Big Digital Energy, Inc. (MIGI) Earnings Call Transcript & Summary

November 5, 2026

NASDAQ US Information Technology Software earnings 54 min

Earnings Call Speaker Segments

Samir Jain

executive
#1

Thanks, operator. Good afternoon, and we appreciate you joining Big Digital Energy's Third Quarter 2026 Earnings Call. With me today are Phil Stanley, our Chief Executive Officer, Cody Smith, our Chief Operating Officer, and Josh Kilgore, our Executive Chairman. Before we begin, please note that what we discuss on this call is accurate only as of today, November 5th, 2026, so time-sensitive information may no longer be valid whenever a future replay is heard or a transcript is read. A replay of today's call can be accessed via webcast on the company's website, www.bigdigital.energy, and instructions for accessing that replay will be provided in the company's earnings release. Comments during this call could contain forward-looking statements as defined under U.S. Federal Securities Laws. Those statements are based on what we currently expect and believe, and they carry risks and uncertainties that might make actual results, products, activities, or time frames turn out materially different. Sometimes forward-looking statements can be spotted by words like believe, expect, potential, should, plan, or similar terminology. Anything that isn't a statement of historical fact may count as a forward-looking statement; such statements represent the present views of Big Digital Energy's management and do not guarantee future performance. A variety of factors—among them the ones outlined in the company's SEC filings—could cause actual results to differ materially from what any forward-looking statements express or imply. Aside from where the law requires it, the company assumes no duty to update or revise forward-looking statements. Certain non-GAAP financial measures will be discussed on this call. Those measures should not be viewed as a replacement for GAAP results. Our earnings release and SEC filings contain a reconciliation to comparable GAAP measures; with that, I'll hand the call over to Phil Stanley, CEO of Big Digital Energy.

Phil Stanley

executive
#2

Thanks, Samir, and I appreciate all of you being with us today. In the prior quarter, we set out a plan for Big Digital. What this quarter is really about is execution. Our approach is simple: lock down powered sites, build them out, attract the appropriate customers and partners, and fund that expansion in a manner that delivers lasting value to shareholders. Through the third quarter, we kept advancing along that route. We moved our Hood County site forward to put a framework in place with Tensor IQ. We kept working alongside financing partners; we pushed engineering and development ahead, and we kept assessing further powered assets that might join the Big Digital platform; there is still plenty of work remaining, but I think the chance in front of the Big Digital team is getting clearer. Power is the crux of all of it. Demand for AI infrastructure is still robust. Yet at the same time, adding substantial new power to the grid is getting harder. Interconnection, permitting, grid reliability, and development readiness all count. Investors, too, are starting to grow more sophisticated regarding the gap between announced megawatts and executable megawatts; that difference matters to us. Having land by itself is not sufficient. A power request by itself is not sufficient. What we aim for is to guide assets through a clear sequence of controlled land, power, customers, financing, and eventually revenue. In this market, available power is turning into the scarcest input, and we think its value rises over time. Hyperscalers constructing conventional data centers are unable to wait three to five years for power, so a site energized today carries more value than one energized later. The grid is getting tighter. In its latest auction, PJM fell substantially short of its reliability requirements, and ERCOT keeps receiving large load interconnection applications. Each year that new power slips makes a megawatt we can deliver today worth more. Today the Big Digital portfolio holds 169 of those valuable megawatts. Beyond that, our affiliation with Six Thirty AI provides access to almost 600 additional ones. That is a sizable pipeline capable of serving as the backbone for years of development. Texas illustrates the point; it stays among the most attractive markets nationwide for AI infrastructure, yet the process for adding large loads to the ERCOT system is growing more difficult. We think that makes existing energized capacity, credible development pathways, and flexible power solutions more valuable, which brings us to Hood County. Right now the site holds roughly 17 MW of energized capacity, and we have a pathway to 111 MW there. This quarter our focus has been on shifting Hood County from a powered site toward a commercial AI infrastructure project. Toward that end, we signed a letter of intent with Texas Load House, our joint venture alongside 10NetZero and Tensor IQ. The framework envisions up to 17 MW of gross capacity and an initial deployment of almost 8,000 NVIDIA B300 GPUs. Our present phase one design calls for 6,336 GPUs. Our present planning assumptions aim for availability during Q3 of 2027. We're carrying out the plan we set forth for Hood County. During the prior quarter, we set out to lock down powered sites, push development forward, establish strategic partnerships, and fund growth in a responsible manner. In this quarter, the joint venture bought 30 acres at that site; we executed a letter of intent with Tensor IQ, and our engineering and development efforts continue to progress. On the basis of the indicative terms contained in the LOI and assuming full utilization, this arrangement could produce more than $550 million in aggregate powered lease-related revenue for Texas Load House across the initial 15-year term. Were both five-year extensions exercised under the same indicative economics, that number could approach roughly $1.1 billion across 25 years. The LOI is non-binding, and substantial work remains before definitive agreements are reached. The project requirements are finished and signed off, and the phase one design basis is finished and quoted. We're now transitioning into basis of design and schematic design, and we're finalizing our partners for general contracting, mechanical, electrical, and plumbing, and civil engineering; we're in active discussions with offtake for this site and expect to execute a lease prior to the close of the fourth quarter. As the Load House site advances, we're also actively assessing opportunities to bring further powered assets onto the Big Digital platform; we're assembling a portfolio of high-return assets, and we're drawing on the broad and substantial portfolio of powered assets accessible through our affiliation with Six Thirty AI. The Six Thirty AI development pipeline, which stands at just under 600 MW, provides us with unique access to opportunities that are hard to source in the public market. Not every discussion will turn into a transaction. Not every site will satisfy our standards. Yet we believe the pipeline is significant, and we're concentrating on the opportunities where power, economics, and execution can converge. Our strategy hasn't changed since the last call. What has changed is the distance we have traveled along it. Josh will now discuss the industry opportunity, our capital strategy, and the governance framework that underpins this growth. Josh?

