Brookfield Renewable Corporation (BEPC) Earnings Call Transcript & Summary

November 5, 2025

New York Stock Exchange US Utilities Independent Power and Renewable Electricity Producers earnings

Earnings Call Speaker Segments

Connor Teskey

executive
#1

Thanks, operator. Hello, everyone, and I appreciate you being with us on this call for the third quarter of 2025. Prior to starting, we'd like to point out that you can find the news release as well as the investor supplement on our website. We'd also like to note that forward-looking statements might be made during this call; such statements carry known and unknown risks, and results in the future could vary materially. To learn more, we urge you to look over our regulatory filings, which are accessible through SEDAR, EDGAR and our website; during today's call, we'll go over how we performed in the third quarter, after which Jen Mazin, Co-President and General Counsel, will talk about the partnership between Westinghouse and the U.S. government that was announced recently and the ways we anticipate this partnership will help our business in the years ahead. Then, to wrap up our remarks, Patrick will cover our operating results along with our financial position. Once our comments are done, we're happy to take your questions. We turned in yet another strong quarter, with solid financial results and progress on our strategic initiatives throughout the business. FFO came to $302 million for the quarter, which works out to $0.46 per unit, a 10% increase compared with a year earlier, and we still anticipate hitting our target of 10% plus growth in FFO per unit for 2025. We made good headway on our commercial priorities, signing contracts that will add another 4,000 gigawatt hours per year of generation, and we keep moving forward on our growth initiatives, bringing 1,800 megawatts of new projects into service during the quarter. On top of that, we made strategic investments in critical technologies across our key markets to support both energy demand and grid reliability. Demand for power keeps accelerating in nearly every market where we operate. Three key themes we've discussed in recent quarters are behind this growth: ongoing electrification, reindustrialization throughout our operating regions and the extraordinary energy demand coming from hyperscalers. Hyperscalers keep increasing their CapEx spending on data centers to fuel the rapid expansion of cloud computing and artificial intelligence. And one thing that's clear to us is that the scale and pace of investment into AI is not slowing down. Meanwhile, offtakers are looking for long-term access to reliable and sustainable energy sources to power this growth. Given this, it's becoming increasingly evident that satisfying the surging demand for electricity will take an any-and-all solution, drawing on solar, wind, hydro, gas, nuclear and other technologies to ensure sufficient load and consistent delivery of electrons. Because of this demand and the any-and-all solution it requires, the opportunity to deploy capital has accelerated noticeably over the past few months and shows up in the pipeline of opportunities we're executing on today. Specifically, we're seeing growing opportunities in nuclear, where we are exceptionally well positioned to play a leading role in the sector's expansion in both the United States and globally, given our ownership of Westinghouse, the U.S. nuclear champion. Back in October, we made public a strategic partnership alongside the U.S. government, aiming to fulfill the goals for revitalizing the nuclear power industrial base laid out in President Trump's executive orders. Through this partnership, the U.S. government is going to back Westinghouse by, among other forms of support, putting together financing and placing orders for new Westinghouse nuclear power reactors that would be constructed inside the United States, carrying a total investment value of no less than $80 billion. Jen will go into greater detail on this transformational agreement in a moment; it establishes nuclear energy deployment as a foundational pillar of America's strategy for maintaining global leadership in artificial intelligence as well as advanced nuclear power technology, and it will produce a step change in nuclear power generation growth, helping to kickstart deployment at scale of new Westinghouse reactors across the U.S. and globally. Aside from that partnership with the U.S. government, during the past month Brookfield put its signature on a letter of intent to carry out 6 weeks of early-stage diligence regarding the possible development of two VC Summer nuclear reactors. Those reactors are Westinghouse AP1000s that had been partially constructed before development was paused in 2017. And although our diligence process remains at an early stage, the initial feedback we've received from potential partners and hyperscaler offtakers has been encouraging. Developing these reactors amounts to another growth opportunity for Westinghouse and potentially for Brookfield Renewable too, strengthening its standing as a leading supplier of scale electricity to utilities and hyperscalers in support of accelerating energy demand through nuclear power. That said, we will proceed only if the right downside protections and risk-adjusted returns are there for us. Another illustration of how rising demand from hyperscalers is affecting our business: these players are increasingly viewing our hydro capacity as a power source, attracted by its scale along with its baseload and clean characteristics. Whereas hyperscalers historically concentrated on contracting our wind and solar generation — and they keep doing so because of its low-cost additionality and speed-to-market advantages — the size of today's demand means a bigger opportunity has emerged to contract our hydro fleet with these offtakers; and since we are the largest private owners and operators of hydro assets in the United States, with roughly 5 terawatt hours of generation approaching recontracting, we are well positioned to capture that growing demand, which will both raise our cash flows through higher pricing and let us upfinance these assets, generating extra capital to deploy into growth. We've watched this unfold through the hydro framework agreement we signed in July with Google and the contracting of two facilities that followed right away. Then, more recently, we signed a new 20-year contract with Microsoft at another one of our hydro assets in PJM, as part of our renewable energy framework with that counterparty. We're also still assessing the chance to acquire hydros, which would be a good fit for our portfolio. During this quarter, we completed the additional investment in Isagen that we had announced earlier, boosting our ownership position in a top-tier hydro operation that offers excellent prospects for expansion. Battery storage represents yet another growth avenue for us, fueled by increasing power consumption, bigger peak demand and deeper adoption of renewables. Expenses keep falling, with a drop exceeding 50% over the last 12 months, and we're observing a meaningful rise in the number of counterparties ready to sign long-term capacity agreements, which is a crucial element of our lower-risk development model. In the quarter just ended, we moved our worldwide battery development plan forward, marked by bringing online a 340-megawatt battery in Australia, which together with this project's initial phase now stands as the biggest functioning battery installation in that nation. We keep identifying opportunities at scale to partner with governments and companies in delivering energy solutions that make use of battery storage; meanwhile, even as we put substantial capital to work in batteries and hydro while assessing additional investment in nuclear, our foundational wind and solar operation keeps expanding at a quickening rate thanks to its standing as the cheapest, quickest-to-deploy source of large-scale electricity in most key markets globally. At present, we hold a worldwide operating portfolio and development pipeline exceeding 200 gigawatts, which pairs with our battery, hydro and nuclear strengths and reinforces our role as the preferred partner for the biggest power purchasers who are seeking affordable, easily accessible power solutions. Indeed, we believe that offering baseload power alongside energy storage raises the worth of our wind and solar pipeline, since these technologies can work in tandem to satisfy customer requirements. These integrated strengths spanning renewable technologies, encompassing our baseload power offerings, our ties with the biggest technology firms and our capacity to access capital at scale let us move swiftly in conditions such as these, putting us in a good position to speed up our expansion across the coming several years. Consequently, our confidence in the growth potential of our business has never been greater. With that said, we'll now hand things over to Jen, who will provide more specifics on the partnership recently announced between Westinghouse and the U.S. government.

