executiveGood morning, everyone, and welcome. I'm David Boshoff, and our CFO, Steve Fewster, is here with me. We're glad to be with you today for our September 2026 quarterly update. Before we start, please keep in mind that this presentation should be read alongside our September quarterly report, which is now available on our website. Should you have any questions, please type them into the live Q&A tab on the right-hand side of your screen, and we'll respond to those questions at the end of the session. Our values define who we are and guide every decision we make. This quarter, our values of Win As One team, and we do what we say, were again on full display. This was led by our projects team. We have completed the dredging and the main packages for the Mardie port, on time and on budget as promised. This is a massive milestone that significantly derisks the construction schedule and the cost of delivering Mardie Salt business. It has been achieved through collaboration with BCI and with our contractors across all the teams. I do want to thank everyone involved in making that happen. That values-driven approach supports the business we're building at Mardie.
David Boshoff
executiveMardie is well on the path to ranking as Australia's biggest solar salt project and number three worldwide. Following years of building work, completion of that effort is now only months off. Even though a great deal of the hard work has already been accomplished, we stay sharply focused on getting the Mardie Salt business built within budget and on timetable. As the salts crystallize, our top concern is a secure and efficient ramp-up. At the heart of this ramp-up lies product quality. Our customers depend on us, and we are set on delivering precisely what we promised. We likewise view KTMS -- products stemming from our output of premium industrial salt as a worthwhile chance to introduce additional products as time goes on. That is the reason our Sulphate of Potash trial matters so much. It represents an essential move toward demonstrating that possibility as a revenue stream down the road. Given its size, its position on the coast and our very own port, Mardie is ideally situated to serve rising demand throughout Asia. Safety stays our number one priority, and I am glad to share that progress this quarter has been good. Our recordable injury frequency rate on a rolling 12-month basis has bettered to 2.7. That compares with 4.4 in the prior quarter.
David Boshoff
executiveThat gain shows the ongoing efforts our teams are making to improve safety throughout the site. We finished 316 critical control verifications along with 620 field leadership interactions. Those verifications tie back to the main risks at the site. Fitness for work, mobile plant and equipment, and vehicles and traffic management. What we learn from these verifications gets used to close gaps in our controls and to direct coaching wherever it is needed. During the September quarter, we achieved ongoing progress across the Mardie production system. Over the winter months, our team got the system ready with care for the summer season coming. Salt forms somewhat more slowly during these cooler months, before an expected warm summer. We took deliberate decisions to speed up brine movement so as to maximize surface area and to get the ponds system ready following the summer months. By the close of September, roughly 266,000 tonnes of salt had crystallized in these crystallizers, which is a rise of 217,000 tonnes compared with the 49,000 tonnes we reported in June. At quarter end, we had 12 crystallizers lined up, up from 8 at the close of June. A further 2 crystallizers have been lined since then. The remaining 40 crystallizers cells will be lined progressively through to the final quarter of FY '27 as we ramp up towards on nameplate capacity.
David Boshoff
executiveSo with filling still underway, our focus is shifting toward how the crystallizer system is performing. During this quarter, we're continuing to test our salt in-house, and those samples are going out to customers so they can do their own independent assessment. The results keep meeting the specs set out in our offtake agreements, and that bolsters customer confidence as commissioning moves forward. Looking ahead, this summer matters a great deal for Mardie. We want to head into the summer evaporation period with as much brine in the system as we can. Summer delivers the strongest evaporation, and that ought to drive additional salt growth in our crystallizers. However, the summer heat also speeds the system up, so our team will be watching pond heights and brine densities very closely while we keep filling the newly lined crystallizers. Nature sets the course to first salt through the evaporation process that yields high-quality industrial salt. As the final view on the slide shows, it's the layers of the crystallizers that make safe harvesting achievable. After a crystallizer is lined, permanent pavement needs to form to roughly 200 millimeters before harvesting can begin. That pavement serves as a stable operating base and lets future salt crops be harvested safely.
