Aurelia Metals Limited (AMI) Earnings Call Transcript & Summary
January 20, 2026
Earnings Call Speaker Segments
Operator
operatorThanks for holding, and welcome to Aurelia Metals Limited's December Quarter Activities Report. Everyone is in listen-only mode right now. A presentation will come first, and after that we'll open it up for questions and answers. Should you want to ask something, press the star key and then the number one on your phone's keypad. At this point I'll turn the conference over to Mr. Bryan Quinn, Managing Director and Chief Executive Officer. Please go ahead.
Bryan Quinn
executiveThanks, Kaylee. Hello everyone, and thank you for being with us for Aurelia Metals' second-quarter results for FY2026. We're grateful you've taken the time to join, giving us the chance to walk through what has been a really strong quarter and share a bit of an outlook too. With me today are Martin Cummings, our Chief Financial Officer, and Andrew Graham, our Chief Technical and Business Development Officer. Angus Wyllie, the Regional General Manager for Cobar, is taking some well-earned leave right now, so he isn't with us. We'll of course open things up for questions once the call and presentation wrap up. Kindly note the forward-looking statements included in our pack. I'd like to begin by taking you through the quarter's highlights before we get into greater detail. So please turn to the highlights slide. We're delighted to report an excellent quarter on the cash flow front, delivering AUD 42.9 million in operating cash flow once our sustaining capital costs are accounted for. That result was underpinned by robust commodity prices and, clearly, very strong gold output during the quarter. The Federation Mine is tracking well. Production at our Peak Mine rose 21% versus prior quarters and keeps climbing quarter on quarter through the rest of the year.
Bryan Quinn
executiveWe're also continuing to see improvements in ore grades and recovery from the ore, consistent with our reserve model. The Great Cobar Project is going well, with our own operator teams achieving a 13% rise in meters compared with the prior quarter as we keep building momentum on that project. That keeps positioning us favorably in the copper market, given the growing demand for copper ahead, obviously. The other three expansion projects at the Peak Mine are also on track and will be delivered in line with what we expect for the expansions. Obviously, the first one is our thickener project, which is being prepared for commissioning in quarter four of FY2026, a ball mill project in quarter one, FY2027, and a materials handling project in quarter two, FY2027. So we're very pleased with how those projects are progressing, and we'll speak a bit more about that shortly. Lastly, and very importantly, our balance sheet remains very strong and continues to let us grow the business in line with the commitments we've made, reaching AUD 85.6 million at the end of the quarter, which Martin will discuss further. So if I can just move on to the production and cost slide, I'd like to reinforce the strong production cost outcomes that we're delivering within guidance for the full year.
Bryan Quinn
executiveBut the key thing I want to do is draw attention to a few specifics within that guidance. Naturally, this quarter we've been arranging our mine so the ore fed into the mill is sequenced, delivering our gold, lead, and zinc ore, which clearly is aimed at maximizing cash. The coming quarter, and how the coming quarter is sequenced, clearly puts more emphasis on higher copper and higher copper and higher lead-zinc from Federation as well. Importantly, we're accumulating a good stock level ahead of the mill, and we're running very close to nameplate capacity at the mill, which I'll discuss more shortly. That's the mill prior to the expansion. Every one of our costs is in line with guidance. Sustaining capital looks a bit higher year to date, clearly, and for the quarter. Clearly, we've made some equipment purchases that Martin will discuss more, which sort of skews the numbers at this point in time. But those costs have already been taken, and we don't have that ahead of us. So overall, and growth capital is slightly under as well, but within guidance too. So when it comes to production and costs, I guess we're really sort of looking to say that we're well and truly within guidance for the full year.
Bryan Quinn
executiveOn sequencing, we do expect, obviously, to shift toward more copper and gold over the coming couple of quarters, and that will, as I mentioned, lift those copper figures within the sequencing for the full-year guidance, which obviously appears somewhat low year to date, but the plans are the plans for the full year. If I could turn to the group sustainability slide. Unfortunately, this quarter we had 4 recordable injuries, which involved hand injuries as well as slips and trips. Management is really focused on preventing injuries before they happen and on having people truly examine hazards and risks on the job and making sure the proper precautions and actions are taken before work begins. Largely, we've had injuries involving short-term contractors on site, and we're going to keep having supervision really concentrate on making sure there is adequate supervision and making sure that, as management and leadership, we're really looking at behavioral-based safety going forward to really sort of enhance safety performance. On our environmental reporting, we've had a good stretch in terms of compliance and over quite a couple of quarters now, so very much in good shape and good results coming out of that reporting process.