Jennifer Mazin

executive
#2

Thanks, Connor, and good morning to all of you. In October, as Connor noted, we unveiled a strategic partnership involving the U.S. government and Westinghouse, under which the U.S. government is going to place orders for new Westinghouse nuclear reactors constructed within the United States, with a total investment value of no less than $80 billion. This agreement backs the government's objective of getting 10 large-scale reactors with finalized designs into construction by 2030, and it brings the U.S. government together with Westinghouse's owners to sharply boost the worth of the business by creating a chance for profit sharing under certain circumstances. Westinghouse, which Cameco and we purchased in 2023, ranks among the top suppliers of mission-critical technology, services and products to the nuclear power sector. As the American nuclear champion, Westinghouse presently services more than 50% of the worldwide nuclear fleet. More than 2/3 of the nuclear reactors running across the globe come from Westinghouse Technology. Three primary business segments make up Westinghouse's operations. Currently, its operating plant services and nuclear fuel businesses combined produce approximately 85% of company earnings, powered by long-term contracts with a worldwide fleet of operating reactors; these segments deliver steady, infrastructure-like cash flows underpinned by Westinghouse's standing as the foremost nuclear service provider. As nuclear power expands around the world through increased usage, life extensions and new reactors, Westinghouse's core business of operating plant services and nuclear fuel will keep growing in step with the wider nuclear market. This leading position plus the stable, growing cash flows from those two businesses constitute the basis of our original investment thesis. Westinghouse additionally holds the intellectual property for the AP1000, the world's leading utility scale reactor, and for the AP300, its small modular reactor version. Via its third main business segment, the Energy Systems business, Westinghouse supplies design, engineering and procurement services for new nuclear power plants while taking on neither construction risk nor operating liabilities. Although we have always held strong conviction about the long-term role nuclear energy will play and about the potential of this Energy Systems segment, when we made the acquisition we attached only modest growth expectations to the Energy Systems business, mirroring the broader market conditions at that time. Since then, given factors such as heightened emphasis on energy security and the insatiable demand for baseload power to support data center build-out, global sentiment regarding new build nuclear has shifted considerably, as shown by new reactor builds announced chiefly in Europe plus restarts in the United States. And now the partnership with the U.S. government announced recently serves as a significant catalyst for Westinghouse's growth trajectory. Under this agreement, the U.S. government intends to put at least $80 billion into new build nuclear facilities in the United States that will rely on Westinghouse reactors. The U.S. government has also committed to supporting Westinghouse by, among other things, arranging financing, facilitating permits and the approvals needed to accommodate the near-term build-out of new nuclear plants in the United States. Westinghouse is going to keep carrying out the very same work it has done ever since we took ownership — that means design, engineering, and procurement services for these new build reactors. And after those plants are up and running, our expectation is that we'd supply fuel along with maintenance services across the entire operational lifetime of each of these new nuclear facilities, which averages somewhere between 60 and 80 years apiece. There are three principal ways this partnership generates substantial value for Westinghouse and Brookfield Renewable. Number one: as the reactors get built, an investment at this scale ought to drive meaningful earnings growth at Westinghouse over time. Number two: we anticipate those orders delivering long-term, recurring cash flows into the business, with Westinghouse providing fuel and maintenance across the reactors' operating lives once they're built. Number three, and this may matter most: an order of this size ought to serve as both a catalyst and a source of greater certainty for the sector, which should unlock investment in the supply chain for Westinghouse and for the nuclear industry at large, producing stronger confidence for future investment in new build reactors and reduced costs down the road as that supply chain scales up. An additional benefit here should be that Westinghouse can push its technology out further, in the U.S. and around the world, well past this first batch of reactors. It's interesting — even in the less than 2 weeks since the announcement, inbound interest for new build Westinghouse reactors has gone up. Another key point: the strategic partnership's terms put us in alignment with the U.S. government, creating considerable near-term value at Westinghouse while the business keeps its existing governance structure. Per our agreement, so long as the U.S. government reaches a final investment decision and signs definitive orders committing at least $80 billion toward building new Westinghouse nuclear reactors in the United States prior to January 2029, the U.S. government gets 20% of distributions from Westinghouse — though only once current shareholders have first collected $17.5 billion in distributions. To sum up, this partnership, together with the near-term buildout of new nuclear reactors, should deliver considerable value for Westinghouse over the long run via reactor construction, supply chain development that enables more global deployment, and the servicing and fuel contracts that come with it. Thanks to the nuclear fuel supply chain know-how of our co-owner Cameco, Westinghouse's leadership in mission-critical technology and services, and our capital access plus deep commercial ties to the biggest electricity buyers, the business sits in an exceptionally strong position to extend its sector leadership. This strategic partnership represents a strong beginning to what we see as a meaningful runway of growth for the business, putting Westinghouse in position to greatly surpass our original underwriting expectations and to deliver considerable value for our shareholders and stakeholders over the long term. With that, I'll hand things over to Patrick to cover our operating results and financial position.