David Boshoff
executiveAnything growing above the pavement gets harvested, washed, and shipped out to our customers. With additional crystallizer ponds coming online and evaporation rising during the warmer months, we anticipate that the pace of salt crystallization will continue to climb. As we've noted before, when the first salt actually goes onto a ship still depends on weather and evaporation conditions over the months that remain. Now moving to construction. When the quarter ended, construction stood at 90% complete. Completing construction of the salt project is only a few months off. The project team keeps delivering on its commitments to build Mardie Salt on time and on budget. With 10% remaining, our attention is fixed on a disciplined closeout and successful commissioning — which is why detailed commissioning plans are now in place and why we stay laser-focused on budget and schedule. Since the salt wash plant, stockyard, and the port are the final major infrastructure pieces to be finished, I'll give more detail on those assets now. The salt wash plant stands at 70% complete. Key milestones during last quarter included delivery of major equipment, among it screw classifiers, centrifuges, dewatering screens, and elutriators, and all the fabricated steel work for the wash plant has also arrived on site.
David Boshoff
executiveOn site, we're still progressing, with structural steel going in up to Level 1, along with the product and the screw classifiers. During this quarter, our structural mechanical piping contractor will finish erecting the steel work and will also install the centrifuges, dewatering screens and elutriators. Our electrical contractors will likewise be kept busy with switch rooms, cabling and instrumentation, all before commissioning. Under the project schedule we're currently on, construction is to be finished by the end of December, and dry commissioning will begin ahead of wet commissioning, which happens once salt is available to run through the plant. Over this quarter, work on the port carried on strongly, and it stood at 98% complete when the quarter ended. During the quarter through September 2026, dredging was finished for the berthing pocket, for our transhipper, and for the channel serving the oceangoing vessels anchorage area. The other marine works — catwalks, navigation aids and dolphins — were all installed too. With both the dredging and the marine works now finished, the marine campaign has come to an end, and that removes any major timeline or project risk for the Board. In the coming quarter, we'll be putting the conveyor belt in place on the Jetty, and that work is already well advanced.
David Boshoff
executiveInstallation of the stockyard conveyor and the belt is also set to happen, along with a switch room and cabling running out to the stockyard, after which dry commissioning will get underway. The CSL Osprey — the vessel that will support our first shipments — is in the process of being converted right now and remains on schedule to reach Mardie before wet commissioning of the Jetty begins. Work on our new transhipment vessel, the Mardie Spirit, is coming along well too, moving through design closeout, production design and hull fabrication. Taken together, these milestones cut the risk in what remains of our port scope by a significant margin and provide a solid foundation for wrapping up construction and kicking off commissioning. I'll pass things over now to Steve, who will walk through our financial position and the salt market.
Steve Fewster
executiveYes. Thank you, David. Construction costs in total are now at $1.265 billion, after we spent $80 million in the course of this quarter. That leaves approximately $178 million left to spend before construction is finished. The biggest remaining work packages include the rest of the crystallizer line, completion of the salt wash plant, the stockout conveyor and the PPA road. Since nearly all of those costs are now committed, and given the progress made on these last construction areas, we stay confident that construction will be completed on budget. In the quarter, we drew $119 million from the syndicated debt facility. To the end of September, 13 drawdowns have now been completed, bringing the total drawn to $706 million. The drawdown process keeps running smoothly. And at quarter end, BCI had $316 million in total available liquidity. Taking into account pre-revenue operating expenditure of $321 million, BCI has invested $1.586 billion in the Mardie Salt operation to date. With $316 million of available liquidity and roughly $178 million still to spend on construction, BCI has ample working capital funding of $138 million for the ramp-up of the salt business. As for the market, BCI remains positive on the medium-term outlook for salt prices in our region. Wood Mackenzie continues to forecast a 27 million tonnes per annum supply shortfall across the Asian region.