Josh Kilgore

executive
#3

Thanks, Phil. The operating opportunity Phil described is a big one, but converting it into shareholder value requires discipline—and that discipline extends to which assets we pursue, how we deploy capital, which counterparties we work with, and the governance process around every material decision. I'll start with the wider industry backdrop. AI infrastructure demand continues to put tremendous strain on power availability, yet the market is increasingly separating capacity that exists from capacity that can realistically be built out. Interconnection queues have gotten longer. Utilities and regulators are taking a closer look at large-load projects. Permitting, transmission, generation, and community factors all influence the timing and economics of development. In our view, those obstacles increase what assets are worth when they bring together land under control, power that is live, and the ability to move straight into development. That is the part of the market where we compete. As Phil said, we aim to assemble a portfolio of powered land assets. We keep assessing further sites, among them possibilities with privately held assets that might be contributed into the Public Company. Any deal that is strategically and economically sound for Big Digital shareholders will get our consideration. Should an opportunity tied to an affiliated party come forward, we will be transparent and comply with all required governance procedures. Our focus on transparency and alignment with shareholders, which we covered last quarter, is meant to stay the same. Capital matters a great deal to our strategy as well. Building AI infrastructure takes a lot of capital. Should we be successful in growing this platform, substantial capital will be required. Whether we can raise capital is not the only issue. The real issue is whether we can structure that capital so that the value created at the project level flows to Big Digital shareholders. With that in mind, we are actively assessing a variety of financing alternatives, among them project-level debt, strategic and JV capital, customer-backed structures, and institutional capital. Our aim is to align capital with identifiable assets and identifiable returns. Corporate common equity is one financing tool, but it is far from the only option we have. Before we go further, keep in mind that management is still Big Digital's biggest stockholder. What matters to every Big Digital shareholder matters to us too. You can count on this: building long-term value for shareholders comes first for us. Now, on the balance sheet: we closed the third quarter with roughly $3.1 million in cash, versus $16.3 million as of June 30. The main reason cash went down is that Texas Load House bought the Hood County site for us, at a cost of about $10 million. In addition, the company lent $4.9 million to our JV partner so it could cover part of its capital contribution. That loan was fully repaid, right on schedule, in October 2026. On top of that, we've grown our Bitcoin holdings by cutting back on how much mined Bitcoin we sell. When the quarter closed, we were holding 20.8 Bitcoin valued at $1.7 million, up from 10.2 Bitcoin on December 31, 2025. Stockholders' equity stood at roughly $8.5 million as of September 30, versus $12.4 million on June 30. During the quarter, we made real progress aligning how we run the business with our strategic vision. And while legal costs remained elevated across the quarter as a whole, the run rate on legal expenses came down as the quarter progressed, if you set aside a one-time non-recurring charge. We expect that improving run rate to come through more clearly in the quarters to come. Overall, better operations have cut the company's cash burn substantially. During the first half of the year, we averaged $3.4 million per month in cash used by operating activities. That figure dropped to $850,000 per month in the third quarter, and the rate of improvement quickened by 50% from the beginning to the end of that quarter. Investors know that Nasdaq's rule calls for us to maintain stockholders' equity of no less than $5 million over the relevant monitoring period. At September 30, our stockholders' equity stood at roughly $8.5 million, which is the next quarterly measurement against that requirement. Maintaining compliance remains a key focus for us; alongside that, we kept addressing obligations inherited on the balance sheet and carried on streamlining the company's capital structure. Settling pending litigation is still among our highest priorities. Several of these matters are largely in the hands of the courts, especially where we feel our position is strong; even so, wherever an opportunity arises for amicable resolution or to walk away from some of these matters, we will definitely pursue it. We understand how much each legacy obligation matters, and we know that getting them settled quickly frees up management to put more time and capital toward the assets that can create value down the road. With that said, I'll turn things over to Cody, who will cover how we operated this quarter and the efforts now underway throughout our infrastructure. Cody?