Bryan Quinn
executiveLet me go straight to the Peak slide. Our real priority is getting the most out of throughput and recoveries so we can fully capitalise on the revenue and cash flow from our commodity mix. As you can roughly see, I'll go through each of the graphs. Our mine development metres are certainly trending the right way, just as we said they would. Part of that comes from the productivity project we've been focused on, which is meant to push our metres properly ahead so we have options about where we produce and stope. On top of that, there's also our Great Cobar metres, which are on track, and I'll cover that shortly. So development at Peak is very much heading in the right direction. We're still concentrating on fleet availability and how well we use the fleet, and that really comes down to having the proper planning systems in place — they're now developing and maturing — plus making sure we have people on the job every single day so we can operate the equipment that's available. So that's clearly a key thing for the team to keep focusing on: the safe productivity of our development and our mining area.
Bryan Quinn
executiveOn throughput, I put in a new slide this quarter, and going forward we’ll keep doing that, clearly with a focus on throughput through the plant. We keep reporting that throughput at the mill at Peak is ramping up. The main takeaway I want you to have is that we are very near nameplate capacity, and we have stocks ahead of the mill from every mine. At quarter end, stock in front of the mill was actually 36,000 tons, which is a great position and something we haven’t had for a while. Importantly, on average monthly volume year to date, we are at record levels since FY2020, and we clearly see upside in those monthly averages ahead as we will now have high-quality ore stocks in front of the mill while we keep building that level in preparation for the expansion. And then, without question, as the projects we’ll discuss keep commissioning over the next quarter four, this financial year and quarter one, FY2027, we expect those averages only to keep rising toward the next nameplate capacity that we’ve reported from the project perspective.
Bryan Quinn
executiveOn recoveries, the positive momentum is still carrying through. It's a real pleasure to see gold recoveries hitting, in a sense, record levels this quarter. And that stands out as remarkable given the elevated throughput rates too. Recoveries for lead and zinc are likewise strong and certainly merit a mention. So all in all we're quite satisfied with how the operation is performing when it comes to processing this ore. Running at greater throughput alongside better recoveries puts Aurelia Metals in a genuinely strong position to generate the fullest value for our shareholders. Turning to the Federation slide, regarding the mining and ramp-up work that we've been discussing with shareholders and investors for some time now, the ramp-up keeps progressing. As you can, in a sense, observe, on average the metres keep moving in the correct direction. We came in somewhat lower in December because of certain equipment utilization issues tied to resourcing difficulties with our principal contractors. That has clearly been resolved in January, and things are back on course. Even so, the overall average remains headed the right way, which we're glad to report, and there are ample production opportunities for growth from the development lying ahead.
Bryan Quinn
executiveLooking at ore mining, the graph shows we're up 21% this quarter compared with before. Naturally, we still anticipate quarter-on-quarter growth through the remainder of this financial year, and that's a strong story for Federation as well. Consistent with that, grades have kept rising from the prior quarter into this one, and we expect them to be broadly aligned with the reserves we've reported to the market. Costs are also tracking as planned for the full year. Since we're halfway through the year, we're halfway through our costs, which lines up closely with the prior slide's full-year guidance figures. Let me now cover a couple of items of information on the Federation Mine. As you know, we've just issued an update on the mine plan showing where we stand year to date and where we're headed. You can see the Federation Mine is performing extremely well. We're advancing the decline further down. As the decline goes down, we're establishing infill drilling plus resource drilling from the different locations, and that's what we've discussed at earlier quarterly and annual results.
Bryan Quinn
executiveWhen you look at the real numbers, we're aiming for roughly 1,500 meters per quarter, and we're hitting that. Infill drilling is coming along nicely and the results let us solidify our stope design, which helps us maximize throughput. And clearly, maximizing grades and throughput lets us cut logistics costs while getting ore onto the road to the Peak mill for processing — a key driver for us. The ore body is reconciling really well right now, and we're seeing that come through at the Peak processing plant as we process ore for Federation. So overall, the message I want to leave is that Federation is definitely ramping up as committed, and we're doing a good job of getting ore in front of the Peak mill at very good quality so processing can occur, and that's how we get the grades and recoveries out of processing. I'll briefly cover the expansion projects before handing over to Andrew to discuss exploration and our future growth options there. Let me speak to the Great Cobar Copper Project.
