Thanks for joining Caledonia Mining's presentation of our Q1 2026 results. At this point I'll pass things along to our CEO, Mark Learmonth, so he can kick off the results presentation. Mark, the floor is yours.

Mark Learmonth

executive
#2

Thanks. Welcome to the presentation covering our results for Q1 2026. Could we go straight to the presenting team? I'm having trouble seeing the slides from here. Let's just go to the presenting team. As you already heard, my name is Mark Learmonth, and I serve as CEO of Caledonia. With me are Ross Jerrard, our CFO, and Victor Gapare, Executive Director. We aren't fully sure whether Craig Harvey can make it. We're dealing with some connection problems reaching Johannesburg, where he currently is. Craig might join us, or he might not. Also here is Maurice Mason, Vice President of Corporate Development and Investor Relations; that covers the team. Should we continue? All right. To give a brief overview, as announced earlier, gold output during the 1st quarter faced some difficulties. Blanket Mine produced roughly 14,700 ounces, and that stemmed entirely from the lower grades we mined in the quarter, as you'll see shortly. Even with that reduced output, our financial results remained solid, helped by a stronger gold price environment. Revenue rose 18%, reaching just above $66 million. Profit also came in higher. Profit after tax climbed almost 70%, to just under $19 million, and cash generation was very strong as well. Free cash flow in particular roughly tripled, going from $4 million to $12 million during the quarter. As one would anticipate when fewer ounces are produced, especially given the impact of lower grade, that weighed on cost per ounce. The all-in sustaining cost per ounce went up to $2,700. That said, it's important to note that our cost per ton came in right in line with what we expected. If the grade recovers, and I believe it can, as I'll demonstrate, those unit costs — cost per ounce — ought to return to normal levels. It's reasonable to say that, as you'll again see shortly, it's reasonable to say that following the quarter's end, through April and into May so far, output at Blanket has improved considerably, and Blanket is now performing as we anticipated. That covers Blanket. The Bilboes Gold Project is moving ahead very well. As you're aware, we released a feasibility study in late November of last year. In January of this year, we completed a highly successful convertible bond raise in New York, bringing in $150 million. We're now carrying on with the remainder of the funding strategy, and we're also advancing well with DRA on finalizing designs and actually pushing this project forward. Victor will cover that with us later. As you know, we've obtained some very encouraging deep-level exploration results at Blanket Mine. Hopefully Craig can join us and provide a bit more detail on that. That continues to support the long-term sustainability of Blanket Mine and reflects the confidence we hold in the resource. As is customary, Blanket — Caledonia, sorry — declared the usual dividend of $0.14 for the quarter; that will be paid shortly. Now, turning to another administrative matter: July Ndlovu, an extremely seasoned mining leader, came onto the board during November 2025. He was named Chairman at last week's AGM. All right, let's turn our attention now to the operating results, beginning with safety. Regarding safety, there isn't a great deal to report. It was an exceptionally strong quarter, with ratios improving. That genuinely mirrors the ongoing emphasis we place on preventing risk before it arises. It makes me very happy to note a meaningful rise in near-miss reporting, since that is among the primary tools we rely on to boost safety consciousness and to take proactive action on safety concerns prior to their turning into problems. Safety performance is strong, yet it obviously remains something we focus on heavily. There's no finishing point. Shall we proceed to the following slide? Here you have the standard pair of charts. Grade and tonnes appear in the upper one. Recovery and ounces appear in the lower one. From the upper chart, you'll notice tonnes have held steady at roughly 200,000 tonnes milled each quarter. The grade is visible there. Grade declined steadily starting in quarter two of last year, continuing through quarter three and quarter four, then dropping further in quarter one. That mirrors a matter we've previously made public — namely the impact of two falls of ground, which combined caused us to be shut out of fairly high-ton, high-grade zones that we depended on to preserve our production mix. The harm done by the grade is evident in the declining production pattern shown in the lower chart, where output dropped from quarter two last year into quarter three, quarter four, and once more in quarter one. As for the drop in recovery, that too mirrors the lower grade, since the tail grade we place on the tailings facility sits at roughly 0.2 grams a ton at its lowest. When the head grade — the feed grade — is reduced, recovery has a tendency to decline. Moving to the following page, you can observe with somewhat finer detail how grade progressed across December and through the quarter. Grade has clearly bounced back. In December 2025, it stood at 2.55 grams a ton, climbing to 2.6 in January, 2.7 in February, and 3 in March. Right now it's operating at roughly 2.9 grams a ton, which is essentially where we thought it would be during quarter two. As I've already explained, Blanket has now come back to the output level we had projected. Three remediation initiatives are already underway. The first involves our having appointed a contractor, who has begun work, to speed up access to higher grade zones. Those efforts will carry on through the rest of this year, and that brings us to a point where we ought to be in a leading position on the development side, which hands us far greater operational flexibility and resilience going forward. A contractor came on board. The next development is that we're putting in place a new shift arrangement, one that shifts the mine's operations from 6 days per week to 7 days per week. The main aim behind that revised shift structure is cutting down on worker fatigue, something we recognized as a serious issue. It will additionally deliver higher run-of-mine output on an annualized basis — 100,000 tons more each year — and in due course that will translate into more ounces produced; over the near term, the extra output will go onto the stockpile. After we've built a reasonable stockpile, from then on, further output will be processed; and in June and July, we anticipate commissioning one more ball mill, BM3, which lifts our total milling capacity by roughly 200 tons per day. Those represent the 3 initiatives under way to boost and tackle the problems encountered at Blanket. As you can see — well, you can't see it, but you will see it in the second quarter — performance at Blanket Mine has turned around, and that area holds a great deal of focus for us. That covers operations in brief. May I ask Ross to walk us through the financial results?