Cody Smith

executive
#4

Thanks, Josh. Our operating priorities are the same as those we laid out last quarter: keep the infrastructure we already have productive, make the platform more efficient, and get our assets ready for higher-value AI and HPC opportunities. I'll begin with the third quarter operating results. In the quarter, Big Digital brought in total revenue of roughly $8.7 million, versus $6.2 million in the second quarter, which is a 41% increase; across our operating portfolio we have about 169 MW of current capacity, plus additional capacity in development. Our Pennsylvania infrastructure keeps giving us an operating base as we push the broader AI strategy forward. The Six Thirty AI arrangement lets us monetize capacity that would otherwise have sat underutilized. That agreement has produced roughly $1.5 million of revenue since the JMA came online. We still see Bitcoin mining as a bridge into the broader AI strategy. It gives us a way to monetize power today while keeping the ability to direct that power toward higher-value uses once those opportunities become available. At the same time, we're staying focused on operating efficiency. Since we took control of the company, we've reviewed vendor relationships, service agreements, staffing levels, and operating processes throughout the organization. That has led to several changes that will make Big Digital a leaner, more efficient company. Our goal is to reach break-even on a cash basis by year-end; this work matters because efficiency creates flexibility. Each dollar we take out of an unnecessary cost is a dollar that can go toward operations, development, or growth. The other major focus is getting Hood County ready for AI and HPC. The Tensor IQ framework gives us concrete technical requirements that development work can advance around. Our teams and partners are working on engineering, site design, power configuration, cooling, construction planning, interconnection, and behind-the-meter generation analysis. The contemplated initial deployment is designed for high-density GPU infrastructure and is expected to support both AI training and inference workloads. Under the current framework, the first phase contemplates direct liquid cooling, and the second phase contemplates immersion cooling. This is an important distinction in how we think about the business. Our objective isn't simply to accumulate megawatts; it's to turn those megawatts into infrastructure that can support compute, attract customers, and generate durable economic returns; that takes operational work long before a facility is ready for deployment; it takes engineering, procurement planning, construction sequencing, power design, and coordination with customers and financing partners. Those efforts are underway. Our existing operations give us a productive base and flexibility. The development work underway is meant to move the portfolio toward higher-value AI and HPC applications over time. With that, I'll turn it back to Phil.

Phil Stanley

executive
#5

Thanks, Cody. Let me wrap up by covering where things stand and what comes after this. During the prior quarter, we laid out for investors the direction we intended to take; in the quarter just reported, we started turning that direction into results. Hood County is transitioning from a powered asset into a commercial development project. Tensor IQ provides us with a structure through which we can capture the monetization of electrons. Our teams are pushing engineering and development forward, we are collaborating with financing partners, and we are in dialogue with customers and strategic partners. We keep assessing further powered assets as a way to grow the Big Digital portfolio. In our view, conditions in the industry make this effort more and more essential. Power is in short supply, development is hard to accomplish, and the market is starting to distinguish announced megawatts from megawatts that generate revenue; that is the arena in which we compete. Looking toward year-end and on into 2027, there are four areas I would ask investors to keep an eye on. First, deals. We are steering existing frameworks toward definitive agreements. Second, customers and partners. We are turning active discussions into commercial relationships. Third, capital. We are locking in the financing required to develop these projects while remaining disciplined about per-share value. And fourth, sites. We are adding more powered infrastructure to what Big Digital controls. That includes identifying ways to bring in some or all of the close to 600 MW at Six Thirty AI. None of these steps will be completed overnight, yet every one of them brings an asset nearer to revenue; we are accumulating concrete milestones, additional powered assets, further development progress, additional partnerships, more financing, and greater contracted revenue; in our view, Big Digital has an opportunity to build something significant; we have the team, we have an expanding foundation of powered infrastructure, and we have a clear roadmap for converting that infrastructure into a broader AI and HPC platform. Execution is our focus, and we are excited about what lies ahead. With that, let's move to questions.