Steve Fewster
executiveThroughout the quarter, we kept working with every one of our offtake partners, and we remain involved and supportive. One standout moment in the quarter was when we hosted a delegation from Sojitz along with the Japanese salt customer. Both groups came away extremely impressed by the progress our operations are making. They could see for themselves how committed we are to salt quality and how focused we are on delivering to a high standard. That matters to us, because building lasting relationships depends on delivering on what we promise our customers. We are also expanding our engagement with chemical companies that are positioning themselves for growth in major megatrends, including the new energy market. In particular, growth in battery storage is driving investment in new caustic soda plants. The caustic soda market -- caustic soda is needed to process the critical minerals used in rechargeable batteries. During the quarter, our team also visited new regions within China, which we view as strategic growth precincts. We are also watching closely new energy projects that continue to show industrial growth across the country. Thank you. I'll now hand you back to David.
David Boshoff
executiveThanks, Steve. SOP, or sulphate of potash, is a significant value-add for our salt operation and a meaningful revenue stream for BCI. Back in August, we handed the construction contract for a 150 kilograms per hour SOP pilot plant to Bluestar Lehigh Engineering Institute. SOP is a premium, chloride-free fertilizer that's used on high-value crops both in Australia and around the world. This pilot plant represents an important step toward confirming whether SOP can be produced at a commercial scale from the Mardie feedstock. Bluestar served as the principal designer for the largest brine-based SOP plant in the world. They'll design, supply, assemble and install the pilot plant, and it will be built and delivered to Mardie in containerized modules. Our engineering consultant Accelerate, which has supported our SOP work since 2024, will provide independent oversight across the design, risk, procurement and commissioning of the pilot plant. Commissioning is targeted for the start of the second quarter of financial year '28, with piloting expected to run approximately 12 months. Funding for the pilot plant will come from our existing debt facilities, and it falls within the approved Mardie capital budget of $1.443 billion. During this quarter, Bluestar completed the front-end engineering design study for the plant. We've since issued the scope for the detailed design and supply.
David Boshoff
executiveWe anticipate wrapping up detailed design by the quarter ending March 2027, with procurement and modular construction kicking off concurrently. This quarter we also finished additional test work supporting the design of the SOP process. The final report from that effort should be ready in the December quarter. In the meantime, our trial crystallizers producing KTMS salts keep running at a steady state, and production stays on schedule to supply the volumes required for the pilot plant trials. Beyond safely ramping up operations and completing construction, sustainability remains a priority, and I'd like to share several highlights from the quarter. On the environmental side, we fulfilled all our key monitoring programs, collaborating with specialist consultants and our traditional owners. That covered our quarterly monitoring of mangroves, samphire and algal mats — important coastal habitats at Mardie. We also carried on our Mesquite control program to manage this invasive weed across the site. We finished a lighting audit aimed at protecting marine turtles that nest on the islands, and we track marine water quality through the entire dredging and offshore disposal process. Taken together, these programs help us understand our environment and manage our impact as we transition into operations.
David Boshoff
executiveOn the community side, I’m pleased to report that our partnership with Karratha Senior High School has been nominated for the AMEC Award in community contribution — that’s in the Community Contribution category. With that partnership, we back the school’s positive behavior support program, and it is helping boost student engagement and behavior. We’ve also renewed our community partnerships for 2027. That covers ongoing support for the program at Karratha Senior High School, scholarships through the Pilbara Kimberley University Centers, and the Karratha Community Club in Karratha. These partnerships for the long term show how we’re committed to building capability and backing the communities where we operate. As we finish this quarter, we do it by living our values and doing what we said we would do. This quarter, salt production went up. Our newly lined crystallizers were filled, and our port reached 98% completion. Construction is in its final stages, and the project is still within budget and fully funded. The coming summer matters a great deal for us. The last stage of construction can be the toughest, and commissioning needs to be carried out with care and patience. We’ve prepared thoroughly, and we’ll remain focused on what we can control: safety, pond management and diligent testing of our product quality.