Patrick Taylor

executive
#3

Appreciate that, Jen, and morning to all of you joining the call. The quarter came in strong for us, with funds from operations reaching $302 million, which works out to $0.46 per unit — a 10% gain compared with a year earlier. That was powered by contracted, inflation-linked cash flows coming off our varied worldwide operating fleet, along with commercial and operational execution, plus what we gained from recent M&A activity and project development. Once again our Hydroelectric segment turned in a robust quarter, producing FFO of $119 million, which is up more than 20% versus the prior year, helped by solid generation out of our Canadian and Colombian fleets, better pricing throughout our U.S. operations, and higher earnings from commercial and operational activities. What this segment's results show is rising appetite for scale baseload power, together with our capacity to lock in improved pricing under present conditions. A combined $177 million of FFO came from our wind and solar segments, lifted by what we picked up through the Neoen, Geronimo Power and U.K. offshore wind portfolio acquisitions we put money into last year. Those gains and our organic development were partly offset, however, by the effect of divesting wind assets in the U.S., Spain and Portugal since Q3 of last year. A solid quarter came from our distributed energy, storage and sustainable solutions segments as well, with FFO of $127 million, higher than a year ago. Driving those results were growth from the Neoen acquisition and strong performance at Westinghouse; let me now shift to our financial position. Over the quarter, we managed to put substantial capital to work in growth while keeping liquidity strong at $4.7 billion and preserving a sector-leading balance sheet, which reaffirms the BBB+ investment-grade rating we hold from three major rating agencies. Our franchise keeps standing apart because of our ability to access scale capital. With energy demand climbing and opportunities opening up for players holding the right blend of capabilities and development expertise, being able to access capital matters even more these days. We closed $7.7 billion of financings during the quarter, which pushed our total financings across just the last 12 months to $38 billion; that figure takes in $1.1 billion of upfinancings spread across the business in the third quarter by itself. At our Holtwood and Safe Harbor hydro assets we recently carried out upfinancings, coming after the first contracts under the framework agreement we signed with Google earlier in the year. We also finished an innovative upfinancing on our Smoky Mountain Hydro asset. Sized to investment grade, these financings drew robust investor interest and came in over 5x oversubscribed at the tightest spreads seen for financings of this kind in the past 5 years, which speaks to how strong the demand is to lend against our high-quality assets. As Connor said before, we also made headway this quarter on our commercial initiatives, putting pen to paper on contracts to deliver roughly 4,000 gigawatt hours per year. Among those is a 20-year contract signed with Microsoft at one of our hydro facilities in the U.S. PJM market. With that contract behind us, we anticipate completing another sizable upfinancing in the fourth quarter. Additionally, throughout the quarter, we stayed quite busy with capital recycling efforts, completing divestitures and executing contracts anticipated to bring in $2.8 billion, or $900 million net, to Brookfield Renewable. That encompasses finalizing a deal to divest an interest in a top North American distributed generation company, though we kept close to 50% of the development operation and its project pipeline, so we preserve participation in this platform's future expansion. We likewise divested a collection of stabilized operating properties inside one of our U.S. platforms — a move we foresee doing increasingly often as we expand our capital recycling skills across every business and keep adding long-life infrastructure assets into service, which right now enjoy exceptionally robust appetite from purchasers with cheap access to funding. We further finalized and completed divestitures of solar, wind, and battery properties in Australia that we picked up via Neoen earlier in the year. Following our purchase of Neoen, we've rolled out an asset recycling initiative and divested holdings totaling $1.1 billion in enterprise value within under 1 year of ownership. That's effectively climbing from a run rate of 0 prior to our buying the company. Looking forward, we foresee growing chances to put capital to work via M&A and inside our current operations. And amid these conditions, our strategy won't shift. We'll stay committed to keeping robust liquidity and capital availability, ensuring we're positioned to invest significant capital whenever attractive prospects emerge. To wrap up, we continue concentrating on achieving 12% to 15% long-term total returns for our investors while staying prudent in how we allocate capital; on behalf of the Board and management, we appreciate all our unitholders and shareholders for their continued backing. That wraps up our prepared comments for today's call. Thanks for being with us this morning. With that, I'll hand things back to the operator for questions.