Samir Jain

executive
#6

Thanks, Phil. Since the previous earnings call, we've kept hearing from shareholders, analysts, and other interested parties via email, social media, and direct conversations. That engagement means a lot to us. A number of subjects have come up repeatedly, among them the company's capital structure and potential dilution, liquidity and legacy obligations, the Hood County joint venture, Tensor IQ project financing, capacity, and the economics of our existing operations. Before we open the call to live questions, let's take those subjects first. All right, I'll direct the first question to you, Phil. Could you bring investors up to date on the Tensor IQ relationship, where a definitive agreement stands today, and what has to happen before Hood County can begin commercial deployment?

Phil Stanley

executive
#7

Thanks, Samir. The letter of intent we have with Tensor IQ provides the framework for negotiating definitive agreements, though it isn't a signed customer contract. Hood County's project requirements from the owner are finished and signed off, and the phase one design basis has been completed and quoted. At this point we're moving into full design: electrical and mechanical work is underway, and vendor quotes are in process. What remains ahead includes commercial terms, customer diligence, and credit support, along with completion of engineering, financing, our required approvals, and definitive documentation. Turning to offtake, we're in active discussions with prospective partners, and by the end of the fourth quarter we expect to execute a lease. Availability in the second quarter of 2027 is a planning assumption we treat as a target rather than a commitment.

Samir Jain

executive
#8

Thanks. I’ll aim this next question at Cody. Outside Hood County, how are you setting priorities across Midland, Bellefonte, and Corning? How much capacity is energized right now, and which sites are best positioned for AI and HPC development?

Cody Smith

executive
#9

Thanks, Samir. Across the portfolio we operate, energized capacity comes to roughly 169 MW at present. Our biggest location is Midland, Pennsylvania — 120 MW, located in the PJM market. In Pennsylvania, Bellefonte contributes 8 MW of self-mining capacity that works alongside Midland, with room to grow to 24 MW. Corning, Ohio, accounts for 24 MW. Since power that is available right now is the scarcest input in this market, we have ranked sites according to time to power. Every site carries its own interconnection, fiber, cooling, and retrofit needs, and we are addressing them one site at a time; beyond the portfolio we operate, Six Thirty AI holds close to 600 MW.

Samir Jain

executive
#10

All right, the next question comes from Josh. Could you lay out the real development plan for Hood County? We'd like to know how much of the current infrastructure is usable, what needs to be constructed, and how you plan to fund the project?

Josh Kilgore

executive
#11

Thanks, Samir. Development at Hood County is proceeding in stages. Roughly 17 MW of energized operational capacity exists at the site as of today. The following step involves extending utility service to around 111 MW, pending ERCOT validation. We are still evaluating the electrical source strategy, which includes the question of whether to employ behind-the-meter generation at the natural gas infrastructure already present at the site. The Tensor IQ framework defines the technical requirements. Phase one's planned deployment consists of high-density GPU infrastructure featuring warm water direct liquid cooling, built on a chiller-free dry cooler concept, while phase two calls for immersion cooling, both subject to final design and definitive agreements. Turning to financing, our approach is to draw on project-level financing, strategic partnerships, and customer-backed structures where appropriate.

Samir Jain

executive
#12

Thanks. Josh, over to Cody for the next question. Could you walk us through the economics behind the 10NetZero joint venture — what each partner is responsible for, what capital commitments lie ahead, and whether ownership might shift as Hood County gets developed?

Cody Smith

executive
#13

As of today, Hood County is owned via Texas Load House, LLC, which is a 50/50 joint venture formed in July with 10NetZero. To assist 10Net in funding its capital contributions for the acquisition, the company made a $4.9 million loan. In October, that loan was repaid in full and on time, along with interest, and 10NetZero lost no ownership. The joint venture's operating agreement establishes governance. During the period the loan remained outstanding, Big Digital served as the sole manager of Texas Load House. Per that agreement, after the loan was repaid in full, 10NetZero and Big Digital act as managers of the joint venture.

Samir Jain

executive
#14

Thanks, Cody. I’ll turn it back to Phil for the following question. You’ve talked about moving privately controlled powered assets into Big Digital. What kinds of opportunities are you putting first, and how will you make sure transactions with affiliated parties are fair to public shareholders?