David Boshoff
executiveWe're still on schedule as we move toward getting first salt onto a ship in FY '27, with the exact timing hinging on weather and evaporation conditions. The basics of our investment case rest on the fact that the world needs salt. It serves many different industries, and demand has been predictable for a long time, with pricing that stays stable. It's sustainable as well. Salt is a renewable resource made from seawater, and 99% of the energy we use in producing salt comes from wind and sun driving natural evaporation. And now that our Sulphate of Potash pilot plant is underway, we're taking the next steps toward extracting additional minerals from that very same process. And thirdly, Mardie can potentially deliver an annuity-style return, given the long life of our assets, our salt and port capital costs, and the fact that our working capital requirements are fully funded. And once we ramp up to production, we expect strong free cash flow to build, with low sustaining capital and surplus capital leading to annuity-style returns for shareholders. That concludes our presentation. We'll now turn to questions. If you haven't done so already, please enter those questions in the live Q&A tab on the right-hand side of your screen.
David Boshoff
executiveI appreciate that.
Operator
operatorThanks, David and Steve. We've received a few questions at this point. David, one in particular concerns when the initial salt shipment will occur. Could you tell us the date now anticipated for the first salt shipment out of Mardie? And what has led to the changed first salt and ship timing relative to the guidance we gave before?
David Boshoff
executiveThanks for asking that. We're still confident that, assuming normal weather, we'll be able to produce first salt and make our first shipment during the first half of next year — the next calendar year. As we said in the presentation, weather is the variable here. So a dry, hot summer with very little rain would, in my expectation, mean an earlier point within that half. And if the summer turns very wet, with several cyclones, then my expectation is that it comes later in that half. Construction as such remains on schedule for completion by December, whatever the weather does. That's where the cost risks sit, and it's what we intend to keep under control, along with the close-out of that work.
Operator
operatorThere's one more thing I wanted to ask about timing. Given that 12—well, actually 14 now—of the 28 crystallizer ponds have been lined, is the lining program going to constrain the pace at which we're able to ramp up?
David Boshoff
executiveWell, right now it isn't, and I don't anticipate that being the situation. At present we're running ahead of the crystallizer fitting process, and we can pull brining at the correct density through the system. Over the summer months, I expect that will get more difficult, and we'll keep watching it as we proceed. Naturally, a really hot summer is a nice problem to have, and I look forward to working through those issues as they arise.
Steve Fewster
executiveI believe the other key point there is that having a number of crystallizer sales line today gives us plenty of production capacity to reach ourselves within the timing you mentioned earlier. And we're quite confident it doesn't restrict our ramp-up process in any way.
David Boshoff
executiveAbsolutely — 16 cells is plenty for generating the first salt and shipping it within the lined portfolio.
Operator
operatorSteve, I'd like to ask about pricing. How did pricing conditions trend during the last quarter? And over the coming 12 to 24 months, what does BCI expect from the salt market?
Steve Fewster
executiveYes. Thank you. We discussed pricing — salt being a commodity whose price tends to stay fairly steady. And if you look at how it has priced over the past 12 months, considering all the global uncertainty and the shifts we've seen in various commodity prices. During that same stretch, salt has traded in a range of roughly plus or minus 5%. So there hasn't been much movement in either direction. It has therefore remained quite stable, even through some rather difficult global conditions. Our medium-term outlook, or our view, remains that salt pricing will follow an upward path. The real reason behind that is the supply and demand fundamentals. Very little supply is entering the market. Yet at the same time, demand in the Asian region is growing at a considerably quicker pace, at a minimum. So that supply shortfall persists, likely over the coming couple of years as those new plants come online — the new caustic soda plants I mentioned earlier. As they start up and demand picks up. At that point we'll probably begin to see that tension — pricing tension — emerge and salt prices begin climbing above today's levels.
Operator
operatorAnd then there’s one more question about pricing. At what point is BCI expected to determine the pricing cost?
