Aurelia Metals Limited (AMI) Earnings Call Transcript & Summary
January 30, 2024
Earnings Call Speaker Segments
Operator
operatorAt this point I'd like to pass the conference call to Mr. Bryan Quinn, our CEO and Managing Director. The floor is yours.
Bryan Quinn
executiveHello, everyone. Bryan Quinn here, Managing Director and CEO of Aurelia Metals. Speaking for the whole team, I'd like to walk you through a few of the main highlights from the quarter that just ended. Thanks to each of you for being on today's call. With me are Martin Cummings, our Chief Financial Officer at Aurelia Metals, and Andrew Graham, our Chief Development and Technical Officer. During this presentation, we'll reference the slides that came out today and we'll take a bit of extra time on the diagrams included in the pack to give you context. Through the December quarter, the business stayed on track to carry out our strategy, and that included Peak lifting volumes and meters compared with earlier quarters. The Federation project is moving forward on development meters, and plenty of other critical programs are well underway. Worth noting as well that our first stope at Federation is still scheduled for quarter one 2025. Our cash position remains solid when measured against our peers, and operating discipline aimed at bringing costs down to counter inflationary pressure is still a priority, and that work goes on across our project, our operations, and in corporate. We're beginning to see some of those benefits come through, and further work is still being targeted in Q3 and Q4 so we can deliver these outcomes through focused efforts on both fronts, particularly in mining and maintenance.
Bryan Quinn
executiveAnd I suppose the way we're deliberately making this sustainable is by aiming for improvements in annual step changes. And those improvements, as I've talked about before, are embedded within our management KPIs. Right now our exploration team has four rigs still drilling in the Cobar region, and so far the results have been excellent and exciting for the Aurelia business. As a matter of fact, two weeks ago we published a number of those results from the Chesney North region at the Peak North mine. That strengthens our belief that this region, along with the leases in the Aurelia portfolio, offers high prospectivity to build upon the 90 million tons resource located in close proximity to Peak Mine, which takes in the current 16 million tons of copper reported. Given these results, over the medium term we'll keep transitioning the Peak Mine from a zinc lead mine into a copper mine. I'll now move on to the next slide, our group production and cost slide. At this stage, our delivery against guidance stays within the range given at the start of the year for gold ounces, which are planned to land at the high end of guidance. Base metals are forecast at the lower end of guidance, and for copper we are resetting our guidance so that it sits outside the previous guidance issued, as per the table in the presentation.
Bryan Quinn
executiveI'll go into more detail on stope sequencing in the slides ahead, to show where things stand as we close out quarter two and how we stay on plan through the remainder of FY 2024 so these guidance outcomes are delivered. Guidance for all-in sustaining costs is still on track, mainly thanks to higher grade stopes in the third and fourth quarters of mining, and we'll get there as well by concentrating on offsetting weaker copper metals output through a disciplined capital allocation process and by bringing operating costs down right across the company. Moving to the following slide, which covers our safety and environment: Aurelia's management team is devoting considerable time to lifting our safety results, since we've had a number of injuries while carrying out our strategy. Our relentless focus is making sure every person working at Aurelia Metals has the right to go home without an injury. Regrettably, we've seen a number of trips, slips and hand injuries so far this year. In FY 2023, Aurelia had a very strong year with very few injuries. That shows we must keep working hard in these areas so that injuries are prevented and our teams stay switched on at all times while at work. This ranks as our highest priority, and we can't rest until we are no longer seeing injuries.
Bryan Quinn
executiveSo our leadership's focus is as follows. First, we're putting time in the field, genuinely talking through safety and hazards with our teams and making sure the right tools get used before work begins. We acknowledge that stopping injuries and stopping fatalities both have to be priorities. Alongside that, we've also kicked off a supervisor leadership program right across the business. To target potential fatalities, we've started a structured program on a detailed schedule that takes one fatal risk hazard per month at every site, so management truly grasps which controls must be in place. Third, leadership will also devote time to evaluating the higher risk at every one of the businesses, confirming controls are functioning properly and that those named as risk and control owners know what they're responsible for. Our priority is to turn the trend around and cut the number of injuries our team members are experiencing, while at the same time halting anything more serious. I'll now go to the slides covering each asset and project. I'll ask Andrew to go into more detail on the exploration results, and Martin to expand on the financial results shortly. But first, I'll highlight some specific Q2 highlights and information about each of the businesses.