Nelson Ng

analyst
#4

Just a quick one — in the U.S., it's clear there's improved visibility on tax credits, and that's a positive. That said, could you discuss whether permitting is speeding up at all, either at the state or federal level? Also, are any adjustments being made that would accelerate how quickly power gets deployed? I realize there's a lot of talk about power needs, but are other shifts happening?

Connor Teskey

executive
#5

Nelson, I appreciate the question. You're correct. The most significant factor that's been widely discussed in the U.S. is simply the growing need for power. As for whether things are progressing faster in practice, we'd describe it as incremental rather than dramatic, to be honest. Because of how large our platform is, that translates into us continuously moving substantial quantities of megawatts into operations. Still, the constraint on growth isn't money, isn't demand — it's execution at the ground level. One point worth emphasizing, and this holds true throughout the U.S. and, I'd add, in markets globally, is that every stakeholder group shows a very obvious determination to fix the problem, to speed up permitting, to fast track approvals. That determination exists. Limited progress so far, yet we're confident it can only improve going forward.

Nelson Ng

analyst
#6

Thanks. Then regarding data centers, clearly the U.S. is a major area of attention. Yet since your platform spans the globe, could you discuss which regions beyond the U.S. you're holding conversations about supplying extra power for data centers?

Connor Teskey

executive
#7

Offering you a simplistic response isn't something we'd want to do, though I'd say it's nearly everywhere; let's dig one level further into that. Without question, the biggest clustering of data center construction happens in the United States. After the United States, that would be Western Europe. So a rising volume of discussions is occurring there. Yet this reaches nearly every market across the globe; we're holding additional talks regarding power for data centers in Australia, in India, even in South America; so globally it's a highly consistent subject. But to add a size dimension on top of that, since the concentration of construction sits largely in the United States and afterward Western Europe, those are the places where we're conducting the highest count of such discussions. And perhaps to dig one level further into one item you mentioned, what's intriguing is that, without question, the greatest opportunity involves constructing data centers for hyperscalers, the biggest corporations worldwide. A second opportunity of quite substantial scale also exists, which involves constructing data centers for nations. Sovereign compute is an increasingly expanding source of demand and something we believe we're just as well positioned to back the same way we back corporate data center demand.

Sean Steuart

analyst
#8

Opening question directed at Connor or Jen: what timeline should we anticipate for the U.S. construction program tied to the Westinghouse deal? I'm simply attempting to estimate when that will start adding to FFO; and I suppose this comes up because the U.S. has rather aggressive schedules for such construction. In terms of the time frame, how does that stack up against what is normal for AP1000 reactors?