Phil Stanley

executive
#15

Appreciate that, Samir. Our assets fall into three buckets: those owned by Big Digital, joint venture stakes such as Hood County, and opportunities under private control, which includes assets held by Six Thirty AI. Per our investor presentation, Six Thirty AI has a development pipeline totaling 584 MW. We favor sites where power, economics, and a believable route to AI or HPC usage come together. Any affiliated purchase would involve a third-party valuation, scrutiny from independent directors, and recusal of principals holding an interest in the target assets. That identical standard governed the Six Thirty AI transaction, which went through review by our independent audit committee. Such chances provide entry to powered infrastructure that is difficult to obtain in the public market, yet none of these opportunities justifies sacrificing governance.

Samir Jain

executive
#16

Thanks. I'll aim this next question at Josh. The revised proxy allows for authorization of as many as 600 million shares. What makes that degree of flexibility necessary, and in what way will management weigh possible acquisitions and financing against dilution for current shareholders?

Josh Kilgore

executive
#17

Thanks, Samir. To start, I want to remind our shareholders and investors that this management team takes a long-term view; when we make decisions, we're looking 20 years ahead. As of September 30, 2026, we had slightly fewer than 6.5 million common shares outstanding, with 90 million shares authorized. Under the Series D financing, we're required to set aside sufficient authorized shares for conversions and warrant exercises, and to obtain stockholder approval for an increase in authorized shares by no later than November 14, 2026. Keep in mind that authorization doesn't equal issuance. We'll reconcile the share count in our filings, covering ATM activity, the Series D financing, and securities issued under commercial agreements. Our aim is to fund growth wisely and safeguard long-term per-share value. Phil, Cody, and I hold roughly 31% of the company, so every shareholder has us experiencing dilution right alongside them. Becoming a larger platform will need room in the capital structure so others can participate. That flexibility lets us move when the right opportunity appears, instead of going back to shareholders at the wrong moment.

Samir Jain

executive
#18

Thanks, Josh. Cody, this question is for you. Regarding liquidity and the obligations the company inherited — including Celsius, W Capital, and Marshall — what progress has been made? Also, how should investors view the going concern disclosure as well as the Nasdaq equity requirements?

Cody Smith

executive
#19

Let me begin with the liquidity question, and after that I'll address obligations. As of September 30, 2026, cash stood at roughly $3.1 million, while stockholders' equity came in at about $8.5 million. For 12 months starting with the quarter that ended June 30, 2026, Nasdaq mandates a minimum of $5 million in stockholders' equity every quarter. The equity figure we reported on June 30 passed that initial test, and the approximately $8.5 million in equity at September 30 represents the following test. Legacy issues — among them the Marshall loan, the W Capital loan, and Celsius matters — continue in litigation, as outlined in our 10-Q. Until these are resolved, we won't characterize what their outcome will be. Management stays dedicated to fortifying the balance sheet as we carry out the operational transformation of the company.

Samir Jain

executive
#20

Alright, let's wrap up with this final question, which I'll aim at Phil. In what way does the Six Thirty AI deal add to Q3 revenue and cash flow, and how do you make the call on whether powered sites get allocated to Bitcoin mining or instead built out for AI and HPC?

Phil Stanley

executive
#21

Thanks, Samir. Since the miners began arriving in June 2026, the joint mining agreement with Six Thirty AI has brought in roughly $1.54 million in mining revenues along with $1 million in gross profit. Since this arrangement gives us contractual flexibility, we're able to maximize cash flows until our AI facilities are ready and then pivot away from mining quickly. As a reminder, under our deal with Six Thirty AI, Big Digital put in no capital, assumed no debt, and gets 100% of the cash generated through the arrangement. Under the JMA, Six Thirty receives payment solely in common stock and warrants, and it is aligned with all shareholders because the benefit Six Thirty derives from the JMA is driven directly by appreciation in the share price.

Samir Jain

executive
#22

Great. Thanks, Phil. Also, thanks, Josh and Cody. Let's open up the call to live questions. Operator, could you please open up the lines?

Kevin Dede

analyst
#23

Thank you. Hey, Josh, Phil. This is Kevin Dede from JonesTrading. I know I've talked with Josh, but I don't believe I've had a chance to speak with you, Phil. I have a few questions, so let me get started. In Granbury, Hood County, one of your competitors operates a data center, and they receive very strong negative pushback from local residents, so I'm curious how you might have handled community relations in Hood County.