Ross Jerrard

executive
#3

Thanks, Mark. Hello, everyone, and good afternoon. I'm always glad to walk you through what we've reported. As Mark mentioned earlier, the story here was essentially a stronger gold price making up for a quarter of weaker output. At the top of the table, you can see how gold sold compares with gold produced. Some ounces — a larger share than before — are still sitting in bullion on hand, and that shifts the timing. On the whole, that average gold price shown in the table, $4,816 per ounce, was largely cancelled out by the reduced number of ounces produced and sold. What pleased us for the period was the absolute cost level. In dollar terms, you'll see on-mine costs and our all-in sustaining spend: $23 million, or just under $24 million, for on-mine costs, and $38 million for all-in sustaining costs. Those came in broadly in line with our budget and planned expenditures, rising 3% for on-mine costs and 9% for all-in sustaining costs. We felt good about those spend rates. The smaller denominator — ounces — weighed on our unit costs. Activity across the board was genuinely strong, and the teams' delivery made us happy. Naturally, the ounce profile hurt our unit costs. Coming out of the quarter, EBITDA rose 50% to just under $34 million, with cashflow arriving very strongly after capital expenditure, which again is in line. There are a few timing variations around the capital expenditure profile. We're very pleased with free cash flow of $12 million, which is 153% higher than the comparative quarter. Financially that's a very pleasing result, even though ounces declined, and overall earnings per share came in 78% above the comparative quarter. Let's go a bit deeper into our profit and loss. May I move to the next slide, please. You'll see how revenue came out and, you know, that better gold price we realized, giving us revenue of $66 million for the period. Our royalties are of course tied to that top line, so they rose as well, to $5.6 million for the period. Production costs matched expectations and were largely on track, as was depreciation. Gross profit stands at a touch over $32 million, a really pleasing outcome and nearly 20% higher. The main movements this quarter really center on our financial instruments, and I'll go a bit deeper into the accounting treatments for that; the net fair value gain on the financial instruments appears as a single line item, but several different elements sit behind it, which I'll get to shortly. Further down the chart, net finance cost is 200% higher, though that stems from the convertible senior loan notes and how those financial instruments are treated. Everything else was mostly as expected, and we finished the quarter with a profit of a little under $19 million, which we're very happy with. Let's go to the next slide, please, and we'll spend a bit more time on cash flows. Net cash from operating activities rose 41% during the period. We spent on capital expenditure as planned. There are some timing differences, but nothing worth reporting and no anomalies that stand out. Then there's the mix of investing and financing, which mainly related to our capped call options, our convertible, and the rollout of our financing program; some fixed-term deposits matured, and we used those against our put option instruments, and there were timing issues with various payments. With the $150 million convertible raise, part of those proceeds went to buy a capped call option. You'll see the $14 million outflow in our cash flow. Lower down, you'll see proceeds from the convertible notes arriving at $145 million. All in all, at the bottom of the page, we ended the period in a tremendous position with $161 million of closing cash and cash equivalents, which demonstrates that the entire financing strategy is truly coming together. If we move to the next slide, which covers liquidity, you'll see that. Along with our cash on hand of $170 million and those drawn bank facilities of $8.8 million, that brings us to the $161 million I just mentioned. Add bullion on hand, representing roughly 3,600 ounces, plus some gold sales receivables, and it all adds up to a very strong financial liquidity position in treasury that lets us proceed with our various capital allocation decisions and deployment of funds. The most exciting thing is clearly our continued development, or advancing our development, of the Bilboes project. Moving to the next slide, without going deep into the financial treatment of financial instruments, this is the first period where we've disclosed the treatment of the convertible notes and the related accounting. Since we don't produce a full set of financial statements that you'd otherwise see, and that will come in due course at the half year, we felt it was important to explain the accounting around the convertible and also the capped call options. To best illustrate that, we raised $150 million, which you can see on the left-hand side of the slide, which is the compound financial instrument of the senior loan notes. Under accounting standards, we have to split that into two elements. There's the host debt, and there's a derivative liability. Those two are accounted for and treated separately. One uses an amortized cost accounting treatment, while the derivative liability is fair value through profit and loss. The accounting implications are a bit different here. In the same way, regarding the second component, part of how that $150 million was deployed went to a capped call option, which gets accounted for separately, and is likewise measured at fair value through profit and loss. So there are two components and pieces when it comes to how this is accounted for and valued. Beneath the chart, you'll be able to see the different line items reflected in the primary statements included with this quarterly announcement. You'll notice that we carry a derivative asset — a non-current asset worth $14 million; in reality, that asset consists of both our capped call options and how they're treated, plus our hedging program as well. It's a mix of several derivative financial instruments. On the liabilities side, there's, clearly, the host debt sitting there, but there's also a derivative financial statement liability. The $97 million together with the $38 million make up that $135 million compound financial instrument for the bond. Likewise, when it comes to the financial statements on our income statement, you'll notice a net $4 million, or $3.9 million, which reflects a combination of several of these fair value adjustments that flow through, covering both our put options and the movements on the financial liabilities and the financial assets. I realize this is complex, and I hope it provides a bit more clarity regarding how it's accounted for. The complete financials, and I suppose much of the movement and detail, will be available at the half year with the June results. Let me pause here; financially it was a really strong quarter, despite the lower ounces. We're in a good position with our strategy, both in terms of internal cash generation and our overall funding position, which I'll discuss in more detail as we go through Bilboes. With that, I'll pass it over, and we'll walk through the Bilboes project. So perhaps Victor, if you could speak to Bilboes.