Bryan Quinn
executiveWhen you take a look at where we stand — and the slide gives you a bit of a picture of where we expect to be over the coming 2 years — mine development is tracking very well. As I mentioned, development rose 13% versus the prior quarter. We have roughly 3 km of development left to reach our platform before we begin drilling to unlock potential future information on infill as well as resource. After that, we have about 4 Ks to go before production. But as I said, conditions in the Great Cobar area look very, very favorable to us. As we keep sequencing our teams, we hope to see some improvements and push beyond our targets. Overall, I think a key message is that with this copper project close at hand, and given where copper pricing sits today and the demand for copper ahead, we do see material upside in the value of this project compared with what we've presented previously. That's great news for Aurelia on the basis of copper and gold prices going forward. I'll move to the next slide now, which covers the plant upgrades.
Bryan Quinn
executiveSure, we're not far off at all — the plant upgrades remain on schedule. First, on Tailings and Process Water Management: that project is still tracking to be delivered in quarter four. We'll get better copper recoveries, and of course some cost benefits from lower cyanide consumption, and that project will be ready within this financial year to begin delivering those improvements for us, which is excellent on top of what we've shown to date. The tertiary ball mill is set for commissioning in quarter one of FY2027. Again, it's tracking as planned. The ball mill has been taken apart at Dargues, and it's ready for trucking, along with the power substations and so on, ready to head to Peak over the coming period. You can definitely follow that progress quarter by quarter. On the photo — that's actually the footings for the Tailings and Process Water Management. We poured most of that before Christmas, back when it was nice, sunny, and hot. The team has done a fantastic job keeping that concrete foundation and steel work moving forward ahead of this tailings and water management being ready for quarter four. Every major part from overseas has come in, and the containers are on site.
Bryan Quinn
executiveThey got here ahead of Christmas. Clearly, we are getting every one of those parts prepared for installation. It is extremely exciting that the initial phase of this project is heading into the coming two quarters ready for commissioning. Finally, our Crushing Materials Handling Project, which targets quarter two of FY2027, is heavily engaged in detailed engineering so it can kick off the process right now. All three projects are progressing very well and remain on track, and they will only add to what we are delivering today. With the stockpile building ahead of the mill, once these projects are executed and commissioned, we will essentially be set to work through those inventories and generate meaningful value for shareholders in the near future. So that is roughly where our upgrades stand. I will now hand it over to Andrew for exploration. Thanks, Andrew.
Andrew Graham
executiveThanks, Bryan. It's genuinely exciting to watch construction moving forward on site at Peak on these projects that we've been eager to see advance. Turning to exploration, anyone who tracks us closely will have noticed that in December we issued a release on Nymagee. That was the sole release we made on the exploration side during the quarter. There are certainly interesting items in it from our drilling at Nymagee North, which was extended up dip by roughly 100 m and also along strike. Interestingly, there was some gold, something we hadn't previously seen at Nymagee, so hopefully that develops further as we continue drilling at Nymagee North. The Metropolitan Lens, which was recently discovered, was likewise extended 40 m up dip, showing good continuity in both thickness and grade, and back at Nymagee Main, the principal portion of the old workings and the ore body, this largely provides the foundation for the resource, and we have a solid extension along strike to the north plus an extension 250 m down dip, which was also very pleasing and backed up some of the results we'd previously seen from Downhole EM. Speaking of Downhole EM, during the quarter we carried out one more survey at Nymagee North, and the results of that are still pending.