Phil Stanley

executive
#24

Yes, we are engaged with local stakeholders. The site is situated in an industrial park that was previously zoned. Our neighbors nearby are at quite a considerable distance. Before we took over ownership, the site had an air permit that fell under the exemption. We believe that in the future, should there be an opportunity to bring behind-the-meter, we can collaborate with our stakeholders and third parties to try to reach a resolution on that air permit that benefits us. In addition, the site is configured for 17 MW to get processing online quite quickly. That exemption we have in place ought to let us scale fairly rapidly at that location, though we probably can't share much more than that given ongoing engagement with the community. But I'm glad to answer additional questions.

Kevin Dede

analyst
#25

Great, thanks. I've received them. That 111 MW target is going to need ERCOT review. My understanding is anything above 75 MW tends to raise a flag. With the political climate having shifted and Texas being a different color, how do you see things playing out through the regulatory bodies there?

Phil Stanley

executive
#26

I'd say it remains quite fluid here in Texas. All of us are living under a changed regime, so we'll have to watch how things develop; from a Big Digital standpoint at the PubCo level, we believe we have several other sites across other states. We're working to remain nimble, and we will do everything we can to stay on the good side of the political climate.

Kevin Dede

analyst
#27

Have you begun working with ERCOT to secure approval for going up to 111 MW? At what point are you in that procedure?

Phil Stanley

executive
#28

As for that procedure, 17 MW is what we currently have available. A load study we submitted has been approved, which takes us to 74 MW so we remain below the large load limit. The extra megawatts would come from behind-the-meter generation using the nat gas pipeline that sits on the property itself.

Kevin Dede

analyst
#29

Did you look into the technology for that? Would it be turbine, recip, or wind?

Phil Stanley

executive
#30

It would be a recip, and we're considering deploying several under the earlier air permit exemption.

Kevin Dede

analyst
#31

All right. So at this point the joint venture is set up between 10NetZero and Big Digital. Does that mean every part of it—deployment and earnings, from top to bottom—is divided 50/50?

Phil Stanley

executive
#32

Yes, Sir; that's exactly how it's divided.

Kevin Dede

analyst
#33

All right. 25,000 miners, 75 MW at Midland. What's the hash rate at that site, and how does it tie to the energy revenue you booked in September, which looked like it jumped well above historical norms?

Phil Stanley

executive
#34

Sure, could I hand this specific question over to Cody?

Cody Smith

executive
#35

Yeah, this is Cody Smith. Our self-mining, or hash rate tied to JMA, is a bit above one exahash at this point. Given the kind of machine we're running, that gives us some chances to curtail and to help out the local grid. We keep adding more load and more megawatts there every day.

Kevin Dede

analyst
#36

Did that curtailment drive the jump we saw in energy-related revenue during September?

Cody Smith

executive
#37

Yes. Yeah, that's sort of the opportunity in the PJM market — being able to work the markets, back up the grid, take some downtime when it makes sense, but also generate revenue to sort of re-enter the market.

Kevin Dede

analyst
#38

All right, I don't want to dominate the call, so let me get back in the queue.

Cody Smith

executive
#39

Thanks.

Bryan Baratian

analyst
#40

Hey, everyone. Appreciate you taking my questions. I've got two, and they're much wider in scope than that, and I'll build on what Kevin just asked. With the Democratic win in Texas, it does feel like I'm getting mixed signals — some folks aren't clear, they lack certainty about the TCEQ permitting, about what's coming. Will it be lifted, that permit pause? Does it get lifted once the audit is delivered on December 10th, or I guess December 17th? What have you all been hearing on the inside, and what should give us confidence about what's happening in Texas at the moment? What's your read on the political dynamics surrounding, I guess, the permit pause before Hinojosa takes office?

Phil Stanley

executive
#41

Yeah, the TCEQ board itself is typically constituted through appointments made by the governor. Several of those seats exist. Those seats, as I understand it, run for roughly six years. I believe one of those commissioners is set to roll off fairly soon, possibly as early as December, and Hinojosa will get a chance to appoint someone she picks herself. I believe it's really sort of a situation where we don't fully understand what that would look like, but the TCEQ board members still serving right now were appointed by Abbott during a more favorable timeframe.

Bryan Baratian

analyst
#42

Understood. All right. Yeah, it seems that even in a scorched-earth scenario, the final say would theoretically rest with the TCEQ board, and they're likely lining up with Governor Abbott, if that makes sense. One other question I had.

Phil Stanley

executive
#43

Yeah, and the count of board members appointed under Governor Abbott would be greater than under Hinojosa. So, in terms of a majority —

Bryan Baratian

analyst
#44

Right. Got it.

Phil Stanley

executive
#45

— standpoint.