Bryan Quinn
executiveLooking at the big picture, operating cash flow came in above the prior quarter — AUD 23 million versus AUD 12.6 million in quarter one. Our overall cash balance sits at roughly AUD 108.7 million, backed by solid liquidity. I'll hand it to Martin to go through the liquidity in more depth. At Peak, mining production volumes rose another 11% over Q1, consistent with our plan to keep feeding the mills with quality ore. Conversely, all-in sustaining costs came in higher in the December quarter two than in the September quarter one, driven by reduced base metals output, which stems directly from the sequencing of stopes — something I'll get into in more detail on slide seven. Development at Peak has kept growing, and that's a key value driver for us. This marks essentially the fourth quarter in a row of increases. It's now reaching 743 meters, which lets our development run more than a quarter ahead and opens up our production stopes, as I'll also show on slide seven. That gives us contingency options and helps de-risk mining production across the coming six months. During quarter two, we also brought an extra production rig into service to debottleneck the drilling work, which further opens up those stopes and supports the remainder of this financial year's performance.
Bryan Quinn
executiveOur aim is to bring the debottlenecking effort back to the winder over the medium term, once drill and blast plus trucking improvements are in place as well. Mining cost per tonne kept falling, reaching AUD 123 per tonne during the latest quarter, and additional gains are planned and in the pipeline. Keep in mind that several quarters back this figure stood at over AUD 143 per tonne. One illustration of the coming step change in efficiency is using our winder for people riding in the future, which will lift utilization of our underground mining assets and boost productivity. Regarding the lead zinc upgrades, I'll use illustration seven for Peak to walk through the sequencing and am glad to give some context on how that sequencing will be delivered in FY 2024. If I move to the illustration on the actual slide seven, you will see, from a context standpoint, that our development right now is clearly well ahead of this quarter and moving into the next one. So looking at Upper Chronos, Lower Chronos, and the Kairos area as well, we're aiming to give transparency that these areas are ready to go.
Bryan Quinn
executiveAnd then, when you look at those callouts — 19,000 tonnes, 29.5, and 37,000 tonnes — those are all basically Q3 activity; they're the stopes we shifted out of Q2 into Q3. Unfortunately, in Q2 we had to resequence the stopes, pulling the Q3 stopes forward into Q2 and the reverse — pushing the Q2 stopes back into Q3. That's why you'll see the grade changes reported in our table. So overall, looking at what's left in Q3 and Q4, our stopes are well and truly ahead of us. High-grade material is being produced right now, in line with the schedule, and we're on track, more or less, to deliver what we put in the guidance table. Let me go a bit further into the illustration, just to make sure that those who can't see the PowerPoint pack have it — basically, we've got 19,000 tonnes this quarter at 16% lead zinc. We have 29,500 tonnes at 27% lead zinc, and we have 37,000 tonnes, 11.5 lead zinc, with an additional 3.7 grams per tonne gold. So those are the stopes we would have taken in quarter two but that have been moved to quarter three.
Bryan Quinn
executiveAnd as I mentioned earlier, obviously, we have shifted stopes out of quarter three and into quarter two. So, on a full-year basis, we believe we're in a solid position to hit the figures we're showing in the tables. Another major piece of work completed in the Cobar region is the rollout of a regional Cobar leadership model. In prior quarters, I've talked about putting in place a hub-and-spoke model, or a regional Cobar model. That was actually finished in the December quarter, and now we're rolling it out in the March quarter. The medium-term result for Aurelia in the region will be synergies and cost benefits, because a single leadership team under a regional GM will run operational activities. This really is a chance to standardize equipment, training, and working capital, and to optimize feed into Peak to value as we move forward with production from Federation toward Peak. If I turn to the Dargues slide, slide eight, at Dargues we keep delivering strong operational stability and credibility, even with some notable weather events. In fact, one rainfall event brought 126 millimeters over 48 hours in November, and then another three-day event delivered 87 millimeters in December.