Steve Fewster
executiveYes. Right now we’re engaging quite actively with customers in Japan. And over the next several months, I’d expect we’ll reach a point where we can establish those prices. But as for the remaining 2 offtake agreements, we’ll begin discussions — well, at present we’re in talks with one regarding pricing. So I expect we’ll likely finalize around January or February of next year. And likewise, for the offtake agreement for January — early in the next calendar year.
Operator
operatorThanks, Steve. David, I've got a question for you about conditions. What effects can we foresee, if any, from cyclonic conditions, extreme weather, or extreme weather events on productivity and product security? And do any mitigation strategies exist?
David Boshoff
executiveWell, I think I would say that over the last couple of seasons, the biggest risk in my view for a salt operation comes during the ramp-up period. During construction and the early ramp-up stages, it's the weather. We've had 4 cyclones in the last — the most severe ones actually just last season. So we've been thoroughly anxious about whether these assets have been built to withstand these conditions, and that's been reported in a number of quarters so far, and I'm really happy with the results and the assets, both the ponds, the pumps on Jetty, and all the constructed assets being included as we stood those tests that we've been through. Now getting to the ramp-up, the challenge with weather isn't so much the wind. In fact, wind is great because wind reduces evaporation, but it's more the rainfall. And the effect that rains had in previous events, this dilution is the same for any salt operation. The good news for us is the amount of evaporation we've had, the amount of dilution we've had, was exactly in line with the amount of rain we've had. What that means is we had no rain water flowing into our ponds from other catchments. Only the waters falling on the ponds has the evolution.
David Boshoff
executiveThat is merely one portion of the salt operation currently in progress. And those assumptions have been incorporated into our modeling as well as our production forecasts.
Operator
operatorMoving now to another question on operations: do you anticipate signing additional salt volume contracts? And as a follow-up, when might those further offtakes potentially occur?
Steve Fewster
executiveAs I said before, we were in southern China specifically during the earlier part of the quarter. The talks we're having there, I'd say, are moving along nicely. Of that 5.3 million tonnes of capacity, 2.3 million tonnes has been contracted so far. Right now we're definitely focused on getting some further term sheets finalized, which would serve as the step before offtake agreements. Over the next 12 months, we'll keep plugging away at those as we continue working through ramp-up.
Operator
operatorSo David, I have a question about the crystallizers. As you said, roughly 12 of them are finished, with around 16 still to go. That seems to leave another 8 crystallizers without liners. Could you tell us what's planned for those?
David Boshoff
executiveRight. At this point we don't plan to bring 2 of the crystallizer trains online. Based on our modeling, those extra crystallizers could serve as added capacity, and they aren't needed in order to reach nameplate capacity. That holds under average weather conditions. Naturally, during warmer or hotter months our output goes up, while in cooler seasons it goes down. In my view, going forward we could use those crystallizers as what we refer to as pickling ponds to speed up volume. That will form part of our debottlenecking efforts further down the line.
Operator
operatorMoving on to the port now. We've talked before about having more port capacity than we need. Are you still holding talks with possible users?
Steve Fewster
executiveYes. In our most recent update, we discussed how we needed to complete the approvals process so that iron ore could be exported through our port. That is definitely the key prerequisite before any kind of agreement with a third party can be formalized. Happily, work on the approvals process has kept moving forward in a positive way. We will get that in place first. We will keep holding discussions with parties that are interested, but that will come first. Getting it finished is a prerequisite to establishing any access agreements.
Operator
operatorNext, I have a question regarding the sulfate of potash facility. If the SOP trial proves successful and advances to full-scale production, would additional capital need to be raised, or would that be entirely covered by the funding already in place?
Steve Fewster
executiveYes, our stance on that has been quite steady. Considering when we expect to reach a decision about investing in a commercial-scale plan, the salt operation is going to be producing positive operating cash flow on its own. That means we'll be able to choose how we deploy those funds — either toward reducing what we owe or toward putting money into SOP. There's certainly a great deal of conversation in just about every nation worldwide regarding fertilizer supply security. We currently have 2 major government agencies among our debt facilities. So I'm confident that with the cash we produce plus our highly supportive lending partners, a capital raise is certainly not something we'd be considering. That has been our stance over the past 2 years — no capital raising, and no new shares issued to finance the SOP.