Connor Teskey

executive
#9

Absolutely, and thanks for raising that, Sean. Perhaps we should take a broader view first: what exactly is the U.S. government trying to accomplish in this area? Normally, extracting a nuclear reactor from the ground requires securing cooperation and support from a wide array of parties, which consumes a considerable stretch of time prior to launching development and construction. In essence, what the U.S. government has accomplished — with our partnership playing a significant role in the overall push — amounts to a commitment to stand behind all of it. Our aim is to break ground as fast as we possibly can. Permits will be expedited by us. Financing will be expedited by us. Access to federal lands will be expedited by us. So how soon will we witness these reactors entering development and construction? Practically right away. We anticipate the initial reactors, the earliest projects, will kick off their development phase, I'd estimate, within the coming quarter or two — nobody has paused for even a moment. From working to finalize the agreement, we shifted focus right away to figuring out how to get that first project moving. So we'd anticipate contributions stemming from this agreement fairly soon, since the moment that development phase kicks off, Westinghouse starts bringing in revenues. That said, let me provide some background on that. Within the Energy Systems division of Westinghouse that Jen outlined — the unit through which Westinghouse earns profits on newly built reactors — here's how to frame it: basically, across a reactor's life, three phases exist. During the initial 3 to 4 years, there's a development phase in which Westinghouse does bring in revenues and profits, though frankly, they're somewhat more limited. When the reactor enters construction, which we'd estimate happens around year 3, the Energy Systems division of Westinghouse enjoys a stretch of elevated profitability. That stretch runs anywhere from 3 to 6 years — the duration required to build the plant — and it's an extremely lucrative, high-margin window for Westinghouse. After that, the reactor comes online and Westinghouse receives what amounts to an 80-year near-annuity covering fuel supply, fuel fabrication and supply, plus operating plant maintenance and services contracts. So revenues from this contract — or rather, this partnership with the U.S. government — should commence within the next couple of quarters, but the real acceleration, I'd say, arrives in the 3- to 4-year time frame.

Sean Steuart

analyst
#10

The next thing I'd like to ask about concerns the Santee Cooper project along with its assets. Should Brookfield put money in straight away, what's the approach for offsetting basis risk tied to cost overruns, or to delays affecting those risks, at the BEP level?

Connor Teskey

executive
#11

Sure. So perhaps simply so that everybody understands, the fact that the U.S. Westinghouse partnership and the Santee Cooper announcement happened a day or 2 apart was completely coincidental. Those are distinct, separate processes and opportunities we're examining. And when it comes to Santee Cooper, we see a chance where Brookfield could be extremely well positioned. Clearly, building this facility began with Westinghouse Technology; therefore it must be completed with Westinghouse technology; so we're well positioned there; but then crucially, our capacity to deliver both capital and offtake to the project, in line with what we do throughout our wider business, set us apart and enabled us to reach preferred bidder status, which is where we stand today. As for us putting money into the actual build-out and ownership of nuclear reactors, we will only do that if we can obtain the right protections regarding cost overrun and key nuclear risks and produce the right risk-adjusted returns for this kind of activity; and so, if we go after an opportunity such as Santee Cooper, we would seek to structure our investment so we have suitable protections around those key risks, especially cost overrun risk; and that is definitely part of our current thinking regarding that opportunity.

Robert Hope

analyst
#12

To pick up where Sean left off, if we consider the next stage of nuclear expansion together with the U.S. government partnership, is it possible that Brookfield and BEP serve as a capital provider for that? And what sort of structure or safeguards would make you willing to act as a prospective purchaser of — let's phrase it this way — reactors that the U.S. government backstops?

Connor Teskey

executive
#13

Rob, I appreciate that. Let me split it into two pieces. In our view, Brookfield Renewable occupies a very strong position to take on a major and meaningful part in expanding nuclear power, in both the United States and globally. Several factors drive that, and I'll mention just a few. First, we hold Westinghouse. The worldwide nuclear leader belongs to us. As Jen said, 60% of reactors across the globe operate using Westinghouse technology. Today, Westinghouse already provides services to over half of the world's nuclear reactor fleet. We sit squarely within the flow of virtually every nuclear generation facility on the planet. Second, we have ties to the biggest offtakers and power consumers, plus the capacity to secure offtake for such projects, our access to capital and ability to potentially finance these build-outs, and then Brookfield's long-established record as a disciplined developer and constructor of large infrastructure and power projects. What we'd tell you now is that we are — we genuinely believe we're well positioned to chase opportunities in this area. Regarding our partnership with the U.S. government, as was said earlier, the U.S. government is basically adopting the stance that it will backstop everything so these projects can get underway. Still, we think that in time, such facilities likely do find a route to ending up with more natural owners, whether utilities or IPPs in the market. As for Brookfield's capacity to invest and obtain the safeguards we'd require to feel comfortable putting money into nuclear power, we can approach this in a number of ways. You can split cost overrun burdens with the offtakers, meaning they pay a higher PPA price if the facility overruns. You can split cost overrun burdens with the technology and construction suppliers. And you can also put together financing that delivers incremental liquidity should cost overruns occur. So those are the kinds of levers we're examining when asking whether we're comfortable investing in the construction and ownership of nuclear, again, making sure we'll only proceed if we believe we can secure the right safeguards; but given what the market is showing us, we do think considerable opportunities will exist for us in this area.