Bryan Quinn
executiveThe team has also performed strongly in concentrating on concrete cost-reduction measures throughout this period. Development has ceased for the mine's remaining life, which means our development spending has come to a halt as well. Going forward at Dargues, and this is important, the final stopes will be mined on retreat as we exit the mine, as shown on slide eight. We're likewise currently engaged in considerable planning regarding the post-closure period — how equipment can be reused at both Peak and Federation — and we're examining how to sell the plant along with the potential mine. Retention programs are now completely secured for every person employed at Dargues. Truly, our main priority is safely delivering the remaining stopes over the coming six months, through to the end of the mine's life. At Dargues, we stay focused on safely maximising cash flow from the remaining stopes. That's essentially what we've discussed each quarter to date, and we are delivering on it. At Federation, development there has kept building from the prior quarter following the August restart of development. Some notable weather events did in fact hit the region in January — the Nymagee region. Work has been under way to give some protection against these going forward, but even though we did have to halt development for a stretch of time to handle those heavy rainfall events, it's worth recognising that construction at the site is still proceeding and the site is not yet complete.
Bryan Quinn
executiveAnd we need to implement these different controls as the project development moves forward. The concrete collar foundations for the raise bore shafts were completed in Q2, and the first raise bore was actually mobilized during Q2. I'm pleased to say that shaft 1 has been finished as far as the raise bore goes, and that has actually let us de-risk the next few shafts by gaining a much better understanding of geotech conditions as well. Actually, the most recent report is that we likely completed the shotcrete lining in the last 24 hours too. The Burthong Road upgrade is moving ahead and on track for completion in Q3 while also coping with some significant weather impacts lately. Just over 2 km of the km road was sealed at the end of Q2 and we're currently working to finish the work by the end of quarter three. Some other key milestones worth calling out are that the underground electrical substation has been installed in the decline and commissioned. And we'll also start — the underground infill drill rig has been in place and working on the final designs of the stopes for our production sequence. Lastly, at a strategic level, our growth team keeps working on optimization options for our portfolio in the Cobar region to utilize our infrastructure as we continue to set up our operations to be at full capacity in the future.
Bryan Quinn
executiveA great deal of activity is still underway across the region on the optimization front, as we mentioned in earlier quarters. Taken together, these results speak to the Aurelia team’s execution — steering through shifting weather patterns in the eastern states that triggered plenty of disruption, a labor market for talent that remains very tight — and our business has stayed resilient and generated the cash needed to fund our exploration and growth projects without drawing on any debt facilities at this point. Federation remains on schedule for first ore in the September quarter of 2025. That rests on delivery of the Burthong Road upgrades, which are coming along well. Development work has been advancing. The first raise bore activity got underway in December. And as I noted, plenty of other workstreams are in motion so we’re ready for those milestones. On project costs, we continue to contend with inflationary pressure on numerous fronts. Right now we’re managing that by reviewing the scope of work across all activities to make sure we’re clear on what the project requires and refining certain elements to keep the overall budget in check. That said, our focus at present is on achieving first ore in Q1 2025 and bringing the project in on budget.
Bryan Quinn
executiveAnd finally, today we put out the announcement about changes to the board of directors. Of course, we're very grateful to Paul and Helen for serving as directors, for the guidance they give the management team, and for the support they've shown the other members of the board. Speaking for myself, I've gained a great deal from both Paul and Helen during their tenure on the board, and we wish them the very best. I'll now hand things over to Andrew to walk through the exploration slides, and after that he'll hand off to Martin. Thank you, Andrew.
Andrew Graham
executiveThanks, Bryan. And for anyone following along, we're now moving to page 10. It's definitely nice to be back running a fully funded exploration program this year. We've mentioned many times during the past year that our ground is highly prospective. And when we explore it systematically, we're quite confident we'll achieve success. This quarter is clearly proof of that. As Bryan mentioned, we had a very successful drill program at Chesney North, where all six holes completed in that program hit significant copper, as well as gold in some holes. That was announced on the 18th of January, and I'll go into that in a bit more detail shortly. For those looking at the slide, just note that the green boxes seem to have shifted slightly to the right. So just assume they're all a little further left, but that won't affect your understanding of what we're doing there. Essentially, what we've been doing at Peak is advancing our high-priority targets. And every year we go through a process of thinking about where we want to be drilling, prioritizing those methodically, and then working through them.