Operator
operatorI do have one more thing to ask about that. Over the short term, as you move through the ramp-up, how do you see your working capital situation, and is there any chance of a capital raise there?
Steve Fewster
executiveYeah. We closed out the quarter with $316 million in available funding and CapEx of roughly $178 million. That leaves about $138 million to support the business before revenue starts coming in. As for the expected use of funds for operations, that likely carries us to the back end of next year, assuming no revenue. So we're feeling fairly comfortable that, given the FSOS timing David mentioned, we're well and truly funded from a working capital standpoint.
David Boshoff
executiveI just want to make sure that's clear — that refers to the close of the calendar year.
Steve Fewster
executiveAbsolutely.
David Boshoff
executiveThat serves as a buffer.
Operator
operatorRegarding the FSOS timing, David — we received some feedback that you were hard to hear during that first question. Could you repeat when the initial salt shipment from Mardie is now anticipated?
David Boshoff
executiveSure, no problem at all. Sorry about the sound quality. I hope I'm coming through more clearly now. During the presentation I noted that weather is what drives the production process. According to all the signals from the bureau, we're in for a summer hotter than normal. Should that prove true, and provided rain stays minimal — which is the crucial factor — then we anticipate the first salt going on ship sooner, within the second half of this financial year. But if the summer proves very wet, or several cyclones drop heavy rain on our operations, that timeline slides to the right. Our modeling shows a range of plus or minus 6 months around that. We'll have to wait and see. I'm quite pleased with how salt crystallization has gone up to now, though how quickly we grow really comes down to the summer period. Putting our crystallizers at risk is something we want to avoid. So, as I said in the presentation, there's $200 million of pavement. We're very focused on holding to that so we can ramp up safely and productively without running into extra costs.
Operator
operatorWe can take two additional questions at this point. Here’s one I have. With diesel costs having risen as they have, has BCI looked into putting in solar power as an alternative for its operations?
David Boshoff
executiveYes, I’m able to address that. Of course, the rise in diesel costs is a matter we’re watching closely. Steve can speak to this as well—we’ve put some quite effective, solid hedging arrangements in place so that we limit the downside exposure from diesel price increases, and I’ll have Steve address that shortly. The need for efficient power supply has definitely been something we’ve been tracking for some time. In my view, once the SOP plant is in place—which will be a key factor, with almost half of our total power demand coming from the SOP plant—that’s the ideal moment to add a renewable source from a power station that delivers a power-station-style supply to both the port facilities, the Salt Wash Plant, the SOP plant, and potentially the village as well. So that remains our objective, and it’s included in our forecast to do so. At that stage, we expect it will bring power costs down. I’ll let Steve cover the hedging on diesel numbers.
Steve Fewster
executiveYes. To begin with, diesel isn’t something we use in large quantities. Yes, we have diesel pumps, and there are pumps across the site that depend on diesel, but our actual diesel consumption is not high. That said, earlier this year we spotted an opportunity when oil prices were far lower than they are now or than they were previously. We entered into several forward contracts, hedging contracts, so our diesel price sits well below what you’d pay at the pumps today. That strategy has been a genuine positive. It has allowed our budget assumptions on diesel prices to remain intact throughout, regardless of what has occurred with oil prices and how that has subsequently affected diesel prices.
Operator
operatorThanks to you both. We have one last question here about the port, just following up on what you shared earlier, Steve. On the port, when do you expect those approvals to come through?
Steve Fewster
executiveYes. Most likely, it will happen at some point in the next calendar year. Approvals usually take a bit of time. We are having active discussions with the regulators. But realistically, I think it will be at some point in the next calendar year.
Operator
operatorThat’s great. Steve and David, many thanks, and thanks as well to all of you who joined us on the call today. With that, we’ll bring this session to a close.
Steve Fewster
executiveI appreciate that.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete BCI Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to BCI Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in BCI Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.