Andrew Graham
executiveThat's what we'll rely on to sharpen our focus on drilling Nymagee North in the future — a key target for us on the exploration front. Just a couple of other items to mention. These aren't shown on the slide, though they do appear in the quarterly report. Importantly, during the quarter we drilled out New Occidental tailings. As of this morning, we've finally received all assays from that work. So we'll now move ahead with developing a resource on those two tailings stockpiles. Those stockpiles aren't a tailings dam, so we'll simply develop a resource there, and at the same time we'll use the assay results from the drilling to carry out some further met testing, which will then feed into a pre-feasibility study that we'll bring to you once it's put together. And permitting on those is being initiated right now as we speak. So from an exploration standpoint, at present we're drilling out Federation West from underground, carrying out some additional exploration drilling there. It'll be a bit of drilling, then back to resource infill, then back to Federation West, but we'll bring those results to you as they come through. Peak for underground drilling at Chesney Deeps and also Kairos Eastern Copper at the moment.
Andrew Graham
executiveTo repeat, as soon as results come in, we'll share them with you over the course of the quarter. So looking ahead, you should expect to see information, clearly, about New Occidental. We'll provide an update on Peak and the assorted drill programs we've had underway there, all of which are laid out in the quarterly report. And in addition, when we receive results from the exploration drilling at Federation West, we'll bring some of those to you as well. I'll hand things over to Martin. I believe it's time now to discuss the balance sheet.
Martin Cummings
executiveThanks, Andrew. I'm on slide 15 of the deck, which just presents the cash flow waterfall for the quarter. As you can see, happily, we ended the period with cash of AUD 85.6 million. Together with our undrawn loan note, which stepped down to $20.4 million this quarter, that brings total liquidity to roughly AUD 116 million. Liquidity remains very strong. We did need to put some cash into restricted cash during the quarter — $7.9 million was added — and that restricted cash balance has now risen to $27.8 million. Restricted cash isn't reported inside this figure; it sits on top of it. The main way to free up that restricted cash is by refinancing our performance bond facility, which is well progressed, and we're currently in the due diligence phase. We aim to complete that refinancing during the second half, and at that point we'll recover the restricted cash. In the meantime, a few further amounts will need to go into restricted cash across January and February, totaling about AUD 10 million. As Bryan noted, operating cash flow was an excellent quarter for the Cobar Regional Operations, with AUD 42.9 million generated, and that's after sustaining capital, driven by very strong production and sales and, clearly, commodity prices.
Martin Cummings
executiveAs you'll remember, in the prior quarter I mentioned some concentrate we had on hand in the September quarter, and so we sold that during the quarter and realized a portion of it in operating cash flow. Bryan brought up sustaining capital earlier at AUD 15.6 million. Our year-to-date figure of roughly 31 is therefore somewhat above the year-to-date midpoint. Yet, as you also noted, we've put investment into our fleet at Peak during the first half, and we've discussed that investment along with some of the gains in availability and operating costs we'll obtain from it. We're therefore fairly at ease with where we stand on sustaining capital relative to the full year range. Conversely, our growth capital sits under the midpoint year-to-date, though the spend profile of those planned expansions Bryan just walked everyone through is really weighted toward the second half. So once more, we do anticipate growth capital will track to the guidance range. A few other items this quarter. As you're aware, in the 30 June accounts we reported a tax payable figure of more than AUD 12 million, and we made that payment during this quarter.
Martin Cummings
executiveIncluded in that figure is AUD 12.2 million tied to the FY2025 tax year. What remains consists of monthly PAYG installments we are paying for FY2026. And, as I mentioned, we also processed the AUD 7.9 million in restricted cash, which shows up in our financing cash flows. Working capital came in fairly flat, though during the quarter we made our annual insurance payment. That produced a net outflow, yet on the whole working capital stayed largely flat. I'll stop there, but I want to leave you with the point that our balance sheet is really strong, thanks to yet another quarter of really strong production and operating performance at Cobar. That has positioned us well, and we remain on track against all of our guidance metrics. With that, I'll hand it back to you, Bryan. Yeah, thanks, Martin.
Bryan Quinn
executiveIf you could turn to the key focus area slide — the final one — for a moment. Clearly, our attention is squarely on carrying out the plan safely as we move toward 40,000 copper equivalent tons, the figure we've discussed, which comes to fruition in FY2028. Reaching that goal means we've been concentrating heavily on allocating capital with discipline, and the cash balance plainly lines up with today's results. It follows that we keep returning that cash to the business to finance our growth, while also strengthening our balance sheet so we retain that resilience. We're still filling the Peak plant right up to its maximum capacity. As I mentioned, we're clearly near nameplate. Over the quarters ahead, we expect — hopefully — to push past nameplate and deliver genuinely high-quality ore, which we now hold in stock, and to keep building that stock ahead of the plant so it's genuinely there for the plant to process, maximizing our revenue and our cash flow. This is a really key message I want to convey to all shareholders: that stock is in front of us, and our focus stays on building it so the plant can truly be maximized now and, hopefully, ramp up as we've just committed to, getting the full year results and getting the expansions ready to go as well.