Robert Hope

analyst
#14

Okay, thanks for that. Now, shifting to the Microsoft Renewable Energy framework, could you explain what factors drove the decision to contract the existing hydro asset instead of constructing new wind and solar? And might we expect further hydro deals with Microsoft?

Connor Teskey

executive
#15

Sure. Our framework agreement with Microsoft, signed a couple of years back, always contemplated hydro being part of it. So this doesn't seem too out of the ordinary, and yes, additional hydro could certainly come into play down the road. What I think this really reflects is the wider trend we're witnessing in terms of demand for our hydro generation — whether through the hydro-focused framework agreement we have with Google, or the recent signing of a contract for a hydro facility in PJM directly with Microsoft. So hydro and other technologies were always part of our framework agreement, and we could definitely see more of it going forward.

Mark Jarvi

analyst
#16

Connor, you brought up the idea of the U.S. government providing a backstop for the new builds. Would that mean they'd be on the hook for every cost overrun? And given that this framework has now been identified, I'm wondering whether you've spoken with other parties — EPC firms, utilities, offtakers — to find out if they support this framework agreement so things can move forward?

Connor Teskey

executive
#17

I'd say we should break that into two separate pieces. When it comes to the partnership with the U.S. government, Westinghouse doesn't hold an ownership stake in those facilities. Our role is purely that of an engineering design and technology services provider. In effect, we supply the essential component for building out those facilities. Responsibility for cost overrun risk, along with the financing obligations tied to those facilities, rests completely with the U.S. government. That's how the facility is constructed. Down the road, if the U.S. government decides to bring partners into particular projects, might that open up opportunities? Possibly. But nothing of that sort has been talked about or settled so far. This only comes up in a case such as Santee Cooper — a live opportunity that falls outside our partnership structure with the U.S. government — where we're exploring options for spreading cost overruns around so we can obtain the protections we're after, which would make us feel secure enough to invest. On that front, when it comes to talks with construction companies, technology suppliers, off-takers, and financing providers, the response has been quite enthusiastic toward the notion of everyone sharing in order to lighten the load, while also generating a major growth opportunity for a broad group of market participants.

Mark Jarvi

analyst
#18

No, my point wasn't that you'd be the one carrying that exposure. It's more that other parties have shown reluctance about stepping in, since they don't want that risk landing on their shoulders. So I'm wondering whether the U.S. government has managed to clear away every worry for the other stakeholders that might be involved.

Connor Teskey

executive
#19

I don't think it falls to us to act as the voice of the U.S. government, though perhaps I can offer something a bit more useful. Given where we stand with Westinghouse, we're clearly at the center of much of the current conversation about new nuclear in the United States. And what we're seeing is that the tone coming from construction providers, technology providers, offtake providers, and even capital providers — among them the Department of Energy and the Loan Program Office of the U.S. government — has been highly constructive and positive toward the notion of taking part in building out new nuclear, with certain cost overrun protections shared across parties. And obviously, we — nothing has been signed, and these opportunities remain at an early stage, but the level of demand and the willingness among the stakeholders whose participation is required is extremely strong.

Mark Jarvi

analyst
#20

When it comes to progressing from that term sheet to an actual purchase agreement, might that be achievable by the time the year ends? Or does it look more like somewhere in the middle to later portion of the first quarter of 2026?

Connor Teskey

executive
#21

Just so I understand correctly, are you referring to the opportunity with the U.S. government, or...

Mark Jarvi

analyst
#22

Yeah, yeah, yeah, that government opportunity, absolutely.

Connor Teskey

executive
#23

Yeah, of course. So our expectation is that this wraps up inside 90 days from when it was signed — from the announcement that came 2 weeks back. So I suppose that puts us right at about year-end.

Mark Strouse

analyst
#24

Connor, I get that you're not going to talk as if you represent the U.S. government. Still, as much as you can tell us, do you believe the government's commitment is stronger when it comes to that $80 billion backstop? Or does their commitment lean more toward the 10 reactors? Really, I understand you aren't accepting the risk of overruns — likely the possible cost overruns. But say overruns happen: would the $80 billion stay more or less a set figure, with the result simply being that fewer reactors end up getting constructed?