Andrew Graham
executiveRegarding Peak, especially during the most recent quarter, we've been doing some work around Jubilee North — you can see that it sits just at the northern end of the North Mine. We've had drilling underway around Upper Blue Lens, which is back down in the south mine at Peak North. In addition, we've been drilling around Chesney, and I mentioned those results earlier. What's exciting to me is that we've also stepped out to drill Mount Pleasant. It's partly obscured by the green box on this slide. But if you consider North Mine and trace back, we have, obviously, the New Cobar ore bodies. You come into Chesney, and the next one along is Burrabungie. What we're chasing now is the one after that, Mount Pleasant. Mount Pleasant had some drilling in it that was really quite interesting in 1997, I believe, and again in 2007. But it really hasn't been methodically tested in recent times. So it's really exciting to be able to get some holes into that, hoping that we continue to stack up those ore bodies in the north mine. We are awaiting assays on some drilling there, and we'll let you know once those results come in. The other interesting piece, which isn't on this slide, but you're all fully aware of what we have, is what we call the Nymagee district, which covers Federation and Hera and the Nymagee mine itself across that whole region.
Andrew Graham
executiveThe team in that region has been really active. So we've been finishing up soil sampling at the Llah site. And you might remember the exciting IP results we received in that area last year. So the following stage in that exploration program involves carrying out detailed soils. With luck, we'll get strong results from that, which would then assist us in targeting our exploration efforts through drilling. So we'll obviously report back to you with those results once they arrive. We've also been drilling at the historic Nymagee mine, along with drilling for extensions near Federation. Once again, the results we've obtained were broadly in line with what we anticipated geologically. Those are currently out for assay. As soon as those assays come back, we'll update you with that information. Moving on to slide 11, which provides a summary of Chesney North drilling. This ties to the announcement released on the 18th of January. If you haven't gone through that announcement, I'd definitely suggest you download it and take a look. Our target was extensions at the northern end of the resource at Chesney. Chesney matters greatly to us when it comes to copper feed.
Andrew Graham
executiveWhat we were aiming to achieve was to close that gap in the resource up to the north. As I said earlier, excitingly, every one of the six holes in that program returned really, really strong copper. You're able to see that in a few of the core tray photos included there. Very good grades, good metres — 17 metres at 1.8% copper in one of the holes, which encompassed 3.4 metres at 5.3% copper, and likewise 7.6 at 2.2% copper in a different hole. That hole ran as high as 9.7% copper across 0.8 of a metre. So it's great that we can see strong copper results all beyond the resource at Chesney, yet all in close proximity to where we anticipate mining. And with luck, these will add to the very sizeable copper resource we currently hold at Peak, which, as Bryan mentioned, stands at 16 million tonnes at 1.8% copper and 0.8 gold. And it genuinely generates some optionality for us, which we noted in that release, regarding how we sequence copper feeds and then when we go after Great Cobar. So the drilling is certainly very exciting for us. I'll now hand over to Martin, who will take you through some of the financial results.
Martin Cummings
executiveThanks, Andrew. Moving on to slide 12, which is titled Balance Sheet. Once again, it's genuinely gratifying to be able to say that during this quarter our operations completely funded the growth at Federation as well as our regional exploration — work that, as Andrew just pointed out, is producing outstanding results and truly warrants that essential investment. Our cash balance stayed at roughly AUD 110 million across the quarter, and it got an extra boost in January when we received a tax refund of AUD 17.8 million. Together with our undrawn $24 million loan note — approximately AUD 36 million — that brings available liquidity to beyond AUD 160 million. You'll notice the tax refund figure is a bit smaller than the one I mentioned last quarter. What drove that change was finalizing the return: we identified some extra adjustments and put them through, which cut the tax loss we had recognized for FY 2023 and in turn brought the refund down. That happened during our assurance process before the return was lodged. As Bryan explained earlier, we're shifting to a higher-grade stope at Peak in the second half, and cash flow from that operation should rise further. With the mine plan at Peak resequenced, our gold group production is now expected to land in the upper half of guidance, while zinc and lead sit in the lower half.
