Daniel Clifford

executive
#43

Yes. Let me take the first question first, since I was planning to address that in my closing remarks about guidance and what lies ahead. So I might handle it there, Michael, if that works for you. As for the second one, I'm not certain I share your view that a 30% blowout on CapEx isn't damaging under any circumstance — regardless, 30% is damaging, it always is, and there's no way around that. So for us, accepting a 30% risk when other alternatives exist in a business that produce — that don't erode the value of the asset or the project over time is worth our reviewing. I think we've always examined these from a cash standpoint as well as a value standpoint. And we will evaluate those options. But I don't agree that a 30% blowout on a big project isn't as damaging. And I would not be at all open to letting that even happen.

Michael Evans

analyst
#44

No, I'm not saying you should. I just picked 30% at random, somewhere in the range — as you said, among those 78 projects that someone has examined, the average comes to roughly that or higher. But yes, all right. So clearly, any kind of capital allocation gets measured against every organic possibility, I suppose. And that means — and there are IRRs for projects, and then there are IRRs for capital in other places. Okay. Got it.

Daniel Clifford

executive
#45

I think the way to look at it, Michael, is that the world has shifted over the past 4 to 5 months. At the beginning of the financial year we make assumptions and base our guidance on them, and if something changes we can re-guide. But when it comes to project studies — this year we've completed a pre-feas on Great Cobar, and that was really just finishing off the feas on Federation — simply sticking to assumptions made 12 or 18 months ago, when those studies were kicked off, doesn't make sense given what's hit us over the last 4 or 5 months. And I think shareholders would want us to review what we're doing on that front and make sure that, when it comes to capital deployment, we're protecting value and driving the highest return we can based on the decisions at that point. So we are looking at it. And at the moment we're still — we're assessing that option. So against the stand-alone option, which was the original scope of the feasibility. So let us get the work done, and we'll see where it goes.

Michael Evans

analyst
#46

Yes. No, that's fine. I'm eager to see that work once it's released. That's everything from my side.

Operator

operator
#47

The next person to ask something is Glen Hussein, who is a private investor.

Speaker

unknown
#48

Right, so I'd like to return to the actual dollar figures within all-in sustaining costs, since clearly that represents a substantial jump for the quarter. A few figures were mentioned regarding one-time items on capital and similar. I simply want some clarity on that extra $30 million of all-in sustaining costs in the quarter, and which portions of it are more one-off versus tied to future capital investment.

Daniel Clifford

executive
#49

Glen, this is Dan. The main driver, really, when I think about it — for all-in sustaining cost, it's typically the denominator being gold plus the base metal offsets or credits. That's where most of it came from in our case. We were able to look at operating performance and estimate and forecast ahead what it seemed to be shaping up as. But taking the equipment late in the year, and then the recent shifts in TC cost, pushes us outside the range. And that's the thing we've been concentrating on. Sustaining capital in the business right now, thinking about it from a broad standpoint, is mostly underground mine development across all the assets, as a rule. And when development rises, sustaining CapEx rises. On top of that, we had the Dargues TSF lift that got moved forward into this year. So that's an acceleration of a project that had been planned for next year. And equipment leases — that equipment, the new equipment arriving, was picked up in sustaining rather than being handled as a finance lease and spread across. So it's a one-off too, and that's direct investment and moving to owner operate.

Daniel Clifford

executive
#50

The main thing we’ll be watching is whether sustaining capital comes in much above plan, because that flows through into all-in sustaining costs, and typically the biggest factor behind that is underground development.

Speaker

unknown
#51

All right, so for the quarter, costs came in at $60 million. That's well above the $35 million to $40 million we'd typically see in a quarter. So the bulk of it sits in sustaining capital, compared with what's normal.

Ian Poole

executive
#52

There's also sustaining capital, plus higher treatment charges at Hera — which we flagged — totaling $4.5 million.

Speaker

unknown
#53

Higher treatment costs—did those come forward, or is it simply down to the material we were processing?

Ian Poole

executive
#54

No, that's a shift in the market — it isn't something brought forward, it's a cost.

Speaker

unknown
#55

Right. All right, so that amounts to a modification in a certain kind of accounting system?

Ian Poole

executive
#56

No. <<inaudible>> So the accounting system hasn't changed. What happens is that the charges we incur are settled by the market, and the settlement covering the 2022 treatment charges occurred during this quarter. As a result, at Hera this quarter we recorded both the treatment charges for the quarter and a catch-up from the March quarter within the current quarter. So from that standpoint, costs went up.

Speaker

unknown
#57

All right, then. So this relates to an earlier quarter — partly an adjustment for that earlier quarter.

Ian Poole

executive
#58

That's right. The reason is that treatment charges across the entire market were finalized during the June quarter. Before that point, we were relying on provisional estimates.

Operator

operator
#59

<<operator_script>> The following question is from Colin Peek, who is a private investor.

Colin Peak

unknown
#60

On the labor side — so the rise in your labor costs, you're looking for that to go up by 10%, 12%. Is that right?