Bryan Quinn
executiveWhen it comes to ramping up Federation, that is absolutely a key focus for us. We are highly focused on delivering more from Federation this year. And clearly, tied to that is the infill drilling and exploration effort aimed at extending the mine life too. So we're pushing the decline down to the bottom of the current ore body as we understand it today, with infill drilling designed to unlock added potential from the existing stopes. And clearly, achieving strong performance on grades and volume from Federation is very much a priority. Regarding our focus on Great Cobar, obviously hitting those project milestones — we are well and truly on track, and we do see some upside in performance there given we're only two quarters into development. And as we build up our routines and our processes around that, there are obviously always improvement areas to build on. So we are on track and definitely ahead of plan relative to where we want to be in delivering our performance there. As for our growth options, we will obviously keep looking at both — as Andrew has mentioned, some of our organic growth options, but also keeping an eye over the fence at inorganic options that may be progressing around us.
Bryan Quinn
executiveThat will remain a constant area of attention for us—not a top priority, clearly, but still something we focus on, examining what our existing resources allow us to do and what might potentially be achievable with things around us. And finally, and this really matters, ensuring we draw in and keep high-quality people in the region and in Brisbane. We have a genuinely strong team, and clearly, as we keep growing the organization, we'll keep searching for talent so we can perform even better than we do today. So really, this is a positive story for Aurelia Metals, and I'm very proud of how the team is performing to bring us to where we are now. With that said, I'll hand it back to you, Kaylee, to move us into questions and answers before I finish up.
Operator
operatorThanks. Should you want to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, hit star two. Those using a speakerphone should lift the handset before asking. Our opening question is from Paul Kaner at Ord Minnett.
Paul Kaner
analystThanks, Bryan, Martin, and Andrew. I've just got a couple of questions, if that's alright. First, on the refinancing item, Martin, you mentioned you expect it to wrap up during this first half. Would you say that's more likely to happen this quarter, or perhaps in the June quarter?
Bryan Quinn
executiveThe goal I have in mind is the close of this quarter, though it could slip into the start of the next one. I suppose the point I want to make, Paul, is that June isn't my target. It will come sooner than that. Yeah. So due diligence is currently moving along well. And yeah, it will just, I mean, yeah, roughly the midpoint of this half is what I'm aiming for.
Paul Kaner
analystYeah. Yeah. No, that's fine. So it could move into the start of the June quarter. That's all good. And then maybe just a couple there for you, Andrew, just regarding exploration. Yeah, obviously some exciting results there from Nymagee. I guess, how should we think about this deposit for, I guess, the longer-term opportunity? Is that a Hera restart opportunity, or can that material go back on the truck down to sort of the Peak processing plant? I guess how are you guys thinking about it at this early stage?
Andrew Graham
executiveYes, Paul, your point is probably important. This is at an early stage. So right now, we're really just trying to figure out what we have. There's definitely more ore there. It can certainly be treated economically. We simply need to determine whether we can get enough to support an economic project. If we can — and it's growing quite nicely — the simplest option is to send another truck directly back to Peak. Should there be sufficient inventory, we can then look at the possibility of restarting Hera. Yeah, it also ties somewhat into Federation and how that develops, and Peak and how that develops. There are a lot of moving parts involved. The good thing is that we have processing plants. We have Peak. It's recovering well. It will expand well. And we have Hera as an option. So the good thing is that as we delineate or upgrade our mines, we can actually process that material.
Paul Kaner
analystAll right, thanks. And turning to Federation West, just to build on that added flexibility — I suppose if this turns out to extend somewhat further, what would be the soonest point at which you might be able to get at that material, based on the existing mine plan and where it's located?