Victor Gapare

executive
#4

Thanks, Ross. Could we go on to the following slide? Alright. The information on this slide, and on the one after it, has in fact already been made public regarding the project. I'm not going to walk through it now, since it's out there already and has appeared in earlier presentations of ours. What I'll do instead is provide an update on our current position. As Mark mentioned, we've brought in DRA to serve as the EPCM contractor on this project. Right now, DRA and our team have locked down the project scope, and that lets DRA finish the detailed designs, which is usually called the front-end engineering design. Our hope is to wrap up those designs possibly between the close of the third quarter and the fourth quarter of this year, and that opens the door for us to order the long lead items near the end of the year — more precisely, during the fourth quarter of this year. Building on this project is set to run across 2027 and 2028, and we anticipate the first gold pour near the close of 2028. That's essentially our status; we're occupied with DRA; we're engaged with the different contractors.

Mark Learmonth

executive
#5

All right, thanks. Victor, I’m not sure whether we’ve lost your connection. May I ask — I believe Craig is with us now. Craig, are you on the line? I hope that’s the case.

Craig Harvey

executive
#6

I actually have managed.

Mark Learmonth

executive
#7

Good

Craig Harvey

executive
#8

to join us, but.

Mark Learmonth

executive
#9

Okay, good.

Craig Harvey

executive
#10

on a mobile.

Mark Learmonth

executive
#11

Alright, sounds good. If you wouldn't mind, could you just walk us through the… wait a moment. My apologies. Before we move on to Craig, I believe, Ross, you were about to share a few remarks regarding the funding approach for Bilboes?

Ross Jerrard

executive
#12

Thanks, Mark. Now, moving on to the following slide — actually, just one more, please.

Victor Gapare

executive
#13

Yeah. The next one. The next slide.

Mark Learmonth

executive
#14

Billy, next slide.

Ross Jerrard

executive
#15

Thank you.

Mark Learmonth

executive
#16

That's it. Thank you.