Martin Cummings
executiveWe've adjusted our copper guidance, since our outlook had it coming in under the prior guidance. For the year, copper production guidance is now 2,000 to 2,300 tonnes. With these shifts in the production mix and attention on operating costs at both sites, our cost guidance still tracks to the original guidance of $1,850-$2,050 per gold ounce. At Dargues, we're pleased that focusing on cash is delivering strong results. This quarter we had an extra shipment that slipped from the September quarter, but it also shows the team's continued emphasis on cost management, with spend at the operation year to date below our plans. Now that the hedging program I mentioned last quarter is complete, the operation will gain from high gold prices for the rest of its life, with an average gold price of $3,072 an ounce from here. Our peak gold production stays unhedged, but we've hedged roughly 25% of payable lead and zinc production, which does give some protection to our oil and sustaining costs. The hedge prices sit around the current market. At Federation, the team reached some important milestones this quarter, with AUD 18.4 million spent, up from AUD 10.6 million in the prior quarter.
Martin Cummings
executiveWith that, our cumulative Federation investment for the year so far comes to AUD 29 million. We expect project spending to rise in the March quarter, reaching roughly AUD 25 million to AUD 30 million, as mine development carries on, the road upgrade is finished, and raised boring work continues. Our spend guidance for Federation is unchanged, staying in the AUD 70 million to AUD 80 million range. Exploration spending was also up this quarter, since the team expanded its drilling programs. We are keeping our exploration guidance at AUD 10 million to AUD 15 million for this year, and as I noted earlier, that has produced outstanding results so far. We are wrapping up yet another very satisfying quarter, one in which our robust cash generation covered our growth spending. Our attention stays on delivering the increased planned production from Peak during the second half, and on keeping up our push to cut costs at both operations. Thank you for your time today. I will now return the call to Bryan.
Bryan Quinn
executiveThanks, Martin. So just to wrap things up, I wanted to talk at a high level about reinforcing the messages we're putting out. Our real focus is on safely delivering the FY 2024 guidance and our growth outcomes. Again, on slide 13, we're very much focused on delivering the mining sequence and lowering costs at Peak, as we did in previous quarters, and on maximizing cash generation at Dargues, along with the remaining life of Dargues, as we've discussed in prior quarters. Our real focus, really, is making sure we can deliver first ore at Federation in quarter one of FY 2025. We keep working on optimizing the Cobar region, and that means looking at how we fill our mills with the right minerals from each of the operations. Exploration to deliver growth options is obviously a very high priority so that we have a very clear path for growth, as Andrew discussed. Importantly, it's also about continuing to attract and retain talent in the Cobar region. As I mentioned, we've set up a Cobar regional model with a regional general manager. We're obviously actively looking for management to be part of that, for some of the roles, to be part of that leadership team.
Bryan Quinn
executiveThat leadership group is going to have responsibility for Peak and Federation, plus whatever other projects we launch down the road. This is a significant shift in the way the organization will operate, and as I mentioned, it matters for attracting and keeping people, but equally for efficiency, productivity, and cost. To close, I want to sincerely thank the board of directors and, of course, the two directors who are departing, for everything they've given us, and I wish them the very best. I'd also like to underscore how much importance and attention the leadership team, the ELT, has devoted to this so far, consistent with our strategy and vision. They're doing an excellent job staying focused on these key deliverables. Finally, I really want to be sure I reiterate our gratitude to the teams at our sites and to our contracting partners, who are working so hard to help us deliver this plan for FY 2024. With that, I'll hand things to Darcy to open it up for questions and answers.
Operator
operatorThanks. Should you want to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, hit star two instead. Anyone using a speakerphone should lift the receiver before asking. Our opening question is from Paul Kaner at Ord Minnett. Go right ahead.