Andrew Graham
executiveRight now we're going through the life of mine process. The team at Federation will give that some thought. It really comes down to how it stacks up against the materials sitting right there in the decline. So we'll consider that and consider the right timing. Obviously, at the moment we have a rig on site doing exploration, which is really stepping below those hits we had before. Once we get results from that and have a clearer story on how it all fits together, we'll bring that to you, obviously. It'll be a bit on and again, off again at the moment, because obviously we're trying to do infill drilling as well. So right now we've got the rig doing exploration. It'll go back to infill. And then later in this financial year, it'll return to exploration, targeting the eastern side of Federation. So as we get some assay results and some information, we'll bring that to you. But we are thinking about when and how that makes sense.
Bryan Quinn
executiveSure, that one was a breeze.
Paul Kaner
analystNo, I appreciate that. I'll try to fit in one more if possible. Bryan, just for you, the ramp-up at Federation is progressing well. I suppose the infill drilling you've completed more recently—has that altered your view regarding, I guess, FY2028, or is it still too early to tell, given that FY2026 and 2027 rest on a somewhat different mining method?
Bryan Quinn
executiveSo, when it comes to infill drilling for FY2026 and 2027, we have a good level of confidence about what lies ahead of us. There's still plenty more to come from the drilling that's underway. We still have a lot of results yet to come back in. But as we've said previously, we'll keep doing infill drilling the whole way through as we work to push the decline down. As we approach the June period, we'll provide updates against our guidance figures on what that looks like. But as I mentioned, the Federation ore deposit is a really strong deposit, and we keep seeing some very good results coming out of it. So that's exciting. And it's a pity we don't have the infill drilling results to share at this moment. So we'll get them as they come up, and we'll report on them accordingly.
Paul Kaner
analystSure thing, no problem at all. Appreciate it, Bryan. That covers everything on my end. Thanks.
Bryan Quinn
executiveAppreciate it, Paul.
Operator
operatorAs a reminder, if you'd like to pose a question, just hit star one on your phone and hold until your name is called. Our next question is from Paul Hissey at Moelis.
Paul Hissey
analystHello, everyone. I'd like to pick up on Federation, Bryan. During the presentation you mentioned it's tracking in line. I want to dig into that a bit further, since clearly that isn't quite how things unfolded at the start. For our benefit, could you clarify — I take it you mean it's tracking in line with your revised plans? Would you mind expanding on that? Thanks.
Bryan Quinn
executiveYeah, look, I think that's the key message. It's reconciling well against our revised plans. We're seeing very much as obviously we're doing infill drilling, we're getting the assays back, we're building our models, and then we're reconciling what we're seeing coming through the plant. And basically, as we sort of said in the report, from this last quarter to this quarter, we're obviously seeing the grades increase, which is obviously coming through our models as well. And we're seeing that at the plant. And in terms of reconciliation, well, we definitely aren't seeing any downside against what we've sort of looked at in our plans. Andrew, did you want to add anything to that at all?
Andrew Graham
executiveSure, Paul, so reconciliation basically breaks into two pieces. One is the geological model, and the other is through the plant. And on the plant side, for sure, we're seeing exactly what we anticipated. Recoveries are excellent. It's moving through the plant very nicely. We've blended zinc ore from Federation with zinc ore from Peak, and that's giving us a synergy. So through Peak we're really seeing a positive reconciliation there. On the geo side, if anything, it's coming out positive, especially for gold. That's some work we're doing right now. It's really just about trying to understand what that means for us over the long term. Obviously, that's good news. Having good news is nice. But then thinking about how we model that going forward. As you know, gold is a pretty hard thing to model given the variability. And it's really a lead zinc ore body when it comes to driving the economics of it. But we do want to get that as right as we can so we can predict what we expect to see. Okay, thanks. And then just one last one, just remind me of the next resource reserve update, which will capture, I guess, the next iteration of Federation life and more.
Andrew Graham
executiveAnd when does that come out? We'll release it following the full-year results. Essentially, we'll finish up the drilling and assaying, then put it out during the September quarter. September quarter.
Paul Hissey
analystThat's great — thanks so much.
Operator
operatorIf you'd like to ask a question, please press star one on your phone once more and wait until your name is called. Our next question is from Roy Gillespie, an individual. Good morning, everyone, and thanks for the strong result. I have two questions, essentially. First, I took a quick look through the quarterly report and couldn't find silver production listed anywhere. Could you tell me what the silver production figure is, and perhaps where in the quarterly report I can locate it? Second, on the gold hedging: you have gold listed as valued at 4,500 something. That appears to be well under the current spot price. And that covers over 10,000 ounces for the remainder of the year. Could you comment on those, please?