Ross Jerrard

executive
#17

Appreciate it, Mark Learmonth and Victor Gapare. I'll give you a brief update on where things stand with the funding approach for Bilboes — as we've shared before and talked about on earlier calls, our strategy rests on four funding pillars. Pillars one and two are now done. We already told you about the hedging program we've put in place, plus the $150 million convertible note raise. Both of those are finished, the money has landed in treasury, and it's ready to be put to work. The key point is that pillars three and four are moving ahead and tracking well. Pillar three covers the interim funding facility, and on that front we're collaborating with a group of banks from Zimbabwe and South Africa to assemble a $150 million facility. Our co-leader and arranger on this is Stanbic, alongside CBZ in Zimbabwe. The data room is up and running at full capacity. We're grinding through all the due diligence work, and we anticipate having this facility locked in by mid 2026, or July 2026 at the very latest. This facility will largely be structured around the cash flows from Blanket Mine. On the broader project finance facility, we're also making solid headway. We're engaged with several financial institutions on it. We recognize that getting to financial close will take somewhat more time. It should wrap up within roughly the next year. Across all these work streams, we've made good progress, and we're genuinely enthusiastic about where we stand and how we're positioned on funding for Bilboes. Moving to the next slide, you'll find an update on the structure I've described before; the best way to read it is by going through the chart from right to left. You'll notice the $590 million figure and how that $590 million breaks down, covering our capital cost as well as working capital and capitalized interest, adding up to the total spend we anticipate needing to deploy for Bilboes. Now looking at the two columns on the left-hand side, at our assumed $3,500 gold price per ounce and how we expect to cover that funding requirement; we currently hold cash on hand, as I mentioned earlier, of $161 million. At the upper end, we have projected net cash flow generated by our operations of $125 million. When it comes to senior debt and other facilities relative to what we're aiming for, the shortfall now stands at $304 million. If we shift that pricing assumption closer to $5,000 per ounce, which is what the middle column shows, you'll see the senior debt and other facility need essentially gets cut in half, dropping to $154 million. We're really encouraged by where we are with our financing strategy and how everything is coming together. In fact, we believe we're well-positioned to begin deploying funds and to keep the Bilboes project moving on time and according to schedule. Hopefully that provides you with a solid picture of where we stand on funding. At this point, I'll hand things over to Craig Harvey so he can discuss exploration.

Craig Harvey

executive
#18

Appreciate that, Ross. I'll walk everyone through what we've been up to at Blanket over these last two months. The opening slide here comes from the RNS we put out on 7 April; if you haven't come across it yet, essentially what it shows is, starting at 34 level, going down roughly 250 meters beneath 34 level. That gives you a sense of the scale involved here. This is really only within what we refer to as the BQR and Blanket ore bodies zone. A few of the main points, like I mentioned, we're cutting the continuation of those ore bodies roughly 250 meters beneath where we're currently working. Those colored blocks, if you can make them out, represent the different ore bodies; it's pretty hard to read since they sit stacked behind each other. That marks the boundary of the inferred mineral resources as they stand right now, dated 31 December. Anyone looking can see down at the bottom we've got some good warm colors, meaning better than 2, 3, 5 grams per ton, sitting underneath the inferred resource base that's already in the public domain. Encouraging points. As we drill, those ore bodies keep going at depth. If you flip to the next slide. This one tabulates some of the results you've already seen. One of the main points there. You'll notice the top four are labeled Blanket 7 under the ore body name; that was March, no, sorry, June 2025, when we released our prior drilling update for Blanket; we noted we'd cut a new ore body. That ore body is now called Blanket 7. The more we drill, the more we define, the more this area will expand. The main point is there is, well, you know, Blanket 7, in the drill holes we're seeing 40 meters wide. You know, any mining company that finds a 40-m wide ore body running between 3 and 4 g/t is going to be very pleased with that. Within that 40 m, we have the choice to be selective about what we do; we can narrow it down, and simply from the drilling assays, we can mine those at anywhere from 5 to 6 m wide, at anywhere from around 12 to 50 g/t; it won't be like that everywhere, but those are the sorts of results we actually get from Blanket. It's, you know, extremely, extremely important. The drilling program is progressing very nicely. We drilled a bit more than 10,300 m between the June 2025 and the April 7 press releases we've issued. Obviously we need to update our mineral resource estimate. That'll happen in 2026 and be reported and declared prior to the close of 2026. I think the bottom line is that at depth nothing has changed. If anything, things are improving a bit. You know, 40 meters wide, 4 grams a ton — I'd call that happy days. Let's move to the next slide, and I'll say a few words about Motapa, the surface exploration project sitting right next to Bilboes, which we were just discussing. Good news: the labs in Zimbabwe have finally been extremely busy. At last, every one of our repeat assays has come back, along with all the assays from the lab that we require. Our 2025 drilling program, our exploration program, is now closed out. With that done, we're aiming at early Q3 2026 for a maiden mineral resource estimate on the Motapa North sulfide mineralization; that reflects roughly $5 million of work carried out across 2023 and 2024 — what we've spent to date. As we move into 2026, we'll essentially do a rinse and repeat at Motapa North. There are also historic open pit oxides there that have been mined. Beneath those pits, there are clearly sulfides. We've completed some reconnaissance drilling there; we'll now formalize it, and drilling is underway right now, to do much the same as we did at Motapa North. On top of that, there are the Motapa oxides, which we're still evaluating. Quite interestingly, during 2025, some surface trenching east of Motapa South exposed mineralized horizons in the trenches. It appears we have yet another near — well, at-surface oxide potential target that we want to take a look at. I'd say Motapa is, yes, business as usual. It's progressing very well. We'll wrap up Q3 2026 with a maiden mineral resource estimate. With that, I'll pass it back to Mark to take us further.