Paul Kaner
analystYeah. Thanks, Bryan and the team. I appreciate you taking my question. I've got a couple here for myself. First, regarding Peak, those 2 stopes that got delayed — could you perhaps go into a little more detail about what actually happened there with the drill and blast?
Bryan Quinn
executiveYes, absolutely, and thanks for asking. So the situation is that drilling work caused some holdups for us. Fortunately, since the development sits in addition, we could shift to different stopes and pull from those instead. Those stopes weren't lost, nor was anything else. The only issue was the delay from drilling activities that slowed us down. As a result, they simply rolled into the following quarter. So we've clearly gone ahead and now secured a third drill — a third production drill. At present, two are under contract with Redpath, and a third is now in place with our own Aurelia team too. In that way, we've more or less removed that bottleneck, if that's the right word, by bringing in the extra rig and concentrating more on fewer hole clean-outs while making sure a genuinely solid standard is established for drilling work.
Paul Kaner
analystSo it's more about drill rig availability than labor availability in that case?
Bryan Quinn
executiveHonestly, it's a combination of factors, really a mix of things. So partly that, and partly redrill and hole clean-out performance too. I suppose a number of issues have caused our drilling performance to slow down. We've also experienced some delays with certain blasting activities, but we've now fixed both of those, obviously, by adding more resources, bringing in extra equipment, and maintaining a very clear focus on those areas, along with additional technical personnel joining the team to concentrate on this. As part of the regional model we've implemented, we've actually installed an acting tech services manager who now oversees both Federation and Peak to really make sure that these kinds of things are properly planned and executed well.
Paul Kaner
analystYeah. No, that's great. Thanks for the context there. Then just second, maybe a question for Andrew, but just on Great Cobar, a nice little resource just sitting there, probably not being valued properly by the market. I mean, have you thought of other ways to potentially realize value from that asset given your capital's currently tied up with Federation?
Andrew Graham
executiveYes. Paul, thanks, Bryan. A few points to add there. As Bryan mentioned, our main focus is essentially to fill the mills. We'll achieve that once Federation begins to come online. What we're examining, however, is which ores are directed where and when you're restarting Hera, for instance, and the Hera mill. And also, what gets fed into the Peak mill? Specifically, too, what the Peak mill can do? There's a lot of latent capacity inside that mill that some very targeted spending can unlock. The other piece, and I hinted at this when we reviewed the Chesney drilling, is the sequence and timing for doing Great Cobar. So if we've got excellent, competitive NSR ore at the Peak Mine that we can extract in the quantities required minus Great Cobar, then we'll consider when Great Cobar needs to be targeted to bring those tonnes online. Look, I'm 100% certain Great Cobar will be mined. It's an excellent orebody, great grade, good gold credits. For us, the question is when do you optimize that mining?
Andrew Graham
executiveDoes it make sense to get over there and begin mining earlier? You'd only take that route if you lack the ore needed to feed at that kind of value otherwise. The other piece we're examining is simply the timing around Great Cobar in terms of reaching it, and whether it pays to get across there sooner so we can drill from underground. So quite a lot of work is underway on that front. And as soon as we have definitive answers, we'll of course bring them to investors.
Bryan Quinn
executiveAnd just to be clear on that point, Paul — the bullet on slide 13 about moving forward with optimization in the Cobar region is what I meant. What it really comes down to is pulling together everything Andrew is working on and then bringing it to the board to say, "Here is how we believe the right sequence looks going forward." And after that, obviously, we'll look at what options exist for taking it forward — whether we speed it up or let it continue at the same pace. All of that will be an investment decision that we bring to the board.
Paul Kaner
analystYes. No. I get it. Thanks for the context. I appreciate that. Cheers.
Operator
operatorThanks. Just a reminder — if you'd like to pose a question, hit star one on your phone and hang tight until your name is called. Our next question comes from Bill Murray, a private investor. Go ahead, please.
Bill Murray
unknownWe're roughly half a year out from the Federation project. Has any consideration been given to how the stopes will be sequenced? What I'm genuinely trying to get at is this: at the outset, would you be inclined to pursue the gold ore, or would the lead-zinc ore come first?
Bryan Quinn
executiveAndrew, would you like to take that question first? I’ll add a follow-up after you.