Bryan Baratian

analyst
#46

All right, that’s clear. The second thing I’m wondering about is what we’ve noticed beyond the political noise from the past week, plus worries about building costs rising and construction costs rising and labor costs—or construction costs, I suppose, take in those. When we consider the financing market, how do you all view lenders’ willingness to provide financing? Conversely, how are you approaching pricing with this LOI? Is there a particular yield on cost or a spread between yield on cost and the cost of debt that you aim to keep? Are our customers such as Do Tensor IQ receptive to that? A bit of detail there would be helpful.

Phil Stanley

executive
#47

Josh, would you like to handle this one?

Josh Kilgore

executive
#48

Sure, I can address that, Phil. I'd say it's fairly clear in the market at the moment that the ability to secure financing has been significantly reduced over roughly the past 90 days, though we continue to see transactions close each week. The lenders we partner with are fairly consistent on this point: bring us a project with a signed lease that can be monetized, and we can get you there. For our team, and for what Big Digital is working on, we are carefully mindful about the wider financing marketplace; yet when you bring it down to a project-by-project level, a solid project that still holds merit can still obtain financing. We are engaging with banks on the street, and we are also engaging with banks in our local communities. There isn't only a single venue for shopping these deals. One more thing — I know most of the deals that come to market are multi-billion dollar, 300 MW to a gigawatt size projects. We have plenty of projects that sit well below that CapEx, and those are far more digestible. From a return standpoint, we aren't pursuing 13% yield on cost type deals. Many of the models we are working on today carry yields of 25%, 30%, 40% yield on cost. That comes down to the kind of location, the kind of clients we are targeting, all the way to the kind of build we are pursuing; we aren't only looking at the Tier III that everyone else has been building; we are really centered on modular solutions that fit perfectly across a number of our sites, and our customers are very eager to make use of them.

Bryan Baratian

analyst
#49

All right, thank you.

Kevin Dede

analyst
#50

My apologies, everyone. I said I'd be back, and here I am — threat fulfilled. You were just talking about modular builds. That's quite interesting given Riot's work with Anthropic down at Corsicana. If I recall, you specified a figure somewhere in the range of 6,300 to 7,700 GPUs. I'm curious whether that's the sort of modular build you have in mind for Hood County.

Josh Kilgore

executive
#51

Well —

Kevin Dede

analyst
#52

Yeah.

Josh Kilgore

executive
#53

Kevin, that initial Hood County build-out actually involves refitting a building that already exists. There's a really big industrial structure on hand. In fact, we have 2 of them there, along with an administrative office on the same site. So those GPUs are being engineered with that first building in mind. Its footprint comes to roughly 25,000 sq ft, with 40-ft clearance. My recollection is the concrete slab is 4+ ft thick at that location. So we plan to white box it; as for the additional developments on that property, we'll evaluate modular, powered shell, and/or Tier III.

Kevin Dede

analyst
#54

All right. I'm still a bit unclear about your GPU count. Somehow I got the figures mixed up, since I believed I might have heard 6,300, and from what I can tell it's 77 + in the press release.

Josh Kilgore

executive
#55

Yes. A few different figures have been circulating out there. I think it's sort of like a phase one and then something like a second phase two gap. The initial figure is somewhere between 6,300 to 6,400, and then there's what you could call an additional set that raises it by, let's say, roughly another 1,000 or so GPUs, and that's all part of that initial build-out.

Kevin Dede

analyst
#56

So do you actually have orders placed, and assurances that they'll be delivered?

Josh Kilgore

executive
#57

The partner we're working with on this project — the LOI we signed with Tensor IQ — has a direct working relationship with Dell, and since the middle of summer they've been lining up those GPUs and the racks. I'd say on those allocations we're well ahead of schedule.

Kevin Dede

analyst
#58

Can you take me through how you see Tensor IQ's business model working? Since my impression was that you were after a longer horizon — five. Sorry, the agreement is 25 years in total, fully executed, with two extensions, right? I suppose I'm just trying to clarify whether that covers only the 17 MW or the step up to 74. From a power standpoint, what does that LOI include?

Josh Kilgore

executive
#59

Yes. Good question. What we've signed initially in the LOI covers only the first 17 MW; that contract runs 15 years and comes with two five-year extensions. That's how the 25 is reached. Tensor would want to develop with us every megawatt we add at that site. Our stance is that we'll concentrate on this first 17, watch how the economics and timelines play out, and then, as more megawatts come online, provided the working economic relationship stays strong, we'll keep going down that road. Should there be some other reason to bring in a different operator for a phase two or phase three deal, we'll evaluate that when the time comes. As things stand, though, Tensor has been a pleasure to work with. They truly have a strong team.