Mark Learmonth

executive
#19

Thanks. Thanks, Craig. To wrap things up. I mean, this slide contains quite a bit of text, but essentially there are two things we're focused on right away. The first is getting Blanket Mine back into solid shape. Judging by what we've observed in April and May so far, it looks like we're moving in the right direction on that front. To add to what Craig has shared with us, you know, we're certain that Blanket has, you know, a lengthy future ahead of it. Something we're currently doing involves exploring methods to boost Blanket's resilience, so it can truly enjoy that extended lifespan and keep producing cash for us. Blanket is an urgent and immediate priority. Obviously the other one involves bringing Bilboes into production as fast as we can. Because, in this gold price climate, for an asset of such high quality, each month that passes represents money we didn't earn. We have strong motivation to complete Bilboes as swiftly as possible, with the goal of then continuing work on Motapa, which will subsequently support our potential for long-term growth. Those represent the three key matters: Blanket, Bilboes and Motapa. With that, a bit longer than we anticipated, I'll take questions. I'd like to apologize once more for some of the connectivity problems we've experienced during this call. I'm sorry about that. Ready for questions.

Maurice Mason

executive
#20

Mark and the team, I really appreciate the presentation you gave today. At this point, I'd like to invite anyone who has a question to put their hand up. Down at the bottom of the panel you have there, you'll find the raise hand button. Before we move on to questions, we'll pause for a moment so that people have a chance to raise their hands. Just hold on for one moment while we—all right. Our first question comes from Nick at Denham Capital. Nick, go ahead and unmute yourself, and then ask the team whatever you'd like to ask.

Mark Learmonth

executive
#21

Nick?

Maurice Mason

executive
#22

Nick, the floor is yours. Your mic is live now. I notice you've turned your mute off, so go right ahead with your question.

Mark Learmonth

executive
#23

No. Can't hear anything.

Maurice Mason

executive
#24

Sadly, Nick, right now you aren't coming through to us. I'd simply like to invite folks, if there's a question you'd like to pose, kindly lift your hand. Nick, we'll hold on to check if perhaps it's your mic configuration, located at the lower left portion of your speaker, on your screen. No, sadly at this moment we're unable to hear you, Nick.

Mark Learmonth

executive
#25

Oh.

Maurice Mason

executive
#26

Should anyone else have any additional inquiries, kindly lift your hand. Well, Mark, right now we have no more questions coming in. Regrettably, Nick can't be heard by us at this time; that's the situation. Would you like to wait a few more minutes, or perhaps a few more seconds, to check whether anybody else would like to pose a question?

Mark Learmonth

executive
#27

I mean, usually folks jump in right away when they've got something to ask, so.

Maurice Mason

executive
#28

I would agree.

Mark Learmonth

executive
#29

I'll assume that-

Maurice Mason

executive
#30

Maybe hand back to you for closing remarks, Mark.

Mark Learmonth

executive
#31

Yeah. All right. All right. So, I appreciate everyone joining. Like I mentioned, Q1 let us down on the production side. We got bailed out by the gold price, but like you've all heard, when it comes to the path ahead for both Blanket and Bilboes, I'm personally quite bullish. Let's leave Q1 in the rearview and keep going. Thanks to each of you for being here today. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Caledonia Mining Corporation Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Caledonia Mining Corporation Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Caledonia Mining Corporation Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.