Daniel Clifford

executive
#61

Colin, Dan here. At this point, what we're seeing — and what we're hearing from the market and from other companies in it — is that we both see and expect something like that heading our way. Internally, we don't necessarily see those increases. But when it comes to what we observe from outside market contractors, casual labor, and so on, that's what we anticipate will be coming at us.

Colin Peak

unknown
#62

All right. I was just reviewing the employee history from earlier. Back in July 2019, the count stood at roughly 85 employees. At present you're at about 169 or 170, which works out to a 99% increase. So could you share what percentage lever currently represents of overall sales, and also confirm, for this industry, what the ideal lever percentage ought to be? That covers both direct and indirect — is it tracked in that manner?

Daniel Clifford

executive
#63

That's not really tied to sales, Colin. There are standard benchmarks, sure — things like run-of-mine tonnes per full-time equivalent and similar metrics that circulate across different businesses — but not in the way you framed it. What I think needs to be clear here is that full-time labor at Aurelia has risen over the last 3 years. A couple of factors contribute to that. Keep in mind that during that period we bought an operation, Dargues, and full-time employment arrangements were put in place with that operation's management team and staff. We're also no longer contract operated at the Dargues processing facility, which is now run by full-time Aurelia staff, just as Hera, Peak and now Dargues are. So the increases stem from bolt-on acquisition and from cases where we have assumed — where we will convert — from contract provision of that service or labor to in-housing or owner operating. And as Peter said earlier, we're going to see that again with the decision to transition the Peak underground, or certainly the South Mine underground, to owner-operator labor rather than externally provided. So full-time labor numbers will rise again, but that will be a direct offset against external resupplied or contract labor.

Colin Peak

unknown
#64

Alright, let me just turn to Dargues for a moment. You made some remarks a while back — "We believe this transaction ticks all the boxes for really shareholders and offers excellent short- and long-term value growth potential." For the investors listening right now, how would you distinguish between the short term and the long term? We're aware that it hasn't met expectations. But looking ahead, where do you see this in a year, or in 2 years? Obviously, a lot of consent shareholders are out there at the moment given the current movement of the share price. And I just think we need some reassurance here.

Daniel Clifford

executive
#65

Yes. So, similar to my earlier response, the grade fell short of what we expected. The other physical aspects of running those assets have met expectations. I think — and we did call that out. So on that measure, it did not live up to what we had anticipated. We have got 2, and we have kept putting money into exploration across the assets and containment so that we can secure margin. Those results, honestly, some are still pending. Much of the effort has gone into underground infill drilling to firm up confidence, especially at the grade control level, for what is coming at us in the near term. I think there is still an exploration upside there to shape our view of what this asset can deliver and for how long. And we continue to fund that exploration over the course of this year and FY '23 so that we can uncover further value in the asset should it exist.

Speaker

unknown
#66

Okay, let’s hope for the best.

Operator

operator
#67

That concludes the question-and-answer portion. Mr. Clifford, I'll return the floor to you now for any closing comments.

Daniel Clifford

executive
#68

To wrap up, I believe we've covered the operational performance. And to close on that point, that result is on us, and we will fix it. Peter and I—and Peter—have made clear how determined we are to turn this around. The effects felt during that quarter have been addressed, I think, when it comes to the shaft work, the blasting, and the reliability issues that followed, especially at Hera. So as we move beyond that quarter, I think we'll see a much stronger performance. Our projects are progressing nicely, and we're pleased with the direction they're taking all the way from government consents through to execution—particularly given what's happening on the surface at Federation right now. As I said, that really places us—it places us in a strong position to adapt our business at this point, because we have flexibility when it comes to milling capacities. And going back to Michael's earlier question, it genuinely does—assessing that flexibility that now sits before us helps us adjust the business to the risks bearing down on us in this economic cycle.

Daniel Clifford

executive
#69

That puts us in a really strong spot. We'll complete that work. And the result of it is—what's on the horizon for us during this quarter? We're anticipating a Federation exploration update. A great deal of the drilling has now been finished there, at least within this tranche, aimed at resource definition, and we'll provide an update in the weeks ahead once the final assays come in. Those assays will also help shape the final outcomes for the Federation feas. After that, it feeds into the Federation feasibility and the options we're reviewing there, which will also let us publish the maiden on Federation. That in turn enables us—since Federation expenditure is near term—to accomplish a couple of things: first, give guidance for the business, again returning to Michael's question, on whether that lands during this quarter, late August, especially regarding CapEx; and second, subject to the assessments we make on milling capacity, the additional or existing milling capacity lets us offer further guidance and development schedules and, of course, more importantly, the full year results at the end of August. So within that will also be the FY '22 <<inaudible>>, because we'll be able to include the Federation maiden reserve in it as well.

Daniel Clifford

executive
#70

There's been a fair amount of triangulation going on during this quarter, and we're eager to be in a position to update shareholders — all of our shareholders — on how those outcomes are shaping up. All right, so with that said and done, thank you so much for spending time with us this morning, and you'll undoubtedly be hearing from us near the end of August. Many thanks.

Operator

operator
#71

Thanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aurelia Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Aurelia Metals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aurelia Metals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.