Kevin Dede

analyst
#60

All right. There are two more questions, and after that I'll let you go. The first one concerns the constraints and the opportunity you have in absorbing the Six Thirty AI assets. What I'd simply like to understand is what needs to happen for you to be able to carry out that strategy on a tactical basis.

Josh Kilgore

executive
#61

Phil or Cody, I don't want to hog the mic here. Would you guys like to comment on it?

Phil Stanley

executive
#62

No, please continue. I believe the real response to what you're asking is that everything here depends on fairness opinions. Our independent board has more members than Cody, Josh, and myself combined. We hold a substantial quantity and value of private assets and megawatts that we believe could prove valuable down the road. Certain of those megawatts are easier to access at this early stage of the process than others. I'd also note that the board has brought in outside legal counsel, and whatever we might wish to pursue when it comes to bringing in privately held assets must go through a process — from a legal perspective — and beyond that, a special transaction committee would be formed to underwrite the economics of such a deal. I'm not fully certain whether that addressed everything you asked, but if there's a point A or point B you'd like me to elaborate on further, I'm glad to do so.

Kevin Dede

analyst
#63

That's really helpful, since from my vantage point it was basically a black box, so I appreciate that. Regarding the LOI you've signed, I know you mentioned a few of the items that still need to be crossed off before it's fully signed and executed, with delivery hopefully coming in Q2 of next year. I was wondering whether that agreement includes some kind of separation clause and penalty. And when do you think, to the best of your ability, it might actually be signed, sealed, and delivered?

Phil Stanley

executive
#64

Well, from a legal standpoint I'm not entirely certain how far we can go into the Ps and Qs of any breakup clause contemplated in the document itself. More broadly, we feel very strongly. We met the engineering team out there at the site in person, walked every inch of the site, and brought in additional outside field engineers to work with that team, and put together a really solid working plan for how we'd approach the development phase. I can say the vibe was very strong, and the total megawatts of that 17 that they're working toward is high. We think we'll have full deployment of that 17 MW. I'm hesitant to give you the exact percentage they gave me on site, but I can say that it's favorable.

Kevin Dede

analyst
#65

Alright then. Fine. Well, I'm eager to hear additional positive developments. Many thanks, sirs. I truly value that you took the time for each of my questions tonight.

Phil Stanley

executive
#66

Of course.

Josh Kilgore

executive
#67

Yeah. Thank you, Kevin.

Phil Stanley

executive
#68

They were good questions.

Rick Lutz

analyst
#69

Yes. I want to pose a question and offer a remark. Because over the last 24 hours, there's been plenty of chatter that any business holding HPC compute capabilities alongside access to power has been viewed as undervalued, since previously it was roughly around $1 million a megawatt before the AI pivot and CapEx, and that figure has been climbing owing to the fact that the moratoriums threatened following the midterms render access to capital even more valuable. I'd like your comment on that, and also whether or not it has affected the capacity to do financing. I understand it's only been 24 hours, so this is a short time frame, but has securing financing on more favorable terms become easier now that you're able to claim 160 MW of available power? If I could, I'd welcome your thoughts.

Josh Kilgore

executive
#70

Yes, Rick, that's a reasonable question. What I'd say is that everything has unfolded right here within the past few days, so we're operating in a very fluid environment, and nothing relevant has landed on my desk in the last 24 to 48 hours indicating better terms than what we saw in the weeks before. Turning to your wider question, the substantial volume of energized capacity we can bring online immediately is a real advantage for us. The market hasn't fully appreciated that yet, which is fine. On the financing side, though, when we don't have to sit through an interconnection queue schedule, the transactions we're currently pursuing become considerably more straightforward.

Rick Lutz

analyst
#71

Thank you.

Phil Stanley

executive
#72

Absolutely; it's a great question.

Josh Kilgore

executive
#73

I simply want to express my appreciation to everyone for being on our call today. Since we assumed control of the company on April 6 of this year, it truly has been an outstanding stretch. In my view, it was a fantastic quarter, and I'm very proud of the team for everything they did to steer this ship and get us headed the right way, and I'm genuinely excited about what the coming few quarters will deliver. I look forward to speaking with all of you once more. Have a wonderful day.

Operator

operator
#74

That wraps up our session for today, everyone. We appreciate each of you taking part. You’re free to leave the line now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Big Digital Energy, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Big Digital Energy, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Big Digital Energy, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.