Andrew Graham
executiveSure, no problem at all, Bryan. And good morning, Bill. The way I see it, once we start ramping up Federation, we'll simply be taking ore — that's it. We won't be giving priority to gold or lead-zinc ore at the outset. If you look at that section of Federation, it begins somewhat thin in terms of tons per vertical meter, and it increases with depth. So our aim will be to get those stopes into a solid sequence while also opening up several mining areas at once, which lets us ramp up toward that 600. Something we've discussed before on calls is getting a handle on the gold. It varies quite a bit throughout the orebody. Now that we're doing underground drilling and infill drilling, that will really assist us in understanding it much better and let us consider what to target and when. As a side note, our general manager of tech services is at site this week, working alongside the team on the sequencing of stopes coming out of Federation. All of that will be fully informed and enhanced once we have that underground drilling.
Bryan Quinn
executiveAppreciate that, Bill.
Bill Murray
unknownOne more item from me. How much in the way of tax losses are you carrying forward? Once Federation is up and running, hopefully it will be a highly profitable operation. What size of tax losses do you have available to set against those profits?
Martin Cummings
executiveHi, Bill — Martin here. I suppose the primary tax shield we have right now is tied to Hera's. When we impaired that asset in June 2022, the impairment went through the accounts, but it doesn't flow through the tax books. So as we wind down at Hera's, that will create tax losses, which we'll then apply against tax profits elsewhere in the group. Given that shield, we don't expect any tax payable in the foreseeable future.
Bill Murray
unknownCan you give me a rough figure for that?
Martin Cummings
executiveI'll walk you through it. Right now we're in the middle of preparing our half-year accounts, so I'd rather not give out a figure while we're still working through where we stand on taxes as of December 31. That said, I expect to add some detail when we report the half-year results at the end of February.
Bill Murray
unknownThanks. Just one last question. When it comes to the regional strategy, the Peel assets come to mind. Without naming them as such, is that the kind of thing you'd be considering? Perhaps a joint venture with an operation that has Peel? And they have several mines there that seem quite interesting.
Bryan Quinn
executiveAndrew, would you like to address that before anyone else?
Andrew Graham
executiveAbsolutely, Bryan. Like I said, Bill, our goal is to feed our own mills. Right now we have an extremely large resource base—especially at Peak. As Bryan pointed out earlier, there are 19 million tonnes of resource at Peak. So what we're really focused on is figuring out how to develop our own ore bodies and keep those mills full. Of course, if at some point we can't fill the mill using our own ores, bringing in some of those regional tonnes could make sense. I've also spent some time over the last few months getting acquainted with our neighbors and learning what they have, considering what synergies might be possible. But honestly, the priority in the work we're doing right now is looking at what we can achieve with our own mills and our own ore bodies, which are substantial.
Bryan Quinn
executiveYes, Bill, I believe that point matters. The infrastructure is in place, and we hold a genuinely strong resource stretching from Great Cobar down to Federation. So our priority must be getting the most out of what already exists before we glance beyond our boundary and consider whether additional material could join that blend. Still, every decision will be driven by commercial logic and by whatever delivers the greatest value to our shareholders.
Bill Murray
unknownAlright, I appreciate it. That's everything on my end.
Operator
operatorThank you. As a reminder, if you'd like to pose a question, just hit star one on your phone. We're going to take a brief pause now so any last questions can come through. At this point, we don't have any more questions. I'll turn things back over to Mr. Quinn for his closing comments.
Bryan Quinn
executiveThanks, everyone, for being here today and for the questions you've sent our way. As you know, our half-year results will be released at the end of February, and we're eager to walk you guys through them. Like I mentioned, there's a great deal of work ahead of us to bring our vision and our strategy as a company to life. I think we have the right kind of infrastructure, resources, and people in place to make that happen. We're excited to keep moving along this journey toward where we want to be, filling our mills at the right value for everyone who backs the company. Once again, thank you to all our employees and investors for the support you've given us so far. We look forward to talking with you guys in roughly a month's time. Thank you very much.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone for joining. You’re free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aurelia Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Aurelia Metals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aurelia Metals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.