Martin Cummings
executiveYeah, hi, Martin here — I'll handle that one. So first, on silver: if you look starting at page 14 in the report, there are complete data tables laying out all the different production figures. Production for the quarter came in at 33,500 ounces. On hedging — yeah, that hedge book was put in place quite a while back. As I mentioned in the report, we haven't added any hedging in some time. The average price you see there reflects the forward prices that were locked in when the hedging was executed. Obviously, the gold price has risen substantially since then. That's simply a consequence of the timing of when the hedging was done. Yeah, it just looks like it's well below. It's listed at AUD 4,500. With the gold price right now at AUD 7,000, it's well under that, isn't it? Yeah. It seems like quite a penalty for the company.
Bryan Quinn
executiveThat hedging choice was made, I suppose, to safeguard the revenue stream tied to our expansion projects. Naturally, as we grow the business and invest substantial capital into it to reach 28,000 copper equivalent tons — a level that will deliver meaningful cash flows for the company — we have taken that route, consistent with our policy, to be cautious about shielding both that capital and the revenue stream. So the decision was taken at that point in time. And so we'll keep going — anything we deliver above gold will clearly be sold at spot too. That's essentially the stance we're taking. Obviously, had we not done it and prices had fallen, I'm certain everyone would hold a different view of us as well on that. So we are extremely capital intensive, so. Yeah. I understand. Yeah. The reason why. Yeah. But the biggest question as we look to the coming year is what the hedging strategy will be. Will the need for it lessen, remain the same, or what?
Martin Cummings
executiveWell, as Bryan said, hedging is something we use to safeguard the balance sheet. So I'm always reviewing hedging. At the moment, the spot price on its own offers us a degree of protection, simply because of where the price sits today relative to our cost base. So we keep watching it. We aren't active in the market at present, but it's something we'll keep evaluating. As Andrew said, we're currently working through our life of mine process, and we'll review our cash flow outlook along with our capital requirements. And as I mentioned, it's an ongoing discussion internally. Fair to say we've come through a very heavy capital spend period with Federation, which obviously goes to commercial production in July. Obviously, we're in great Cobar and obviously getting it up and running and moving. These expansion projects are sort of coming up over the next six months. Really, the life of mine will sort of examine what our exposure is, what capital outlay we have beyond these projects, if there is any, and we'll evaluate it accordingly with the board. Thank you.
Operator
operatorDaniel Roden from Jefferies has the next question.
Daniel Roden
analystHi everyone, thanks for joining the call. I’ve got just a couple of quick questions. Looking at items such as the TC/RCs cost line, it appears to have gone up this quarter. I was just wondering whether you could offer any commentary on how TC/RCs are trending right now. Around the world, with some of the major players and electric vehicles, things look fairly positive. So, I guess, are you anticipating any benefits from that during 2026?
Martin Cummings
executiveHi, Dan Martin. Your line is fairly typical, but I believe what you're getting at is TC/RCs and the quarter-over-quarter variance. Yeah, so this quarter does show somewhat elevated TC/RC, mostly driven by how much we've sold and how many shipments we've completed. So occasionally there's a slight timing gap between revenue recognition and when the TCRC gets recognized. But as far as our outlook goes, the outlook for FY or for calendar year 2026 suggests there's still some opportunity on TC/RCs for us, though we'll wait and see how the benchmark setting process unfolds. But the market intel is positive, yes.
Daniel Roden
analystYeah. Fantastic.
Martin Cummings
executiveWith any luck, that is what you're asking.
Daniel Roden
analystYes. Yes. And my apologies — I hope that connection is clearer now.
Martin Cummings
executiveThat is the case.
Daniel Roden
analystYeah. Sorry about that. Thanks. This is New Occidental — I was just wondering whether you could. Sorry, I may have missed this, but if you could share some expectations, I suppose, on maybe the scale or the grade range around that. What's the strategy there, I guess? It simply feeds into the expanded Peak mill once that's finalized, assuming everything is economic, of course. Andrew, you're running that project — would you like to explain, please?