Connor Teskey

executive
#25

Well, our agreement covers $80 billion in reactor contracts. Before any cost overruns, that's what the initial order would be. Still, perhaps stepping back — and once more, speaking for the U.S. government isn't our role. That said, I believe we can state confidently that this administration strongly wants to spur expansion of nuclear power generation along with the supply chain backing it within the United States. They aren't — I'd say with tremendous confidence that they aren't fixated on any particular count of reactors. Whether it's $80 billion, $82 billion, or $78 billion isn't what concerns them most. Their goal is for the U.S. to hold the top spot globally as a producer of nuclear power generation. And Natalie is going to drive construction of both a domestic supply chain and domestic nuclear power generation reactors, plus a quite substantial rise in exports of U.S. nuclear technology into other parts of the world. One point — and sorry for repeating myself — that with regard to our partnership with the U.S. government, we truly can't emphasize enough: absolutely, the $80 billion in reactor orders benefits Westinghouse greatly; that portion of the deal excites us; yet the real effect is to set the flywheel of nuclear power generation growth spinning, in the United States and globally. And we anticipate it will bring about development of a large number of reactors beyond this partnership with the U.S. government, with Westinghouse emerging as the top technology provider for those newly built reactors worldwide; and that spans Europe, that spans the globe, on top of the $80 billion of reactors from the U.S. government.

Mark Strouse

analyst
#26

Understood. Now, may I pose a second question? I value the points you made before regarding revenue across those 3 distinct phases. Could you explain what our approach should be to margins in each one, whether we look at EBITDA or FFO?

Connor Teskey

executive
#27

Of course. When it comes to Westinghouse, you should view it this way: its Energy Systems division generally runs at a minimum of a 20% margin while a facility is being developed and built. That figure can shift from one year to the next; however, across this facility's lifespan, the Energy Systems division has historically seen margins of roughly 20%, and given an order of this magnitude, we anticipate those margins will rise through economies of scale. Even so, in the past it has been around 20% margins, and going forward we would view that level as essentially the floor.

Baltej Sidhu

analyst
#28

Connor, has your view shifted at all when it comes to which projects in the U.S. development pipeline running through 2029 qualify for federal tax credits?

Connor Teskey

executive
#29

Sure — there are two main things to cover. Clearly, we now have more clarity on safe harboring; and, as I think we said on the last call, our whole U.S. development pipeline out to 2029 has been safe harbored. Our position there feels very solid. The other item is, of course, FEOC, and right now there isn't a great deal of additional clarity regarding the details of how FEOC gets defined. We keep watching; once those definitions come out, we do expect that if they turn out to be tighter, then just like other regulatory shifts, the benefit will probably go to big players like us, given our global supply chains, our centralized procurement functions and our ties with domestic U.S. suppliers. So here's our take: on safe harboring, we're in a great spot. And on FEOC, we're still waiting, and we'll respond as needed. But just like other regulatory shifts, we think it can be handled within our portfolio.

Baltej Sidhu

analyst
#30

Great. And regarding the asset rotation part of the business, given the power requirement together with the present policy and macro environment, what's your view on how valuations are trending in private markets versus public? And any detail you can provide on jurisdiction—no need for a breakdown—whether that's Europe and the rest of the world, would be excellent.

Connor Teskey

executive
#31

Thanks for asking; without any ambiguity, demand and valuations for recently constructed contracted high-quality operating cash-generative renewables assets are considerably greater in private markets compared to public markets at this moment. And we'd describe the demand for such assets as very robust. We think we may have stepped up what we do with capital recycling over the past year. My sense is that this is just the start. We are at the early stage of speeding up both the chances and the work of recycling capital so we can take advantage of that situation, for two reasons: first, our development skills keep growing, so each year we move more newly built projects through to COD; and second, across the wider market, buyers increasingly want to acquire these assets, and they will pay appealing prices. Obviously, during this quarter, we finished some asset recycling, particularly in the United States. With Neoen, we have carried this out worldwide. Based on the processes that are already underway, we can say with a lot of confidence that we anticipate notable asset recycling activity across North America, Western Europe, Australia, and India, likely within the coming 2 to 3 quarters. That is probably where most of our monetization activity is presently slated to occur.

Ben Pham

analyst
#32

I had a few additional questions regarding the strategy for deploying nuclear. Could you discuss, perhaps looking out over the next 5 years, what share of your business you expect nuke to represent? Might it become a new business line that you'd break out? And maybe tied to that — it could be somewhat of an odd question given what you mentioned. Are there any kind of internal constraints or ESG constraints limiting how large that exposure could become for renewable?