Andrew Graham
executiveYeah, absolutely. Hey, Dan. Look, I really don't want to presume tons and grade right now, because that's the process we're going through at the moment with the assays. I think we've previously suggested something in the order of kind of two and a half million tons and a half a gram is sort of roughly where we thought it might end out. We'll know more about that in the coming couple of months, and we'll put that out. So the earlier question about resources, we'll probably put that out ahead of the usual resource update for the business just because it will form the basis of a pre-feasibility study that we've got active at the moment. The intention is to feed it effectively while we're feeding Federation material. And the reason is that we don't need the third ball mill, the tertiary ball mill on Federation ores and lead zinc ores. The intention for that is to use that on copper. So that mill will be available. At this stage, the study would suggest we pop it through a scrubber, take out any pieces we don't want to get into the slurry, and put it through that mill from there straight into the CIL.
Andrew Graham
executiveAnd we'd have CIL capacity available to handle that material. So yes, the plan is that we'd be feeding it at roughly 250,000 tons annually over a prolonged period, recovering additional gold through the existing plant, and doing so without disrupting what we intend to do with fresh ores.
Daniel Roden
analystGreat. That clarifies things nicely. Thanks so much. One last item from me — since you brought it up, the inorganic possibilities and chances you're watching. I suppose that's been a feature of the market for 2 years now, tied to some of those opportunities. But are you noticing further, I guess, advancement on any of them? Do you feel somewhat more confident about moving some of those chances forward, and what could they end up looking like?
Bryan Quinn
executiveLook, I won't get into specifics about what those opportunities might look like, since obviously they aren't fully defined yet. But effectively, we've always been positioned well because we have a great resource within our existing lease holdings. And if we're able to drill it, establish it as a resource reserve, mine it, and keep it under our control, then we can deliver a lot of value without paying a premium. That said, we'll keep looking over the fence at opportunities that perhaps add better value for shareholders down the road. So I don't think we're going to define what that looks like at this point in time. But it's one of those things that, as a business, we'll get to the next sort of 18 months, we'll be getting great Cobar moving. We'll have the Federation at full capacity. The plant will be at full capacity. We'll be generating excellent cash. And we'll be considering where do we go next and what do we do next. And so that's sort of what the next six to 12 months is all about for the management team as well to put some ideas to the board at some stage. Yep. That sounds good.
Daniel Roden
analystGreat. Thanks so much, everyone. And congratulations on a solid quarter. Nice work.
Bryan Quinn
executiveAppreciate it.
Andrew Graham
executiveAppreciate that, Dan.
Operator
operatorThat brings us to the end of the question-and-answer portion. I'll now return the floor to Mr. Quinn, who will offer some closing remarks.
Bryan Quinn
executiveYeah. Thanks, Kaylee. And thanks to everyone for being with us today. I just want to emphasize the solid cash flow the business generated this quarter, which is really funding our future. And with strong production, particularly by leveraging gold, we still have a very good gold stream flowing through our business on the production side. Federation is ramping up consistent with our commitments. And hopefully, we can outperform that over this full year. And the grades and really the overall results for the business look very good coming from Federation. The Peak processing plant, as I mentioned, is near capacity. It has a ROM stockpile ahead of it, something it hasn't had in quite a while. And that stockpile is going to keep growing. So we're really now putting pressure on the plant's bottleneck, which is exactly where it should be, and I'm excited to tell people about that, filling our mills. And the excellent throughputs and excellent recoveries. So a really, really great result for the team and for what they're delivering there. And just to reinforce, our growth projects are well and truly on track and moving in the right direction. And so we're only seeing upside when it comes to throughput and potential recoveries and potential value coming out of the business going forward over the next 12 months.
Bryan Quinn
executiveSo we're in a genuinely strong position. Next quarter we'll return and update you on how those specific projects are progressing and how they're performing, but I'd say the business is in good shape, and the balance sheet backs that up. Look, I obviously want to thank the shareholders for their continued support as we keep building our business, but also—and this matters—the management team and the workforce. Yeah, everybody is putting in a great deal of effort to deliver this value, and without them, we wouldn't be where we are now, so I really want to thank everyone for the huge efforts and the support they're giving, so without further ado, thanks everyone for joining, and many thanks, Kaylee, for the call.
Operator
operatorThat brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aurelia Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aurelia Metals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aurelia Metals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.