Connor Teskey

executive
#33

There are definitely no constraints, since throughout our broader business we direct capital toward wherever we find the best risk-adjusted returns. If that ends up being nuclear, then we could find ourselves putting too much of our overall allocation into it. Yes, nuclear certainly made a lot of headlines this quarter — saying that is an understatement, honestly. Even with all that, our main hydro operations are performing at what may be their strongest level ever, and the interest we're getting for contracts in that area is definitely the highest we've seen. Our wind and solar segment keeps speeding up as well. When we look at Brookfield's FFO right now, Westinghouse and nuclear account for roughly 5%, and we'd anticipate that share increasing as time goes on. There's still a lot of ground for it to cover prior to surpassing, say, our hydro FFO, which sits above 40%. So is it possible for nuclear to expand beyond where it stands today? Certainly. Even so, that expansion will occur alongside a business that's growing in practically every segment we're involved in.

Ben Pham

analyst
#34

All right, understood. Moving over now to the Santee possibility. Could you discuss — I realize you aim to reduce construction risk to the greatest extent possible; yet could you address at a broad level, specifically regarding the nuclear chance, how it aligns with the target return? Does it fall within that 12% to 15%? Or are you aiming higher than that? And in connection with that, what is your view regarding the synergies Westinghouse might bring on the services side when looking at total return?

Connor Teskey

executive
#35

Throughout Brookfield Renewable, our objective is 12% to 15% returns on a blended basis. Clearly, our long-term contracted operating assets sit probably toward the lower boundary or perhaps even beneath it. Whenever we undertake construction and development, including in solar, our objective is beyond 15% return. Thus, if we examine nuclear, we will definitely be substantially and clearly beyond our 12% to 15% return target for the business in that sector. So unquestionably greater returns compared with certain other asset classes we concentrate on; regarding Westinghouse and what it delivers for us, Westinghouse as a stand-alone business is exceptionally well positioned to take part in nuclear's growth through multiple avenues. Even when a reactor does not use Westinghouse technology, Westinghouse will probably gain from its Fuel Fabrication business and its operating Plant Services business, even when the technology isn't Westinghouse's. Therefore, any expansion of the Nuclear segment globally, Westinghouse gains from. Naturally, new builds of Westinghouse reactors are tremendously advantageous to Westinghouse, which explains why we're so enthusiastic about certain ongoing opportunities. And then third, extremely few individuals, perhaps none, possess the knowledge and experience of Westinghouse when evaluating new nuclear opportunities globally. We believe our ownership of Westinghouse delivers an undeniable competitive advantage and expertise whenever we evaluate new opportunities in this space. Yet, whenever we evaluate those opportunities, we would not combine Westinghouse's economics with the returns on capital we would anticipate generating as an owner and constructor of a new facility. Westinghouse would need to earn an appropriate margin on its services, and we would need to earn an appropriate return on capital; we would not merge those two things in order to justify a transaction.

Ben Pham

analyst
#36

Alright, understood. That matches my own read, I just needed confirmation. Perhaps one final item, then. I realize it's — nuclear is up 5% as of today, and there's still plenty of room ahead. But do you figure that, on a like-for-like dollar basis, when you consider this fresh batch of opportunities, it's arguably the top return available at the moment? Since it appears the yields exceed your objectives, and while comparable transactions are scarce, we do observe new exposure changing hands at roughly 20 to 30x EBITDA.

Connor Teskey

executive
#37

Just as we handle every segment of our operations, our mindset toward generating value is long term; and there's undoubtedly considerable enthusiasm surrounding nuclear across the globe; much of that strikes us as justified given rising need for clean, dispatchable baseload electricity, with nuclear being one of, perhaps the sole, scalable source of additional supply for that kind of power. That said, we will only deploy capital in places where returns look appealing to us. Naturally, we'll pursue chances in the market whenever we see strong pricing for our assets or companies. As of now, though, we view ourselves as being at the start of a build-out in nuclear generation spanning many decades, and luckily, thanks to owning Westinghouse and our newly formed partnership with the U.S. government, we believe we hold the leading spot in it. Our aim is to leverage that standing and generate long-term earnings expansion in our company over the coming years and decades. In our view, that represents the optimal path to producing enormous value for BEP down the road.

Connor Teskey

executive
#38

Thanks to each of you for being here on our Q3 earnings call, and for the backing and attention you keep giving Brookfield Renewable. We can't wait to talk with you once the next quarter wraps up, when we share our results for year-end 2025. Thanks again, and enjoy the rest of your day.

Operator

operator
#39

Everyone, we appreciate you joining in. That brings an end to the session for today, and you're free to log off at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Brookfield Renewable Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Brookfield Renewable Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Brookfield Renewable Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.